ML102520157: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:HLT 0810 ES-201 Examination Security Agreement Form ES-201-3 1. Pre-Examination I
{{#Wiki_filter:__________
that I acqu i red specfalized about the NRC l i censing examinations scheduled fOfthe week{s) of 6/7-18/2010 as ottM date of my signature. I a.gree that I will not knowing l y d i vulge any information abou t these examinations t o a n y persons wtlo have not been authorized by the NRC chief exam i ner. I understand that I am not to instruct , evaluate , or provide pertormance feedback to th ose app li cants scheduled to be administered these l i censing examinations from this da t e until completion of exam i nation administration, except as speci fi cally noted below and authorized by the NRC (e.g., ac ti ng , as a simulaior booth operator or communicator is acceptable i f the indi vi dua l does not se l ec t the training content or pro'/idB direct or ind i rec t feedback).
ES-201                                   Examination Preparation Checklist                          Form ES-201-1 Facility:            0                  1 Fr                                    Date of Examination:
Furthermore, I am aware of the physical security measures and requirements (as documented in the facilit1 l icensee's procedures) and understand that violation of the conditions of this agreement may result in cancellaiion of the examinations and/or an enforcement action against me or the facilin' l i censee. l'i'l,II immediately report to iacility management or the NRC chief examiner any indications or suggestions that examination security m ay h ave IJeen comprom i sed. 2. Post-Examination To m e best of my knowledge , I did not dilJu l geto any unau ih orized persons any information conce mi ng th e NRC li censing examina ii Ofls administere d during the weekes) of 6/7-18/201Q From the date th at I entered i nto this security agreoolent until the comple ti on at exami n a iion administration , 1 did not instruct, evaluate, or provide pertomlance to those applicants who were administered these licens i ng examinations , except as specifically noted below and authorized by the NRC. PRINTED NAME JOB TITLE I RESPONSIBILITY SIGN.A.TURE (1)
Developed by: Written        - Facility        NRC   Li  II Operating  - FaciIityi  NRC    Li Target                                                                                                Chief Date*                                    Task Description (Reference)                             Examiners Initials
\"J\c Of'S
    -180          1. Examination administration date confirmed (Cia; C.2.a and b)
-. --.
    -120          2. NRC examiners and facility contact assigned (C.1.d; C.2.e)
e _. 0"''' :'
    -120          3. Facility contact briefed on security and other requirements (C.2.c)
.. .. t/;v:Pr U,,) IT f}
    -120        4. Corporate notification letter sent (C.2.d)
-u "'. +. S' ...... *veiv;sejr I.J yJ-1 r s V1.5W\ V N l "T l..soft.
[-90]        [5. Reference material due (C.1.e; C.3.c; Affachment 3)]
Oil)4'. 14. :IO lff? \?e'0.4-'v i2A(J 15;tPEftLc" (t<;4,;t[(&#xa3;A, lA0,4 r C'-I'&#xa3;rtv.f:s wt.
{-75}        6. Integrated examination outline(s) due, including Forms ES2-2, ES<3, ES-29 ES-3t-2, ES1-5, ES            V1s, ES-40)4/2 ES481-3, and 2
-( -U-<c) NOTES: ES-20'I, Page 27 of 28 HLT0810 ES-201 Examination Security Agreement Form ES-201-3 1. Pre-Examination I acknowledge that I have acquired specialized knowtedg e about the NRC licensing examinations scheduled for the week( s) of 6/7-18/2010 as of the date of my signature.
ES-4-1-4, as applicable (C.1.e and f; C.3.d)
I agree that I will not divUlge any Information aoou; these examinations to any persons who have not been authorized by the NRC chief examiner.
                                                                                                      -,)j
J understand that I am not to instruct, evaluate, or provide performance feedback to mose applicants scheduled to be administered these licensing examinations from this daie until completion of examination administration, except as speciiically noted below and authorized by the NRC (e.{I., .acting as a simulator booth operator or communicator is acceptable if the individual does not se l ec t the training content or provide direct or ind i rect feedback).
{-70}        {7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee (C.2.h; C.3.e)}
Furthermore
{-45}        8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form ES-201-3 updates), and reference materials due (C.1 .e, f, g and h; C.3.d)
., I am aware ot the physical security measures and requirements (as documented i n the facilitj l icensee's procedures) and understand that violation of the conditions of till is a{lreement may result i n cance ll a tion of the examinations and/or an enforcement action against me or the facility lictmsee. I immediately report to facility management o r the NRC chief exam i ner any indications or suggestions that examination security may have !Jeen compromised.
    -30          9. Preliminary license applications (NRC Form 398s) due (C.1 .1; C.2.g; ES-202)
: 2. Post-Examination To the best of my knO',vledge, I did not divulgefo any unauihorized persons any i nformation concerning th e N RC l i censing eY.amina tJ o n s admin i stered duling the week(s) of 6/7-18/201 Q From the date mat I entered i nto Iflis secu rit y agreement u n ti l the comple ti o n o f exami n a ti o n adm i n i stra u on, I did not i nstruct, evaluate, or provide performance feedlJacJ( to lhase applicants who were admin i ste r ed these licens i ng exami n ations, except as specifically noted be lo w and au th orized by the NRC j PR l N T ED NAME JOB TITLE I RESPONSIBILITY
                                                                                                      .\
.1. J'l' 0 .
t)7L      .ID
S U::!l s: V c-4J6vE SllliSvs.
    -14         10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202)
=. "
    -14        11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f)
S* te 4. -R-ebcc)(, .... /!)pr r:;;
    -14        12. Examinations reviewed with facility licensee (Cli; C.2.f and h; C.3.g)
...
      -7        13. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h)
5 . \:0: M.Otl.R,.\
      -7         14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204)
S '1"'ClO4-T aJ" 1)\ &#xa3;JiLt\)iZ p ..... -c i.' 6.  
      -7        15. Proctoring/written exam adminisation guidelines reviewed with facility licensee (C.3.k)
<.,-eg,.E, 0 13 _ _
    -7          16. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i)
*2-he,J (,. , 7. 0&;1-1% fI.Jal.,n eiPs d'; .JAJ.lblm o tJ I' _. 2-2'-1(/ ' --:: 10 . .-:To
* Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by case basis in coordination with the facility licensee.
____ _
[Applies only] {Does not apply} to examinations prepared by the NRC.
lhlS?i)
ES-201, Page 25 of 28
: 15. ;Oru) lIA/IJDa WW' o P s NOTES: ES-20*t, Page 27 of 28 HLT 0801                                  Administrative Topics Outline                                Form ES-301-1   Facility:
 
Browns Ferry NPP Date of Examination:
ES-201                                        Examination Outline Quality Checklist                                    Form ES-201-2 Facility:
6/7/2010 Examination Level
Date of Examination:
:          RO  Operating Test Number:
Item                                                        Task Description
1006  Administrative Topic (see Note)
: 1.       a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401.
Type Code
w R          b. Assess whether the outline was systematically and randomly prepared in accordance with I            Section D 1 of ES-401 and whether all KJA categories are appropriately sampled.
* Describe activity to be performed Conduct of Operations N 2.1.5 Evaluate Work Schedule against guidelines of SPP 1.5 Fatigue Management and Work Hour Limits (jpm551) Conduct of Operations N 2.1.36 Complete SRM operability surveillance and determine if acceptance criteria is met for core alterations. (jpm554) Equipment Control N 2.2.41 Determine the isolation boundary for PCS Head Tank Pump 2B (jpm561) Radiation Control P/M 2.3.12 Locked High Radiation Area Entry requirements (jpm548)  Emergency Plan NOTE:  All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
: c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.
* Type Codes & Criteria:
: d. Assess whether the justifications for deselected or rejected K/A statements are appropriate.
(C)ontrol Room (D)irect from bank (< 3 for ROs;
: 2.         a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, S              and major transients.
< 4 for SROs and RO retakes)
M          b. Assess whether there are enough scenario sets (and spares) to test the projected number u              and mix of applicants in accordance with the expected crew composition and rotation schedule
(N)ew or (M)odified from bank (> 1)  (P)revious 2 exams (< 1; randomly selected)
[              without compromising exam integrity, and ensure that each applicant can be tested using A              at least one new or significantly modified scenario, that no scenarios are duplicated T              from the applicants audit test(s), and that scenarios will not be repeated on subseo
: c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative R              and quantitative criteria specified on Form ES-301-4 and described in Appendix D.
: 3.      a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:
(1) the outline(s) contain(s) the required number of control room and in-plant tasks W                      distributed among the safety functions as specified on the form I              (2) task repetition from the last two NRC examinations is within the limits specified on the form T              (3) no tasks are duplicated from the applicants audit test(s)
(4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.
: b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:
(1) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations
: c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
: 4.       a. Assess whether plant-specific priorities (including ERA and IPE insights) are covered in the appropriate exam sections.
: b. Assess whether the 10 CFR 55.4 1/43 and 55.45 sampling is appropriate.
N        c. Ensure that K/A importance ratings (except for plant-specific priorities) are at least 2.5.
: d. Check for duplication and overlap among exam sections.
A        e. Check the entire exam for balance of coverage.
L
: f. Assess whether the exam fits the appropriate job level (RO or SRO).
: a. Author                                                                                                                      Date
:.
: b. Facility Reviewer (*)                     71      ti)  /
e 2 iefcicI
: c. NRC Chief Examiner            (#)    4 Ik                                            j.
d NRC Supervisor W!chi:f examin:
Note                        # Independent NRC reviewer initial items in Colu Not applicable for NRC-prepared examination outlines concurrence required.
ES-201, Page 26 of 28
 
HLT 0810 ES-201                                                              Examination Security Agreement                                            Form ES-201-3
: 1.        Pre-Examination I acknO'~~edge that I ha'~'e acquired specfalized knO'\';~edge about the NRC licensing examinations scheduled fOfthe week{s) of 6/7-18/2010 as ottM date of my signature. I a.gree that I will not knowingly divulge any information about these examinations to any persons wtlo have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide pertormance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting, as a simulaior booth operator or communicator is acceptable if the individual does not select the training content or pro'/idB direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facilit1 licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellaiion of the examinations and/or an enforcement action against me or the facilin' licensee. l'i'l,II immediately report to iacility management or the NRC chief examiner any indications or suggestions that examination security may have IJeen compromised.
: 2.        Post-Examination To me best of my knowledge, I did not dilJulgeto any unauihorized persons any information conceming the NRC licensing examinaiiOfls administered during the weekes) of 6/7-18/201Q From the date that I entered into this security agreoolent until the completion at examinaiion administration, 1did not instruct, evaluate, or provide pertomlance feedba~ to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.
PRINTED NAME              JOB TITLE I RESPONSIBILITY                    SIGN.A.TURE (1) d\l\ON'~ \"J\c ~~I)\l.1i:U                Of'S Sur~~,\J')\~I-l~t oJ\ fi~lt>;"~
    -. - - .                          "ReCLc.:to"R.,_D~o...-tn-c                  e _.    ~
~- ~I_()<:," ~                        0"'''        ~V'E"'.J;,.                ~.~
:' %1i<~J. h                        i}I~~~r-t/;v:Pr    .~.uv~lJY\
                                                                                .. _;~. . ~
U,,) IT      f} ~,:hctL
                                          - afu~.j.. ~lr u "'. +. S' ......*veiv;sejr
:rV'l6~'"
I.J yJ-1 r s ~'17""''l. V1.5W\
V N l "T    ~PAII l..soft.
iI~j+' Oil)4'. ~
: 14. :IOlff? \?e'0.4-'vi2A(J              vrV~ l~VVc:n.(A,< &#xa3;.:...("",.          ~~' \~ ~-2\D 15;tPEftLc" (t<;4,;t[(&#xa3;A,                  lA0,4 r C'-I'&#xa3;rtv.f:swt.            ~---B -(                                                          -U-<c)
NOTES:
ES-20'I, Page 27 of 28
 
HLT0810 ES-201                                                                        Examination Security Agreement                                  Form ES-201-3
: 1.        Pre-Examination I acknowledge that I have acquired specialized knowtedg e about the NRC licensing examinations scheduled for the week( s) of 6/7-18/2010 as of the date of my signature. I agree that I will not ~it1awingly divUlge any Information aoou; these examinations to any persons who have not been authorized by the NRC chief examiner. J understand that I am not to instruct, evaluate, or provide performance feedback to mose applicants scheduled to be administered these licensing examinations from this daie until completion of examination administration, except as speciiically noted below and authorized by the NRC (e.{I., .acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore., I am aware ot the physical security measures and requirements (as documented in the facilitj licensee's procedures) and understand that violation of the conditions of tillis a{lreement may result in cancellation of the examinations and/or an enforcement action against me or the facility lictmsee. I ~Vill immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have !Jeen compromised.
: 2.        Post-Examination To the best of my knO',vledge, I did not divulgefo any unauihorized persons any information concerning the NRC licensing eY.aminatJons administered duling the week(s) of 6/7-18/201 Q From the date mat I entered into Iflis security agreement until the completion of examination administrauon, I did not instruct, evaluate, or provide performance feedlJacJ( to lhase applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC PRlNTED NAME                JOB TITLE I RESPONSIBILITY
.1.
~.
j"
~~~?: 4J6vE J'l ' ~:S 0..1~~.\-
              <!2~e.r-4 . -R-ebcc)(,....    /!)pr r: ;;
S U::!l SllliSvs.
S*          te s: V c-
                                                                      =.
_---::;;;;:::;t<"~a=:::;i....,........_~rr=~
                                                                                      ~"'''{'I~
: 5.  .J~ \:0: M.Otl.R,.\
: 6. !iTJZ.!.4~c&iT        <.,-eg,.E, S
013 w~ aJ"
                                            '1"'ClO4-T                  1)\ &#xa3;JiLt\)iZ I)I~
_      _ c=~_~ ~"-"-~.
p .....
                                                                                                              *2-he,J z~ _ (,. ,
                                                                                                                                      .        - ci.'
: 7. 0&;1-1% fI.Jal.,n ~(\ '"                      eiPs                                                        ~()                                  d';
~ 2*~&#xa5;te~ ~1~                                          .JAJ.lblmotJ                    I'        _.        2-2'-1(/                        '    --::
: 10. .-:To ~ &#xa5;~            ...r~;-'.-.:"--_-=
Jb            i!P.~0'..,. ,,,--
: s. _ _ _ __
n:~h~S;'~                                          ~1-:-                              --~~
~!:iiiEA':1112M.:b
: 15.    ;Oru)      lIA/IJDa WW' lhlS?i) 1)E'''''~''r<.
Cu~~          o Ps                  ~.I.
V~~-:6-'
:77T~w7 NOTES:
ES-20*t, Page 27 of 28
 
HLT 0801                      Administrative Topics Outline                          Form ES-301-1 Facility:  Browns Ferry NPP                Date of Examination:    6/7/2010 Examination Level:      RO                  Operating Test Number:      1006 Administrative Topic      Type                    Describe activity to be performed Code *
(see Note)
Conduct of Operations      N      2.1.5 Evaluate Work Schedule against guidelines of SPP 1.5 Fatigue Management and Work Hour Limits (jpm551)
Conduct of Operations      N      2.1.36 Complete SRM operability surveillance and determine if acceptance criteria is met for core alterations. (jpm554)
Equipment Control          N      2.2.41 Determine the isolation boundary for PCS Head Tank Pump 2B (jpm561)
Radiation Control          P/M      2.3.12 Locked High Radiation Area Entry requirements (jpm548)
Emergency Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
* Type Codes & Criteria:      (C)ontrol Room (D)irect from bank (< 3 for ROs; < 4 for SROs and RO retakes)
(N)ew or (M)odified from bank (> 1)
(P)revious 2 exams (< 1; randomly selected)
(S)imulator
(S)imulator


HLT 0801                                 Administrative Topics Outline                               Form ES-301-1   1. Evaluate Work Schedule for compliance with new fatigue management guidelines New SPP 1.5 Fatigue Management and Work Hour Limits 2.1.5 Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc. Importance RO 2.9
HLT 0801                         Administrative Topics Outline                         Form ES-301-1
: 1. Evaluate Work Schedule for compliance with new fatigue management guidelines
* New
* SPP 1.5 Fatigue Management and Work Hour Limits
* 2.1.5 Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc. Importance RO 2.9
: 2. Complete SRM operability surveillance and determine if acceptance criteria is met for core alterations.
: 2. Complete SRM operability surveillance and determine if acceptance criteria is met for core alterations.
New 1-SR-3.3.1.2.4 Source Range Monitor System Count Rate and Signal to Noise Ratio Check 2.1.36 Knowledge of procedures and limitations involved in core alterations.         Importance RO 3.0
* New
: 3. Determine the isolation boundary for PCS Head Tank Pump 2B New Drawings 2
* 1-SR-3.3.1.2.4 Source Range Monitor System Count Rate and Signal to Noise Ratio Check
-47E814-1, 2-45E779-19, 2-47E610-71-1, 2-45E2750-4, and 2-47E751-3 and 5 2.2.41 Ability to obtain and interpret station electrical and mechanical drawings. Importance RO 3.5
* 2.1.36 Knowledge of procedures and limitations involved in core alterations.
: 4. Locked High Radiation Area Entry requirements Previous/Modified Handout JPM 548 RWP and Survey Map SPP 5.1 Radiological Controls 2.3.12 Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high
Importance RO 3.0
-radiation areas, aligning filters, etc. Importance RO 3.2
: 3. Determine the isolation boundary for PCS Head Tank Pump 2B
* New
* Drawings 2-47E814-1, 2-45E779-19, 2-47E610-71-1, 2-45E2750-4, and 2-47E751-3 and 5
* 2.2.41 Ability to obtain and interpret station electrical and mechanical drawings. Importance RO 3.5
: 4. Locked High Radiation Area Entry requirements
* Previous/Modified
* Handout JPM 548 RWP and Survey Map
* SPP 5.1 Radiological Controls
* 2.3.12 Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc. Importance RO 3.2


HLT 0801                                   Administrative Topics Outline                               Form ES-301-1   Facility:
HLT 0801                       Administrative Topics Outline                       Form ES-301-1 Facility:   Browns Ferry NPP                 Date of Examination:   6/7/2010 Examination Level:   SRO                   Operating Test Number:     1006 Administrative Topic       Type                     Describe activity to be performed Code *
Browns Ferry NPP Date of Examination:
(see Note)
6/7/2010 Examination Level
Conduct of Operations       N       2.1.5 Evaluate Work Schedule against guidelines of SPP 1.5 Fatigue Management and Work Hour Limits (jpm551sro)
:       SRO   Operating Test Number:
Conduct of Operations       N       2.1.18 NRC Event Notification due to Reactor Scram (jpm553)
1006 Administrative Topic (see Note)
Equipment Control           N       2.2.40 Controlling a containment penetration to meet the isolation requirements of TS 3.6.1.3 (jpm555)
Type Code
Radiation Control         P/M     2.3.12 Locked High Radiation Area Entry requirements (jpm548)
* Describe activity to be performed Conduct of Operations N 2.1.5 Evaluate Work Schedule against guidelines of SPP 1.5 Fatigue Management and Work Hour Limits (jpm551sro) Conduct of Operations N 2.1.18 NRC Event Notification due to Reactor Scram (jpm553) Equipment Control N 2.2.40 Controlling a containment penetration to meet the isolatio n requirements of TS 3.6.1.3 (jpm555) Radiation Control P/M 2.3.12 Locked High Radiation Area Entry requirements (jpm548) Emergency Plan N 2.4.44 Protective Action Recommendation Evaluation (jpm552) NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
Emergency Plan             N       2.4.44 Protective Action Recommendation Evaluation (jpm552)
* Type Codes & Criteria:
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
(C)ontrol Room (D)irect from bank (< 3 for ROs;  
* Type Codes & Criteria:       (C)ontrol Room (D)irect from bank (< 3 for ROs; < 4 for SROs and RO retakes)
< 4 for SROs and RO retakes)
(N)ew or (M)odified from bank (> 1)
(N)ew or (M)odified from bank (> 1) (P)revious 2 exams (< 1; randomly selected)
(P)revious 2 exams (< 1; randomly selected)
(S)imulator
(S)imulator


HLT 0801                                   Administrative Topics Outline                               Form ES-301-1   1. Evaluate Work Schedule for compliance with new fatigue management guidelines New SPP 1.5 Fatigue Management and Work Hour Limits 2.1.5 Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc. Importance SRO 3.9
HLT 0801                         Administrative Topics Outline                         Form ES-301-1
: 2. NRC Event Notification due to Reactor Scram New SPP 3.5 Regulatory Reporting Requirements 2.1.18 Ability to make accurate, clear, and concise logs, records, status boards and reports. Importance SRO 3.8
: 1. Evaluate Work Schedule for compliance with new fatigue management guidelines
: 3. Controlling a containment penetration to meet the isolation requirements of TS 3.6.1.3 New Technical Specification 3.6.1.3 Drawing 2-47E811-1 SPP 10.2 Clearance Procedure to Safely Control Energy 2.2.40 Ability to apply Technical Specifications for a system. Importance SRO 4.7
* New
: 4. Locked High Radiation Area Entry requirements Previous / Modified Handout JPM 548 RWP and Survey Map SPP 5.1 Radiological Controls 2.3.12 Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high
* SPP 1.5 Fatigue Management and Work Hour Limits
-radiation areas, aligning filters, etc. Importance SRO 3.7
* 2.1.5 Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc. Importance SRO 3.9
: 5. Protective Action Recommendation Evaluation New EPIP-1 and 5 Emergency Classification Procedure and General Emergency Completed Notification Handout 2.4.44 Knowledge of emergency plan protective action recommendations. Importance SRO 4.4
: 2. NRC Event Notification due to Reactor Scram
* New
* SPP 3.5 Regulatory Reporting Requirements
* 2.1.18 Ability to make accurate, clear, and concise logs, records, status boards and reports.
Importance SRO 3.8
: 3. Controlling a containment penetration to meet the isolation requirements of TS 3.6.1.3
* New
* Technical Specification 3.6.1.3
* Drawing 2-47E811-1
* SPP 10.2 Clearance Procedure to Safely Control Energy
* 2.2.40 Ability to apply Technical Specifications for a system. Importance SRO 4.7
: 4. Locked High Radiation Area Entry requirements
* Previous / Modified
* Handout JPM 548 RWP and Survey Map
* SPP 5.1 Radiological Controls
* 2.3.12 Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc. Importance SRO 3.7
: 5. Protective Action Recommendation Evaluation
* New
* EPIP-1 and 5 Emergency Classification Procedure and General Emergency
* Completed Notification Handout
* 2.4.44 Knowledge of emergency plan protective action recommendations. Importance SRO 4.4


ES-301 Control Room/In
ES-301                         Control Room/In-Plant Systems Outline                                 Form ES-301-2 Facility:     Browns Ferry NPP                           Date of Examination:         6/7/2010 Exam Level: RO                                           Operating Test No.:           1006
-Plant Systems Outline Form ES-301-2 Facility: Browns Ferry NPP Date of Examination:
                              @
6/7/2010 Exam Level
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
: RO       Operating Test No.:
Safety System / JPM Title                                 Type Code*
1006  Control Room Systems
Function
@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO
: a. Control Rod Exercise SR 3.1.3.2 (U2/U3)                                         M, A, S                   1
-U, including 1 ESF
: b. Place a 2nd/3rd RFPT in service (U2/U3)                                           N, S                    2
) System / JPM Title Type Code*
: c. Close MSIVs during Power Operation (U2/U3)                                       N, S                     3
Safety Function a. Control Rod Exercise SR 3.1.3.2 (U2/U3) M, A , S 1 b. Place a 2 nd/3 rdN, S  RFPT in service (U2/U3) 2 c. Close MSIV's during Power Operation (U2/U3) N, S 3 d. Loss of Shutdown Cooling (U2/U3) N, L, A , S 4 e. Returning an IRM to service from Bypass (U2/U3)
: d. Loss of Shutdown Cooling (U2/U3)                                               N, L, A, S                 4
N , L , S 7 f. Return DW CAM to service after isolation (U2/U3) N, S 9 g. Drywell sprays w/Fire Protection Unit 1 and 2 actions EN, N, C 5 h. Generator Synchronization and Load (U2/U3)
: e. Returning an IRM to service from Bypass (U2/U3)                                 N, L, S                   7
N, A, S 6 In-Plant Systems
: f. Return DW CAM to service after isolation (U2/U3)                                   N, S                   9
@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO
: g. Drywell sprays w/Fire Protection Unit 1 and 2 actions                         EN, N, C                   5
-U) i. Shutdown Unit 3 'A' DG at 4 KV Shutdown Board N, E, A 6 j. Suppression Pool Water Inventory Removal App 18 (U1) N, R, E 5 k. 0-SSI-2-1, ATTACHMENT 2 D , E , A 8 @ All RO and SRO
: h. Generator Synchronization and Load (U2/U3)                                       N, A, S                   6 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
-I control room (and in
: i. Shutdown Unit 3 A DG at 4 KV Shutdown Board                                   N, E, A                   6
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
: j. Suppression Pool Water Inventory Removal App 18 (U1)                           N, R, E                   5
* Type Codes Criteria for RO / SRO
: k. 0-SSI-2-1, ATTACHMENT 2                                                         D, E, A                   8
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
@           All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
* Type Codes                                     Criteria for RO / SRO-I / SRO-U (A)lternate path                                                                 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                               <9 / <8 / <4 (E)mergency or abnormal in-plant                                                 >1 / >1 / >1 (EN)gineered safety feature                                                           - / - / > 1 (control room system)
(P)revious 2 exams (R)CA (S)imulator 4-6  / 4-6  /  2-3  < 9  /  < 8  /  < 4 > 1  /  > 1  / > 1 -  /  -  /  > 1 (control room system)
(L)ow-Power / Shutdown                                                           >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A)                                     >2 / >2 / >1 (P)revious 2 exams                                                                < 3 / < 3 / < 2 (randomly selected)
> 1  /  > 1  /  > 1 > 2 /  > 2  /  > 1 < 3 / < 3 / < 2 (randomly selected)
(R)CA                                                                            >1 / >1 / >1 (S)imulator
> 1 / > 1 / > 1 HLT 0801 Control Room/In
-Plant Systems JPM Narrative Control Room Systems:
: a. Control Rod Exercise SR 3.1.3.
3 (80) Modified / Simulator / Alternate Path 3-SR 3.1.3.3 , Control Rod Test for Withdrawn Control Rods Rev. 2 8  3-AOI-85-5 Rod Drift In Rev 9 201002 Reactor Manual Control System A2.02  Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:  Rod Drift Alarm  IMPORTANCE:  RO 3.2  SRO 3.3
: b. Place RFPT 3C in Service (202)  New / Simulator  3-OI-3 Reactor Feedwater System Rev 79, Section 5.7 2 59001 Reactor Feedwater System A4.02  Ability to manually operate and/or monitor in the Control Room: Manually start/control a RFP/TDRFP IMPORTANCE:  RO 3.9 SRO 3.7  c. Close MSIV's during Power Operation (203)  N ew / Simulator  3-OI-1 Main Steam System Rev 29 Section 8.2 2 39001 Main and Reheat Steam System A4.0 1  Ability to manually operate and/or monitor in the control room:  MSIV's  IMPORTANCE:  RO 4.
2  SRO 4.0
: d. Loss of Shutdown Cooling (225)  N ew / L o w-Power / Simulator / Alternate Path 3-A OI-74-1 Loss of Shutdown Cooling Rev 17 3-ARP-9-3D Rev 27  295021 Loss of Shutdown Cooling AA1.02  Ability to operate and/or monitor the following as they apply to Loss of Shutdown Cooling:
RHR/shutdown cooling IMPORTANCE:  RO 3.5  SRO 3.5
: e. Returning an IRM to service from Bypass (207)  L ow-Powe r / Simulator / N ew  -OI-92 A IRM Rev 15 section 6.2 215003 IRM System A2.02  Ability to (a) predict the impacts of the following on the IRM System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:  IRM inop condition IMPORTANCE:  RO 3.5  SRO 3.7


HLT 0801 Control Room/In
HLT 0801             Control Room/In-Plant Systems JPM Narrative Control Room Systems:
-Plant Systems JPM Narrative
: a. Control Rod Exercise SR 3.1.3.3 (80)
: f. Return DW Cam to Service after isolation (208)  N ew / Simulator / Engineered Safety Feature 3-A OI-10 0-1 Reactor Scram Rev 5 1  step 37  2 72 000 Radiation Monitoring System A 2.10  Ability to (a) predict the impacts of the following on the Radiation Monitoring System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:  LOCA  IMPORTANCE:  RO 3.9  SRO 4.1  g. Spray the Drywell using Fire Protection Unit 1 and 2 CR actions (209)  New / Control Room
* Modified / Simulator / Alternate Path
/ Engineered Safety Feature 3-EOI Appendix 17 B RHR System Operation Drywell Sprays, Rev 5  295024 High Drywell Pressure
* 3-SR 3.1.3.3, Control Rod Test for Withdrawn Control Rods Rev. 28
: E A 1.11 Ability to operate and/or monitor the following as they apply to High Drywell Pressure
* 3-AOI-85-5 Rod Drift In Rev 9
:  Drywell Spray: Mark
* 201002 Reactor Manual Control System A2.02 Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Rod Drift Alarm IMPORTANCE: RO 3.2 SRO 3.3
-I&II  IMPORTANCE:
: b. Place RFPT 3C in Service (202)
RO 4.2  SRO 4.2  h. Generator Synchronization and Load (210)  New / Alternate Path
* New / Simulator
/ Simulator  3-OI-47 Turbine Generator System, Rev. 84, Section 5.5  3-A RP-9-7 B  3-XA-55-7B Rev 22 Window 32 26200 1 AC Electrical Distribution A4.04  Ability to manually operate and/or monitor in the control room
* 3-OI-3 Reactor Feedwater System Rev 79, Section 5.7
:  Synchronizing and paralleling of different AC Supplies IMPORTANCE:  RO 3.6  SRO 3.
* 259001 Reactor Feedwater System A4.02 Ability to manually operate and/or monitor in the Control Room: Manually start/control a RFP/TDRFP IMPORTANCE: RO 3.9 SRO 3.7
In-Plant Systems:
: c. Close MSIVs during Power Operation (203)
: i. Shutdown Unit 3 A DG from the 4KV Shutdown Board (21 1)  N ew / Emergency or Abnormal In
* New / Simulator
-Plant / Alternate Path 3-OI-82 , Standby Diesel Generator System, Rev.
* 3-OI-1 Main Steam System Rev 29 Section 8.2
88, Section 7.3 and 7.5  264000 Emergency Generators K4.07  Knowledge of Emergency Generators design features and/or interlocks for the following: Local operation and control IMPORTANCE:  RO 3.3  SRO 3.4 HLT 0801 Control Room/In
* 239001 Main and Reheat Steam System A4.01 Ability to manually operate and/or monitor in the control room: MSIVs IMPORTANCE: RO 4.2 SRO 4.0
-Plant Systems JPM Narrative
: d. Loss of Shutdown Cooling (225)
: j. Suppression Pool Water Inventory Removal 1
* New / Low-Power / Simulator / Alternate Path
-EOI-Appendix 18 (21 2)  N ew / RCA Entry /
* 3-AOI-74-1 Loss of Shutdown Cooling Rev 17
Emergency or Abnormal In
* 3-ARP-9-3D Rev 27
-Plant  1-EOI-Appendix 18, Rev. 0  2 95029 High Suppression Pool Water Level E K 2.0 1  Knowledge of the interrelations between High Suppression Pool Water Level and the following: RHR/LPCI IMPORTANCE:  RO 3.
* 295021 Loss of Shutdown Cooling AA1.02 Ability to operate and/or monitor the following as they apply to Loss of Shutdown Cooling: RHR/shutdown cooling IMPORTANCE: RO 3.5 SRO 3.5
0  SRO 3.3
: e. Returning an IRM to service from Bypass (207)
: k. 0-SSI-2-1, ATTACHMENT 2 (12 7)  Bank / Emergency or Abnormal In
* Low-Power / Simulator / New
-Plant / Alternate Path 0-SS I-2-1 Rev 7  6000 00 Plant Fire on Site AA2.16 Ability to determine and interpret the following as the apply to Plant Fire on Site: Vital equipment and control systems to be maintained and operated during a fire IMPORTANCE:  RO 3.
        * -OI-92A IRM Rev 15 section 6.2
0  SRO 3.5 ES-301 Control Room/In
* 215003 IRM System A2.02 Ability to (a) predict the impacts of the following on the IRM System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: IRM inop condition IMPORTANCE: RO 3.5 SRO 3.7
-Plant Systems Outline Form ES-301-2  Facility: Browns Ferry NPP Date of Examination:
6/7/2010 Exam Level
: S RO-I      Operating Test No.:
1006  Control Room Systems
@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO
-U, including 1 ESF
) System / JPM Title Type Code*
Safety Function a. Control Rod Exercise SR 3.1.3.2 (U2/U3)  M, A , S 1 b. Place a 2 nd/3 rdN, S  RFPT in service (U2/U3) 2 c. Close MSIV's during Power Operation (U2/U3) N, S 3 d. Loss of Shutdown Cooling (U2/U3) N, L, A , S 4 e. Returning an IRM to service from Bypass (U2/U3)
N , L, S 7    g. Drywell sprays w/Fire Protection Unit 1 and 2 actions EN, N, C 5 h. Generator Synchronization and Load (U2/U3)
N, A, S 6 In-Plant Systems
@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO
-U) i. Shutdown Unit 3 'A' DG at 4 KV Shutdown Board N, E, A 6 j. Suppression Pool Water Inventory Removal App 18 (U1)
N, R, E 5 k. 0-SSI-2-1, ATTACHMENT 2 D, E, A 8 @ All RO and SRO
-I control room (and in
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes Criteria for RO / SRO
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6  /  4-6  /  2-3  < 9  /  < 8  /  < 4 > 1  /  > 1  /  > 1 -  /  -  /  > 1 (control room system)
> 1  /  > 1  /  > 1 > 2  /  > 2  /  > 1 < 3  /  < 3  /  < 2  (randomly selected)
> 1  /  > 1  /  > 1 HLT 0801 Control Room/In
-Plant Systems JPM Narrative Control Room Systems:
: a. Control Rod Exercise SR 3.1.3.
3 (80)  Modified / Simulator / Alternate Path 3-SR 3.1.3.3 , Control Rod Test for Withdrawn Control Rods Rev. 2 8  3-AOI-85-5 Rod Drift In Rev 9 201002 Reactor Manual Control System A2.02 Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Rod Drift Alarm IMPORTANCE: RO 3.2 SRO 3.3
: b. Place RFPT 3C in Service (202)   New / Simulator 3-OI-3 Reactor Feedwater System Rev 79, Section 5.7 2 59001 Reactor Feedwater System A4.02 Ability to manually operate and/or monitor in the Control Room: Manually start/control a RFP/TDRFP IMPORTANCE: RO 3.9 SRO 3.7 c. Close MSIV's during Power Operation (203) N ew / Simulator 3-OI-1 Main Steam System Rev 29 Section 8.2 2 39001 Main and Reheat Steam System A4.0 1  Ability to manually operate and/or monitor in the control room: MSIV's  IMPORTANCE: RO 4.
2 SRO 4.0
: d. Loss of Shutdown Cooling (225) New / L ow-Power / Simulator / Alternate Path 3-A OI-74-1 Loss of Shutdown Cooling Rev 17 3-ARP-9-3D Rev 27 295021 Loss of Shutdown Cooling AA1.0 2  Ability to operate and/or monitor the following as they apply to Loss of Shutdown Cooling:
RHR/shutdown cooling IMPORTANCE: RO 3.5 SRO 3.5 e. Returning an IRM to service from Bypass (207) L ow-Power / Simulator / N ew  3-OI-92 A IRM Rev 15 section 6.2 215003 IRM System A2.02 Ability to (a) predict the impacts of the following on the IRM System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: IRM inop condition IMPORTANCE: RO 3.5 SRO 3.7


HLT 0801 Control Room/In
HLT 0801           Control Room/In-Plant Systems JPM Narrative
-Plant Systems JPM Narrative
: f. Return DW Cam to Service after isolation (208)
: g. Spray the Drywell using Fire Protection Unit 1 and 2 CR actions (209) N ew / Control Room
* New / Simulator / Engineered Safety Feature
/ Engineered Safety Feature 3-EOI Appendix 17B RHR System Operation Drywell Sprays, Rev 5 295024 High Drywell Pressure: E A1.11 Ability to operate and/or monitor the following as they apply to High Drywell Pressure
* 3-AOI-100-1 Reactor Scram Rev 51 step 37
: Drywell Spray: Mark
* 272000 Radiation Monitoring System A2.10 Ability to (a) predict the impacts of the following on the Radiation Monitoring System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: LOCA IMPORTANCE: RO 3.9 SRO 4.1
-I&II IMPORTANCE:
: g. Spray the Drywell using Fire Protection Unit 1 and 2 CR actions (209)
RO 4.2 SRO 4.2 h. Generator Synchronization and Load (210) New / Alternate Path
* New / Control Room / Engineered Safety Feature
/ Simulator 3-OI-47 Turbine Generator System, Rev. 84 , Section 5.5 3-A RP-9-7 B  3-XA-55-7B Rev 22 Window 32 26200 1 AC Electrical Distribution A4.04 Ability to manually operate and/or monitor in the control room
* 3-EOI Appendix 17B RHR System Operation Drywell Sprays, Rev 5
: Synchronizing and paralleling of different AC Supplies IMPORTANCE: RO 3.6 SRO 3.
* 295024 High Drywell Pressure: EA1.11 Ability to operate and/or monitor the following as they apply to High Drywell Pressure: Drywell Spray: Mark-I&II IMPORTANCE: RO 4.2 SRO 4.2
7  In-Plant Systems: i. Shutdown Unit 3 A DG from the 4KV Shutdown Board (21 1)  N ew / Emergency or Abnormal In
: h. Generator Synchronization and Load (210)
-Plant / Alternate Path 3-OI-82 , Standby Diesel Generator System, Rev.
* New / Alternate Path / Simulator
88, Section 7.3 and 7.5  264000 Emergency Generators K4.07  Knowledge of Emergency Generators design features and/or interlocks for the following: Local operation and control IMPORTANCE:  RO 3.3  SRO 3.4  j. Suppression Pool Water Inventory Removal 1
* 3-OI-47 Turbine Generator System, Rev. 84, Section 5.5
-EOI-Appendix 18 (21 2)  N ew / RCA Entry /
* 3-ARP-9-7B 3-XA-55-7B Rev 22 Window 32
Emergency or Abnormal In
* 262001 AC Electrical Distribution A4.04 Ability to manually operate and/or monitor in the control room: Synchronizing and paralleling of different AC Supplies IMPORTANCE: RO 3.6 SRO 3.7 In-Plant Systems:
-Plant  1-EOI-Appendix 18, Rev. 0  2 95029 High Suppression Pool Water Level E K 2.0 1  Knowledge of the interrelations between High Suppression Pool Water Level and the following: RHR/LPCI IMPORTANCE:  RO 3.
0  SRO 3.3
: k. 0-SSI-2-1, ATTACHMENT 2 (12 7)  Bank / Emergency or Abnormal In
-Plant / Alternate Path 0-SSI-2-1 Rev 7  6000 00 Plant Fire on Site AA2.16 Ability to determine and interpret the following as the apply to Plant Fire on Site: Vital equipment and control systems to be maintained and operated during a fire IMPORTANCE:  RO 3.
SRO 3.5 ES-301 Control Room/In
-Plant Systems Outline Form ES-301-2  Facility: Browns Ferry NPP Date of Examination:
6/7/2010 Exam Level
:  S RO-U      Operating Test No.:
1006  Control Room Systems
@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO
-U, including 1 ESF
) System / JPM Title Type Code*
Safety Function a. Control Rod Exercise SR 3.1.3.2 (U2/U3)  M, A , S 1      d. Loss of Shutdown Cooling (U2/U3) N, L, A, S 4    g. Drywell sprays w/Fire Protection Unit 1 and 2 actions EN, N, C 5      In-Plant Systems
@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO
-U) i. Shutdown Unit 3 'A' DG at 4 KV Shutdown Board N, E, A 6 k. 0-SSI-2-1, ATTACHMENT 2 D, E, A 8    @ All RO and SRO
-I control room (and in
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes Criteria for RO / SRO
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
-plant (EN)gineered safety feature (L)o w-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6  /  4-6  /  2-3  < 9  /  < 8  /  < 4 > 1  /  > 1  /  > 1 -  /  -  /  > 1 (control room system)
> 1  /  > 1  /  > 1 > 2  /  > 2  /  > 1 < 3  /  < 3  /  < 2  (randomly selected)
> 1  /  > 1  /  > 1 HLT 0801 Control Room/In
-Plant Systems JPM Narrative Control Room Systems:
: a. Control Rod Exercise SR 3.1.3.
3 (80)  Modified / Simulator / Alternate Path 3-SR 3.1.3.3 , Control Rod Test for Withdrawn Control Rods Rev. 2 8  3-AOI-85-5 Rod Drift In Rev 9 201002 Reactor Manual Control System A2.02  Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:  Rod Drift Alarm  IMPORTANCE:  RO 3.2  SRO 3.3
: d. Loss of Shutdown Cooling (225)  New / L ow-Power / Simulator / Alternate Path 3-A OI-74-1 Loss of Shutdown Cooling Rev 17 3-ARP-9-3D Rev 27  295021 Loss of Shutdown Cooling AA1.02  Ability to operate and/or monitor the following as they apply to Loss of Shutdown Cooling:
RHR/shutdown cooling IMPORTANCE:  RO 3.5  SRO 3.5  g. Spray the Drywell using Fire Protection Unit 1 and 2 CR actions (209)  New / Control Room
/ Engineered Safety Feature 3-EOI Appendix 17B RHR System Operation Drywell Sprays, Rev 5 295024 High Drywell Pressure: E A1.11 Ability to operate and/or monitor the following as they apply to High Drywell Pressure
:  Drywell Spray: Mark
-I&II  IMPORTANCE:
RO 4.2  SRO 4.2  In-Plant Systems:
: i. Shutdown Unit 3 A DG from the 4KV Shutdown Board (211)
: i. Shutdown Unit 3 A DG from the 4KV Shutdown Board (211)
N ew / Emergency or Abnormal In
* New / Emergency or Abnormal In-Plant / Alternate Path
-Plant / Alternate Path 3-OI-82, Standby Diesel Generator System, Rev. 88, Section 7.3 and 7.5 264000 Emergency Generators K4.07 Knowledge of Emergency Generators design features and/or interlocks for the following: Local operation and control IMPORTANCE: RO 3.3 SRO 3.4
* 3-OI-82, Standby Diesel Generator System, Rev. 88, Section 7.3 and 7.5
* 264000 Emergency Generators K4.07 Knowledge of Emergency Generators design features and/or interlocks for the following: Local operation and control IMPORTANCE:
RO 3.3 SRO 3.4


HLT 0801 Control Room/In
HLT 0801           Control Room/In-Plant Systems JPM Narrative
-Plant Systems JPM Narrative
: j. Suppression Pool Water Inventory Removal 1-EOI-Appendix 18 (212)
: k. 0-SSI-2-1, ATTACHMENT 2 (12 7) Bank / Emergency or Abnormal In
* New / RCA Entry / Emergency or Abnormal In-Plant
-Plant / Alternate Path 0-SSI-2-1 Rev 7 6000 00 Plant Fire on Site AA2.16 Ability to determine and interpret the following as the apply to Plant Fire on Site: Vital equipment and control systems to be maintained and operated during a fire IMPORTANCE: RO 3.
* 1-EOI-Appendix 18, Rev. 0
0 SRO 3.5 ES-301 Operating Test Quality Checklist Form ES-301-3 Facility:
* 295029 High Suppression Pool Water Level EK2.01 Knowledge of the interrelations between High Suppression Pool Water Level and the following: RHR/LPCI IMPORTANCE: RO 3.0 SRO 3.3
Browns Ferry Date of Examination:
: k. 0-SSI-2-1, ATTACHMENT 2 (127)
June 2010 Operating Test Number: 1006 a. b. c. d. e. 1. General Criteria The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution).
* Bank / Emergency or Abnormal In-Plant / Alternate Path
There is no day-to-day repetition between this and other operating tests to be administered during this examination.
* 0-SSI-2-1 Rev 7
The operating test shall not duplicate items from the applicants' audit test(s). (see Section D.1.a.) Overlap with the written examination and between different parts of the operating test is within acceptable limits. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level. 2. Walk-Through Criteria a. Each JPM includes the following, as applicable:
* 600000 Plant Fire on Site AA2.16 Ability to determine and interpret the following as the apply to Plant Fire on Site: Vital equipment and control systems to be maintained and operated during a fire IMPORTANCE: RO 3.0 SRO 3.5
: b.
 
ES-301                        Control Room/In-Plant Systems Outline                                  Form ES-301-2 Facility:    Browns Ferry NPP                          Date of Examination:          6/7/2010 Exam Level: SRO-I                                        Operating Test No.:          1006
                              @
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title                                Type Code*
Function
: a. Control Rod Exercise SR 3.1.3.2 (U2/U3)                                        M, A, S                    1
: b. Place a 2nd/3rd RFPT in service (U2/U3)                                          N, S                    2
: c. Close MSIVs during Power Operation (U2/U3)                                      N, S                    3
: d. Loss of Shutdown Cooling (U2/U3)                                              N, L, A, S                  4
: e. Returning an IRM to service from Bypass (U2/U3)                                  N, L, S                  7
: g. Drywell sprays w/Fire Protection Unit 1 and 2 actions                          EN, N, C                    5
: h. Generator Synchronization and Load (U2/U3)                                      N, A, S                  6 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. Shutdown Unit 3 A DG at 4 KV Shutdown Board                                    N, E, A                  6
: j. Suppression Pool Water Inventory Removal App 18 (U1)                            N, R, E                    5
: k. 0-SSI-2-1, ATTACHMENT 2                                                          D, E, A                  8
@          All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                    Criteria for RO / SRO-I / SRO-U (A)lternate path                                                                  4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                                <9 / <8 / <4 (E)mergency or abnormal in-plant                                                  >1 / >1 / >1 (EN)gineered safety feature                                                            - / - / > 1 (control room system)
(L)ow-Power / Shutdown                                                            >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A)                                      >2 / >2 / >1 (P)revious 2 exams                                                                < 3 / < 3 / < 2 (randomly selected)
(R)CA                                                                            >1 / >1 / >1 (S)imulator
 
HLT 0801            Control Room/In-Plant Systems JPM Narrative Control Room Systems:
: a. Control Rod Exercise SR 3.1.3.3 (80)
* Modified / Simulator / Alternate Path
* 3-SR 3.1.3.3, Control Rod Test for Withdrawn Control Rods Rev. 28
* 3-AOI-85-5 Rod Drift In Rev 9
* 201002 Reactor Manual Control System A2.02 Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Rod Drift Alarm IMPORTANCE: RO 3.2 SRO 3.3
: b. Place RFPT 3C in Service (202)
* New / Simulator
* 3-OI-3 Reactor Feedwater System Rev 79, Section 5.7
* 259001 Reactor Feedwater System A4.02 Ability to manually operate and/or monitor in the Control Room: Manually start/control a RFP/TDRFP IMPORTANCE: RO 3.9 SRO 3.7
: c. Close MSIVs during Power Operation (203)
* New / Simulator
* 3-OI-1 Main Steam System Rev 29 Section 8.2
* 239001 Main and Reheat Steam System A4.01 Ability to manually operate and/or monitor in the control room: MSIVs IMPORTANCE: RO 4.2 SRO 4.0
: d. Loss of Shutdown Cooling (225)
* New / Low-Power / Simulator / Alternate Path
* 3-AOI-74-1 Loss of Shutdown Cooling Rev 17
* 3-ARP-9-3D Rev 27
* 295021 Loss of Shutdown Cooling AA1.02 Ability to operate and/or monitor the following as they apply to Loss of Shutdown Cooling: RHR/shutdown cooling IMPORTANCE: RO 3.5 SRO 3.5
: e. Returning an IRM to service from Bypass (207)
* Low-Power / Simulator / New
* 3-OI-92A IRM Rev 15 section 6.2
* 215003 IRM System A2.02 Ability to (a) predict the impacts of the following on the IRM System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: IRM inop condition IMPORTANCE: RO 3.5 SRO 3.7
 
HLT 0801            Control Room/In-Plant Systems JPM Narrative
: g. Spray the Drywell using Fire Protection Unit 1 and 2 CR actions (209)
* New / Control Room / Engineered Safety Feature
* 3-EOI Appendix 17B RHR System Operation Drywell Sprays, Rev 5
* 295024 High Drywell Pressure: EA1.11 Ability to operate and/or monitor the following as they apply to High Drywell Pressure: Drywell Spray: Mark-I&II IMPORTANCE: RO 4.2 SRO 4.2
: h. Generator Synchronization and Load (210)
* New / Alternate Path / Simulator
* 3-OI-47 Turbine Generator System, Rev. 84, Section 5.5
* 3-ARP-9-7B 3-XA-55-7B Rev 22 Window 32
* 262001 AC Electrical Distribution A4.04 Ability to manually operate and/or monitor in the control room: Synchronizing and paralleling of different AC Supplies IMPORTANCE: RO 3.6 SRO 3.7 In-Plant Systems:
: i. Shutdown Unit 3 A DG from the 4KV Shutdown Board (211)
* New / Emergency or Abnormal In-Plant / Alternate Path
* 3-OI-82, Standby Diesel Generator System, Rev. 88, Section 7.3 and 7.5
* 264000 Emergency Generators K4.07 Knowledge of Emergency Generators design features and/or interlocks for the following: Local operation and control IMPORTANCE:
RO 3.3 SRO 3.4
: j. Suppression Pool Water Inventory Removal 1-EOI-Appendix 18 (212)
* New / RCA Entry / Emergency or Abnormal In-Plant
* 1-EOI-Appendix 18, Rev. 0
* 295029 High Suppression Pool Water Level EK2.01 Knowledge of the interrelations between High Suppression Pool Water Level and the following: RHR/LPCI IMPORTANCE: RO 3.0 SRO 3.3
: k. 0-SSI-2-1, ATTACHMENT 2 (127)
* Bank / Emergency or Abnormal In-Plant / Alternate Path
* 0-SSI-2-1 Rev 7
* 600000 Plant Fire on Site AA2.16 Ability to determine and interpret the following as the apply to Plant Fire on Site: Vital equipment and control systems to be maintained and operated during a fire IMPORTANCE: RO 3.0 SRO 3.5
 
ES-301                        Control Room/In-Plant Systems Outline                                  Form ES-301-2 Facility:     Browns Ferry NPP                          Date of Examination:         6/7/2010 Exam Level: SRO-U                                        Operating Test No.:           1006
                              @
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title                                Type Code*
Function
: a. Control Rod Exercise SR 3.1.3.2 (U2/U3)                                        M, A, S                    1
: d. Loss of Shutdown Cooling (U2/U3)                                              N, L, A, S                  4
: g. Drywell sprays w/Fire Protection Unit 1 and 2 actions                          EN, N, C                    5 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. Shutdown Unit 3 A DG at 4 KV Shutdown Board                                    N, E, A                  6
: k. 0-SSI-2-1, ATTACHMENT 2                                                          D, E, A                  8
@          All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                    Criteria for RO / SRO-I / SRO-U (A)lternate path                                                                  4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                                <9 / <8 / <4 (E)mergency or abnormal in-plant                                                  >1 / >1 / >1 (EN)gineered safety feature                                                            - / - / > 1 (control room system)
(L)ow-Power / Shutdown                                                            >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A)                                      >2 / >2 / >1 (P)revious 2 exams                                                                < 3 / < 3 / < 2 (randomly selected)
(R)CA                                                                            >1 / >1 / >1 (S)imulator
 
HLT 0801            Control Room/In-Plant Systems JPM Narrative Control Room Systems:
: a. Control Rod Exercise SR 3.1.3.3 (80)
* Modified / Simulator / Alternate Path
* 3-SR 3.1.3.3, Control Rod Test for Withdrawn Control Rods Rev. 28
* 3-AOI-85-5 Rod Drift In Rev 9
* 201002 Reactor Manual Control System A2.02 Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Rod Drift Alarm IMPORTANCE: RO 3.2 SRO 3.3
: d. Loss of Shutdown Cooling (225)
* New / Low-Power / Simulator / Alternate Path
* 3-AOI-74-1 Loss of Shutdown Cooling Rev 17
* 3-ARP-9-3D Rev 27
* 295021 Loss of Shutdown Cooling AA1.02 Ability to operate and/or monitor the following as they apply to Loss of Shutdown Cooling: RHR/shutdown cooling IMPORTANCE: RO 3.5 SRO 3.5
: g. Spray the Drywell using Fire Protection Unit 1 and 2 CR actions (209)
* New / Control Room / Engineered Safety Feature
* 3-EOI Appendix 17B RHR System Operation Drywell Sprays, Rev 5
* 295024 High Drywell Pressure: EA1.11 Ability to operate and/or monitor the following as they apply to High Drywell Pressure: Drywell Spray: Mark-I&II IMPORTANCE: RO 4.2 SRO 4.2 In-Plant Systems:
: i. Shutdown Unit 3 A DG from the 4KV Shutdown Board (211)
* New / Emergency or Abnormal In-Plant / Alternate Path
* 3-OI-82, Standby Diesel Generator System, Rev. 88, Section 7.3 and 7.5
* 264000 Emergency Generators K4.07 Knowledge of Emergency Generators design features and/or interlocks for the following: Local operation and control IMPORTANCE:
RO 3.3 SRO 3.4
 
HLT 0801            Control Room/In-Plant Systems JPM Narrative
: k. 0-SSI-2-1, ATTACHMENT 2 (127)
* Bank / Emergency or Abnormal In-Plant / Alternate Path
* 0-SSI-2-1 Rev 7
* 600000 Plant Fire on Site AA2.16 Ability to determine and interpret the following as the apply to Plant Fire on Site: Vital equipment and control systems to be maintained and operated during a fire IMPORTANCE: RO 3.0 SRO 3.5
 
ES-301                                          Operating Test Quality Checklist                                      Form ES-301-3 Facility:      Browns Ferry                            Date of Examination:  June 2010            Operating Test Number:          1006 Initials
: 1. General Criteria a  b*      c#
: a.        The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution).
: b.        There is no day-to-day repetition between this and other operating tests to be administered during this examination.
: c.        The operating test shall not duplicate items from the applicants' audit test(s). (see Section D.1.a.)
: d.        Overlap with the written examination and between different parts of the operating test is within acceptable limits.
: e.        It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.
: 2. Walk-Through Criteria
: a.       Each JPM includes the following, as applicable:
* initial conditions
* initial conditions
* initiating cues
* initiating cues
* references and tools, including associated procedures
* references and tools, including associated procedures
* reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee
* reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee
* operationally important specific performance criteria that include: -detailed expected actions with exact criteria and nomenclature  
* operationally important specific performance criteria that include:
-system response and other examiner cues -statements describing important observations to be made by the applicant  
                -     detailed expected actions with exact criteria and nomenclature
-criteria for successful completion of the task -identification of critical steps and their associated performance standards  
                -     system response and other examiner cues
-restrictions on the sequence of steps, if applicable Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
                -     statements describing important observations to be made by the applicant
                -     criteria for successful completion of the task
                -     identification of critical steps and their associated performance standards
                -     restrictions on the sequence of steps, if applicable
: b.        Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
: 3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached.
: 3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached.
Date a a. Author t../ Z.QIC:> b. Facility Reviewer(*)
Date
: c. NRC Chief Examiner (#) d. NRC Supervisor NOTE:
: a. Author                                                                                                 t../ Z.QIC:>
* The facility signature is not applicable for NRC-developed tests. ') 5" .... 1.\ -;;l.D I " (Q , /-,tOlD # Independent NRC reviewer initial items in Column *c"; chief examiner concurrence required.
: b. Facility Reviewer(*)                                                                                   i-/~- U/~
Initials b* c#
: c. NRC Chief Examiner (#)                                                                               5" . . 1.\ - ;;l.D I "
ES-301 Simulator Scenario Quality Checklist Form ES-301-4 Facility:
: d. NRC Supervisor                                                                                        (Q ,   ~  /- ,tOlD
Browns Ferry Date of Exam: June 2010 Scenario Numbers: 20/21/22124 Operating Test No.: HLT 1006 QUALITATIVE ATTRIBUTES Initials a b* C# 1. The initial conditions are realistic, in that some equipment and/or instrumentation may be out ;<< of service, but it does not cue the operators into expected events. D'-2. The scenarios consist mostly of related events. 01-3. Each event description consists of
                                                                                                ')
NOTE:
* The facility signature is not applicable for NRC-developed tests.
          # Independent NRC reviewer initial items in Column *c"; chief examiner concurrence required.
 
ES-301                                 Simulator Scenario Quality Checklist                                       Form ES-301-4 Facility: Browns Ferry Date of Exam:           June 2010         Scenario Numbers: 20/21/22124       Operating Test No.: HLT 1006 QUALITATIVE ATTRIBUTES                                                             Initials a         b*     C#
: 1.       The initial conditions are realistic, in that some equipment and/or instrumentation may be out of service, but it does not cue the operators into expected events.
D'-     ;<< ~J1L-
: 2.       The scenarios consist mostly of related events.                                                           01-     ~ ~)}L
: 3.       Each event description consists of
* the point in the scenario when it is to be initiated
* the point in the scenario when it is to be initiated
* the malfunction(s) that are entered to initiate the event
* the malfunction(s) that are entered to initiate the event
* the symptoms/cues that will be visible to the crew
* the symptoms/cues that will be visible to the crew
* the expected operator actions (by shift position)
* the expected operator actions (by shift position)
* the event termination point (if applicable)
* the event termination point (if applicable)                                                       O"t..   ;q ~N--
O"t.. ;q 4. No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the scenario without a credible incident such as a seismic event. 0"1-;q 5. The events are valid with regard to physics and thermodynamics.
: 4.       No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the scenario without a credible pr~ceding incident such as a seismic event.                                           0"1-     ;q ~kL
o'"t..-U
: 5.       The events are valid with regard to physics and thermodynamics.                                           o'"t..-   U '~.At-
: 6. Sequencing and timing of events is reasonable, and allows the examination team to obtain 'J:'/ tJJ<-complete evaluation results commensurate with the scenario objectives.
: 6.       Sequencing and timing of events is reasonable, and allows the examination team to obtain complete evaluation results commensurate with the scenario objectives.                                   0'1-       'J:'/ tJJ<-
0'1-7. If time compression techniques are used, the scenario summary clearly so indicates.
: 7.        If time compression techniques are used, the scenario summary clearly so indicates.
Operators have sufficient time to carry out expected activities without undue time constraints.
Operators have sufficient time to carry out expected activities without undue time constraints. Cues are given.                                                                                                 en... ;q        ~
Cues ;q are given. en... 8. The simulator modeling is not altered.
: 8.       The simulator modeling is not altered.                                                                   o~
: 9. The scenarios have been validated.
                                                                                                                              ~tf ~J\L
Pursuant to 10 CFR 55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated to ensure that functional fidelity is maintained while running the planned scenarios.
: 9.       The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated to ensure that functional fidelity is maintained while running the planned scenarios.                     oz. U -t-~
oz. U 10. Every operator will be evaluated using at least one new or significantly modified scenario.
: 10.       Every operator will be evaluated using at least one new or significantly modified scenario. All other scenarios have been altered in accordance with Section 0 .5 of ES-301.                                   o~      It:I     -bk
All other -bk scenarios have been altered in accordance with Section 0.5 of ES-301. It: I 11. All individual operator competencies can be evaluated, as verified using Form ES-301-6 +k (submit the form along with the simulator scenarios).
: 11.       All individual operator competencies can be evaluated, as verified using Form ES-301-6 (submit the form along with the simulator scenarios).                                                     O"L       ;ttJ   +k
O"L ;ttJ 12. Each applicant will be significantly involved in the minimum number of transients and events tk specified on Form ES-301-5 (submit the form with the simulator scenarios). O"L 13. The level of difficulty is appropriate to support licenSing decisions for each crew position.
: 12.       Each applicant will be significantly involved in the minimum number of transients and events specified on Form ES-301-5 (submit the form with the simulator scenarios).                               O"L ~,{          tk
OL 1CtJ Target Quantitative Attributes (Per Scenario; See Section D.S.d) Actual Attributes  
: 13.      The level of difficulty is appropriate to support licenSing decisions for each crew position.             OL 1CtJ ~
---1. Total malfunctions (5-8) 71717/8 ''', Jf({ t Jl-2. Malfunctions after EOP entry (1-2) 2/2/2/3 0 ...... d tJc-3. Abnormal events (2-4) 4/4/4/4 D"t. Id ttL 4. Major transients (1-2) 1/1/2/2 .0" l:tr t Jc 5. EOPs entered/requiring substantive actions (1-2) 2/3/3/3 C1:! 6. EOP contingencies requiring substantive actions (0-2) 1/0/1/2 i"-lu' 7. Critical tasks (2-3) 5/4/3/7 o'L W RIU RX NOR1121 I/C3,4,5,63,4,5,682 MAJ7721 TS3,64,642 RX22,6,721 NOR1121 I/C3,63,4,5,65,684 MAJ777,842 TS4,622 RX2,6221 NOR1121 I/C3,64,63,4,5,684 MAJ777,842 TS4,622ATCBOPSROATCBOPSROROSRO-I   # 2SRO-UATCBOPAPPLICANTEVENTTYPERO SRO-I   SRO-U    # 1ROSRO-I    # 1SRO-UCREWPOSITIONTOTALSROATCBOPSROCREWPOSITIONCREWPOSITIONCREWPOSITIONCREWPOSITIONScenarios1 (3-20)2 (3-21)3 (3-22)4 (3-24)spareMINIMUM (*)BOPSROATCForm ES-301-5Transient and Event ChecklistFacility: Browns Ferry NPPDate of Exam:  Operating Test No.:  HLT 1006ES-301Page 1 of 5 RIUATCBOPSROATCBOPSROATCBOPAPPLICANTEVENTTYPERO SRO-I    SRO-U   # 1CREWPOSITIONTOTALSROATCBOPSROCREWPOSITIONCREWPOSITIONCREWPOSITIONCREWPOSITIONScenarios1 (3-20)2 (3-21)3 (3-22)4 (3-24)spareMINIMUM (*)BOPSROATCForm ES-301-5Transient and Event ChecklistFacility:  Browns Ferry NPPDate of Exam:  Operating Test No.:  HLT 1006ES-301 RX2,6221 NOR1121 I/C3,64,63,4,5,684 MAJ777,842 TS4,622 RX2,6221 NOR111 I/C4,63,4,5,664 MAJ77,832 TS4,622 RX22,6,721 NOR111 I/C3,4,5,65,664 MAJ77,832 TS3,622ROSRO-I    # 3SRO-UROSRO-I    # 4SRO-UROSRO-I    # 5SRO-UPage 2 of 5 RIUATCBOPSROATCBOPSROATCBOPAPPLICANTEVENTTYPERO SRO-I    SRO-U    # 1CREWPOSITIONTOTALSROATCBOPSROCREWPOSITIONCREWPOSITIONCREWPOSITIONCREWPOSITIONScenarios1 (3-20)2 (3-21)3 (3-22)4 (3-24)spareMINIMUM (*)BOPSROATCForm ES-301-5Transient and Event ChecklistFacility:  Browns Ferry NPPDate of Exam:  Operating Test No.:  HLT 1006ES-301 RX2,311 NOR1121 I/C4,53,53,464 MAJ777,842 TS RX2,311 NOR1121 I/C4,53,53,464 MAJ777,842 TS RX2,311 NOR1121 I/C4,53,53,464 MAJ777,842 TSRO # 1SRO-I    SRO-URO # 2SRO-I   SRO-URO # 3SRO-I   SRO-UPage 3 of 5 RIUATCBOPSROATCBOPSROATCBOPAPPLICANTEVENTTYPERO SRO-I    SRO-U    # 1CREWPOSITIONTOTALSROATCBOPSROCREWPOSITIONCREWPOSITIONCREWPOSITIONCREWPOSITIONScenarios1 (3-20)2 (3-21)3 (3-22)4 (3-24)spareMINIMUM (*)BOPSROATCForm ES-301-5Transient and Event ChecklistFacility:  Browns Ferry NPPDate of Exam:  Operating Test No.:  HLT 1006ES-301 RX22,6,721 NOR111 I/C3,4,5,65,664 MAJ77,832 TS3,622 RX NOR111 I/C3,4,5,642 MAJ711 TS4,622RO SRO-I        SRO-U     #2RO SRO-I     #6 SRO-UPage 4 of 5 RIUATCBOPSROATCBOPSROATCBOPAPPLICANTEVENTTYPERO SRO-I   SRO-U   # 1CREWPOSITIONTOTALSROATCBOPSROCREWPOSITIONCREWPOSITIONCREWPOSITIONCREWPOSITIONScenarios1 (3-20)2 (3-21)3 (3-22)4 (3-24)spareMINIMUM (*)BOPSROATCForm ES-301-5Transient and Event ChecklistFacility: Browns Ferry NPPDate of Exam: Operating Test No.: HLT 1006ES-3011.2.3.Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the Instructions:Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.Page 5 of 5 ES-301, Rev. 9 Competencies Checklist Form ES-301-6  Facility: Browns Ferry   Date of Examination:
Target Quantitative Attributes (Per Scenario; See Section D.S.d)                     Actual Attributes     -         -       -
J une 20 10  Operating Test No.: HLT 1006  APPLICANTS RO         SRO-I           SRO-U Competencies SCENARIO SCENARIO SCENARIO  20 21 22 24  2 0 21 22 24  20 21 22 24  Interpret/Diagnose Events and Conditions 3,4 6,7 3,4 5,6 4,6 3,3,4 6,7 3,4 5,6 4,6 3,4  3,4 6,7 3,4 5,6 4,6 3,4  Comply With and Use Procedures (1) 1,3 1, 4, 6 1,4,6 3,5  1,3 1,4,6 1,4,6 3,5  1,3 1,4,6 1,4,6 3,5 Operate Contro l Boards (2) 3,4  5,6 3,4 5,6 3,4 5,6 3,4 5,6  3,4  5,6 3,4 5,6 3,4 5,6 3,4 5,6      Communicate and Interact 5,6,7 6,7,8 7,8 7,8  5,6,7 6,7,8 7,8 7,8  5,6,7 6,7,8 7,8 7,8  Demonstrate Supervisory Ability (3) 5,6,7 6,7,8 7,8 7,8  5,6,7 6,7,8 7,8 7, 8  Comply With and Use Tech. Specs. (3) 3,6 4,6 4,6 3,5  3,6 4,6 4,6 3,5  Notes: (1) Includes Technical Specification compliance for an RO. (2) Optional for an SRO-U. (3) Only applicable to SROs.
: 1.       Total malfunctions (5-8)                                                               71717/8           ''', Jf({         t Jl-
: 2.       Malfunctions after EOP entry (1-2)                                                     2/2/2/3           0 ...... d       tJc-
: 3.       Abnormal events (2-4)                                                                 4/4/4/4           D"t. Id         ttL
: 4.       Major transients (1-2)                                                                 1/1/2/2           .0"     l:tr     tJc
: 5.       EOPs entered/requiring substantive actions (1-2)                                       2/3/3/3           o~
C1:! ~J)c 1/0/1/2           i"- lu ' ~
: 6.       EOP contingencies requiring substantive actions (0-2)
: 7.        Critical tasks (2-3)                                                                   5/4/3/7           o'L     W       ~k
 
ES-301                                              Transient and Event Checklist                                      Form ES-301-5 Facility: Browns Ferry NPP                                  Date of Exam: June 06 - 19, 2010                Operating Test No.: HLT 1006 A        E                                                              Scenarios P        V                                                                                                          T        M 1 (3-20)            2 (3-21)              3 (3-22)          4 (3-24)spare P        E                                                                                                          O        I L        N          CREW                CREW                  CREW                  CREW          CREW          T        N I       T        POSITION            POSITION              POSITION            POSITION        POSITION        A        I C              S      A      B    S        A      B      S        A    B      S      A      B S   A      B    L        M A        T    R        T    O    R        T      O    R        T    O      R      T      O  R    T    O              U N        Y    O        C      P    O        C      P    O        C      P      O      C      P O    C      P              M (*)
T        P                                                                                                                R    I  U E
RO RX NOR    1                    1                                                                                2              1 SRO-I I/C 3,4,5,6              3,4,5,6                                                                            8              2 SRO-U MAJ        7                    7                                                                                2             1
  #1 TS    3,6                  4,6                                                                              4             2 RO RX                          2                            2,6,7                                              2          1 NOR                    1    1                                                                                2          1 SRO-I
  #1      I/C                  3,6 3,4,5,6                          5,6                                              8          4 SRO-U MAJ                        7    7                              7,8                                              4          2 TS                          4,6                                                                              2          2 RO RX                                  2,6           2                                                        2          1 NOR                    1                            1                                                        2          1 SRO-I
  #2      I/C                  3,6            4,6        3,4,5,6                                                      8          4 SRO-U MAJ                        7              7            7,8                                                        4          2 TS                                                4,6                                                        2          2 Page 1 of 5
 
ES-301                                          Transient and Event Checklist                                      Form ES-301-5 Facility: Browns Ferry NPP                            Date of Exam: June 06 - 19, 2010                Operating Test No.: HLT 1006 A        E                                                          Scenarios P        V                                                                                                      T        M 1 (3-20)       2 (3-21)               3 (3-22)           4 (3-24)spare P        E                                                                                                      O        I L        N          CREW            CREW                  CREW                  CREW          CREW          T        N I       T        POSITION        POSITION              POSITION            POSITION        POSITION        A        I C              S      A      B  S      A      B      S        A    B      S      A      B S   A      B    L        M A        T   R        T    O  R      T      O    R        T    O      R      T      O  R   T    O              U N        Y   O        C      P  O    C      P    O        C      P      O      C      P O    C      P              M (*)
T        P                                                                                                          R    I  U E
RO RX                              2,6            2                                                        2          1 NOR                    1                      1                                                        2          1 SRO-I
  #3      I/C                  3,6       4,6        3,4,5,6                                                      8          4 SRO-U MAJ                        7        7            7,8                                                        4          2
  #1 TS                                            4,6                                                        2          2 RO RX                              2,6            2                                                        2          1 NOR                                            1                                                        1          1 SRO-I
  #4     I/C                            4,6        3,4,5,6                                                      6          4 SRO-U MAJ                                  7            7,8                                                        3         2 TS                                            4,6                                                        2          2 RO RX      2                                            2,6,7                                              2          1 NOR    1                                                                                                1          1 SRO-I
  #5      I/C  3,4,5,6                                          5,6                                              6          4 SRO-U MAJ        7                                              7,8                                              3          2 TS    3,6                                                                                              2          2 Page 2 of 5
 
ES-301                                       Transient and Event Checklist                                    Form ES-301-5 Facility: Browns Ferry NPP                          Date of Exam: June 06 - 19, 2010              Operating Test No.: HLT 1006 A        E                                                    Scenarios P        V                                                                                                T        M 1 (3-20)      2 (3-21)            3 (3-22)           4 (3-24)spare P        E                                                                                                O        I L        N        CREW          CREW                  CREW                  CREW          CREW          T        N I        T      POSITION      POSITION            POSITION            POSITION        POSITION        A        I C              S      A    B S    A        B    S      A      B    S      A      B S    A      B    L        M A        T    R        T    O R    T      O    R      T    O      R      T      O  R    T    O              U N        Y    O      C    P O    C        P    O      C      P    O      C      P O    C      P              M (*)
T        P                                                                                                      R    I  U E
RO # 1 RX            2,3                                                                                  1    1 NOR                                  1                  1                                        2    1 SRO-I I/C           4,5                  3,5                3,4                                        6    4 SRO-U MAJ                7                    7                  7,8                                        4   2
  #1 TS RO # 2 RX            2,3                                                                                  1    1 NOR                                  1                  1                                        2    1 SRO-I I/C            4,5                  3,5                3,4                                        6    4 SRO-U MAJ                7                    7                  7,8                                        4    2 TS RO # 3 RX            2,3                                                                                 1    1 NOR                                  1                  1                                        2    1 SRO-I I/C            4,5                  3,5                3,4                                       6   4 SRO-U MAJ                7                    7                  7,8                                        4   2 TS Page 3 of 5
 
ES-301                                            Transient and Event Checklist                                    Form ES-301-5 Facility: Browns Ferry NPP                                Date of Exam: June 06 - 19, 2010              Operating Test No.: HLT 1006 A        E                                                          Scenarios P        V                                                                                                      T        M 1 (3-20)          2 (3-21)             3 (3-22)          4 (3-24)spare P        E                                                                                                      O        I L        N          CREW              CREW                  CREW                  CREW          CREW          T        N I        T        POSITION          POSITION            POSITION            POSITION        POSITION        A        I C              S      A    B    S      A      B    S        A    B    S      A      B S    A      B    L        M A        T    R        T    O  R        T      O    R        T    O      R      T      O R    T    O              U N        Y    O        C    P  O        C      P    O      C      P    O      C      P O    C      P              M (*)
T        P                                                                                                            R    I  U E
RO RX      2                                              2,6,7                                            2          1 NOR    1                                                                                                1          1 SRO-I
  #6     I/C  3,4,5,6                                             5,6                                              6          4 SRO-U MAJ        7                                                7,8                                              3         2
  #1 TS    3,6                                                                                               2          2 RO RX NOR                        1                                                                              1              1 SRO-I I/C                    3,4,5,6                                                                           4              2 SRO-U MAJ                            7                                                                              1              1
  #2 TS                        4,6                                                                             2              2 Page 4 of 5
 
ES-301                                                        Transient and Event Checklist                                                          Form ES-301-5 Facility: Browns Ferry NPP                                              Date of Exam: June 06 - 19, 2010                                Operating Test No.:    HLT 1006 A        E                                                                            Scenarios P        V                                                                                                                                          T        M 1 (3-20)                  2 (3-21)                3 (3-22)               4 (3-24)spare P        E                                                                                                                                          O        I L      N              CREW                      CREW                    CREW                      CREW                      CREW              T        N I      T            POSITION                  POSITION                POSITION                  POSITION                  POSITION              A        I C                  S      A        B        S        A      B      S        A      B        S      A        B      S        A        B      L        M A        T        R      T        O        R        T      O      R        T      O        R      T        O        R        T        O              U N        Y        O      C        P        O        C      P      O        C      P        O      C        P      O        C        P              M (*)
T      P                                                                                                                                              R      I  U E
RO Instructions:
: 1.       Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the SRO-I    ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
SRO-U
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section
  # 1 C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
Page 5 of 5
 
ES-301, Rev. 9                              Competencies Checklist                          Form ES-301-6 Facility: Browns Ferry      Date of Examination: June 2010                  Operating Test No.: HLT 1006 APPLICANTS RO                    SRO-I                        SRO-U Competencies                      SCENARIO                SCENARIO                  SCENARIO 20 21 22 24              20    21 22 24            20 21 22 24 Interpret/Diagnose Events              3,4  3,4  4,6  3,4      3,4  3,4  4,6  3,4      3,4  3,4  4,6  3,4 and Conditions                        6,7  5,6                6,7  5,6                6,7  5,6 Comply With and                        1,3 1,4,6 1,4,6 3,5      1,3  1,4,6 1,4,6 3,5      1,3 1,4,6 1,4,6 3,5 Use Procedures (1)
Operate Control                        3,4  3,4  3,4  3,4      3,4  3,4  3,4  3,4 Boards (2)                            5,6  5,6  5,6  5,6      5,6  5,6  5,6  5,6 Communicate                          5,6,7 6,7,8 7,8  7,8    5,6,7 6,7,8 7,8  7,8    5,6,7 6,7,8 7,8  7,8 and Interact Demonstrate Supervisory                                        5,6,7 6,7,8 7,8  7,8    5,6,7 6,7,8 7,8  7,8 Ability (3)
Comply With and                                                3,6  4,6  4,6  3,5      3,6  4,6  4,6  3,5 Use Tech. Specs. (3)
Notes:
(1)    Includes Technical Specification compliance for an RO.
(2)    Optional for an SRO-U.
(3)     Only applicable to SROs.
Instructions:
Instructions:
Check the applicants' license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.
Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.
 
ES-401                                                          1                                          Form ES-401-1
                                                                                                                              -
Facility:    Browns Ferry NPP                        Date of Exam :    June 07 - 23, 2010                    ILT-10-06 I
RO KIA Category Points                              SRO-Only Points Tier        Group K    K    K    K      K  K    A  A  A    A    G Total        A2        G*      Total 1    2    3    4      5  6    1  2  3    4    *
: 1.            1        4    3    3                    4    3            3      20            3          4        7 Emergency
        &              2        1    1    1                    2    1            1        7            1          2        3 NJA                  N/A Abnormal Plant          Tier Totals 5    4    4                    6    4            4      27            4          6      10 Evolutions 1        3    2    2    3      1    2    3  2  3    3    2      26            2          3      5 2.
Plant            2        1    1    1    1      1    1  1    1  2    1    1      12        0    1      2      3 Systems          Tier 4    3    3    4      2    3  4    3  5  4    3      38            3          5      8 Totals 1        2        3        4                    1    2    3    4
: 3. Generic Knowledge and Abilities Categories 10                              7 3        3        2        2                    1    2    2    2 Notes :  1.          Ensure that at least two topics from every KIA category are sampled within each tier of the RO and SRO-only outlines (Le., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each KIA category shall not be less than two).
: 2.        The point total for each group and tier in the proposed outline must match that specified in the table. The final point total for each group and Uer may deviate by +/-1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.
: 3.        Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, Site-speCific systems/evolutions that are not included on the outline should be added. Refer to Section D.1.b of ES-401 for guidance regarding the elimination of inappropriate KIA statements.
: 4.        Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
: 5.        Absent a plant-specific priority, only those KlAs having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only port.ions, respectively.
: 6.        Select SRO topics for TIers 1 and 2 from the shaded systems and KIA categories.
7.*        The generic (G) KlAs in Tiers 1 and 2 shall be selected from Section 2 of the KIA Catalog, but the topics must be relevant to the applicable evolution or system . Refer to Section D.1 .b of ES-401 for the applicable KlAs.
B.        On the following pages, enter the KIA numbers, a brief description of each topic, the topics' importance ratings (IR) (or the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above. Use duplicate pages for RO and SRO-only exams.
: 9.        For Tier 3, select topics from Section 2 of the KIA catalog, and enter the KIA numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to KlAs that are linked to 10 CFR 55.43.
 
-          0                                                                  2
                                                                                ~
                                                                                ~                                                          Form
                                                                                                                                                .
ES-~01-1 ES-401                                                            BWR Examination Outline                                                    Form ES*401*1 Emergency and Abnormal Plant Evolutions - TIer 1/Group 1 (RO I SRO)
ElAPE  1# I Name I Safety Function    K K K A A    G                                          KIA Topic(s) 1 2 3 1 2 IR      #
295001 Partial or Complete Loss of Forced                1  G2.1.7 (10CFR 55.41 .5)
Core Flow Circulation / 1 & 4 Ability to evaluate plant performance and make operational jUdgments based on      4.4      1 operating characteristics, reactor behavior, and instrument interpretation.                      I 295003 Partial or Complete Loss of AC I 6                1  G2.1.27 (10CFR 55.41 .7)
Knowledge of system purpose andl or function.
3.9      2 295004 Partial or Total loss of DC Pwr I 6      1 1        AA1.03 (10CFR 55.41.7) i Ability to operate and/or monitor the following as they apply to PARTIAL OR
                                                        ,    COMPLETE LOSS OF D.C. POWER:                                                      3.4      3
                                                        >
* A.C. electrical distribution AA2.01 (10CFR 55.43.2 - SRO Only)
                                                    ,
Ability to determine and/or interpret the following as they apply to PARTIAL OR COMPLETE LOSS OF LOSS OF D.C. POWER:
3.6      76
                                                      ..
* Cause of partial or complete loss of D. C. power 295005 Main Turbine Generator Trip 13              1        AA2.08 (10CFR 55.41 .10)
Ability to determine and/or interpret the following as they apply to MAIN TURBINE GENERATOR TRIP:                                                            3.2      4
                                                        ." .
* Electrical distribution status 295006 SCRAM I 1                              1            AK3.03 (10CFR 55.41 .5)
Knowledge of the reasons for the following responses as they apply to SCRAM :      3.8      5    j
* Reactor pressure response 1
SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM                                                                                                                  Page 2
 
- e ES-401                                                                      *2                                                                      .-
Form ES-401-1
    - --        -  -    -  -    -    - --  --      -        -                                          - -- -              -              -              -
ES-401                                                          BWR Examination Outline                                                            Form ES-401 . 1 Emergency and Abnormal Plant Evolutions - TIer 1/Group 1 (RO I SRO)
EJAPE # I Name I Safety Function K K K A A G                                          KIA Topic(s)                                      IR      #
1 2 3 1 2 295016 Control Room Abandonment 17                  1 1    AA1.08 (10CFR 55.41 .7)
Ability to operate and/or monitor the following as they apply to CONTROL 4.0      6 ROOM ABANDONMENT:
* Reactor pressure AA2.05 (10CFR 55.43.5 - SRO Only)
                                                        ,  Ability to determine and/or interpret the following      as they apply to CONTROL        3.9      77 ROOM ABANDONMENT:
* Drywell pressure 295018 Partial or Total Loss of CCW I 8          1    1  AK3.07 (10CFR 55.41 .5)
Knowledge of the reasons for the following responses as they apply to PARTIAL OR COMPLETE LOSS OF COMPONENT COOLING WATER:                                              3.1      7
* Cross-connecting with backup systems 1I G2.1.27 (10CFR 55.43.5 - SRO Only)                                                        4.0      78 Knowledge of system purpose and/or function.
295019 Partial or Total Loss of' Inst Air ' 8        1    AA2.02 (1 OCFR 55.41 .10)
Ability to determine andlor interpret the following as they apply to PARTIAL OR COMPLETE LOSS OF INSTRUMENT AIR:                                                          3.6      8
* Status of safety-related Instrument air system loads (see AK2.1 -
AK2.19)
                                                                                                - -              --
SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM                                                                                                                        Page 3


ES-401 1 Form ES-401-1 -Facility:
- e ES*401
Browns Ferry NPP Date of Exam: June 07 -23, 2010 ILT-10-06 I RO KIA Category Points SRO-Only Points Tie r Group K K K K K K A A A A G 1 2 3 4 5 6 1 2 3 4
* 2
* Total A2 G* Total 1. 1 4 3 3 4 3 3 20 3 4 7 Emergency 2 1 1 1 2 1 1 7 1 2 3 & Abnormal NJA N/A Plant Tier 5 4 4 6 4 4 27 4 6 10 Evolutions Totals 1 3 2 2 3 1 2 3 2 3 3 2 26 2 3 5 2. 2 1 1 1 1 1 1 1 1 2 1 1 12 0 1 2 3 Plant Systems Tier 4 Totals 4 3 3 2 3 4 3 5 4 3 38 3 5 8 3. Generic Knowledge and 1 2 3 4 1 2 3 4 10 7 Abilities Categories 3 3 2 2 1 2 2 2 Not es: 1. Ensure that at least two topics from every KIA category are sampled within each tier of the RO and SRO-only outlines (Le., except for one category in Tier 3 of the SRO-only outline , the "Tier Totals" in each KIA category shall not be less than two). 2. The point total for each group and tier in the proposed outline must match that specified in the table. The final point total for each group and Uer may deviate by +/-1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points. 3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, Site-speCific systems/evolutions that are not included on the outline should be added. Refer to Section D.1.b of ES-401 for guidance regarding the elimination of inappropriate KIA statements. 4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution. 5. Absent a plant-specific priority, only those KlAs having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only port.ions , respect ively. 6. Select SRO topics for TIers 1 and 2 from the shaded systems and KIA categories. 7.* The generic (G) KlAs in Tiers 1 and 2 shall be selected from Section 2 of the KIA Catalog , but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable KlAs. B. On the following pages, enter the KIA numbers , a brief description of each topic, the topics' importance ratings (IR) (or the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above. Use duplicate pages for RO and SRO-only exams. 9. For Tier 3, select topics from Section 2 of the KIA catalog , and enter the KIA numbers , descriptions, IRs , and point totals (#) on Form ES-401-3.
                                                                                                                                        <it Form ES*401*1 I
Limit SRO selections to KlAs that are linked to 10 CFR 55.43. 
                -
-0 . Form 2 ES-401 BWR Exam i nation Outline Form ES*401*1 Emergency and Abnormal Plant Evolutions
ES-401                                                       BWR Examination Outline                                                   Form ES-401-1 Emergency and Abnormal Plant Evolutions - Tier lIGroup 1 (RO I SRO)
-TIer 1/Group 1 (RO I SRO) El APE 1# I N a m e I S a fety Fu n ct i o n K K K A A G KI A T op ic(s) IR # 1 2 3 1 2 295001 Part i al or Complete L oss of Forced 1 G2.1.7 (10CFR 55.41.5) Core Flow C i rculation
K K K A A     G ElAPE 1# I Name I Safety Function                                                        KlA Toplc(s)                               IR       #
/1 & 4 Ability to evaluate plant performance and make operational jUdgments based on 4.4 1 I operating characteristics , reactor behavi o r, and instrument i nterpretation. 295003 Partial or Complete Loss of AC I 6 1 G2.1.27 (10CFR 55.41.7) 3.9 2 Knowledge of system purpose and l or function.
1 2 3 1 2 295021 Loss of Shutdown Cooling I 4     1           1 AK2.01 (10CFR 55.41 .7)
295004 Partial or Total loss of DC Pwr I 6 1 1 AA1.03 (10CFR 55.41.7) Ability to operate and/or monitor the following as they apply t o PART I AL OR i , CO M PL E TE L OSS O F D.C. POWER: 3.4 3 >
Knowledge of the interrelations between LOSS OF SHUTDOWN COOLING and the following :                                                                  3.6       9   I
* A.C. electrical distr i bution AA2.01 (10CFR 55.43.2 -SRO Only) , Ability to determine and/or interpret the following as they apply to PARTIAL OR 3.6 76 .. COMPLETE LOSS OF LO S S OF D.C. POWER:
* Reactor water temperature G2.4.47 (10CFR 55.43.5 - SRO Only)
* Cause of partial or complete loss of D. C. power 295005 Ma i n Turbine Generator Trip 13 1 AA2.08 (10C FR 55.41.10) Ability to determine and/or interpret the following as they apply to MAIN 3.2 4 ." TURBI N E GENERATOR TRIP: .
Ability to diagnose and recognize trends in an accurate and timely manner 4.2      79 utilizing the appropriate control room reference material.
* Electrical distribution status 295006 SCRAM I 1 1 AK3.03 (10CFR 55.41.5) K nowledge of the reasons f or the following responses as they apply to SCRAM: 3.8 5 j
295023 Refueling Ace I 8                   1       1 AA1.03 (10CFR 55.41 .7)
* Reactor pressure response 1 SRO only K/ As shown in italics 3/17/2010
Ability to operate and/or monitor the following as they apply to REFUELING ACCIDENTS:                                                                        3.3     10
-9:15:46 AM Page 2 
-e * .-ES-401 2 Form ES-401-1 ----------------------ES-401 BWR Exam i nat i on Outline Form ES-401.1 Emergency and Abnormal P l ant Evolutions  
-TI er 1/Group 1 (RO I SRO) EJAPE # I Name I Safety Function K K K A A G KIA Topic(s) IR # 1 2 3 1 2 295016 Control Room Abandonment 1 7 1 1 AA1.08 (10CFR 55.41.7) Ability to operate and/or monitor the following as they apply to CONTROL 4.0 6 ROOM ABANDONMENT
:
* Reactor pressure AA2.05 (10CFR 55.43.5 -SRO Only) Ability to determine and/or interpret the following as they apply to CONTROL 3.9 77 , ROOM ABANDONMENT
:
* Drywell pressure 295018 Partial or Total Loss of CCW I 8 1 1 AK3.07 (10CFR 55.41.5) Knowledge of the reasons for the following responses as they apply to PARTIAL 3.1 7 OR COMPLETE LOSS OF COMPONENT COOLING WATER:
* Cross-connecting with backup systems 1 I G2.1.27 (10CFR 55.43.5 -SRO Only) 4.0 78 Knowledge of system purpose and/or function.
295019 Partial or Total Loss of' Inst A i r' 8 1 AA2.02 (1 OCFR 55.41.10) Ability to determine andlor interpret the following as they apply to PARTIAL OR COMPLETE LOSS OF INSTRUMENT AIR: 3.6 8
* Status of safety-related Instrument air system loads (see AK2.1 -AK2.19) ----SRO only K/ As shown in italics 3/17/2010
-9:15:46 AM Page 3 
-e * <it ES*401 2 Form ES*401*1 -Form ES-401-1 I ES-40 1 BWR Examination Ou tline Eme rg ency and Abnormal Plant Evolutions
-Tier lI Group 1 (RO I SRO) ElAPE 1# I Name I Safety Funct i on K K K A A G KlA Toplc(s) IR # 1 2 3 1 2 295021 Loss of Shutdown Cooling I 4 1 1 AK2.01 (10 CFR 55.41.7) Knowledge of the interrelations between LOSS OF SHUTDOWN COOLING and 3.6 9 I the following:
* Reactor water temperature G2.4.47 (10CFR 55.43.5 -SRO Only) 4.2 79 Ability to diagnose and recognize trends in an accurate and timely manner utilizing the appropriate control room reference material. 295023 Refue li ng Ace I 8 1 1 AA1.03 (10CFR 55.41.7) Ability to operate and/or monitor the follow i ng as they apply to REFUELING 3.3 10 ACCIDENTS:
* Fuel handling equipment G2.1.7 (10CFR 55.43.5
* Fuel handling equipment G2.1.7 (10CFR 55.43.5
* SRO Only) 80 .. 4.7 Ability to evaluate plant performance and make operational judgments based on operating characteristics , reactor behavior , and instrument interpretation. I 295024 High Drywe ll Pressure I 5 1 1 EK1.01 (10CFR 55.41.9) Knowledge of the operational implicati ons of the following concepts as they 4.1 11 apply to HIGH DRYWELL PRESSURE: ..
* SRO Only)
* Drywell integrity: Plant-Specific G2.1.31 (10CFR 55.43.5 -SRO Only) 4.3 81 Ability to locale control room switches , controls, and indications , and to determine that they correctly reflect the desired plant lineup. 295025 High Reactor Pressure I 3 1 EK3.01 (10CFR 55.41.5) K nowledge of the reasons for the follow i ng responses as they apply to H I GH 4.2 12 REACTOR PRESSURE:
                                                  ..
* Safety/relief valve opening ---SRO only K/ As shown in italics 3/17/2010 -9: 15:46 AM Page 4
Ability to evaluate plant performance and make operational judgments based on     4.7      80 operating characteristics, reactor behavior, and instrument interpretation.                     I 295024 High Drywell Pressure I 5     1             1 EK1.01 (10CFR 55.41 .9)
----'10.0 0 --ES-401 2 Form ES-401-1 -ES-401 BWR Exam I nati on O utli n e E m ergen cy a nd Abnonna l Pla nt E voluti ons -TI er 1/Group 1 (RO I SRO) EJAPE # I Name I Safety Function K K K A A G KIA Toplc(s) IR # 1 2 3 1 2 I 295026 Suppre ss i on Pool H i gh Wate r 1 EA2.01 (10CFR 55.41.10) Te m p. 1 5 Abi li ty to determi n e and l or i nterpret the follow i ng as they apply to SUPPRESSION POOL HIGH WATER TEMPERATURE
Knowledge of the operational implications of the following concepts as they apply to HIGH DRYWELL PRESSURE:
: 4.1 13
4.1      11
* Suppression pool water temperature 381cxa7 MIF c;: .. ___ 14m,a ....... /1 ------NlA for BFN -KIA for Mark III Containments ONL Y ----, 295028 H I gh Drywell Temperature 1 5 1 1 EK2.01 (10CFR 55.41.5) Knowledge of the i nterrelations between HIGH DRYWELL TEMPERATURE and 3.7 14 the follow i ng:
                                                ..
* Drywell spray: Mark-I&II . EA2.06 (10CFR 55.43.5
* Drywell integrity: Plant-Specific G2.1.31 (10CFR 55.43.5 - SRO Only)
* SRO Only) Abifity to determine and/or interpret the following as they apply to HIGH 3.7 82
Ability to locale control room switches, controls, and indications, and to 4.3      81 determine that they correctly reflect the desired plant lineup.
295025 High Reactor Pressure I 3         1           EK3.01 (10CFR 55.41 .5)
Knowledge of the reasons for the following responses as they apply to HIGH REACTOR PRESSURE:                                                                4.2     12
* Safety/relief valve opening
                                                                                                                      ---
SRO only K/As shown in italics 3/17/2010 - 9 :15:46 AM                                                                                                         Page 4
 
----'10.0 ES-401                                                                    02                                                                --
Form ES-401-1
                                              -
ES-401                                                         BWR ExamInation Outline Emergency and Abnonnal Plant Evolutions - TIer 1/Group 1 (RO I SRO)               FO~E~~
EJAPE # I Name I Safety Function   K K K   A A   G                                         KIA Toplc(s)                               IR       #
1 2 3   1 2 I
295026 Suppression Pool High Water                1       EA2.01 (10CFR 55.41 .10)
Temp. 15 Ability to determine andl or interpret the following as they apply to SUPPRESSION POOL HIGH WATER TEMPERATURE :
4.1     13
* Suppression pool water temperature 381cxa7 MIF c;:..___ 14m,a ....... /1
                                        - - - - - -       NlA for BFN - KIA for Mark III Containments ONL Y                   ,            -- --
295028 HIgh Drywell Temperature 15        1       1       EK2.01 (10CFR 55.41 .5)
Knowledge of the interrelations between HIGH DRYWELL TEMPERATURE and the following:                                                                    3.7     14
                                                    .
* Drywell spray: Mark-I&II EA2.06 (10CFR 55.43.5
* SRO Only)
Abifity to determine and/or interpret the following as they apply to HIGH         3.7     82
* DRYWELL TEMPERA TURE:
* DRYWELL TEMPERA TURE:
* Torus/suppression chamber air space temperature
* Torus/suppression chamber air space temperature: Plant-Specific 295030 Low SuppressIon Pool WfT Lvi I 5 1                 EK1 .02 (10CFR 55.41 .8)
: Plant-Specific 295 03 0 L ow Suppress I on Po o l WfT Lvi I 5 1 EK1.02 (10CFR 55.41.8) Knowledge of the operational implicat i ons of the follow i ng concepts as they 3.5 15 apply to LOW SUPPRESSION POOL WATER LEVEL:
Knowledge of the operational implications of the following concepts as they apply to LOW SUPPRESSION POOL WATER LEVEL:                                       3.5      15
* Pump NPSH 2950 3 1 Reactor L o w Water L eve l 1 2 1 EK1.03 (10CFR 55.41.10) Knowledge of the operat i onal implicat i ons of the follow i ng concepts as they 3.7 16 ,. apply to REACTOR LOW WATER LEVEL:
* Pump NPSH 295031 Reactor Low Water Level 12      1                 EK1 .03 (10CFR 55.41 .10)
* Water level effects on reactor power i 2950 3 7 SCRAM Cond i ti o n Pr e sent and 1 EK2.13 (10CFR 55.41.7) Power Above APRM Downscale or , Knowledge of the interrelations between SCRAM CONDITION PRESENT AND Un kn own 1 1 REACTOR POWER ABOVE APRM DOWNSCALE OR UNKNOWN and the 3.4 17 follow i ng:
Knowledge of the operational implications of the following concepts as they
* Alternate boron injection methods: Plant-Specific SRO only K/ As shown in italics 3/17/2010  
                                                        ,. apply to REACTOR LOW WATER LEVEL:                                                 3.7      16
-9:15:46 AM Page 5
* Water level effects on reactor power i
* 8 2 Form ES-401-1 ---------ES-401 BWR Exam i nation Outline Form ES-401-' Emergency and Abnormal Plant Evolutions  
295037 SCRAM Condition Present and Power Above APRM Downscale or 1         ,
-T i er 1/Group 1 (RO I SRO) E/APE # I Name/ Safety Function K K K A A G KIA Toplc(s) IR # 1 2 3 1 2 295038 H i gh Off-site Release Rate / 9 1 G2.4.9 (10CFR 55.41.10)
EK2.13 (10CFR 55.41 .7)
Knowledge of low power/shutdown implications in accident (e.g., loss of coolant 3.8 18 accident or loss of residual heat removal) mitigation strategies. 600000 Plant Fire On Site I 8 1 AK1.02 (10CFR 55.41.5) Knowledge of the operational implications of the following concepts as they 2.9 19 ! apply to PLANT FIRE ON SITE:
Unknown 1 1                                              Knowledge of the interrelations between SCRAM CONDITION PRESENT AND REACTOR POWER ABOVE APRM DOWNSCALE OR UNKNOWN and the                             3.4     17 following:
* Fire fighting 700000 Generator Voltage and Electric Grid 1 AA1.03 (10CFR 5S.41.10) Disturbances
* Alternate boron injection methods: Plant-Specific SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM                                                                                                             Page 5
/ 6 Ability to operate and/or monitor the following as they apply to GENERATOR VOLTAGE AND ELECTRIC GRID DISTURBANCES
* 8 2
: 3.8 20
O~--
* Voltage regulator controls , I KIA Category Totals; (RO) 4 3 3 4 3 3 Group Po i nt Total: (RO) 20 KIA Category Totals: (SRO) 3 4 Group Po in t Total: (SRO) 7 --SRO only K/ As shown in italics 3/17/2010  
Form ES-401-1
-9:15:46 AM Page 6 ES-401
                                                                                                                        -- -     ---           -   --   --  ~
* 3 0 Form E fJ .. O-1.-1------ES-401 BWR E xamination OuUlne Form ES-401-1 Emergency and Abnormal Plant Evolutions  
ES-401                                                         BWR Examination Outline                                                                 Form ES-401-'
-Tier 1/Group 2 (RO I SRO) ElAPE # I Name I Safety Funct ion K K K A A G KIA Toplc(s) IR # 1 2 3 1 2 295002 Loss of Ma i n Condenser Vae I 3 1 AK2.02 (10CFR55.41.10)  
Emergency and Abnormal Plant Evolutions - Tier 1/Group 1 (RO I SRO)
-OPERATING EXPERIENCE u Knowledge of the interrelations between LOSS OF MAIN CONDENSER 3.1 21 VACUUM and the following:
E/APE # I Name/ Safety Function K K K A A   G                                         KIA Toplc(s)                                             IR       #
* Ma in turbine a81QQ:J NI&h A ....
1 2 3 1 2 295038 High Off-site Release Rate / 9                   1 G2.4.9 (10CFR 55.41.10)
a ------NOT RANDOMLY SELECTED ----M008 ...".. A ** ., w .. .....,.. a ------NOT RANDOMLY SELECTED ---295009 low Reactor Water Levell 2 1 AK1.0S (10CF R 55.41.10)
Knowledge of low power/shutdown implications in accident (e.g. , loss of coolant               3.8     18 accident or loss of residual heat removal) mitigation strategies.
Knowledge of the operational impli cations of the foll owing concepts as they 3.3 22 apply to LOW REACTOR WATER LEVEL:
600000 Plant Fire On Site I 8             1             AK1.02 (10CFR 55.41 .5)
* Natural circulation 295010 High Drywell Pressure I 5 1 1 AA1.06 (10CFR 55.41.7) Ability to operate and/or monitor the following as they apply to HIGH DRYWELL 3.3 23 . , PRESSURE: .
Knowledge of the operational implications of the following concepts as they
* Le akage detection systems G2.2.4 (10CFR 55.43.5 -SRO Only) (multi-unit license) Ability to explain the variations in control board/controJ room 3.6 83 layouts , systems, instrumen tation , and procedural actions between units at a fac ility. I 28601 WIsh G8RtaiAIMRI  
                                                      !
+., J-Ii ------NlA for BFN -KiA for Mark III Containments ONL Y --a&I013 ..... +8Alp ..... $1 -----NOT RANDOMLY SELECTED -. ---IoUgh S .. ,,"IIIi8R Peel 14M,. ! * ------NOT RANDOMLY SELECTED ----------.-SRO only K/ As shown in italics 3/17/2010  
apply to PLANT FIRE ON SITE:
-9:15:46 AM Page 7
2.9      19
---"o eD 0 ES-401 3 --Form ES-401 BWR Exam i nation Outline Form ES-40 1*' Emergenoy and Abnormal Plant Evolutions  
* Fire fighting 700000 Generator Voltage and Electric Grid Disturbances / 6 1       AA1.03 (10CFR 5S.41 .10)
-Ti er 1/Group 2 (RO I SRO) ElAPE Ii I Name I Safety Function K K K A A G KiA Toplc(s) IR # 1 2 3 1 2 295014 Inadvertent Reactivity Addition 1 1 1 AA2.01 (10CFR 55.43.5 -SRO Only) AbIlity to determine and/or interpret the following as they apply to 4.1 84 INADVERTENT REACTIVITY ADDITION:
Ability to operate and/or monitor the following as they apply to GENERATOR VOLTAGE AND ELECTRIC GRID DISTURBANCES:
* Reactor power ..o;lllRIIIIIRpiaIe SGMMJ ------NOT RANDOMLY SELECTED , ---
3.8     20
HIfIII OW tile Rei .... Rate $ 8 NOT RANDOMLY SELECTED . __ I --------,-IAaIh'-' GaR" leelatieR J Ii &:,: ------NOT RANDOMLY SELECTED .. ----295022 Loss of CRD Pumps 1 1 1 G2.2.38 (10CFR 55.41.10) 3.6 24 Knowledge of conditions and limitations in the facility license. I 295029 H i gh Suppression Pool Wtr Lvi I 5 1 EK3.03 (10CFR 55.41.10) Knowledge of the reasons for the following responses as they apply to HIGH 3.4 25 SUPPRESSION POOL WATER LEVEL:
* Voltage regulator controls                                                                         ,
* Reactor SCRAM 281Gaa HI .. S8I8R1l1If)'
I KIA Category Totals; (RO)                 4 3 3 4 3 3                                                                         Group Point Total:   (RO)           20 KIA Category Totals: (SRO)                         3 4                                                                       Group Point Total:   (SRO)             7
CenlaiMleRt  
                                                  --
-------NOT RAN DOML Y SELECTED ----' .. ,..T ...........
SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM                                                                                                                           Page 6
JIi .. --295033 High Secondary Containment 1 G2.3.13 (10CFR 55.43.2 -SRO Only) Area Radiation Levels I 9 Knowledge of radi%gical safety procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry 3.8 85 1 requirements, fuel handling responsibilities, access to locked high-radiation  
 
! I areas , aligning filters, etc. 295034 Secondary Containment 1 EA1.02 (10CFR 55.41.7) Ventilation High Radiation I 9 Ability to operate and/or monitor the following as they apply to SECONDARY 3.9 26 CONTAINMENT VENTILATION HIGH RADIATION:
ES-401
--_ ... --SRO only K/ As shown in italics 3/17/2010  
* 30                                                              Form Ef J  ..O-1.-1-- --
-9:15:46 AM Page 8 O@
                                                                                                                          -                           -
* ES-401 3 Form ES-401-1 -ES-401 BWR Exam i nation OuUine Form ES-401-1 Emergency and Abnormal Plant Evolutions  
ES-401                                                         BWR Examination OuUlne                                                           Form ES-401 -1 Emergency and Abnormal Plant Evolutions - Tier 1/Group 2 (RO I SRO)
-Tier 1/Group 2 (RO I SRO) ElAPE # I Name I Safety Funct ion K K K A A G KIA Topic(s) IR # 1 2 3 1 2
K K K A A  G ElAPE # I Name I Safety Function                                                              KIA Toplc(s)                                     IR         #
* Process rad iation monitoring system _gali SaseR..,.
1 2 3 1 2 295002 Loss of Main Condenser Vae I 3       1           AK2.02 (10CFR55.41.10) - OPERATING EXPERIENCEu Knowledge of the interrelations between LOSS OF MAIN CONDENSER VACUUM and the following:
CeMliRlReAt Nigh ----I:MIfefaAliai P,.. * ..,. J Ii --NOT RANOOML Y SELECTED ---295036 Secondary Containment High 1 EA2.01 (1 OCFR 55.41.10) Sump/Area Water level I 5 Ability to determine and/or interpret the following as they apply to SECONDARY CONTAINMENT HIGH SUMP/AREA WATER LEVEL: 3.0 27
3.1      21
* Operability of components within the affected area IQQQQQ Nigh CTMr "&#xa5;I'-ileA CaM. I Ii ------NOT RANOOML Y SELECTED ------I KIA Category Totals: (RO) 1 1 1 2 1 1 Group Point Tota l: (RO) 7 KIA Category Totals: (SRO) 1 2 Group Po i nt To t al: (SRO) 3 -SRO only K/ As shown in italics 3/17/2010  
* Main turbine a81QQ:J NI&h A. . . . PF.'~""I a           - - - - - -   NOT RANDOMLY SELECTED                                                                 -- --
-9:15:46 AM Page 9 ES*401 4 Form 1*1 .. -] ES-401 BWR Exam i nation Outline Form ES-401-1 Plant Systems -Tier 21Group 1 (RO I SRO) System # I Name K K K K K K A A A A G KiA Top i c(s) IR # 1 2 3 4 5 6 1 2 3 4 203000 RHRlLPCI: Injection 2 1 A1.01 (10CFR 55.41.5) Mode Ab ility to predict and/or monitor changes in parameters assoc i ated with operating the RHRlLPCI: INJECT I ON MODE (PLA NT SPECIFIC) 4.2 28 controls inclu ding:
M008 ...".. A**. , w. . .....,.. ~ a
* Reactor water level A1.04 (10CFR 55.41.5) Ab ility to pred i ct and/or monitor changes in parameters associated w i th operating the RHRlLPCI: INJECT ION MODE (PLANT SPEC I FIC) 3.6 29 controls Inc luding:
                                            - - - - - -   NOT RANDOMLY SELECTED                                           ~                      -- -
* System pressure A2.09 (10CFR 55.43.5 -SRO Only) Ability to (a) predict the impacts of the f ollowing on the RHRlLPCI: , INJECTION MODE (PLANT SPECIFIC); and (b) based on those 3.4 86 , predictions , use procedures to COffect , control , or mitigate the " consequences of those abnormal conditions or operations
295009 low Reactor Water Levell 2         1             AK1.0S (10CFR 55.41.10)
: i
Knowledge of the operational implications of the following concepts as they apply to LOW REACTOR WATER LEVEL :                                                     3.3      22
* Inadequate system flow 205000 Shutdown Cooling 1 K3.05 (10 CFR 55.41.7) Knowledge of the effect that a loss or malfunction of the SHU TD OWN " COOLING SYSTEM (RHR SHUTDOWN COOLING MODE) will have 2.6 30 on the following:
* Natural circulation 295010 High Drywell Pressure I 5                 1     1 AA1.06 (10CFR 55.41.7)
* Fuel pool cooling assist: Pla nt-Spec ific 206000 HPCI 1 K2.02 (10CFR 55.41.7) Knowledge of electrical power supplies to the following:
Ability to operate and/or monitor the following as they apply to HIGH DRYWELL
2.8 31
                                                      .,                                                                                          3.3       23
* System pumps: BWR-2 , 3,4 aG109Q ..... aA " Ca ...... -----------NlA for BFN -No Isolation Condenser(s)  
                                                      . PRESSURE:
-------,. SRO only K/ As shown in italics 3/17/2010  
* Leakage detection systems G2.2.4 (10CFR 55.43.5 - SRO Only)
-9:15:46 AM Page 10
(multi-unit license) Ability to explain the variations in control board/controJ room   3.6       83 layouts, systems, instrumentation, and procedural actions between units at a facility.
--e * .---ES-401 4 Form ES-401-1 ES-401 BWR examination OuU lne Form ES-401.' Plant Systems -Tier 21Group 1 (RO I SRO) S ys t e m # I N ame K K K K K K A A A A G KIA To p ic(s) IR # 1 2 3 4 5 6 1 2 3 4 209001 LPCS 1 K1.08 (10CFR 55.41.7) I Knowledge of the p hysical connections andlor cause-effect relationships between the LOW PRESSURE CORE SPRAY (LPCS) 3.2 3 2 SYSTEM and the following:
                                            - - - - - -
* A.C. electrical power " NJA for BFN -No HPCS S ystem --------------211000 SLC 1 1 A3.01 (1 OCFR 55.41. 7) . Ability to monitor automatic operations of the STANDBY LIQUID 3.5 33 CONTRO L SYSTEM including: I
I 28601 ~ WIsh G8RtaiAIMRI +., J-Ii                         NlA for BFN - KiA for Mark III Containments ONL Y                                     - -
* Pump discharge pressure: Plant*Specific " G2.1.7 (10CFR 55.43.5 -SRO Only) A bility to evaluate plant performance and make operational judgments 4.7 87 based on operating characteristics, reactor behavior , and instrument interpretation.
a&I013 ..... ~ +8Alp ..... $1             - - - - - -    NOT RANDOMLY SELECTED                               .   -                             - -
212000 RPS 1 A2.09 (10CFR 55.41.5) Ability to (a) predict the impacts of the following on the REACTOR PROTECTION SYSTEM (RPS); and (b) based on those predictions , 4.1 3 4 use procedures to co r rect , control , or mitigate the consequences of those abnormal conditions or operations:
~3      IoUgh S ..,,"IIIi8R Peel 14M,. ! * - - - - - -   NOT RANDOMLY SELECTED
* High containmenVdrywell pressure SRO only K/ As shown in italics 3/17/2010
                                                                                                          - ---   -   --     .-
-9:15:46 AM Page 11
                                                                                                                                                  -- -
___ ___________
SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM                                                                                                                   Page 7
* a ES-401 '-" 4 Form ES-401-1 ---------ES-401 BWR Examination Outl i ne Form ES-4 01-1 Plant Systems -Ti er 21Group 1 (RO I SRO) K K K K K K A A. A A G I System # I Name 1 2 3 4 5 6 1 2 3 4 KIA Toplc(s) IR # 2150031RM 2 A4.04 (10CFR 55.41 , 7) Ability to manually operate andlor monitor in the control room: 3.1 35
 
* IRM back panel switches , meters , and ind i cating lights A4.05 (10CFR 55.41.7) Ability to manually operate and/or mon i tor in the control room: 3.4 36
---"oeD ES-401                                                                           3 0                                                        Form  --
* Trip bypasses 215004 Sour c e Range Mon i tor 1 G2.2.2 (10CFR 55.41.7) Ability to manipulate the console controls as required to operate the 4.6 37 , facility between shutdown and designated power levels. 2 1 5005 APRM I LPRM 1 K4.01 (10CFR 55.41.7) Knowledge of AVERAGE POWER RANGE MONITOR / LOCAL POWER RANGE MONITOR (APRM I LPRM) SYSTEM des ign 3.7 38 feature(s) and/or inte rlocks which prov i de for the following:
ES-~01-1 ES-401                                                             BWR Examination Outline                                                   Form ES-401* '
* Rod withdrawal blocks 217000 RCIC 1 K6.04 (10CFR 55.41.7) .; Knowledge of the effect that a loss or malfunction of the following will have on the REACTOR CORE ISOLATION COOLING SYSTEM 3.5 39 (RC IC):
Emergenoy and Abnormal Plant Evolutions - Tier 1/Group 2 (RO I SRO)
* Condensate storage and transfer system SRO only K/ As shown in italics 3/17/2010
ElAPE Ii I Name I Safety Function K K K A A G                                           KiA Toplc(s)                             IR       #
-9:15:46 AM Page 12 
1 2 3 1 2 295014 Inadvertent Reactivity Addition 1 1               1   AA2.01 (10CFR 55.43.5 - SRO Only)
--0
AbIlity to determine and/or interpret the following as they apply to INADVERTENT REACTIVITY ADDITION:
* ES-401 4 Form ES-401-1 ES-401 BWR Exam i nation OuUlne Form ES-401-1 Plant Systems -TIer 21Group 1 (RO I SRO) System # I Name K K K K K K A A A A G KlA Toplc(s) IR 1# 1 2 3 4 5 6 1 2 3 4 218000 ADS 2 K4.02 (10CFR 55.41.7) Knowledge of AUTOMATIC DEPRESSURIZATION SYSTEM (ADS) 3.8 40 design feature(s) and/or interlocks which provide for the following:
: 4. 1    84
* Allows manual initiation of ADS logic K4.03 (10CFR 55.41.7) Knowledge of AUTOMATIC DEPRESSURIZATION SYSTEM (ADS) 3.8 41 I design feature(s) and/or interlocks which provide for the follow i ng:
* Reactor power
* ADS logic control 223002 PelS/Nuclear Steam 2 K1.04 (10CFR 55.41.7) Supply Shutoff I Knowledge of the physical connections and/or cause-effect relationsh i ps between the PRIMARY CONTAINMENT ISOLATION 3.5 42 SYSTEM (PCIS) / NUCLEAR STEAM SUPPLY SHUT-OFF and the following:
  ..o;lllRIIIIIRpiaIe SGMMJ ~                      - - - - - -   NOT RANDOMLY SELECTED                                         ,
* H i gh pressure coolant injection: Plant-Specific , K1.08 (10CFR 55.41.7) Knowledge of the physical connections and/or cause-effect 3.4 43 relationships between the PRIMARY CONTAINMENT ISOLATION SYSTEM (PCIS) I NUCLEAR STEAM SUPPLY SHUT-OFF and the following:
                                                                                                                                                - --
* Shutdown cooling system/RHR 239002 SRVs 1 K2.01 (10CFR 55.41.7) Knowledge of electrical power supplies to the following: 2.8 44
                                                  - - - - - -                                                                            .              __ I
* SRV solenoids SRO only Kj As shown in italics 3/17/2010
_o~:,:    HIfIII OW tile Rei.... Rate $ 8                     NOT RANDOMLY SELECTED                                               ,-         --
-9:15:46 AM Page 13 ES-401 8 4 Form ES-401-1 ES-401 BWR Exam i nation Outline Fonn ES-401-1 Plant Systems -Tier 21Group 1 (RO I SRO) S ys t em # I N ame K K K K K K A A A A G KIA T op ic(s) IR # 1 2 3 4 5 6 1 2 3 4 259002 Reactor Waler Level 1 G2.2.40 (10CFR 55.41.10)
  ~ IAaIh'-' GaR"             leelatieR J Ii &:,: - - - - - -   NOT RANDOMLY SELECTED
Contro l Ability to apply technical specifications for a system. 3.4 4 5 261000 SGTS 1 1 A 1.01 (10CFR 55.41.5) Ability to predict and/or monitor changes in parameters associated with operating the STANDBY GAS TREATMENT SYSTEM (SGTS) 2.9 46 controls including:
                                                                                                                                        ..
..
                                                                                                                                                -- --
* System flow G2.2.4 (1OCFR 55.43.5 -SRO Only) (multi-unit license) Ability to explain the variations in control 3.6 88 board/control room layouts. systems. instrumentation , and procedural actions between units at a facility.
295022 Loss of CRD Pumps 1 1                             1   G2.2.38 (10CFR 55.41 .10) 3.6     24 Knowledge of conditions and limitations in the facility license.
262001 AC Electrical 1 K5.02 (10CFR 55.41.5) Distribution Knowledge of the operational Implications of the following concepts as they apply to A.C. ELECTRICAL DISTRIBUTION
I 295029 High Suppression Pool Wtr Lvi I 5           1         EK3.03 (10CFR 55.41 .10)
: 2.6 47
Knowledge of the reasons for the following responses as they apply to HIGH SUPPRESSION POOL WATER LEVEL:                                                   3.4      25
* Breaker control 1 262002 UPS (AClDC) 1 K3.08 (10C F R 55.41.7) Knowledge of the effect that a loss or malfunction of the UNINTERRUPTABLE POWER SUPPLY (A.C.lD.C.)wili have on the 2.7 48 following:
* Reactor SCRAM
* Compute r operation:
                                                                                                          -
Plant-Specific SRO only Kj As shown in italics 3/17/2010
281Gaa HI.. S8I8R1l1If)' CenlaiMleRt
-9:15:46 AM Page 14 
  ..,..T........... JIi                           - - - - - -  NOT RAN DOML Y SELECTED                                                ..     -- -- '
----->.,.Q
                                                                                      -                                    -
* ES-401 4 Form ES-401-1 --------------------ES-401 BWR Exam i nalion Outline Form ES-401-1 Plant Systems -Tier 21 Group 1 (RO I SRO) S ys t em 1# I N am e K K K K K K A A A A G KI A Topic(s) IR # , 1 2 3 4 5 6 1 2 3 4 263000 DC Electrica l 1 1 A2.0 2 (10CFR 55.41 , 5) D istri b uti on Ability to (a) pred i ct the im pacts of the following on the D , C. ELECTRICAL DISTRIBUTION SYSTEM; and (b) based on those 2.6 49 pred i ctions , use procedures to correct , control , or mitigate the consequences of those abnormal conditions or operations
295033 High Secondary Containment                         1 G2.3.13 (10CFR 55.43.2 - SRO Only)
:
Area Radiation Levels I 9 Knowledge of radi%gical safety procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry 1 requirements, fuel handling responsibilities, access to locked high-radiation     3.8    85
* Loss of ventilation dur i ng charging G2.1.2B (10CFR 55.43.5 -SRO Onl y) 4.1 89
!                                                             I areas, aligning filters, etc.
* Knowledge of the purpose and function of major system components and controls. 264000 EDGs 2 A 3.0 2 (10CFR 55.41.7) Ability to monitor automatic operations of the EMERGENCY GENERATORS (DIESEL I JET) including: 3.1 50 I
295034 Secondary Containment                         1       EA1.02 (10CFR 55.41.7)
* Min i mum time for load pickup A 3.0 4 (1 OCFR 55.41.7) Ability to monitor automatic operations of the EMERGENCY GENERATORS (DIESEL I JET) i ncluding: 3.1 5 1
Ventilation High Radiation I 9 Ability to operate and/or monitor the following as they apply to SECONDARY       3.9     26
* Operation of the governor control system on frequency and voltage control 30 00 00 I nstrument AIr 1 A4.0 1 (10CFR 55.41.7) ! Ability to manually operate andlor monitor in the control room: 2.6 52
  - - _ ... -       -
* Pressure gauges ---------------SRO only K/ As shown in italics 3/17/2010
CONTAINMENT VENTILATION HIGH RADIATION:
-9:15:46 AM Page 15 ES*401 ES-401 BWR Exam i na ti o n Outl i ne Form ES*401*1 Plant Systems -Tier 21Group 1 (RO I SRO) System ttl Name K K K K K K A A A A G KIA Toplc(s) IR # 1 2 3 4 5 6 1 2 3 4 400000 Component Coo lin g 1 1 K6.05 (10CFR 55.41.7) Water Knowledge of the effect that a loss or malfunction of the following will 2.8 53 have on the CCWS:
SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM                                                                                                               Page 8
* Pumps " , A2.02 (10CFR 55.43.5 -SRO Only) Ability to (a) predict the impacts of the following on the CCWS; and (b) based on those predictions , use procedures to correct, control , or 3.0 90 mitigate the consequences of those abnormal conditions or operations
 
:
ES-401 O@                                                      3
* High/low surge tank level KIA Category Point Totals: 3 2 2 3 1 2 3 2 3 3 2 G r oup P oint Tota l: (RO) 26 (RO) KIA Category Po i nt Totals: 2 3 Group Point Total: (SRO) 5 (SRO) I SRO only K/ As shown in italics 3/17/2010
* Form ES-401-1
-9:15: 46 AM Page 16 Q 0 Q!!!F--''': -5 Form ES*401*1 j ES-401 BWR Exam in atlon Outline Form ES-401-1 Plant Systems -ner 2JGroup 2 (RO I SRO) System 11 , Name K K K K K K A A A A G KIA Top ic(s) IR # 1 2 3 4 5 6 1 2 3 4 -----------NOT RANDOMLY SELECTED ----,--201002 RMCS 1 A2.04 (1 0CFR 55.41.5) Ab il ity to (a) predict the imp acts of the following on the REACTOR MA NUA L CONTROL SYSTEM; and (b) based on those pred i ctions, 3.2 54 use procedures to correct , control , or mitigate the consequences of those abnormal conditions or operations
                                                -
:
ES-401                                                   BWR Examination OuUine                                                                 Form ES-401 -1 Emergency and Abnormal Plant Evolutions - Tier 1/Group 2 (RO I SRO)
* Control rod block 3Q1aoac.l1trgl .. -----NOT RANDOMLY SELECTED -----Me8MAIeM -------I R&G& -----------NlA for BFN -BWR 4/5 ONLY -------------NlA for BFN -BWR 6 ONLY > -------3QUIOIAWM -----------NOT RANDOMLY SELECTED ----R.alN1llali8fl
ElAPE # I Name I Safety Function K K K A A   G                                         KIA Topic(s)                                         IR       #
-----------NOT RANDOML Y SELECTED ----2QaOQa Re ...... 1eA Flew QeAtr8I -----------NOT RANDOMLY SELECTED ---
1 2 3 1 2
-----------NOT RANDOMLY SELECTED ----:n4DQORPI&
* Process radiation monitoring system
-----------NOT RANDOMLY SELECTED ---215001 Traversing I n-core Probe 1 G2.4.21 (10CFR 55.43.5 -SRO Only) i Knowledge of the parameters and logic used to assess the status of , safety functions, such as reactivity control , core cooling and heat 4.6 91 " removal, reactor coolant system integrity, containment conditions, , radioactivity release control, etc. I i SRO only K/ As shown in italics 3/17/2010
_gali SaseR..,. CeMliRlReAt Nigh I:MIfefaAliai P,..* ..,. J Ii         - --  - - -  NOT RANOOMLY SELECTED                                                                       -- -
-9:15:46 AM Page 17 8
295036 Secondary Containment High               1   EA2.01 (1 OCFR 55.41 .10)
* 0---ES-401 5 Form ES-401-1 ES-401 BWR Examination OuUine Form ES-401*1 Plant Systems -T i er 21Group 2 (RO I SRO) System # I Name K K K K K K A A A A G KJA To pic(s) IR # 1 2 3 4 5 6 1 2 3 4 215002 RBM 1 A3.04 (10CFR 55.41.7) Ability to monitor automatic operations of the ROD BLOCK 3.6 55 MONITOR SYSTEM including:
Sump/Area Water level I 5 Ability to determine and/or interpret the following as they apply to SECONDARY CONTAINMENT HIGH SUMP/AREA WATER LEVEL:
* Verification of proper functioning I operability
3.0     27
: BWR-3,4 ,5 216000 Nuclear Boiler Ins\. 1 1 A1.02 (10CFR 55.41.5) Ability to predict and/or monitor changes in parameters associated with operat ing the NUCLEAR BOILER INSTRUMENTATION 2.9 56 controls including:
* Operability of components within the affected area IQQQQQ Nigh CTMr "&#xa5;I'-ileA CaM. I Ii   - - - - -   - NOT RANOOMLY SELECTED
* Removing or returning a (sensor) transmitter to service I A2.06 (10CFR 55.43.5* SRO Only) Ability to (a) predict the impacts of the following on the NUCLEAR BOILER INSTRUMENTATION
                                                                                                                                    - -         -- --
; and (b) based on those predictions , 3.1 92 use procedures to correct , control , or mitigate the consequences of those abnormal conditions or operations
I KIA Category Totals:       (RO)       1 1 1 2 1 1                                                                       Group Point Total: (RO)           7 KIA Category Totals: (SRO)                     1 2                                                                     Group Point Total: (SRO)           3
:
                                                -
* Loss of power supply 219000 RHRlLPCI: TorusIPool 1 G2.4.41 (10CFR 55.43.5 -SRO Only) Cooling Mode Know/edge of the emergency action level thresholds and 4.6 93 classmcations.
SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM                                                                                                                 Page 9
PfiIMty
 
.. -----------NOT RANDOMLY SELECTED ----ZMIQ01 8pn1)1 --------I ----NOT RANDOMLY SELECTED . --230000 RHRlLPCI: Torus/Pool 1 j A4.04 (10CFR 55.41.7) I Spray Mode 1 I Ab il ity to manually operate and/or mo ni tor i n the control room: 3.1 57 I
ES*401                                                               4                                                             Form         1*1
* M i nimum flow valves ------_ .. -SRO only K/ As shown in italics 3/17/2010
                                                                                                                                    ..       -
-9:15:46 AM Page 18 ES-401 ES-401 BWR Exam i nation Ou Uin e Fonn ES-401-1 Plant Systems -Tier 21Group 2 (RO I SRO) System # I Name K K K K K K A A A A G KIA Topic(s) IR #I 1 2 3 4 5 6 1 2 3 4 233000 Fuel Poo l Cooling/Cleanup 1 K2.02 (1 OCFR 55.41.7) Knowledge of electrical power supplies to the following: 2.8 58
ES-401                                                 BWR Examination Outline                                                         Form ES-401 -1 ]
* RHR pumps SRO only K/ As shown in italics 3/17/2010
Plant Systems - Tier 21Group 1 (RO I SRO)
-9:15:46 AM Page 19 o 0 5 Form ES-401-1 I ES-401 BWR Examination Outline Form ES-401-1 Plant Systems -Tier 21Group 2 (R O I SRO) System # I Name K K K K K K A A A A G KIA Topic(s) IR # 1 2 3 4 5 6 1 2 3 4 234000 Fuel Handling Equipment 1 K 5.02 (10CFR 55.41.5) "' Knowledge of the operational implications of the following concepts 3.1 59 as they apply to FUEL HANDLING EQUIPMENT: "
K   K K K K K A A   A   A   G System # I Name                                                                          KiA Topic(s)                             IR         #
* Fuel handling equipment interlocks
1   2 3 4 5 6 1 2   3   4 203000 RHRlLPCI: Injection               2 1                 A1.01 (10CFR 55.41 .5)
...... _ R ...... S,._ -----------NOT RANDOMLY SELECTED----.' 3a8Q03 MSIV La ..... (;eARI -----------NJAfor BFN ----241000 Reacl , orrrurbine Pressure 1 K6.0 6 (10CFR 55.41.7) Regulator Knowledge of the effect that a loss or malfunction of the following will have on the REACTOR I TURBINE PRESSURE REGULATING 3.8 60 SYSTEM:
Mode Ability to predict and/or monitor changes in parameters associated with operating the RHRlLPCI : INJECTION MODE (PLANT SPECIFIC) controls including:
* Reactor pressure 34iOQQ MIlA ;"ftllAe G.i. ."' .. NOT RANDOMLY SELECTED , ------------3MGOG R ****
4.2         28
-----------NOT RANDOMLY SELECTED --" -
* Reactor water level A1.04 (10CFR 55.41.5)
Reaelaf .... .,... -----------NOT RANDOMLY SELECTED --268000 Radwaste 1 K 3.04 (10CFR 55.41.5) Knowledge of the effect that a loss or malfunction of the 2.7 61 RADWASTE will have on the following:
Ability to predict and/or monitor changes in parameters associated with operating the RHRlLPCI : INJECTION MODE (PLANT SPECIFIC) controls Including:                                                      3.6         29
* Drain sumps mggog .... -----------NOT RANDOMLY SELECTED ---I SRO only K/ As shown in italics 3/17/2010
* System pressure A2.09 (10CFR 55.43.5 - SRO Only)
-9:15:46 AM Page 20 
Ability to (a) predict the impacts of the following on the RHRlLPCI:
-e
                                            ,                 INJECTION MODE (PLANT SPECIFIC); and (b) based on those
* ES*401 5 Form ES*401*1 ES-401 BWR Exam i nation Outline Fonn ES-401-1 I Plant Systems -Tier 21Group 2 (RO I SRO) System # I Name K K K K K K A A A A G KJA Toplc(s) IR # 1 2 3 4 5 6 1 2 3 4 272000 Rad l alion Mon i t oring 1 A3.02 (10CFR 55.41.7) Ability to monitor automatic operations of the RADIATION 3.6 62 MONITORING SYSTEM including:
                                                ,                                                                                        3.4       86 predictions, use procedures to COffect, control, or mitigate the consequences of those abnormal conditions or operations:                                   i
* Offgas system isolation indications 286000 Fire Protection 1 G2.2.42 (10CFR 55.41.10) Ability to recognize system parameters that are entry-level 3.9 63 conditions for Technical Specifications. :a&1OGO
                                                            "
----NOT RANDOMLY SELECTED -------.. ---
* Inadequate system flow 205000 Shutdown Cooling 1                             K3.05 (10CFR 55.41 .7)
& ** c:lM; -----------NOT RANDOMLY SELECTED ----' 290003 Contro l Room HVAC 1 K4.01 (10CFR 55.41.7) Knowledge of CONTROL ROOM HVAC design feature(s) and/or 3.1 64 in terlocks which provide for the follow ing:
Knowledge of the effect that a loss or malfunction of the SHUTDOWN
* System initiationslreconfiguration
                                                "
: Plant-Specific 290002 Reactor Vessel Intemals 1 K1.12 (10CFR 55.41.6) Knowledge of the physical connections andlor cause-effect relationships between REACTOR VESSEL INTERNALS and the 3.4 65 following:
COOLING SYSTEM (RHR SHUTDOWN COOLING MODE) will have                     2.6       30 on the following:
* SBlC KJA Category Point Totals: 1 1 1 1 1 1 1 1 2 1 1 Group Po i nt Total: (RO) 12 (RO) KIA Category Point Totals: 1 2 Group Point Total: (SRO) 3 (SRO) SRO only K/ As shown in italics 3/17/20 1 0 -9:15:46 AM Page 2 1 ES-401 Generic Knowledge and Abilities Outline (Tier 3) Form ES-401-3 Facility: Browns Ferry NPP Date of Exam: June 07 -23 2010 RO SRO-Only Category KlA# Topic IR # IR # 2.1. G2.1.2S (10CFR 55.41.10) 3.9 66 Ability to interpret reference materials , such as graphs , curves, tables, etc. en 3.7 94 c:: G2.1.41 (10CFR 55.43.6 -SRO Only) 0 :;::; Know/edge of the refueling processes.
* Fuel pool cooling assist: Plant-Specific 206000 HPCI 1                               K2.02 (10CFR 55.41 .7)
ro L.. 3.9 67 Q) 2.1. G2.1.27 (10CFR 55.41.7) --0. Knowledge of system purpose andlor function . . 0 "f'-'+-2.1. G2.1.8 (10CFR 55.41.10) 3.4 68 0 --.... Ability to coordinate personnel activities outside U the control room. NOT RANDOMLY SELECTED c:: ----0 0 NOT RANDOMLY SELECTED ----NOT RANDOMLY SELECTED ----Subtotal 3 1 2.2. G2.2.37 (10CFR 55.41.10) 3.6 69 Ability to determine operab i lity and/or availability of safety related equipment.
Knowledge of electrical power supplies to the following:                 2.8       31 aG109Q .....aA (&IR"I8A~}
G2.2.39 (10CFR 55.43.2 -SRO Only) 4.5 95 Know/edge of less than or equal to one hour technical speCification action statements for systems. -0 2.2 . G2.2.22 (10CFR 55.41.5) 4.0 70 ..... ..... Knowledge of limiting cond i t i ons for operations c:: 0 and safety limits. 0 . ..... G2.2.43 (10CFR 55.43.3 -SRO Only) 3.3 96 N c:: Q) Know/edge of the process used to track E inoperable alarms. 0-2.2. G2.2.4 (10CFR 55.41.7) 3.6 71 .---::J (multi-unit license) Ability to explain the 0' W variations in control board/control room layouts , systems , instrumentation , and procedural actions between units at a facility. NOT RANDOMlY SELECTED ----NOT RANDOMlY SELECTED ----NOT RANDOMLY SELECTED ----Subtotal 3 2 SRO only K/ As shown in italics 3/17/2010
* System pumps: BWR-2,3,4 Ca......                   - - - - - - - - - - -               NlA for BFN - No Isolation Condenser(s)
-9:16:21 AM Page 22 ES-401 Generic Knowledge and Abilities Outline (Tier 3) Form ES-401-3 Facility: Browns Ferry NPP Date of Exam: June 07 -23 2010 RO SRO-Only Category KIA # Topic IR # IR # 2.3 G2.3.14 (10CFR 55.41.12) 3.4 72 Knowledge of radiation or contamination hazards that may arise during normal , abnormal , or emergency conditions or activities. G2.3.11 (10CFR 55.43.4-SRO Only) 4.3 97 Ability to control radiation releases.
                                                                                                                            "
-2.3 G2.3.S (1 OCFR 55.41.11 ) 2.9 73 0 Ability to use radiation monitoring systems , L-+-" such as fixed radiation monitors and alarms , C portable survey instruments , personnel 0 U monitoring equipment , etc. ('I') C G2.3.13 (10CFR 55.43.4 -SRO Only) 3.8 98 0 :t:j Knowledge of radiological safety procedures ro pertaining to licensed operator duties , such as .-"0 response to radiation monitor alarms , ro containment entry requirements , fuel handling 0:: responsibilities, access to locked high-radiation areas , aligning filters, etc. a:3 NOT RANDOMLY SELECTED ----a:3 NOT RAN DOML Y SELECTED ----a:3 NOT RANDOMLY SELECTED ----Subtotal 2 2 2.4. G2.4.20 (10CFR 55.41.10) 3.8 74 Knowledge of the operational implications of C EOP warnings , cautions, and notes. ro 0.. G2.4.40 (10CFR 55.43.5 -SRO Only) 4.5 99 -Knowledge of SRO's responsibilities in en emergency plan implementation.
                                                                                                                                        -- ,.--
Q) L-::l 2.4. G2.4.45 (10CFR 55.41.10) 4.1 75 '"0 Q) Ability to prioritize and interpret the significance U of each annunciator or alarm. .q-0 L-4.3 100 0.. G2.4.45 (10CFR 55.43.5 -SRO Only) >-Ability to prioritize and interpret the significance U of each annunciator or a/arm. c: Q) 0> L-NOT RANDOMLY SELECTED ----a> NOT RANDOMLY SelECTED E ----W NOT RANDOMLY SELECTED "; ----Subtotal 2 2 Tier 3 Point Total 10 7 SRO only K/ As shown in italics 3/17/2010
                                                                                                                                            ---
-9:16:21 AM Page 2 3 ES*401 Record of Rejected KlAs Form ES*401*4
SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM                                                                                                           Page 10
* Tier / Randomly Reason for Rejection Group Selected KIA 1 / 1 295023 AA 1.05 Rejected KIA no fuel transfer system for Browns Ferry, replaced with AA 1.03 Fuel handling equipment 1 / 1 295031 EK1.02 Rejected KIA due to overlap with 295009, replaced with EK1.03 water level effects on reactor power Rejected due to no significant unit differences for SRMs, 2/1 215004 G2.2.4 replaced with G2.2.2 Ability to manipulate the console controls as required to operate the facility between shutdown and designated power levels. 2/2 272000 A3.01 Rejected due to no auto main steam isolation, replaced with A3.02 Offgas system isolation indications Rejected unsuccessful last exam, replaced with G2.2.37: Ability 3 2.2.20 to determine operability and/or availability of safety related SRO only, rejected due to low probability of success, replaced with G2.4.21: Knowledge of the parameters and logic used to 2/2 215001 G2.4.2 assess the status of safety functions, such as reactivity control, core cooling and heat removal, reactor coolant system integrity,
* containment conditions, radioactivity release control, etc. SRO only rejected due to overlap, replaced with 2.3.13: Knowledge of radiological safety procedures pertaining to 1 /2 2950332.2.39 licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc
* 3/17/2010
-9:16:11 AM Page 1 ES-401 Written Examination Quality Checklist Form ES-401*6 Facility:
Browns Ferry Date of Exam: June 2010 Exam Level: RO 181 SRO 181 Initial Item Description a b* c# 1. Questions and answers are technically accurate and applicable to the facility. 0'\.. /f11 2. a. NRC KiAs are referenced for all questions. b. Facility learning objectives are referenced as available.
O"Lo-3. SRO questions are appropriate in accordance with Section D.2.d of ES-401 O-V --nf 4. The sampling process was random and systematic (If more than 4 RO or 2 SRO questions were repeated from the last 2 NRC licensing exams, consult the NRR OL 1tJJt-program office). 5. Question duplication from the license screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:
_ the audit exam was systematically and randomly developed; or _ the audit exam was completed before the license exam was started; or _ the examinations were developed independently; or _x_ the licensee certifies that there is no duplication; or 0""" 1f1 _ other (explain)
: 6. Bank use meets limits (no more than 75 percent Bank Modified New from the bank, at least 10 percent new, and the rest new or modified);
enter the actual RO / SRO-only 33%/36% 28% /20% 39%/44% O-V tqf -:M-L question distribution(s) at right. 7. Between 50 and 60 percent of the questions on the RO exam are written at the comprehension/
analysis level; Memory CIA the SRO exam may exceed 60 percent if the randomly selected KiAs support the higher cognitive levels; enter 45%/24% 55%/76% 01/ At I#-the actual RO / SRO question distribution(s) at right. 8. References/handouts provided do not give away answers 0""'" lU or aid in the elimination of distractors.
: 9. Question content conforms with specific KiA statements in the previous ly approved examination outline and is appropriate for the tier to which they are assigned; ()'V deviations are justified. "N1 10. Question psychometric quality and format meet the guidelines in ES Appendix B. 0-(.. 1M 11. The exam contains the required number of one-point, multiple choice items; ov 11k the total is correct and agrees with the value on the cover sheet. U Printed Name / S ignature ) &#xa3; Date a. Author D A,...'&#xa3;L k. Z ,{L'..-J.IC.'
I Q..,j)! y-q -.J \l J\) b. Facility Reviewer (*)
u) ./!e-/Jl'fir/cl ", L") j4-t'L -
: c. NRC Chief Examiner (#) G. 11 '5,1.7 , 201 0 d. NRC Regional Supervisor ttl. A* \\ATi".$ Foe I J J1 lJzl J .,-k.<-'" ttkl \..l8t. "" \H ..,r. .u" .J Note:
* The facility reviewer's initials/signature are not applicable for NRC-developed examinations.
# Independent NRC reviewer initial items in Column "c"; c hief examiner concurrence required.
If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification ES-401 Written Examination Review Worksheet Form ES-401-9    Q# 1. LOK (F/H) 2. LOD (1-5) 3. Psychometric Flaws
: 4. Job Content Flaws
: 5. Other 6. B/M/N  7. U/E/S 8. Explanation Stem Focus Cues T/F Cred. Dist. Partial Job-Link Minutia #/ units Back-ward Q= K/A SRO Only Gen                Before in-office visit (preliminary assessment):
[# of  Unsat RO Items:    [9/75 = %] Allowing credit for changes to previously identified Unsat items prior to 4/23/10 submittals; i.e., only tallying Unsat items on the 4/23/10 submittal]
# of Unsat SRO Items:
[ 8/25 = 32%]  Overall # of Unsat Items:  21/100 = 21
% # of  Unsat RO Items:    [XX/75 = XX%] After in-office visit:
# of Unsat SRO Items:  [ X/25 = XX%]
Overall # of Unsat Items:  XX/100 = XX%
Gen                If annunciator(s) referred to in a question, use EXACT nomenclature engraved on Alarm Window (also specified in ARP) followed by parentheses containing the shortest possible abbreviated window location designation that the applicants are familiar with.
Gen                Each question should contain "Which ONE of the following..." in the primary stem of the question. If it is a fill
-in-the-blank question, utilize "Which one of the following completes the statement
?" Gen                If providing a reference to the candidate, place a bracketed statement "[REFERENCE PROVIDED]" between the stem and the first possible answer choice.
Gen                Limit the amount of references provided to the candidates to the maximum extent possible.
Gen                In a two-part question format with more than one element contained in each choice, limit the number of elements to two (for each choice). Gen                Whenever applicable, ensure the phrase "in accordance with-."  Is pasted after the stem question. This ensures that there is only one correct answer.
In all procedure related questions, ensure that the stem question includes "in accordance with
-[procedure name]"


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LOD (1-5) 3. Psychometric Flaws
--e ES-401
: 4. Job Content Flaws
* 4                                                                . ---
: 5. Other 6. B/M/N  7. U/E/S 8. Explanation Stem Focus Cues T/F Cred. Dist. Partial Job-Link Minutia #/ units Back-ward Q= K/A SRO Only Gen                Please submit reference discs (in addition to "selected" procedure references) because this will:
Form ES-401-1 ES-401                                                BWR examination OuUlne                                                        Form ES-401.'
: 1) Provide the procedures to allow research on questions
Plant Systems - Tier 21Group 1 (RO I SRO)
. For example, a question may have the procedure reference ne eded to verify the correct answer; however, the procedure needed to validate the distractor is often not provided. 2) Having the other procedures will also facilitate development of alternative suggestions for questions needing replacements
System # I Name K  K K K K K A  A  A  A    G                                    KIA Topic(s)                             IR      #
. Gen                Avoid using the word "should" in any test questions because this can often be argued as correct by an applicant.
1  2 3 4 5 6 1  2  3  4 209001 LPCS                1                  I K1.08 (10CFR 55.41 .7)
Gen                SRO-only Clarification Guidance Rev 0, page 12 contains an example of a good SRO
Knowledge of the physical connections andlor cause-effect relationships between the LOW PRESSURE CORE SPRAY (LPCS)                 3.2     32 SYSTEM and the following:
-only question that is linked to 10CFR55.43 (5) procedure selection. Also pages 7 & 8 provide clarification in the first bullets by stating that if the question involves prescribing a procedure, then it may be SRO
* A.C. electrical power
-only. To further clarify
~"'~$                "
:  One area of SRO
                            -  - - - - - -  - - - -          NJA for BFN - No HPCS System                                          -        --
-level knowledge (with respect to prescribing or selecting procedures) is knowledge of the content of the procedure (SRO knowledge) versus knowledge of the overall mitigative strategy of the procedure (RO knowledge)
211000 SLC                                        1        1  A3.01 (1 OCFR 55.41 .7)
. To satisfy the 10CFR55.43.5 topic, the question must be linked to procedure selection. The SRO portion of a question may include procedure selection, tech specs, and/or E
                                                            . Ability to monitor automatic operations of the STANDBY LIQUID CONTROL SYSTEM including:                                                3.5      33
-plan classification, among the 7 areas listed in 10CFR55.43.
                                            "
Gen                Ensure that the stem question is followed with a question mark (?)
* Pump discharge pressure: Plant*Specific                                    I G2.1.7 (10CFR 55.43.5 - SRO Only)
instead of trailing (-.)
Ability to evaluate plant performance and make operational judgments    4.7      87 based on operating characteristics, reactor behavior, and instrument interpretation.
212000 RPS                                                    A2.09 (10CFR 55.41 .5) 1 Ability to (a) predict the impacts of the following on the REACTOR PROTECTION SYSTEM (RPS); and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of 4.1      34 those abnormal conditions or operations:
* High containmenVdrywell pressure SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM                                                                                                          Page 11


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Instructions
___n~___________*
ES-401      '-"                                                      4 a
Form ES-401-1
                                                                                              -  ~          ~~ -
                                                                                                                        - --      -  -  - --  -
ES-401                                                BWR Examination Outline                                                            Form ES-401 -1 Plant Systems - Tier 21Group 1 (RO I SRO)
I K  K K K K K A A. A  A    G                                                                                IR        #
System # I Name                                                                          KIA Toplc(s) 1  2 3 4 5 6 1 2    3  4 2150031RM                                            2        A4.04 (10CFR 55.41 ,7)
Ability to manually operate andlor monitor in the control room :
3.1      35
* IRM back panel switches, meters, and indicating lights A4.05 (10CFR 55.41 .7)
Ability to manually operate and/or monitor in the control room :            3.4      36
* Trip bypasses 215004 Source Range Monitor                                1  G2.2.2 (10CFR 55.41 .7)
Ability to manipulate the console controls as required to operate the                      ,
facility between shutdown and designated power levels.                      4.6      37 215005 APRM I LPRM 1                          K4.01 (10CFR 55.41 .7)
Knowledge of AVERAGE POWER RANGE MONITOR / LOCAL POWER RANGE MONITOR (APRM I LPRM) SYSTEM design                              3.7      38 feature(s) and/or interlocks which provide for the following :
* Rod withdrawal blocks 217000 RCIC 1                      K6.04 (10CFR 55.41 .7)
                                                .;              Knowledge of the effect that a loss or malfunction of the following will have on the REACTOR CORE ISOLATION COOLING SYSTEM                            3.5      39 (RCIC):
* Condensate storage and transfer system SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM                                                                                                              Page 12
 
- -0 ES-401                                                            4
                                                                  *                                                                  ~
Form ES-401-1 ES-401                                            BWR Examination OuUlne                                                          Form ES-401-1 Plant Systems - TIer 21Group 1 (RO I SRO)
System # I Name K  K K K K K A A A  A    G                                    KlA Toplc(s)                              IR        1#
1  2 3 4 5 6 1 2 3  4 218000 ADS                          2                      K4.02 (10CFR 55.41 .7)
Knowledge of AUTOMATIC DEPRESSURIZATION SYSTEM (ADS) design feature(s) and/or interlocks which provide for the following:      3.8      40
* Allows manual initiation of ADS logic K4.03 (10CFR 55.41 .7)
Knowledge of AUTOMATIC DEPRESSURIZATION SYSTEM (ADS)                      3.8      41  I design feature(s) and/or interlocks which provide for the following:
* ADS logic control 223002 PelS/Nuclear Steam  2                              K1.04 (10CFR 55 .41 .7)                                                                  I Supply Shutoff Knowledge of the physical connections and/or cause-effect relationships between the PRIMARY CONTAINMENT ISOLATION                    3.5      42 SYSTEM (PCIS) / NUCLEAR STEAM SUPPLY SHUT-OFF and the following:
* High pressure coolant injection: Plant-Specific
                                                        ,
K1 .08 (10CFR 55.41 .7)
Knowledge of the physical connections and/or cause-effect relationships between the PRIMARY CONTAINMENT ISOLATION                  3.4      43 SYSTEM (PCIS) I NUCLEAR STEAM SUPPLY SHUT-OFF and the following :
* Shutdown cooling system/RHR 239002 SRVs 1                          K2.01 (10CFR 55.41 .7)
Knowledge of electrical power supplies to the following:                  2.8      44
* SRV solenoids SRO only KjAs shown in italics 3/17/2010 - 9:15:46 AM                                                                                                        Page 13
 
ES-401
              ~                                                        8 4
O~-
Form ES-401-1 ES-401                                                  BWR Examination Outline                                                      Fonn ES-401 -1 Plant Systems - Tier 21Group 1 (RO I SRO)
K  K K K K K A A    A  A    G System # I Name                                                                            KIA Topic(s)                          IR        #
1  2 3 4 5 6 1 2    3  4 259002 Reactor Waler Level                                  1  G2.2.40 (10CFR 55.41.10)
Control                                                                                                                                  3.4      45 Ability to apply technical specifications for a system.
261000 SGTS                                                      A 1.01 (10CFR 55.41 .5) 1              1 Ability to predict and/or monitor changes in parameters associated with operating the STANDBY GAS TREATMENT SYSTEM (SGTS)                  2.9      46 controls including:
                                                  ..
* System flow G2.2.4 (10CFR 55.43.5 - SRO Only)
(multi-unit license) Ability to explain the variations in control      3.6      88 board/control room layouts. systems. instrumentation, and procedural actions between units at a facility.
262001 AC Electrical                                            K5.02 (10CFR 55.41 .5)
Distribution 1
Knowledge of the operational Implications of the following concepts as they apply to A.C. ELECTRICAL DISTRIBUTION:
2.6      47
* Breaker control                                                            1 262002 UPS (AClDC)                  1                          K3.08 (10CFR 55.41 .7)
Knowledge of the effect that a loss or malfunction of the UNINTERRUPTABLE POWER SUPPLY (A.C.lD.C.)wili have on the                2.7      48 following :
* Computer operation: Plant-Specific SRO only KjAs shown in italics 3/17/2010 - 9:15:46 AM                                                                                                        Page 14
 
----->.,.
ES-401 Q
* 4 G~-
Form ES-401-1
      - -- -    -- -    --~-- -      ~~ - ~-- - ----        -  - --    - -    --    -    -    - -    -  -- -          - --      -    - -    --
ES-401                                                      BWR Examinalion Outline                                                        Form ES-401-1 Plant Systems - Tier 21Group 1 (RO I SRO)
K  K K K  K K  A A  A  A      G                                                                                          ,
System 1# I Name                                                                              KIA Topic(s)                            IR        #
1  2 3 4  5 6  1 2  3  4 263000 DC Electrical                              1              1 A2.02 (10CFR 55.41 ,5)
Distribution Ability to (a) predict the impacts of the following on the D,C.
ELECTRICAL DISTRIBUTION SYSTEM; and (b) based on those predictions, use procedures to correct, control , or mitigate the 2.6      49 consequences of those abnormal conditions or operations:
* Loss of ventilation during charging G2.1.2B (10CFR 55.43.5 - SRO Only)
* 4. 1      89 Knowledge of the purpose and function of major system components and controls.
264000 EDGs                                          2            A 3.02 (10CFR 55.41 .7)
Ability to monitor automatic operations of the EMERGENCY GENERATORS (DIESEL I JET) including:                                      3.1      50  I
* Minimum time for load pickup A 3.04 (1 OCFR 55.41 .7)
Ability to monitor automatic operations of the EMERGENCY GENERATORS (DIESEL I JET) including:                                      3.1      51
* Operation of the governor control system on frequency and voltage control 300000 Instrument AIr                                                                                                                                      !
1        A4.01 (10CFR 55.41 .7)
Ability to manually operate andlor monitor in the control room :          2.6      52
* Pressure gauges
                                                                                                  - - - --- - ---  - -      -      --          ~
SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM                                                                                                            Page 15
 
ES*401 ES-401                                                BWR Examination Outline                                                            Form ES*401 *1 Plant Systems - Tier 21Group 1 (RO I SRO)
K  K K K K K A  A    A  A    G                                    KIA Toplc(s)                                  IR        #
System ttl Name 1  2 3 4 5 6 1  2    3  4 400000 Component Cooling                1    1                K6.05 (10CFR 55.41 .7)
Water Knowledge of the effect that a loss or malfunction of the following will have on the CCWS:
2.8      53
* Pumps
                                            "  ,
A2.02 (10CFR 55.43.5 - SRO Only)
Ability to (a) predict the impacts of the following on the CCWS; and (b) based on those predictions, use procedures to correct, control, or            3.0      90 mitigate the consequences of those abnormal conditions or operations:
* High/low surge tank level KIA Category Point Totals:
(RO)                        3 2 2 3 1 2 3 2 3 3 2                                                                    Group Point Total: (RO)          26 KIA Category Point Totals:
(SRO)                                        2            3                                                        Group Point Total: (SRO)            5 I
SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM                                                                                                              Page 16
 
Q                                                          0 5
Q !!!F--
                                                                                                                                            ''':
Form ES*401*1
                                                                                                                                                    -
                                        ~                                                                                                    ~  - --
ES-401                                                  BWR Examinatlon Outline                                                        Form ES-401-1  j Plant Systems - ner 2JGroup 2 (RO I SRO)
K K K K  K K A  A A    A    G System 11 , Name                                                                          KIA Topic(s)                            IR          #
1 2 3 4  5 6 1  2 3    4 3Q~DQ~~"'''''8                  - - - - - - - - - - -              NOT RANDOMLY SELECTED                                              - -- -,--
201002 RMCS                                      1                A2 .04 (1 0CFR 55.41.5)
Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of    3.2          54 those abnormal conditions or operations:
* Control rod block 3Q1aoac.l1trgl Me8MAIeM
              ~ .. ~
                                - - - - - - - -    - - -          NOT RANDOMLY SELECTED
                                                                                                                                        -----      - I 3Q~QCM R&G&                    - - - - - - - -    - -      -    NlA for BFN - BWR 4/5 ONLY                                            ----        --
301QOi~I$
                      >        - - - - - - - -    - -      -    NlA for BFN - BWR 6 ONLY                                              - --
3QUIOIAWM
                          -
                                - - - - - - - -    - -      -    NOT RANDOMLY SELECTED                                                - --
~1    R.alN1llali8fl          - - - - - - - -    - -      -    NOT RANDOML Y SELECTED                                                -- --
2QaOQa Re......1eA Flew QeAtr8I - - - - - - - -    - -      -    NOT RANDOMLY SELECTED                                                -- -
ao4DQO~
                                - - - - - - - -    - -      -    NOT RANDOMLY SELECTED                                                - ---
:n4DQORPI&                      - - - - - - - -    - -      -    NOT RANDOMLY SELECTED                                                -          --
215001 Traversing In-core Probe                                1 G2.4.21 (10CFR 55.43.5 - SRO Only)                                                      i, Knowledge of the parameters and logic used to assess the status of safety functions, such as reactivity control , core cooling and heat
                                                "
removal, reactor coolant system integrity, containment conditions, 4.6          91
                                                                , radioactivity release control, etc.
I                                                                                        i SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM                                                                                                            Page 17
 
ES-401 8
* 5 0---
Form ES-401-1 ES-401                                                BWR Examination OuUine                                                              Form ES-401*1 Plant Systems - Tier 21Group 2 (RO I SRO)
System # I Name K  K K K K K A    A A  A    G 1    3 KJA Topic(s)                                IR        #
2  4 5 6 1    2 3  4 215002 RBM                                        1            A3.04 (10CFR 55.41 .7)
Ability to monitor automatic operations of the ROD BLOCK MONITOR SYSTEM including:                                                  3.6      55
* Verification of proper functioning I operability: BWR-3,4,5 216000 Nuclear Boiler Ins\.                1 1                  A1.02 (10CFR 55.41 .5)
Ability to predict and/or monitor changes in parameters associated with operating the NUCLEAR BOILER INSTRUMENTATION controls including:                                                        2.9      56 I
* Removing or returning a (sensor) transmitter to service A2.06 (10CFR 55.43.5
* SRO Only)
Ability to (a) predict the impacts of the following on the NUCLEAR BOILER INSTRUMENTATION; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of        3.1      92 those abnormal conditions or operations:
* Loss of power supply 219000 RHRlLPCI : TorusIPool                                1 G2.4.41 (10CFR 55.43.5 - SRO Only)
Cooling Mode Know/edge of the emergency action level thresholds and                    4.6      93 classmcations.
                                                                                                                  ..
mDO~    PfiIMty ~ ~.-.        - - - - - - - - - - -            NOT RANDOMLY SELECTED                                                    -- --
ZMIQ01 RIoI~9GI: ~ 8pn1)1
~
230000 RHRlLPCI : Torus/Pool Spray Mode
                                - - - - - - - - - - -
1 NOT RANDOMLY SELECTED j A4.04    (10CFR 55.41.7)
                                                                                                                                        .
                                                                                                                                            --      -I    I 1
Ability to manually operate and/or monitor in the control room:            3.1      57 I                I
* Minimum flow valves
                                                                                                                      - - -- - - _.. -                    ~
SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM                                                                                                            Page 18
 
ES-401 ES-401                                              BWR Examination OuUine                                            Fonn ES-401-1 Plant Systems - Tier 21Group 2 (RO I SRO)
System # I Name K K K K K K A A A  A    G                                KIA Topic(s)                  IR        #I 1 2 3 4 5 6 1 2 3  4 233000 Fuel Pool Cooling/Cleanup  1                          K2.02 (1 OCFR 55.41 .7)
Knowledge of electrical power supplies to the following: 2.8      58
* RHR pumps SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM                                                                                          Page 19
 
o                                                            0 5
O~-
Form ES-401-1 I
ES-401                                                  BWR Examination Outline                                                          Form ES-401-1 Plant Systems - Tier 21Group 2 (RO I SRO)
K K K K K K A A    A    A    G System # I Name                                                                          KIA Topic(s)                              IR        #
1 2 3 4 5 6 1 2    3    4 234000 Fuel Handling Equipment            1                        K5.02 (10CFR 55.41 .5)
Knowledge of the operational implications of the following concepts
                                                  "'
as they apply to FUEL HANDLING EQUIPMENT:
3.1      59
                                                              "
* Fuel handling equipment interlocks 238QQ~ ...... _  R...... S,._
                                  - - - - - - - - - -          -  NOT RANDOMLY SELECTED-
                                                                                                                              .'
                                                                                                                                          -- -
3a8Q03 MSIV La..... (;eARI        - - - - - - - - - -          -  NJAfor BFN                                                              -- --
241000 Reacl,o rrrurbine Pressure          1                      K6.06 (10CFR 55.41 .7)
Regulator Knowledge of the effect that a loss or malfunction of the following will have on the REACTOR I TURBINE PRESSURE REGULATING                  3.8      60 SYSTEM:
* Reactor pressure
                                                                                                                                              ,
34iOQQ MIlA ;"ftllAe G.i. ~ ."'.. - - - - - - - - - - -            NOT RANDOMLY SELECTED                                                            -
3MGOG R**** ~IIA""                - - - - - - - - - - -            NOT RANDOMLY SELECTED                                                  - -"    -
al8OO~ Reaelaf .....,...
268000 Radwaste
                                  - - - - - - - - - - -            NOT RANDOMLY SELECTED                                                  -        -
1                            K3.04 (10CFR 55.41 .5)
Knowledge of the effect that a loss or malfunction of the RADWASTE will have on the following:                                    2.7      61
* Drain sumps mggog....                        - - - - - - - - - -          -  NOT RANDOMLY SELECTED                                                  -        --I SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM                                                                                                            Page 20
 
- e ES*401
* 5 o~-
Form ES*401*1 ES-401                                              BWR Examination Outline Plant Systems - Tier 21Group 2 (RO I SRO)
Fonn ES-401-1 I K  K K K K K A A  A    A    G System # I Name                                                                        KJA Toplc(s)                                IR        #
1  2 3 4 5 6 1 2  3    4 272000 Radlalion Monitoring                      1            A3.02 (10CFR 55.41 .7)
Ability to monitor automatic operations of the RADIATION MONITORING SYSTEM including:
3.6      62
* Offgas system isolation indications 286000 Fire Protection                                    1  G2.2.42 (10CFR 55.41 .10)
Ability to recognize system parameters that are entry-level                  3.9      63 conditions for Technical Specifications.
:a&1OGO PlaAl~teA""A          - - - - - - - - - - -          NOT RANDOMLY SELECTED                              ..                      -        --
28OQO~  &**A"~ c:lM;          - - - - - - - - - - -          NOT RANDOMLY SELECTED                                                      -- - - '
290003 Control Room HVAC              1                        K4.01 (10CFR 55.41 .7)
Knowledge of CONTROL ROOM HVAC design feature(s) and/or interlocks which provide for the following:                                3.1      64
* System initiationslreconfiguration: Plant-Specific 290002 Reactor Vessel Intemals 1                                K1.12 (10CFR 55.41 .6)
Knowledge of the physical connections andlor cause-effect relationships between REACTOR VESSEL INTERNALS and the                      3.4      65 following:
* SBlC KJA Category Point Totals:
(RO)                          1 1 1 1 1 1 1 1 2 1 1                                                              Group Point Total: (RO)            12 KIA Category Point Totals:
(SRO)                                        1            2                                                    Group Point Total: (SRO)              3 SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM                                                                                                            Page 2 1
 
ES-401                        Generic Knowledge and Abilities Outline (Tier 3)                            Form ES-401-3 Facility:              Browns Ferry NPP                              Date of Exam :    June 07 - 23 2010 RO        SRO-Only Category                    KlA#                            Topic IR      #      IR      #
2 .1. G2.1.2S (10CFR 55.41 .10)                            3 .9    66 Ability to interpret reference materials, such as graphs, curves, tables, etc.
en c::                        G2.1.41 (10CFR 55.43.6 - SRO Only) 3.7    94 0
:;::;                      Know/edge of the refueling processes.
ro L..
Q) 0.
2.1 . G2.1.27 (10CFR 55.41 .7)                              3.9      67    -      -
Knowledge of system purpose andlor function .
          .0 "f'-  '+-
            ....0              2.1 . G2.1.8 (10CFR 55.41 .10)
Ability to coordinate personnel activities outside 3.4      68    -      -
U
              ~                          the control room .
            ~
c::
0
                                ~        NOT RANDOMLY SELECTED                                -        -      -      -
0                  ~        NOT RANDOMLY SELECTED                                -        -      -      -
                                ~        NOT RANDOMLY SELECTED                                -        -      -      -
Subtotal                                                                3              1 2 .2. G2.2.37 (10CFR 55.41 .10)                            3.6    69 Ability to determine operability and/or availability of safety related equipment.
G2.2.39 (10CFR 55.43.2 - SRO Only) 4.5    95 Know/edge of less than or equal to one hour technical speCification action statements for systems.
            -0                          G2.2.22 (10CFR 55.41 .5)
            ..........c::      2.2 .
Knowledge of limiting conditions for operations 4.0    70 0                          and safety limits.
0
          . .....
c::                        G2.2.43 (10CFR 55.43.3 - SRO Only)                                  3.3    96 N      Q)                        Know/edge of the process used to track E                          inoperable alarms.
            .              ::J 2.2. G2.2.4 (10CFR 55.41 .7)                              3.6    71    -      -
0'                        (multi-unit license) Ability to explain the W                          variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility.
                                ~        NOT RANDOMlY SELECTED                                -      -      - -
                                ~        NOT RANDOMlY SELECTED                                -      -      - -
                              ~        NOT RANDOMLY SELECTED                                -      -      - -
Subtotal                                                                3              2 SRO only K/As shown in italics 3/17/2010 - 9:16:21 AM                                                                                          Page 22
 
ES-401                Generic Knowledge and Abilities Outline (Tier 3)                            Form ES-401-3 Facility:      Browns Ferry NPP                              Date of Exam :      June 07 - 23 2010 RO        SRO-Only Category          KIA #                          Topic IR      #      IR      #
2.3      G2.3.14 (10CFR 55.41 .12)                              3.4    72 Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities.
G2.3.11 (10CFR 55.43.4- SRO Only)                                      4.3    97 Ability to control radiation releases.
            -0        2.3      G2.3.S (1 OCFR 55.41 .11 )
Ability to use radiation monitoring systems, 2.9    73 L-
              +-"              such as fixed radiation monitors and alarms, C
0                portable survey instruments, personnel U                  monitoring equipment, etc.
('I')  C                G2.3.13 (10CFR 55.43.4 - SRO Only)                                    3.8    98 0
:t:j              Knowledge of radiological safety procedures ro
            .-                pertaining to licensed operator duties, such as "0                response to radiation monitor alarms, ro                containment entry requirements, fuel handling 0::                responsibilities, access to locked high-radiation areas, aligning filters, etc.
a:3      NOT RANDOMLY SELECTED                                  -      -      -      -
a:3      NOT RAN DOMLY SELECTED                                -      -      - -
a:3      NOT RANDOMLY SELECTED                                  -      -      - -
Subtotal                                                                  2            2 2.4. G2.4.20 (10CFR 55.41 .10)                              3.8    74 Knowledge of the operational implications of C                EOP warnings, cautions, and notes.
ro
            -
0..                G2.4.40 (10CFR 55.43.5 - SRO Only) 4.5    99 Knowledge of SRO's responsibilities in en                emergency plan implementation.
Q)
L-
::l      2.4. G2.4.45 (10CFR 55.41 .10)                              4.1    75
            '"0 Q)                Ability to prioritize and interpret the significance U                of each annunciator or alarm .
      .q- 0  L-0..                G2.4.45 (10CFR 55.43.5 - SRO Only) 4.3    100
              >-
U Ability to prioritize and interpret the significance c:                of each annunciator or a/arm.
Q) 0>
L-
                      ~        NOT RANDOMLY SELECTED                                  -      -      - -
a>
E        ~        NOT RANDOMLY SelECTED                                  -      -      -      -
W        ~        NOT RANDOMLY SELECTED
                                                                                ";
                                                                                      -      -      -      -
Subtotal                                                                2              2 Tier 3 Point Total                                                                            10              7 SRO only K/As shown in italics 3/17/2010 - 9:16:21 AM                                                                                  Page 23
 
ES*401                      Record of Rejected KlAs                      Form ES*401*4
* Tier /
Group 1/ 1 Randomly Selected KIA 295023 AA 1.05 Reason for Rejection Rejected KIA no fuel transfer system for Browns Ferry, replaced with AA 1.03 Fuel handling equipment Rejected KIA due to overlap with 295009, replaced with EK1.03 1/ 1    295031 EK1.02 water level effects on reactor power Rejected due to no significant unit differences for SRMs, replaced with G2.2.2 Ability to manipulate the console controls 2/1      215004 G2.2.4 as required to operate the facility between shutdown and designated power levels.
Rejected due to no auto main steam isolation, replaced with 2/2      272000 A3.01 A3.02 Offgas system isolation indications Rejected unsuccessful last exam, replaced with G2.2.37: Ability 3          2.2.20    to determine operability and/or availability of safety related
                              ~CJuiQment.
SRO only, rejected due to low probability of success, replaced with G2.4.21: Knowledge of the parameters and logic used to 2/2      215001 G2.4.2 assess the status of safety functions, such as reactivity control, core cooling and heat removal, reactor coolant system integrity,
* containment conditions, radioactivity release control, etc.
SRO only rejected due to overlap, replaced with 2.3.13:
Knowledge of radiological safety procedures pertaining to licensed operator duties, such as response to radiation monitor 1 /2      2950332.2.39 alarms, containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc
* 3/17/2010 - 9:16:11 AM                                                        Page 1
 
ES-401                                        Written Examination Quality Checklist                                  Form ES-401*6 Facility: Browns Ferry                                      Date of Exam: June 2010                    Exam Level: RO    181  SRO      181 Initial Item Description                                                  a        b*        c#
: 1. Questions and answers are technically accurate and applicable to the facility.                                  0'\..  /f11 I~
: 2. a.      NRC KiAs are referenced for all questions.
: b. Facility learning objectives are referenced as available.                                                O"Lo- 1~        ~jL
: 3. SRO questions are appropriate in accordance with Section D.2.d of ES-401                                        O-V      --nf I~
: 4. The sampling process was random and systematic (If more than 4 RO or 2 SRO questions were repeated from the last 2 NRC licensing exams, consult the NRR OL program office).                                                                                                                1tJJt-
: 5. Question duplication from the license screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:
_ the audit exam was systematically and randomly developed; or
_ the audit exam was completed before the license exam was started; or
_ the examinations were developed independently; or
_x_ the licensee certifies that there is no duplication; or
_ other (explain) 0"""    1f1 ~;k-
: 6. Bank use meets limits (no more than 75 percent                                      Bank    Modified    New from the bank, at least 10 percent new, and the rest new or modified); enter the actual RO / SRO-only question distribution(s) at right.
33%/36%  28% /20%  39%/44%  O-V tqf            -:M-L
: 7. Between 50 and 60 percent of the questions on the RO exam are written at the comprehension/ analysis level;                              Memory          CIA the SRO exam may exceed 60 percent if the randomly selected KiAs support the higher cognitive levels; enter the actual RO / SRO question distribution(s) at right.                            45%/24%        55%/76% 01/
At      I#-
: 8. References/handouts provided do not give away answers or aid in the elimination of distractors.                                                                        0""'"  lU ~
: 9. Question content conforms with specific KiA statements in the previously approved examination outline and is appropriate for the tier to which they are assigned ;
                                                                                                                              "N1 l~
()'V deviations are justified.
: 10. Question psychometric quality and format meet the guidelines in ES Appendix B.                                  0-(..
1M        ~
: 11. The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with the value on the cover sheet.                                            ov U              11k Printed Name / Signature        )&#xa3;                    Date
: a. Author                                                D A,... ' &#xa3;L k . Z ,{ L'..-J.IC.' I Q..,j)! ~                y- q -.J  \lJ\)
: b. Facility Reviewer (*)                                N;/~ u) ./!e-/Jl'fir/cl ~tJ &, ",L ") j4-t'L - ~/()
: c. NRC Chief Examiner (#)
: d. NRC Regional Supervisor ttl.
                                                          ~'~ \h~ G. CoJ\el~J:jJAG.c>. 11 A*  \\ ATi".$
ttkl \..l8t. "" \H Foe
                                                                                \D~
I  J J1lJzl..,r. J.,-k.<-'"
                                                                                                                  .J
                                                                                                                        '5,1.7 ,201 0
                                                                                                                        ~ _I)I- .u" Note:
* The facility reviewer's initials/signature are not applicable for NRC-developed examinations.
              # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.
 
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification ES-401                                                            Written Examination Review Worksheet                                                                      Form ES-401-9
: 1.      2.          3. Psychometric Flaws              4. Job Content Flaws        5. Other    6.      7.                                        8.
Q#    LOK    LOD (F/H)    (1-5)  Stem Cues      T/F    Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                  Explanation Focus                  Dist.          Link          units ward K/A Only Gen                                                                                                                  Before in-office visit (preliminary assessment): [Allowing credit for changes to previously identified Unsat items prior to 4/23/10 submittals; i.e., only tallying Unsat items on the 4/23/10 submittal]
                                                                                                                        # of Unsat RO Items:        [9/75 = %]
                                                                                                                        # of Unsat SRO Items: [ 8/25 = 32%]
Overall # of Unsat Items: 21/100 = 21%
After in-office visit:
                                                                                                                        # of Unsat RO Items:        [XX/75 = XX%]
                                                                                                                        # of Unsat SRO Items: [ X/25 = XX%]
Overall # of Unsat Items: XX/100 = XX%
Gen                                                                                                                  If annunciator(s) referred to in a question, use EXACT nomenclature engraved on Alarm Window (also specified in ARP) followed by parentheses containing the shortest possible abbreviated window location designation that the applicants are familiar with.
Gen                                                                                                                  Each question should contain Which ONE of the following... in the primary stem of the question. If it is a fill-in-the-blank question, utilize Which one of the following completes the statement?
Gen                                                                                                                  If providing a reference to the candidate, place a bracketed statement [REFERENCE PROVIDED] between the stem and the first possible answer choice.
Gen                                                                                                                  Limit the amount of references provided to the candidates to the maximum extent possible.
Gen                                                                                                                  In a two-part question format with more than one element contained in each choice, limit the number of elements to two (for each choice).
Gen                                                                                                                  Whenever applicable, ensure the phrase in accordance with. Is pasted after the stem question. This ensures that there is only one correct answer. In all procedure related questions, ensure that the stem question includes in accordance with [procedure name]
 
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 1.      2.          3. Psychometric Flaws              4. Job Content Flaws        5. Other    6.      7.                                          8.
Q#    LOK    LOD (F/H)    (1-5)  Stem Cues      T/F    Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                    Explanation Focus                  Dist.          Link          units ward K/A Only Gen                                                                                                                  Please submit reference discs (in addition to selected procedure references) because this will:
: 1) Provide the procedures to allow research on questions. For example, a question may have the procedure reference needed to verify the correct answer; however, the procedure needed to validate the distractor is often not provided.
: 2) Having the other procedures will also facilitate development of alternative suggestions for questions needing replacements.
Gen                                                                                                                  Avoid using the word should in any test questions because this can often be argued as correct by an applicant.
Gen                                                                                                                  SRO-only Clarification Guidance Rev 0, page 12 contains an example of a good SRO-only question that is linked to 10CFR55.43 (5) procedure selection. Also pages 7 & 8 provide clarification in the first bullets by stating that if the question involves prescribing a procedure, then it may be SRO-only.
To further clarify: One area of SRO-level knowledge (with respect to prescribing or selecting procedures) is knowledge of the content of the procedure (SRO knowledge) versus knowledge of the overall mitigative strategy of the procedure (RO knowledge). To satisfy the 10CFR55.43.5 topic, the question must be linked to procedure selection. The SRO portion of a question may include procedure selection, tech specs, and/or E-plan classification, among the 7 areas listed in 10CFR55.43.
Gen                                                                                                                  Ensure that the stem question is followed with a question mark (?)
instead of trailing (.)
 
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Instructions
[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]
[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]
: 1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
: 1.         Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
: 2. Enter the level of difficulty (LOD) of each question using a 1 - 5 (easy - difficult) rating scale (questions in the 2 - 4 range are acceptable).
: 2.         Enter the level of difficulty (LOD) of each question using a 1 - 5 (easy - difficult) rating scale (questions in the 2 - 4 range are acceptable).
: 3. Check the appropriate box if a psychometric flaw is identified:
: 3.         Check the appropriate box if a psychometric flaw is identified:
* The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).
* The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).
* The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).
* The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).
* The answer choices are a collection of unrelated true/false statements.
* The answer choices are a collection of unrelated true/false statements.
* The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable
* The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable.
.
* One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
* One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem). 4. Check the appropriate box if a job content error is identified:
: 4.         Check the appropriate box if a job content error is identified:
* The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).
* The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).
* The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).
* The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).
* The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
* The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
* The question requires reverse logic or application compared to the job requirements.
* The question requires reverse logic or application compared to the job requirements.
: 5. Check questions that are sampled
: 5.         Check questions that are sampled for conformance with the approved K/A and those that are designated SRO-only (K/A and license level mismatches are unacceptable).
: 6. Enter question source: (B)ank, (M)odified, or (N)ew. Check that (M)odified questions meet criteria of ES
: 6.         Enter question source: (B)ank, (M)odified, or (N)ew. Check that (M)odified questions meet criteria of ES-401 Section D.2.f.
-401 Section D.2.f.
: 7.         Based on the reviewers judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
for conformance with the approved K/A and those that are designated SRO
: 8.         At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).
-only (K/A and license level mismatches are unacceptable
). 7. Based on the reviewer's judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
: 8. At a minimum, explain any "U" ratings (e.g., how the Appendix B psychometric attributes are not being met).


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification ES-401 2 Form ES-401-9     Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification ES-401                                                                                         2                                                                         Form ES-401-9
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only   33 H 2           N E S 211000A3.01 Appears to meet the KA. Could someone argue that the relief just lifted and pressure may be decreasing? This could make "D" also correct. Is it better to write out the parameters: SLC Pump Dish Press is 1100 psig and steady? 4/20/10, Reviewed again for draft submittal. Changes were made as noted above. SAT 66 F 3     X       B U S G2.1.25  Appears to meet the KA. Could someone argue that "B" & "D" are also correct? The level of 11.5' is the level at which the: A. downcomer vents begin to become uncovered
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                       8.
. B. HPCI Turb Exhaust begins to be uncovered at 12.75', therefore it is uncovered at 11.5'. D. control room SP NR lvl indication goes off scale at ~13 ft. 11.5' is < all 3 of these choices. Change to say either: "IAW procedure-, line 1 above" or "In the derivation of the PSP curve, line 1 above-"  4/20/10, Reviewed again for draft submittal. Changes were made as noted above. SAT 76 H 3           N E S 295004AA2.01 Appears to meet the KA. Rewrite the 2 nd4/20/10, Reviewed again for draft submittal. Changes were made as noted above. SAT  question to simplify it and contain only 1 sentence. "After manually transferring the 250 VDC RMOV Bd, the Board is considered _____IAW TS 3.8.7."
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                      Explanation (1- m es        ed.        Link            units ward K/A Only
: 5) Fo          Dis cus          t.
211000A3.01 33     H     2                                                                       N       E S   Appears to meet the KA. Could someone argue that the relief just lifted and pressure may be decreasing? This could make D also correct. Is it better to write out the parameters: SLC Pump Dish Press is 1100 psig and steady?
4/20/10, Reviewed again for draft submittal. Changes were made as noted above. SAT G2.1.25 66     F     3                   X                                                   B     U S   Appears to meet the KA. Could someone argue that B & D are also correct? The level of 11.5 is the level at which the: A.
downcomer vents begin to become uncovered. B. HPCI Turb Exhaust begins to be uncovered at 12.75, therefore it is uncovered at 11.5. D. control room SP NR lvl indication goes off scale at ~13 ft.
11.5 is < all 3 of these choices. Change to say either: IAW procedure, line 1 above or In the derivation of the PSP curve, line 1 above 4/20/10, Reviewed again for draft submittal. Changes were made as noted above. SAT 76     H     3                                                                       N       E   295004AA2.01 Appears to meet the KA. Rewrite the 2nd question to simplify it and contain only 1 sentence. After manually transferring the 250 VDC RMOV Bd, the Board is considered _____IAW TS 3.8.7.
4/20/10, Reviewed again for draft submittal. Changes were made as noted above. SAT


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 80 F 2           B E E S 295023G2.1.7 Appears to meet the KA. EOI
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                       8.
-3, Table 4 shows 1000 mr/hr as MAX SAFE (500 mr/hr is listed as MAX SAFE in the distractor discussion for A & B). Max Normal alarm setpoint is not included with references. Can not tell if "A" is also correct or not
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                        Explanation (1- m es        ed.        Link            units ward K/A Only
, due to insufficient references being available.
: 5) Fo          Dis cus          t.
Reword: "Which ONE of the following identifies: 1.) The EOI
80     F     2                                                                       B     E   295023G2.1.7 Appears to meet the KA. EOI-3, Table 4 shows 1000 mr/hr as MAX SAFE (500 mr/hr is listed as MAX SAFE in the distractor discussion S
-3 MAX NORMAL operating- AND 2.) The required approval-.IAW 2
for A & B). Max Normal alarm setpoint is not included with references.
-AOI-79-1-" 4/20/10, Reviewed again for draft submittal. Changes were made as noted above. Where did the 500 mr/hr come from? Is it better distractor "2 X Normal Background Radiation level" or maybe "10 X Normal Background"?
Can not tell if A is also correct or not, due to insufficient references being available.
Reword: Which ONE of the following identifies: 1.) The EOI-3 MAX NORMAL operating AND 2.) The required approval.IAW 2-AOI-79-1 4/20/10, Reviewed again for draft submittal. Changes were made as noted above. Where did the 500 mr/hr come from? Is it better distractor 2 X Normal Background Radiation level or maybe 10 X Normal Background?
5/20/10 Changed the distractor A & B to 72 mr/hr.
5/20/10 Changed the distractor A & B to 72 mr/hr.
87 F 2           N S  211000G2.1.7
87     F     2                                                                       N       S  211000G2.1.7 Appears to meet the KA.
4/20/10, Reviewed again for draft submittal. No changes were required. SAT
 
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 1. 2. 3. Psychometric Flaws      4. Job Content Flaws        5. Other    6.      7.                                          8.
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                        Explanation (1- m es        ed.        Link            units ward K/A Only
: 5) Fo          Dis cus          t.
90    H      2  X                                                            X    N      U  400000A2.02 S  This question is not SRO Only. An RO could determine the answer by using knowledge of the overall mitigative strategy of the procedure.
The 1st half of choice B or D can be determined using RO knowledge of Rx trip criteria (i.e. a Rx trip is required for a loss of RBCCW). Only one ARM reading is given; therefore, by knowing that it requires at least 2 ARM readings > Max Safe to ED, distractors C & D can be eliminated (this is knowledge of overall mitigative strategy). From this analysis of RO information the correct answer can be determined as choice B.
EOI-3 was not provided for use in evaluating distractor analysis.
Could correct by rewording 2nd question to ask what procedure is used to C/D the plant?
4/20/10, Reviewed again for draft submittal. This is not meeting the KA. The impact of the high surge tank level (i.e., the KA) is stated in the stem of the question: RBCCW is isolated to containment. This should be in the distractor statements as a choice. To make this possible, more bullets need to be added to the stem to reflect the leak is from the RCP seal cooler [rise in 2-RM-90-131(Panel 2-9-10) activity (2-RR-90-131/132 on Panel 2-9-2) or 2-TE-68-54 or 67 temperature (Panel 2-9-21) or a lowering of any Recirc pump seal pressure.]. Does the 2nd question need to broken out? The question could be read to mean that the criteria to scram and initiate the cooldown are contained in the same procedure (in this case that assumption is correct). Would it make the other choices more plausible to break this into two statements?
The impact of losing CCW to the drywell is a required scram.
However, what is the impact of high/low surge tank level on the CCWS? ES-401, Section D.2.a states that for A2 K/A statements, try to test both aspects of the K/A and if that is not possible without expending an inordinate amount of resources, then limit the scope to the question to that aspect of the K/A statement requiring the highest cog level, i.e., the 2nd portion dealing with using procedures.
5/20/10 Reviewed rewrite onsite. KA is still not being met. Will provide licensee with another KA.
5/25/10 New question written to meet newly selected KA. This question still needs review. Question to rewritten to include 2nd part fo identify proper procedure to use. SAT after review in office.
5/26/10 New question reviewed. SAT.


Appears to meet the KA.
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
4/20/10, Reviewed again for draft submittal. No changes were required. SAT If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 4. Job Content Flaws
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                     8.
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 90 H 2 X          X N U S  
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                    Explanation (1- m es        ed.        Link            units ward K/A Only
: 5) Fo          Dis cus          t.
93    H     2                                                                       N      E  219000G2.4.41 S  Appears to meet the KA. Should the entire EPIP-1 or at least the entire section 1 be provided as a reference? Is there any other EPIP EAL that the applicant could erroneously go to instead of the correct one?
The wrong EPIP curve is provided as a reference. 1.5-S was provided. Curve 1.2-G is the correct curve for use with this question.
4/20/10, Reviewed again for draft submittal. Changes were made as noted above. SAT 96    F      2                                                                      N       E  G2.2.43 S  Appears to meet the KA. This 2nd question part has a very low LOD as written. Modify the question slightly to increase the LOD. Modify to ask: If an Annunciator input (delete window). Change disabled/restored to disabled and restored. Add then prior to a separate 10CFR50.59. Delete for the disablement at the end of the question. Change distractor (2) to say is still.
4/20/10, Reviewed again for draft submittal. Changes were made as noted above. SAT The questions from here up were submitted for early review and will not count as UNSATs unless they are left uncorrected on the final submittal.
77    H                                                                                      S  295016AA2.05 Appears to meet the KA.
78    H                                                                                      E  295018G2.1.27 S   Does a qualifier need to be added to assure that the applicant could not argue that the C1 EECW pump be manually aligned and therefore ALL EECW flow has not been lost? (i.e. No correct answer) Add If no operator actions are taken


400000A2.02 This question is not SRO Only. An RO could determine the answer by using knowledge of the overall mitigative strategy of the procedure. The 1 stEOI-3 was not provided for use in evaluating distractor analysis.
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
half of choice B or D can be determined using RO knowledge of Rx trip criteria (i.e. a Rx trip is required for a loss of RBCCW).
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
Only one ARM reading is given
: 1. 2. 3. Psychometric Flaws      4. Job Content Flaws        5. Other    6.     7.                                       8.
; therefore, by knowing that it requires at least 2 ARM reading s > Max Safe to ED, distractors C & D can be eliminated (this is knowledge of overall mitigative strategy). From this analysis of RO information the correct answer can be determined as choice B.
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                      Explanation (1- m es        ed.         Link            units ward K/A Only
Could correct by rewording 2 nd4/20/10, Reviewed again for draft submittal.
: 5) Fo          Dis cus          t.
This is not meeting the KA. The impact of the high surge tank level (i.e., the KA) is stated in the stem of the question: "RBCCW is isolated to containment". This should be in the distractor statements as a choice. To make this possible, more bullets need to be added to the stem to reflect the leak is from the RCP seal cooler [rise in 2-RM-90-131(Panel 2-9-10) activity (2
79    H                                                                        X            U  295021G2.4.47 Both of these look as if they are RO knowledge level criteria.
-RR-90-131/132 on Panel 2 2) or 2-TE-68-54 or 67 temperature (Panel 2-9-21) or a lowering of any Recirc pump seal pressure.]. Does the 2 question to ask what procedure is used to C/D the plant?
OPL171.059 for Startup has this shown under an objective for the 100 deg. Heatup limit. This was used on last years NRC exam, verify this is noted on the QA form. I could not locate the question on last years NRC exam.
ndThe impact of losing CCW to the drywell is a required scram.
SRO only: SRO-only knowledge cannot be claimed for questions that can be answered solely based on knowledge of 1 hour action statements. ROs are expected to know the LCO statement (TS 3.4.9 RCS Temp & Press Limits), applicability, and any notes; i.e., the information above the double line separating the actions from the LCO and applicability statements. The knowledge that RCS heatup and cooldown rates are limited to 100F in any 1 hour period is RO knowledge. The knowledge associated with Modes is also RO knowledge. Suggest writing a question testing the applicants knowledge of WHEN alternate SDCg is REQUIRED (based on a trend) IAW the AOP and the minimum REQUIRED emergency classification.
However, what is the impact of high/low surge tank level on the CCWS?  ES-401, Section D.2.a states that for A2 K/A statements, try to test both aspects of the K/A and if that is not possible without expending an inordinate amount of resources, then limit the scope to the question to that aspect of the K/A statement requiring the highest cog level, i.e., the 2 question need to broken out?  The question could be read to mean that the criteria to scram and initiate the cooldown are contained in the same procedure (in this case that assumption is correct). Would it make the other choices more plausible to break this into two statements?
5/20/10 Revised question on site. Changed 1st part to derive exact time of mode change and 2nd part to state that the EAL is met.
nd5/20/10 Reviewed rewrite onsite. KA is still not being met.
81    H                                                                        X            U  295024G2.1.31 S  This does not appear to be SRO Only level knowledge. Can use RO knowledge alone to determine both responses. The OI for manual operation specifies 5K for the setpoint. OPL171.201 Objective V.B.7 requires an RO to know that EOI appendices are used instead of OI when in the EOI arena.
Will provide licensee with another KA.
Q=KA The proposed test item does not meet the K/A because it does not test the applicants knowledge of the required lineup for switches/
portion dealing with using procedures.
controls and/or required indications following a high drywell pressure condition. [The proposed item tests the applicants knowledge of whether the HPCI controller setpoint is at the required standby lineup setpoint and the required procedure after the EOI high drywell entry condition has been reached.] The HPCI controller setpoint is always true, even if no high drywell pressure condition exists. The question should test the applicants ability to confirm a switch or indication is lined up correctly following a high drywell pressure actuation.
5/25/10 New question written to meet newly selected KA
5/20/10 Rewrite. Added IAW TS.
. This question still needs review.
Question to rewritten to include 2 nd5/26/10 New question reviewed. SAT.
part fo identify proper procedure to use.
SAT after review in office.


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 93 H 2            N E S 219000G2.4.41 Appears to meet the KA. Should the entire EPIP
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                       8.
-1 or at least the entire section 1 be provided as a reference?  Is there any other EPIP EAL that the applicant could erroneously go to instead of the correct one? The wrong EPIP curve is provided as a reference. 1.5
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                       Explanation (1- m es        ed.         Link            units ward K/A Only
-S was provided. Curve 1.2
: 5) Fo          Dis cus          t.
-G is the correct curve for use with this question.
82    F                                                                X                    S   295028EA2.06 The answer does not meet the KA criteria but is acceptable if no correlation exist for SC/Torus air temp. Verify with the licensee.
4/20/10, Reviewed again for draft submittal. Changes were made as noted above. SAT 96 F 2           N E S G2.2.43 Appears to meet the KA. This 2 nd4/20/10, Reviewed again for draft submittal. Changes were made as noted above. SAT question part has a very low LOD as written. Modify the question slightly to increase the LOD. Modify to ask: "If an Annunciator input (delete "window"). Change "disabled/restored" to "disabled and restored". Add "then" prior to "a separate 10CFR50.59". Delete "for the disablement" at the end of the question. Change distractor (2) to say "is still".
5/20/10 Verified with the licensee on site.
The questions from here up were submitted for early review and will not count as UNSATs unless they are left uncorrected on the final submittal.
83    F                      X                                                              U  295010G2.2.4 S   Distractors C&D do not appear plausible. If emergency depressurization is required EOI-1 RCP is not plausible at this point.
77 H              S 295016AA2.05 Appears to meet the KA.
Suggest a change to the 2nd part of the distractor to a reason why ED is necessary from the basis statement. Part D plausibility is incorrect.
78 H              E S 295018G2.1.27 Does a qualifier need to be added to assure that the applicant could not argue that the C1 EECW pump be manually aligned and therefore ALL EECW flow has not been lost?
5/20/10 Question is still UNSAT upon onsite review. The 2nd part of the distractors is still missing. (See above in blue).
(i.e. No correct answer)  Add "If no operator actions are taken-"
Upon editorial changes being made to the question the question is acceptable even though no explanation is involved. The KA is met via the technical process of understanding the unit difference to arrive at the answer.
84    H                                                                X                    U  295014AA2.01 S  This question does not meet the KA because the applicants are not being tested on their ability to determine or interpret reactor power because this value is already provided in the stem, i.e., 16%. Instead, the proposed question tests the applicants knowledge of the applicability of TS 3.1.6, i.e., when rod pattern control is required. If the intent was to require the applicant to interpret reactor power, then provide a disparity between various indicated power levels and test the applicants knowledge of which indication means power is less than 16%.
5/3/10, Reviewed again for draft submittal. Agreed with licensees argument. Since the T.S. applicability requires knowledge of the power level, this question is considered as an original SAT.


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 79 H            X  U 295021G2.4.47 Both of these look as if they are RO knowledge level criteria. OPL171.059 for Startup has this shown under an objective for the 100 deg. Heatup limit.
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                     8.
This was used on last years NRC exam, verify this is noted on the QA form. I could not locate the question on last years NRC exam. SRO only:  SRO-only knowledge cannot be claimed for questions that can be answered solely based on knowledge of statements.
Q#   LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                     Explanation (1- m es       ed.         Link             units ward K/A Only
ROs are expected to know the LCO statement (TS 3.4.9 RCS Temp & Press Limits), applicability, and any notes; i.e., the information "above the double line separating the actions from the LCO and applicability statements. The knowledge that RCS heatup and cooldown rates are limited to 100F in any 1 hour period is RO knowledge.
: 5) Fo          Dis cus          t.
The knowledge associated with Modes is also RO knowledge. Suggest writing a question testing the applicants' knowledge of WHEN alternate SDC'g is REQUIRED (based on a trend) IAW the AOP and the minimum REQUIRED emergency classification.
85     H         X           X                                                               E   295033G2.3.13 Distractors A&C justification referenced that EPIP-8 provided this guidance if all TVA EROs were activated. This guidance could not be confirmed. Also EPIP-8 is Personnel Evacuation & Accountability not Dose Assessment. The question is misleading.
5/20/10 Revised question on site. Changed 1 st part to derive exact time of mode change and 2 nd part to state that the EAL is met.
                                                                                                    #/units: Use ONLY the exact titles of procedures in NRC questions, i.e., in A and C. Since the exact title of EPIP-8 makes choices A and C not plausible, then suggest incorporating another knowledge item to test associated with the required operator actions when a fuel assembly is dropped (in accordance with the AOP). The 2nd portion of the proposed test item is SRO (i.e., E-plan classification) 5/20/10 Add: Based on the above conditions, which ONE 86     H                     X                                                               E   203000A2.09 Replace distractor A with 1600 (0300 + 13hrs to Mode 3) vs. 1800.
81 H            X  U S 295024G2.1.31 This does not appear to be SRO Only level knowledge. Can use RO knowledge alone to determine both responses. The OI for manual operation specifies 5K for the setpoint. OPL171.201 Objective V.B.7 requires an RO to know that EOI appendices are used instead of OI when in the EOI arena.
This is a more realistic error an operator would make. The applicant is more likely to apply the T.S. 3.5.1 clock start time from the time the ST failed for the 2nd ECCS pump than from the time the 1st pump was tagged out for maintenance.
Q=KA  The proposed test item does not meet the K/A because it does not test the applicants' knowledge of the required lineup for switches/
5/20/10 Revised question per above. SAT.
controls and/or required indications "following a high drywell pressur e condition. [The proposed item tests the applicant's knowledge of whether the HPCI controller setpoint is at the required standby lineup setpoint and the required procedure after the EOI high drywell entry condition has been reached.]  The HPCI controller setpoint is always true, even if no high drywell pressure condition exists. The question should test the applicants' ability to confirm a switch or indication is lined up correctly following a high drywell pressure actuation.
5/20/10 Rewrite. Added "IAW TS".
If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
: 4. Job Content Flaws
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 82 F          X  S 295028EA2.06 The answer does not meet the KA criteria but is acceptable if no correlation exist for SC/Torus air temp. Verify with the licensee.
5/20/10 Verified with the licensee on site. 83 F    X        U S 295010G2.2.4 Distractor s C&D do not appear plausible. If emergency depressurization is required EOI
-1 RCP is not plausible at this point. Suggest a c hange to the 2 nd5/20/10 Question is still UNSAT upon onsite review. The 2 part of the distractor to a reason why ED is necessary from the basis statement
. Part D plausibility is incorrect.
ndUpon editorial changes being made to the question the question is acceptable even though no explanation is involved. The KA is met via the technical process of understanding the unit difference to arrive at the answer.
part of the distractors is still missing.  (See above in blue).
84 H          X  S U 295014AA2.01 This question does not meet the KA because the applicants' are not being tested on their ability to determine or interpret reactor power because this value is already provided in the stem, i.e., 16%. Instead, the proposed question tests the applicants
' knowledge of the applicability of TS 3.1.6, i.e., when rod pattern control is required.
If the intent was to require the applicant to interpret reactor power, then provide a disparity between various indicated power levels and test the applicants' knowledge of which indication means power is less than 16%. 5/3/10, Reviewed again for draft submittal. Agreed with licensee's argument. Since the T.S. applicability requires knowledge of the power level, this question is considered as an original SAT.
If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
: 4. Job Content Flaws
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 85 H X   X         E S 295033G2.3.13 Distractors A&C justification referenced that EPIP
-8 provided this guidance if all TVA EROs were activated. This guidance could not be confirmed.
Also EPIP-8 is "Personnel Evacuation & Accountability" not "Dose Assessment". The question is misleading.
#/units: Use ONLY the exact titles of procedures in NRC questions, i.e., in "A" and "C". Since the exact title of EPIP
-8 makes choices "A" and "C" not plausible, then suggest incorporating another knowledge item to test associated with the required operator actions when a fuel assembly is dropped (in accordance with the AOP). The 2 nd5/20/10 Add: Based on the above conditions, which ONE-portion of the proposed test item is SRO (i.e., E
-plan classification) 86 H     X         E S 203000A2.09 Replace distractor A with 1600 (0300 + 13hrs to Mode 3) vs. 1800.
This is a more realistic error an operator would make. The applicant is more likely to apply the T.S. 3.5.1 clock start time from the time the ST failed for the 2 nd ECCS pump than from the time the 1 st5/20/10 Revised question per above. SAT.
pump was tagged out for maintenance.


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 88 H           X U S 261000G2.2.4 SRO-only knowledge cannot any AOP entry condition
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                       8.
. be claimed for questions that can be answered solely using knowledge of:
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                      Explanation (1- m es        ed.        Link            units ward K/A Only
plant parameters that require direct entry to major EOPs; e.g., major Westinghouse EOPs are E0, E1, E2, E3, ECA
: 5) Fo          Dis cus          t.
-0.0, and Red/Orange Functional Restoration Procedures and major General Electric EOPs are Reactor Vessel Control, Primary Containment Control, Secondary Containment Control, and Radioactive Release Control
88     H                                                                       X             U   261000G2.2.4 SRO-only knowledge cannot be claimed for questions that can be answered solely using knowledge of:
. SRO-only knowledge cannot be claimed for questions that can be answered solely using "systems knowledge"; e.g.:
* any AOP entry condition.
how the system works flow path component locations, etc. Suggest re
* plant parameters that require direct entry to major EOPs; e.g.,
-writing the question to test SRO applicants' knowledge of the 1) preferred location to start SGT and 2) the required LCO actions when one SGT is inoperable and one of the units is in a refueling outage and the other two units are operating at 100% power.
major Westinghouse EOPs are E0, E1, E2, E3, ECA-0.0, and Red/Orange Functional Restoration Procedures and major General Electric EOPs are Reactor Vessel Control, Primary Containment Control, Secondary Containment Control, and Radioactive Release Control.
5/20/10 Reworded 1st question to ask what is the preferred lineup IAW OIAccepted the question to meet the KA because to answer the question the applicant has to understand why he is using U1 or U2 instrumentation and therefore meets the KA.
SRO-only knowledge cannot be claimed for questions that can be answered solely using systems knowledge; e.g.:
89 H           U S 263000G2.1.28 This question does not match the KA. The question should be asking about the operability of the electrical system not the effect of a loss of the electrical system on RCIC. The question as written is an A2 KA for RCIC not a generic for the DC electrical system.
* how the system works
* flow path
* component locations, etc.
Suggest re-writing the question to test SRO applicants knowledge of the 1) preferred location to start SGT and 2) the required LCO actions when one SGT is inoperable and one of the units is in a refueling outage and the other two units are operating at 100% power.
5/20/10 Reworded 1st question to ask what is the preferred lineup IAW OI Accepted the question to meet the KA because to answer the question the applicant has to understand why he is using U1 or U2 instrumentation and therefore meets the KA.
89     H                                                                 X                   U   263000G2.1.28 This question does not match the KA. The question should be asking about the operability of the electrical system not the effect of a loss of the electrical system on RCIC. The question as written is an A2 KA for RCIC not a generic for the DC electrical system.
5/20/10 New question written and reviewed on site. SAT.
5/20/10 New question written and reviewed on site. SAT.


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 91 H           X U E S 215001G2.4.21 OPL171.023 Describe the operation of the TIP system, including automatic and manual operation. SRO-only knowledge cannot be claimed for questions that can be answered solely using "systems knowledge"; e.g.:
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                       8.
how the system works
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                      Explanation (1- m es        ed.        Link            units ward K/A Only
 
: 5) Fo          Dis cus          t.
SRO-only: The proposed question can be answered using RO knowledge of AOP entry conditions and system operation.
91     H                                                                       X             U   215001G2.4.21 OPL171.023 Describe the operation of the TIP system, including automatic and manual operation.
Q=KA: The proposed question does not test the applicants' ability to determine if a Group 8 signal exists, Instead, the applicant is provi ded with this information in the stem.
S SRO-only knowledge cannot be claimed for questions that can be answered solely using systems knowledge; e.g.:
 
* how the system works SRO-only: The proposed question can be answered using RO knowledge of AOP entry conditions and system operation.
Partial: An applicant could successfully argue that "A" is also correct IF OI-94 also provides steps to withdraw the TIP.
Q=KA: The proposed question does not test the applicants ability to determine if a Group 8 signal exists, Instead, the applicant is provided with this information in the stem.
Job-Link: Is the term "parked" delineated in any procedure?
Partial: An applicant could successfully argue that A is also correct IF OI-94 also provides steps to withdraw the TIP.
5/20/10 New question provided to licensee to meet the KA.
Job-Link: Is the term parked delineated in any procedure?
Reference will be provided with light color indications removed.
5/20/10 New question provided to licensee to meet the KA. Reference will be provided with light color indications removed.
92 H           U S 216000A2.06 This question does not match the KA. The KA is asking for the effects a loss of power has on instrumentation. This is question is asking for the effects a Recirc pump trip has on instrument indication.
92     H                                                                 X                   U   216000A2.06 This question does not match the KA. The KA is asking for the effects a loss of power has on instrumentation. This is question is asking for the effects a Recirc pump trip has on instrument indication.
Suggest writing a question testing the applicants' knowledge of which drywell pressure instruments are affected by a loss of power, including the required TS actions
Suggest writing a question testing the applicants knowledge of which drywell pressure instruments are affected by a loss of power, including the required TS actions.
. 5/20/10. New question written. Reviewed on site. SAT.
5/20/10. New question written. Reviewed on site. SAT.


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 94 H             E S G2.1.41 Core map for use as a reference with the question was not included. Is moving fuel in the SFP a core alt? If not then there is no reason to stop moving fuel as long as it stays in the SFP. Why not change to have the bundle already on the core side, possibly already a portion of the way down so that the correct answer is to insert it the rest of the way in prior to suspending core alts.
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                     8.
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                      Explanation (1- m es        ed.        Link            units ward K/A Only
: 5) Fo          Dis cus          t.
94     H                                                                                     E   G2.1.41 Core map for use as a reference with the question was not included.
Is moving fuel in the SFP a core alt? If not then there is no reason to stop moving fuel as long as it stays in the SFP. Why not change to have the bundle already on the core side, possibly already a portion of the way down so that the correct answer is to insert it the rest of the way in prior to suspending core alts.
5/20/10 Reviewed on site. SAT.
5/20/10 Reviewed on site. SAT.
95 H             S G2.2.39 Appears to meet the KA & SRO Only criteria. SAT
95     H                                                                                     S   G2.2.39 Appears to meet the KA & SRO Only criteria. SAT.
. 97 H             E S G2.3.11 To clarify, the words, IAW EOI
97     H                                                                                     E   G2.3.11 To clarify, the words, IAW EOI-2 need to be added. Otherwise, the candidate could argue that EOI Appendix allows use of the hardened SP vent and would be successful. Is the candidate required to know the PSP curve from memory?
-2 need to be added. Otherwise, the candidate could argue that EOI Appendix allows use of the hardened SP vent and would be successful. Is the candidate required to know the PSP curve from memory?
5/20/10 Distractor D not valid. Doesnt pass logic test. Recommended adding 2nd part to distractors to add part to D and B for plausibility.
5/20/10 Distractor D not valid. Doesn't pass logic test. Recommended adding 2 nd5/25/11 Reviewed in office. B & D distractor changed to App 15 vs App 12. SAT. part to distractors to add part to D and B for plausibility
5/25/11 Reviewed in office. B & D distractor changed to App 15 vs App 12. SAT.
. 98 F           X U S G2.3.13 This question does not match the KA. The KA is for radiological safety concerns. The question is related to industrial safety.
98     F                                                                       X             U   G2.3.13 This question does not match the KA. The KA is for radiological safety concerns. The question is related to industrial safety.
5/20/10 Wrote new question to meet the KA. Reviewed on site. SAT. 99 F             S G2.4.40 Appears to meet the KA & SRO Only criteria. SAT
5/20/10 Wrote new question to meet the KA. Reviewed on site. SAT.
99     F                                                                                     S   G2.4.40 Appears to meet the KA & SRO Only criteria. SAT


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 100 H     X         E S G2.4.45 No information is provided in the stem of the question that requires the applicant to address a possible loss of fuel clad. One negative response. Why not give enough information so that two barriers lost and then you have enough different choices so to eliminate the NOT distractor.
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                         8.
  "D" is not a plausible distractor.
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                        Explanation (1- m es        ed.        Link            units ward K/A Only
5/20/10 Changed stem to include "DW Press Hi" alarm and "GP 1 PCIS Logic A Success light is NOT illuminated" to make distractor D plausible.
: 5) Fo          Dis cus          t.
1 H             E S 295001G2.1.7 Appears to meet the KA. Is "entering Region 1" needed as part of the question? If you left off it off, is D still plausible?
100     H                     X                                                               E   G2.4.45 No information is provided in the stem of the question that requires the applicant to address a possible loss of fuel clad. One negative response. Why not give enough information so that two barriers lost and then you have enough different choices so to eliminate the NOT distractor. D is not a plausible distractor.
5/20/10 Verified Region 1 require d. 2 F             S 295003G2.1.27 Appears to meet the KA.
5/20/10 Changed stem to include DW Press Hi alarm and GP 1 PCIS Logic A Success light is NOT illuminated to make distractor D plausible.
3 H             E S 295004AA1.03 Appears to meet the KA.
1     H                                                                                     E   295001G2.1.7 Appears to meet the KA. Is entering Region 1 needed as part of the question? If you left off it off, is D still plausible?
Why not ask the status of 480v SD BD B? It remains energized and is therefore more pertinent to the 4KV to 480v relationship. The question as written is leading. Why would you ask about the other 480v train unless there was a relationship that would cause a loss of power to the bus? If the 480v train is changed to the B train, the candidate might improperly assume it is fed from its own respective 4KV bus and therefore respond that it loses power. This would change the correct answer to "C".
5/20/10 Verified Region 1 required.
2     F                                                                                     S   295003G2.1.27 Appears to meet the KA.
3     H                                                                                     E   295004AA1.03 Appears to meet the KA.
Why not ask the status of 480v SD BD B? It remains energized and is therefore more pertinent to the 4KV to 480v relationship. The question as written is leading. Why would you ask about the other 480v train unless there was a relationship that would cause a loss of power to the bus? If the 480v train is changed to the B train, the candidate might improperly assume it is fed from its own respective 4KV bus and therefore respond that it loses power. This would change the correct answer to C.
5/20/10. Accepted question as is. SAT.
5/20/10. Accepted question as is. SAT.


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 4 H             E S 295005AA2.08 Appears to meet the KA. Could this question be rewritten so that it is not necessary to ask a two part question? Power supply choices be USST, CSST, DG, or Main Generator (i.e. give condition to interrupt whether a Main Generator trip will occur or not.)
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                     8.
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                    Explanation (1- m es        ed.        Link            units ward K/A Only
: 5) Fo          Dis cus          t.
4     H                                                                                     E   295005AA2.08 Appears to meet the KA. Could this question be rewritten so that it is not necessary to ask a two part question? Power supply choices be USST, CSST, DG, or Main Generator (i.e. give condition to interrupt whether a Main Generator trip will occur or not.)
5/20/10 Rewrote new question per recommendation above.
5/20/10 Rewrote new question per recommendation above.
5 H             E S 295006AK3.03 Appears to meet the KA. No EHC information is given in the stem (Press or Alarms) to address anything other than EHC staying in Rx Press mode. The LOD on part 1 of the question is a 1.
5     H                                                                                     E   295006AK3.03 Appears to meet the KA. No EHC information is given in the stem (Press or Alarms) to address anything other than EHC staying in Rx Press mode. The LOD on part 1 of the question is a 1.
5/20/10. Accepted question as is during review process on site
5/20/10. Accepted question as is during review process on site.
. 6 H             E S 295016AA1.08 Appears to meet the KA. Could this question be rewritten so that it is not necessary to ask a two part question? (i.e., how is Rx press controlled immediately following control room abandonment: TBY in Auto, TBV in Manual, RCIC in press control mode, HPCI in press control mode?)
6     H                                                                                     E   295016AA1.08 Appears to meet the KA. Could this question be rewritten so that it is not necessary to ask a two part question? (i.e., how is Rx press controlled immediately following control room abandonment: TBY in Auto, TBV in Manual, RCIC in press control mode, HPCI in press control mode?)
5/20/10 Accepted as is based upon on site review.
5/20/10 Accepted as is based upon on site review.
7 H             E S 295018AK3.07 Appears to meet the KA.
7     H                                                                                     E   295018AK3.07 Appears to meet the KA.
Add the word "the" to the stem statement following the question.
Add the word the to the stem statement following the question. Add the word are to choice B to make the sentence grammatically correct.
Add the word "are" to choice B to make the sentence grammatically correct. The KA is: "Due to a loss of CCW (could be RBCCW or RCW), what is the reason for cross connecting to the backup system?"
The KA is: Due to a loss of CCW (could be RBCCW or RCW), what is the reason for cross connecting to the backup system?
The question is convoluted as written. RCW or EECW provide the heat sink for RBCCW. This is why EECW is cross connected. Part of the question for the answer given is: Why does 70
The question is convoluted as written. RCW or EECW provide the heat sink for RBCCW. This is why EECW is cross connected. Part of the question for the answer given is: Why does 70-48 go close on low pressure? Could the question be written to ask only the RCW/EECW component instead of asking two questions (i.e., leave out the RBCCW piece)?
-48 go close on low pressure? Could the question be written to ask only the RCW/EECW component instead of asking two questions (i.e., leave out the RBCCW piece)?
5/20/10 Changed distractor C to make more plausible. SAT.
5/20/10 Changed distractor C to make more plausible. SAT.


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 8 H             E S 295109AA2.02 Appears to meet the KA.
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                     8.
Reword the question to state: "Which ONE of the following events explains the receipt of the associated alarms stated above?"
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                    Explanation (1- m es        ed.        Link            units ward K/A Only
: 5) Fo          Dis cus          t.
8     H                                                                                     E   295109AA2.02 Appears to meet the KA.
Reword the question to state: Which ONE of the following events explains the receipt of the associated alarms stated above?
5/20/10 Changes made as noted above. SAT.
5/20/10 Changes made as noted above. SAT.
9 H     X         E U S 295021AK2.01 Appears to meet the KA.
9     H                     X                                                               U   295021AK2.01 Appears to meet the KA.
Distractors A & D do not appear plausible. Does not pass the logic test. If RCS temp is available, why wouldn't you use it to determine stratification and If RCS temp is not accurate, why would you choose RCS temp indications as a viable method to use to determine if RCS Stratification is occurring?
Distractors A & D do not appear plausible. Does not pass the logic test. If RCS temp is available, why wouldnt you use it to determine stratification and If RCS temp is not accurate, why would you choose RCS temp indications as a viable method to use to determine if RCS Stratification is occurring?
5/20/10 Reviewed on site and accepted question after a minor rewording in the stem of the question
5/20/10 Reviewed on site and accepted question after a minor rewording in the stem of the question. Original question needed enhancement only.
. Original question needed enhancement only.
10     H                                                                                     E   295023AA1.03 Appears to meet the KA.
10 H             E S 295023AA1.03 Appears to meet the KA.
There is no period at the end of distractor B. This is a bank question; it does not meet the modified criteria.
There is no period at the end of distractor B. This is a bank question; it does not meet the modified criteria.
What makes C plausible? All Control Rods are required to be in to move fuel and no info in stem to even address this as a possible scenario? Also, isn't rod withdrawal capability defeated as a prerequisite to moving fuel? Also, wouldn't the bundle need to be raised from the core location 1 s t5/20/10. Changed distractor C to make more plausible. SAT
What makes C plausible? All Control Rods are required to be in to move fuel and no info in stem to even address this as a possible scenario? Also, isnt rod withdrawal capability defeated as a prerequisite to moving fuel? Also, wouldnt the bundle need to be raised from the core location 1s t? This needs to be added to the answer or made the correct answer.
. ?  This needs to be added to the answer or made the correct answer.
5/20/10. Changed distractor C to make more plausible. SAT.
11 F             S 295024EK1.01 Appears to meet the KA.
11     F                                                                                     S   295024EK1.01 Appears to meet the KA.
12 F             E S 295025EK3.01 Appears to meet the KA. Why not use the TS Safety Limit LCO for Rx Press Safety Dome of 1325#? 5/20/10. Accepted question as is upon review on site. SAT.
12     F                                                                                     E   295025EK3.01 Appears to meet the KA.
Why not use the TS Safety Limit LCO for Rx Press Safety Dome of 1325#?
5/20/10. Accepted question as is upon review on site. SAT.


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 13 H             E S 295026EA2.01 Appears to meet the KA.
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                     8.
Does the SP temp indicator read as bulk temp? TS uses avg temp. Why does the question use "bulk"? Remove "bulk" unless necessary.
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                      Explanation (1- m es        ed.        Link            units ward K/A Only
: 5) Fo          Dis cus          t.
13     H                                                                                     E   295026EA2.01 Appears to meet the KA.
Does the SP temp indicator read as bulk temp? TS uses avg temp.
Why does the question use bulk? Remove bulk unless necessary.
5/20/10. Accepted question with changes noted above.
5/20/10. Accepted question with changes noted above.
14 F 1             S U 295028EK2.01 This is a generic fundamentals question. Not appropriate for this portion of the exam.
14     F     1                                                                               U   295028EK2.01 This is a generic fundamentals question. Not appropriate for this portion of the exam. LOD=1 Upon review on site with licensee, this is a basis document question.
LOD=1 Upon review on site with licensee, this is a basis document question.
Several misses were noted on this question due to concept errors.
Several misses were noted on this question due to concept errors.
Also this is to be credited as SAT and not added to the total.
Also this is to be credited as SAT and not added to the total.
15 H? 1             U S 295030EK1.02 This is a generic fundamentals question. Not appropriate for this portion of the exam. LOD=1 Below is an example question. Also, does not pass the logic test. When would NPSH increase on lowering level? 5/25/10 Question was rewritten to require use of ECCS curves. Reviewed in office. SAT 16 F?     X         U 295031EK1.03 1 st 2 part of A & C does not pass the logic test. If temp is decreased (maximize subcooling)
15   H?     1                                                                               U   295030EK1.02 This is a generic fundamentals question. Not appropriate for this portion of the exam. LOD=1 Below is an example question. Also, does not pass the logic test. When would NPSH increase on lowering level?
, how would this reduce reactor power?
5/25/10 Question was rewritten to require use of ECCS curves.
nd5/20/10 New A&C distractor written. SAT.
Reviewed in office. SAT 16   F?                     X                                                               U   295031EK1.03 S  1st part of A & C does not pass the logic test. If temp is decreased (maximize subcooling), how would this reduce reactor power?
part of C & D implies that there is a Rx Water Level interlock for reopening the MSIVs?
2nd part of C & D implies that there is a Rx Water Level interlock for reopening the MSIVs?
17 F             S 295037EK2.13 Appears to meet the KA.
5/20/10 New A&C distractor written. SAT.
17     F                                                                                     S   295037EK2.13 Appears to meet the KA.
Ensure that this is not double jeopardy w/ Q#13.
Ensure that this is not double jeopardy w/ Q#13.
Double jeopardy verified to be OK
Double jeopardy verified to be OK.
.
 
If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 18 H     X     S U 295038G2.4
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                     8.
.9 Does not meet the KA. Question is not dependent on low power or shutdown condition.
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                    Explanation (1- m es        ed.        Link            units ward K/A Only
: 5) Fo          Dis cus          t.
18     H                     X                                         X                   U   295038G2.4.9 Does not meet the KA. Question is not dependent on low power or shutdown condition.
Distractor A does not pass the logic test.
Distractor A does not pass the logic test.
5/20/10 Reviewed on site w/licensee. Upon further review w/licensee and based on validation results from licensee this question is satisfactory as is
5/20/10 Reviewed on site w/licensee. Upon further review w/licensee and based on validation results from licensee this question is satisfactory as is.
. 19 H             E S 600000AK1.02 Appears to meet the KA.
19     H                                                                                     E   600000AK1.02 Appears to meet the KA.
Information in the stem of the question is confusing. How much time has passed? Suggest a rewrite to include a chronological time log. Also, no information is given as to what Rx press or level is. Choice B is only dependent on DW press in the stem. Is this realistic? List ed as modified. Original question is not included.
Information in the stem of the question is confusing. How much time has passed? Suggest a rewrite to include a chronological time log.
Also, no information is given as to what Rx press or level is. Choice B is only dependent on DW press in the stem. Is this realistic? Listed as modified. Original question is not included.
5/20/10 Enhanced as noted above. SAT.
5/20/10 Enhanced as noted above. SAT.
20 H 1 X   X         U S 700000AA1.03 Appears to meet the KA. EHC does not change generator voltage with the VR in AUTO. Also, cap banks are not used for high voltage conditions (GFES).
20     H     1   X           X                                                               U   700000AA1.03 Appears to meet the KA.
This question was used on the last NRC exam HLT0801 Q20 (not noted on your 401
EHC does not change generator voltage with the VR in AUTO. Also, cap banks are not used for high voltage conditions (GFES).
-5 form in the "Last NRC Exam" section).
This question was used on the last NRC exam HLT0801 Q20 (not noted on your 401-5 form in the Last NRC Exam section).
Suggest possibly ask a frequency question this time.
Suggest possibly ask a frequency question this time.
5/21/10 Licensee disagrees based on validation.
5/21/10 Licensee disagrees based on validation. Need further review to determine if question can be used.
Need further review to determine if question can be used.
5/25/10 Revised question in office to ask what the procedure states relative to cap bank status. SAT.
5/25/10 Revised question in office to ask what the procedure states relative to cap bank status. SAT. 21 H           E U S 295002AK2.02 The 1 st5/21/10 Question rewritten per suggestion above. SAT
21     H                                                                 X                   U   295002AK2.02 The 1st part of the question does not match the KA. Suggest rewriting the question so that a two part question is not needed.
. part of the question does not match the KA. Suggest rewriting the question so that a two part question is not needed.
S 5/21/10 Question rewritten per suggestion above. SAT.


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 22 F             S 295009AK1.05 Appears to meet the KA.
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                     8.
23 F             N S 295010AA1.06 Appears to meet the KA.
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                    Explanation (1- m es        ed.        Link            units ward K/A Only
24 H             B E S 295022G2.2.38 Does not appear to be any operational reasoning for the operator to choose 250 degrees F. To make the question more operational valid. Remove the IAW and remove the 1 st question. Add a 2 nd5/21/10 Question modified as noted above. SAT.
: 5) Fo          Dis cus          t.
question to ask whether to isolate the affected CRD HCUs from service or raise drive water flow.
22     F                                                                                     S   295009AK1.05 Appears to meet the KA.
25 H             N S 295029EK3.03 Appears to meet the KA.
23     F                                                                             N       S   295010AA1.06 Appears to meet the KA.
5/21/10 This question is overlapped in scenario 3
24     H                                                                               B     E   295022G2.2.38 Does not appear to be any operational reasoning for the operator to choose 250 degrees F. To make the question more operational valid.
-20. This scenario is designated as the backup scenario. Therefore this question is OK for use on the written exam.
Remove the IAW and remove the 1st question. Add a 2nd question to ask whether to isolate the affected CRD HCUs from service or raise drive water flow.
26 H             B S 295034EA1.02 Appears to meet the KA.
5/21/10 Question modified as noted above. SAT.
27 H             N S 295036EA2.01 Appears to meet the KA.
25     H                                                                             N       S   295029EK3.03 Appears to meet the KA.
28 H             B S 203000A1.01 Appears to meet the KA.
5/21/10 This question is overlapped in scenario 3-20. This scenario is designated as the backup scenario. Therefore this question is OK for use on the written exam.
29 H             B S 203000A1.04 Appears to meet the KA.
26     H                                                                               B     S   295034EA1.02 Appears to meet the KA.
27     H                                                                             N       S   295036EA2.01 Appears to meet the KA.
28     H                                                                               B     S   203000A1.01 Appears to meet the KA.
29     H                                                                               B     S   203000A1.04 Appears to meet the KA.


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 30 H             N E S 205000K3.05 Appears to meet the KA.
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                     8.
Not sure if "C" is plausible? If the line comes in between 2 SDC valves and you have SDC isolation, how would this not cause a loss of SPF cooling? The 2 nd5/21/10 Reviewed again with same result. Validation showed misses for A & B. No one chose C. May need new KA. part of "B" states you will loose SFP if the tie comes in outside the SDC loop valves, is this plausible? 5/25/10 Reviewed in office. Made minor change to wording.
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                    Explanation (1- m es        ed.        Link            units ward K/A Only
Added IAW SDC procedure to stem of question.
: 5) Fo          Dis cus          t.
SAT. 31 F             B S 206000K2.02 Appears to meet the KA.
30     H                                                                             N       E   205000K3.05 Appears to meet the KA. Not sure if C is plausible? If the line comes in between 2 SDC valves and you have SDC isolation, how would this not cause a loss of SPF cooling? The 2nd part of B states you will loose SFP if the tie comes in outside the SDC loop valves, is this plausible?
32 H             B S 209001K1.08 Appears to meet the KA.
5/21/10 Reviewed again with same result. Validation showed misses for A & B. No one chose C. May need new KA.
3 4 H           X B U S /E 212000A2.09 Appears the correct answer does not meet the KA criteria. With the mode switch in SD, App 1F & 2 would be required w/o regard to the high DW press condition.
5/25/10 Reviewed in office. Made minor change to wording. Added IAW SDC procedure to stem of question. SAT.
5/21/10 Reviewed the question. Will review again on Monday as part of in office review
31     F                                                                               B     S   206000K2.02 Appears to meet the KA.
. May need a new KA.
32     H                                                                               B     S   209001K1.08 Appears to meet the KA.
5/25/10 Reviewed in office and made a change to distractor C to "vent to lower DW press. Until DW press. Alarm clears.
34    H                                                                 X             B     U/E 212000A2.09 Appears the correct answer does not meet the KA criteria. With the mode switch in SD, App 1F & 2 would be required w/o regard to the high DW press condition.
5/21/10 Reviewed the question. Will review again on Monday as part of in office review. May need a new KA.
5/25/10 Reviewed in office and made a change to distractor C to vent to lower DW press. Until DW press. Alarm clears.
Changed original classification to E from U after in office meeting.
Changed original classification to E from U after in office meeting.
35 F             B S 215003A4.04 Appears to meet the KA.
35     F                                                                               B     S   215003A4.04 Appears to meet the KA.
36 H             N S 215003A4.05 Appears to meet the KA.
36     H                                                                             N       S   215003A4.05 Appears to meet the KA.


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 37 H             M S 215004G2.2.2 Appears to meet the KA.
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                       8.
Is this modified? Answer not shown on original question. Difficult to tell what was modified.
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                        Explanation (1- m es        ed.        Link            units ward K/A Only
: 5) Fo          Dis cus          t.
37     H                                                                             M       S   215004G2.2.2 Appears to meet the KA. Is this modified? Answer not shown on original question. Difficult to tell what was modified.
5/21/10. Original question provided and modified status determined.
5/21/10. Original question provided and modified status determined.
38 H             B S 215005K4.01 Appears to meet the KA.
38     H                                                                               B     S   215005K4.01 Appears to meet the KA.
39 H             N E S 217000K6.04 The 1 st5/21/10 Question revised as noted above. SAT
39     H                                                                             N       E   217000K6.04 The 1st part of B & D should read the same. B says press control. D says pump to the CST. Why the difference? The examinee will most likely ask also.
. part of B & D should read the same. B says "press control". D says "pump to the CST". Why the difference? The examinee will most likely ask also.
5/21/10 Question revised as noted above. SAT.
40 H           X M U S 218000K4.02 Can ADS be armed at your site? The question as written does not meet the KA. The KA is for manual ignition of ADS logic. The question is asking about manual operation of the ADS SRV, which can always be accomplished and auto ADS logic.
40     H                                                                 X           M       U   218000K4.02 Can ADS be armed at your site? The question as written does not meet the KA. The KA is for manual ignition of ADS logic. The question is asking about manual operation of the ADS SRV, which can always be accomplished and auto ADS logic.
5/21/10 This question will be moved to question 41. A new KA will be needed for this question.
5/21/10 This question will be moved to question 41. A new KA will be needed for this question.
5/25/10 New question reviewed in office. Minor modification made to question to ensure it is logic based and not procedure based. SAT.
5/25/10 New question reviewed in office. Minor modification made to question to ensure it is logic based and not procedure based. SAT.
41 F           X B U S 218000K4.03 This inherent trait of the relief valve (valve design) and has nothing to do with ADS input logic. Q#40 could be used to satisfy this KA.
41     F                                                                 X             B     U   218000K4.03 This inherent trait of the relief valve (valve design) and has nothing to do with ADS input logic. Q#40 could be used to satisfy this KA.
5/21/10 Replaced this question w/ Q#40 and is now SAT.
5/21/10 Replaced this question w/ Q#40 and is now SAT.
42 F             N S 223002K1.04
42     F                                                                             N       S   223002K1.04 Appears to meet the KA.


Appears to meet the KA. 
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
 
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                     8.
: 4. Job Content Flaws
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                      Explanation (1- m es        ed.        Link            units ward K/A Only
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 43 H     X       B S E 223002K1.08 C & D: 2 nd5/21/10 Upon review with the licensee, this question is SAT.
: 5) Fo          Dis cus          t.
part of each statement is not plausible. If no isolation signal is present, why would you have to reopen either valve?
43     H                     X                                                       B     E   223002K1.08 C & D: 2nd part of each statement is not plausible. If no isolation signal is present, why would you have to reopen either valve?
44 F     X       N U S /E 239002K2.01 This question seems convoluted. Not all SRVs have 2 power supplies and not all SRVs have an automatic backup.
5/21/10 Upon review with the licensee, this question is SAT.
Therefore, it appears that this could lead to an argument for multiple correct answers.
44     F                     X                                                       N     U/E 239002K2.01 This question seems convoluted. Not all SRVs have 2 power supplies and not all SRVs have an automatic backup. Therefore, it appears that this could lead to an argument for multiple correct answers.
5/21/10 Changed this question to SAT after on site review w/licensee.
5/21/10 Changed this question to SAT after on site review w/licensee.
45 H             M S 259002G2.2.40 Appears to meet the KA.
45     H                                                                             M       S   259002G2.2.40 Appears to meet the KA.
46 F             N U S /E 261000A1.01 This appears to be a repeat Q#88 There was another question regarding the precaution (Z) concerning the fact that all 3 trains of SBGT can be started from Unit 3, it's best to start if from Unit 2 or 2 due to instrumentation availability.
46     F                                                                             N     U/E 261000A1.01 This appears to be a repeat Q#88 There was another question regarding the precaution (Z) concerning the fact that all 3 trains of SBGT can be started from Unit 3, its best to start if from Unit 2 or 2 due to instrumentation availability.
5/21/10 Reviewed Double Jeopardy concern w/licensee on site and agreed to look at changing the 1 st5/25/10 Reviewed question in office and provided details for a new question to ensure the KA is being met
5/21/10 Reviewed Double Jeopardy concern w/licensee on site and agreed to look at changing the 1st half of this question.
. Original question credited as an Enhancement, i.e. NOT UNSAT
5/25/10 Reviewed question in office and provided details for a new question to ensure the KA is being met. Original question credited as an Enhancement, i.e. NOT UNSAT.
. half of this question. 5/26/10 Reviewed question. SAT.
5/26/10 Reviewed question. SAT.


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 47 F 1   X       B U S 262001K5.02 No plausibility reason given for an operator to possibly choose choices A, B, or D. D seems especially not plausible. This implies we could never operate a breaker (remotely or locally) on a loss of control power. When would a breaker trip open on a loss of control power? The operator would have to loose sight of what control power is for to even consider this as an option. LOD=1 5/21/10 Review w/licensee. I will discuss their rationale for believing the question is SAT as is with the region and provide feedback. 5/25/10 Reviewed in office. Changes made are OK. Add noun name for the 43 switch. SAT.
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                     8.
48 F             M S 262002K3.08 Appears to meet the KA.
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                    Explanation (1- m es        ed.        Link            units ward K/A Only
49 F             M E S 263000A2.02 This has a low LOD for distractors C & D. Logically you would know that either choice C & D is correct.
: 5) Fo          Dis cus          t.
5/21/10 Upon review on site, agreed w/licensee decision making process that C &
47     F     1               X                                                       B     U   262001K5.02 No plausibility reason given for an operator to possibly choose choices A, B, or D. D seems especially not plausible. This implies we could never operate a breaker (remotely or locally) on a loss of control power. When would a breaker trip open on a loss of control power?
D are plausible
The operator would have to loose sight of what control power is for to even consider this as an option. LOD=1 5/21/10 Review w/licensee. I will discuss their rationale for believing the question is SAT as is with the region and provide feedback.
. 5/26/10 Changed stem to specify Battery Rooms 1, 2, & 3.
5/25/10 Reviewed in office. Changes made are OK. Add noun name for the 43 switch. SAT.
50 F             N S 264000A3.02 Appears to meet KA.
48     F                                                                             M       S   262002K3.08 Appears to meet the KA.
51 F/H             B S 264000A3.04 Appears to meet KA.
49     F                                                                             M       E   263000A2.02 This has a low LOD for distractors C & D. Logically you would know that either choice C & D is correct.
Not sure I would count this as a fundamental.
5/21/10 Upon review on site, agreed w/licensee decision making process that C & D are plausible.
5/26/10 Changed stem to specify Battery Rooms 1, 2, & 3.
50     F                                                                             N       S   264000A3.02 Appears to meet KA.
51   F/H                                                                             B     S   264000A3.04 Appears to meet KA. Not sure I would count this as a fundamental.
5/21/10 Changed to H cognitive level.
5/21/10 Changed to H cognitive level.
52 H/F             N S 300000A4.01 Appears to meet KA
52   H/F                                                                             N       S   300000A4.01 Appears to meet KA.
. 5/21/10 Changed to F cognitive level.
5/21/10 Changed to F cognitive level.
53 H             B S 400000K6.05 Appears to meet KA.
53     H                                                                               B     S   400000K6.05 Appears to meet KA.


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 54 H             M S 201002A2.04 Appears to meet KA.
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                       8.
55 F             B S 215002A3.04 Appears to meet KA.
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                        Explanation (1- m es        ed.        Link            units ward K/A Only
56 H     X       M S E 216000A1.02 Appears to meet KA.
: 5) Fo          Dis cus          t.
1 st5/21/10 Reviewed w/licensee onsite. Unable to make a determination at this time. Get branch input upon return to determine if U or just E
54     H                                                                             M       S   201002A2.04 Appears to meet KA.
. part of the question is a fundamental GFES level (LOD=1).
55     F                                                                               B     S   215002A3.04 Appears to meet KA.
5/25/10 Reviewed in office. Agreed SAT as is.
56     H                     X                                                       M       E   216000A1.02 Appears to meet KA.
Original question was SAT from original submittal.
1st part of the question is a fundamental GFES level (LOD=1).
57 F             N S 230000A4.04 Appears to meet KA.
5/21/10 Reviewed w/licensee onsite. Unable to make a determination at this time. Get branch input upon return to determine if U or just E.
58 H X X         N E S 233000K2.02 Appears to meet KA. Is the lead in statement needed? Is "NORMAL" needed in the 2 nd5/21/10 Licensee agreed with the change noted above. SAT  statement for the fill in the blank? Reword: What is the power supply for the PREFERRED pump used for Supplemental Fuel Pool Cooling
5/25/10 Reviewed in office. Agreed SAT as is. Original question was SAT from original submittal.
. 59 H             B E S 234000K5.02 Appears to meet KA.
57     F                                                                             N       S   230000A4.04 Appears to meet KA.
Distractor B is written to imply that an auto protective function has occurred. (Remove the word "other")
58     H         X   X                                                               N       E   233000K2.02 Appears to meet KA.
5/21/10 Licensee agreed with the change noted above. SAT
Is the lead in statement needed? Is NORMAL needed in the 2nd statement for the fill in the blank? Reword: What is the power supply for the PREFERRED pump used for Supplemental Fuel Pool Cooling.
5/21/10 Licensee agreed with the change noted above. SAT 59     H                                                                               B     E   234000K5.02 Appears to meet KA.
Distractor B is written to imply that an auto protective function has occurred. (Remove the word other) 5/21/10 Licensee agreed with the change noted above. SAT


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 60 H             B E S 241000K6.06 Check to verify that this question is not repeated from a previous one (Q#5). D distractor plausibility is incorrect, should say RX PRESS CONTROL. 5/21/10 Reviewed w/licensee and agreed that this is not a double jeopardy question.
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                       8.
61 H           X N U S 268000K3.04 Does not meet the KA. There is no loss or malfunction.
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                      Explanation (1- m es        ed.        Link            units ward K/A Only
: 5) Fo          Dis cus          t.
60     H                                                                               B     E   241000K6.06 Check to verify that this question is not repeated from a previous one (Q#5). D distractor plausibility is incorrect, should say RX PRESS CONTROL.
5/21/10 Reviewed w/licensee and agreed that this is not a double jeopardy question.
61     H                                                                 X           N       U   268000K3.04 Does not meet the KA. There is no loss or malfunction.
5/21/10 Reviewed new question on site. Appears to be SAT. Review again as part of in office review to verify.
5/21/10 Reviewed new question on site. Appears to be SAT. Review again as part of in office review to verify.
5/25/10 Reviewed again in office. Made minor mod to question. SAT. 62 F             N E S 272000A3.02 Does the logic require both rad monitors to be HIGH HIGH to cause the trip and isolation?
5/25/10 Reviewed again in office. Made minor mod to question. SAT.
5/21/10 Reviewed on site w/licensee. Only 1 detector is required to cause a trip & isolation of the MVP. Discussed this w/licensee. Lesson material is out of date and states 2 rad detectors required. U3 mod during the last outage (2 months ago). Lesson material not up to date. SR is to be developed.
62     F                                                                             N       E   272000A3.02 Does the logic require both rad monitors to be HIGH HIGH to cause the trip and isolation?
5/21/10 Reviewed on site w/licensee. Only 1 detector is required to cause a trip & isolation of the MVP. Discussed this w/licensee.
Lesson material is out of date and states 2 rad detectors required. U3 mod during the last outage (2 months ago). Lesson material not up to date. SR is to be developed.
5/26/10 Revised question to ask status of MVP OG isolation valves upon receipt of HIGH HIGH condition.
5/26/10 Revised question to ask status of MVP OG isolation valves upon receipt of HIGH HIGH condition.
63 F             N S 286000G2.2.42 Appears to meet the KA.
63     F                                                                             N       S   286000G2.2.42 Appears to meet the KA.
64 F             N S 290003K4.01 Appears to meet the KA.
64     F                                                                             N       S   290003K4.01 Appears to meet the KA.
65 F 2           B S 002K1.12 BANK Analysis for C should stat e that there is no injection in the outer tube.
002K1.12 BANK 65     F     2                                                                       B     S   Analysis for C should state that there is no injection in the outer tube.
The outer tube exist only for instrumentation purposes 66               See earlier review.
The outer tube exist only for instrumentation purposes 66                                                                                               See earlier review.


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 67 F 2    X      B E S G2.1.27 Part: The correct answer A is a subset issue. If the actual acceptance criteria are to maintain cladding temperature < 2200 degrees, the n it is also to maintain it < 2600 degrees (A).
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                       8.
Change to 1800 o5/21/10 Discussed w/licensee on site. With the "equal" statement as part of the answer, this could not be argued as a subset criterion
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                        Explanation (1- m es        ed.        Link            units ward K/A Only
. F. It's incorrect yet plausible because 1800 degrees is when DNB becomes significant.
: 5) Fo          Dis cus          t.
68 F 2    X        B E G2.1.8 Distractors B/C/D doesn't state coordination requirements. Local supervision doesn't count as coordination. B & C are left open in that they are both correct but not complete.
G2.1.27 Part: The correct answer A is a subset issue. If the actual acceptance criteria are to maintain cladding temperature < 2200 degrees, then it is also to maintain it < 2600 degrees (A).
It is not plausible to think that an AUO could manipulate reactivity controls without a licensed operator 'D'.
67    F      2                    X                                                  B S  Change to 1800 oF. Its incorrect yet plausible because 1800 degrees is when DNB becomes significant.
5/21/10 Discussed w/licensee on site. With the equal statement as part of the answer, this could not be argued as a subset criterion.
G2.1.8 Distractors B/C/D doesnt state coordination requirements. Local supervision doesnt count as coordination. B & C are left open in that they are both correct but not complete.
It is not plausible to think that an AUO could manipulate reactivity 68    F      2              X                                                        B      E  controls without a licensed operator D.
D is correct also if the recirc pump is uncoupled.
D is correct also if the recirc pump is uncoupled.
5/21/10 Reviewed w/licensee on site. Licensee revised original question. Changed original mark from U to E only.
5/21/10 Reviewed w/licensee on site. Licensee revised original question. Changed original mark from U to E only. Licensee is still working on revision. Question will be reviewed in office next week.
Licensee is still working on revision. Question will be review ed in office next week.
5/25/10 Reviewed in office. Changes made are OK. SAT.
5/25/10 Reviewed in office. Changes made are OK. SAT.
69 F 3          X  N U S /E G 2.2.37 KA is to determine operability and/or availability of safety related equipment. The question asks TS related jet pump flow mismatch limits. This is not safety related EQUIPMENT availability/operability.
G 2.2.37 KA is to determine operability and/or availability of safety related equipment. The question asks TS related jet pump flow mismatch U/E  limits. This is not safety related EQUIPMENT availability/operability.
Is this RO required knowledge?
69    F      3                                                          X            N S  Is this RO required knowledge?
5/21/10 Reviewed w/licensee on site. Original question is marked as a E, not a U. Determined that this is safety related equipment. The LOD was determined to be w/
5/21/10 Reviewed w/licensee on site. Original question is marked as a E, not a U. Determined that this is safety related equipment. The LOD was determined to be w/i reason for an RO. SAT G2.2.22 70     F     3                                                                       B     S Appears to meet KA. SAT.
i reason for an RO.
G2.2.4 Does not meet the KA. The question asks you to explain the reason 71    F      2                                                          X            N S  for the unit difference not the unit difference itself.
SAT 70 F 3           B S G2.2.22 Appears to meet KA. SAT.
71 F 2          X  N U S G2.2.4 Does not meet the KA. The question ask s you to "explain" the reason for the unit difference not the unit difference itself.
5/26/10 New question written and reviewed in office. SAT.
5/26/10 New question written and reviewed in office. SAT.


If more than 20 percent 1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort. To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Q# 1. LOK (F/H) 2. LO D (1-5) 3. Psychometric Flaws
If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.
: 4. Job Content Flaws
To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification
: 5. Other 6. B/M/N 7. U/E/S 8. Explanation Ste m Focus Cu es T/F Cr ed. Dis t. Partial Job-Link Minutia #/ units Bac k-ward Q= K/A SRO Only 72 H 2      X    B S G2.3.14 Is this minutia? Are operators expected to know this from memory?
: 1. 2. 3. Psychometric Flaws       4. Job Content Flaws       5. Other     6.     7.                                     8.
5/21/10 Reviewed w/licensee. This is relevant to operations and is sat as written.
Q#  LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S                                                      Explanation (1- m es        ed.        Link            units ward K/A Only
73 H 3          X  M U S G2.3.5 Does not meet the KA.
: 5) Fo          Dis cus          t.
The KA asks for ability to use radiation monitoring systems. The question asks about using the Turbine Building Ventilation System for an elevated release.
G2.3.14 Is this minutia? Are operators expected to know this from memory?
72    H      2                                    X                                  B      S 5/21/10 Reviewed w/licensee. This is relevant to operations and is sat as written.
G2.3.5 Does not meet the KA.
The KA asks for ability to use radiation monitoring systems. The 73    H      3                                                          X            M          question asks about using the Turbine Building Ventilation System for an elevated release.
5/21/10 Reviewed w/licensee on site. A new question will be written.
5/21/10 Reviewed w/licensee on site. A new question will be written.
5/26/10 Reviewed new question in office. SAT.
5/26/10 Reviewed new question in office. SAT.
74 F 2   X       M S G 2.4.20  Appears to meet KA. SAT.
G 2.4.20 74     F     2               X                                                       M       S Appears to meet KA. SAT.
75 F 2        X    M E S G2.4.45 MOD Distractor D: Is the orange rectangle around EOI
G2.4.45 MOD Minutia: C is confusing as written. Rec: Change C to is normal for current plant conditions.
-3 entry alarms a magnetic border or a permanent border? If it is permanent, I would consider this distractor not plausible.
E 75    F      2                                    X                                M          Distractor D: Is the orange rectangle around EOI-3 entry alarms a magnetic border or a permanent border? If it is permanent, I would consider this distractor not plausible.
Minutia:  C is confusing as written. Rec:  Change C to "is normal for current plant conditions".
5/21/10 Reviewed new distractor D and approved change. SAT.
5/21/10 Reviewed new distractor D and approved change. SAT
 
.}}
ES-403                              Written Examination Grading                      Form ES-403-1
                        .                  Quality Checklist Facility: cZO*J,          zi(        Date of Exam:    (c,- i7 Zic Exam Level: RO>1 SRO><
Initials Item Description                                  a      b        c
: 1.      Clean answer sheets copied before grading                            oz    74 Nji
: 2.        Answer key changes and question deletions justified and_documented
: 3.        Applicants scores checked for addition errors (reviewers spot check > 25% of examinations)
: 4.       Grading for all borderline cases (80 +/-2% overall and 70 or 80, as applicable, +/-4% on the SRO-only) reviewed in detail                      Z%      4A--
: 5.        Al! other failing examinations checked to ensure that grades are justified                                                              Z?
: 6.        Performance on missed questions checked for training deficiencies and wording problems; evaluate validity of questions_missed_by_half or more of the_applicants Printed Name/Signature                            Date
: a. Grader                                        1ELISI                        .
: b. Facility Reviewer(*)
: c. NRC Chief Examiner (*)                                                                7-li-ti
: d. NRC Supervisor (*)                                                                _______
(*)      The facility reviewers signature is not applicable for examinations graded by the NRC; two independent NRC reviews are required.
ES-403, Page 6 of 6}}

Revision as of 13:29, 13 November 2019

Initial Exam 2010-301 Final Administrative Documents
ML102520157
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/16/2010
From:
NRC/RGN-II
To:
Tennessee Valley Authority
References
50-259/10-301, 50-260/10-301, 50-296/10-301, ES-201, ES-201-1 50-259/10-301, 50-260/10-301, 50-296/10-301
Download: ML102520157 (79)


Text

__________

ES-201 Examination Preparation Checklist Form ES-201-1 Facility: 0 1 Fr Date of Examination:

Developed by: Written - Facility NRC Li II Operating - FaciIityi NRC Li Target Chief Date* Task Description (Reference) Examiners Initials

-180 1. Examination administration date confirmed (Cia; C.2.a and b)

-120 2. NRC examiners and facility contact assigned (C.1.d; C.2.e)

-120 3. Facility contact briefed on security and other requirements (C.2.c)

-120 4. Corporate notification letter sent (C.2.d)

[-90] [5. Reference material due (C.1.e; C.3.c; Affachment 3)]

{-75} 6. Integrated examination outline(s) due, including Forms ES2-2, ES<3, ES-29 ES-3t-2, ES1-5, ES V1s, ES-40)4/2 ES481-3, and 2

ES-4-1-4, as applicable (C.1.e and f; C.3.d)

-,)j

{-70} {7. Examination outline(s) reviewed by NRC and feedback provided to facility licensee (C.2.h; C.3.e)}

{-45} 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form ES-201-3 updates), and reference materials due (C.1 .e, f, g and h; C.3.d)

-30 9. Preliminary license applications (NRC Form 398s) due (C.1 .1; C.2.g; ES-202)

.\

t)7L .ID

-14 10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; ES-202)

-14 11. Examination approved by NRC supervisor for facility licensee review (C.2.h; C.3.f)

-14 12. Examinations reviewed with facility licensee (Cli; C.2.f and h; C.3.g)

-7 13. Written examinations and operating tests approved by NRC supervisor (C.2.i; C.3.h)

-7 14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204)

-7 15. Proctoring/written exam adminisation guidelines reviewed with facility licensee (C.3.k)

-7 16. Approved scenarios, job performance measures, and questions distributed to NRC examiners (C.3.i)

  • Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by case basis in coordination with the facility licensee.

[Applies only] {Does not apply} to examinations prepared by the NRC.

ES-201, Page 25 of 28

ES-201 Examination Outline Quality Checklist Form ES-201-2 Facility:

Date of Examination:

Item Task Description

1. a. Verify that the outline(s) fit(s) the appropriate model, in accordance with ES-401.

w R b. Assess whether the outline was systematically and randomly prepared in accordance with I Section D 1 of ES-401 and whether all KJA categories are appropriately sampled.

c. Assess whether the outline over-emphasizes any systems, evolutions, or generic topics.
d. Assess whether the justifications for deselected or rejected K/A statements are appropriate.
2. a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, S and major transients.

M b. Assess whether there are enough scenario sets (and spares) to test the projected number u and mix of applicants in accordance with the expected crew composition and rotation schedule

[ without compromising exam integrity, and ensure that each applicant can be tested using A at least one new or significantly modified scenario, that no scenarios are duplicated T from the applicants audit test(s), and that scenarios will not be repeated on subseo

c. To the extent possible, assess whether the outline(s) conform(s) with the qualitative R and quantitative criteria specified on Form ES-301-4 and described in Appendix D.
3. a. Verify that the systems walk-through outline meets the criteria specified on Form ES-301-2:

(1) the outline(s) contain(s) the required number of control room and in-plant tasks W distributed among the safety functions as specified on the form I (2) task repetition from the last two NRC examinations is within the limits specified on the form T (3) no tasks are duplicated from the applicants audit test(s)

(4) the number of new or modified tasks meets or exceeds the minimums specified on the form (5) the number of alternate path, low-power, emergency, and RCA tasks meet the criteria on the form.

b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:

(1) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations

c. Determine if there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
4. a. Assess whether plant-specific priorities (including ERA and IPE insights) are covered in the appropriate exam sections.
b. Assess whether the 10 CFR 55.4 1/43 and 55.45 sampling is appropriate.

N c. Ensure that K/A importance ratings (except for plant-specific priorities) are at least 2.5.

d. Check for duplication and overlap among exam sections.

A e. Check the entire exam for balance of coverage.

L

f. Assess whether the exam fits the appropriate job level (RO or SRO).
a. Author Date
.
b. Facility Reviewer (*) 71 ti) /

e 2 iefcicI

c. NRC Chief Examiner (#) 4 Ik j.

d NRC Supervisor W!chi:f examin:

Note # Independent NRC reviewer initial items in Colu Not applicable for NRC-prepared examination outlines concurrence required.

ES-201, Page 26 of 28

HLT 0810 ES-201 Examination Security Agreement Form ES-201-3

1. Pre-Examination I acknO'~~edge that I ha'~'e acquired specfalized knO'\';~edge about the NRC licensing examinations scheduled fOfthe week{s) of 6/7-18/2010 as ottM date of my signature. I a.gree that I will not knowingly divulge any information about these examinations to any persons wtlo have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide pertormance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting, as a simulaior booth operator or communicator is acceptable if the individual does not select the training content or pro'/idB direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facilit1 licensee's procedures) and understand that violation of the conditions of this agreement may result in cancellaiion of the examinations and/or an enforcement action against me or the facilin' licensee. l'i'l,II immediately report to iacility management or the NRC chief examiner any indications or suggestions that examination security may have IJeen compromised.
2. Post-Examination To me best of my knowledge, I did not dilJulgeto any unauihorized persons any information conceming the NRC licensing examinaiiOfls administered during the weekes) of 6/7-18/201Q From the date that I entered into this security agreoolent until the completion at examinaiion administration, 1did not instruct, evaluate, or provide pertomlance feedba~ to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE I RESPONSIBILITY SIGN.A.TURE (1) d\l\ON'~ \"J\c ~~I)\l.1i:U Of'S Sur~~,\J')\~I-l~t oJ\ fi~lt>;"~

-. - - . "ReCLc.:to"R.,_D~o...-tn-c e _. ~

~- ~I_()<:," ~ 0" ~V'E"'.J;,. ~.~

' %1i<~J. h i}I~~~r-t/;v:Pr .~.uv~lJY\

.. _;~. . ~

U,,) IT f} ~,:hctL

- afu~.j.. ~lr u "'. +. S' ......*veiv;sejr

rV'l6~'"

I.J yJ-1 r s ~'17""l. V1.5W\

V N l "T ~PAII l..soft.

iI~j+' Oil)4'. ~

14. :IOlff? \?e'0.4-'vi2A(J vrV~ l~VVc:n.(A,< £.:...("",. ~~' \~ ~-2\D 15;tPEftLc" (t<;4,;t[(£A, lA0,4 r C'-I'£rtv.f:swt. ~---B -( -U-<c)

NOTES:

ES-20'I, Page 27 of 28

HLT0810 ES-201 Examination Security Agreement Form ES-201-3

1. Pre-Examination I acknowledge that I have acquired specialized knowtedg e about the NRC licensing examinations scheduled for the week( s) of 6/7-18/2010 as of the date of my signature. I agree that I will not ~it1awingly divUlge any Information aoou; these examinations to any persons who have not been authorized by the NRC chief examiner. J understand that I am not to instruct, evaluate, or provide performance feedback to mose applicants scheduled to be administered these licensing examinations from this daie until completion of examination administration, except as speciiically noted below and authorized by the NRC (e.{I., .acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore., I am aware ot the physical security measures and requirements (as documented in the facilitj licensee's procedures) and understand that violation of the conditions of tillis a{lreement may result in cancellation of the examinations and/or an enforcement action against me or the facility lictmsee. I ~Vill immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have !Jeen compromised.
2. Post-Examination To the best of my knO',vledge, I did not divulgefo any unauihorized persons any information concerning the NRC licensing eY.aminatJons administered duling the week(s) of 6/7-18/201 Q From the date mat I entered into Iflis security agreement until the completion of examination administrauon, I did not instruct, evaluate, or provide performance feedlJacJ( to lhase applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC PRlNTED NAME JOB TITLE I RESPONSIBILITY

.1.

~.

j"

~~~?: 4J6vE J'l ' ~:S 0..1~~.\-

<!2~e.r-4 . -R-ebcc)(,.... /!)pr r: ;;

S U::!l SllliSvs.

S* te s: V c-

=.

_---::;;;;:::;t<"~a=:::;i....,........_~rr=~

~"{'I~

5. .J~ \:0: M.Otl.R,.\
6. !iTJZ.!.4~c&iT <.,-eg,.E, S

013 w~ aJ"

'1"'ClO4-T 1)\ £JiLt\)iZ I)I~

_ _ c=~_~ ~"-"-~.

p .....

  • 2-he,J z~ _ (,. ,

. - ci.'

7. 0&;1-1% fI.Jal.,n ~(\ '" eiPs ~() d';

~ 2*~¥te~ ~1~ .JAJ.lblmotJ I' _. 2-2'-1(/ ' --::

10. .-:To ~ ¥~ ...r~;-'.-.:"--_-=

Jb i!P.~0'..,. ,,,--

s. _ _ _ __

n:~h~S;'~ ~1-:- --~~

~!:iiiEA':1112M.:b

15. ;Oru) lIA/IJDa WW' lhlS?i) 1)E~r<.

Cu~~ o Ps ~.I.

V~~-:6-'

77T~w7 NOTES:

ES-20*t, Page 27 of 28

HLT 0801 Administrative Topics Outline Form ES-301-1 Facility: Browns Ferry NPP Date of Examination: 6/7/2010 Examination Level: RO Operating Test Number: 1006 Administrative Topic Type Describe activity to be performed Code *

(see Note)

Conduct of Operations N 2.1.5 Evaluate Work Schedule against guidelines of SPP 1.5 Fatigue Management and Work Hour Limits (jpm551)

Conduct of Operations N 2.1.36 Complete SRM operability surveillance and determine if acceptance criteria is met for core alterations. (jpm554)

Equipment Control N 2.2.41 Determine the isolation boundary for PCS Head Tank Pump 2B (jpm561)

Radiation Control P/M 2.3.12 Locked High Radiation Area Entry requirements (jpm548)

Emergency Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol Room (D)irect from bank (< 3 for ROs; < 4 for SROs and RO retakes)

(N)ew or (M)odified from bank (> 1)

(P)revious 2 exams (< 1; randomly selected)

(S)imulator

HLT 0801 Administrative Topics Outline Form ES-301-1

1. Evaluate Work Schedule for compliance with new fatigue management guidelines
  • New
  • SPP 1.5 Fatigue Management and Work Hour Limits
  • 2.1.5 Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc. Importance RO 2.9
2. Complete SRM operability surveillance and determine if acceptance criteria is met for core alterations.
  • New
  • 1-SR-3.3.1.2.4 Source Range Monitor System Count Rate and Signal to Noise Ratio Check

Importance RO 3.0

3. Determine the isolation boundary for PCS Head Tank Pump 2B
  • New
  • Drawings 2-47E814-1, 2-45E779-19, 2-47E610-71-1, 2-45E2750-4, and 2-47E751-3 and 5
  • 2.2.41 Ability to obtain and interpret station electrical and mechanical drawings. Importance RO 3.5
4. Locked High Radiation Area Entry requirements
  • Previous/Modified
  • Handout JPM 548 RWP and Survey Map
  • SPP 5.1 Radiological Controls
  • 2.3.12 Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc. Importance RO 3.2

HLT 0801 Administrative Topics Outline Form ES-301-1 Facility: Browns Ferry NPP Date of Examination: 6/7/2010 Examination Level: SRO Operating Test Number: 1006 Administrative Topic Type Describe activity to be performed Code *

(see Note)

Conduct of Operations N 2.1.5 Evaluate Work Schedule against guidelines of SPP 1.5 Fatigue Management and Work Hour Limits (jpm551sro)

Conduct of Operations N 2.1.18 NRC Event Notification due to Reactor Scram (jpm553)

Equipment Control N 2.2.40 Controlling a containment penetration to meet the isolation requirements of TS 3.6.1.3 (jpm555)

Radiation Control P/M 2.3.12 Locked High Radiation Area Entry requirements (jpm548)

Emergency Plan N 2.4.44 Protective Action Recommendation Evaluation (jpm552)

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol Room (D)irect from bank (< 3 for ROs; < 4 for SROs and RO retakes)

(N)ew or (M)odified from bank (> 1)

(P)revious 2 exams (< 1; randomly selected)

(S)imulator

HLT 0801 Administrative Topics Outline Form ES-301-1

1. Evaluate Work Schedule for compliance with new fatigue management guidelines
  • New
  • SPP 1.5 Fatigue Management and Work Hour Limits
  • 2.1.5 Ability to use procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc. Importance SRO 3.9
2. NRC Event Notification due to Reactor Scram
  • New
  • SPP 3.5 Regulatory Reporting Requirements
  • 2.1.18 Ability to make accurate, clear, and concise logs, records, status boards and reports.

Importance SRO 3.8

3. Controlling a containment penetration to meet the isolation requirements of TS 3.6.1.3
  • New
  • Drawing 2-47E811-1
  • SPP 10.2 Clearance Procedure to Safely Control Energy
  • 2.2.40 Ability to apply Technical Specifications for a system. Importance SRO 4.7
4. Locked High Radiation Area Entry requirements
  • Previous / Modified
  • Handout JPM 548 RWP and Survey Map
  • SPP 5.1 Radiological Controls
  • 2.3.12 Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc. Importance SRO 3.7
5. Protective Action Recommendation Evaluation
  • New
  • EPIP-1 and 5 Emergency Classification Procedure and General Emergency
  • Completed Notification Handout
  • 2.4.44 Knowledge of emergency plan protective action recommendations. Importance SRO 4.4

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Browns Ferry NPP Date of Examination: 6/7/2010 Exam Level: RO Operating Test No.: 1006

@

Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System / JPM Title Type Code*

Function

a. Control Rod Exercise SR 3.1.3.2 (U2/U3) M, A, S 1
b. Place a 2nd/3rd RFPT in service (U2/U3) N, S 2
c. Close MSIVs during Power Operation (U2/U3) N, S 3
d. Loss of Shutdown Cooling (U2/U3) N, L, A, S 4
e. Returning an IRM to service from Bypass (U2/U3) N, L, S 7
f. Return DW CAM to service after isolation (U2/U3) N, S 9
g. Drywell sprays w/Fire Protection Unit 1 and 2 actions EN, N, C 5
h. Generator Synchronization and Load (U2/U3) N, A, S 6 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. Shutdown Unit 3 A DG at 4 KV Shutdown Board N, E, A 6
j. Suppression Pool Water Inventory Removal App 18 (U1) N, R, E 5
k. 0-SSI-2-1, ATTACHMENT 2 D, E, A 8

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system)

(L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams < 3 / < 3 / < 2 (randomly selected)

(R)CA >1 / >1 / >1 (S)imulator

HLT 0801 Control Room/In-Plant Systems JPM Narrative Control Room Systems:

a. Control Rod Exercise SR 3.1.3.3 (80)
  • Modified / Simulator / Alternate Path
  • 3-AOI-85-5 Rod Drift In Rev 9
  • 201002 Reactor Manual Control System A2.02 Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Rod Drift Alarm IMPORTANCE: RO 3.2 SRO 3.3
b. Place RFPT 3C in Service (202)
  • New / Simulator
  • 3-OI-3 Reactor Feedwater System Rev 79, Section 5.7
  • 259001 Reactor Feedwater System A4.02 Ability to manually operate and/or monitor in the Control Room: Manually start/control a RFP/TDRFP IMPORTANCE: RO 3.9 SRO 3.7
c. Close MSIVs during Power Operation (203)
  • New / Simulator
  • 239001 Main and Reheat Steam System A4.01 Ability to manually operate and/or monitor in the control room: MSIVs IMPORTANCE: RO 4.2 SRO 4.0
d. Loss of Shutdown Cooling (225)
  • New / Low-Power / Simulator / Alternate Path
  • 3-ARP-9-3D Rev 27
  • 295021 Loss of Shutdown Cooling AA1.02 Ability to operate and/or monitor the following as they apply to Loss of Shutdown Cooling: RHR/shutdown cooling IMPORTANCE: RO 3.5 SRO 3.5
e. Returning an IRM to service from Bypass (207)
  • Low-Power / Simulator / New
  • -OI-92A IRM Rev 15 section 6.2
  • 215003 IRM System A2.02 Ability to (a) predict the impacts of the following on the IRM System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: IRM inop condition IMPORTANCE: RO 3.5 SRO 3.7

HLT 0801 Control Room/In-Plant Systems JPM Narrative

f. Return DW Cam to Service after isolation (208)
  • New / Simulator / Engineered Safety Feature
  • 3-AOI-100-1 Reactor Scram Rev 51 step 37
  • 272000 Radiation Monitoring System A2.10 Ability to (a) predict the impacts of the following on the Radiation Monitoring System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: LOCA IMPORTANCE: RO 3.9 SRO 4.1
g. Spray the Drywell using Fire Protection Unit 1 and 2 CR actions (209)
  • New / Control Room / Engineered Safety Feature
  • 3-EOI Appendix 17B RHR System Operation Drywell Sprays, Rev 5
  • 295024 High Drywell Pressure: EA1.11 Ability to operate and/or monitor the following as they apply to High Drywell Pressure: Drywell Spray: Mark-I&II IMPORTANCE: RO 4.2 SRO 4.2
h. Generator Synchronization and Load (210)
  • New / Alternate Path / Simulator
  • 3-OI-47 Turbine Generator System, Rev. 84, Section 5.5
  • 3-ARP-9-7B 3-XA-55-7B Rev 22 Window 32
  • 262001 AC Electrical Distribution A4.04 Ability to manually operate and/or monitor in the control room: Synchronizing and paralleling of different AC Supplies IMPORTANCE: RO 3.6 SRO 3.7 In-Plant Systems:
i. Shutdown Unit 3 A DG from the 4KV Shutdown Board (211)
  • New / Emergency or Abnormal In-Plant / Alternate Path
  • 3-OI-82, Standby Diesel Generator System, Rev. 88, Section 7.3 and 7.5
  • 264000 Emergency Generators K4.07 Knowledge of Emergency Generators design features and/or interlocks for the following: Local operation and control IMPORTANCE:

RO 3.3 SRO 3.4

HLT 0801 Control Room/In-Plant Systems JPM Narrative

j. Suppression Pool Water Inventory Removal 1-EOI-Appendix 18 (212)
  • New / RCA Entry / Emergency or Abnormal In-Plant
  • 1-EOI-Appendix 18, Rev. 0
  • 295029 High Suppression Pool Water Level EK2.01 Knowledge of the interrelations between High Suppression Pool Water Level and the following: RHR/LPCI IMPORTANCE: RO 3.0 SRO 3.3
k. 0-SSI-2-1, ATTACHMENT 2 (127)
  • Bank / Emergency or Abnormal In-Plant / Alternate Path
  • 0-SSI-2-1 Rev 7
  • 600000 Plant Fire on Site AA2.16 Ability to determine and interpret the following as the apply to Plant Fire on Site: Vital equipment and control systems to be maintained and operated during a fire IMPORTANCE: RO 3.0 SRO 3.5

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Browns Ferry NPP Date of Examination: 6/7/2010 Exam Level: SRO-I Operating Test No.: 1006

@

Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System / JPM Title Type Code*

Function

a. Control Rod Exercise SR 3.1.3.2 (U2/U3) M, A, S 1
b. Place a 2nd/3rd RFPT in service (U2/U3) N, S 2
c. Close MSIVs during Power Operation (U2/U3) N, S 3
d. Loss of Shutdown Cooling (U2/U3) N, L, A, S 4
e. Returning an IRM to service from Bypass (U2/U3) N, L, S 7
g. Drywell sprays w/Fire Protection Unit 1 and 2 actions EN, N, C 5
h. Generator Synchronization and Load (U2/U3) N, A, S 6 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. Shutdown Unit 3 A DG at 4 KV Shutdown Board N, E, A 6
j. Suppression Pool Water Inventory Removal App 18 (U1) N, R, E 5
k. 0-SSI-2-1, ATTACHMENT 2 D, E, A 8

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system)

(L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams < 3 / < 3 / < 2 (randomly selected)

(R)CA >1 / >1 / >1 (S)imulator

HLT 0801 Control Room/In-Plant Systems JPM Narrative Control Room Systems:

a. Control Rod Exercise SR 3.1.3.3 (80)
  • Modified / Simulator / Alternate Path
  • 3-AOI-85-5 Rod Drift In Rev 9
  • 201002 Reactor Manual Control System A2.02 Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Rod Drift Alarm IMPORTANCE: RO 3.2 SRO 3.3
b. Place RFPT 3C in Service (202)
  • New / Simulator
  • 3-OI-3 Reactor Feedwater System Rev 79, Section 5.7
  • 259001 Reactor Feedwater System A4.02 Ability to manually operate and/or monitor in the Control Room: Manually start/control a RFP/TDRFP IMPORTANCE: RO 3.9 SRO 3.7
c. Close MSIVs during Power Operation (203)
  • New / Simulator
  • 239001 Main and Reheat Steam System A4.01 Ability to manually operate and/or monitor in the control room: MSIVs IMPORTANCE: RO 4.2 SRO 4.0
d. Loss of Shutdown Cooling (225)
  • New / Low-Power / Simulator / Alternate Path
  • 3-ARP-9-3D Rev 27
  • 295021 Loss of Shutdown Cooling AA1.02 Ability to operate and/or monitor the following as they apply to Loss of Shutdown Cooling: RHR/shutdown cooling IMPORTANCE: RO 3.5 SRO 3.5
e. Returning an IRM to service from Bypass (207)
  • Low-Power / Simulator / New
  • 3-OI-92A IRM Rev 15 section 6.2
  • 215003 IRM System A2.02 Ability to (a) predict the impacts of the following on the IRM System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: IRM inop condition IMPORTANCE: RO 3.5 SRO 3.7

HLT 0801 Control Room/In-Plant Systems JPM Narrative

g. Spray the Drywell using Fire Protection Unit 1 and 2 CR actions (209)
  • New / Control Room / Engineered Safety Feature
  • 3-EOI Appendix 17B RHR System Operation Drywell Sprays, Rev 5
  • 295024 High Drywell Pressure: EA1.11 Ability to operate and/or monitor the following as they apply to High Drywell Pressure: Drywell Spray: Mark-I&II IMPORTANCE: RO 4.2 SRO 4.2
h. Generator Synchronization and Load (210)
  • New / Alternate Path / Simulator
  • 3-OI-47 Turbine Generator System, Rev. 84, Section 5.5
  • 3-ARP-9-7B 3-XA-55-7B Rev 22 Window 32
  • 262001 AC Electrical Distribution A4.04 Ability to manually operate and/or monitor in the control room: Synchronizing and paralleling of different AC Supplies IMPORTANCE: RO 3.6 SRO 3.7 In-Plant Systems:
i. Shutdown Unit 3 A DG from the 4KV Shutdown Board (211)
  • New / Emergency or Abnormal In-Plant / Alternate Path
  • 3-OI-82, Standby Diesel Generator System, Rev. 88, Section 7.3 and 7.5
  • 264000 Emergency Generators K4.07 Knowledge of Emergency Generators design features and/or interlocks for the following: Local operation and control IMPORTANCE:

RO 3.3 SRO 3.4

j. Suppression Pool Water Inventory Removal 1-EOI-Appendix 18 (212)
  • New / RCA Entry / Emergency or Abnormal In-Plant
  • 1-EOI-Appendix 18, Rev. 0
  • 295029 High Suppression Pool Water Level EK2.01 Knowledge of the interrelations between High Suppression Pool Water Level and the following: RHR/LPCI IMPORTANCE: RO 3.0 SRO 3.3
k. 0-SSI-2-1, ATTACHMENT 2 (127)
  • Bank / Emergency or Abnormal In-Plant / Alternate Path
  • 0-SSI-2-1 Rev 7
  • 600000 Plant Fire on Site AA2.16 Ability to determine and interpret the following as the apply to Plant Fire on Site: Vital equipment and control systems to be maintained and operated during a fire IMPORTANCE: RO 3.0 SRO 3.5

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Browns Ferry NPP Date of Examination: 6/7/2010 Exam Level: SRO-U Operating Test No.: 1006

@

Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System / JPM Title Type Code*

Function

a. Control Rod Exercise SR 3.1.3.2 (U2/U3) M, A, S 1
d. Loss of Shutdown Cooling (U2/U3) N, L, A, S 4
g. Drywell sprays w/Fire Protection Unit 1 and 2 actions EN, N, C 5 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. Shutdown Unit 3 A DG at 4 KV Shutdown Board N, E, A 6
k. 0-SSI-2-1, ATTACHMENT 2 D, E, A 8

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system)

(L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams < 3 / < 3 / < 2 (randomly selected)

(R)CA >1 / >1 / >1 (S)imulator

HLT 0801 Control Room/In-Plant Systems JPM Narrative Control Room Systems:

a. Control Rod Exercise SR 3.1.3.3 (80)
  • Modified / Simulator / Alternate Path
  • 3-AOI-85-5 Rod Drift In Rev 9
  • 201002 Reactor Manual Control System A2.02 Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Rod Drift Alarm IMPORTANCE: RO 3.2 SRO 3.3
d. Loss of Shutdown Cooling (225)
  • New / Low-Power / Simulator / Alternate Path
  • 3-ARP-9-3D Rev 27
  • 295021 Loss of Shutdown Cooling AA1.02 Ability to operate and/or monitor the following as they apply to Loss of Shutdown Cooling: RHR/shutdown cooling IMPORTANCE: RO 3.5 SRO 3.5
g. Spray the Drywell using Fire Protection Unit 1 and 2 CR actions (209)
  • New / Control Room / Engineered Safety Feature
  • 3-EOI Appendix 17B RHR System Operation Drywell Sprays, Rev 5
  • 295024 High Drywell Pressure: EA1.11 Ability to operate and/or monitor the following as they apply to High Drywell Pressure: Drywell Spray: Mark-I&II IMPORTANCE: RO 4.2 SRO 4.2 In-Plant Systems:
i. Shutdown Unit 3 A DG from the 4KV Shutdown Board (211)
  • New / Emergency or Abnormal In-Plant / Alternate Path
  • 3-OI-82, Standby Diesel Generator System, Rev. 88, Section 7.3 and 7.5
  • 264000 Emergency Generators K4.07 Knowledge of Emergency Generators design features and/or interlocks for the following: Local operation and control IMPORTANCE:

RO 3.3 SRO 3.4

HLT 0801 Control Room/In-Plant Systems JPM Narrative

k. 0-SSI-2-1, ATTACHMENT 2 (127)
  • Bank / Emergency or Abnormal In-Plant / Alternate Path
  • 0-SSI-2-1 Rev 7
  • 600000 Plant Fire on Site AA2.16 Ability to determine and interpret the following as the apply to Plant Fire on Site: Vital equipment and control systems to be maintained and operated during a fire IMPORTANCE: RO 3.0 SRO 3.5

ES-301 Operating Test Quality Checklist Form ES-301-3 Facility: Browns Ferry Date of Examination: June 2010 Operating Test Number: 1006 Initials

1. General Criteria a b* c#
a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution).
b. There is no day-to-day repetition between this and other operating tests to be administered during this examination.
c. The operating test shall not duplicate items from the applicants' audit test(s). (see Section D.1.a.)
d. Overlap with the written examination and between different parts of the operating test is within acceptable limits.
e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.
2. Walk-Through Criteria
a. Each JPM includes the following, as applicable:
  • initial conditions
  • initiating cues
  • references and tools, including associated procedures
  • reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee
  • operationally important specific performance criteria that include:

- detailed expected actions with exact criteria and nomenclature

- system response and other examiner cues

- statements describing important observations to be made by the applicant

- criteria for successful completion of the task

- identification of critical steps and their associated performance standards

- restrictions on the sequence of steps, if applicable

b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached.

Date

a. Author t../ Z.QIC:>
b. Facility Reviewer(*) i-/~- U/~
c. NRC Chief Examiner (#) 5" . . 1.\ - ;;l.D I "
d. NRC Supervisor (Q , ~ /- ,tOlD

')

NOTE:

  • The facility signature is not applicable for NRC-developed tests.
  1. Independent NRC reviewer initial items in Column *c"; chief examiner concurrence required.

ES-301 Simulator Scenario Quality Checklist Form ES-301-4 Facility: Browns Ferry Date of Exam: June 2010 Scenario Numbers: 20/21/22124 Operating Test No.: HLT 1006 QUALITATIVE ATTRIBUTES Initials a b* C#

1. The initial conditions are realistic, in that some equipment and/or instrumentation may be out of service, but it does not cue the operators into expected events.

D'-  ;<< ~J1L-

2. The scenarios consist mostly of related events. 01- ~ ~)}L
3. Each event description consists of
  • the point in the scenario when it is to be initiated
  • the malfunction(s) that are entered to initiate the event
  • the symptoms/cues that will be visible to the crew
  • the expected operator actions (by shift position)
  • the event termination point (if applicable) O"t.. ;q ~N--
4. No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the scenario without a credible pr~ceding incident such as a seismic event. 0"1- ;q ~kL
5. The events are valid with regard to physics and thermodynamics. o'"t..- U '~.At-
6. Sequencing and timing of events is reasonable, and allows the examination team to obtain complete evaluation results commensurate with the scenario objectives. 0'1- 'J:'/ tJJ<-
7. If time compression techniques are used, the scenario summary clearly so indicates.

Operators have sufficient time to carry out expected activities without undue time constraints. Cues are given. en... ;q ~

8. The simulator modeling is not altered. o~

~tf ~J\L

9. The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated to ensure that functional fidelity is maintained while running the planned scenarios. oz. U -t-~
10. Every operator will be evaluated using at least one new or significantly modified scenario. All other scenarios have been altered in accordance with Section 0 .5 of ES-301. o~ It:I -bk
11. All individual operator competencies can be evaluated, as verified using Form ES-301-6 (submit the form along with the simulator scenarios). O"L ;ttJ +k
12. Each applicant will be significantly involved in the minimum number of transients and events specified on Form ES-301-5 (submit the form with the simulator scenarios). O"L ~,{ tk
13. The level of difficulty is appropriate to support licenSing decisions for each crew position. OL 1CtJ ~

Target Quantitative Attributes (Per Scenario; See Section D.S.d) Actual Attributes - - -

1. Total malfunctions (5-8) 71717/8 , Jf({ t Jl-
2. Malfunctions after EOP entry (1-2) 2/2/2/3 0 ...... d tJc-
3. Abnormal events (2-4) 4/4/4/4 D"t. Id ttL
4. Major transients (1-2) 1/1/2/2 .0" l:tr tJc
5. EOPs entered/requiring substantive actions (1-2) 2/3/3/3 o~

C1:! ~J)c 1/0/1/2 i"- lu ' ~

6. EOP contingencies requiring substantive actions (0-2)
7. Critical tasks (2-3) 5/4/3/7 o'L W ~k

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Browns Ferry NPP Date of Exam: June 06 - 19, 2010 Operating Test No.: HLT 1006 A E Scenarios P V T M 1 (3-20) 2 (3-21) 3 (3-22) 4 (3-24)spare P E O I L N CREW CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION POSITION A I C S A B S A B S A B S A B S A B L M A T R T O R T O R T O R T O R T O U N Y O C P O C P O C P O C P O C P M (*)

T P R I U E

RO RX NOR 1 1 2 1 SRO-I I/C 3,4,5,6 3,4,5,6 8 2 SRO-U MAJ 7 7 2 1

  1. 1 TS 3,6 4,6 4 2 RO RX 2 2,6,7 2 1 NOR 1 1 2 1 SRO-I
  1. 1 I/C 3,6 3,4,5,6 5,6 8 4 SRO-U MAJ 7 7 7,8 4 2 TS 4,6 2 2 RO RX 2,6 2 2 1 NOR 1 1 2 1 SRO-I
  1. 2 I/C 3,6 4,6 3,4,5,6 8 4 SRO-U MAJ 7 7 7,8 4 2 TS 4,6 2 2 Page 1 of 5

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Browns Ferry NPP Date of Exam: June 06 - 19, 2010 Operating Test No.: HLT 1006 A E Scenarios P V T M 1 (3-20) 2 (3-21) 3 (3-22) 4 (3-24)spare P E O I L N CREW CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION POSITION A I C S A B S A B S A B S A B S A B L M A T R T O R T O R T O R T O R T O U N Y O C P O C P O C P O C P O C P M (*)

T P R I U E

RO RX 2,6 2 2 1 NOR 1 1 2 1 SRO-I

  1. 3 I/C 3,6 4,6 3,4,5,6 8 4 SRO-U MAJ 7 7 7,8 4 2
  1. 1 TS 4,6 2 2 RO RX 2,6 2 2 1 NOR 1 1 1 SRO-I
  1. 4 I/C 4,6 3,4,5,6 6 4 SRO-U MAJ 7 7,8 3 2 TS 4,6 2 2 RO RX 2 2,6,7 2 1 NOR 1 1 1 SRO-I
  1. 5 I/C 3,4,5,6 5,6 6 4 SRO-U MAJ 7 7,8 3 2 TS 3,6 2 2 Page 2 of 5

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Browns Ferry NPP Date of Exam: June 06 - 19, 2010 Operating Test No.: HLT 1006 A E Scenarios P V T M 1 (3-20) 2 (3-21) 3 (3-22) 4 (3-24)spare P E O I L N CREW CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION POSITION A I C S A B S A B S A B S A B S A B L M A T R T O R T O R T O R T O R T O U N Y O C P O C P O C P O C P O C P M (*)

T P R I U E

RO # 1 RX 2,3 1 1 NOR 1 1 2 1 SRO-I I/C 4,5 3,5 3,4 6 4 SRO-U MAJ 7 7 7,8 4 2

  1. 1 TS RO # 2 RX 2,3 1 1 NOR 1 1 2 1 SRO-I I/C 4,5 3,5 3,4 6 4 SRO-U MAJ 7 7 7,8 4 2 TS RO # 3 RX 2,3 1 1 NOR 1 1 2 1 SRO-I I/C 4,5 3,5 3,4 6 4 SRO-U MAJ 7 7 7,8 4 2 TS Page 3 of 5

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Browns Ferry NPP Date of Exam: June 06 - 19, 2010 Operating Test No.: HLT 1006 A E Scenarios P V T M 1 (3-20) 2 (3-21) 3 (3-22) 4 (3-24)spare P E O I L N CREW CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION POSITION A I C S A B S A B S A B S A B S A B L M A T R T O R T O R T O R T O R T O U N Y O C P O C P O C P O C P O C P M (*)

T P R I U E

RO RX 2 2,6,7 2 1 NOR 1 1 1 SRO-I

  1. 6 I/C 3,4,5,6 5,6 6 4 SRO-U MAJ 7 7,8 3 2
  1. 1 TS 3,6 2 2 RO RX NOR 1 1 1 SRO-I I/C 3,4,5,6 4 2 SRO-U MAJ 7 1 1
  1. 2 TS 4,6 2 2 Page 4 of 5

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Browns Ferry NPP Date of Exam: June 06 - 19, 2010 Operating Test No.: HLT 1006 A E Scenarios P V T M 1 (3-20) 2 (3-21) 3 (3-22) 4 (3-24)spare P E O I L N CREW CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION POSITION A I C S A B S A B S A B S A B S A B L M A T R T O R T O R T O R T O R T O U N Y O C P O C P O C P O C P O C P M (*)

T P R I U E

RO Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the SRO-I ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

SRO-U

2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section
  1. 1 C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

Page 5 of 5

ES-301, Rev. 9 Competencies Checklist Form ES-301-6 Facility: Browns Ferry Date of Examination: June 2010 Operating Test No.: HLT 1006 APPLICANTS RO SRO-I SRO-U Competencies SCENARIO SCENARIO SCENARIO 20 21 22 24 20 21 22 24 20 21 22 24 Interpret/Diagnose Events 3,4 3,4 4,6 3,4 3,4 3,4 4,6 3,4 3,4 3,4 4,6 3,4 and Conditions 6,7 5,6 6,7 5,6 6,7 5,6 Comply With and 1,3 1,4,6 1,4,6 3,5 1,3 1,4,6 1,4,6 3,5 1,3 1,4,6 1,4,6 3,5 Use Procedures (1)

Operate Control 3,4 3,4 3,4 3,4 3,4 3,4 3,4 3,4 Boards (2) 5,6 5,6 5,6 5,6 5,6 5,6 5,6 5,6 Communicate 5,6,7 6,7,8 7,8 7,8 5,6,7 6,7,8 7,8 7,8 5,6,7 6,7,8 7,8 7,8 and Interact Demonstrate Supervisory 5,6,7 6,7,8 7,8 7,8 5,6,7 6,7,8 7,8 7,8 Ability (3)

Comply With and 3,6 4,6 4,6 3,5 3,6 4,6 4,6 3,5 Use Tech. Specs. (3)

Notes:

(1) Includes Technical Specification compliance for an RO.

(2) Optional for an SRO-U.

(3) Only applicable to SROs.

Instructions:

Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant.

ES-401 1 Form ES-401-1

-

Facility: Browns Ferry NPP Date of Exam : June 07 - 23, 2010 ILT-10-06 I

RO KIA Category Points SRO-Only Points Tier Group K K K K K K A A A A G Total A2 G* Total 1 2 3 4 5 6 1 2 3 4 *

1. 1 4 3 3 4 3 3 20 3 4 7 Emergency

& 2 1 1 1 2 1 1 7 1 2 3 NJA N/A Abnormal Plant Tier Totals 5 4 4 6 4 4 27 4 6 10 Evolutions 1 3 2 2 3 1 2 3 2 3 3 2 26 2 3 5 2.

Plant 2 1 1 1 1 1 1 1 1 2 1 1 12 0 1 2 3 Systems Tier 4 3 3 4 2 3 4 3 5 4 3 38 3 5 8 Totals 1 2 3 4 1 2 3 4

3. Generic Knowledge and Abilities Categories 10 7 3 3 2 2 1 2 2 2 Notes : 1. Ensure that at least two topics from every KIA category are sampled within each tier of the RO and SRO-only outlines (Le., except for one category in Tier 3 of the SRO-only outline, the "Tier Totals" in each KIA category shall not be less than two).
2. The point total for each group and tier in the proposed outline must match that specified in the table. The final point total for each group and Uer may deviate by +/-1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.
3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, Site-speCific systems/evolutions that are not included on the outline should be added. Refer to Section D.1.b of ES-401 for guidance regarding the elimination of inappropriate KIA statements.
4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
5. Absent a plant-specific priority, only those KlAs having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only port.ions, respectively.
6. Select SRO topics for TIers 1 and 2 from the shaded systems and KIA categories.

7.* The generic (G) KlAs in Tiers 1 and 2 shall be selected from Section 2 of the KIA Catalog, but the topics must be relevant to the applicable evolution or system . Refer to Section D.1 .b of ES-401 for the applicable KlAs.

B. On the following pages, enter the KIA numbers, a brief description of each topic, the topics' importance ratings (IR) (or the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above. Use duplicate pages for RO and SRO-only exams.

9. For Tier 3, select topics from Section 2 of the KIA catalog, and enter the KIA numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to KlAs that are linked to 10 CFR 55.43.

- 0 2

~

~ Form

.

ES-~01-1 ES-401 BWR Examination Outline Form ES*401*1 Emergency and Abnormal Plant Evolutions - TIer 1/Group 1 (RO I SRO)

ElAPE 1# I Name I Safety Function K K K A A G KIA Topic(s) 1 2 3 1 2 IR #

295001 Partial or Complete Loss of Forced 1 G2.1.7 (10CFR 55.41 .5)

Core Flow Circulation / 1 & 4 Ability to evaluate plant performance and make operational jUdgments based on 4.4 1 operating characteristics, reactor behavior, and instrument interpretation. I 295003 Partial or Complete Loss of AC I 6 1 G2.1.27 (10CFR 55.41 .7)

Knowledge of system purpose andl or function.

3.9 2 295004 Partial or Total loss of DC Pwr I 6 1 1 AA1.03 (10CFR 55.41.7) i Ability to operate and/or monitor the following as they apply to PARTIAL OR

, COMPLETE LOSS OF D.C. POWER: 3.4 3

>

,

Ability to determine and/or interpret the following as they apply to PARTIAL OR COMPLETE LOSS OF LOSS OF D.C. POWER:

3.6 76

..

Ability to determine and/or interpret the following as they apply to MAIN TURBINE GENERATOR TRIP: 3.2 4

." .

Knowledge of the reasons for the following responses as they apply to SCRAM : 3.8 5 j

  • Reactor pressure response 1

SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM Page 2

- e ES-401 *2 .-

Form ES-401-1

- -- - - - - - - -- -- - - - -- - - - -

ES-401 BWR Examination Outline Form ES-401 . 1 Emergency and Abnormal Plant Evolutions - TIer 1/Group 1 (RO I SRO)

EJAPE # I Name I Safety Function K K K A A G KIA Topic(s) IR #

1 2 3 1 2 295016 Control Room Abandonment 17 1 1 AA1.08 (10CFR 55.41 .7)

Ability to operate and/or monitor the following as they apply to CONTROL 4.0 6 ROOM ABANDONMENT:

, Ability to determine and/or interpret the following as they apply to CONTROL 3.9 77 ROOM ABANDONMENT:

  • Drywell pressure 295018 Partial or Total Loss of CCW I 8 1 1 AK3.07 (10CFR 55.41 .5)

Knowledge of the reasons for the following responses as they apply to PARTIAL OR COMPLETE LOSS OF COMPONENT COOLING WATER: 3.1 7

  • Cross-connecting with backup systems 1I G2.1.27 (10CFR 55.43.5 - SRO Only) 4.0 78 Knowledge of system purpose and/or function.

295019 Partial or Total Loss of' Inst Air ' 8 1 AA2.02 (1 OCFR 55.41 .10)

Ability to determine andlor interpret the following as they apply to PARTIAL OR COMPLETE LOSS OF INSTRUMENT AIR: 3.6 8

  • Status of safety-related Instrument air system loads (see AK2.1 -

AK2.19)

- - --

SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM Page 3

- e ES*401

  • 2

<it Form ES*401*1 I

-

ES-401 BWR Examination Outline Form ES-401-1 Emergency and Abnormal Plant Evolutions - Tier lIGroup 1 (RO I SRO)

K K K A A G ElAPE 1# I Name I Safety Function KlA Toplc(s) IR #

1 2 3 1 2 295021 Loss of Shutdown Cooling I 4 1 1 AK2.01 (10CFR 55.41 .7)

Knowledge of the interrelations between LOSS OF SHUTDOWN COOLING and the following : 3.6 9 I

Ability to diagnose and recognize trends in an accurate and timely manner 4.2 79 utilizing the appropriate control room reference material.

295023 Refueling Ace I 8 1 1 AA1.03 (10CFR 55.41 .7)

Ability to operate and/or monitor the following as they apply to REFUELING ACCIDENTS: 3.3 10

..

Ability to evaluate plant performance and make operational judgments based on 4.7 80 operating characteristics, reactor behavior, and instrument interpretation. I 295024 High Drywell Pressure I 5 1 1 EK1.01 (10CFR 55.41 .9)

Knowledge of the operational implications of the following concepts as they apply to HIGH DRYWELL PRESSURE:

4.1 11

..

Ability to locale control room switches, controls, and indications, and to 4.3 81 determine that they correctly reflect the desired plant lineup.

295025 High Reactor Pressure I 3 1 EK3.01 (10CFR 55.41 .5)

Knowledge of the reasons for the following responses as they apply to HIGH REACTOR PRESSURE: 4.2 12

  • Safety/relief valve opening

---

SRO only K/As shown in italics 3/17/2010 - 9 :15:46 AM Page 4


'10.0 ES-401 02 --

Form ES-401-1

-

ES-401 BWR ExamInation Outline Emergency and Abnonnal Plant Evolutions - TIer 1/Group 1 (RO I SRO) FO~E~~

EJAPE # I Name I Safety Function K K K A A G KIA Toplc(s) IR #

1 2 3 1 2 I

295026 Suppression Pool High Water 1 EA2.01 (10CFR 55.41 .10)

Temp. 15 Ability to determine andl or interpret the following as they apply to SUPPRESSION POOL HIGH WATER TEMPERATURE :

4.1 13

  • Suppression pool water temperature 381cxa7 MIF c;:..___ 14m,a ....... /1

- - - - - - NlA for BFN - KIA for Mark III Containments ONL Y , -- --

295028 HIgh Drywell Temperature 15 1 1 EK2.01 (10CFR 55.41 .5)

Knowledge of the interrelations between HIGH DRYWELL TEMPERATURE and the following: 3.7 14

.

Abifity to determine and/or interpret the following as they apply to HIGH 3.7 82

  • DRYWELL TEMPERA TURE:
  • Torus/suppression chamber air space temperature: Plant-Specific 295030 Low SuppressIon Pool WfT Lvi I 5 1 EK1 .02 (10CFR 55.41 .8)

Knowledge of the operational implications of the following concepts as they apply to LOW SUPPRESSION POOL WATER LEVEL: 3.5 15

Knowledge of the operational implications of the following concepts as they

,. apply to REACTOR LOW WATER LEVEL: 3.7 16

  • Water level effects on reactor power i

295037 SCRAM Condition Present and Power Above APRM Downscale or 1 ,

EK2.13 (10CFR 55.41 .7)

Unknown 1 1 Knowledge of the interrelations between SCRAM CONDITION PRESENT AND REACTOR POWER ABOVE APRM DOWNSCALE OR UNKNOWN and the 3.4 17 following:

  • Alternate boron injection methods: Plant-Specific SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM Page 5
  • 8 2

O~--

Form ES-401-1

-- - --- - -- -- ~

ES-401 BWR Examination Outline Form ES-401-'

Emergency and Abnormal Plant Evolutions - Tier 1/Group 1 (RO I SRO)

E/APE # I Name/ Safety Function K K K A A G KIA Toplc(s) IR #

1 2 3 1 2 295038 High Off-site Release Rate / 9 1 G2.4.9 (10CFR 55.41.10)

Knowledge of low power/shutdown implications in accident (e.g. , loss of coolant 3.8 18 accident or loss of residual heat removal) mitigation strategies.

600000 Plant Fire On Site I 8 1 AK1.02 (10CFR 55.41 .5)

Knowledge of the operational implications of the following concepts as they

!

apply to PLANT FIRE ON SITE:

2.9 19

  • Fire fighting 700000 Generator Voltage and Electric Grid Disturbances / 6 1 AA1.03 (10CFR 5S.41 .10)

Ability to operate and/or monitor the following as they apply to GENERATOR VOLTAGE AND ELECTRIC GRID DISTURBANCES:

3.8 20

  • Voltage regulator controls ,

I KIA Category Totals; (RO) 4 3 3 4 3 3 Group Point Total: (RO) 20 KIA Category Totals: (SRO) 3 4 Group Point Total: (SRO) 7

--

SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM Page 6

ES-401

  • 30 Form Ef J ..O-1.-1-- --

- -

ES-401 BWR Examination OuUlne Form ES-401 -1 Emergency and Abnormal Plant Evolutions - Tier 1/Group 2 (RO I SRO)

K K K A A G ElAPE # I Name I Safety Function KIA Toplc(s) IR #

1 2 3 1 2 295002 Loss of Main Condenser Vae I 3 1 AK2.02 (10CFR55.41.10) - OPERATING EXPERIENCEu Knowledge of the interrelations between LOSS OF MAIN CONDENSER VACUUM and the following:

3.1 21

  • Main turbine a81QQ:J NI&h A. . . . PF.'~""I a - - - - - - NOT RANDOMLY SELECTED -- --

M008 ...".. A**. , w. . .....,.. ~ a

- - - - - - NOT RANDOMLY SELECTED ~ -- -

295009 low Reactor Water Levell 2 1 AK1.0S (10CFR 55.41.10)

Knowledge of the operational implications of the following concepts as they apply to LOW REACTOR WATER LEVEL : 3.3 22

  • Natural circulation 295010 High Drywell Pressure I 5 1 1 AA1.06 (10CFR 55.41.7)

Ability to operate and/or monitor the following as they apply to HIGH DRYWELL

., 3.3 23

. PRESSURE:

(multi-unit license) Ability to explain the variations in control board/controJ room 3.6 83 layouts, systems, instrumentation, and procedural actions between units at a facility.

- - - - - -

I 28601 ~ WIsh G8RtaiAIMRI +., J-Ii NlA for BFN - KiA for Mark III Containments ONL Y - -

a&I013 ..... ~ +8Alp ..... $1 - - - - - - NOT RANDOMLY SELECTED . - - -

~3 IoUgh S ..,,"IIIi8R Peel 14M,. ! * - - - - - - NOT RANDOMLY SELECTED

- --- - -- .-

-- -

SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM Page 7

---"oeD ES-401 3 0 Form --

ES-~01-1 ES-401 BWR Examination Outline Form ES-401* '

Emergenoy and Abnormal Plant Evolutions - Tier 1/Group 2 (RO I SRO)

ElAPE Ii I Name I Safety Function K K K A A G KiA Toplc(s) IR #

1 2 3 1 2 295014 Inadvertent Reactivity Addition 1 1 1 AA2.01 (10CFR 55.43.5 - SRO Only)

AbIlity to determine and/or interpret the following as they apply to INADVERTENT REACTIVITY ADDITION:

4. 1 84
  • Reactor power

..o;lllRIIIIIRpiaIe SGMMJ ~ - - - - - - NOT RANDOMLY SELECTED ,

- --

- - - - - - . __ I

_o~:,: HIfIII OW tile Rei.... Rate $ 8 NOT RANDOMLY SELECTED ,- --

~ IAaIh'-' GaR" leelatieR J Ii &:,: - - - - - - NOT RANDOMLY SELECTED

..

-- --

295022 Loss of CRD Pumps 1 1 1 G2.2.38 (10CFR 55.41 .10) 3.6 24 Knowledge of conditions and limitations in the facility license.

I 295029 High Suppression Pool Wtr Lvi I 5 1 EK3.03 (10CFR 55.41 .10)

Knowledge of the reasons for the following responses as they apply to HIGH SUPPRESSION POOL WATER LEVEL: 3.4 25

-

281Gaa HI.. S8I8R1l1If)' CenlaiMleRt

..,..T........... JIi - - - - - - NOT RAN DOML Y SELECTED .. -- -- '

- -

295033 High Secondary Containment 1 G2.3.13 (10CFR 55.43.2 - SRO Only)

Area Radiation Levels I 9 Knowledge of radi%gical safety procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry 1 requirements, fuel handling responsibilities, access to locked high-radiation 3.8 85

! I areas, aligning filters, etc.

295034 Secondary Containment 1 EA1.02 (10CFR 55.41.7)

Ventilation High Radiation I 9 Ability to operate and/or monitor the following as they apply to SECONDARY 3.9 26

- - _ ... - -

CONTAINMENT VENTILATION HIGH RADIATION:

SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM Page 8

ES-401 O@ 3

-

ES-401 BWR Examination OuUine Form ES-401 -1 Emergency and Abnormal Plant Evolutions - Tier 1/Group 2 (RO I SRO)

ElAPE # I Name I Safety Function K K K A A G KIA Topic(s) IR #

1 2 3 1 2

  • Process radiation monitoring system

_gali SaseR..,. CeMliRlReAt Nigh I:MIfefaAliai P,..* ..,. J Ii - -- - - - NOT RANOOMLY SELECTED -- -

295036 Secondary Containment High 1 EA2.01 (1 OCFR 55.41 .10)

Sump/Area Water level I 5 Ability to determine and/or interpret the following as they apply to SECONDARY CONTAINMENT HIGH SUMP/AREA WATER LEVEL:

3.0 27

  • Operability of components within the affected area IQQQQQ Nigh CTMr "¥I'-ileA CaM. I Ii - - - - - - NOT RANOOMLY SELECTED

- - -- --

I KIA Category Totals: (RO) 1 1 1 2 1 1 Group Point Total: (RO) 7 KIA Category Totals: (SRO) 1 2 Group Point Total: (SRO) 3

-

SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM Page 9

ES*401 4 Form 1*1

.. -

ES-401 BWR Examination Outline Form ES-401 -1 ]

Plant Systems - Tier 21Group 1 (RO I SRO)

K K K K K K A A A A G System # I Name KiA Topic(s) IR #

1 2 3 4 5 6 1 2 3 4 203000 RHRlLPCI: Injection 2 1 A1.01 (10CFR 55.41 .5)

Mode Ability to predict and/or monitor changes in parameters associated with operating the RHRlLPCI : INJECTION MODE (PLANT SPECIFIC) controls including:

4.2 28

Ability to predict and/or monitor changes in parameters associated with operating the RHRlLPCI : INJECTION MODE (PLANT SPECIFIC) controls Including: 3.6 29

Ability to (a) predict the impacts of the following on the RHRlLPCI:

, INJECTION MODE (PLANT SPECIFIC); and (b) based on those

, 3.4 86 predictions, use procedures to COffect, control, or mitigate the consequences of those abnormal conditions or operations: i

"

Knowledge of the effect that a loss or malfunction of the SHUTDOWN

"

COOLING SYSTEM (RHR SHUTDOWN COOLING MODE) will have 2.6 30 on the following:

  • Fuel pool cooling assist: Plant-Specific 206000 HPCI 1 K2.02 (10CFR 55.41 .7)

Knowledge of electrical power supplies to the following: 2.8 31 aG109Q .....aA (&IR"I8A~}

  • System pumps: BWR-2,3,4 Ca...... - - - - - - - - - - - NlA for BFN - No Isolation Condenser(s)

"

-- ,.--

---

SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM Page 10

--e ES-401

  • 4 . ---

Form ES-401-1 ES-401 BWR examination OuUlne Form ES-401.'

Plant Systems - Tier 21Group 1 (RO I SRO)

System # I Name K K K K K K A A A A G KIA Topic(s) IR #

1 2 3 4 5 6 1 2 3 4 209001 LPCS 1 I K1.08 (10CFR 55.41 .7)

Knowledge of the physical connections andlor cause-effect relationships between the LOW PRESSURE CORE SPRAY (LPCS) 3.2 32 SYSTEM and the following:

  • A.C. electrical power

~"'~$ "

- - - - - - - - - - - NJA for BFN - No HPCS System - --

211000 SLC 1 1 A3.01 (1 OCFR 55.41 .7)

. Ability to monitor automatic operations of the STANDBY LIQUID CONTROL SYSTEM including: 3.5 33

"

  • Pump discharge pressure: Plant*Specific I G2.1.7 (10CFR 55.43.5 - SRO Only)

Ability to evaluate plant performance and make operational judgments 4.7 87 based on operating characteristics, reactor behavior, and instrument interpretation.

212000 RPS A2.09 (10CFR 55.41 .5) 1 Ability to (a) predict the impacts of the following on the REACTOR PROTECTION SYSTEM (RPS); and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of 4.1 34 those abnormal conditions or operations:

  • High containmenVdrywell pressure SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM Page 11

___n~___________*

ES-401 '-" 4 a

Form ES-401-1

- ~ ~~ -

- -- - - - -- -

ES-401 BWR Examination Outline Form ES-401 -1 Plant Systems - Tier 21Group 1 (RO I SRO)

I K K K K K K A A. A A G IR #

System # I Name KIA Toplc(s) 1 2 3 4 5 6 1 2 3 4 2150031RM 2 A4.04 (10CFR 55.41 ,7)

Ability to manually operate andlor monitor in the control room :

3.1 35

  • IRM back panel switches, meters, and indicating lights A4.05 (10CFR 55.41 .7)

Ability to manually operate and/or monitor in the control room : 3.4 36

  • Trip bypasses 215004 Source Range Monitor 1 G2.2.2 (10CFR 55.41 .7)

Ability to manipulate the console controls as required to operate the ,

facility between shutdown and designated power levels. 4.6 37 215005 APRM I LPRM 1 K4.01 (10CFR 55.41 .7)

Knowledge of AVERAGE POWER RANGE MONITOR / LOCAL POWER RANGE MONITOR (APRM I LPRM) SYSTEM design 3.7 38 feature(s) and/or interlocks which provide for the following :

.; Knowledge of the effect that a loss or malfunction of the following will have on the REACTOR CORE ISOLATION COOLING SYSTEM 3.5 39 (RCIC):

  • Condensate storage and transfer system SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM Page 12

- -0 ES-401 4

  • ~

Form ES-401-1 ES-401 BWR Examination OuUlne Form ES-401-1 Plant Systems - TIer 21Group 1 (RO I SRO)

System # I Name K K K K K K A A A A G KlA Toplc(s) IR 1#

1 2 3 4 5 6 1 2 3 4 218000 ADS 2 K4.02 (10CFR 55.41 .7)

Knowledge of AUTOMATIC DEPRESSURIZATION SYSTEM (ADS) design feature(s) and/or interlocks which provide for the following: 3.8 40

Knowledge of AUTOMATIC DEPRESSURIZATION SYSTEM (ADS) 3.8 41 I design feature(s) and/or interlocks which provide for the following:

  • ADS logic control 223002 PelS/Nuclear Steam 2 K1.04 (10CFR 55 .41 .7) I Supply Shutoff Knowledge of the physical connections and/or cause-effect relationships between the PRIMARY CONTAINMENT ISOLATION 3.5 42 SYSTEM (PCIS) / NUCLEAR STEAM SUPPLY SHUT-OFF and the following:
  • High pressure coolant injection: Plant-Specific

,

K1 .08 (10CFR 55.41 .7)

Knowledge of the physical connections and/or cause-effect relationships between the PRIMARY CONTAINMENT ISOLATION 3.4 43 SYSTEM (PCIS) I NUCLEAR STEAM SUPPLY SHUT-OFF and the following :

Knowledge of electrical power supplies to the following: 2.8 44

  • SRV solenoids SRO only KjAs shown in italics 3/17/2010 - 9:15:46 AM Page 13

ES-401

~ 8 4

O~-

Form ES-401-1 ES-401 BWR Examination Outline Fonn ES-401 -1 Plant Systems - Tier 21Group 1 (RO I SRO)

K K K K K K A A A A G System # I Name KIA Topic(s) IR #

1 2 3 4 5 6 1 2 3 4 259002 Reactor Waler Level 1 G2.2.40 (10CFR 55.41.10)

Control 3.4 45 Ability to apply technical specifications for a system.

261000 SGTS A 1.01 (10CFR 55.41 .5) 1 1 Ability to predict and/or monitor changes in parameters associated with operating the STANDBY GAS TREATMENT SYSTEM (SGTS) 2.9 46 controls including:

..

(multi-unit license) Ability to explain the variations in control 3.6 88 board/control room layouts. systems. instrumentation, and procedural actions between units at a facility.

262001 AC Electrical K5.02 (10CFR 55.41 .5)

Distribution 1

Knowledge of the operational Implications of the following concepts as they apply to A.C. ELECTRICAL DISTRIBUTION:

2.6 47

Knowledge of the effect that a loss or malfunction of the UNINTERRUPTABLE POWER SUPPLY (A.C.lD.C.)wili have on the 2.7 48 following :

  • Computer operation: Plant-Specific SRO only KjAs shown in italics 3/17/2010 - 9:15:46 AM Page 14

>.,.

ES-401 Q

  • 4 G~-

Form ES-401-1

- -- - -- - --~-- - ~~ - ~-- - ---- - - -- - - -- - - - - - -- - - -- - - - --

ES-401 BWR Examinalion Outline Form ES-401-1 Plant Systems - Tier 21Group 1 (RO I SRO)

K K K K K K A A A A G ,

System 1# I Name KIA Topic(s) IR #

1 2 3 4 5 6 1 2 3 4 263000 DC Electrical 1 1 A2.02 (10CFR 55.41 ,5)

Distribution Ability to (a) predict the impacts of the following on the D,C.

ELECTRICAL DISTRIBUTION SYSTEM; and (b) based on those predictions, use procedures to correct, control , or mitigate the 2.6 49 consequences of those abnormal conditions or operations:

  • Loss of ventilation during charging G2.1.2B (10CFR 55.43.5 - SRO Only)
  • 4. 1 89 Knowledge of the purpose and function of major system components and controls.

264000 EDGs 2 A 3.02 (10CFR 55.41 .7)

Ability to monitor automatic operations of the EMERGENCY GENERATORS (DIESEL I JET) including: 3.1 50 I

  • Minimum time for load pickup A 3.04 (1 OCFR 55.41 .7)

Ability to monitor automatic operations of the EMERGENCY GENERATORS (DIESEL I JET) including: 3.1 51

  • Operation of the governor control system on frequency and voltage control 300000 Instrument AIr  !

1 A4.01 (10CFR 55.41 .7)

Ability to manually operate andlor monitor in the control room : 2.6 52

- - - --- - --- - - - -- ~

SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM Page 15

ES*401 ES-401 BWR Examination Outline Form ES*401 *1 Plant Systems - Tier 21Group 1 (RO I SRO)

K K K K K K A A A A G KIA Toplc(s) IR #

System ttl Name 1 2 3 4 5 6 1 2 3 4 400000 Component Cooling 1 1 K6.05 (10CFR 55.41 .7)

Water Knowledge of the effect that a loss or malfunction of the following will have on the CCWS:

2.8 53

  • Pumps

" ,

A2.02 (10CFR 55.43.5 - SRO Only)

Ability to (a) predict the impacts of the following on the CCWS; and (b) based on those predictions, use procedures to correct, control, or 3.0 90 mitigate the consequences of those abnormal conditions or operations:

  • High/low surge tank level KIA Category Point Totals:

(RO) 3 2 2 3 1 2 3 2 3 3 2 Group Point Total: (RO) 26 KIA Category Point Totals:

(SRO) 2 3 Group Point Total: (SRO) 5 I

SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM Page 16

Q 0 5

Q !!!F--

:

Form ES*401*1

-

~ ~ - --

ES-401 BWR Examinatlon Outline Form ES-401-1 j Plant Systems - ner 2JGroup 2 (RO I SRO)

K K K K K K A A A A G System 11 , Name KIA Topic(s) IR #

1 2 3 4 5 6 1 2 3 4 3Q~DQ~~"8 - - - - - - - - - - - NOT RANDOMLY SELECTED - -- -,--

201002 RMCS 1 A2 .04 (1 0CFR 55.41.5)

Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of 3.2 54 those abnormal conditions or operations:

~ .. ~

- - - - - - - - - - - NOT RANDOMLY SELECTED


- I 3Q~QCM R&G& - - - - - - - - - - - NlA for BFN - BWR 4/5 ONLY ---- --

301QOi~I$

> - - - - - - - - - - - NlA for BFN - BWR 6 ONLY - --

3QUIOIAWM

-

- - - - - - - - - - - NOT RANDOMLY SELECTED - --

~1 R.alN1llali8fl - - - - - - - - - - - NOT RANDOML Y SELECTED -- --

2QaOQa Re......1eA Flew QeAtr8I - - - - - - - - - - - NOT RANDOMLY SELECTED -- -

ao4DQO~

- - - - - - - - - - - NOT RANDOMLY SELECTED - ---

n4DQORPI& - - - - - - - - - - - NOT RANDOMLY SELECTED - --

215001 Traversing In-core Probe 1 G2.4.21 (10CFR 55.43.5 - SRO Only) i, Knowledge of the parameters and logic used to assess the status of safety functions, such as reactivity control , core cooling and heat

"

removal, reactor coolant system integrity, containment conditions, 4.6 91

, radioactivity release control, etc.

I i SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM Page 17

ES-401 8

  • 5 0---

Form ES-401-1 ES-401 BWR Examination OuUine Form ES-401*1 Plant Systems - Tier 21Group 2 (RO I SRO)

System # I Name K K K K K K A A A A G 1 3 KJA Topic(s) IR #

2 4 5 6 1 2 3 4 215002 RBM 1 A3.04 (10CFR 55.41 .7)

Ability to monitor automatic operations of the ROD BLOCK MONITOR SYSTEM including: 3.6 55

  • Verification of proper functioning I operability: BWR-3,4,5 216000 Nuclear Boiler Ins\. 1 1 A1.02 (10CFR 55.41 .5)

Ability to predict and/or monitor changes in parameters associated with operating the NUCLEAR BOILER INSTRUMENTATION controls including: 2.9 56 I

  • Removing or returning a (sensor) transmitter to service A2.06 (10CFR 55.43.5

Ability to (a) predict the impacts of the following on the NUCLEAR BOILER INSTRUMENTATION; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of 3.1 92 those abnormal conditions or operations:

  • Loss of power supply 219000 RHRlLPCI : TorusIPool 1 G2.4.41 (10CFR 55.43.5 - SRO Only)

Cooling Mode Know/edge of the emergency action level thresholds and 4.6 93 classmcations.

..

mDO~ PfiIMty ~ ~.-. - - - - - - - - - - - NOT RANDOMLY SELECTED -- --

ZMIQ01 RIoI~9GI: ~ 8pn1)1

~

230000 RHRlLPCI : Torus/Pool Spray Mode

- - - - - - - - - - -

1 NOT RANDOMLY SELECTED j A4.04 (10CFR 55.41.7)

.

-- -I I 1

Ability to manually operate and/or monitor in the control room: 3.1 57 I I

  • Minimum flow valves

- - -- - - _.. - ~

SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM Page 18

ES-401 ES-401 BWR Examination OuUine Fonn ES-401-1 Plant Systems - Tier 21Group 2 (RO I SRO)

System # I Name K K K K K K A A A A G KIA Topic(s) IR #I 1 2 3 4 5 6 1 2 3 4 233000 Fuel Pool Cooling/Cleanup 1 K2.02 (1 OCFR 55.41 .7)

Knowledge of electrical power supplies to the following: 2.8 58

  • RHR pumps SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM Page 19

o 0 5

O~-

Form ES-401-1 I

ES-401 BWR Examination Outline Form ES-401-1 Plant Systems - Tier 21Group 2 (RO I SRO)

K K K K K K A A A A G System # I Name KIA Topic(s) IR #

1 2 3 4 5 6 1 2 3 4 234000 Fuel Handling Equipment 1 K5.02 (10CFR 55.41 .5)

Knowledge of the operational implications of the following concepts

"'

as they apply to FUEL HANDLING EQUIPMENT:

3.1 59

"

  • Fuel handling equipment interlocks 238QQ~ ...... _ R...... S,._

- - - - - - - - - - - NOT RANDOMLY SELECTED-

.'

-- -

3a8Q03 MSIV La..... (;eARI - - - - - - - - - - - NJAfor BFN -- --

241000 Reacl,o rrrurbine Pressure 1 K6.06 (10CFR 55.41 .7)

Regulator Knowledge of the effect that a loss or malfunction of the following will have on the REACTOR I TURBINE PRESSURE REGULATING 3.8 60 SYSTEM:

  • Reactor pressure

,

34iOQQ MIlA ;"ftllAe G.i. ~ ."'.. - - - - - - - - - - - NOT RANDOMLY SELECTED -

3MGOG R**** ~IIA"" - - - - - - - - - - - NOT RANDOMLY SELECTED - -" -

al8OO~ Reaelaf .....,...

268000 Radwaste

- - - - - - - - - - - NOT RANDOMLY SELECTED - -

1 K3.04 (10CFR 55.41 .5)

Knowledge of the effect that a loss or malfunction of the RADWASTE will have on the following: 2.7 61

  • Drain sumps mggog.... - - - - - - - - - - - NOT RANDOMLY SELECTED - --I SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM Page 20

- e ES*401

  • 5 o~-

Form ES*401*1 ES-401 BWR Examination Outline Plant Systems - Tier 21Group 2 (RO I SRO)

Fonn ES-401-1 I K K K K K K A A A A G System # I Name KJA Toplc(s) IR #

1 2 3 4 5 6 1 2 3 4 272000 Radlalion Monitoring 1 A3.02 (10CFR 55.41 .7)

Ability to monitor automatic operations of the RADIATION MONITORING SYSTEM including:

3.6 62

  • Offgas system isolation indications 286000 Fire Protection 1 G2.2.42 (10CFR 55.41 .10)

Ability to recognize system parameters that are entry-level 3.9 63 conditions for Technical Specifications.

a&1OGO PlaAl~teA""A - - - - - - - - - - - NOT RANDOMLY SELECTED .. - --

28OQO~ &**A"~ c:lM; - - - - - - - - - - - NOT RANDOMLY SELECTED -- - - '

290003 Control Room HVAC 1 K4.01 (10CFR 55.41 .7)

Knowledge of CONTROL ROOM HVAC design feature(s) and/or interlocks which provide for the following: 3.1 64

  • System initiationslreconfiguration: Plant-Specific 290002 Reactor Vessel Intemals 1 K1.12 (10CFR 55.41 .6)

Knowledge of the physical connections andlor cause-effect relationships between REACTOR VESSEL INTERNALS and the 3.4 65 following:

  • SBlC KJA Category Point Totals:

(RO) 1 1 1 1 1 1 1 1 2 1 1 Group Point Total: (RO) 12 KIA Category Point Totals:

(SRO) 1 2 Group Point Total: (SRO) 3 SRO only K/As shown in italics 3/17/2010 - 9:15:46 AM Page 2 1

ES-401 Generic Knowledge and Abilities Outline (Tier 3) Form ES-401-3 Facility: Browns Ferry NPP Date of Exam : June 07 - 23 2010 RO SRO-Only Category KlA# Topic IR # IR #

2 .1. G2.1.2S (10CFR 55.41 .10) 3 .9 66 Ability to interpret reference materials, such as graphs, curves, tables, etc.

en c:: G2.1.41 (10CFR 55.43.6 - SRO Only) 3.7 94 0

Know/edge of the refueling processes.

ro L..

Q) 0.

2.1 . G2.1.27 (10CFR 55.41 .7) 3.9 67 - -

Knowledge of system purpose andlor function .

.0 "f'- '+-

....0 2.1 . G2.1.8 (10CFR 55.41 .10)

Ability to coordinate personnel activities outside 3.4 68 - -

U

~ the control room .

~

c::

0

~ NOT RANDOMLY SELECTED - - - -

0 ~ NOT RANDOMLY SELECTED - - - -

~ NOT RANDOMLY SELECTED - - - -

Subtotal 3 1 2 .2. G2.2.37 (10CFR 55.41 .10) 3.6 69 Ability to determine operability and/or availability of safety related equipment.

G2.2.39 (10CFR 55.43.2 - SRO Only) 4.5 95 Know/edge of less than or equal to one hour technical speCification action statements for systems.

-0 G2.2.22 (10CFR 55.41 .5)

..........c:: 2.2 .

Knowledge of limiting conditions for operations 4.0 70 0 and safety limits.

0

. .....

c:: G2.2.43 (10CFR 55.43.3 - SRO Only) 3.3 96 N Q) Know/edge of the process used to track E inoperable alarms.

.  ::J 2.2. G2.2.4 (10CFR 55.41 .7) 3.6 71 - -

0' (multi-unit license) Ability to explain the W variations in control board/control room layouts, systems, instrumentation, and procedural actions between units at a facility.

~ NOT RANDOMlY SELECTED - - - -

~ NOT RANDOMlY SELECTED - - - -

~ NOT RANDOMLY SELECTED - - - -

Subtotal 3 2 SRO only K/As shown in italics 3/17/2010 - 9:16:21 AM Page 22

ES-401 Generic Knowledge and Abilities Outline (Tier 3) Form ES-401-3 Facility: Browns Ferry NPP Date of Exam : June 07 - 23 2010 RO SRO-Only Category KIA # Topic IR # IR #

2.3 G2.3.14 (10CFR 55.41 .12) 3.4 72 Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities.

G2.3.11 (10CFR 55.43.4- SRO Only) 4.3 97 Ability to control radiation releases.

-0 2.3 G2.3.S (1 OCFR 55.41 .11 )

Ability to use radiation monitoring systems, 2.9 73 L-

+-" such as fixed radiation monitors and alarms, C

0 portable survey instruments, personnel U monitoring equipment, etc.

('I') C G2.3.13 (10CFR 55.43.4 - SRO Only) 3.8 98 0

t:j Knowledge of radiological safety procedures ro

.- pertaining to licensed operator duties, such as "0 response to radiation monitor alarms, ro containment entry requirements, fuel handling 0:: responsibilities, access to locked high-radiation areas, aligning filters, etc.

a:3 NOT RANDOMLY SELECTED - - - -

a:3 NOT RAN DOMLY SELECTED - - - -

a:3 NOT RANDOMLY SELECTED - - - -

Subtotal 2 2 2.4. G2.4.20 (10CFR 55.41 .10) 3.8 74 Knowledge of the operational implications of C EOP warnings, cautions, and notes.

ro

-

0.. G2.4.40 (10CFR 55.43.5 - SRO Only) 4.5 99 Knowledge of SRO's responsibilities in en emergency plan implementation.

Q)

L-

l 2.4. G2.4.45 (10CFR 55.41 .10) 4.1 75

'"0 Q) Ability to prioritize and interpret the significance U of each annunciator or alarm .

.q- 0 L-0.. G2.4.45 (10CFR 55.43.5 - SRO Only) 4.3 100

>-

U Ability to prioritize and interpret the significance c: of each annunciator or a/arm.

Q) 0>

L-

~ NOT RANDOMLY SELECTED - - - -

a>

E ~ NOT RANDOMLY SelECTED - - - -

W ~ NOT RANDOMLY SELECTED

";

- - - -

Subtotal 2 2 Tier 3 Point Total 10 7 SRO only K/As shown in italics 3/17/2010 - 9:16:21 AM Page 23

ES*401 Record of Rejected KlAs Form ES*401*4

  • Tier /

Group 1/ 1 Randomly Selected KIA 295023 AA 1.05 Reason for Rejection Rejected KIA no fuel transfer system for Browns Ferry, replaced with AA 1.03 Fuel handling equipment Rejected KIA due to overlap with 295009, replaced with EK1.03 1/ 1 295031 EK1.02 water level effects on reactor power Rejected due to no significant unit differences for SRMs, replaced with G2.2.2 Ability to manipulate the console controls 2/1 215004 G2.2.4 as required to operate the facility between shutdown and designated power levels.

Rejected due to no auto main steam isolation, replaced with 2/2 272000 A3.01 A3.02 Offgas system isolation indications Rejected unsuccessful last exam, replaced with G2.2.37: Ability 3 2.2.20 to determine operability and/or availability of safety related

~CJuiQment.

SRO only, rejected due to low probability of success, replaced with G2.4.21: Knowledge of the parameters and logic used to 2/2 215001 G2.4.2 assess the status of safety functions, such as reactivity control, core cooling and heat removal, reactor coolant system integrity,

  • containment conditions, radioactivity release control, etc.

SRO only rejected due to overlap, replaced with 2.3.13:

Knowledge of radiological safety procedures pertaining to licensed operator duties, such as response to radiation monitor 1 /2 2950332.2.39 alarms, containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc

  • 3/17/2010 - 9:16:11 AM Page 1

ES-401 Written Examination Quality Checklist Form ES-401*6 Facility: Browns Ferry Date of Exam: June 2010 Exam Level: RO 181 SRO 181 Initial Item Description a b* c#

1. Questions and answers are technically accurate and applicable to the facility. 0'\.. /f11 I~
2. a. NRC KiAs are referenced for all questions.
b. Facility learning objectives are referenced as available. O"Lo- 1~ ~jL
3. SRO questions are appropriate in accordance with Section D.2.d of ES-401 O-V --nf I~
4. The sampling process was random and systematic (If more than 4 RO or 2 SRO questions were repeated from the last 2 NRC licensing exams, consult the NRR OL program office). 1tJJt-
5. Question duplication from the license screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:

_ the audit exam was systematically and randomly developed; or

_ the audit exam was completed before the license exam was started; or

_ the examinations were developed independently; or

_x_ the licensee certifies that there is no duplication; or

_ other (explain) 0""" 1f1 ~;k-

6. Bank use meets limits (no more than 75 percent Bank Modified New from the bank, at least 10 percent new, and the rest new or modified); enter the actual RO / SRO-only question distribution(s) at right.

33%/36% 28% /20% 39%/44% O-V tqf -:M-L

7. Between 50 and 60 percent of the questions on the RO exam are written at the comprehension/ analysis level; Memory CIA the SRO exam may exceed 60 percent if the randomly selected KiAs support the higher cognitive levels; enter the actual RO / SRO question distribution(s) at right. 45%/24% 55%/76% 01/

At I#-

8. References/handouts provided do not give away answers or aid in the elimination of distractors. 0""'" lU ~
9. Question content conforms with specific KiA statements in the previously approved examination outline and is appropriate for the tier to which they are assigned ;

"N1 l~

()'V deviations are justified.

10. Question psychometric quality and format meet the guidelines in ES Appendix B. 0-(..

1M ~

11. The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with the value on the cover sheet. ov U 11k Printed Name / Signature )£ Date
a. Author D A,... ' £L k . Z ,{ L'..-J.IC.' I Q..,j)! ~ y- q -.J \lJ\)
b. Facility Reviewer (*) N;/~ u) ./!e-/Jl'fir/cl ~tJ &, ",L ") j4-t'L - ~/()
c. NRC Chief Examiner (#)
d. NRC Regional Supervisor ttl.

~'~ \h~ G. CoJ\el~J:jJAG.c>. 11 A* \\ ATi".$

ttkl \..l8t. "" \H Foe

\D~

I J J1lJzl..,r. J.,-k.<-'"

.J

'5,1.7 ,201 0

~ _I)I- .u" Note:

  • The facility reviewer's initials/signature are not applicable for NRC-developed examinations.
  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification ES-401 Written Examination Review Worksheet Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Gen Before in-office visit (preliminary assessment): [Allowing credit for changes to previously identified Unsat items prior to 4/23/10 submittals; i.e., only tallying Unsat items on the 4/23/10 submittal]

  1. of Unsat RO Items: [9/75 = %]
  1. of Unsat SRO Items: [ 8/25 = 32%]

Overall # of Unsat Items: 21/100 = 21%

After in-office visit:

  1. of Unsat RO Items: [XX/75 = XX%]
  1. of Unsat SRO Items: [ X/25 = XX%]

Overall # of Unsat Items: XX/100 = XX%

Gen If annunciator(s) referred to in a question, use EXACT nomenclature engraved on Alarm Window (also specified in ARP) followed by parentheses containing the shortest possible abbreviated window location designation that the applicants are familiar with.

Gen Each question should contain Which ONE of the following... in the primary stem of the question. If it is a fill-in-the-blank question, utilize Which one of the following completes the statement?

Gen If providing a reference to the candidate, place a bracketed statement [REFERENCE PROVIDED] between the stem and the first possible answer choice.

Gen Limit the amount of references provided to the candidates to the maximum extent possible.

Gen In a two-part question format with more than one element contained in each choice, limit the number of elements to two (for each choice).

Gen Whenever applicable, ensure the phrase in accordance with. Is pasted after the stem question. This ensures that there is only one correct answer. In all procedure related questions, ensure that the stem question includes in accordance with [procedure name]

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only Gen Please submit reference discs (in addition to selected procedure references) because this will:

1) Provide the procedures to allow research on questions. For example, a question may have the procedure reference needed to verify the correct answer; however, the procedure needed to validate the distractor is often not provided.
2) Having the other procedures will also facilitate development of alternative suggestions for questions needing replacements.

Gen Avoid using the word should in any test questions because this can often be argued as correct by an applicant.

Gen SRO-only Clarification Guidance Rev 0, page 12 contains an example of a good SRO-only question that is linked to 10CFR55.43 (5) procedure selection. Also pages 7 & 8 provide clarification in the first bullets by stating that if the question involves prescribing a procedure, then it may be SRO-only.

To further clarify: One area of SRO-level knowledge (with respect to prescribing or selecting procedures) is knowledge of the content of the procedure (SRO knowledge) versus knowledge of the overall mitigative strategy of the procedure (RO knowledge). To satisfy the 10CFR55.43.5 topic, the question must be linked to procedure selection. The SRO portion of a question may include procedure selection, tech specs, and/or E-plan classification, among the 7 areas listed in 10CFR55.43.

Gen Ensure that the stem question is followed with a question mark (?)

instead of trailing (.)

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification Instructions

[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]

1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
2. Enter the level of difficulty (LOD) of each question using a 1 - 5 (easy - difficult) rating scale (questions in the 2 - 4 range are acceptable).
3. Check the appropriate box if a psychometric flaw is identified:
  • The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).
  • The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).
  • The answer choices are a collection of unrelated true/false statements.
  • The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable.
  • One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
4. Check the appropriate box if a job content error is identified:
  • The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).
  • The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).
  • The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
  • The question requires reverse logic or application compared to the job requirements.
5. Check questions that are sampled for conformance with the approved K/A and those that are designated SRO-only (K/A and license level mismatches are unacceptable).
6. Enter question source: (B)ank, (M)odified, or (N)ew. Check that (M)odified questions meet criteria of ES-401 Section D.2.f.
7. Based on the reviewers judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
8. At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification ES-401 2 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

211000A3.01 33 H 2 N E S Appears to meet the KA. Could someone argue that the relief just lifted and pressure may be decreasing? This could make D also correct. Is it better to write out the parameters: SLC Pump Dish Press is 1100 psig and steady?

4/20/10, Reviewed again for draft submittal. Changes were made as noted above. SAT G2.1.25 66 F 3 X B U S Appears to meet the KA. Could someone argue that B & D are also correct? The level of 11.5 is the level at which the: A.

downcomer vents begin to become uncovered. B. HPCI Turb Exhaust begins to be uncovered at 12.75, therefore it is uncovered at 11.5. D. control room SP NR lvl indication goes off scale at ~13 ft.

11.5 is < all 3 of these choices. Change to say either: IAW procedure, line 1 above or In the derivation of the PSP curve, line 1 above 4/20/10, Reviewed again for draft submittal. Changes were made as noted above. SAT 76 H 3 N E 295004AA2.01 S Appears to meet the KA. Rewrite the 2nd question to simplify it and contain only 1 sentence. After manually transferring the 250 VDC RMOV Bd, the Board is considered _____IAW TS 3.8.7.

4/20/10, Reviewed again for draft submittal. Changes were made as noted above. SAT

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

80 F 2 B E 295023G2.1.7 E Appears to meet the KA. EOI-3, Table 4 shows 1000 mr/hr as MAX SAFE (500 mr/hr is listed as MAX SAFE in the distractor discussion S

for A & B). Max Normal alarm setpoint is not included with references.

Can not tell if A is also correct or not, due to insufficient references being available.

Reword: Which ONE of the following identifies: 1.) The EOI-3 MAX NORMAL operating AND 2.) The required approval.IAW 2-AOI-79-1 4/20/10, Reviewed again for draft submittal. Changes were made as noted above. Where did the 500 mr/hr come from? Is it better distractor 2 X Normal Background Radiation level or maybe 10 X Normal Background?

5/20/10 Changed the distractor A & B to 72 mr/hr.

87 F 2 N S 211000G2.1.7 Appears to meet the KA.

4/20/10, Reviewed again for draft submittal. No changes were required. SAT

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

90 H 2 X X N U 400000A2.02 S This question is not SRO Only. An RO could determine the answer by using knowledge of the overall mitigative strategy of the procedure.

The 1st half of choice B or D can be determined using RO knowledge of Rx trip criteria (i.e. a Rx trip is required for a loss of RBCCW). Only one ARM reading is given; therefore, by knowing that it requires at least 2 ARM readings > Max Safe to ED, distractors C & D can be eliminated (this is knowledge of overall mitigative strategy). From this analysis of RO information the correct answer can be determined as choice B.

EOI-3 was not provided for use in evaluating distractor analysis.

Could correct by rewording 2nd question to ask what procedure is used to C/D the plant?

4/20/10, Reviewed again for draft submittal. This is not meeting the KA. The impact of the high surge tank level (i.e., the KA) is stated in the stem of the question: RBCCW is isolated to containment. This should be in the distractor statements as a choice. To make this possible, more bullets need to be added to the stem to reflect the leak is from the RCP seal cooler [rise in 2-RM-90-131(Panel 2-9-10) activity (2-RR-90-131/132 on Panel 2-9-2) or 2-TE-68-54 or 67 temperature (Panel 2-9-21) or a lowering of any Recirc pump seal pressure.]. Does the 2nd question need to broken out? The question could be read to mean that the criteria to scram and initiate the cooldown are contained in the same procedure (in this case that assumption is correct). Would it make the other choices more plausible to break this into two statements?

The impact of losing CCW to the drywell is a required scram.

However, what is the impact of high/low surge tank level on the CCWS? ES-401, Section D.2.a states that for A2 K/A statements, try to test both aspects of the K/A and if that is not possible without expending an inordinate amount of resources, then limit the scope to the question to that aspect of the K/A statement requiring the highest cog level, i.e., the 2nd portion dealing with using procedures.

5/20/10 Reviewed rewrite onsite. KA is still not being met. Will provide licensee with another KA.

5/25/10 New question written to meet newly selected KA. This question still needs review. Question to rewritten to include 2nd part fo identify proper procedure to use. SAT after review in office.

5/26/10 New question reviewed. SAT.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

93 H 2 N E 219000G2.4.41 S Appears to meet the KA. Should the entire EPIP-1 or at least the entire section 1 be provided as a reference? Is there any other EPIP EAL that the applicant could erroneously go to instead of the correct one?

The wrong EPIP curve is provided as a reference. 1.5-S was provided. Curve 1.2-G is the correct curve for use with this question.

4/20/10, Reviewed again for draft submittal. Changes were made as noted above. SAT 96 F 2 N E G2.2.43 S Appears to meet the KA. This 2nd question part has a very low LOD as written. Modify the question slightly to increase the LOD. Modify to ask: If an Annunciator input (delete window). Change disabled/restored to disabled and restored. Add then prior to a separate 10CFR50.59. Delete for the disablement at the end of the question. Change distractor (2) to say is still.

4/20/10, Reviewed again for draft submittal. Changes were made as noted above. SAT The questions from here up were submitted for early review and will not count as UNSATs unless they are left uncorrected on the final submittal.

77 H S 295016AA2.05 Appears to meet the KA.

78 H E 295018G2.1.27 S Does a qualifier need to be added to assure that the applicant could not argue that the C1 EECW pump be manually aligned and therefore ALL EECW flow has not been lost? (i.e. No correct answer) Add If no operator actions are taken

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

79 H X U 295021G2.4.47 Both of these look as if they are RO knowledge level criteria.

OPL171.059 for Startup has this shown under an objective for the 100 deg. Heatup limit. This was used on last years NRC exam, verify this is noted on the QA form. I could not locate the question on last years NRC exam.

SRO only: SRO-only knowledge cannot be claimed for questions that can be answered solely based on knowledge of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> action statements. ROs are expected to know the LCO statement (TS 3.4.9 RCS Temp & Press Limits), applicability, and any notes; i.e., the information above the double line separating the actions from the LCO and applicability statements. The knowledge that RCS heatup and cooldown rates are limited to 100F in any 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period is RO knowledge. The knowledge associated with Modes is also RO knowledge. Suggest writing a question testing the applicants knowledge of WHEN alternate SDCg is REQUIRED (based on a trend) IAW the AOP and the minimum REQUIRED emergency classification.

5/20/10 Revised question on site. Changed 1st part to derive exact time of mode change and 2nd part to state that the EAL is met.

81 H X U 295024G2.1.31 S This does not appear to be SRO Only level knowledge. Can use RO knowledge alone to determine both responses. The OI for manual operation specifies 5K for the setpoint. OPL171.201 Objective V.B.7 requires an RO to know that EOI appendices are used instead of OI when in the EOI arena.

Q=KA The proposed test item does not meet the K/A because it does not test the applicants knowledge of the required lineup for switches/

controls and/or required indications following a high drywell pressure condition. [The proposed item tests the applicants knowledge of whether the HPCI controller setpoint is at the required standby lineup setpoint and the required procedure after the EOI high drywell entry condition has been reached.] The HPCI controller setpoint is always true, even if no high drywell pressure condition exists. The question should test the applicants ability to confirm a switch or indication is lined up correctly following a high drywell pressure actuation.

5/20/10 Rewrite. Added IAW TS.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

82 F X S 295028EA2.06 The answer does not meet the KA criteria but is acceptable if no correlation exist for SC/Torus air temp. Verify with the licensee.

5/20/10 Verified with the licensee on site.

83 F X U 295010G2.2.4 S Distractors C&D do not appear plausible. If emergency depressurization is required EOI-1 RCP is not plausible at this point.

Suggest a change to the 2nd part of the distractor to a reason why ED is necessary from the basis statement. Part D plausibility is incorrect.

5/20/10 Question is still UNSAT upon onsite review. The 2nd part of the distractors is still missing. (See above in blue).

Upon editorial changes being made to the question the question is acceptable even though no explanation is involved. The KA is met via the technical process of understanding the unit difference to arrive at the answer.

84 H X U 295014AA2.01 S This question does not meet the KA because the applicants are not being tested on their ability to determine or interpret reactor power because this value is already provided in the stem, i.e., 16%. Instead, the proposed question tests the applicants knowledge of the applicability of TS 3.1.6, i.e., when rod pattern control is required. If the intent was to require the applicant to interpret reactor power, then provide a disparity between various indicated power levels and test the applicants knowledge of which indication means power is less than 16%.

5/3/10, Reviewed again for draft submittal. Agreed with licensees argument. Since the T.S. applicability requires knowledge of the power level, this question is considered as an original SAT.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

85 H X X E 295033G2.3.13 S Distractors A&C justification referenced that EPIP-8 provided this guidance if all TVA EROs were activated. This guidance could not be confirmed. Also EPIP-8 is Personnel Evacuation & Accountability not Dose Assessment. The question is misleading.

  1. /units: Use ONLY the exact titles of procedures in NRC questions, i.e., in A and C. Since the exact title of EPIP-8 makes choices A and C not plausible, then suggest incorporating another knowledge item to test associated with the required operator actions when a fuel assembly is dropped (in accordance with the AOP). The 2nd portion of the proposed test item is SRO (i.e., E-plan classification) 5/20/10 Add: Based on the above conditions, which ONE 86 H X E 203000A2.09 S Replace distractor A with 1600 (0300 + 13hrs to Mode 3) vs. 1800.

This is a more realistic error an operator would make. The applicant is more likely to apply the T.S. 3.5.1 clock start time from the time the ST failed for the 2nd ECCS pump than from the time the 1st pump was tagged out for maintenance.

5/20/10 Revised question per above. SAT.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

88 H X U 261000G2.2.4 S SRO-only knowledge cannot be claimed for questions that can be answered solely using knowledge of:

  • any AOP entry condition.
  • plant parameters that require direct entry to major EOPs; e.g.,

major Westinghouse EOPs are E0, E1, E2, E3, ECA-0.0, and Red/Orange Functional Restoration Procedures and major General Electric EOPs are Reactor Vessel Control, Primary Containment Control, Secondary Containment Control, and Radioactive Release Control.

SRO-only knowledge cannot be claimed for questions that can be answered solely using systems knowledge; e.g.:

  • how the system works
  • flow path
  • component locations, etc.

Suggest re-writing the question to test SRO applicants knowledge of the 1) preferred location to start SGT and 2) the required LCO actions when one SGT is inoperable and one of the units is in a refueling outage and the other two units are operating at 100% power.

5/20/10 Reworded 1st question to ask what is the preferred lineup IAW OI Accepted the question to meet the KA because to answer the question the applicant has to understand why he is using U1 or U2 instrumentation and therefore meets the KA.

89 H X U 263000G2.1.28 S This question does not match the KA. The question should be asking about the operability of the electrical system not the effect of a loss of the electrical system on RCIC. The question as written is an A2 KA for RCIC not a generic for the DC electrical system.

5/20/10 New question written and reviewed on site. SAT.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

91 H X U 215001G2.4.21 E OPL171.023 Describe the operation of the TIP system, including automatic and manual operation.

S SRO-only knowledge cannot be claimed for questions that can be answered solely using systems knowledge; e.g.:

  • how the system works SRO-only: The proposed question can be answered using RO knowledge of AOP entry conditions and system operation.

Q=KA: The proposed question does not test the applicants ability to determine if a Group 8 signal exists, Instead, the applicant is provided with this information in the stem.

Partial: An applicant could successfully argue that A is also correct IF OI-94 also provides steps to withdraw the TIP.

Job-Link: Is the term parked delineated in any procedure?

5/20/10 New question provided to licensee to meet the KA. Reference will be provided with light color indications removed.

92 H X U 216000A2.06 S This question does not match the KA. The KA is asking for the effects a loss of power has on instrumentation. This is question is asking for the effects a Recirc pump trip has on instrument indication.

Suggest writing a question testing the applicants knowledge of which drywell pressure instruments are affected by a loss of power, including the required TS actions.

5/20/10. New question written. Reviewed on site. SAT.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

94 H E G2.1.41 S Core map for use as a reference with the question was not included.

Is moving fuel in the SFP a core alt? If not then there is no reason to stop moving fuel as long as it stays in the SFP. Why not change to have the bundle already on the core side, possibly already a portion of the way down so that the correct answer is to insert it the rest of the way in prior to suspending core alts.

5/20/10 Reviewed on site. SAT.

95 H S G2.2.39 Appears to meet the KA & SRO Only criteria. SAT.

97 H E G2.3.11 S To clarify, the words, IAW EOI-2 need to be added. Otherwise, the candidate could argue that EOI Appendix allows use of the hardened SP vent and would be successful. Is the candidate required to know the PSP curve from memory?

5/20/10 Distractor D not valid. Doesnt pass logic test. Recommended adding 2nd part to distractors to add part to D and B for plausibility.

5/25/11 Reviewed in office. B & D distractor changed to App 15 vs App 12. SAT.

98 F X U G2.3.13 S This question does not match the KA. The KA is for radiological safety concerns. The question is related to industrial safety.

5/20/10 Wrote new question to meet the KA. Reviewed on site. SAT.

99 F S G2.4.40 Appears to meet the KA & SRO Only criteria. SAT

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

100 H X E G2.4.45 S No information is provided in the stem of the question that requires the applicant to address a possible loss of fuel clad. One negative response. Why not give enough information so that two barriers lost and then you have enough different choices so to eliminate the NOT distractor. D is not a plausible distractor.

5/20/10 Changed stem to include DW Press Hi alarm and GP 1 PCIS Logic A Success light is NOT illuminated to make distractor D plausible.

1 H E 295001G2.1.7 S Appears to meet the KA. Is entering Region 1 needed as part of the question? If you left off it off, is D still plausible?

5/20/10 Verified Region 1 required.

2 F S 295003G2.1.27 Appears to meet the KA.

3 H E 295004AA1.03 S Appears to meet the KA.

Why not ask the status of 480v SD BD B? It remains energized and is therefore more pertinent to the 4KV to 480v relationship. The question as written is leading. Why would you ask about the other 480v train unless there was a relationship that would cause a loss of power to the bus? If the 480v train is changed to the B train, the candidate might improperly assume it is fed from its own respective 4KV bus and therefore respond that it loses power. This would change the correct answer to C.

5/20/10. Accepted question as is. SAT.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

4 H E 295005AA2.08 S Appears to meet the KA. Could this question be rewritten so that it is not necessary to ask a two part question? Power supply choices be USST, CSST, DG, or Main Generator (i.e. give condition to interrupt whether a Main Generator trip will occur or not.)

5/20/10 Rewrote new question per recommendation above.

5 H E 295006AK3.03 S Appears to meet the KA. No EHC information is given in the stem (Press or Alarms) to address anything other than EHC staying in Rx Press mode. The LOD on part 1 of the question is a 1.

5/20/10. Accepted question as is during review process on site.

6 H E 295016AA1.08 S Appears to meet the KA. Could this question be rewritten so that it is not necessary to ask a two part question? (i.e., how is Rx press controlled immediately following control room abandonment: TBY in Auto, TBV in Manual, RCIC in press control mode, HPCI in press control mode?)

5/20/10 Accepted as is based upon on site review.

7 H E 295018AK3.07 S Appears to meet the KA.

Add the word the to the stem statement following the question. Add the word are to choice B to make the sentence grammatically correct.

The KA is: Due to a loss of CCW (could be RBCCW or RCW), what is the reason for cross connecting to the backup system?

The question is convoluted as written. RCW or EECW provide the heat sink for RBCCW. This is why EECW is cross connected. Part of the question for the answer given is: Why does 70-48 go close on low pressure? Could the question be written to ask only the RCW/EECW component instead of asking two questions (i.e., leave out the RBCCW piece)?

5/20/10 Changed distractor C to make more plausible. SAT.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

8 H E 295109AA2.02 Appears to meet the KA.

S Reword the question to state: Which ONE of the following events explains the receipt of the associated alarms stated above?

5/20/10 Changes made as noted above. SAT.

9 H X U 295021AK2.01 E Appears to meet the KA.

Distractors A & D do not appear plausible. Does not pass the logic S test. If RCS temp is available, why wouldnt you use it to determine stratification and If RCS temp is not accurate, why would you choose RCS temp indications as a viable method to use to determine if RCS Stratification is occurring?

5/20/10 Reviewed on site and accepted question after a minor rewording in the stem of the question. Original question needed enhancement only.

10 H E 295023AA1.03 S Appears to meet the KA.

There is no period at the end of distractor B. This is a bank question; it does not meet the modified criteria.

What makes C plausible? All Control Rods are required to be in to move fuel and no info in stem to even address this as a possible scenario? Also, isnt rod withdrawal capability defeated as a prerequisite to moving fuel? Also, wouldnt the bundle need to be raised from the core location 1s t? This needs to be added to the answer or made the correct answer.

5/20/10. Changed distractor C to make more plausible. SAT.

11 F S 295024EK1.01 Appears to meet the KA.

12 F E 295025EK3.01 S Appears to meet the KA.

Why not use the TS Safety Limit LCO for Rx Press Safety Dome of 1325#?

5/20/10. Accepted question as is upon review on site. SAT.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

13 H E 295026EA2.01 S Appears to meet the KA.

Does the SP temp indicator read as bulk temp? TS uses avg temp.

Why does the question use bulk? Remove bulk unless necessary.

5/20/10. Accepted question with changes noted above.

14 F 1 U 295028EK2.01 S This is a generic fundamentals question. Not appropriate for this portion of the exam. LOD=1 Upon review on site with licensee, this is a basis document question.

Several misses were noted on this question due to concept errors.

Also this is to be credited as SAT and not added to the total.

15 H? 1 U 295030EK1.02 S This is a generic fundamentals question. Not appropriate for this portion of the exam. LOD=1 Below is an example question. Also, does not pass the logic test. When would NPSH increase on lowering level?

5/25/10 Question was rewritten to require use of ECCS curves.

Reviewed in office. SAT 16 F? X U 295031EK1.03 S 1st part of A & C does not pass the logic test. If temp is decreased (maximize subcooling), how would this reduce reactor power?

2nd part of C & D implies that there is a Rx Water Level interlock for reopening the MSIVs?

5/20/10 New A&C distractor written. SAT.

17 F S 295037EK2.13 Appears to meet the KA.

Ensure that this is not double jeopardy w/ Q#13.

Double jeopardy verified to be OK.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

18 H X X U 295038G2.4.9 S Does not meet the KA. Question is not dependent on low power or shutdown condition.

Distractor A does not pass the logic test.

5/20/10 Reviewed on site w/licensee. Upon further review w/licensee and based on validation results from licensee this question is satisfactory as is.

19 H E 600000AK1.02 S Appears to meet the KA.

Information in the stem of the question is confusing. How much time has passed? Suggest a rewrite to include a chronological time log.

Also, no information is given as to what Rx press or level is. Choice B is only dependent on DW press in the stem. Is this realistic? Listed as modified. Original question is not included.

5/20/10 Enhanced as noted above. SAT.

20 H 1 X X U 700000AA1.03 S Appears to meet the KA.

EHC does not change generator voltage with the VR in AUTO. Also, cap banks are not used for high voltage conditions (GFES).

This question was used on the last NRC exam HLT0801 Q20 (not noted on your 401-5 form in the Last NRC Exam section).

Suggest possibly ask a frequency question this time.

5/21/10 Licensee disagrees based on validation. Need further review to determine if question can be used.

5/25/10 Revised question in office to ask what the procedure states relative to cap bank status. SAT.

21 H X U 295002AK2.02 E The 1st part of the question does not match the KA. Suggest rewriting the question so that a two part question is not needed.

S 5/21/10 Question rewritten per suggestion above. SAT.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

22 F S 295009AK1.05 Appears to meet the KA.

23 F N S 295010AA1.06 Appears to meet the KA.

24 H B E 295022G2.2.38 S Does not appear to be any operational reasoning for the operator to choose 250 degrees F. To make the question more operational valid.

Remove the IAW and remove the 1st question. Add a 2nd question to ask whether to isolate the affected CRD HCUs from service or raise drive water flow.

5/21/10 Question modified as noted above. SAT.

25 H N S 295029EK3.03 Appears to meet the KA.

5/21/10 This question is overlapped in scenario 3-20. This scenario is designated as the backup scenario. Therefore this question is OK for use on the written exam.

26 H B S 295034EA1.02 Appears to meet the KA.

27 H N S 295036EA2.01 Appears to meet the KA.

28 H B S 203000A1.01 Appears to meet the KA.

29 H B S 203000A1.04 Appears to meet the KA.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

30 H N E 205000K3.05 S Appears to meet the KA. Not sure if C is plausible? If the line comes in between 2 SDC valves and you have SDC isolation, how would this not cause a loss of SPF cooling? The 2nd part of B states you will loose SFP if the tie comes in outside the SDC loop valves, is this plausible?

5/21/10 Reviewed again with same result. Validation showed misses for A & B. No one chose C. May need new KA.

5/25/10 Reviewed in office. Made minor change to wording. Added IAW SDC procedure to stem of question. SAT.

31 F B S 206000K2.02 Appears to meet the KA.

32 H B S 209001K1.08 Appears to meet the KA.

34 H X B U/E 212000A2.09 S Appears the correct answer does not meet the KA criteria. With the mode switch in SD, App 1F & 2 would be required w/o regard to the high DW press condition.

5/21/10 Reviewed the question. Will review again on Monday as part of in office review. May need a new KA.

5/25/10 Reviewed in office and made a change to distractor C to vent to lower DW press. Until DW press. Alarm clears.

Changed original classification to E from U after in office meeting.

35 F B S 215003A4.04 Appears to meet the KA.

36 H N S 215003A4.05 Appears to meet the KA.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

37 H M S 215004G2.2.2 Appears to meet the KA. Is this modified? Answer not shown on original question. Difficult to tell what was modified.

5/21/10. Original question provided and modified status determined.

38 H B S 215005K4.01 Appears to meet the KA.

39 H N E 217000K6.04 S The 1st part of B & D should read the same. B says press control. D says pump to the CST. Why the difference? The examinee will most likely ask also.

5/21/10 Question revised as noted above. SAT.

40 H X M U 218000K4.02 S Can ADS be armed at your site? The question as written does not meet the KA. The KA is for manual ignition of ADS logic. The question is asking about manual operation of the ADS SRV, which can always be accomplished and auto ADS logic.

5/21/10 This question will be moved to question 41. A new KA will be needed for this question.

5/25/10 New question reviewed in office. Minor modification made to question to ensure it is logic based and not procedure based. SAT.

41 F X B U 218000K4.03 S This inherent trait of the relief valve (valve design) and has nothing to do with ADS input logic. Q#40 could be used to satisfy this KA.

5/21/10 Replaced this question w/ Q#40 and is now SAT.

42 F N S 223002K1.04 Appears to meet the KA.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

43 H X B E 223002K1.08 S C & D: 2nd part of each statement is not plausible. If no isolation signal is present, why would you have to reopen either valve?

5/21/10 Upon review with the licensee, this question is SAT.

44 F X N U/E 239002K2.01 S This question seems convoluted. Not all SRVs have 2 power supplies and not all SRVs have an automatic backup. Therefore, it appears that this could lead to an argument for multiple correct answers.

5/21/10 Changed this question to SAT after on site review w/licensee.

45 H M S 259002G2.2.40 Appears to meet the KA.

46 F N U/E 261000A1.01 S This appears to be a repeat Q#88 There was another question regarding the precaution (Z) concerning the fact that all 3 trains of SBGT can be started from Unit 3, its best to start if from Unit 2 or 2 due to instrumentation availability.

5/21/10 Reviewed Double Jeopardy concern w/licensee on site and agreed to look at changing the 1st half of this question.

5/25/10 Reviewed question in office and provided details for a new question to ensure the KA is being met. Original question credited as an Enhancement, i.e. NOT UNSAT.

5/26/10 Reviewed question. SAT.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

47 F 1 X B U 262001K5.02 S No plausibility reason given for an operator to possibly choose choices A, B, or D. D seems especially not plausible. This implies we could never operate a breaker (remotely or locally) on a loss of control power. When would a breaker trip open on a loss of control power?

The operator would have to loose sight of what control power is for to even consider this as an option. LOD=1 5/21/10 Review w/licensee. I will discuss their rationale for believing the question is SAT as is with the region and provide feedback.

5/25/10 Reviewed in office. Changes made are OK. Add noun name for the 43 switch. SAT.

48 F M S 262002K3.08 Appears to meet the KA.

49 F M E 263000A2.02 S This has a low LOD for distractors C & D. Logically you would know that either choice C & D is correct.

5/21/10 Upon review on site, agreed w/licensee decision making process that C & D are plausible.

5/26/10 Changed stem to specify Battery Rooms 1, 2, & 3.

50 F N S 264000A3.02 Appears to meet KA.

51 F/H B S 264000A3.04 Appears to meet KA. Not sure I would count this as a fundamental.

5/21/10 Changed to H cognitive level.

52 H/F N S 300000A4.01 Appears to meet KA.

5/21/10 Changed to F cognitive level.

53 H B S 400000K6.05 Appears to meet KA.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

54 H M S 201002A2.04 Appears to meet KA.

55 F B S 215002A3.04 Appears to meet KA.

56 H X M E 216000A1.02 S Appears to meet KA.

1st part of the question is a fundamental GFES level (LOD=1).

5/21/10 Reviewed w/licensee onsite. Unable to make a determination at this time. Get branch input upon return to determine if U or just E.

5/25/10 Reviewed in office. Agreed SAT as is. Original question was SAT from original submittal.

57 F N S 230000A4.04 Appears to meet KA.

58 H X X N E 233000K2.02 S Appears to meet KA.

Is the lead in statement needed? Is NORMAL needed in the 2nd statement for the fill in the blank? Reword: What is the power supply for the PREFERRED pump used for Supplemental Fuel Pool Cooling.

5/21/10 Licensee agreed with the change noted above. SAT 59 H B E 234000K5.02 S Appears to meet KA.

Distractor B is written to imply that an auto protective function has occurred. (Remove the word other) 5/21/10 Licensee agreed with the change noted above. SAT

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

60 H B E 241000K6.06 S Check to verify that this question is not repeated from a previous one (Q#5). D distractor plausibility is incorrect, should say RX PRESS CONTROL.

5/21/10 Reviewed w/licensee and agreed that this is not a double jeopardy question.

61 H X N U 268000K3.04 S Does not meet the KA. There is no loss or malfunction.

5/21/10 Reviewed new question on site. Appears to be SAT. Review again as part of in office review to verify.

5/25/10 Reviewed again in office. Made minor mod to question. SAT.

62 F N E 272000A3.02 S Does the logic require both rad monitors to be HIGH HIGH to cause the trip and isolation?

5/21/10 Reviewed on site w/licensee. Only 1 detector is required to cause a trip & isolation of the MVP. Discussed this w/licensee.

Lesson material is out of date and states 2 rad detectors required. U3 mod during the last outage (2 months ago). Lesson material not up to date. SR is to be developed.

5/26/10 Revised question to ask status of MVP OG isolation valves upon receipt of HIGH HIGH condition.

63 F N S 286000G2.2.42 Appears to meet the KA.

64 F N S 290003K4.01 Appears to meet the KA.

002K1.12 BANK 65 F 2 B S Analysis for C should state that there is no injection in the outer tube.

The outer tube exist only for instrumentation purposes 66 See earlier review.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

G2.1.27 Part: The correct answer A is a subset issue. If the actual acceptance criteria are to maintain cladding temperature < 2200 degrees, then it is E also to maintain it < 2600 degrees (A).

67 F 2 X B S Change to 1800 oF. Its incorrect yet plausible because 1800 degrees is when DNB becomes significant.

5/21/10 Discussed w/licensee on site. With the equal statement as part of the answer, this could not be argued as a subset criterion.

G2.1.8 Distractors B/C/D doesnt state coordination requirements. Local supervision doesnt count as coordination. B & C are left open in that they are both correct but not complete.

It is not plausible to think that an AUO could manipulate reactivity 68 F 2 X B E controls without a licensed operator D.

D is correct also if the recirc pump is uncoupled.

5/21/10 Reviewed w/licensee on site. Licensee revised original question. Changed original mark from U to E only. Licensee is still working on revision. Question will be reviewed in office next week.

5/25/10 Reviewed in office. Changes made are OK. SAT.

G 2.2.37 KA is to determine operability and/or availability of safety related equipment. The question asks TS related jet pump flow mismatch U/E limits. This is not safety related EQUIPMENT availability/operability.

69 F 3 X N S Is this RO required knowledge?

5/21/10 Reviewed w/licensee on site. Original question is marked as a E, not a U. Determined that this is safety related equipment. The LOD was determined to be w/i reason for an RO. SAT G2.2.22 70 F 3 B S Appears to meet KA. SAT.

G2.2.4 U Does not meet the KA. The question asks you to explain the reason 71 F 2 X N S for the unit difference not the unit difference itself.

5/26/10 New question written and reviewed in office. SAT.

If more than 20 percent1 of the submitted test items (with the operating test and RO/SRO written exams assessed separately) required replacement or significant modification, the report shall include a factual description of the test item changes (observations), including the number and types of test items replaced and/or significantly modified as a result of the joint NRC and facility licensee examination review process. The report shall also note that the overall submittal was outside the acceptable quality range expected by the NRC and that future examination submittals should incorporate any lessons learned from this effort.

To be considered a significantly modified question, at least one pertinent condition in the stem and at least one distractor must be changed from the original bank question. Changing the conditions in the stem such that one of the three distractors in the original question becomes the correct answer would also be considered a significant modification

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LO (F/H) D Ste Cu T/F Cr Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation (1- m es ed. Link units ward K/A Only

5) Fo Dis cus t.

G2.3.14 Is this minutia? Are operators expected to know this from memory?

72 H 2 X B S 5/21/10 Reviewed w/licensee. This is relevant to operations and is sat as written.

G2.3.5 Does not meet the KA.

U The KA asks for ability to use radiation monitoring systems. The 73 H 3 X M question asks about using the Turbine Building Ventilation System for S an elevated release.

5/21/10 Reviewed w/licensee on site. A new question will be written.

5/26/10 Reviewed new question in office. SAT.

G 2.4.20 74 F 2 X M S Appears to meet KA. SAT.

G2.4.45 MOD Minutia: C is confusing as written. Rec: Change C to is normal for current plant conditions.

E 75 F 2 X M Distractor D: Is the orange rectangle around EOI-3 entry alarms a S magnetic border or a permanent border? If it is permanent, I would consider this distractor not plausible.

5/21/10 Reviewed new distractor D and approved change. SAT.

ES-403 Written Examination Grading Form ES-403-1

. Quality Checklist Facility: cZO*J, zi( Date of Exam: (c,- i7 Zic Exam Level: RO>1 SRO><

Initials Item Description a b c

1. Clean answer sheets copied before grading oz 74 Nji
2. Answer key changes and question deletions justified and_documented
3. Applicants scores checked for addition errors (reviewers spot check > 25% of examinations)
4. Grading for all borderline cases (80 +/-2% overall and 70 or 80, as applicable, +/-4% on the SRO-only) reviewed in detail Z% 4A--
5. Al! other failing examinations checked to ensure that grades are justified Z?
6. Performance on missed questions checked for training deficiencies and wording problems; evaluate validity of questions_missed_by_half or more of the_applicants Printed Name/Signature Date
a. Grader 1ELISI .
b. Facility Reviewer(*)
c. NRC Chief Examiner (*) 7-li-ti
d. NRC Supervisor (*) _______

(*) The facility reviewers signature is not applicable for examinations graded by the NRC; two independent NRC reviews are required.

ES-403, Page 6 of 6