ML100550630: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Decay Time TR 3.9.1 Watts Bar - Unit 2 3.9-1 Technical Requirements (developmental) A TR 3.9  REFUELING OPERATIONS
{{#Wiki_filter:Decay Time TR 3.9.1 TR 3.9 REFUELING OPERATIONS TR 3.9.1 Decay Time TR 3.9.1              The reactor shall be subcritical for > 100 hours.
APPLICABILITY:        During movement of irradiated fuel in the reactor vessel.
ACTIONS CONDITION                          REQUIRED ACTION                COMPLETION TIME A. Reactor subcritical for          A.1      Suspend all operations      Immediately
    < 100 hours.                              involving movement of irradiated fuel in the reactor vessel.
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE                                        FREQUENCY TSR 3.9.1.1        Verify the reactor has been subcritical for > 100 hours  Prior to movement of by confirming the date and time of subcriticality.        irradiated fuel in the reactor vessel Watts Bar - Unit 2                             3.9-1 Technical Requirements (developmental)                                                             A


TR 3.9.1 Decay Time
Communications TR 3.9.2 TR 3.9 REFUELING OPERATIONS TR 3.9.2 Communications TR 3.9.2              Direct communications shall be maintained between the control room and personnel at the refueling station.
APPLICABILITY:        During CORE ALTERATIONS.
ACTIONS CONDITION                          REQUIRED ACTION              COMPLETION TIME A. Direct communications          A.1       Suspend all CORE          Immediately between the control room                  ALTERATIONS.
and personnel at the refueling station cannot be maintained.
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY TSR 3.9.2.1        Demonstrate that direct communications between the      1 hour prior to the control room and personnel at the refueling station are start of CORE established.                                            ALTERATIONS AND Each 12 hours during CORE ALTERATIONS Watts Bar - Unit 2                            3.9-2 Technical Requirements (developmental)                                                        A


TR  3.9.1 The reactor shall be subcritical for
Refueling Machine TR 3.9.3 TR 3.9 REFUELING OPERATIONS TR 3.9.3 Refueling Machine TR 3.9.3             The Refueling Machine and Auxiliary Hoist shall be used for movement of fuel assemblies or drive shafts and shall be OPERABLE as follows:
> 100 hours.
 
APPLICABILITY: During movement of irradiated fuel in the reactor vessel.
 
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Reactor subcritical for
< 100 hours.
A.1 Suspend all operations involving movement of
 
irradiated fuel in the
 
reactor vessel.
Immediately
 
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR  3.9.1.1 Verify the reactor has been subcritical for
> 100 hours by confirming the date and time of subcriticality.
Prior to movement of
 
irradiated fuel in the
 
reactor vessel
 
Communications TR 3.9.2  Watts Bar - Unit 2 3.9-2 Technical Requirements  (developmental) A TR 3.9  REFUELING OPERATIONS
 
TR 3.9.2  Communications
 
TR  3.9.2 Direct communications shall be maintained between the control room and personnel at the refueling station.
 
APPLICABILITY: During CORE ALTERATIONS.
 
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Direct communications between the control room
 
and personnel at the
 
refueling station cannot be
 
maintained. A.1 Suspend all CORE ALTERATIONS.
Immediately
 
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR  3.9.2.1 Demonstrate that direct communications between the control room and personnel at the refueling station are established.
1 hour prior to the
 
start of CORE
 
ALTERATIONS AND Each 12 hours
 
during CORE
 
ALTERATIONS
 
Refueling Machine TR 3.9.3 Watts Bar - Unit 2 3.9-3 Technical Requirements  (developmental) A TR 3.9 REFUELING OPERATIONS  
 
TR 3.9.3 Refueling Machine  
 
TR 3.9.3 The Refueling Machine and Auxiliary Hoist shall be used for movement of fuel assemblies or drive shafts and shall be OPERABLE as follows:
: a. The Refueling Machine shall have a capacity of  3150 pounds, and two electrical overload cutoff limits of  2650 pounds and  2800 pounds, respectively.
: a. The Refueling Machine shall have a capacity of  3150 pounds, and two electrical overload cutoff limits of  2650 pounds and  2800 pounds, respectively.
: b. The Auxiliary Hoist shall have a capacity of  1200 pounds and a load indicator shall be used to indicate the lifting of loads > 1190 pounds.  
: b. The Auxiliary Hoist shall have a capacity of  1200 pounds and a load indicator shall be used to indicate the lifting of loads > 1190 pounds.
 
APPLICABILITY:       During movement of fuel assemblies or drive shafts within the reactor pressure vessel.
APPLICABILITY: During movement of fuel assemblies or drive shafts within the reactor pressure vessel.  
ACTIONS CONDITION                           REQUIRED ACTION                   COMPLETION TIME A. Refueling Machine               A.1       Suspend use of Refueling       Immediately inoperable.                                Machine from operations involving the movement of fuel assemblies within the reactor pressure vessel.
 
B. Auxiliary Hoist inoperable.     B.1       Suspend use of Auxiliary       Immediately Hoist from operations involving the movement of drive shafts within the reactor pressure vessel.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Refueling Machine inoperable. A.1 Suspend use of Refueling Machine from operations  
Watts Bar - Unit 2                             3.9-3 Technical Requirements (developmental)                                                               A
 
involving the movement  
 
of fuel assemblies within  
 
the reactor pressure vessel. Immediately B. Auxiliary Hoist inoperable. B.1 Suspend use of Auxiliary Hoist from operations  
 
involving the movement  
 
of drive shafts within the  
 
reactor pressure vessel.
Immediately Refueling Machine TR 3.9.3  Watts Bar - Unit 2 3.9-4 Technical Requirements  (developmental) A TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR  3.9.3.1 For each required Refueling Machine, perform a load test of  3150 pounds and demonstrate an automatic electrical load cutoff before the crane load is
> 2650 pounds. Demonstrate a second automatic
 
electrical load cutoff before the crane load is
> 2800 pounds. 18 months TSR  3.9.3.2 For each required Auxiliary Hoist and associated load indicator, perform a load test of  1200 pounds.
Within 100 hours prior to start of
 
movement of drive
 
shafts within the
 
reactor pressure vessel Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4  Watts Bar - Unit 2 3.9-5 Technical Requirements (developmental) A TR 3.9  REFUELING OPERATIONS
 
TR 3.9.4  Crane Travel - Spent Fuel Storage Pool Building
 
TR  3.9.4 Loads > 2059 pounds shall be prohibited from travel over fuel assemblies in the spent fuel pool.
 
APPLICABILITY: With fuel assemblies in the spent fuel pool.
----------------------------------------------NOTE----------------------------------------------
TR 3.0.3 is not applicable.
-----------------------------------------------------------------------------------------------------
 
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Technical Requirement not met. A.1 Place the crane load in a safe condition.
Immediately
 
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR  3.9.4.1 Demonstrate crane interlocks and physical stops which prevent crane travel over fuel assemblies to be
 
OPERABLE.
Within 7 days prior to
 
crane use AND At least once per
 
7 days thereafter


during crane  
Refueling Machine TR 3.9.3 TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE                                  FREQUENCY TSR 3.9.3.1        For each required Refueling Machine, perform a load  18 months test of  3150 pounds and demonstrate an automatic electrical load cutoff before the crane load is
                  > 2650 pounds. Demonstrate a second automatic electrical load cutoff before the crane load is
                  > 2800 pounds.
TSR 3.9.3.2        For each required Auxiliary Hoist and associated load Within 100 hours indicator, perform a load test of  1200 pounds.      prior to start of movement of drive shafts within the reactor pressure vessel Watts Bar - Unit 2                              3.9-4 Technical Requirements (developmental)                                                        A


operation}}
Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4 TR 3.9 REFUELING OPERATIONS TR 3.9.4 Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4            Loads > 2059 pounds shall be prohibited from travel over fuel assemblies in the spent fuel pool.
APPLICABILITY:      With fuel assemblies in the spent fuel pool.
                    ----------------------------------------------NOTE----------------------------------------------
TR 3.0.3 is not applicable.
                    -----------------------------------------------------------------------------------------------------
ACTIONS CONDITION                                REQUIRED ACTION                          COMPLETION TIME A. Technical Requirement not          A.1          Place the crane load in a              Immediately met.                                              safe condition.
TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                          FREQUENCY TSR 3.9.4.1        Demonstrate crane interlocks and physical stops                            Within 7 days prior to which prevent crane travel over fuel assemblies to be                      crane use OPERABLE.
AND At least once per 7 days thereafter during crane operation Watts Bar - Unit 2                                    3.9-5 Technical Requirements (developmental)                                                                                  A}}

Revision as of 21:34, 13 November 2019

Developmental Revision B - Technical Requirements Manual TR 3.9 - Refueling Operations
ML100550630
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/02/2010
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML100550630 (5)


Text

Decay Time TR 3.9.1 TR 3.9 REFUELING OPERATIONS TR 3.9.1 Decay Time TR 3.9.1 The reactor shall be subcritical for > 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />.

APPLICABILITY: During movement of irradiated fuel in the reactor vessel.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Reactor subcritical for A.1 Suspend all operations Immediately

< 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />. involving movement of irradiated fuel in the reactor vessel.

TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.1.1 Verify the reactor has been subcritical for > 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> Prior to movement of by confirming the date and time of subcriticality. irradiated fuel in the reactor vessel Watts Bar - Unit 2 3.9-1 Technical Requirements (developmental) A

Communications TR 3.9.2 TR 3.9 REFUELING OPERATIONS TR 3.9.2 Communications TR 3.9.2 Direct communications shall be maintained between the control room and personnel at the refueling station.

APPLICABILITY: During CORE ALTERATIONS.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Direct communications A.1 Suspend all CORE Immediately between the control room ALTERATIONS.

and personnel at the refueling station cannot be maintained.

TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.2.1 Demonstrate that direct communications between the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> prior to the control room and personnel at the refueling station are start of CORE established. ALTERATIONS AND Each 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during CORE ALTERATIONS Watts Bar - Unit 2 3.9-2 Technical Requirements (developmental) A

Refueling Machine TR 3.9.3 TR 3.9 REFUELING OPERATIONS TR 3.9.3 Refueling Machine TR 3.9.3 The Refueling Machine and Auxiliary Hoist shall be used for movement of fuel assemblies or drive shafts and shall be OPERABLE as follows:

a. The Refueling Machine shall have a capacity of 3150 pounds, and two electrical overload cutoff limits of 2650 pounds and 2800 pounds, respectively.
b. The Auxiliary Hoist shall have a capacity of 1200 pounds and a load indicator shall be used to indicate the lifting of loads > 1190 pounds.

APPLICABILITY: During movement of fuel assemblies or drive shafts within the reactor pressure vessel.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Refueling Machine A.1 Suspend use of Refueling Immediately inoperable. Machine from operations involving the movement of fuel assemblies within the reactor pressure vessel.

B. Auxiliary Hoist inoperable. B.1 Suspend use of Auxiliary Immediately Hoist from operations involving the movement of drive shafts within the reactor pressure vessel.

Watts Bar - Unit 2 3.9-3 Technical Requirements (developmental) A

Refueling Machine TR 3.9.3 TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.3.1 For each required Refueling Machine, perform a load 18 months test of 3150 pounds and demonstrate an automatic electrical load cutoff before the crane load is

> 2650 pounds. Demonstrate a second automatic electrical load cutoff before the crane load is

> 2800 pounds.

TSR 3.9.3.2 For each required Auxiliary Hoist and associated load Within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> indicator, perform a load test of 1200 pounds. prior to start of movement of drive shafts within the reactor pressure vessel Watts Bar - Unit 2 3.9-4 Technical Requirements (developmental) A

Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4 TR 3.9 REFUELING OPERATIONS TR 3.9.4 Crane Travel - Spent Fuel Storage Pool Building TR 3.9.4 Loads > 2059 pounds shall be prohibited from travel over fuel assemblies in the spent fuel pool.

APPLICABILITY: With fuel assemblies in the spent fuel pool.


NOTE----------------------------------------------

TR 3.0.3 is not applicable.


ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Technical Requirement not A.1 Place the crane load in a Immediately met. safe condition.

TECHNICAL SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.9.4.1 Demonstrate crane interlocks and physical stops Within 7 days prior to which prevent crane travel over fuel assemblies to be crane use OPERABLE.

AND At least once per 7 days thereafter during crane operation Watts Bar - Unit 2 3.9-5 Technical Requirements (developmental) A