ML16125A069: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Appendix C Job Performance Measure Form ES-C-1 Worksheet 2016 Admin  
{{#Wiki_filter:Appendix C                       Job Performance Measure             Form ES-C-1 Worksheet JPM A1a RO Developed By:      ______________________________        Date: ___________
- JPM A1a RO (Rev_010816) NUREG 1021, Revision 10
Instructor/Developer Concurred By:      ______________________________        Date: ___________
Line Superintendent/Supervisor SRO Approved By:      ______________________________        Date: ___________
Superintendent/Supervisor Training 2016 Admin - JPM A1a RO (Rev_010816)                 NUREG 1021, Revision 10


JPM A1a RO      Developed By:
Appendix C                                       Page 2 of 10                         Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                             Task No.:
______________________________
Task Title:             Calculate QPTR                         JPM No.:     2016 Admin - JPM A1a RO K/A  
Date:  ___________
Instructor/Developer Concurred By:
______________________________
Date:  ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date:  ___________
Superintendent/Supervisor Training   
 
Appendix C Page 2 of 10 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
- JPM A1a RO NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Calculate QPTR JPM No.: 2016 Admin  
- JPM A1a RO     K/A  


==Reference:==
==Reference:==
2.1.7 (4.4)
Examinee:                                                    NRC Examiner:
Facility Evaluator:                                          Date:
Method of testing:
Simulated Performance:                                      Actual Performance:        X Classroom          X    Simulator            Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Initial Conditions:
* The plant is in Mode 1 at 60% RTP.
* ERFIS is inoperable.
* The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation.
* Detector Currents are as follows:
* N41: Upper - 63 / Normalizing - 123
* N41: Lower - 55 / Normalizing - 120
* N42: Upper - 55 / Normalizing - 109
* N42: Lower - 52 / Normalizing - 110
* N43: Upper - 50 / Normalizing - 104
* N43: Lower - 45 / Normalizing - 99
* N44: Upper - 48 / Normalizing - 97
* N44: Lower - 45 / Normalizing - 95 Initiating Cue:
* The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT.
2016 Admin - JPM A1a RO                                                    NUREG 1021, Revision 10


2.1.7 (4.4)
Appendix C                                       Page 3 of 10                       Form ES-C-1 Job Performance Measure Worksheet
Examinee:  NRC Examiner:
* Round all calculations to three decimal places (Example: 1.2348 would be rounded to 1.235)
Facility Evaluator:
* Identify any limits that are not being complied with.
Date:  Method of testing:
Task Standard:         The operator will complete the QPTR calculation in accordance with the provided KEY, and identify that Technical Specification LCO is NOT met.
Simulated Performance:
Required Materials:     Calculator Robinson Technical Specifications and Basis must be available.
Actual Performance:
X  Classroom X Simulator  Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
: 1. Initial Conditions:
The plant is in Mode 1 at 60% RTP
. ERFIS is inoperable
. The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation
. Detector Currents are as follows:
N41: Upper
- 63 / Normalizing
- 123  N41: Lower
- 55 / Normalizing
- 120  N42: Upper
- 55 / Normalizing
- 109  N42: Lower
- 52 / Normalizing
- 110  N43: Upper
- 50 / Normalizing
- 104  N43: Lower
- 45 / Normalizing
- 99  N44: Upper
- 48 / Normalizing
- 97  N44: Lower
- 45 / Normalizing
- 95  Initiating Cue:
The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT
.
Appendix C Page 3 of 10 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
- JPM A1a RO NUREG 1021, Revision 10 Round all calculations to three decimal places (Example: 1.2348 would be rounded to 1.235)
Identify any limits that are not being complied with.
Task Standard:
The operator will complete the QPTR calculation in accordance with the provided KEY, and identify that Technical Specification LCO is NOT met. Required Materials:
Calculator Robinson Technical Specifications and Basis must be available.
General  
General  


==References:==
==References:==
FMP-007 (Quadrant Power Tilt), Rev 15 Robinson Technical Specification LCO 3.2.4 (Quadrant Power Tilt Ratio), Amendment 176 Handouts:              Handout 1: Blank copy of FMP-007.
Time Critical Task:    NO Validation Time:        10 minutes Critical Step Justification Step 6        This step is critical because identifying that the maximum Upper Normalized Detector Ratio is N41 (0.512), and dividing it by the Average Upper Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY.
Step 7        This step is critical because identifying that the maximum Lower Normalized Detector Ratio is N44 (0.474), and dividing it by the Average Lower Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY.
Step 8        This step is critical because identifying that the Upper QPTR is larger than the Lower QPTR is necessary to complete the QPTR calculation in accordance with the provided KEY.
Step 9        This step is critical because determining that LCO 3.2.4 permits a maximum QPTR of 1.02 when power level is greater than 50% is necessary to identify that Technical Specification LCO is NOT met.
2016 Admin - JPM A1a RO                                                NUREG 1021, Revision 10


FMP-007 (Quadrant Power Tilt), Rev 15  Robinson Technical Specification LCO 3.
Appendix C                                   Page 4 of 10                     Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
2.4 (Quadrant Power Tilt Ratio), Amendment 176  Handouts: Handout 1: Blank copy of FMP-007. Time Critical Task:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
NO  Validation Time:
START TIME:
10 minutes        Critical Step Justification Step 6 This step is critical because identifying that the maximum Upper Normalized Detector Ratio is N41 (0.512), and dividing it by the Average Upper Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY
STEP 1:           Read the Upper (A) and the Lower (B) Indicated Detector Currents from the Detector Current meters of each operable Power Range channel and record on ATTACHMENT 10.2.                             ___ SAT (Step 8.2.4.1)
. Step 7 This step is critical because identifying that the maximum Lower Normalized Detector Ratio is N4 4 (0.474), and dividing it by the Average Lower Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY
STANDARD:         The operator records the provided Upper and Lower Detector
. Step 8 This step is critical because identifying that the Upper QPTR is larger than the Lower QPTR is necessary t o complete the QPTR calculation in accordance with the provided KEY
___ UNSAT Currents on Attachment 10.2 IAW the provided KEY.
. Step 9 This step is critical because determining that LCO 3.2.4 permits a maximum QPTR of 1.02 when power level is greater than 50% is necessary to identify that Technical Specification LCO is NOT met
EXAMINERS CUE:                 NONE EXAMINERS NOTE:                 NONE COMMENTS:
.
STEP 2:         Record the Upper and Lower Normalizing Detector Currents from the Control Room Status Board for each operable Power Range channel on ATTACHMENT 10.2.                                                   ___ SAT (Step 8.2.4.2)
Appendix C Page 4 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
STANDARD: The operator records the provided Upper and Lower Detector                 ___ UNSAT Currents on Attachment 10.2 IAW the provided KEY.
- JPM A1a RO NUREG 1021, Revision 10 (Critical Steps are identified as such in right
EXAMINERS CUE:                 NONE EXAMINERS NOTE:                 NONE COMMENTS:
-hand column)
NOTE:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
Normalized Ratios, Average Ratios and QPTR values should be recorded to at least 3 decimal places.
: 1. START TIME:
2016 Admin - JPM A1a RO                                           NUREG 1021, Revision 10
STEP 1: Read the Upper (A) and the Lower (B) Indicated Detector Currents from the Detector Current meters of each operable Power Range channel and record on ATTACHMENT 10.2.
(Step 8.2.4.1) STANDARD: The operator records the provided Upper and Lower Detector Currents on Attachment 10.2 IAW the provided KEY. EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE COMMENTS:       ___ SAT    ___ UNSAT  STEP 2: Record the Upper and Lower Normalizing Detector Currents from the Control Room Status Board for each operable Power Range channel on ATTACHMENT 10.2.
(Step 8.2.4.2) STANDARD: The operator records the provided Upper and Lower Detector Currents on Attachment 10.2 IAW the provided KEY.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE COMMENTS:       ___ SAT    ___ UNSAT  NOTE: Normalized Ratios, Average Ratios and QPTR values should be recorded to at least 3 decimal places.
Appendix C Page 5 of 10 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin  
- JPM A1a RO NUREG 1021, Revision 10 STEP 3: Divide each Indicated Detector Current by its corresponding Normalizing Detector Current and record the result as the Normalized Detector Ratio on ATTACHMENT 10.2.
(Step 8.2.4.3)  STANDARD: The operator reads the Note, and proceeds
. The operator divides each Indicated Detector Current by its corresponding Normalizing Detector Current and records the result as the Normalized Detector Ratio on ATTACHMENT 10.2 IAW the provided KEY
. Upper N41 = 0.512            Lower N41 = 0.458 Upper N42 = 0.505            Lower N42 = 0.473  Upper N43 = 0.481            Lower N43 = 0.455 Upper N44 = 0.495            Lower N44 = 0.474  EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE COMMENTS: 


___ SAT   ___ UNSAT   STEP 4: Average the Upper Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Upper column on ATTACHMENT 10.2.
Appendix C                                Page 5 of 10                      Form ES-C-1 PERFORMANCE INFORMATION STEP 3:      Divide each Indicated Detector Current by its corresponding Normalizing Detector Current and record the result as the Normalized Detector Ratio on ATTACHMENT 10.2.
(Step 8.2.4.4)
(Step 8.2.4.3)                                                        ___ SAT STANDARD:    The operator reads the Note, and proceeds.
STANDARD: The operator average s the Upper Normalized Detector Ratios and record s the result as the Average Normalized Detector Ratio in the Upper column on Attachment 10.2 IAW the provided KEY
___ UNSAT The operator divides each Indicated Detector Current by its corresponding Normalizing Detector Current and records the result as the Normalized Detector Ratio on ATTACHMENT 10.2 IAW the provided KEY.
.
Upper N41 = 0.512          Lower N41 = 0.458 Upper N42 = 0.505          Lower N42 = 0.473 Upper N43 = 0.481          Lower N43 = 0.455 Upper N44 = 0.495          Lower N44 = 0.474 EXAMINERS CUE:              NONE EXAMINERS NOTE:            NONE COMMENTS:
STEP 4:       Average the Upper Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Upper column on ATTACHMENT 10.2.
(Step 8.2.4.4)                                                       ___ SAT STANDARD:     The operator averages the Upper Normalized Detector Ratios and records the result as the Average Normalized Detector Ratio in the   ___ UNSAT Upper column on Attachment 10.2 IAW the provided KEY.
Upper Average Normalized Detector Ratio = 0.498 (+.001/-0)
Upper Average Normalized Detector Ratio = 0.498 (+.001/-0)
EXAMINER'S CUE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE COMMENTS:
NONE EXAMINER'S NOTE:
2016 Admin - JPM A1a RO                                          NUREG 1021, Revision 10
NONE COMMENTS:  


___ SAT    ___ UNSAT Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
Appendix C                                   Page 6 of 10                     Form ES-C-1 PERFORMANCE INFORMATION STEP 5:       Average the Lower Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Lower column on ATTACHMENT 10.2.                                           ___ SAT (Step 8.2.4.5)
- JPM A1a RO NUREG 1021, Revision 10 STEP 5: Average the Lower Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Lower column on ATTACHMENT 10.2.
STANDARD:     The operator averages the Lower Normalized Detector Ratios and       ___ UNSAT records the result as the Average Normalized Detector Ratio in the Lower column on Attachment 10.2 IAW the provided KEY.
(Step 8.2.4.5)   STANDARD: The operator averages the Lower Normalized Detector Ratios and records the result as the Average Normalized Detector Ratio in the Lower column on Attachment 10.2 IAW the provided KEY
Lower Average Normalized Detector Ratio = 0.465 (+.001/-0)
. Lower Average Normalized Detector Ratio = 0.465 (+.001/-0) EXAMINER'S CUE: NONE EXAMINER'S NOTE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE COMMENTS:
NONE COMMENTS:       ___ SAT    ___ UNSAT  STEP 6: Determine the maximum Upper Normalized Detector Ratio and divide it by the Average Upper Normalized Detector Ratio and record the resulting Upper QPTR on ATTACHMENT 10.2.
STEP 6:       Determine the maximum Upper Normalized Detector Ratio and             CRITICAL divide it by the Average Upper Normalized Detector Ratio and             STEP record the resulting Upper QPTR on ATTACHMENT 10.2.
(Step 8.2.4.6)
(Step 8.2.4.6)
STANDARD: The operator identifies that the maximum Upper Normalized Detector Ratio is N41 (0.512), and divides it by the Average Upper Normalized Detector Ratio from Performance Step 4 and record s the resulting Upper QPTR on Attachment 10.2 IAW the provided KEY. Upper QPTR = 0.512 / 0.498 = 1.028 (+.001/-0) EXAMINER'S CUE:
STANDARD:     The operator identifies that the maximum Upper Normalized             ___ SAT Detector Ratio is N41 (0.512), and divides it by the Average Upper Normalized Detector Ratio from Performance Step 4 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided KEY.                                                                 ___ UNSAT Upper QPTR = 0.512 / 0.498 = 1.028 (+.001/-0)
NONE EXAMINER'S NOTE:
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE COMMENTS:
NONE COMMENTS:     CRITICAL STEP
2016 Admin - JPM A1a RO                                            NUREG 1021, Revision 10
___ SAT    ___ UNSAT Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
 
- JPM A1a RO NUREG 1021, Revision 10 STEP 7: Determine the maximum Lower Normalized Detector Ratio and divide it by the Average Lower Normalized Detector Ratio and record the resulting Lower QPTR on ATTACHMENT 10.2 (Step 8.2.4.7) STANDARD: The operator observes that the maximum Lower Normalized Detector Ratio is N44 (0.474), and divides it by the Average Lower Normalized Detector Ratio from Performance Step 5 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided KEY. Lower QPTR = 0.474 / 0.465 = 1.019 (+.001/-0) EXAMINER'S CUE:
Appendix C                                   Page 7 of 10                     Form ES-C-1 PERFORMANCE INFORMATION STEP 7:       Determine the maximum Lower Normalized Detector Ratio and divide it by the Average Lower Normalized Detector Ratio and           CRITICAL record the resulting Lower QPTR on ATTACHMENT 10.2                       STEP (Step 8.2.4.7)
NONE EXAMINER'S NOTE:
___ SAT STANDARD:     The operator observes that the maximum Lower Normalized Detector Ratio is N44 (0.474), and divides it by the Average Lower Normalized Detector Ratio from Performance Step 5 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided         ___ UNSAT KEY.
NONE   COMMENTS:
Lower QPTR = 0.474 / 0.465 = 1.019 (+.001/-0)
CRITICAL STEP  ___ SAT    ___ UNSAT  STEP 8: Record larger of the Upper QPTR or the Lower QPTR as the Maximum QPTR on ATTACHMENT 10.2 along with the reactor power and any comments.
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE COMMENTS:
(Step 8.2.4.8) STANDARD: The operator identifies that the Upper QPTR is larger than the Lower QPTR and records the Maximum QPTR as 1.028
STEP 8:     Record larger of the Upper QPTR or the Lower QPTR as the                 CRITICAL Maximum QPTR on ATTACHMENT 10.2 along with the reactor power               STEP and any comments.
(+.001/-0) IAW the provided KEY.
(Step 8.2.4.8)                                                         ___ SAT STANDARD:     The operator identifies that the Upper QPTR is larger than the Lower QPTR and records the Maximum QPTR as 1.028 (+.001/-0)
EXAMINER'S CUE:
___ UNSAT IAW the provided KEY.
NONE EXAMINER'S NOTE:
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE COMMENTS:
NONE   COMMENTS:
2016 Admin - JPM A1a RO                                              NUREG 1021, Revision 10
CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
 
- JPM A1a RO NUREG 1021, Revision 10 STEP 9: Identify any limits that are not being complied with.
Appendix C                                     Page 8 of 10                   Form ES-C-1 PERFORMANCE INFORMATION STEP 9:     Identify any limits that are not being complied with.                   CRITICAL STEP STANDARD:     The operator reviews Technical Specification LCO 3.2.4 and
STANDARD: The operator reviews Technical Specification LCO 3.2.4 and determines that with the plant in Mode 1 at greater than 50% power, a maximum QPTR of 1.02 is permitted.
___ SAT determines that with the plant in Mode 1 at greater than 50% power, a maximum QPTR of 1.02 is permitted.
T he operator identifies that LCO 3.2.4 is NOT met
The operator identifies that LCO 3.2.4 is NOT met.
.      EXAMINER'S CUE:
___ UNSAT EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE COMMENTS:
NONE EXAMINER'S NOTE:
Terminating Cue:               Evaluation on this JPM is complete.
NONE COMMENTS:     CRITICAL STEP
___ SAT    ___ UNSAT              Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Admin - JPM A1a RO                                            NUREG 1021, Revision 10


Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Admin
Appendix C                             Page 9 of 10               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A1a RO Examinees Name:
- JPM A1a RO NUREG 1021, Revision 10 Job Performance Measure No.:
2016 Admin  
- JPM A1a RO Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 156: Line 120:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT            UNSAT Examiners Signature:                                Date:
2016 Admin - JPM A1a RO                                  NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                               Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The plant is in Mode 1 at 60% RTP.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* ERFIS is inoperable.
The plant is in Mode 1 at 60% RTP
* The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation.
. ERFIS is inoperable
* Detector Currents are as follows:
. The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation
* N41: Upper - 63 / Normalizing - 123
. Detector Currents are as follows:
* N41: Lower - 55 / Normalizing - 120
N41: Upper  
* N42: Upper - 55 / Normalizing - 109
- 63 / Normalizing  
* N42: Lower - 52 / Normalizing - 110
- 123 N41: Lower  
* N43: Upper - 50 / Normalizing - 104
- 55 / Normalizing  
* N43: Lower - 45 / Normalizing - 99
- 120 N42: Upper  
* N44: Upper - 48 / Normalizing - 97
- 55 / Normalizing  
* N44: Lower - 45 / Normalizing - 95 INITIATING CUE:
- 109 N42: Lower  
* The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT.
- 52 / Normalizing  
* Round all calculations to three decimal places (Example:
- 110   N43: Upper  
1.2348 would be rounded to 1.235)
- 50 / Normalizing  
* Identify any limits that are not being complied with.
- 104   N43: Lower - 45 / Normalizing  
NUREG 1021, Revision 10
- 99 N44: Upper  
- 48 / Normalizing  
- 97 N44: Lower  
- 45 / Normalizing  
- 95     INITIATING CUE:
The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP
-007, QUADRANT POWER TILT
. Round all calculations to three decimal places (Example: 1.2348 would be rounded to 1.235)
Identify any limits that are not being complied with.


Appendix C Job Performance Measure Form ES-C-1 Worksheet 2016 Admin  
Appendix C                       Job Performance Measure             Form ES-C-1 Worksheet JPM A1a SRO Developed By:      ______________________________        Date: ___________
- JPM A1a SRO (Rev_010816) NUREG 1021, Revision 10
Instructor/Developer Concurred By:      ______________________________        Date: ___________
Line Superintendent/Supervisor SRO Approved By:      ______________________________        Date: ___________
Superintendent/Supervisor Training 2016 Admin - JPM A1a SRO (Rev_010816)                 NUREG 1021, Revision 10


JPM A 1a S RO      Developed By:
Appendix C                                       Page 2 of 10                         Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                             Task No.:
______________________________
Task Title:             Calculate QPTR                         JPM No.:     2016 Admin - JPM A1a SRO K/A  
Date:  ___________
Instructor/Developer Concurred By:
______________________________
Date:  ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date:  ___________
Superintendent/Supervisor Training   
 
Appendix C Page 2 of 10 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
- JPM A1a S RO  NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Calculate QPTR JPM No.: 2016 Admin  
- JPM A1a S RO    K/A  


==Reference:==
==Reference:==
2.1.7 (4.7)
Examinee:                                                    NRC Examiner:
Facility Evaluator:                                          Date:
Method of testing:
Simulated Performance:                                      Actual Performance:        X Classroom          X    Simulator            Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Initial Conditions:
* The plant is in Mode 1 at 100% RTP.
* ERFIS is inoperable.
* The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation.
* Detector Currents are as follows:
* N41: Upper - 105 / Normalizing - 123
* N41: Lower - 92 / Normalizing - 120
* N42: Upper - 92 / Normalizing - 109
* N42: Lower - 87 / Normalizing - 110
* N43: Upper - 83 / Normalizing - 104
* N43: Lower - 75 / Normalizing - 99
* N44: Upper - 80 / Normalizing - 97
* N44: Lower - 75 / Normalizing - 95 Initiating Cue:
* The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT.
* Round all calculations to three decimal places (Example: 1.2348 would be rounded to 1.235) 2016 Admin - JPM A1a SRO                                                  NUREG 1021, Revision 10


2.1.7 (4.7)    Examinee:  NRC Examiner:
Appendix C                                       Page 3 of 10                       Form ES-C-1 Job Performance Measure Worksheet
Facility Evaluator:
* Identify whether or not any limitations have been exceeded, and if so, what, if any ACTION, is required.
Date:  Method of testing:
Task Standard:         The operator will complete the QPTR calculation in accordance with the provided KEY, identify that Technical Specification LCO is NOT met, and identify that all six ACTIONs (A.1-A.6) must be taken for Condition A of LCO 3.2.4.
Simulated Performance:
Required Materials:     Calculator Robinson Technical Specifications and Basis must be available.
Actual Performance:
X  Classroom X Simulator  Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
: 1. Initial Conditions:
The plant is in Mode 1 at 100% RTP. ERFIS is inoperable
. The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation
. Detector Currents are as follows:
N41: Upper
- 105 / Normalizing
- 123  N41: Lower
- 92 / Normalizing
- 120  N42: Upper
- 92 / Normalizing
- 109  N42: Lower
- 87 / Normalizing
- 110  N43: Upper
- 83 / Normalizing
- 104  N43: Lower
- 75 / Normalizing
- 99  N44: Upper
- 80 / Normalizing
- 97  N44: Lower
- 75 / Normalizing
- 95  Initiating Cue:
The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT
. Round all calculations to three decimal places (Example: 1.2348 would be rounded to 1.235)
 
Appendix C Page 3 of 10 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
- JPM A1a S RO  NUREG 1021, Revision 10 Identify whether or not any limitations have been exceeded, and if so, what, if any ACTION, is required
. Task Standard:
The operator will complete the QPTR calculation in accordance with the provided KEY, identify that Technical Specification LCO is NOT met
, and identify that all six ACTIONs (A.1
-A.6) must be taken for Condition A of LCO 3.2.4
. Required Materials:
Calculator Robinson Technical Specifications and Basis must be available.
General  
General  


==References:==
==References:==
FMP-007 (Quadrant Power Tilt), Rev 15 Robinson Technical Specification LCO 3.2.4 (Quadrant Power Tilt Ratio), Amendment 176 Handouts:              Handout 1: Blank copy of FMP-007.
Time Critical Task:    NO Validation Time:        15 minutes Critical Step Justification Step 6        This step is critical because identifying that the maximum Upper Normalized Detector Ratio is N41 (0.854), and dividing it by the Average Upper Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY.
Step 7        This step is critical because identifying that the maximum Lower Normalized Detector Ratio is N42 (0.791), and dividing it by the Average Lower Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY.
Step 8        This step is critical because identifying that the Upper QPTR is larger than the Lower QPTR is necessary to complete the QPTR calculation in accordance with the provided KEY.
Step 9        This step is critical because determining that LCO 3.2.4 permits a maximum QPTR of 1.02 when power level is greater than 50% is necessary to identify that Technical Specification LCO is NOT met; and identifying that ACTIONs A.1 through A.6 must be completed is necessary to identify all of the Technical Specification required ACTION.
2016 Admin - JPM A1a SRO                                              NUREG 1021, Revision 10


FMP-007 (Quadrant Power Tilt), Rev 15  Robinson Technical Specification LCO 3.
Appendix C                                   Page 4 of 10                     Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
2.4 (Quadrant Power Tilt Ratio), Amendment 176  Handouts: Handout 1: Blank copy of FMP-007. Time Critical Task:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
NO  Validation Time:
START TIME:
15 minutes        Critical Step Justification Step 6 This step is critical because identifying that the maximum Upper Normalized Detector Ratio is N41 (0.
STEP 1:           Read the Upper (A) and the Lower (B) Indicated Detector Currents from the Detector Current meters of each operable Power Range channel and record on ATTACHMENT 10.2.                             ___ SAT (Step 8.2.4.1)
854), and dividing it by the Average Upper Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY
STANDARD:         The operator records the provided Upper and Lower Detector
. St ep 7 This step is critical because identifying that the maximum Lower Normalized Detector Ratio is N4 2 (0.791), and dividing it by the Average Lower Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY
___ UNSAT Currents on Attachment 10.2 IAW the provided KEY.
. Step 8 This step is critical because identifying that the Upper QPTR is larger than the Lower QPTR is necessary to complete the QPTR calculation in accordance with the provided KEY
EXAMINERS CUE:                 NONE EXAMINERS NOTE:                 NONE COMMENTS:
. Step 9 This step is critical because determining that LCO 3.2.4 permits a maximum QPTR of 1.02 when power level is greater than 50% is necessary to identify that Technical Specification LCO is NOT met; and identifying that ACTIONs A.1 through A.6 must be completed is necessary to identify all of the Technical Specification required ACTION
STEP 2:         Record the Upper and Lower Normalizing Detector Currents from the Control Room Status Board for each operable Power Range channel on ATTACHMENT 10.2.                                                   ___ SAT (Step 8.2.4.2)
.
STANDARD: The operator records the provided Upper and Lower Detector                 ___ UNSAT Currents on Attachment 10.2 IAW the provided KEY.
Appendix C Page 4 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
EXAMINERS CUE:                 NONE EXAMINERS NOTE:                 NONE COMMENTS:
- JPM A1a S RO  NUREG 1021, Revision 10 (Critical Steps are identified as such in right
NOTE:
-hand column)
Normalized Ratios, Average Ratios and QPTR values should be recorded to at least 3 decimal places.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
2016 Admin - JPM A1a SRO                                          NUREG 1021, Revision 10
: 1. START TIME:
STEP 1: Read the Upper (A) and the Lower (B) Indicated Detector Currents from the Detector Current meters of each operable Power Range channel and record on ATTACHMENT 10.2.
(Step 8.2.4.1) STANDARD: The operator records the provided Upper and Lower Detector Currents on Attachment 10.2 IAW the provided KEY. EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE COMMENTS:       ___ SAT    ___ UNSAT  STEP 2: Record the Upper and Lower Normalizing Detector Currents from the Control Room Status Board for each operable Power Range channel on ATTACHMENT 10.2.
(Step 8.2.4.2) STANDARD: The operator records the provided Upper and Lower Detector Currents on Attachment 10.2 IAW the provided KEY.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE COMMENTS:       ___ SAT    ___ UNSAT  NOTE: Normalized Ratios, Average Ratios and QPTR values should be recorded to at least 3 decimal places.
Appendix C Page 5 of 10 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin  
- JPM A1a S RO  NUREG 1021, Revision 10 STEP 3: Divide each Indicated Detector Current by its corresponding Normalizing Detector Current and record the result as the Normalized Detector Ratio on ATTACHMENT 10.2.
(Step 8.2.4.3)  STANDARD: The operator reads the Note, and proceeds
. The operator divides each Indicated Detector Current by its corresponding Normalizing Detector Current and records the result as the Normalized Detector Ratio on ATTACHMENT 10.2 IAW the provided KEY
. Upper N41 =
0.854            Lower N41 =
0.767 Upper N42 =
0.844            Lower N42 =
0.791  Upper N43 =
0.798            Lower N43 =
0.758 Upper N44 =
0.82 5            Lower N44 =
0.789  EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE COMMENTS: 


___ SAT   ___ UNSAT   STEP 4: Average the Upper Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Upper column on ATTACHMENT 10.2.
Appendix C                                Page 5 of 10                      Form ES-C-1 PERFORMANCE INFORMATION STEP 3:      Divide each Indicated Detector Current by its corresponding Normalizing Detector Current and record the result as the Normalized Detector Ratio on ATTACHMENT 10.2.
(Step 8.2.4.4)
(Step 8.2.4.3)                                                        ___ SAT STANDARD:    The operator reads the Note, and proceeds.
STANDARD: The operator average s the Upper Normalized Detector Ratios and record s the result as the Average Normalized Detector Ratio in the Upper column on Attachment 10.2 IAW the provided KEY
___ UNSAT The operator divides each Indicated Detector Current by its corresponding Normalizing Detector Current and records the result as the Normalized Detector Ratio on ATTACHMENT 10.2 IAW the provided KEY.
.
Upper N41 = 0.854          Lower N41 = 0.767 Upper N42 = 0.844          Lower N42 = 0.791 Upper N43 = 0.798          Lower N43 = 0.758 Upper N44 = 0.825          Lower N44 = 0.789 EXAMINERS CUE:              NONE EXAMINERS NOTE:            NONE COMMENTS:
Upper Average Normalized Detector Ratio =
STEP 4:       Average the Upper Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Upper column on ATTACHMENT 10.2.
0.830 (+.001/-0)
(Step 8.2.4.4)                                                       ___ SAT STANDARD:     The operator averages the Upper Normalized Detector Ratios and records the result as the Average Normalized Detector Ratio in the   ___ UNSAT Upper column on Attachment 10.2 IAW the provided KEY.
EXAMINER'S CUE:
Upper Average Normalized Detector Ratio = 0.830 (+.001/-0)
NONE EXAMINER'S NOTE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE COMMENTS:
NONE COMMENTS:  
2016 Admin - JPM A1a SRO                                          NUREG 1021, Revision 10


___ SAT    ___ UNSAT Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
Appendix C                                   Page 6 of 10                     Form ES-C-1 PERFORMANCE INFORMATION STEP 5:       Average the Lower Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Lower column on ATTACHMENT 10.2.                                           ___ SAT (Step 8.2.4.5)
- JPM A1a S RO  NUREG 1021, Revision 10 STEP 5: Average the Lower Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Lower column on ATTACHMENT 10.2.
STANDARD:     The operator averages the Lower Normalized Detector Ratios and       ___ UNSAT records the result as the Average Normalized Detector Ratio in the Lower column on Attachment 10.2 IAW the provided KEY.
(Step 8.2.4.5)   STANDARD: The operator averages the Lower Normalized Detector Ratios and records the result as the Average Normalized Detector Ratio in the Lower column on Attachment 10.2 IAW the provided KEY
Lower Average Normalized Detector Ratio = 0.776 (+.001/-0)
. Lower Average Normalized Detector Ratio =
EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE COMMENTS:
0.776 (+.001/-0) EXAMINER'S CUE: NONE EXAMINER'S NOTE:
STEP 6:       Determine the maximum Upper Normalized Detector Ratio and             CRITICAL divide it by the Average Upper Normalized Detector Ratio and             STEP record the resulting Upper QPTR on ATTACHMENT 10.2.
NONE COMMENTS:       ___ SAT    ___ UNSAT  STEP 6: Determine the maximum Upper Normalized Detector Ratio and divide it by the Average Upper Normalized Detector Ratio and record the resulting Upper QPTR on ATTACHMENT 10.2.
(Step 8.2.4.6)
(Step 8.2.4.6)
STANDARD: The operator identifies that the maximum Upper Normalized Detector Ratio is N41 (0.
STANDARD:     The operator identifies that the maximum Upper Normalized             ___ SAT Detector Ratio is N41 (0.854), and divides it by the Average Upper Normalized Detector Ratio from Performance Step 4 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided KEY.                                                                 ___ UNSAT Upper QPTR = 0.854 / 0.830 = 1.029 (+.001/-0)
854), and divides it by the Average Upper Normalized Detector Ratio from Performance Step 4 and record s the resulting Upper QPTR on Attachment 10.2 IAW the provided KEY. Upper QPTR = 0.
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE COMMENTS:
854 / 0.830 = 1.02 9 (+.001/-0) EXAMINER'S CUE:
2016 Admin - JPM A1a SRO                                            NUREG 1021, Revision 10
NONE EXAMINER'S NOTE:
 
NONE COMMENTS:     CRITICAL STEP
Appendix C                                   Page 7 of 10                     Form ES-C-1 PERFORMANCE INFORMATION STEP 7:       Determine the maximum Lower Normalized Detector Ratio and divide it by the Average Lower Normalized Detector Ratio and           CRITICAL record the resulting Lower QPTR on ATTACHMENT 10.2                       STEP (Step 8.2.4.7)
___ SAT    ___ UNSAT Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
___ SAT STANDARD:     The operator observes that the maximum Lower Normalized Detector Ratio is N42 (0.791), and divides it by the Average Lower Normalized Detector Ratio from Performance Step 5 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided         ___ UNSAT KEY.
- JPM A1a S RO  NUREG 1021, Revision 10 STEP 7: Determine the maximum Lower Normalized Detector Ratio and divide it by the Average Lower Normalized Detector Ratio and record the resulting Lower QPTR on ATTACHMENT 10.2 (Step 8.2.4.7) STANDARD: The operator observes that the maximum Lower Normalized Detector Ratio is N4 2 (0.791), and divides it by the Average Lower Normalized Detector Ratio from Performance Step 5 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided KEY. Lower QPTR = 0.
Lower QPTR = 0.791 / 0.776 = 1.019 (+.001/-0)
791 / 0.776 = 1.019 (+.001/-0) EXAMINER'S CUE:
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE COMMENTS:
NONE EXAMINER'S NOTE:
STEP 8:     Record larger of the Upper QPTR or the Lower QPTR as the                 CRITICAL Maximum QPTR on ATTACHMENT 10.2 along with the reactor power               STEP and any comments.
NONE   COMMENTS:
(Step 8.2.4.8)                                                         ___ SAT STANDARD:     The operator identifies that the Upper QPTR is larger than the Lower QPTR and records the Maximum QPTR as 1.029 (+.001/-0)
CRITICAL STEP  ___ SAT    ___ UNSAT  STEP 8: Record larger of the Upper QPTR or the Lower QPTR as the Maximum QPTR on ATTACHMENT 10.2 along with the reactor power and any comments.
___ UNSAT IAW the provided KEY.
(Step 8.2.4.8) STANDARD: The operator identifies that the Upper QPTR is larger than the Lower QPTR and records the Maximum QPTR as 1.02 9 (+.001/-0) IAW the provided KEY.
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE COMMENTS:
EXAMINER'S CUE:
2016 Admin - JPM A1a SRO                                            NUREG 1021, Revision 10
NONE EXAMINER'S NOTE:
 
NONE   COMMENTS:
Appendix C                                   Page 8 of 10                       Form ES-C-1 PERFORMANCE INFORMATION STEP 9:     Identify whether or not any limitations have been exceeded, and if so,     CRITICAL what, if any ACTION, is required.                                            STEP
CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
___ SAT STANDARD:     The operator reviews Technical Specification LCO 3.2.4 and determines that with the plant in Mode 1 at greater than 50% power, a maximum QPTR of 1.02 is permitted.
- JPM A1a S RO  NUREG 1021, Revision 10 STEP 9: Identify whether or not any limitations have been exceeded, and if so, what, if any ACTION, is required
___ UNSAT The operator identifies that LCO 3.2.4 is NOT met.
. STANDARD: The operator reviews Technical Specification LCO 3.2.4 and determines that with the plant in Mode 1 at greater than 50% power, a maximum QPTR of 1.02 is permitted.
The operator identifies that ACTIONS A.1 through A.6 must be taken for Condition A of LCO 3.2.4.
T he operator identifies that LCO 3.2.4 is NOT met
* Reduce THERMAL POWER  3% from RTP for each 1% of QPTR > 1.00 within 2 hours (Minimum of 8.7% power reduction OR Maximum allowable power of 91.3%).
.
* Determine QPTR and reduce THERMAL POWER  3% from RTP for each 1% of QPTR > 1.00 once per 12 hours.
The operator identifies that ACTIONS A.1 through A.6 must be taken for Condition A of LCO 3.2.4
* Perform SR 3.2.1.1 and SR 3.2.2.1 within 24 hours and once per 7 days thereafter.
.
* Reevaluate safety analyses and confirm results remain valid for duration of operation under this condition prior to increasing THERMAL POWER above the limit of Required Action A.1.
QPTR > 1.00 within 2 hours (Minimum of 8.7% power reduction OR Maximu m allowable power of 91.3%).
* Prior to increasing THERMAL POWER above the limit of Required Action A.1 prior to increasing THERMAL POWER above the limit of Required Action A.1 or A.2.
Determine RTP for each 1% of QPTR > 1.00 once per 12 hours.
* Perform SR 3.2.1.1 and SR 3.2.2.1 Within 24 hours after reaching RTP OR Within 48 hours after increasing THERMAL POWER above the limit of Required Action A.1 or A.2.
Perform SR 3.2.1.1 and SR 3.2.2.1 within 24 hours and once per 7 days thereafter.
EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE COMMENTS:
Reevaluate safety analyses and confirm results remain valid for duration of operation under this condition prior to increasing THERMAL POWER above the limit of Required Action A.1.
Terminating Cue:               Evaluation on this JPM is complete.
Prior to increasing THERMAL POWER above the limit of Required Action A.1 prior to increasing THERMAL POWER above the limit of Required Action A.1 or A.2.
Perform SR 3.2.1.1 and SR 3.2.2.1 Within 24 hours after reaching RTP OR Within 48 hours after increasing THERMAL POWER above the limit of Required Action A.1 or A.2.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE COMMENTS:     CRITICAL STEP  ___ SAT    ___ UNSAT              Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Admin - JPM A1a SRO                                              NUREG 1021, Revision 10


Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Admin
Appendix C                             Page 9 of 10                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A1a SRO Examinees Name:
- JPM A1a S RO  NUREG 1021, Revision 10 Job Performance Measure No.:
2016 Admin  
- JPM A1a S RO  Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 347: Line 252:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT            UNSAT Examiners Signature:                                  Date:
2016 Admin - JPM A1a SRO                                  NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                             Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The plant is in Mode 1 at 100% RTP.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* ERFIS is inoperable.
The plant is in Mode 1 at 100% RTP. ERFIS is inoperable
* The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation.
. The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation
* Detector Currents are as follows:
. Detector Currents are as follows:
* N41: Upper - 105 / Normalizing - 123
N41: Upper  
* N41: Lower - 92 / Normalizing - 120
- 105 / Normalizing  
* N42: Upper - 92 / Normalizing - 109
- 123 N41: Lower  
* N42: Lower - 87 / Normalizing - 110
- 92 / Normalizing  
* N43: Upper - 83 / Normalizing - 104
- 120 N42: Upper  
* N43: Lower - 75 / Normalizing - 99
- 92 / Normalizing  
* N44: Upper - 80 / Normalizing - 97
- 109 N42: Lower  
* N44: Lower - 75 / Normalizing - 95 INITIATING CUE:
- 87 / Normalizing  
* The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT.
- 110   N43: Upper  
* Round all calculations to three decimal places (Example:
- 83 / Normalizing  
1.2348 would be rounded to 1.235)
- 104   N43: Lower  
* Identify whether or not any limitations have been exceeded, and if so, what, if any ACTION, is required.
- 75 / Normalizing  
NUREG 1021, Revision 10
- 99 N44: Upper  
- 80 / Normalizing  
- 97 N44: Lower  
- 75 / Normalizing  
- 95     INITIATING CUE:
The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP
-007, QUADRANT POWER TILT
. Round all calculations to three decimal places (Example: 1.2348 would be rounded to 1.235)   Identify whether or not any limitations have been exceeded, and if so, what, if any ACTION, is required
.
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Admin
- JPM A1 b RO (Rev_010816)  NUREG 1021, Revision 10


JPM A 1 b RO     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet JPM A1b RO Developed By:     ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:     ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Admin - JPM A1b RO (Rev_010816)                  NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 7 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                           Page 2 of 7                           Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                                 Task No.:
- JPM A1 b RO  NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Determine License Status                   JPM No.:     2016 Admin - JPM A1b RO K/A  
Determine License Status JPM No.: 2016 Admin  
- JPM A1 b RO     K/A  


==Reference:==
==Reference:==
2.1.4 (3.3)
2.1.4 (3.3)
Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                         Actual Performance:         X Classroom           X     Simulator             Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
X Classroom X Simulator Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
Initial Conditions:
Initial Conditions:
You are a Licensed Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
* You are a Licensed Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
Your last medical exam was on 11/17/14.
* Your last medical exam was on 11/17/14.
Your last SCBA quantitative and qualitative fit test was on 1/18/1
* Your last SCBA quantitative and qualitative fit test was on 1/18/15.
: 5. You have attended all required LOCT training sessions, and passed all exams administered.
* You have attended all required LOCT training sessions, and passed all exams administered.
Your supervisor has directed you to maintain your license active AND qualified to stand watch.
* Your supervisor has directed you to maintain your license active AND qualified to stand watch.
Your Control Room work history in the last three months is as follows:   11/26/15, BOP for 12 hours (Day Shift) 1/2/1 6, RO for 8 hours (Night Shift 1800
* Your Control Room work history in the last three months is as follows:
-2400)   1/4/1 6, Extra Operator for 4 hours assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
* 11/26/15, BOP for 12 hours (Day Shift)
1/10/1 6, BOP for 12 hours (Day Shift)
* 1/2/16, RO for 8 hours (Night Shift 1800-2400)
* 1/4/16, Extra Operator for 4 hours assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
* 1/10/16, BOP for 12 hours (Day Shift) 2016 Admin - JPM A1b RO                                                      NUREG 1021, Revision 10


Appendix C Page 3 of 7 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                       Page 3 of 7                         Form ES-C-1 Job Performance Measure Worksheet Initiating Cue:         Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.
- JPM A1 b RO  NUREG 1021, Revision 10 Initiating Cue:
Task Standard:           The operator will evaluate their work history and identify that four 12-hour shifts must be completed as either the RO or the BOP prior to the end of the quarter to maintain their license ACTIVE, and that an SCBA quantitative and qualitative fit test must be completed prior to standing watch in the Control Room again.
Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE
Required Materials:     Calculator General  
; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room
. Task Standard:
The operator will evaluate their work history and identify that four 12
-hour shifts must be completed as either the RO or the BOP prior to the end of the quarter to maintain their license ACTIVE, and that an SCBA quantitative and qualitative fit test must be completed prior to standing watch in the Control Room again
. Required Materials:
Calculator General  


==References:==
==References:==
OMM-001-5 (Training and Qualification), Rev 53 AD-OP-ALL-1000 (Conduct of Operations), Rev 4 Handouts:                None Time Critical Task:      NO Validation Time:        6 minutes Critical Step Justification Step 1        This step is critical because identifying the watches that must be completed before the end of the quarter is necessary to maintain the license status ACTIVE.
Step 2        This step is critical because identifying the requirement to complete an annual fit test is necessary to maintain the ability to stand watch in the Control Room.
2016 Admin - JPM A1b RO                                                  NUREG 1021, Revision 10


OMM-00 1-5 (Training and Qualification), Rev 5 3  AD-OP-ALL-1000 (Conduct of Operations), Rev 4  Handouts: None  Time Critical Task:
Appendix C                                       Page 4 of 7                     Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
NO  Validation Time:
6 minutes        Critical Step Justification Step 1 This step is critical because identifying the watches that must be completed before the end of the quarter is necessary to maintain the license status ACTIVE
. Step 2 This step is critical because identifying the requirement to complete an annual fit test is necessary to maintain the ability to stand watch in the Control Room
.
Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
- JPM A1 b RO  NUREG 1021, Revision 10 (Critical Steps are identified as such in right
-hand column)
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
START TIME:
START TIME:
STEP 1: Identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE
STEP 1:         Identify any requirements that must be met prior to the end of the       CRITICAL quarter that are required to maintain your license ACTIVE.                STEP
. STANDARD: The operator identifies that ROs must stand a minimum number of hours in a Licensed position, satisfactorily participate in the Licensed Operator Continuing Training Program, and have a biennial medical exam; and conclude s that the LOCT and Medical requirements have been met
___ SAT STANDARD:             The operator identifies that ROs must stand a minimum number of hours in a Licensed position, satisfactorily participate in the Licensed Operator Continuing Training Program, and have a biennial medical exam; and concludes
. The operator recognizes that Individuals with RO Licenses may maintain an active license by standing watch a minimum of five 12 hour shifts per calendar quarter as RO or BOP
___ UNSAT that the LOCT and Medical requirements have been met.
. The operator recognizes that the work on 11/26/15 does not count towards this calendar-quarter's number of watches.
The operator recognizes that Individuals with RO Licenses may maintain an active license by standing watch a minimum of five 12 hour shifts per calendar quarter as RO or BOP.
The operator recognizes that the work on 1/2/1 6 does not count towards the minimum of five 12
The operator recognizes that the work on 11/26/15 does not count towards this calendar-quarters number of watches.
-hour shifts.
The operator recognizes that the work on 1/2/16 does not count towards the minimum of five 12-hour shifts.
The operator recognizes that the work on 1/4/16 does not count towards the minimum of five 12-hour shifts; because it was not stood as the BOP or the RO.
The operator recognizes that the work on 1/10/16 does count towards the minimum of five 12-hour shifts; and concludes that 4 additional 12-hour shifts as either the RO or BOP must be completed before the end of the quarter.
EXAMINERS CUE:                NONE EXAMINERS NOTE:                See Section 5.3 of OMM-001-5.
COMMENTS:
2016 Admin - JPM A1b RO                                              NUREG 1021, Revision 10


The operator recognizes that the work on 1/4/1 6 does not count towards the minimum of five 12
Appendix C                                     Page 5 of 7                           Form ES-C-1 PERFORMANCE INFORMATION STEP 2:     Identify the requirements that are required to maintain your                   CRITICAL qualification to stand watch in the Control Room.                                 STEP STANDARD: The operator recognizes that in order to maintain qualification to stand         ___ SAT watch in the Control Room, the operator must be Respirator Qualified as defined in the section on Maintaining License and Qualification Active Status; and that this section requires an SCBA quantitative and qualitative fit test annually.                                                 ___ UNSAT The operator recognizes that the last SCBA quantitative and qualitative fit test was over a year ago, and identifies that this fit test must be completed prior to standing a watch in the Control Room.
-hour shifts; because it was not stood as the BOP or the RO.
EXAMINERS CUE:                 NONE EXAMINERS NOTE:                 NONE COMMENTS:
The operator recognizes that the work on 1/10/1 6 does count towards the minimum of five 12
Terminating Cue:                 Evaluation on this JPM is complete.
-hour shifts; and concludes that 4 additional 12
-hour shifts as either the RO or BOP must be completed before the end of the quarter. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
See Section 5.3 of OMM
-001-5. COMMENTS:        CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
- JPM A1 b RO  NUREG 1021, Revision 10 STEP 2: Identify the requirements that are required to maintain your qualification to stand watch in the Control Room.
STANDARD: The operator recognizes that in order to maintain qualification to stand watch in the Control Room, the operator must be Respirator Qualified as defined in the section on Maintaining License and Qualification Active Status; and that this section requires an SCBA quantitative and qualitative fit test annually.
The operator recognizes that the last SCBA quantitative and qualitative fit test was over a year ago, and identifies that this fit test must be completed prior to standing a watch in the Control Room.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE COMMENTS:     CRITICAL STEP  ___ SAT    ___ UNSAT            Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Admin - JPM A1b RO                                                NUREG 1021, Revision 10


Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Admin
Appendix C                             Page 6 of 7               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A1b RO Examinees Name:
- JPM A1 b RO  NUREG 1021, Revision 10 Job Performance Measure No.:
2016 Admin  
- JPM A1 b RO   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 469: Line 337:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT            UNSAT Examiners Signature:                                Date:
2016 Admin - JPM A1b RO                                  NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                                         Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* You are a Licensed Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* Your last medical exam was on 11/17/14.
You are a Licensed Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
* Your last SCBA quantitative and qualitative fit test was on 1/18/15.
Your last medical exam was on 11/17/14.
* You have attended all required LOCT training sessions, and passed all exams administered.
Your last SCBA quantitative and qualitative fit test was on 1/18/1 5. You have attended all required LOCT training sessions, and passed all exams administered.
* Your supervisor has directed you to maintain your license active AND qualified to stand watch.
Your supervisor has directed you to maintain your license active AND qualified to stand watch.
* Your Control Room work history in the last three months is as follows:
Your Control Room work history in the last three months is as follows:   11/26/15, BOP for 12 hours (Day Shift) 1/2/1 6, RO for 8 hours (Night Shift 1800
* 11/26/15, BOP for 12 hours (Day Shift)
-2400)   1/4/1 6, Extra Operator for 4 hours assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
* 1/2/16, RO for 8 hours (Night Shift 1800-2400)
1/10/1 6, BOP for 12 hours (Day Shift)   INITIATING CUE:
* 1/4/16, Extra Operator for 4 hours assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.
* 1/10/16, BOP for 12 hours (Day Shift)
Requirements that must be met before the end of the quarter to maintain an ACTIVE License:         Requirements that must be to maintain your qualification to stand watch in the Control Room:        
INITIATING CUE:           Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.
Requirements that must be met before the end of the quarter to maintain an ACTIVE License:
Requirements that must be to maintain your qualification to stand watch in the Control Room:
NUREG 1021, Revision 10


Appendix C Job Performance Measure Form ES-C-1 Worksheet 2 016 Admin - JPM A1b SRO (Rev_010816) NUREG 1021, Revision 10
Appendix C                       Job Performance Measure             Form ES-C-1 Worksheet JPM A1b SRO Developed By:      ______________________________        Date: ___________
Instructor/Developer Concurred By:      ______________________________        Date: ___________
Line Superintendent/Supervisor SRO Approved By:      ______________________________        Date: ___________
Superintendent/Supervisor Training 2016 Admin - JPM A1b SRO (Rev_010816)                 NUREG 1021, Revision 10


JPM A 1b S RO      Developed By:
Appendix C                                           Page 2 of 7                           Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
______________________________
Task Title:             Determine License Status                   JPM No.:     2016 Admin - JPM A1b SRO K/A  
Date:  ___________
Instructor/Developer Concurred By:
______________________________
Date:  ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date:  ___________
Superintendent/Supervisor Training   
 
Appendix C Page 2 of 7 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
- JPM A1b S RO  NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Determine License Status JPM No.: 2016 Admin  
- JPM A1b S RO    K/A  


==Reference:==
==Reference:==
2.1.4 (3.3)
2.1.4 (3.3)
Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                         Actual Performance:         X Classroom           X     Simulator             Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
X Classroom X Simulator Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
Initial Conditions:
Initial Conditions:
You are a Licensed Senior Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
* You are a Licensed Senior Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
Your last medical exam was on 11/17/14.
* Your last medical exam was on 11/17/14.
Your last SCBA quantitative and qualitative fit test was on 1/18/1
* Your last SCBA quantitative and qualitative fit test was on 1/18/15.
: 5. You have attended all required LOCT training sessions, and passed all exams administered.
* You have attended all required LOCT training sessions, and passed all exams administered.
Your supervisor has directed you to maintain your license active AND qualified to stand watch.
* Your supervisor has directed you to maintain your license active AND qualified to stand watch.
Your Control Room work history in the last three months is as follows:   11/26/15, BOP for 12 hours (Day Shift) 1/2/1 6, RO for 8 hours (Night Shift 1800
* Your Control Room work history in the last three months is as follows:
-2400)   1/4/1 6, Extra Operator for 4 hours assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
* 11/26/15, BOP for 12 hours (Day Shift)
1/10/1 6 , CRS for 12 hours (Day Shift)
* 1/2/16, RO for 8 hours (Night Shift 1800-2400)
* 1/4/16, Extra Operator for 4 hours assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
* 1/10/16, CRS for 12 hours (Day Shift) 2016 Admin - JPM A1b SRO                                                    NUREG 1021, Revision 10


Appendix C Page 3 of 7 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                       Page 3 of 7                         Form ES-C-1 Job Performance Measure Worksheet Initiating Cue:         Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.
- JPM A1b S RO  NUREG 1021, Revision 10 Initiating Cue:
Task Standard:           The operator will evaluate their work history and identify that four 12-hour shifts must be completed as either the SM, CRS, RO or the BOP prior to the end of the quarter to maintain their license ACTIVE, and that an SCBA quantitative and qualitative fit test must be completed prior to standing watch in the Control Room again.
Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.
Required Materials:     Calculator General  
Task Standard:
The operator will evaluate their work history and identify that four 12
-hour shifts must be completed as either the SM, CRS, RO or the BOP prior to the end of the quarter to maintain their license ACTIVE, and that an SCBA quantitative and qualitative fit test must be completed prior to standing watch in the Control Room again
.      Required Materials:
Calculator General  


==References:==
==References:==
OMM-001-5 (Training and Qualification), Rev 53 AD-OP-ALL-1000 (Conduct of Operations), Rev 4 Handouts:                None Time Critical Task:      NO Validation Time:        7 minutes Critical Step Justification Step 1        This step is critical because identifying the watches that must be completed before the end of the quarter is necessary to maintain the license status ACTIVE.
Step 2        This step is critical because identifying the requirement to complete an annual fit test is necessary to maintain the ability to stand watch in the Control Room.
2016 Admin - JPM A1b SRO                                                NUREG 1021, Revision 10


OMM-001-5 (Training and Qualification), Rev 5 3  AD-OP-ALL-1000 (Conduct of Operations), Rev 4 Handouts: None  Time Critical Task:
Appendix C                                       Page 4 of 7                     Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
NO  Validation Time:
7 minutes      Critical Step Justification Step 1 This step is critical because identifying the watches that must be completed before the end of the quarter is necessary to maintain the license status ACTIVE.
Step 2 This step is critical because identifying the requirement to complete an annual fit test is necessary to maintain the ability to stand watch in the Control Room.
 
Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
- JPM A1b S RO  NUREG 1021, Revision 10 (Critical Steps are identified as such in right
-hand column)
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
START TIME:
START TIME:
STEP 1: Identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE.
STEP 1:         Identify any requirements that must be met prior to the end of the       CRITICAL quarter that are required to maintain your license ACTIVE.                 STEP STANDARD:             The operator identifies that SROs must stand a minimum
STANDARD: The operator identifies that SROs must stand a minimum number of hours in a Licensed position, satisfactorily participate in the Licensed Operator Continuing Training Program, and have a biennial medical exam; and conclude that the LOCT and Medical requirements have been met.
___ SAT number of hours in a Licensed position, satisfactorily participate in the Licensed Operator Continuing Training Program, and have a biennial medical exam; and conclude that the LOCT and Medical requirements have been met.
The operator recognizes that Individuals with SRO Licenses may maintain an active license by standing watch a minimum of five 12 hour shifts in a License required position, at least one of which must be in the SM or CRS position in the Main Control Room
___ UNSAT The operator recognizes that Individuals with SRO Licenses may maintain an active license by standing watch a minimum of five 12 hour shifts in a License required position, at least one of which must be in the SM or CRS position in the Main Control Room.
. The operator recognizes that the work on 11/26/15 does not count towards this calendar
The operator recognizes that the work on 11/26/15 does not count towards this calendar-quarters number of watches.
-quarter's number of watches.
The operator recognizes that the work on 1/2/16 does not count towards the minimum of five 12-hour shifts.
The operator recognizes that the work on 1/2/1 6 does not count towards the minimum of five 12
The operator recognizes that the work on 1/4/16 does not count towards the minimum of five 12-hour shifts; and was not stood as the SM, CRS, BOP or the RO.
-hour shifts.
The operator recognizes that the work on 1/10/16 does count towards the minimum of five 12-hour shifts; and concludes that 4 additional 12-hour shifts as either the SM, CRS, RO or BOP must be completed before the end of the quarter.
The operator recognizes that the work on 1/4/1 6 does not count towards the minimum of five 12
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               See Section 5.3 of OMM-001-5.
-hour shifts; and was not stood as the SM, CRS, BOP or the RO.
COMMENTS:
The operator recognizes that the work on 1/10/1 6 does count towards the minimum of five 12
2016 Admin - JPM A1b SRO                                                NUREG 1021, Revision 10
-hour shifts; and concludes that 4 additional 12
 
-hour shifts as either the SM, CRS, RO or BOP must be completed before the end of the quarter. EXAMINER'S CUE:
Appendix C                                     Page 5 of 7                           Form ES-C-1 PERFORMANCE INFORMATION STEP 2:     Identify the requirements that are required to maintain your                   CRITICAL qualification to stand watch in the Control Room.                                 STEP STANDARD: The operator recognizes that in order to maintain qualification to stand         ___ SAT watch in the Control Room, the operator must be Respirator Qualified as defined in the section on Maintaining License and Qualification Active Status; and that this section requires an SCBA quantitative and qualitative fit test annually.                                                 ___ UNSAT The operator recognizes that the last SCBA quantitative and qualitative fit test was over a year ago, and identifies that this fit test must be completed prior to standing a watch in the Control Room.
NONE   EXAMINER'S NOTE:
EXAMINERS CUE:                 NONE EXAMINERS NOTE:                 NONE COMMENTS:
See Section 5.3 of OMM
Terminating Cue:                 Evaluation on this JPM is complete.
-001-5. COMMENTS:     CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
- JPM A1b S RO  NUREG 1021, Revision 10 STEP 2: Identify the requirements that are required to maintain your qualification to stand watch in the Control Room.
STANDARD: The operator recognizes that in order to maintain qualification to stand watch in the Control Room, the operator must be Respirator Qualified as defined in the section on Maintaining License and Qualification Active Status; and that this section requires an SCBA quantitative and qualitative fit test annually.
The operator recognizes that the last SCBA quantitative and qualitative fit test was over a year ago, and identifies that this fit test must be completed prior to standing a watch in the Control Room.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE COMMENTS:       CRITICAL STEP  ___ SAT    ___ UNSAT Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Admin - JPM A1b SRO                                                NUREG 1021, Revision 10


Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Admin
Appendix C                             Page 6 of 7                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A1b SRO Examinees Name:
- JPM A1b S RO  NUREG 1021, Revision 10 Job Performance Measure No.:
2016 Admin  
- JPM A1b S RO  Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 575: Line 418:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT            UNSAT Examiners Signature:                                  Date:
2016 Admin - JPM A1b SRO                                  NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                                       Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* You are a Licensed Senior Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* Your last medical exam was on 11/17/14.
You are a Licensed Senior Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
* Your last SCBA quantitative and qualitative fit test was on 1/18/15.
Your last medical exam was on 11/17/14. Your last SCBA quantitative and qualitative fit test was on 1/18/1 5. You have attended all required LOCT training sessions, and passed all exams administered.
* You have attended all required LOCT training sessions, and passed all exams administered.
Your supervisor has directed you to maintain your license active AND qualified to stand watch.
* Your supervisor has directed you to maintain your license active AND qualified to stand watch.
Your Control Room work history in the last three months is as follows:   11/26/15, BOP for 12 hours (Day Shift) 1/2/1 6, RO for 8 hours (Night Shift 1800
* Your Control Room work history in the last three months is as follows:
-2400)   1/4/1 6, Extra Operator for 4 hours assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
* 11/26/15, BOP for 12 hours (Day Shift)
1/10/1 6 , CRS for 12 hours (Day Shift)
* 1/2/16, RO for 8 hours (Night Shift 1800-2400)
INITIATING CUE:
* 1/4/16, Extra Operator for 4 hours assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.
* 1/10/16, CRS for 12 hours (Day Shift)
Requirements that must be met before the end of the quarter to maintain an ACTIVE License:         Requirements that must be to maintain your qualification to stand watch in the Control Room:        
INITIATING CUE:           Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.
 
Requirements that must be met before the end of the quarter to maintain an ACTIVE License:
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Admin
Requirements that must be to maintain your qualification to stand watch in the Control Room:
- JPM A 2 RO (Rev_010816)  NUREG 1021, Revision 10
NUREG 1021, Revision 10


JPM A 2 RO     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet JPM A2 RO Developed By:     ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:     ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Admin - JPM A2 RO (Rev_010816)                  NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 7 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                           Page 2 of 7                         Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                                 Task No.:
- JPM A 2 RO  NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Determine Proper Equipment                 JPM No.:     2016 Admin - JPM A2 Boundaries                                              RO K/A  
Determine Proper Equipment Boundaries JPM No.: 2016 Admin - JPM A 2 RO     K/A  


==Reference:==
==Reference:==
2.2.41 (3.5)
2.2.41 (3.5)
Examinee: NRC Examiner:
Examinee:                                                       NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                             Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                         Actual Performance:       X Classroom           X     Simulator             Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
X Classroom X Simulator Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM). Initial Conditions:
* The plant is in Mode 1 at 100% power.
The plant is in Mode 1 at 100% power
* Charging Pump A suction relief valve CVC-2080 has failed open.
. Charging Pump "A" suction relief valve CVC
* The operating crew has entered AOP-016, Excessive Primary Plant Leakage, to control the plant.
-2080 has failed open.
Initiating Cue:             The CRS has directed you to use all available resources to identify the pump boundary valves needed to be closed to isolate the leak, and identify the motor breaker to electrically isolate the pump motor.
The operating crew has entered AOP
Task Standard:               The operator will identify that the leak can be isolated by closing three valves; CVC-270, CVC-290 and CVC-291, and that the pump motor can be electrically isolated by opening Breaker 52/34B.
-016, Excessive Primary Plant Leakage, to control the plant.
Required Materials:         Set of P&IDs available to the operator Set of EDPs available to the operator General  
Initiating Cue:
The CRS has directed you to use all available resources to identify the pump boundary valves needed to be closed to isolate the leak, and identify the motor breaker to electrically isolate the pump motor
. Task Standard:
The operator will identify that the leak can be isolated by closing three valves; CVC
-270, CVC-290 and CVC
-291, and that the pump motor can be electrically isolated by opening Breaker 52/34B
. Required Materials:
Set of P&IDs available to the operator Set of EDPs available to the operator General  


==References:==
==References:==
P&ID 5379-685 Sheet 2 of 3 (Chemical and Volume Control System Purification and Makeup Flow Diagram), Rev 61 2016 Admin - JPM A2 RO                                                      NUREG 1021, Revision 10


P&ID 5379-685 Sheet 2 of 3 (Chemical and Volume Control System Purification and Makeup Flow Diagram), Rev 61 Appendix C Page 3 of 7 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                       Page 3 of 7                     Form ES-C-1 Job Performance Measure Worksheet EDP-002 (480V AC Busses), Rev 16 OWP-005 (Chemical and Volume Control System (CVCS)), Rev 65 Handouts:               None Time Critical Task:     NO Validation Time:         5 minutes Critical Step Justification Step 1       This step is critical because closing CVC-270, CV-290 and CVC-291 is necessary to isolate the leak.
- JPM A 2 RO  NUREG 1021, Revision 10 EDP-002 (480V AC Busses), Rev 16 OWP-005 (Chemical and Volume Control System (CVCS)), Rev 65 Handouts: None   Time Critical Task:
Step 2       This step is critical because opening Breaker 52/34B is necessary to electrically isolate the A Charging Pump.
NO   Validation Time:
2016 Admin - JPM A2 RO                                              NUREG 1021, Revision 10
5 minutes       Critical Step Justification Step 1 This step is critical because closing CVC-270, CV-290 and CVC
-291 is necessary to isolate the leak
. Step 2 This step is critical because opening Breaker 52/34B is necessary to electrically isolate the "A" Charging Pump.


Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
Appendix C                                     Page 4 of 7                       Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- JPM A 2 RO  NUREG 1021, Revision 10 (Critical Steps are identified as such in right
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
-hand column)
START TIME:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM)
STEP 1:         Review P&IDs to determine pump boundary valves.                         CRITICAL STEP STANDARD:       The operator reviews the set of P&IDs, and determines that the boundary valves associated with the A Charging Pump and its
. START TIME:
___ SAT relief valve are located on P&ID 5379-685 Sheet 2 of 3 (Chemical and Volume Control System Purification and Makeup Flow Diagram).
STEP 1: Review P&IDs to determine pump boundary valves.
___ UNSAT As a MINIMUM, the operator identifies the following valves are required to be verified in the selected positions to ensure that the leak flow path is isolated :
STANDARD: The operator reviews the set of P&IDs, and determines that the boundary valves associated with the "A" Charging Pump and its relief valve are located on P&ID 5379-685 Sheet 2 of 3 (Chemical and Volume Control System Purification and Makeup Flow Diagram). As a MINIMUM, the operator identifies the following valves are required to be verified in the selected positions to ensure that the leak flow path is isolated
* CVC-270, Charging Pump A Suction - CLOSED
CVC-270, Charging Pump A Suction  
* CVC-290, Charging Pump A to Charging Line - CLOSED
- CLOSED CVC-290, Charging Pump A to Charging Line  
* CVC-291, Charging Pump A to Seal Injection - CLOSED EXAMINERS CUE:                 NONE EXAMINERS NOTE:               This JPM consists of identifying the boundaries necessary to isolate the leakage path from Charging Pump A suction relief valve CVC-2080. The sequence of the component isolation is NOT required for the performance of this JPM.
- CLOSED CVC-291, Charging Pump A to Seal Injection  
Not required for credit. Additional isolation valves that can be included are as follows:
- CLOSED   EXAMINER'S CUE:
* CVC-465, Charging Pump A Suction Vent - CLOSED
NONE   EXAMINER'S NOTE:
* CVC-275F, Charging Pump A Suction Line Vent - CLOSED
This JPM consists of identifying the boundaries necessary to isolate the leakage path from Charging Pump A suction relief valve CVC
* CVC-280C, Charging Pump A Drain - CLOSED
-2080. The sequence of the component isolation is NOT required for the performance of this JPM.
* CVC-400A, Charging Pump A Leakage Isolation - OPEN
Not required for credit.
* CVC-277C, Charging Pump A Recirc Root - CLOSED CVC-466, Charging Pump A Suction Stabilizer Drain - OPEN COMMENTS:
Additional isolation valves that can be included are as follows:
2016 Admin - JPM A2 RO                                                 NUREG 1021, Revision 10
CVC-465, Charging Pump A Suction Vent  
- CLOSED CVC-275F, Charging Pump A Suction Line Vent  
- CLOSED CVC-280C, Charging Pump A Drain  
- CLOSED CVC-400A, Charging Pump A Leakage Isolation  
- OPEN CVC-277C, Charging Pump A Recirc Root  
- CLOSED CVC-466, Charging Pump A Suction Stabilizer Drain - OPEN COMMENTS:       CRITICAL STEP
___ SAT    ___ UNSAT Appendix C Page 5 of 7 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin  
- JPM A 2 RO NUREG 1021, Revision 10 STEP 2: Determine the power supply to Charging Pump "A". STANDARD: The operator reviews the EDPs and determines that EDP
-002 must be addressed
. As a MINIMUM the operator that Charging Pump A power supply is breaker 52/34B must be OPENED.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE: The sequence of the component isolation is NOT required for the performance of this JPM.


Not required for credit.
Appendix C                                      Page 5 of 7                    Form ES-C-1 PERFORMANCE INFORMATION STEP 2:        Determine the power supply to Charging Pump A.                        CRITICAL STEP STANDARD: The operator reviews the EDPs and determines that EDP-002 must              ___ SAT be addressed.
Additional breakers/switches that can be included                           are as follows:
As a MINIMUM the operator that Charging Pump A power supply is breaker 52/34B must be OPENED.
RTGB Control switch for Charging Pump A  
___ UNSAT EXAMINERS CUE:                  NONE EXAMINERS NOTE:                The sequence of the component isolation is NOT required for the performance of this JPM.
- CAPPED Power Panel 37 Circuit 2, Charging Pump A Suction Stabilizer Heater Breaker  
Not required for credit. Additional breakers/switches that can be included are as follows:
- OPEN     COMMENTS:     CRITICAL STEP  ___ SAT    ___ UNSAT            Terminating Cue:
* RTGB Control switch for Charging Pump A - CAPPED
Evaluation on this JPM is complete.
* Power Panel 37 Circuit 2, Charging Pump A Suction Stabilizer Heater Breaker -
OPEN COMMENTS:
Terminating Cue:                 Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Admin - JPM A2 RO                                                NUREG 1021, Revision 10


Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Admin
Appendix C                             Page 6 of 7               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A2 RO Examinees Name:
- JPM A 2 RO  NUREG 1021, Revision 10 Job Performance Measure No.: 2016 Admin  
- JPM A2 RO   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 685: Line 501:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT            UNSAT Examiners Signature:                                Date:
2016 Admin - JPM A2 RO                                  NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                                 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The plant is in Mode 1 at 100% power.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* Charging Pump A suction relief valve CVC-2080 has failed open.
The plant is in Mode 1 at 100% power
* The operating crew has entered AOP-016, Excessive Primary Plant Leakage, to control the plant.
. Charging Pump "A" suction relief valve CVC
INITIATING CUE:     The CRS has directed you to use all available resources to identify the pump boundary valves needed to be closed to isolate the leak, and identify the motor breaker to electrically isolate the pump motor.
-2080 has failed open. The operating crew has entered AOP
NUREG 1021, Revision 10
-016, Excessive Primary Plant Leakage, to control the plant.
INITIATING CUE:
The CRS has directed you to use all available resources to identify the pump boundary valves needed to be closed to isolate the leak, and identify the motor breaker to electrically isolate the pump motor.
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Admin
- JPM A2 SRO (Rev_010816)  NUREG 1021, Revision 10


JPM A 2 S RO      Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet JPM A2 SRO Developed By:     ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:     ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Admin - JPM A2 SRO (Rev_010816)                  NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 15 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                       Page 2 of 15                           Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- JPM A2 SRO NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Determine if Mode Change is               JPM No.:     2016 Admin - JPM A2 Permissible                                            SRO K/A  
Determine if Mode Change is Permissible JPM No.: 2016 Admin - JPM A 2 S RO    K/A  


==Reference:==
==Reference:==
2.2.38 (4.5)
2.2.38 (4.5)
Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                       Actual Performance:       X Classroom           X     Simulator             Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
Provide Operator with Initial Conditions/Cue and the Available Equipment Inoperable List (Last Two Pages of this JPM), and Handout 1.
X Classroom X Simulator Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Provide Operator with Initial Conditions/Cue and the Available Equipment Inoperable List (Last Two Page s of this JPM), and Handout
* The plant is in Mode 5, returning from a refueling outage.
: 1. Initial Conditions:
* RCS temperature is 165°F and there is a bubble in the PZR.
The plant is in Mode 5, returning from a refueling outage.
* RHR Loop A is maintaining RCS temperature.
RCS temperature is 165°F and there is a bubble in the PZR.
* You are an extra SRO assigned to support the shift during re-start activities.
RHR Loop "A" is maintaining RCS temperature.
* An Inoperable Equipment List is available.
You are an extra SRO assigned to support the shift during re
-start activities.
An Inoperable Equipment List is available.
Initiating Cue:
Initiating Cue:
The SM has directed you to complete the attached partially completed OMM
* The SM has directed you to complete the attached partially completed OMM-001-12, MINIMUM EQUIPMENT LIST AND SHIFT RELIEF, Att. 2, 200°F to 350°F (MODE 4) MEL that was started on the previous shift and determine if any Mode 4 restrictions exist.
-001-12, MINIMUM EQUIPMENT LIST AND SHIFT RELIEF, Att. 2, 200°F to 350°F (MODE 4) MEL that was started on the previous shift and determine if any Mode 4 restrictions exist
* The SM has indicated that it is expected to make the Mode change without reliance upon Technical Specification 3.0.4.b.
. The SM has indicated that it is expected to make the Mode change without reliance upon Technical Specification 3.0.4.b.
2016 Admin - JPM A2 SRO                                                    NUREG 1021, Revision 10


Appendix C Page 3 of 15 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                     Page 3 of 15                       Form ES-C-1 Job Performance Measure Worksheet Task Standard:         The operator will evaluate the Technical Specifications/Technical Requirements against the Inoperable Equipment List and listed parameters and determines that CCW Pump C, V6-16B, WCCU-1A must be restored to operable prior to changing modes; that CVT 1 must be repaired and Instrument Bus 1 must be powered from MCC-5 prior to changing modes, and that DFO Storage tank level must be raised to > 19000 gallons prior to changing modes per the provided KEY.
- JPM A2 SRO NUREG 1021, Revision 10 Task Standard:
Required Materials:   Robinson Technical Specifications and Basis must be available.
The operator will evaluate the Technical Specifications/Technical Requirements against the Inoperable Equipment List and listed parameters and determines that CCW Pump "C", V6
-16B, WCCU-1A must be restored to operable prior to changing modes; that CVT 1 must be repaired and Instrument Bus 1 must be powered from MCC-5 prior to changing modes , and that DFO Storage tank level must be raised to > 19000 gallons prior to changing modes per the provided KEY. Required Materials:
Robinson Technical Specifications and Basis must be available.
General  
General  


==References:==
==References:==
OMM-001-12 (Minimum Equipment List and Shift Relief), Rev 85 Technical Specifications for H. B. Robinson Steam Electric Plant Unit No. 2 Handouts:              Handout 1: Attachment 2 of OMM-001-12 marked up for this JPM Time Critical Task:    NO Validation Time:      15 minutes Critical Step Justification Step 9        This step is critical because LCO 3.7.6 is NOT met, and meeting this LCO is necessary to change Modes.
Step 10      This step is critical because LCO 3.7.7 is NOT met, and meeting this LCO is necessary to change Modes.
Step 11      This step is critical because LCO 3.7.10 is NOT met, and meeting this LCO is necessary to change Modes.
Step 12      This step is critical because LCO 3.8.3 is NOT met, and meeting this LCO is necessary to change Modes.
Step 14      This step is critical because LCO 3.8.7 is NOT met, and meeting this LCO is necessary to change Modes.
Step 15      This step is critical because LCO 3.8.9 is NOT met, and meeting this LCO is necessary to change Modes.
Step 18      This step is critical because the report to the SM must be correct prior to changing Modes.
2016 Admin - JPM A2 SRO                                              NUREG 1021, Revision 10
Appendix C                                      Page 4 of 15                    Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
Provide Operator with Initial Conditions/Cue and the Available Equipment Inoperable List (Last Two Pages of this JPM), and Handout 1.
START TIME:
STEP 1:        Evaluate ITS LCO 3.4.17 requirements.
___ SAT STANDARD:      The operator recognizes that 2 Charging Pumps must be OPERABLE, and that the A Charging Pump is inoperable.
The operator determines minimum requirement is met with B and
___ UNSAT C Charging Pumps OPERABLE, and initials the appropriate block.
The operator recognizes that the Seal Water Injection flow to EACH of the RCPs is greater than 6 gpm, and initials the appropriate block.
EXAMINERS CUE:                  NONE EXAMINERS NOTE:                This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
STEP 2:        Evaluate ITS LCO 3.5.4 requirements.
___ SAT STANDARD: The operator recognizes that the RWST level is greater than 91 %,
and initials the appropriate block.
The operator recognizes that the RWST Boron concentration is          ___ UNSAT 1950 ppm and  2400 ppm, and initials the appropriate block.
The operator recognizes that the RWST temperature is  45°F and 100°F, and initials the appropriate block.
EXAMINERS CUE:                  NONE EXAMINERS NOTE:                This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
2016 Admin - JPM A2 SRO                                              NUREG 1021, Revision 10
Appendix C                                    Page 5 of 15                      Form ES-C-1 PERFORMANCE INFORMATION STEP 3:      Evaluate ITS LCO 3.6.4 requirements.
___ SAT STANDARD: The operator recognizes that the Containment Pressure is  -0.8 psig AND  +1.0 psig, and initials the appropriate block.
___ UNSAT EXAMINERS CUE:                NONE EXAMINERS NOTE:              This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
STEP 4:      Evaluate ITS LCO 3.6.5 requirements.
___ SAT STANDARD: The operator recognizes that the Containment Air Temperature is 120°F, and initials the appropriate block.
___ UNSAT EXAMINERS CUE:                NONE EXAMINERS NOTE:              This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
STEP 5:      Evaluate ITS LCO 3.6.7 requirements.
___ SAT STANDARD: The operator recognizes that the Spray Additive Tank Level is 32%,
and initials the appropriate block.
The operator recognizes that the Spray Additive Tank concentration is    ___ UNSAT 30% NAOH, and initials the appropriate block.
EXAMINERS CUE:                NONE EXAMINERS NOTE:              This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
2016 Admin - JPM A2 SRO                                          NUREG 1021, Revision 10
Appendix C                                    Page 6 of 15                      Form ES-C-1 PERFORMANCE INFORMATION STEP 6:      Evaluate ITS LCO 3.6.8 requirements.
___ SAT STANDARD: The operator recognizes that the IVSW pressure is 49 psig as indicated locally on PI-1910, and initials the appropriate block.
The operator recognizes that the IVSW tank level is 49%, and initials    ___ UNSAT the appropriate block.
EXAMINERS CUE:                NONE EXAMINERS NOTE:              This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
STEP 7:        Evaluate ITS LCO 3.7.4 requirements.
___ SAT STANDARD:      The operator recognizes that 1 MDAFW Pump (LCO-3.0.4.b N/A) is required to be OPERABLE, and that the B MDAFW Pump is inoperable.
The operator determines minimum requirement is met with the A        ___ UNSAT MDAFW Pump OPERABLE, and initials the appropriate block.
EXAMINERS CUE:                NONE EXAMINERS NOTE:              This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
STEP 8:        Evaluate ITS LCO 3.7.5 requirements.
STANDARD:      The operator recognizes that the Condensate Storage Tank level is      ___ SAT 26%, and initials the appropriate block.
EXAMINERS CUE:                NONE
___ UNSAT EXAMINERS NOTE:              This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
2016 Admin - JPM A2 SRO                                              NUREG 1021, Revision 10
Appendix C                                  Page 7 of 15                      Form ES-C-1 PERFORMANCE INFORMATION STEP 9:      Evaluate ITS LCO 3.7.6 requirements.                                      CRITICAL STEP STANDARD: The operator recognizes that 2 Trains powered from Emergency Power supplies ("B" and "C" pumps) are required to be OPERABLE,
___ SAT and that the C CCW Pump is inoperable.
The operator determines that the C CCW Pump must be restored to OPERABLE prior to changing modes, and does NOT initial the              ___ UNSAT associated block.
EXAMINERS CUE:              NONE EXAMINERS NOTE:              This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
STEP 10:      Evaluate ITS LCO 3.7.7 requirements.                                    CRITICAL STEP STANDARD:      The operator recognizes that the Turbine Bldg Loop Isolation valves are required to be OPERABLE, and that V6-16B is inoperable.
___ SAT The operator determines that V6-16B must be restored to OPERABLE prior to changing modes, and does NOT initial the associated block.
___ UNSAT EXAMINERS CUE:              NONE EXAMINERS NOTE:              This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
2016 Admin - JPM A2 SRO                                          NUREG 1021, Revision 10


OMM-001-12 (Minimum Equipment List and Shift Relief), Rev 8 5  Technical Specifications for H. B. Robinson Steam Electric Plant Unit No. 2  Handouts: Handout 1: Attachment 2 of OMM
Appendix C                                   Page 8 of 15                       Form ES-C-1 PERFORMANCE INFORMATION STEP 11:     Evaluate ITS LCO 3.7.10 requirements.                                   CRITICAL STEP STANDARD:     The operator recognizes that 2 HVAC WCCU Trains are required to be OPERABLE, and that WCCU-1A is inoperable.                           ___ SAT The operator determines that WCCU-1A must be restored to OPERABLE prior to changing modes, and does NOT initial the associated block.                                                       ___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:             This evaluation can be made in ANY order. See provided KEY.
-001-12 marked up for this JPM Time Critical Task:
COMMENTS:
NO  Validation Time:
STEP 12:     Evaluate ITS LCO 3.8.3 requirements.                                     CRITICAL STEP STANDARD:     The operator recognizes that 19,000 gallons is NOT available from DFO Storage tank, and recognizes that tank level must be          ___ SAT raised to > 19000 gallons prior to changing modes, and does NOT initial the associated block.
15 minutes        Critical Step Justification Step 9 This step is critical because LCO 3.7.6 is NOT met, and meeting this LCO is necessary to change Modes
The operator recognizes that  15,000 gallons is available from Unit    ___ UNSAT 1 IC Turbine Fuel Oil Storage tanks, and initials the appropriate block. (Not Critical)
. Step 10 This step is critical because LCO 3.7.7 is NOT met, and meeting this LCO is necessary to change Modes.
The operator recognizes that the A EDG Air receiver pressure is greater than 210 psig, and initials the appropriate block. (Not Critical)
Step 11 This step is critical because LCO 3.7.10 is NOT met, and meeting this LCO is necessary to change Modes.
The operator recognizes that the B EDG Air receiver pressure is greater than 210 psig, and initials the appropriate block. (Not Critical)
Step 12 This step is critical because LCO 3.8.3 is NOT met, and meeting this LCO is necessary to change Modes.
EXAMINERS CUE:               NONE EXAMINERS NOTE:             This evaluation can be made in ANY order. See provided KEY.
Step 14 This step is critical because LCO 3.8.7 is NOT met, and meeting this LCO is necessary to change Modes.
COMMENTS:
Step 15 This step is critical because LCO 3.8.9 is NOT met, and meeting this LCO is necessary to change Modes.
2016 Admin - JPM A2 SRO                                             NUREG 1021, Revision 10
Step 18 This step is critical because the report to the SM must be correct prior to changing Modes.
Appendix C Page 4 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
- JPM A2 SRO NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column)
Provide Operator with Initial Conditions/Cue and the Available Equipment Inoperable List (Last Two Page s of this JPM), and Handout
: 1. START TIME:
STEP 1: Evaluate ITS LCO 3.4.17 requirements.
STANDARD: The operator recognizes that 2 Charging Pumps must be OPERABLE, and that the "A" Charging Pump is inoperable.
The operator determines minimum requirement is met with "B" and "C" Charging Pumps OPERABLE, and initials the appropriate block
. The operator recognizes that the Seal Water Injection flow to EACH of the RCPs is greater than 6 gpm, and initials the appropriate block. EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:       ___ SAT    ___ UNSAT  STEP 2: Evaluate ITS LCO 3.5.4 requirements.
STANDARD: The operator recognizes that the RWST level is greater than 91 %, and initials the appropriate block.
initials the appropriate block.
100°F, and initials the appropriate block.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:       ___ SAT    ___ UNSAT Appendix C Page 5 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin  
- JPM A2 SRO NUREG 1021, Revision 10 STEP 3: Evaluate ITS LCO 3.6.4 requirements.
STANDARD: -0.8 psig AND    EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.


Appendix C                                    Page 9 of 15                  Form ES-C-1 PERFORMANCE INFORMATION STEP 13:      Evaluate ITS LCO 3.8.4 requirements.
___ SAT STANDARD:    The operator recognizes that MCC-A Voltage is > 126 VDC, and initials the appropriate block.
The operator recognizes that MCC-B Voltage is > 126 VDC, and        ___ UNSAT initials the appropriate block.
EXAMINERS CUE:                NONE EXAMINERS NOTE:              This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
COMMENTS:
___ SAT    ___ UNSAT  STEP 4: Evaluate ITS LCO 3.6.5 requirements.
STEP 14:     Evaluate ITS LCO 3.8.7 requirements.                                 CRITICAL STEP STANDARD:     The operator recognizes that Inverter A Voltage is > 114 VAC, and    ___ SAT initials the appropriate block. (Not Critical)
STANDARD: The operator recognizes that the Containment Air Temperature is block. EXAMINER'S CUE:
The operator recognizes that Inverter B Voltage is > 114 VAC, and initials the appropriate block. (Not Critical)                      ___ UNSAT The operator recognizes that CVT 1, must be OPERABLE, and that that it is currently inoperable.
NONE  EXAMINER'S NOTE:
The operator determines that CVT 1 must be restored to OPERABLE prior to changing modes, and does NOT initial the associated block.
This evaluation can be made in ANY order.
EXAMINERS CUE:               NONE EXAMINERS NOTE:               This evaluation can be made in ANY order. See provided KEY.
See provided KEY.
COMMENTS:    ___ SAT   ___ UNSAT  STEP 5: Evaluate ITS LCO 3.6.7 requirements.
STANDARD: The operator recognizes that the Spray Additive and initials the appropriate block.
The operator recognizes that the Spray Additive Tank concentration is   EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
This evaluation can be made in ANY order
. See provided KEY.
COMMENTS:    ___ SAT    ___ UNSAT Appendix C Page 6 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin
- JPM A2 SRO NUREG 1021, Revision 10 STEP 6: Evaluate ITS LCO 3.6.8 requirements.
STANDARD: indicated locally on PI
-1910, and initials the appropriate block.
The the appropriate block.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:    ___ SAT    ___ UNSAT   STEP 7: Evaluate ITS LCO 3.7.4 requirements.
STANDARD: The operator recognizes that 1 MDAFW Pump (LCO
-3.0.4.b N/A) is required to be OPERABLE, and that the "B" MDAFW Pump is inoperable.
The operator determines minimum requirement is met with the "A" MDAFW Pump OPERABLE, and initials the appropriate block.
EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:
COMMENTS:
___ SAT    ___ UNSAT  STEP 8: Evaluate ITS LCO 3.7.5 requirements.
2016 Admin - JPM A2 SRO                                           NUREG 1021, Revision 10
STANDARD: The operator recognizes that the Condensate Storage Tank level is  EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:      ___ SAT    ___ UNSAT Appendix C Page 7 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin
- JPM A2 SRO NUREG 1021, Revision 10 STEP 9: Evaluate ITS LCO 3.7.6 requirements.
STANDARD: The operator recognizes that 2 Trains powered from Emergency Power supplies ("B" and "C" pumps) are required to be OPERABLE, and that the "C" CCW Pump is inoperable.
The operator determines that the "C" CCW Pump must be restored to OPERABLE prior to changing modes , and does NOT initial the associated block. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:      CRITICAL STEP  ___ SAT    ___ UNSAT  STEP 10: Evaluate ITS LCO 3.7.
7 requirements.
STANDARD: The operator recognizes that the Turbine Bldg Loop Isolation valves are required to be OPERABLE, and that V6-16B is inoperable.
The operator determines that V6
-16B must be restored to OPERABLE prior to changing modes , and does NOT initial the associated block. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:      CRITICAL STEP
___ SAT    ___ UNSAT Appendix C Page 8 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin
- JPM A2 SRO NUREG 1021, Revision 10 STEP 11: Evaluate ITS LCO 3.7.10 requirements.
STANDARD: The operator recognizes that 2 HVAC WCCU Trains are required to be OPERABLE, and that WCCU
-1A is inoperable.
The operator determines that WCCU
-1A must be restored to OPERABLE prior to changing modes , and does NOT initial the associated block. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:    CRITICAL STEP
___ SAT    ___ UNSAT  STEP 12: Evaluate ITS LCO 3.8.3 requirements.
STANDARD: NOT available from DFO Storage tank, and recognizes that tank level must be raised to > 19000 gallons prior to changing modes , and does NOT initial the associated block. 0 gallons is available from Unit 1 IC Turbine Fuel Oil Storage tanks, and initials the appropriate block. (Not Critical)
The operator recognizes that the "A" EDG Air receiver pressure is greater than 210 psig, and initials the appropriate block.
(Not Critical)  The operator recognizes that the "B" EDG Air receiver pressure is greater than 210 psig, and initials the appropriate block.
(Not Critical)
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:    CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 9 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin  
- JPM A2 SRO NUREG 1021, Revision 10 STEP 13: Evaluate ITS LCO 3.8.4 requirements.
STANDARD: The operator recognizes that MCC
-A Voltage is > 126 VDC, and initials the appropriate block.
The operator recognizes that MCC-B Voltage is > 126 VDC, and initials the appropriate block.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:    ___ SAT    ___ UNSAT  STEP 14:  Evaluate ITS LCO 3.8.7 requirements.
STANDARD: The operator recognizes that Inverter A Voltage is > 114 VAC, and initials the appropriate block.
(Not Critical)


The operator recognizes that Inverter B Voltage is > 114 VAC, and initials the appropriate block.
Appendix C                                  Page 10 of 15                    Form ES-C-1 PERFORMANCE INFORMATION STEP 15:      Evaluate ITS LCO 3.8.9 requirements.                                  CRITICAL STEP STANDARD:    The operator recognizes that 4KV Bus 2 Voltage is > 3.2 KV, and initials the appropriate block. (Not Critical)
(Not Critical)
___ SAT The operator recognizes that 4KV Bus 3 Voltage is > 3.2 KV, and initials the appropriate block. (Not Critical)
The operator recognizes that CVT 1, must be OPERABLE, and that that it is currently inoperable.
The operator recognizes that 480V Bus E-1 Voltage (lowest phase)      ___ UNSAT is > 440 VAC, and initials the appropriate block. (Not Critical)
The operator determines that CVT 1 must be restored to OPERABLE prior to changing modes , and does NOT initial the associated block. EXAMINER'S CUE:
The operator recognizes that 480V Bus E-2 Voltage (lowest phase) is > 440 VAC, and initials the appropriate block. (Not Critical)
NONE EXAMINER'S NOTE: This evaluation can be made in ANY order.
The operator recognizes that MCC-5 breaker, CMPT NO. 4BL, FEED TO INSTRUMENT BUS 1, must be closed to be OPERABLE, and that that it is currently OPEN due to problem with No. 1 Constant Voltage Transformer.
See provided KEY.
The operator determines that MCC-5 breaker, CMPT NO. 4BL, FEED TO INSTRUMENT BUS 1, must be closed prior to changing modes, and does NOT initial the associated block.
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
2016 Admin - JPM A2 SRO                                            NUREG 1021, Revision 10


COMMENTS:      CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 10 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin
Appendix C                                 Page 11 of 15                     Form ES-C-1 PERFORMANCE INFORMATION STEP 16:     Evaluate TRMS 3.6.b requirements.
- JPM A2 SRO NUREG 1021, Revision 10 STEP 15: Evaluate ITS LCO 3.8.9 requirements.
STANDARD:     The operator recognizes that the "A" Boric Acid Tank Level is >       ___ SAT 42%, and initials the appropriate block.
STANDARD: The operator recognizes that 4KV Bus 2 Voltage is > 3.2 KV, and initials the appropriate block.
The operator recognizes that the "A" Boric Acid Tank boron
(Not Critical)
___ UNSAT concentration is between 20,000 ppm - 22,500 ppm, and initials the appropriate block.
The operator recognizes that 4KV Bus 3 Voltage is > 3.2 KV, and initials the appropriate block.  (Not Critical)
The operator recognizes that the "A" Boric Acid Tank temperature is
The operator recognizes that 480V Bus E
              > 145°F, and initials the appropriate block.
-1 Voltage (lowest phase) is > 440 VAC, and initials the appropriate block. (Not Critical)
The operator recognizes that the "B" Boric Acid Tank Level is >
The operator recognizes that 480V Bus E
42%, and initials the appropriate block.
-2 Voltage (lowest phase) is > 440 VAC, and initials the appropriate block. (Not Critical)
The operator recognizes that the "B" Boric Acid Tank boron concentration is between 20,000 ppm - 22,500 ppm, and initials the appropriate block.
The operator recognizes that MCC-5 breaker, CMPT NO. 4BL, FEED TO INSTRUMENT BUS 1, must be closed to be OPERABLE, and that that it is currently OPEN due to problem with No. 1 Constant Voltage Transformer
The operator recognizes that the "B" Boric Acid Tank temperature is
. The operator determines that MCC-5 breaker, CMPT NO. 4BL, FEED TO INSTRUMENT BUS 1, must be closed prior to changing modes , and does NOT initial the associated block. EXAMINER'S CUE:
              > 145°F, and initials the appropriate block.
NONE EXAMINER'S NOTE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:             This evaluation can be made in ANY order. See provided KEY.
This evaluation can be made in ANY order.
COMMENTS:
See provided KEY.
2016 Admin - JPM A2 SRO                                          NUREG 1021, Revision 10
COMMENTS:      CRITICAL STEP
___ SAT    ___ UNSAT Appendix C Page 11 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
- JPM A2 SRO NUREG 1021, Revision 10 STEP 16: Evaluate TRMS 3.6.b requirements.
STANDARD: The operator recognizes that the "A" Boric Acid Tank Level is > 42%, and initials the appropriate block.
The operator recognizes that the "A" Boric Acid Tank boron concentration is between 20,000 ppm  
- 22,500 ppm, and initials the appropriate block.
The operator recognizes that the "A" Boric Acid Tank temperature is > 145°F, and initials the appropriate block.
The operator recognizes that the "B" Boric Acid Tank Level is > 42%, and initials the appropriate block.
The operator recognizes that the " B" Boric Acid Tank boron concentration is between 20,000 ppm  
- 22,500 ppm, and initials the appropriate block.
The operator recognizes that the "B" Boric Acid Tank temperature is > 145°F, and initials the appropriate block.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.


COMMENTS:        ___ SAT    ___ UNSAT Appendix C Page 12 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
Appendix C                                   Page 12 of 15                   Form ES-C-1 PERFORMANCE INFORMATION STEP 17:     Evaluate TRMS 3.6.d requirements.
- JPM A2 SRO NUREG 1021, Revision 10 STEP 17: Evaluate TRMS 3.6.d requirements.
___ SAT STANDARD:     The operator recognizes that the Primary Water Storage Tank Level is > 45%, and initials the appropriate block.
STANDARD: The operator recognizes that the Primary Water Storage Tank Level is > 45%, and initials the appropriate block.
___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:             This evaluation can be made in ANY order. See provided KEY.
EXAMINER'S CUE:
COMMENTS:
NONE EXAMINER'S NOTE:
STEP 18:     The operator reports findings to the Shift Manager.                   CRITICAL STEP STANDARD:     The operator reports findings / provides applicable pages or all
This evaluation can be made in ANY order.
___ SAT pages of Attachment 2 to Shift Manager.
See provided KEY.
* CCW Pump C must be restored to operable prior to changing modes.
COMMENTS:   ___ SAT    ___ UNSAT  STEP 18: The operator reports findings to the Shift Manager.
* V6-16B must be restored to operable prior to changing modes.       ___ UNSAT
STANDARD: The operator reports findings / provides applicable pages or all pages of Attachment 2 to Shift Manager.
* WCCU-1A must be restored to operable prior to changing modes.
CCW Pump "C" must be restored to operable prior to changing modes. V6-16B must be restored to operable prior to changing modes.
* CVT #1 must be repaired
WCCU-1A must be restored to operable prior to changing modes. CVT #1 must be repaired Instrument Bus 1 must be powered from MCC
* Instrument Bus 1 must be powered from MCC-5 prior to changing modes.
-5 prior to changing modes.
* DFO Storage tank level must be raised to > 19000 gallons EXAMINERS CUE:               NONE EXAMINERS NOTE:             See provided KEY.
DFO Storage tank level must be raised to > 19000 gallons EXAMINER'S CUE:
COMMENTS:
NONE EXAMINER'S NOTE:
Terminating Cue:             Evaluation on this JPM is complete.
See provided KEY.
COMMENTS:       CRITICAL STEP  ___ SAT    ___ UNSAT Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Admin - JPM A2 SRO                                            NUREG 1021, Revision 10


Appendix C Page 13 of 15 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Admin
Appendix C                           Page 13 of 15               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A2 SRO Examinees Name:
- JPM A2 SRO NUREG 1021, Revision 10 Job Performance Measure No.:
2016 Admin  
- JPM A 2 S RO  Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 928: Line 684:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT            UNSAT Examiners Signature:                                Date:
2016 Admin - JPM A2 SRO                                  NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                                     Form ES-C-1 JPM CUE SHEET Inoperable Equipment List
Date:
* Charging Pump A
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 Inoperable Equipment List Charging Pump "A" Component Cooling Water Pump "C" MDAFW Pump "B" V6-16B, SW TURB BLDG SUPPLY, is OPEN with the motor leads disconnected for control circuit troubleshooting.
* Component Cooling Water Pump C
Instrument Bus 1 is being powered from MCC
* MDAFW Pump B
-8. MCC-5 feed to Instrument Bus 1 is de-energized due to problem with No. 1 Constant Voltage Transformer.
* V6-16B, SW TURB BLDG SUPPLY, is OPEN with the motor leads disconnected for control circuit troubleshooting.
Control Room Water Cooled Condensing Unit, WCCU-1A Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* Instrument Bus 1 is being powered from MCC-8. MCC-5 feed to Instrument Bus 1 is de-energized due to problem with No. 1 Constant Voltage Transformer.
The plant is in Mode 5, returning from a refueling outage.
* Control Room Water Cooled Condensing Unit, WCCU-1A NUREG 1021, Revision 10
RCS temperature is 165°F and there is a bubble in the PZR.
 
RHR Loop "A" is maintaining RCS temperature.
Appendix C                                                               Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
You are an extra SRO assigned to support the shift during re
* The plant is in Mode 5, returning from a refueling outage.
-start activities.
* RCS temperature is 165°F and there is a bubble in the PZR.
An Inoperable Equipment List is available.
* RHR Loop A is maintaining RCS temperature.
* You are an extra SRO assigned to support the shift during re-start activities.
* An Inoperable Equipment List is available.
INITIATING CUE:
INITIATING CUE:
The SM has directed you to complete the attached partially completed OMM
* The SM has directed you to complete the attached partially completed OMM-001-12, MINIMUM EQUIPMENT LIST AND SHIFT RELIEF, Att. 2, 200°F to 350°F (MODE 4) MEL that was started on the previous shift and determine if any Mode 4 restrictions exist.
-001-12, MINIMUM EQUIPMENT LIST AND SHIFT RELIEF, Att. 2, 200°F to 350°F (MODE 4) MEL that was started on the previous shift and determine if any Mode 4 restrictions exist
* The SM has indicated that it is expected to make the Mode change without reliance upon Technical Specification 3.0.4.b.
. The SM has indicated that it is expected to make the Mode change without reliance upon Technical Specification 3.0.4.b.
NUREG 1021, Revision 10
 
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Admin
- JPM A 3 RO (Rev_010816)  NUREG 1021, Revision 10


JPM A 3 RO     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet JPM A3 RO Developed By:     ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:     ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Admin - JPM A3 RO (Rev_010816)                  NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 7 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                         Page 2 of 7                         Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- JPM A 3 RO  NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Evaluate Stay Time with Lowered           JPM No.:     2016 Admin - JPM A3 SFP Level                                              RO K/A  
Evaluate Stay Time with Lowered SFP Level JPM No.: 2016 Admin - JPM A 3 RO     K/A  


==Reference:==
==Reference:==
 
2.3.7 (3.5)
2.3.7 (3.5)   Examinee: NRC Examiner:
Examinee:                                                   NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                         Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                       Actual Performance:       X Classroom           X     Simulator           Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
X Classroom X Simulator Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
Initial Conditions:
Initial Conditions:
A station wide accident has occurred due to an Earthquake
* A station wide accident has occurred due to an Earthquake.
. The plant is in Mode 6 with a full core off
* The plant is in Mode 6 with a full core off-load.
-load. The Spent Fuel Pool level has lowered to 10 feet above the top of the fuel, and has stabilized at this level.
* The Spent Fuel Pool level has lowered to 10 feet above the top of the fuel, and has stabilized at this level.
The crew is implementing AOP
* The crew is implementing AOP-036 (SFP Events).
-036 (SFP Events).
* R-5, Spent Fuel Building Rad Monitor, reads 1.93E+2 mr/hr.
R-5, Spent Fuel Building Rad Monitor, reads 1.93E+2 mr/hr. A dose limit of 25 mrem has been placed on all personnel performing emergency tasks within the building.
* A dose limit of 25 mrem has been placed on all personnel performing emergency tasks within the building.
You have been assigned a repetitive task within AOP
* You have been assigned a repetitive task within AOP-036 which will require you to enter the Spent Fuel Building and proceed to the area around the Spent Fuel Pool, and remain there for 3 minutes, before exiting the building.
-036 which will require you to enter the Spent Fuel Building and proceed to the area around the Spent Fuel Pool, and remain there for 3 minutes, before exiting the building.
* The exposure traveling to and from the Spent Fuel Pool area results in no appreciable exposure.
The exposure traveling to and from the Spent Fuel Pool area results in no appreciable exposure.
Initiating Cue:             The OSC Leader has directed you to estimate how many times you can perform this repetitive task before you must be replaced by another operator.
Initiating Cue:
2016 Admin - JPM A3 RO                                                      NUREG 1021, Revision 10
The OSC Leader has directed you to estimate how many times you can perform this repetitive task before you must be replaced by another operator.
 
Appendix C Page 3 of 7 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                       Page 3 of 7                     Form ES-C-1 Job Performance Measure Worksheet Task Standard:         The operator will determine that the repetitive task can be performed 2 times before another operator will need to perform the task.
- JPM A 3 RO  NUREG 1021, Revision 10 Task Standard:
Required Materials:   Calculator General  
The operator will determine that the repetitive task can be performed 2 times before another operator will need to perform the task.
Required Materials:
Calculator General  


==References:==
==References:==
AOP-036 (SFP Events), Rev 48 OMM-014 (Radiation Monitor Setpoints), Rev 51 Handouts:              None Time Critical Task:    NO Validation Time:      7 minutes Critical Step Justification Step 3        This step is critical because it is necessary to determine how many times the task can be performed without exceeding a limit.
2016 Admin - JPM A3 RO                                                NUREG 1021, Revision 10


AOP-036 (SFP Events
Appendix C                                     Page 4 of 7                   Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
), Rev 48  OMM-014 (Radiation Monitor Setpoints), Rev 51 Handouts: None  Time Critical Task:
NO  Validation Time:
7 minutes    Critical Step Justification Step 3 This step is critical because it is necessary to determine how many times the task can be performed without exceeding a limit.
 
Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
- JPM A 3 RO  NUREG 1021, Revision 10 (Critical Steps are identified as such in right
-hand column)
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
START TIME:
START TIME:
STEP 1: Determine dose rate in the Spent Fuel Pool Area STANDARD: The operator evaluates the R
STEP 1:         Determine dose rate in the Spent Fuel Pool Area
-5 reading and determines that the area radiation levels are 193 mrem/hour.
___ SAT STANDARD:             The operator evaluates the R-5 reading and determines that the area radiation levels are 193 mrem/hour.
EXAMINER'S CUE:
___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE COMMENTS:
NONE EXAMINER'S NOTE:
STEP 2:       Determine the accumulated Dose each time the repetitive task is performed.                                                           ___ SAT STANDARD: The operator determines that 3 minutes in a radiation field of 193 mrem/hour will yield a dose of 9.65 mrem
NONE COMMENTS:     ___ SAT    ___ UNSAT  STEP 2: Determine the accumulated Dose each time the repetitive task is performed.
___ UNSAT 193 mrem/hr x 1hr/60 minutes x 3 minutes/task = 9.65 mrem/task EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE COMMENTS:
STANDARD: The operator determines that 3 minutes in a radiation field of 193 mrem/hour will yield a dose of 9.65 mrem 193 mrem/hr x 1hr/60 minutes x 3 minutes/task = 9.65 mrem/task EXAMINER'S CUE:
2016 Admin - JPM A3 RO                                            NUREG 1021, Revision 10
NONE EXAMINER'S NOTE:
 
NONE COMMENTS:
Appendix C                                   Page 5 of 7                     Form ES-C-1 PERFORMANCE INFORMATION STEP 3:     Determine how many times the repetitive task can be performed           CRITICAL before allowable RWP limits have been reached.                             STEP STANDARD: The operator determines that a Task which accumulates 9.65 mrem           ___ SAT can be performed twice without exceeding a dose limit of 25 mrem.
___ SAT    ___ UNSAT Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
25 mrem x task/9.65 mrem = 2.6 tasks
- JPM A 3 RO  NUREG 1021, Revision 10 STEP 3: Determine how many times the repetitive task can be performed before allowable RWP limits have been reached.
___ UNSAT Since the task cannot be partially performed, the task can be performed twice before the operator must be replaced with another operator.
STANDARD: The operator determines that a Task which accumulates 9.65 mrem can be performed twice without exceeding a dose limit of 25 mrem.
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE COMMENTS:
25 mrem x task/9.65 mrem = 2.6 tasks Since the task cannot be partially performed, the task can be performed twice before the operator must be replaced with another operator. EXAMINER'S CUE:
Terminating Cue:             Evaluation on this JPM is complete.
NONE EXAMINER'S NOTE:
NONE   COMMENTS:   CRITICAL STEP
___ SAT    ___ UNSAT Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Admin - JPM A3 RO                                              NUREG 1021, Revision 10


Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Admin
Appendix C                             Page 6 of 7               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A3 RO Examinees Name:
- JPM A 3 RO  NUREG 1021, Revision 10 Job Performance Measure No.:
2016 Admin  
- JPM A3 RO   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,030: Line 764:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT            UNSAT Examiners Signature:                                Date:
2016 Admin - JPM A3 RO                                  NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                                 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* A station wide accident has occurred due to an Earthquake.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* The plant is in Mode 6 with a full core off-load.
A station wide accident has occurred due to an Earthquake
* The Spent Fuel Pool level has lowered to 10 feet above the top of the fuel, and has stabilized at this level.
. The plant is in Mode 6 with a full core off
* The crew is implementing AOP-036 (SFP Events).
-load. The Spent Fuel Pool level has lowered to 10 feet above the top of the fuel, and has stabilized at this level.
* R-5, Spent Fuel Building Rad Monitor, reads 1.93E+2 mr/hr.
The crew is implementing AOP
* A dose limit of 25 mrem has been placed on all personnel performing emergency tasks within the building.
-036 (SFP Events).
* You have been assigned a repetitive task within AOP-036 which will require you to enter the Spent Fuel Building and proceed to the area around the Spent Fuel Pool, and remain there for 3 minutes, before exiting the building.
R-5, Spent Fuel Building Rad Monitor, reads 1.93E+2 mr/hr.
* The exposure traveling to and from the Spent Fuel Pool area results in no appreciable exposure.
A dose limit of 25 mrem has been placed on all personnel performing emergency tasks within the building.
INITIATING CUE:     The OSC Leader has directed you to estimate how many times you can perform this repetitive task before you must be replaced by another operator.
You have been assigned a repetitive task within AOP
NUREG 1021, Revision 10
-036 which will require you to enter the Spent Fuel Building and proceed to the area around the Spent Fuel Pool, and remain there for 3 minutes, before exiting the building.
The exposure traveling to and from the Spent Fuel Pool area results in no appreciable exposure.
INITIATING CUE:
The OSC Leader has directed you to estimate how many times you can perform this repetitive task before you must be replaced by another operator
.
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Admin
- JPM A3 SRO (Rev_010816)  NUREG 1021, Revision 10


JPM A 3 S RO      Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet JPM A3 SRO Developed By:     ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:     ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Admin - JPM A3 SRO (Rev_010816)                  NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 9 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                           Page 2 of 9                       Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- JPM A 3 S RO  NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Approve a Waste Gas Release               JPM No.:   2016 Admin - JPM A3 Permit                                                SRO K/A  
Approve a Waste Gas Release Permit JPM No.: 2016 Admin  
- JPM A 3 S RO    K/A  


==Reference:==
==Reference:==
 
2.3.8 (3.7)
2.3.8 (3.7)   Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                         Actual Performance:     X Classroom           X     Simulator             Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
X Classroom X Simulator Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
* The plant is in Mode 1 at 100% power.
: 1. Initial Conditions:
* A Waste Gas Release Permit for the A WGDT has been presented to the Shift Manager for review and approval.
The plant is in Mode 1 at 100% power. A Waste Gas Release Permit for the "A" WGDT has been presented to the Shift Manager for review and approval.
Initiating Cue:
Initiating Cue: Review and Approve the Waste Gas Release Permit.
* Review and Approve the Waste Gas Release Permit.
Identify all issues found (if any) which would prevent approval.
* Identify all issues found (if any) which would prevent approval.
Task Standard:
Task Standard:             The operator will review the WGDT Release Permit and identify that it cannot be approved because (1) it has been written for the wrong WGDT and (2) the R14C setpoint is less conservative than required.
The operator will review the WGDT Release Permit and identify that it cannot be approved because (1) it has been written for the wrong WGDT and (2) the R14C setpoint is less conservative than required.
Required Materials:         None General  
Required Materials:
None   General  


==References:==
==References:==
EMP-022 (Gaseous Waste Release Permits), Rev 56 OMM-014 (Radiation Monitor Setpoints), Rev 51 OP-706 (Waste Disposal - Gaseous Rad Waste Release), Rev 18 2016 Admin - JPM A3 SRO                                                    NUREG 1021, Revision 10


EMP-022 (Gaseous Waste Release Permits), Rev 56  OMM-014 (Radiation Monitor Setpoints), Rev 51 OP-706 (Waste Disposal - Gaseous Rad Waste Release), Rev 18
Appendix C                                      Page 3 of 9                          Form ES-C-1 Job Performance Measure Worksheet Handouts:              Handout 1: Completed Attachment 10.3 of EMP-022 marked up for this JPM.
Time Critical Task:    NO Validation Time:      8 minutes Critical Step Justification Step 4        This step is critical because denial of permit approval, and identification of the reasons for this denial is necessary to prevent an uncontrolled release of B WGDT and/or a release with the radiation monitor setpoint at a non-conservative value.
2016 Admin - JPM A3 SRO                                                NUREG 1021, Revision 10


Appendix C Page 3 of 9 Form ES-C-1  Job Performance Measure Worksheet 2016 Admin
Appendix C                                     Page 4 of 9                     Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- JPM A 3 S RO  NUREG 1021, Revision 10 Handouts: Handout 1: Completed Attachment 10.3 of EMP
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
-022 marked up for this JPM. Time Critical Task:
START TIME:
NO  Validation Time:
STEP 1:         Review the Waste Gas Release Permit preliminary Information
8 minutes        Critical Step Justification Step 4 This step is critical because denial of permit approval, and identification of the reasons for this denial is necessary to prevent an uncontrolled release of "B" WGDT and/or a release with the radiation monitor setpoint at a non
___ SAT STANDARD:       The operator observes that the following preliminary information is completed on Attachment 10.3 of EMP-022:
-conservative value.
* Release #: G-2016-015
Appendix C Page 4 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
* SSN (XXXX)                                                         ___ UNSAT
- JPM A 3 S RO  NUREG 1021, Revision 10 (Critical Steps are identified as such in right
* Date (of Permit preparation)
-hand column)
* Printed Name (of Individual preparing the Permit)
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
* Initial (of Individual preparing the Permit)
: 1. START TIME:
* Signature (of Individual preparing the Permit)
STEP 1: Review the Waste Gas Release Permit preliminary Information STANDARD: The operator observes that the following preliminary information is completed on Attachment 10.3 of EMP
* Date (of Signature)
-022: Release #: G-2016-015 SSN (XXXX) Date (of Permit preparation)
Printed Name (of Individual preparing the Permit)
Initial (of Individual preparing the Permit)
Signature (of Individual preparing the Permit)
Date (of Signature)
The operator recognizes that the preliminary information is acceptable and proceeds.
The operator recognizes that the preliminary information is acceptable and proceeds.
EXAMINER'S CUE:
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE COMMENTS:
NONE EXAMINER'S NOTE:
2016 Admin - JPM A3 SRO                                              NUREG 1021, Revision 10
NONE  COMMENTS:          ___ SAT    ___ UNSAT Appendix C Page 5 of 9 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin
- JPM A 3 S RO  NUREG 1021, Revision 10 STEP 2: Review the Waste Gas Release Permit PART I Information STANDARD: The operator observes that the following PART I information is completed on Attachment 10.3 of EMP
-022:  Waste Gas Decay Tank
: B  Estimated Release Start Date/Time: 2/6/16 21 00  Estimated Release Stop Date/Time:
2/6/16 213 0  Monitor R14C Setp oint: 5.6E3  Basis: Activity Circled  CV Purge:  Not In Service Circled  Maximum WGDT Flow Rate:
90 CFM  Prepared By: name of preparer Peer Review: name of reviewer Verified By: NA Chemistry Supervisor: NA The operator identifies that the Permit is for the "B" WGDT and the Permit was requested for the "
A" WGDT, and identifies that this must be modified before approval.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 6 of 9 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin  
- JPM A 3 S RO  NUREG 1021, Revision 10 STEP 3: Review the Waste Gas Release Permit PART II Information STANDARD: The operator observes that the following PART II information is completed on Attachment 10.3 of EMP
-022:  PRIOR1 (Channel Check)
: 19.9  SOURCE CHECK 2: Initialed  SETPOINT VERF. AT 3: 1.0E4  UPDATE STATUS BOARD 4: Initialed  DURING RELEASE
: Left Blank AFTER RELEASE
:  Left Blank SETPOINT RETURNED TO3,5: Left Blank STATUS BOARD UPDATED 4: Left Blank The operator identifies that the R14C setpoint is less conservative than required and identifies that this must be modified before approval. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE  COMMENTS:            ___ SAT    ___ UNSAT Appendix C Page 7 of 9 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin
- JPM A 3 S RO  NUREG 1021, Revision 10 STEP 4: Approve the Waste Gas Release Permit or identify all issues found which would prevent approval STANDARD: The operator identifies that the Waste Gas Permit cannot be approved until:
The Permit is identified with the correct WGDT in PART I ("
A" WGDT)  The R14C setpoint is verified in PART II to be at or less conservative than the setpoint listed in PART I


EXAMINER'S CUE:
Appendix C                                    Page 5 of 9                      Form ES-C-1 PERFORMANCE INFORMATION STEP 2:      Review the Waste Gas Release Permit PART I Information
NONE EXAMINER'S NOTE:
___ SAT STANDARD: The operator observes that the following PART I information is completed on Attachment 10.3 of EMP-022:
If the operator indicates after discovering only one of two errors that the permit would not be approved until corrected, correct the error, and return the permit and provide the Initiating CUE a second time.
* Waste Gas Decay Tank: B
* Estimated Release Start Date/Time: 2/6/16 2100                        ___ UNSAT
* Estimated Release Stop Date/Time: 2/6/16 2130
* Monitor R14C Setpoint: 5.6E3
* Basis: Activity Circled
* CV Purge: Not In Service Circled
* Maximum WGDT Flow Rate: 90 CFM
* Prepared By: name of preparer
* Peer Review: name of reviewer
* Verified By: NA
* Chemistry Supervisor: NA The operator identifies that the Permit is for the B WGDT and the Permit was requested for the A WGDT, and identifies that this must be modified before approval.
EXAMINERS CUE:             NONE EXAMINERS NOTE:            NONE COMMENTS:
2016 Admin - JPM A3 SRO                                            NUREG 1021, Revision 10
 
Appendix C                                    Page 6 of 9                      Form ES-C-1 PERFORMANCE INFORMATION STEP 3:      Review the Waste Gas Release Permit PART II Information STANDARD:      The operator observes that the following PART II information is completed on Attachment 10.3 of EMP-022:                              ___ SAT
* PRIOR1 (Channel Check): 19.9
* SOURCE CHECK2: Initialed
* SETPOINT VERF. AT3: 1.0E4                                          ___ UNSAT
* UPDATE STATUS BOARD4: Initialed
* DURING RELEASE: Left Blank
* AFTER RELEASE: Left Blank
* SETPOINT RETURNED TO3,5: Left Blank
* STATUS BOARD UPDATED4: Left Blank The operator identifies that the R14C setpoint is less conservative than required and identifies that this must be modified before approval.
EXAMINERS CUE:              NONE EXAMINERS NOTE:            NONE COMMENTS:
2016 Admin - JPM A3 SRO                                            NUREG 1021, Revision 10
 
Appendix C                                    Page 7 of 9                          Form ES-C-1 PERFORMANCE INFORMATION STEP 4:      Approve the Waste Gas Release Permit or identify all issues found          CRITICAL which would prevent approval                                                  STEP STANDARD:    The operator identifies that the Waste Gas Permit cannot be                ___ SAT approved until:
* The Permit is identified with the correct WGDT in PART I (A WGDT)
* The R14C setpoint is verified in PART II to be at or less                ___ UNSAT conservative than the setpoint listed in PART I EXAMINERS CUE:              NONE EXAMINERS NOTE:              If the operator indicates after discovering only one of two errors that the permit would not be approved until corrected, correct the error, and return the permit and provide the Initiating CUE a second time.
COMMENTS:
COMMENTS:
CRITICAL STEP  ___ SAT    ___ UNSAT Terminating Cue:
Terminating Cue:             Evaluation on this JPM is complete.
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Admin - JPM A3 SRO                                              NUREG 1021, Revision 10


Appendix C Page 8 of 9 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Admin
Appendix C                             Page 8 of 9               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A3 SRO Examinees Name:
- JPM A 3 S RO  NUREG 1021, Revision 10 Job Performance Measure No.:
2016 Admin  
- JPM A 3 S RO  Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,147: Line 868:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT            UNSAT Examiners Signature:                                Date:
2016 Admin - JPM A3 SRO                                  NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                               Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The plant is in Mode 1 at 100% power.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* A Waste Gas Release Permit for the A WGDT has been presented to the Shift Manager for review and approval.
The plant is in Mode 1 at 100% power. A Waste Gas Release Permit for the "A" WGDT has been presented to the Shift Manager for review and approval.
INITIATING CUE:
INITIATING CUE:
Review and Approve the Waste Gas Release Permit.
* Review and Approve the Waste Gas Release Permit.
Identify all issues found (if any) which would prevent approval.
* Identify all issues found (if any) which would prevent approval.
 
NUREG 1021, Revision 10
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Admin
- JPM A4 SRO (Rev_010816)  NUREG 1021, Revision 10


JPM A 4 S RO      Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet JPM A4 SRO Developed By:     ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:     ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Admin - JPM A4 SRO (Rev_010816)                  NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 6 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                         Page 2 of 6                         Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                             Task No.:
- JPM A4 S RO  NUREG 1021, Revision 10 Facility: H B Robinson Task No.:     Task Title:
Task Title:             Emergency Classification               JPM No.:     2016 Admin - JPM A4 SRO K/A  
Emergency Classification JPM No.: 2016 Admin  
- JPM A4 S RO    K/A  


==Reference:==
==Reference:==
 
2.4.41 (4.4)
2.4.4 1 (4.4)   Examinee: NRC Examiner:
Examinee:                                                   NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                         Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                       Actual Performance:       X Classroom           X   Simulator             Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handouts 1-2.
X Classroom X Simulator Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout s 1-2. Initial Conditions:
* The plant is operating at 100% power.
The plant is operating at 100% power.
* Protesters have illegally entered the plant, and have gained entry to the protected area.
Protesters have illegally entered the plant, and have gained entry to the protected area.
* Security has declared a Security Event (Confirmed Protected Area Intrusion).
Security has declared a Security Event (Confirmed Protected Area Intrusion)
* Security has all intruders under restraint and has prevented further entry into the plant.
. Security has all intruders under restraint and has prevented further entry into the plant.
* Other than minor damage to the security fences and protest slogans spray painted on some walls, there was no plant damage.
Other than minor damage to the security fences and protest slogans spray painted on some walls, there was no plant damage.
Initiating Cue:
Initiating Cue:
Classify the event in accordance with the Robinson Nuclear Plant Emergency Action Level Matrix.     Then prepare an Emergency Notification Form for this classification.
* Classify the event in accordance with the Robinson Nuclear Plant Emergency Action Level Matrix.
THIS JPM IS TIME CRITICAL
* Then prepare an Emergency Notification Form for this classification.
THIS JPM IS TIME CRITICAL 2016 Admin - JPM A4 SRO                                                  NUREG 1021, Revision 10


Appendix C Page 3 of 6 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                       Page 3 of 6                         Form ES-C-1 Job Performance Measure Worksheet Task Standard:         The operator will declare an ALERT based on HA4.1, Confirmed Security event in a plant Protected Area or notification of either an airborne attack threat or hostile threat within the Owner Controlled Area, within 15 minutes. Then, the operator will prepare an Emergency Notification Form for this event in accordance with EPCLA-01 (Emergency Control) in accordance with the attached KEY, also within 15 minutes.
- JPM A4 S RO  NUREG 1021, Revision 10 Task Standard:
Required Materials:     None General  
The operator will declare an ALERT based on HA4.1 , Confirmed Security event in a plant Protected Area or notification of either an airborne attack threat or hostile threat within the Owner Controlled Area , within 15 minutes. Then, the operator will prepare an Emergency Notification Form for this event in accordance with EPCLA-01 (Emergency Control
) in accordance with the attached KEY , also within 15 minutes.
Required Materials:
None   General  


==References:==
==References:==
Robinson Nuclear Plant Emergency Action Level Matrix, Sheet 1 of 3, Rev 4 Robinson Nuclear Plant Emergency Action Level Matrix, Sheet 2 of 3, Rev 7 Robinson Nuclear Plant Emergency Action Level Matrix, Sheet 3 of 3, Rev 1 EPCLA-01 (Emergency Control), Rev 43 EPCLA-04 (Emergency Action Level Technical Basis Document), Rev 13 EPNOT-01 (CR/EOF Emergency Communicator), Rev 46 Handouts:              Handout 1: Robinson Nuclear Plant Emergency Action Level Matrix Sheets 1-3 Handout 2: Blank Copy of EPCLA-01 Time Critical Task:    YES - 15 Minutes to classify the event, and then 15 minutes to generate an ENF for the classification Validation Time:        15 minutes Critical Step Justification Step 1        This step is critical because accurately classifying the event is necessary to properly implement on-site and off-site response to an emergency event.
Step 2        This step is critical because the completion of the ENF is necessary to properly communicate to local, state and federal organizations the status of on-going emergency events.
2016 Admin - JPM A4 SRO                                                  NUREG 1021, Revision 10


Robinson Nuclear Plant Emergency Action Level Matrix, Sheet 1 of 3, Rev 4  Robinson Nuclear Plant Emergency Action Level Matrix, Sheet 2 of 3, Rev 7  Robinson Nuclear Plant Emergency Action Level Matrix, Sheet 3 of 3, Rev 1  EPCLA-01 (Emergency Control), Rev 43 EPCLA-04 (Emergency Action Level Technical Basis Document), Rev 13  EPNOT-01 (CR/EOF Emergency Communicator), Rev 46 Handouts: Handout 1: Robinson Nuclear Plant Emergency Action Level Matrix Sheets 1-3  Handout 2: Blank Copy of EPCLA
Appendix C                                   Page 4 of 6                     Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
-01  Time Critical Task:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handouts 1-2.
YES  - 15 Minutes to classify the event, and then 15 minutes to generate an ENF for the classification Validation Time:
START TIME:
15 minutes      Critical Step Justification Step 1 This step is critical because accurately classifying the event is necessary to properly implement on
STEP 1:         Classify the event in accordance with the Robinson Nuclear Plant     CRITICAL Emergency Action Level Matrix                                         STEP
-site and off
___ SAT STANDARD:       The operator will declare an ALERT based on HA4.1 due to threshold 1 (Security event in the plant Protected Area as determined and reported by Security shift supervision)
-site response to an emergency event
___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE COMMENTS:
. Step 2 This step is critical because the completion of the ENF is necessary to properly communicate to local, state and federal organizations the status of on
TIME CRITICAL STOP TIME #1: __________
-going emergency events
STEP 2:       Prepare an ENF                                                       CRITICAL STEP STANDARD: The operator completes Attachment 10.5, Page 9 of 10 (Or Equivalent       ___ SAT ENF Form) of EPCLA-01 IAW the provided KEY.
.
EXAMINERS CUE:               NONE
Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
___ UNSAT EXAMINERS NOTE:               NONE COMMENTS:
- JPM A4 S RO  NUREG 1021, Revision 10 (Critical Steps are identified as such in right
TIME CRITICAL STOP TIME #2: __________
-hand column)
Terminating Cue:               Evaluation on this JPM is complete.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout s 1-2. START TIME:
STEP 1: Classify the event in accordance with the Robinson Nuclear Plant Emergency Action Level Matrix STANDARD: The operator will declare an ALERT based on HA4.1 due to threshold 1 (Security event in the plant Protected Area as determined and reported by Security shift supervision
)  EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE COMMENTS:           TIME CRITICAL STOP TIME #1: __________
CRITICAL STEP  ___ SAT    ___ UNSAT  STEP 2: Prepare an ENF STANDARD: The operator completes Attachment 10.5, Page 9 of 10 (Or Equivalent ENF Form) of EPCLA-01 IAW the provided KEY.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE COMMENTS:         TIME CRITICAL STOP TIME #2: __________
CRITICAL STEP
___ SAT    ___ UNSAT            Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Admin - JPM A4 SRO                                            NUREG 1021, Revision 10


Appendix C Page 5 of 6 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Admin
Appendix C                             Page 5 of 6               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A4 SRO Examinees Name:
- JPM A4 S RO  NUREG 1021, Revision 10 Job Performance Measure No.:
2016 Admin  
- JPM A4 S RO  Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,237: Line 934:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT            UNSAT Examiners Signature:                                Date:
2016 Admin - JPM A4 SRO                                  NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                               Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The plant is operating at 100% power.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* Protesters have illegally entered the plant, and have gained entry to the protected area.
The plant is operating at 100% power.
* Security has declared a Security Event (Confirmed Protected Area Intrusion).
Protesters have illegally entered the plant, and have gained entry to the protected area.
* Security has all intruders under restraint and has prevented further entry into the plant.
Security has declared a Security Event (Confirmed Protected Area Intrusion)
* Other than minor damage to the security fences and protest slogans spray painted on some walls, there was no plant damage.
. Security has all intruders under restraint and has prevented further entry into the plant.
INITIATING CUE:
Other than minor damage to the security fences and protest slogans spray painted on some walls, there was no plant damage. INITIATING CUE:
* Classify the event in accordance with the Robinson Nuclear Plant Emergency Action Level Matrix.
Classify the event in accordance with the Robinson Nuclear Plant Emergency Action Level Matrix.
* Then prepare an Emergency Notification Form for this classification.
Then prepare an Emergency Notification Form for this classification.
THIS JPM IS TIME CRITICAL NUREG 1021, Revision 10
THIS JPM IS TIME CRITICAL
 
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Admin
- JPM A1a RO (Rev_010816)  NUREG 1021, Revision 10


JPM A1a RO     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet JPM A1a RO Developed By:     ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:     ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Admin - JPM A1a RO (Rev_010816)                  NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 10 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                       Page 2 of 10                         Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                             Task No.:
- JPM A1a RO NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Calculate QPTR                         JPM No.:     2016 Admin - JPM A1a RO K/A  
Calculate QPTR JPM No.: 2016 Admin  
- JPM A1a RO     K/A  


==Reference:==
==Reference:==
2.1.7 (4.4)
Examinee:                                                    NRC Examiner:
Facility Evaluator:                                          Date:
Method of testing:
Simulated Performance:                                      Actual Performance:        X Classroom          X    Simulator            Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Initial Conditions:
* The plant is in Mode 1 at 60% RTP.
* ERFIS is inoperable.
* The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation.
* Detector Currents are as follows:
* N41: Upper - 63 / Normalizing - 123
* N41: Lower - 55 / Normalizing - 120
* N42: Upper - 55 / Normalizing - 109
* N42: Lower - 52 / Normalizing - 110
* N43: Upper - 50 / Normalizing - 104
* N43: Lower - 45 / Normalizing - 99
* N44: Upper - 48 / Normalizing - 97
* N44: Lower - 45 / Normalizing - 95 Initiating Cue:
* The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT.
2016 Admin - JPM A1a RO                                                    NUREG 1021, Revision 10


2.1.7 (4.4)
Appendix C                                       Page 3 of 10                       Form ES-C-1 Job Performance Measure Worksheet
Examinee:  NRC Examiner:
* Round all calculations to three decimal places (Example: 1.2348 would be rounded to 1.235)
Facility Evaluator:
* Identify any limits that are not being complied with.
Date:  Method of testing:
Task Standard:         The operator will complete the QPTR calculation in accordance with the provided KEY, and identify that Technical Specification LCO is NOT met.
Simulated Performance:
Required Materials:     Calculator Robinson Technical Specifications and Basis must be available.
Actual Performance:
X  Classroom X Simulator  Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
: 1. Initial Conditions:
The plant is in Mode 1 at 60% RTP
. ERFIS is inoperable
. The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation
. Detector Currents are as follows:
N41: Upper
- 63 / Normalizing
- 123  N41: Lower
- 55 / Normalizing
- 120  N42: Upper
- 55 / Normalizing
- 109  N42: Lower
- 52 / Normalizing
- 110  N43: Upper
- 50 / Normalizing
- 104  N43: Lower
- 45 / Normalizing
- 99  N44: Upper
- 48 / Normalizing
- 97  N44: Lower
- 45 / Normalizing
- 95  Initiating Cue:
The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT
.
Appendix C Page 3 of 10 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
- JPM A1a RO NUREG 1021, Revision 10 Round all calculations to three decimal places (Example: 1.2348 would be rounded to 1.235)
Identify any limits that are not being complied with.
Task Standard:
The operator will complete the QPTR calculation in accordance with the provided KEY, and identify that Technical Specification LCO is NOT met. Required Materials:
Calculator Robinson Technical Specifications and Basis must be available.
General  
General  


==References:==
==References:==
FMP-007 (Quadrant Power Tilt), Rev 15 Robinson Technical Specification LCO 3.2.4 (Quadrant Power Tilt Ratio), Amendment 176 Handouts:              Handout 1: Blank copy of FMP-007.
Time Critical Task:    NO Validation Time:        10 minutes Critical Step Justification Step 6        This step is critical because identifying that the maximum Upper Normalized Detector Ratio is N41 (0.512), and dividing it by the Average Upper Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY.
Step 7        This step is critical because identifying that the maximum Lower Normalized Detector Ratio is N44 (0.474), and dividing it by the Average Lower Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY.
Step 8        This step is critical because identifying that the Upper QPTR is larger than the Lower QPTR is necessary to complete the QPTR calculation in accordance with the provided KEY.
Step 9        This step is critical because determining that LCO 3.2.4 permits a maximum QPTR of 1.02 when power level is greater than 50% is necessary to identify that Technical Specification LCO is NOT met.
2016 Admin - JPM A1a RO                                                NUREG 1021, Revision 10


FMP-007 (Quadrant Power Tilt), Rev 15  Robinson Technical Specification LCO 3.
Appendix C                                   Page 4 of 10                     Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
2.4 (Quadrant Power Tilt Ratio), Amendment 176  Handouts: Handout 1: Blank copy of FMP-007. Time Critical Task:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
NO  Validation Time:
START TIME:
10 minutes        Critical Step Justification Step 6 This step is critical because identifying that the maximum Upper Normalized Detector Ratio is N41 (0.512), and dividing it by the Average Upper Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY
STEP 1:           Read the Upper (A) and the Lower (B) Indicated Detector Currents from the Detector Current meters of each operable Power Range channel and record on ATTACHMENT 10.2.                             ___ SAT (Step 8.2.4.1)
. Step 7 This step is critical because identifying that the maximum Lower Normalized Detector Ratio is N4 4 (0.474), and dividing it by the Average Lower Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY
STANDARD:         The operator records the provided Upper and Lower Detector
. Step 8 This step is critical because identifying that the Upper QPTR is larger than the Lower QPTR is necessary t o complete the QPTR calculation in accordance with the provided KEY
___ UNSAT Currents on Attachment 10.2 IAW the provided KEY.
. Step 9 This step is critical because determining that LCO 3.2.4 permits a maximum QPTR of 1.02 when power level is greater than 50% is necessary to identify that Technical Specification LCO is NOT met
EXAMINERS CUE:                 NONE EXAMINERS NOTE:                 NONE COMMENTS:
.
STEP 2:         Record the Upper and Lower Normalizing Detector Currents from the Control Room Status Board for each operable Power Range channel on ATTACHMENT 10.2.                                                   ___ SAT (Step 8.2.4.2)
Appendix C Page 4 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
STANDARD: The operator records the provided Upper and Lower Detector                 ___ UNSAT Currents on Attachment 10.2 IAW the provided KEY.
- JPM A1a RO NUREG 1021, Revision 10 (Critical Steps are identified as such in right
EXAMINERS CUE:                 NONE EXAMINERS NOTE:                 NONE COMMENTS:
-hand column)
NOTE:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
Normalized Ratios, Average Ratios and QPTR values should be recorded to at least 3 decimal places.
: 1. START TIME:
2016 Admin - JPM A1a RO                                           NUREG 1021, Revision 10
STEP 1: Read the Upper (A) and the Lower (B) Indicated Detector Currents from the Detector Current meters of each operable Power Range channel and record on ATTACHMENT 10.2.
(Step 8.2.4.1) STANDARD: The operator records the provided Upper and Lower Detector Currents on Attachment 10.2 IAW the provided KEY. EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE COMMENTS:       ___ SAT    ___ UNSAT  STEP 2: Record the Upper and Lower Normalizing Detector Currents from the Control Room Status Board for each operable Power Range channel on ATTACHMENT 10.2.
(Step 8.2.4.2) STANDARD: The operator records the provided Upper and Lower Detector Currents on Attachment 10.2 IAW the provided KEY.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE COMMENTS:       ___ SAT    ___ UNSAT  NOTE: Normalized Ratios, Average Ratios and QPTR values should be recorded to at least 3 decimal places.
Appendix C Page 5 of 10 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin  
- JPM A1a RO NUREG 1021, Revision 10 STEP 3: Divide each Indicated Detector Current by its corresponding Normalizing Detector Current and record the result as the Normalized Detector Ratio on ATTACHMENT 10.2.
(Step 8.2.4.3)  STANDARD: The operator reads the Note, and proceeds
. The operator divides each Indicated Detector Current by its corresponding Normalizing Detector Current and records the result as the Normalized Detector Ratio on ATTACHMENT 10.2 IAW the provided KEY
. Upper N41 = 0.512            Lower N41 = 0.458 Upper N42 = 0.505            Lower N42 = 0.473  Upper N43 = 0.481            Lower N43 = 0.455 Upper N44 = 0.495            Lower N44 = 0.474  EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE COMMENTS: 


___ SAT   ___ UNSAT   STEP 4: Average the Upper Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Upper column on ATTACHMENT 10.2.
Appendix C                                Page 5 of 10                      Form ES-C-1 PERFORMANCE INFORMATION STEP 3:      Divide each Indicated Detector Current by its corresponding Normalizing Detector Current and record the result as the Normalized Detector Ratio on ATTACHMENT 10.2.
(Step 8.2.4.4)
(Step 8.2.4.3)                                                        ___ SAT STANDARD:    The operator reads the Note, and proceeds.
STANDARD: The operator average s the Upper Normalized Detector Ratios and record s the result as the Average Normalized Detector Ratio in the Upper column on Attachment 10.2 IAW the provided KEY
___ UNSAT The operator divides each Indicated Detector Current by its corresponding Normalizing Detector Current and records the result as the Normalized Detector Ratio on ATTACHMENT 10.2 IAW the provided KEY.
.
Upper N41 = 0.512          Lower N41 = 0.458 Upper N42 = 0.505          Lower N42 = 0.473 Upper N43 = 0.481          Lower N43 = 0.455 Upper N44 = 0.495          Lower N44 = 0.474 EXAMINERS CUE:              NONE EXAMINERS NOTE:            NONE COMMENTS:
STEP 4:       Average the Upper Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Upper column on ATTACHMENT 10.2.
(Step 8.2.4.4)                                                       ___ SAT STANDARD:     The operator averages the Upper Normalized Detector Ratios and records the result as the Average Normalized Detector Ratio in the   ___ UNSAT Upper column on Attachment 10.2 IAW the provided KEY.
Upper Average Normalized Detector Ratio = 0.498 (+.001/-0)
Upper Average Normalized Detector Ratio = 0.498 (+.001/-0)
EXAMINER'S CUE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE COMMENTS:
NONE EXAMINER'S NOTE:
2016 Admin - JPM A1a RO                                          NUREG 1021, Revision 10
NONE COMMENTS:  


___ SAT    ___ UNSAT Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
Appendix C                                   Page 6 of 10                     Form ES-C-1 PERFORMANCE INFORMATION STEP 5:       Average the Lower Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Lower column on ATTACHMENT 10.2.                                           ___ SAT (Step 8.2.4.5)
- JPM A1a RO NUREG 1021, Revision 10 STEP 5: Average the Lower Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Lower column on ATTACHMENT 10.2.
STANDARD:     The operator averages the Lower Normalized Detector Ratios and       ___ UNSAT records the result as the Average Normalized Detector Ratio in the Lower column on Attachment 10.2 IAW the provided KEY.
(Step 8.2.4.5)   STANDARD: The operator averages the Lower Normalized Detector Ratios and records the result as the Average Normalized Detector Ratio in the Lower column on Attachment 10.2 IAW the provided KEY
Lower Average Normalized Detector Ratio = 0.465 (+.001/-0)
. Lower Average Normalized Detector Ratio = 0.465 (+.001/-0) EXAMINER'S CUE: NONE EXAMINER'S NOTE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE COMMENTS:
NONE COMMENTS:       ___ SAT    ___ UNSAT  STEP 6: Determine the maximum Upper Normalized Detector Ratio and divide it by the Average Upper Normalized Detector Ratio and record the resulting Upper QPTR on ATTACHMENT 10.2.
STEP 6:       Determine the maximum Upper Normalized Detector Ratio and             CRITICAL divide it by the Average Upper Normalized Detector Ratio and             STEP record the resulting Upper QPTR on ATTACHMENT 10.2.
(Step 8.2.4.6)
(Step 8.2.4.6)
STANDARD: The operator identifies that the maximum Upper Normalized Detector Ratio is N41 (0.512), and divides it by the Average Upper Normalized Detector Ratio from Performance Step 4 and record s the resulting Upper QPTR on Attachment 10.2 IAW the provided KEY. Upper QPTR = 0.512 / 0.498 = 1.028 (+.001/-0) EXAMINER'S CUE:
STANDARD:     The operator identifies that the maximum Upper Normalized             ___ SAT Detector Ratio is N41 (0.512), and divides it by the Average Upper Normalized Detector Ratio from Performance Step 4 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided KEY.                                                                 ___ UNSAT Upper QPTR = 0.512 / 0.498 = 1.028 (+.001/-0)
NONE EXAMINER'S NOTE:
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE COMMENTS:
NONE COMMENTS:     CRITICAL STEP
2016 Admin - JPM A1a RO                                            NUREG 1021, Revision 10
___ SAT    ___ UNSAT Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
 
- JPM A1a RO NUREG 1021, Revision 10 STEP 7: Determine the maximum Lower Normalized Detector Ratio and divide it by the Average Lower Normalized Detector Ratio and record the resulting Lower QPTR on ATTACHMENT 10.2 (Step 8.2.4.7) STANDARD: The operator observes that the maximum Lower Normalized Detector Ratio is N44 (0.474), and divides it by the Average Lower Normalized Detector Ratio from Performance Step 5 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided KEY. Lower QPTR = 0.474 / 0.465 = 1.019 (+.001/-0) EXAMINER'S CUE:
Appendix C                                   Page 7 of 10                     Form ES-C-1 PERFORMANCE INFORMATION STEP 7:       Determine the maximum Lower Normalized Detector Ratio and divide it by the Average Lower Normalized Detector Ratio and           CRITICAL record the resulting Lower QPTR on ATTACHMENT 10.2                       STEP (Step 8.2.4.7)
NONE EXAMINER'S NOTE:
___ SAT STANDARD:     The operator observes that the maximum Lower Normalized Detector Ratio is N44 (0.474), and divides it by the Average Lower Normalized Detector Ratio from Performance Step 5 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided         ___ UNSAT KEY.
NONE   COMMENTS:
Lower QPTR = 0.474 / 0.465 = 1.019 (+.001/-0)
CRITICAL STEP  ___ SAT    ___ UNSAT  STEP 8: Record larger of the Upper QPTR or the Lower QPTR as the Maximum QPTR on ATTACHMENT 10.2 along with the reactor power and any comments.
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE COMMENTS:
(Step 8.2.4.8) STANDARD: The operator identifies that the Upper QPTR is larger than the Lower QPTR and records the Maximum QPTR as 1.028
STEP 8:     Record larger of the Upper QPTR or the Lower QPTR as the                 CRITICAL Maximum QPTR on ATTACHMENT 10.2 along with the reactor power               STEP and any comments.
(+.001/-0) IAW the provided KEY.
(Step 8.2.4.8)                                                         ___ SAT STANDARD:     The operator identifies that the Upper QPTR is larger than the Lower QPTR and records the Maximum QPTR as 1.028 (+.001/-0)
EXAMINER'S CUE:
___ UNSAT IAW the provided KEY.
NONE EXAMINER'S NOTE:
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE COMMENTS:
NONE   COMMENTS:
2016 Admin - JPM A1a RO                                              NUREG 1021, Revision 10
CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
 
- JPM A1a RO NUREG 1021, Revision 10 STEP 9: Identify any limits that are not being complied with.
Appendix C                                     Page 8 of 10                   Form ES-C-1 PERFORMANCE INFORMATION STEP 9:     Identify any limits that are not being complied with.                   CRITICAL STEP STANDARD:     The operator reviews Technical Specification LCO 3.2.4 and
STANDARD: The operator reviews Technical Specification LCO 3.2.4 and determines that with the plant in Mode 1 at greater than 50% power, a maximum QPTR of 1.02 is permitted.
___ SAT determines that with the plant in Mode 1 at greater than 50% power, a maximum QPTR of 1.02 is permitted.
T he operator identifies that LCO 3.2.4 is NOT met
The operator identifies that LCO 3.2.4 is NOT met.
.      EXAMINER'S CUE:
___ UNSAT EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE COMMENTS:
NONE EXAMINER'S NOTE:
Terminating Cue:               Evaluation on this JPM is complete.
NONE COMMENTS:     CRITICAL STEP
___ SAT    ___ UNSAT              Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Admin - JPM A1a RO                                            NUREG 1021, Revision 10


Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Admin
Appendix C                             Page 9 of 10               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A1a RO Examinees Name:
- JPM A1a RO NUREG 1021, Revision 10 Job Performance Measure No.:
2016 Admin  
- JPM A1a RO Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,390: Line 1,052:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT            UNSAT Examiners Signature:                                Date:
2016 Admin - JPM A1a RO                                  NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                               Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The plant is in Mode 1 at 60% RTP.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* ERFIS is inoperable.
The plant is in Mode 1 at 60% RTP
* The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation.
. ERFIS is inoperable
* Detector Currents are as follows:
. The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation
* N41: Upper - 63 / Normalizing - 123
. Detector Currents are as follows:
* N41: Lower - 55 / Normalizing - 120
N41: Upper  
* N42: Upper - 55 / Normalizing - 109
- 63 / Normalizing  
* N42: Lower - 52 / Normalizing - 110
- 123 N41: Lower  
* N43: Upper - 50 / Normalizing - 104
- 55 / Normalizing  
* N43: Lower - 45 / Normalizing - 99
- 120 N42: Upper  
* N44: Upper - 48 / Normalizing - 97
- 55 / Normalizing  
* N44: Lower - 45 / Normalizing - 95 INITIATING CUE:
- 109 N42: Lower  
* The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT.
- 52 / Normalizing  
* Round all calculations to three decimal places (Example:
- 110   N43: Upper  
1.2348 would be rounded to 1.235)
- 50 / Normalizing  
* Identify any limits that are not being complied with.
- 104   N43: Lower - 45 / Normalizing  
NUREG 1021, Revision 10
- 99 N44: Upper  
- 48 / Normalizing  
- 97 N44: Lower  
- 45 / Normalizing  
- 95     INITIATING CUE:
The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP
-007, QUADRANT POWER TILT
. Round all calculations to three decimal places (Example: 1.2348 would be rounded to 1.235)
Identify any limits that are not being complied with.


Appendix C Job Performance Measure Form ES-C-1 Worksheet 2016 Admin  
Appendix C                       Job Performance Measure             Form ES-C-1 Worksheet JPM A1a SRO Developed By:      ______________________________        Date: ___________
- JPM A1a SRO (Rev_010816) NUREG 1021, Revision 10
Instructor/Developer Concurred By:      ______________________________        Date: ___________
Line Superintendent/Supervisor SRO Approved By:      ______________________________        Date: ___________
Superintendent/Supervisor Training 2016 Admin - JPM A1a SRO (Rev_010816)                 NUREG 1021, Revision 10


JPM A 1a S RO      Developed By:
Appendix C                                       Page 2 of 10                         Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                             Task No.:
______________________________
Task Title:             Calculate QPTR                         JPM No.:     2016 Admin - JPM A1a SRO K/A  
Date:  ___________
Instructor/Developer Concurred By:
______________________________
Date:  ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date:  ___________
Superintendent/Supervisor Training   
 
Appendix C Page 2 of 10 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
- JPM A1a S RO  NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Calculate QPTR JPM No.: 2016 Admin  
- JPM A1a S RO    K/A  


==Reference:==
==Reference:==
2.1.7 (4.7)
Examinee:                                                    NRC Examiner:
Facility Evaluator:                                          Date:
Method of testing:
Simulated Performance:                                      Actual Performance:        X Classroom          X    Simulator            Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Initial Conditions:
* The plant is in Mode 1 at 100% RTP.
* ERFIS is inoperable.
* The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation.
* Detector Currents are as follows:
* N41: Upper - 105 / Normalizing - 123
* N41: Lower - 92 / Normalizing - 120
* N42: Upper - 92 / Normalizing - 109
* N42: Lower - 87 / Normalizing - 110
* N43: Upper - 83 / Normalizing - 104
* N43: Lower - 75 / Normalizing - 99
* N44: Upper - 80 / Normalizing - 97
* N44: Lower - 75 / Normalizing - 95 Initiating Cue:
* The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT.
* Round all calculations to three decimal places (Example: 1.2348 would be rounded to 1.235) 2016 Admin - JPM A1a SRO                                                  NUREG 1021, Revision 10


2.1.7 (4.7)    Examinee:  NRC Examiner:
Appendix C                                       Page 3 of 10                       Form ES-C-1 Job Performance Measure Worksheet
Facility Evaluator:
* Identify whether or not any limitations have been exceeded, and if so, what, if any ACTION, is required.
Date:  Method of testing:
Task Standard:         The operator will complete the QPTR calculation in accordance with the provided KEY, identify that Technical Specification LCO is NOT met, and identify that all six ACTIONs (A.1-A.6) must be taken for Condition A of LCO 3.2.4.
Simulated Performance:
Required Materials:     Calculator Robinson Technical Specifications and Basis must be available.
Actual Performance:
X  Classroom X Simulator  Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
: 1. Initial Conditions:
The plant is in Mode 1 at 100% RTP. ERFIS is inoperable
. The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation
. Detector Currents are as follows:
N41: Upper
- 105 / Normalizing
- 123  N41: Lower
- 92 / Normalizing
- 120  N42: Upper
- 92 / Normalizing
- 109  N42: Lower
- 87 / Normalizing
- 110  N43: Upper
- 83 / Normalizing
- 104  N43: Lower
- 75 / Normalizing
- 99  N44: Upper
- 80 / Normalizing
- 97  N44: Lower
- 75 / Normalizing
- 95  Initiating Cue:
The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT
. Round all calculations to three decimal places (Example: 1.2348 would be rounded to 1.235)
 
Appendix C Page 3 of 10 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
- JPM A1a S RO  NUREG 1021, Revision 10 Identify whether or not any limitations have been exceeded, and if so, what, if any ACTION, is required
. Task Standard:
The operator will complete the QPTR calculation in accordance with the provided KEY, identify that Technical Specification LCO is NOT met
, and identify that all six ACTIONs (A.1
-A.6) must be taken for Condition A of LCO 3.2.4
. Required Materials:
Calculator Robinson Technical Specifications and Basis must be available.
General  
General  


==References:==
==References:==
FMP-007 (Quadrant Power Tilt), Rev 15 Robinson Technical Specification LCO 3.2.4 (Quadrant Power Tilt Ratio), Amendment 176 Handouts:              Handout 1: Blank copy of FMP-007.
Time Critical Task:    NO Validation Time:        15 minutes Critical Step Justification Step 6        This step is critical because identifying that the maximum Upper Normalized Detector Ratio is N41 (0.854), and dividing it by the Average Upper Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY.
Step 7        This step is critical because identifying that the maximum Lower Normalized Detector Ratio is N42 (0.791), and dividing it by the Average Lower Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY.
Step 8        This step is critical because identifying that the Upper QPTR is larger than the Lower QPTR is necessary to complete the QPTR calculation in accordance with the provided KEY.
Step 9        This step is critical because determining that LCO 3.2.4 permits a maximum QPTR of 1.02 when power level is greater than 50% is necessary to identify that Technical Specification LCO is NOT met; and identifying that ACTIONs A.1 through A.6 must be completed is necessary to identify all of the Technical Specification required ACTION.
2016 Admin - JPM A1a SRO                                              NUREG 1021, Revision 10


FMP-007 (Quadrant Power Tilt), Rev 15  Robinson Technical Specification LCO 3.
Appendix C                                   Page 4 of 10                     Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
2.4 (Quadrant Power Tilt Ratio), Amendment 176  Handouts: Handout 1: Blank copy of FMP-007. Time Critical Task:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
NO  Validation Time:
START TIME:
15 minutes        Critical Step Justification Step 6 This step is critical because identifying that the maximum Upper Normalized Detector Ratio is N41 (0.
STEP 1:           Read the Upper (A) and the Lower (B) Indicated Detector Currents from the Detector Current meters of each operable Power Range channel and record on ATTACHMENT 10.2.                             ___ SAT (Step 8.2.4.1)
854), and dividing it by the Average Upper Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY
STANDARD:         The operator records the provided Upper and Lower Detector
. St ep 7 This step is critical because identifying that the maximum Lower Normalized Detector Ratio is N4 2 (0.791), and dividing it by the Average Lower Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY
___ UNSAT Currents on Attachment 10.2 IAW the provided KEY.
. Step 8 This step is critical because identifying that the Upper QPTR is larger than the Lower QPTR is necessary to complete the QPTR calculation in accordance with the provided KEY
EXAMINERS CUE:                 NONE EXAMINERS NOTE:                 NONE COMMENTS:
. Step 9 This step is critical because determining that LCO 3.2.4 permits a maximum QPTR of 1.02 when power level is greater than 50% is necessary to identify that Technical Specification LCO is NOT met; and identifying that ACTIONs A.1 through A.6 must be completed is necessary to identify all of the Technical Specification required ACTION
STEP 2:         Record the Upper and Lower Normalizing Detector Currents from the Control Room Status Board for each operable Power Range channel on ATTACHMENT 10.2.                                                   ___ SAT (Step 8.2.4.2)
.
STANDARD: The operator records the provided Upper and Lower Detector                 ___ UNSAT Currents on Attachment 10.2 IAW the provided KEY.
Appendix C Page 4 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
EXAMINERS CUE:                 NONE EXAMINERS NOTE:                 NONE COMMENTS:
- JPM A1a S RO  NUREG 1021, Revision 10 (Critical Steps are identified as such in right
NOTE:
-hand column)
Normalized Ratios, Average Ratios and QPTR values should be recorded to at least 3 decimal places.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
2016 Admin - JPM A1a SRO                                          NUREG 1021, Revision 10
: 1. START TIME:
STEP 1: Read the Upper (A) and the Lower (B) Indicated Detector Currents from the Detector Current meters of each operable Power Range channel and record on ATTACHMENT 10.2.
(Step 8.2.4.1) STANDARD: The operator records the provided Upper and Lower Detector Currents on Attachment 10.2 IAW the provided KEY. EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE COMMENTS:       ___ SAT    ___ UNSAT  STEP 2: Record the Upper and Lower Normalizing Detector Currents from the Control Room Status Board for each operable Power Range channel on ATTACHMENT 10.2.
(Step 8.2.4.2) STANDARD: The operator records the provided Upper and Lower Detector Currents on Attachment 10.2 IAW the provided KEY.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE COMMENTS:       ___ SAT    ___ UNSAT  NOTE: Normalized Ratios, Average Ratios and QPTR values should be recorded to at least 3 decimal places.
Appendix C Page 5 of 10 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin  
- JPM A1a S RO  NUREG 1021, Revision 10 STEP 3: Divide each Indicated Detector Current by its corresponding Normalizing Detector Current and record the result as the Normalized Detector Ratio on ATTACHMENT 10.2.
(Step 8.2.4.3)  STANDARD: The operator reads the Note, and proceeds
. The operator divides each Indicated Detector Current by its corresponding Normalizing Detector Current and records the result as the Normalized Detector Ratio on ATTACHMENT 10.2 IAW the provided KEY
. Upper N41 =
0.854            Lower N41 =
0.767 Upper N42 =
0.844            Lower N42 =
0.791  Upper N43 =
0.798            Lower N43 =
0.758 Upper N44 =
0.82 5            Lower N44 =
0.789  EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE COMMENTS: 


___ SAT   ___ UNSAT   STEP 4: Average the Upper Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Upper column on ATTACHMENT 10.2.
Appendix C                                Page 5 of 10                      Form ES-C-1 PERFORMANCE INFORMATION STEP 3:      Divide each Indicated Detector Current by its corresponding Normalizing Detector Current and record the result as the Normalized Detector Ratio on ATTACHMENT 10.2.
(Step 8.2.4.4)
(Step 8.2.4.3)                                                        ___ SAT STANDARD:    The operator reads the Note, and proceeds.
STANDARD: The operator average s the Upper Normalized Detector Ratios and record s the result as the Average Normalized Detector Ratio in the Upper column on Attachment 10.2 IAW the provided KEY
___ UNSAT The operator divides each Indicated Detector Current by its corresponding Normalizing Detector Current and records the result as the Normalized Detector Ratio on ATTACHMENT 10.2 IAW the provided KEY.
.
Upper N41 = 0.854          Lower N41 = 0.767 Upper N42 = 0.844          Lower N42 = 0.791 Upper N43 = 0.798          Lower N43 = 0.758 Upper N44 = 0.825          Lower N44 = 0.789 EXAMINERS CUE:              NONE EXAMINERS NOTE:            NONE COMMENTS:
Upper Average Normalized Detector Ratio =
STEP 4:       Average the Upper Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Upper column on ATTACHMENT 10.2.
0.830 (+.001/-0)
(Step 8.2.4.4)                                                       ___ SAT STANDARD:     The operator averages the Upper Normalized Detector Ratios and records the result as the Average Normalized Detector Ratio in the   ___ UNSAT Upper column on Attachment 10.2 IAW the provided KEY.
EXAMINER'S CUE:
Upper Average Normalized Detector Ratio = 0.830 (+.001/-0)
NONE EXAMINER'S NOTE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE COMMENTS:
NONE COMMENTS:  
2016 Admin - JPM A1a SRO                                          NUREG 1021, Revision 10


___ SAT    ___ UNSAT Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
Appendix C                                   Page 6 of 10                     Form ES-C-1 PERFORMANCE INFORMATION STEP 5:       Average the Lower Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Lower column on ATTACHMENT 10.2.                                           ___ SAT (Step 8.2.4.5)
- JPM A1a S RO  NUREG 1021, Revision 10 STEP 5: Average the Lower Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Lower column on ATTACHMENT 10.2.
STANDARD:     The operator averages the Lower Normalized Detector Ratios and       ___ UNSAT records the result as the Average Normalized Detector Ratio in the Lower column on Attachment 10.2 IAW the provided KEY.
(Step 8.2.4.5)   STANDARD: The operator averages the Lower Normalized Detector Ratios and records the result as the Average Normalized Detector Ratio in the Lower column on Attachment 10.2 IAW the provided KEY
Lower Average Normalized Detector Ratio = 0.776 (+.001/-0)
. Lower Average Normalized Detector Ratio =
EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE COMMENTS:
0.776 (+.001/-0) EXAMINER'S CUE: NONE EXAMINER'S NOTE:
STEP 6:       Determine the maximum Upper Normalized Detector Ratio and             CRITICAL divide it by the Average Upper Normalized Detector Ratio and             STEP record the resulting Upper QPTR on ATTACHMENT 10.2.
NONE COMMENTS:       ___ SAT    ___ UNSAT  STEP 6: Determine the maximum Upper Normalized Detector Ratio and divide it by the Average Upper Normalized Detector Ratio and record the resulting Upper QPTR on ATTACHMENT 10.2.
(Step 8.2.4.6)
(Step 8.2.4.6)
STANDARD: The operator identifies that the maximum Upper Normalized Detector Ratio is N41 (0.
STANDARD:     The operator identifies that the maximum Upper Normalized             ___ SAT Detector Ratio is N41 (0.854), and divides it by the Average Upper Normalized Detector Ratio from Performance Step 4 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided KEY.                                                                 ___ UNSAT Upper QPTR = 0.854 / 0.830 = 1.029 (+.001/-0)
854), and divides it by the Average Upper Normalized Detector Ratio from Performance Step 4 and record s the resulting Upper QPTR on Attachment 10.2 IAW the provided KEY. Upper QPTR = 0.
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE COMMENTS:
854 / 0.830 = 1.02 9 (+.001/-0) EXAMINER'S CUE:
2016 Admin - JPM A1a SRO                                            NUREG 1021, Revision 10
NONE EXAMINER'S NOTE:
 
NONE COMMENTS:     CRITICAL STEP
Appendix C                                   Page 7 of 10                     Form ES-C-1 PERFORMANCE INFORMATION STEP 7:       Determine the maximum Lower Normalized Detector Ratio and divide it by the Average Lower Normalized Detector Ratio and           CRITICAL record the resulting Lower QPTR on ATTACHMENT 10.2                       STEP (Step 8.2.4.7)
___ SAT    ___ UNSAT Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
___ SAT STANDARD:     The operator observes that the maximum Lower Normalized Detector Ratio is N42 (0.791), and divides it by the Average Lower Normalized Detector Ratio from Performance Step 5 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided         ___ UNSAT KEY.
- JPM A1a S RO  NUREG 1021, Revision 10 STEP 7: Determine the maximum Lower Normalized Detector Ratio and divide it by the Average Lower Normalized Detector Ratio and record the resulting Lower QPTR on ATTACHMENT 10.2 (Step 8.2.4.7) STANDARD: The operator observes that the maximum Lower Normalized Detector Ratio is N4 2 (0.791), and divides it by the Average Lower Normalized Detector Ratio from Performance Step 5 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided KEY. Lower QPTR = 0.
Lower QPTR = 0.791 / 0.776 = 1.019 (+.001/-0)
791 / 0.776 = 1.019 (+.001/-0) EXAMINER'S CUE:
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE COMMENTS:
NONE EXAMINER'S NOTE:
STEP 8:     Record larger of the Upper QPTR or the Lower QPTR as the                 CRITICAL Maximum QPTR on ATTACHMENT 10.2 along with the reactor power               STEP and any comments.
NONE   COMMENTS:
(Step 8.2.4.8)                                                         ___ SAT STANDARD:     The operator identifies that the Upper QPTR is larger than the Lower QPTR and records the Maximum QPTR as 1.029 (+.001/-0)
CRITICAL STEP  ___ SAT    ___ UNSAT  STEP 8: Record larger of the Upper QPTR or the Lower QPTR as the Maximum QPTR on ATTACHMENT 10.2 along with the reactor power and any comments.
___ UNSAT IAW the provided KEY.
(Step 8.2.4.8) STANDARD: The operator identifies that the Upper QPTR is larger than the Lower QPTR and records the Maximum QPTR as 1.02 9 (+.001/-0) IAW the provided KEY.
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE COMMENTS:
EXAMINER'S CUE:
2016 Admin - JPM A1a SRO                                            NUREG 1021, Revision 10
NONE EXAMINER'S NOTE:
 
NONE   COMMENTS:
Appendix C                                   Page 8 of 10                       Form ES-C-1 PERFORMANCE INFORMATION STEP 9:     Identify whether or not any limitations have been exceeded, and if so,     CRITICAL what, if any ACTION, is required.                                            STEP
CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
___ SAT STANDARD:     The operator reviews Technical Specification LCO 3.2.4 and determines that with the plant in Mode 1 at greater than 50% power, a maximum QPTR of 1.02 is permitted.
- JPM A1a S RO  NUREG 1021, Revision 10 STEP 9: Identify whether or not any limitations have been exceeded, and if so, what, if any ACTION, is required
___ UNSAT The operator identifies that LCO 3.2.4 is NOT met.
. STANDARD: The operator reviews Technical Specification LCO 3.2.4 and determines that with the plant in Mode 1 at greater than 50% power, a maximum QPTR of 1.02 is permitted.
The operator identifies that ACTIONS A.1 through A.6 must be taken for Condition A of LCO 3.2.4.
T he operator identifies that LCO 3.2.4 is NOT met
* Reduce THERMAL POWER  3% from RTP for each 1% of QPTR > 1.00 within 2 hours (Minimum of 8.7% power reduction OR Maximum allowable power of 91.3%).
.
* Determine QPTR and reduce THERMAL POWER  3% from RTP for each 1% of QPTR > 1.00 once per 12 hours.
The operator identifies that ACTIONS A.1 through A.6 must be taken for Condition A of LCO 3.2.4
* Perform SR 3.2.1.1 and SR 3.2.2.1 within 24 hours and once per 7 days thereafter.
.
* Reevaluate safety analyses and confirm results remain valid for duration of operation under this condition prior to increasing THERMAL POWER above the limit of Required Action A.1.
QPTR > 1.00 within 2 hours (Minimum of 8.7% power reduction OR Maximu m allowable power of 91.3%).
* Prior to increasing THERMAL POWER above the limit of Required Action A.1 prior to increasing THERMAL POWER above the limit of Required Action A.1 or A.2.
Determine RTP for each 1% of QPTR > 1.00 once per 12 hours.
* Perform SR 3.2.1.1 and SR 3.2.2.1 Within 24 hours after reaching RTP OR Within 48 hours after increasing THERMAL POWER above the limit of Required Action A.1 or A.2.
Perform SR 3.2.1.1 and SR 3.2.2.1 within 24 hours and once per 7 days thereafter.
EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE COMMENTS:
Reevaluate safety analyses and confirm results remain valid for duration of operation under this condition prior to increasing THERMAL POWER above the limit of Required Action A.1.
Terminating Cue:               Evaluation on this JPM is complete.
Prior to increasing THERMAL POWER above the limit of Required Action A.1 prior to increasing THERMAL POWER above the limit of Required Action A.1 or A.2.
Perform SR 3.2.1.1 and SR 3.2.2.1 Within 24 hours after reaching RTP OR Within 48 hours after increasing THERMAL POWER above the limit of Required Action A.1 or A.2.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE COMMENTS:     CRITICAL STEP  ___ SAT    ___ UNSAT              Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Admin - JPM A1a SRO                                              NUREG 1021, Revision 10


Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Admin
Appendix C                             Page 9 of 10                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A1a SRO Examinees Name:
- JPM A1a S RO  NUREG 1021, Revision 10 Job Performance Measure No.:
2016 Admin  
- JPM A1a S RO  Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,581: Line 1,184:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT            UNSAT Examiners Signature:                                  Date:
2016 Admin - JPM A1a SRO                                  NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                             Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The plant is in Mode 1 at 100% RTP.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* ERFIS is inoperable.
The plant is in Mode 1 at 100% RTP. ERFIS is inoperable
* The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation.
. The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation
* Detector Currents are as follows:
. Detector Currents are as follows:
* N41: Upper - 105 / Normalizing - 123
N41: Upper  
* N41: Lower - 92 / Normalizing - 120
- 105 / Normalizing  
* N42: Upper - 92 / Normalizing - 109
- 123 N41: Lower  
* N42: Lower - 87 / Normalizing - 110
- 92 / Normalizing  
* N43: Upper - 83 / Normalizing - 104
- 120 N42: Upper  
* N43: Lower - 75 / Normalizing - 99
- 92 / Normalizing  
* N44: Upper - 80 / Normalizing - 97
- 109 N42: Lower  
* N44: Lower - 75 / Normalizing - 95 INITIATING CUE:
- 87 / Normalizing  
* The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT.
- 110   N43: Upper  
* Round all calculations to three decimal places (Example:
- 83 / Normalizing  
1.2348 would be rounded to 1.235)
- 104   N43: Lower  
* Identify whether or not any limitations have been exceeded, and if so, what, if any ACTION, is required.
- 75 / Normalizing  
NUREG 1021, Revision 10
- 99 N44: Upper  
- 80 / Normalizing  
- 97 N44: Lower  
- 75 / Normalizing  
- 95     INITIATING CUE:
The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP
-007, QUADRANT POWER TILT
. Round all calculations to three decimal places (Example: 1.2348 would be rounded to 1.235)   Identify whether or not any limitations have been exceeded, and if so, what, if any ACTION, is required
.
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Admin
- JPM A1 b RO (Rev_010816)  NUREG 1021, Revision 10


JPM A 1 b RO     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet JPM A1b RO Developed By:     ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:     ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Admin - JPM A1b RO (Rev_010816)                  NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 7 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                           Page 2 of 7                           Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                                 Task No.:
- JPM A1 b RO  NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Determine License Status                   JPM No.:     2016 Admin - JPM A1b RO K/A  
Determine License Status JPM No.: 2016 Admin  
- JPM A1 b RO     K/A  


==Reference:==
==Reference:==
2.1.4 (3.3)
2.1.4 (3.3)
Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                         Actual Performance:         X Classroom           X     Simulator             Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
X Classroom X Simulator Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
Initial Conditions:
Initial Conditions:
You are a Licensed Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
* You are a Licensed Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
Your last medical exam was on 11/17/14.
* Your last medical exam was on 11/17/14.
Your last SCBA quantitative and qualitative fit test was on 1/18/1
* Your last SCBA quantitative and qualitative fit test was on 1/18/15.
: 5. You have attended all required LOCT training sessions, and passed all exams administered.
* You have attended all required LOCT training sessions, and passed all exams administered.
Your supervisor has directed you to maintain your license active AND qualified to stand watch.
* Your supervisor has directed you to maintain your license active AND qualified to stand watch.
Your Control Room work history in the last three months is as follows:   11/26/15, BOP for 12 hours (Day Shift) 1/2/1 6, RO for 8 hours (Night Shift 1800
* Your Control Room work history in the last three months is as follows:
-2400)   1/4/1 6, Extra Operator for 4 hours assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
* 11/26/15, BOP for 12 hours (Day Shift)
1/10/1 6, BOP for 12 hours (Day Shift)
* 1/2/16, RO for 8 hours (Night Shift 1800-2400)
* 1/4/16, Extra Operator for 4 hours assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
* 1/10/16, BOP for 12 hours (Day Shift) 2016 Admin - JPM A1b RO                                                      NUREG 1021, Revision 10


Appendix C Page 3 of 7 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                       Page 3 of 7                         Form ES-C-1 Job Performance Measure Worksheet Initiating Cue:         Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.
- JPM A1 b RO  NUREG 1021, Revision 10 Initiating Cue:
Task Standard:           The operator will evaluate their work history and identify that four 12-hour shifts must be completed as either the RO or the BOP prior to the end of the quarter to maintain their license ACTIVE, and that an SCBA quantitative and qualitative fit test must be completed prior to standing watch in the Control Room again.
Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE
Required Materials:     Calculator General  
; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room
. Task Standard:
The operator will evaluate their work history and identify that four 12
-hour shifts must be completed as either the RO or the BOP prior to the end of the quarter to maintain their license ACTIVE, and that an SCBA quantitative and qualitative fit test must be completed prior to standing watch in the Control Room again
. Required Materials:
Calculator General  


==References:==
==References:==
OMM-001-5 (Training and Qualification), Rev 53 AD-OP-ALL-1000 (Conduct of Operations), Rev 4 Handouts:                None Time Critical Task:      NO Validation Time:        6 minutes Critical Step Justification Step 1        This step is critical because identifying the watches that must be completed before the end of the quarter is necessary to maintain the license status ACTIVE.
Step 2        This step is critical because identifying the requirement to complete an annual fit test is necessary to maintain the ability to stand watch in the Control Room.
2016 Admin - JPM A1b RO                                                  NUREG 1021, Revision 10


OMM-00 1-5 (Training and Qualification), Rev 5 3  AD-OP-ALL-1000 (Conduct of Operations), Rev 4  Handouts: None  Time Critical Task:
Appendix C                                       Page 4 of 7                     Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
NO  Validation Time:
6 minutes        Critical Step Justification Step 1 This step is critical because identifying the watches that must be completed before the end of the quarter is necessary to maintain the license status ACTIVE
. Step 2 This step is critical because identifying the requirement to complete an annual fit test is necessary to maintain the ability to stand watch in the Control Room
.
Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
- JPM A1 b RO  NUREG 1021, Revision 10 (Critical Steps are identified as such in right
-hand column)
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
START TIME:
START TIME:
STEP 1: Identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE
STEP 1:         Identify any requirements that must be met prior to the end of the       CRITICAL quarter that are required to maintain your license ACTIVE.                STEP
. STANDARD: The operator identifies that ROs must stand a minimum number of hours in a Licensed position, satisfactorily participate in the Licensed Operator Continuing Training Program, and have a biennial medical exam; and conclude s that the LOCT and Medical requirements have been met
___ SAT STANDARD:             The operator identifies that ROs must stand a minimum number of hours in a Licensed position, satisfactorily participate in the Licensed Operator Continuing Training Program, and have a biennial medical exam; and concludes
. The operator recognizes that Individuals with RO Licenses may maintain an active license by standing watch a minimum of five 12 hour shifts per calendar quarter as RO or BOP
___ UNSAT that the LOCT and Medical requirements have been met.
. The operator recognizes that the work on 11/26/15 does not count towards this calendar-quarter's number of watches.
The operator recognizes that Individuals with RO Licenses may maintain an active license by standing watch a minimum of five 12 hour shifts per calendar quarter as RO or BOP.
The operator recognizes that the work on 1/2/1 6 does not count towards the minimum of five 12
The operator recognizes that the work on 11/26/15 does not count towards this calendar-quarters number of watches.
-hour shifts.
The operator recognizes that the work on 1/2/16 does not count towards the minimum of five 12-hour shifts.
The operator recognizes that the work on 1/4/16 does not count towards the minimum of five 12-hour shifts; because it was not stood as the BOP or the RO.
The operator recognizes that the work on 1/10/16 does count towards the minimum of five 12-hour shifts; and concludes that 4 additional 12-hour shifts as either the RO or BOP must be completed before the end of the quarter.
EXAMINERS CUE:                NONE EXAMINERS NOTE:                See Section 5.3 of OMM-001-5.
COMMENTS:
2016 Admin - JPM A1b RO                                              NUREG 1021, Revision 10


The operator recognizes that the work on 1/4/1 6 does not count towards the minimum of five 12
Appendix C                                     Page 5 of 7                           Form ES-C-1 PERFORMANCE INFORMATION STEP 2:     Identify the requirements that are required to maintain your                   CRITICAL qualification to stand watch in the Control Room.                                 STEP STANDARD: The operator recognizes that in order to maintain qualification to stand         ___ SAT watch in the Control Room, the operator must be Respirator Qualified as defined in the section on Maintaining License and Qualification Active Status; and that this section requires an SCBA quantitative and qualitative fit test annually.                                                 ___ UNSAT The operator recognizes that the last SCBA quantitative and qualitative fit test was over a year ago, and identifies that this fit test must be completed prior to standing a watch in the Control Room.
-hour shifts; because it was not stood as the BOP or the RO.
EXAMINERS CUE:                 NONE EXAMINERS NOTE:                 NONE COMMENTS:
The operator recognizes that the work on 1/10/1 6 does count towards the minimum of five 12
Terminating Cue:                 Evaluation on this JPM is complete.
-hour shifts; and concludes that 4 additional 12
-hour shifts as either the RO or BOP must be completed before the end of the quarter. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
See Section 5.3 of OMM
-001-5. COMMENTS:        CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
- JPM A1 b RO  NUREG 1021, Revision 10 STEP 2: Identify the requirements that are required to maintain your qualification to stand watch in the Control Room.
STANDARD: The operator recognizes that in order to maintain qualification to stand watch in the Control Room, the operator must be Respirator Qualified as defined in the section on Maintaining License and Qualification Active Status; and that this section requires an SCBA quantitative and qualitative fit test annually.
The operator recognizes that the last SCBA quantitative and qualitative fit test was over a year ago, and identifies that this fit test must be completed prior to standing a watch in the Control Room.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE COMMENTS:     CRITICAL STEP  ___ SAT    ___ UNSAT            Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Admin - JPM A1b RO                                                NUREG 1021, Revision 10


Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Admin
Appendix C                             Page 6 of 7               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A1b RO Examinees Name:
- JPM A1 b RO  NUREG 1021, Revision 10 Job Performance Measure No.:
2016 Admin  
- JPM A1 b RO   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,703: Line 1,269:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT            UNSAT Examiners Signature:                                Date:
2016 Admin - JPM A1b RO                                  NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                                         Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* You are a Licensed Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* Your last medical exam was on 11/17/14.
You are a Licensed Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
* Your last SCBA quantitative and qualitative fit test was on 1/18/15.
Your last medical exam was on 11/17/14.
* You have attended all required LOCT training sessions, and passed all exams administered.
Your last SCBA quantitative and qualitative fit test was on 1/18/1 5. You have attended all required LOCT training sessions, and passed all exams administered.
* Your supervisor has directed you to maintain your license active AND qualified to stand watch.
Your supervisor has directed you to maintain your license active AND qualified to stand watch.
* Your Control Room work history in the last three months is as follows:
Your Control Room work history in the last three months is as follows:   11/26/15, BOP for 12 hours (Day Shift) 1/2/1 6, RO for 8 hours (Night Shift 1800
* 11/26/15, BOP for 12 hours (Day Shift)
-2400)   1/4/1 6, Extra Operator for 4 hours assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
* 1/2/16, RO for 8 hours (Night Shift 1800-2400)
1/10/1 6, BOP for 12 hours (Day Shift)   INITIATING CUE:
* 1/4/16, Extra Operator for 4 hours assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.
* 1/10/16, BOP for 12 hours (Day Shift)
Requirements that must be met before the end of the quarter to maintain an ACTIVE License:         Requirements that must be to maintain your qualification to stand watch in the Control Room:        
INITIATING CUE:           Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.
Requirements that must be met before the end of the quarter to maintain an ACTIVE License:
Requirements that must be to maintain your qualification to stand watch in the Control Room:
NUREG 1021, Revision 10


Appendix C Job Performance Measure Form ES-C-1 Worksheet 2 016 Admin - JPM A1b SRO (Rev_010816) NUREG 1021, Revision 10
Appendix C                       Job Performance Measure             Form ES-C-1 Worksheet JPM A1b SRO Developed By:      ______________________________        Date: ___________
Instructor/Developer Concurred By:      ______________________________        Date: ___________
Line Superintendent/Supervisor SRO Approved By:      ______________________________        Date: ___________
Superintendent/Supervisor Training 2016 Admin - JPM A1b SRO (Rev_010816)                 NUREG 1021, Revision 10


JPM A 1b S RO      Developed By:
Appendix C                                           Page 2 of 7                           Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
______________________________
Task Title:             Determine License Status                   JPM No.:     2016 Admin - JPM A1b SRO K/A  
Date:  ___________
Instructor/Developer Concurred By:
______________________________
Date:  ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date:  ___________
Superintendent/Supervisor Training   
 
Appendix C Page 2 of 7 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
- JPM A1b S RO  NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Determine License Status JPM No.: 2016 Admin  
- JPM A1b S RO    K/A  


==Reference:==
==Reference:==
2.1.4 (3.3)
2.1.4 (3.3)
Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                         Actual Performance:         X Classroom           X     Simulator             Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
X Classroom X Simulator Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
Initial Conditions:
Initial Conditions:
You are a Licensed Senior Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
* You are a Licensed Senior Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
Your last medical exam was on 11/17/14.
* Your last medical exam was on 11/17/14.
Your last SCBA quantitative and qualitative fit test was on 1/18/1
* Your last SCBA quantitative and qualitative fit test was on 1/18/15.
: 5. You have attended all required LOCT training sessions, and passed all exams administered.
* You have attended all required LOCT training sessions, and passed all exams administered.
Your supervisor has directed you to maintain your license active AND qualified to stand watch.
* Your supervisor has directed you to maintain your license active AND qualified to stand watch.
Your Control Room work history in the last three months is as follows:   11/26/15, BOP for 12 hours (Day Shift) 1/2/1 6, RO for 8 hours (Night Shift 1800
* Your Control Room work history in the last three months is as follows:
-2400)   1/4/1 6, Extra Operator for 4 hours assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
* 11/26/15, BOP for 12 hours (Day Shift)
1/10/1 6 , CRS for 12 hours (Day Shift)
* 1/2/16, RO for 8 hours (Night Shift 1800-2400)
* 1/4/16, Extra Operator for 4 hours assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
* 1/10/16, CRS for 12 hours (Day Shift) 2016 Admin - JPM A1b SRO                                                    NUREG 1021, Revision 10


Appendix C Page 3 of 7 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                       Page 3 of 7                         Form ES-C-1 Job Performance Measure Worksheet Initiating Cue:         Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.
- JPM A1b S RO  NUREG 1021, Revision 10 Initiating Cue:
Task Standard:           The operator will evaluate their work history and identify that four 12-hour shifts must be completed as either the SM, CRS, RO or the BOP prior to the end of the quarter to maintain their license ACTIVE, and that an SCBA quantitative and qualitative fit test must be completed prior to standing watch in the Control Room again.
Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.
Required Materials:     Calculator General  
Task Standard:
The operator will evaluate their work history and identify that four 12
-hour shifts must be completed as either the SM, CRS, RO or the BOP prior to the end of the quarter to maintain their license ACTIVE, and that an SCBA quantitative and qualitative fit test must be completed prior to standing watch in the Control Room again
.      Required Materials:
Calculator General  


==References:==
==References:==
OMM-001-5 (Training and Qualification), Rev 53 AD-OP-ALL-1000 (Conduct of Operations), Rev 4 Handouts:                None Time Critical Task:      NO Validation Time:        7 minutes Critical Step Justification Step 1        This step is critical because identifying the watches that must be completed before the end of the quarter is necessary to maintain the license status ACTIVE.
Step 2        This step is critical because identifying the requirement to complete an annual fit test is necessary to maintain the ability to stand watch in the Control Room.
2016 Admin - JPM A1b SRO                                                NUREG 1021, Revision 10


OMM-001-5 (Training and Qualification), Rev 5 3  AD-OP-ALL-1000 (Conduct of Operations), Rev 4 Handouts: None  Time Critical Task:
Appendix C                                       Page 4 of 7                     Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
NO  Validation Time:
7 minutes      Critical Step Justification Step 1 This step is critical because identifying the watches that must be completed before the end of the quarter is necessary to maintain the license status ACTIVE.
Step 2 This step is critical because identifying the requirement to complete an annual fit test is necessary to maintain the ability to stand watch in the Control Room.
 
Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
- JPM A1b S RO  NUREG 1021, Revision 10 (Critical Steps are identified as such in right
-hand column)
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
START TIME:
START TIME:
STEP 1: Identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE.
STEP 1:         Identify any requirements that must be met prior to the end of the       CRITICAL quarter that are required to maintain your license ACTIVE.                 STEP STANDARD:             The operator identifies that SROs must stand a minimum
STANDARD: The operator identifies that SROs must stand a minimum number of hours in a Licensed position, satisfactorily participate in the Licensed Operator Continuing Training Program, and have a biennial medical exam; and conclude that the LOCT and Medical requirements have been met.
___ SAT number of hours in a Licensed position, satisfactorily participate in the Licensed Operator Continuing Training Program, and have a biennial medical exam; and conclude that the LOCT and Medical requirements have been met.
The operator recognizes that Individuals with SRO Licenses may maintain an active license by standing watch a minimum of five 12 hour shifts in a License required position, at least one of which must be in the SM or CRS position in the Main Control Room
___ UNSAT The operator recognizes that Individuals with SRO Licenses may maintain an active license by standing watch a minimum of five 12 hour shifts in a License required position, at least one of which must be in the SM or CRS position in the Main Control Room.
. The operator recognizes that the work on 11/26/15 does not count towards this calendar
The operator recognizes that the work on 11/26/15 does not count towards this calendar-quarters number of watches.
-quarter's number of watches.
The operator recognizes that the work on 1/2/16 does not count towards the minimum of five 12-hour shifts.
The operator recognizes that the work on 1/2/1 6 does not count towards the minimum of five 12
The operator recognizes that the work on 1/4/16 does not count towards the minimum of five 12-hour shifts; and was not stood as the SM, CRS, BOP or the RO.
-hour shifts.
The operator recognizes that the work on 1/10/16 does count towards the minimum of five 12-hour shifts; and concludes that 4 additional 12-hour shifts as either the SM, CRS, RO or BOP must be completed before the end of the quarter.
The operator recognizes that the work on 1/4/1 6 does not count towards the minimum of five 12
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               See Section 5.3 of OMM-001-5.
-hour shifts; and was not stood as the SM, CRS, BOP or the RO.
COMMENTS:
The operator recognizes that the work on 1/10/1 6 does count towards the minimum of five 12
2016 Admin - JPM A1b SRO                                                NUREG 1021, Revision 10
-hour shifts; and concludes that 4 additional 12
 
-hour shifts as either the SM, CRS, RO or BOP must be completed before the end of the quarter. EXAMINER'S CUE:
Appendix C                                     Page 5 of 7                           Form ES-C-1 PERFORMANCE INFORMATION STEP 2:     Identify the requirements that are required to maintain your                   CRITICAL qualification to stand watch in the Control Room.                                 STEP STANDARD: The operator recognizes that in order to maintain qualification to stand         ___ SAT watch in the Control Room, the operator must be Respirator Qualified as defined in the section on Maintaining License and Qualification Active Status; and that this section requires an SCBA quantitative and qualitative fit test annually.                                                 ___ UNSAT The operator recognizes that the last SCBA quantitative and qualitative fit test was over a year ago, and identifies that this fit test must be completed prior to standing a watch in the Control Room.
NONE   EXAMINER'S NOTE:
EXAMINERS CUE:                 NONE EXAMINERS NOTE:                 NONE COMMENTS:
See Section 5.3 of OMM
Terminating Cue:                 Evaluation on this JPM is complete.
-001-5. COMMENTS:     CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
- JPM A1b S RO  NUREG 1021, Revision 10 STEP 2: Identify the requirements that are required to maintain your qualification to stand watch in the Control Room.
STANDARD: The operator recognizes that in order to maintain qualification to stand watch in the Control Room, the operator must be Respirator Qualified as defined in the section on Maintaining License and Qualification Active Status; and that this section requires an SCBA quantitative and qualitative fit test annually.
The operator recognizes that the last SCBA quantitative and qualitative fit test was over a year ago, and identifies that this fit test must be completed prior to standing a watch in the Control Room.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE COMMENTS:       CRITICAL STEP  ___ SAT    ___ UNSAT Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Admin - JPM A1b SRO                                                NUREG 1021, Revision 10


Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Admin
Appendix C                             Page 6 of 7                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A1b SRO Examinees Name:
- JPM A1b S RO  NUREG 1021, Revision 10 Job Performance Measure No.:
2016 Admin  
- JPM A1b S RO  Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,809: Line 1,350:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT            UNSAT Examiners Signature:                                  Date:
2016 Admin - JPM A1b SRO                                  NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                                       Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* You are a Licensed Senior Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* Your last medical exam was on 11/17/14.
You are a Licensed Senior Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
* Your last SCBA quantitative and qualitative fit test was on 1/18/15.
Your last medical exam was on 11/17/14. Your last SCBA quantitative and qualitative fit test was on 1/18/1 5. You have attended all required LOCT training sessions, and passed all exams administered.
* You have attended all required LOCT training sessions, and passed all exams administered.
Your supervisor has directed you to maintain your license active AND qualified to stand watch.
* Your supervisor has directed you to maintain your license active AND qualified to stand watch.
Your Control Room work history in the last three months is as follows:   11/26/15, BOP for 12 hours (Day Shift) 1/2/1 6, RO for 8 hours (Night Shift 1800
* Your Control Room work history in the last three months is as follows:
-2400)   1/4/1 6, Extra Operator for 4 hours assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
* 11/26/15, BOP for 12 hours (Day Shift)
1/10/1 6 , CRS for 12 hours (Day Shift)
* 1/2/16, RO for 8 hours (Night Shift 1800-2400)
INITIATING CUE:
* 1/4/16, Extra Operator for 4 hours assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.
* 1/10/16, CRS for 12 hours (Day Shift)
Requirements that must be met before the end of the quarter to maintain an ACTIVE License:         Requirements that must be to maintain your qualification to stand watch in the Control Room:        
INITIATING CUE:           Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.
 
Requirements that must be met before the end of the quarter to maintain an ACTIVE License:
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Admin
Requirements that must be to maintain your qualification to stand watch in the Control Room:
- JPM A 2 RO (Rev_010816)  NUREG 1021, Revision 10
NUREG 1021, Revision 10


JPM A 2 RO     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet JPM A2 RO Developed By:     ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:     ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Admin - JPM A2 RO (Rev_010816)                  NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 7 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                           Page 2 of 7                         Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                                 Task No.:
- JPM A 2 RO  NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Determine Proper Equipment                 JPM No.:     2016 Admin - JPM A2 Boundaries                                              RO K/A  
Determine Proper Equipment Boundaries JPM No.: 2016 Admin - JPM A 2 RO     K/A  


==Reference:==
==Reference:==
2.2.41 (3.5)
2.2.41 (3.5)
Examinee: NRC Examiner:
Examinee:                                                       NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                             Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                         Actual Performance:       X Classroom           X     Simulator             Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
X Classroom X Simulator Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM). Initial Conditions:
* The plant is in Mode 1 at 100% power.
The plant is in Mode 1 at 100% power
* Charging Pump A suction relief valve CVC-2080 has failed open.
. Charging Pump "A" suction relief valve CVC
* The operating crew has entered AOP-016, Excessive Primary Plant Leakage, to control the plant.
-2080 has failed open.
Initiating Cue:             The CRS has directed you to use all available resources to identify the pump boundary valves needed to be closed to isolate the leak, and identify the motor breaker to electrically isolate the pump motor.
The operating crew has entered AOP
Task Standard:               The operator will identify that the leak can be isolated by closing three valves; CVC-270, CVC-290 and CVC-291, and that the pump motor can be electrically isolated by opening Breaker 52/34B.
-016, Excessive Primary Plant Leakage, to control the plant.
Required Materials:         Set of P&IDs available to the operator Set of EDPs available to the operator General  
Initiating Cue:
The CRS has directed you to use all available resources to identify the pump boundary valves needed to be closed to isolate the leak, and identify the motor breaker to electrically isolate the pump motor
. Task Standard:
The operator will identify that the leak can be isolated by closing three valves; CVC
-270, CVC-290 and CVC
-291, and that the pump motor can be electrically isolated by opening Breaker 52/34B
. Required Materials:
Set of P&IDs available to the operator Set of EDPs available to the operator General  


==References:==
==References:==
P&ID 5379-685 Sheet 2 of 3 (Chemical and Volume Control System Purification and Makeup Flow Diagram), Rev 61 2016 Admin - JPM A2 RO                                                      NUREG 1021, Revision 10


P&ID 5379-685 Sheet 2 of 3 (Chemical and Volume Control System Purification and Makeup Flow Diagram), Rev 61 Appendix C Page 3 of 7 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                       Page 3 of 7                     Form ES-C-1 Job Performance Measure Worksheet EDP-002 (480V AC Busses), Rev 16 OWP-005 (Chemical and Volume Control System (CVCS)), Rev 65 Handouts:               None Time Critical Task:     NO Validation Time:         5 minutes Critical Step Justification Step 1       This step is critical because closing CVC-270, CV-290 and CVC-291 is necessary to isolate the leak.
- JPM A 2 RO  NUREG 1021, Revision 10 EDP-002 (480V AC Busses), Rev 16 OWP-005 (Chemical and Volume Control System (CVCS)), Rev 65 Handouts: None   Time Critical Task:
Step 2       This step is critical because opening Breaker 52/34B is necessary to electrically isolate the A Charging Pump.
NO   Validation Time:
2016 Admin - JPM A2 RO                                              NUREG 1021, Revision 10
5 minutes       Critical Step Justification Step 1 This step is critical because closing CVC-270, CV-290 and CVC
-291 is necessary to isolate the leak
. Step 2 This step is critical because opening Breaker 52/34B is necessary to electrically isolate the "A" Charging Pump.


Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
Appendix C                                     Page 4 of 7                       Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- JPM A 2 RO  NUREG 1021, Revision 10 (Critical Steps are identified as such in right
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
-hand column)
START TIME:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM)
STEP 1:         Review P&IDs to determine pump boundary valves.                         CRITICAL STEP STANDARD:       The operator reviews the set of P&IDs, and determines that the boundary valves associated with the A Charging Pump and its
. START TIME:
___ SAT relief valve are located on P&ID 5379-685 Sheet 2 of 3 (Chemical and Volume Control System Purification and Makeup Flow Diagram).
STEP 1: Review P&IDs to determine pump boundary valves.
___ UNSAT As a MINIMUM, the operator identifies the following valves are required to be verified in the selected positions to ensure that the leak flow path is isolated :
STANDARD: The operator reviews the set of P&IDs, and determines that the boundary valves associated with the "A" Charging Pump and its relief valve are located on P&ID 5379-685 Sheet 2 of 3 (Chemical and Volume Control System Purification and Makeup Flow Diagram). As a MINIMUM, the operator identifies the following valves are required to be verified in the selected positions to ensure that the leak flow path is isolated
* CVC-270, Charging Pump A Suction - CLOSED
CVC-270, Charging Pump A Suction  
* CVC-290, Charging Pump A to Charging Line - CLOSED
- CLOSED CVC-290, Charging Pump A to Charging Line  
* CVC-291, Charging Pump A to Seal Injection - CLOSED EXAMINERS CUE:                 NONE EXAMINERS NOTE:               This JPM consists of identifying the boundaries necessary to isolate the leakage path from Charging Pump A suction relief valve CVC-2080. The sequence of the component isolation is NOT required for the performance of this JPM.
- CLOSED CVC-291, Charging Pump A to Seal Injection  
Not required for credit. Additional isolation valves that can be included are as follows:
- CLOSED   EXAMINER'S CUE:
* CVC-465, Charging Pump A Suction Vent - CLOSED
NONE   EXAMINER'S NOTE:
* CVC-275F, Charging Pump A Suction Line Vent - CLOSED
This JPM consists of identifying the boundaries necessary to isolate the leakage path from Charging Pump A suction relief valve CVC
* CVC-280C, Charging Pump A Drain - CLOSED
-2080. The sequence of the component isolation is NOT required for the performance of this JPM.
* CVC-400A, Charging Pump A Leakage Isolation - OPEN
Not required for credit.
* CVC-277C, Charging Pump A Recirc Root - CLOSED CVC-466, Charging Pump A Suction Stabilizer Drain - OPEN COMMENTS:
Additional isolation valves that can be included are as follows:
2016 Admin - JPM A2 RO                                                 NUREG 1021, Revision 10
CVC-465, Charging Pump A Suction Vent  
- CLOSED CVC-275F, Charging Pump A Suction Line Vent  
- CLOSED CVC-280C, Charging Pump A Drain  
- CLOSED CVC-400A, Charging Pump A Leakage Isolation  
- OPEN CVC-277C, Charging Pump A Recirc Root  
- CLOSED CVC-466, Charging Pump A Suction Stabilizer Drain - OPEN COMMENTS:       CRITICAL STEP
___ SAT    ___ UNSAT Appendix C Page 5 of 7 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin  
- JPM A 2 RO NUREG 1021, Revision 10 STEP 2: Determine the power supply to Charging Pump "A". STANDARD: The operator reviews the EDPs and determines that EDP
-002 must be addressed
. As a MINIMUM the operator that Charging Pump A power supply is breaker 52/34B must be OPENED.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE: The sequence of the component isolation is NOT required for the performance of this JPM.


Not required for credit.
Appendix C                                      Page 5 of 7                    Form ES-C-1 PERFORMANCE INFORMATION STEP 2:        Determine the power supply to Charging Pump A.                        CRITICAL STEP STANDARD: The operator reviews the EDPs and determines that EDP-002 must              ___ SAT be addressed.
Additional breakers/switches that can be included                           are as follows:
As a MINIMUM the operator that Charging Pump A power supply is breaker 52/34B must be OPENED.
RTGB Control switch for Charging Pump A  
___ UNSAT EXAMINERS CUE:                  NONE EXAMINERS NOTE:                The sequence of the component isolation is NOT required for the performance of this JPM.
- CAPPED Power Panel 37 Circuit 2, Charging Pump A Suction Stabilizer Heater Breaker  
Not required for credit. Additional breakers/switches that can be included are as follows:
- OPEN     COMMENTS:     CRITICAL STEP  ___ SAT    ___ UNSAT            Terminating Cue:
* RTGB Control switch for Charging Pump A - CAPPED
Evaluation on this JPM is complete.
* Power Panel 37 Circuit 2, Charging Pump A Suction Stabilizer Heater Breaker -
OPEN COMMENTS:
Terminating Cue:                 Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Admin - JPM A2 RO                                                NUREG 1021, Revision 10


Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Admin
Appendix C                             Page 6 of 7               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A2 RO Examinees Name:
- JPM A 2 RO  NUREG 1021, Revision 10 Job Performance Measure No.: 2016 Admin  
- JPM A2 RO   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,919: Line 1,433:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT            UNSAT Examiners Signature:                                Date:
2016 Admin - JPM A2 RO                                  NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                                 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The plant is in Mode 1 at 100% power.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* Charging Pump A suction relief valve CVC-2080 has failed open.
The plant is in Mode 1 at 100% power
* The operating crew has entered AOP-016, Excessive Primary Plant Leakage, to control the plant.
. Charging Pump "A" suction relief valve CVC
INITIATING CUE:     The CRS has directed you to use all available resources to identify the pump boundary valves needed to be closed to isolate the leak, and identify the motor breaker to electrically isolate the pump motor.
-2080 has failed open. The operating crew has entered AOP
NUREG 1021, Revision 10
-016, Excessive Primary Plant Leakage, to control the plant.
INITIATING CUE:
The CRS has directed you to use all available resources to identify the pump boundary valves needed to be closed to isolate the leak, and identify the motor breaker to electrically isolate the pump motor.
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Admin
- JPM A2 SRO (Rev_010816)  NUREG 1021, Revision 10


JPM A 2 S RO      Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet JPM A2 SRO Developed By:     ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:     ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Admin - JPM A2 SRO (Rev_010816)                  NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 15 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                       Page 2 of 15                           Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- JPM A2 SRO NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Determine if Mode Change is               JPM No.:     2016 Admin - JPM A2 Permissible                                            SRO K/A  
Determine if Mode Change is Permissible JPM No.: 2016 Admin - JPM A 2 S RO    K/A  


==Reference:==
==Reference:==
2.2.38 (4.5)
2.2.38 (4.5)
Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                       Actual Performance:       X Classroom           X     Simulator             Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
Provide Operator with Initial Conditions/Cue and the Available Equipment Inoperable List (Last Two Pages of this JPM), and Handout 1.
X Classroom X Simulator Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Provide Operator with Initial Conditions/Cue and the Available Equipment Inoperable List (Last Two Page s of this JPM), and Handout
* The plant is in Mode 5, returning from a refueling outage.
: 1. Initial Conditions:
* RCS temperature is 165°F and there is a bubble in the PZR.
The plant is in Mode 5, returning from a refueling outage.
* RHR Loop A is maintaining RCS temperature.
RCS temperature is 165°F and there is a bubble in the PZR.
* You are an extra SRO assigned to support the shift during re-start activities.
RHR Loop "A" is maintaining RCS temperature.
* An Inoperable Equipment List is available.
You are an extra SRO assigned to support the shift during re
-start activities.
An Inoperable Equipment List is available.
Initiating Cue:
Initiating Cue:
The SM has directed you to complete the attached partially completed OMM
* The SM has directed you to complete the attached partially completed OMM-001-12, MINIMUM EQUIPMENT LIST AND SHIFT RELIEF, Att. 2, 200°F to 350°F (MODE 4) MEL that was started on the previous shift and determine if any Mode 4 restrictions exist.
-001-12, MINIMUM EQUIPMENT LIST AND SHIFT RELIEF, Att. 2, 200°F to 350°F (MODE 4) MEL that was started on the previous shift and determine if any Mode 4 restrictions exist
* The SM has indicated that it is expected to make the Mode change without reliance upon Technical Specification 3.0.4.b.
. The SM has indicated that it is expected to make the Mode change without reliance upon Technical Specification 3.0.4.b.
2016 Admin - JPM A2 SRO                                                    NUREG 1021, Revision 10


Appendix C Page 3 of 15 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                     Page 3 of 15                       Form ES-C-1 Job Performance Measure Worksheet Task Standard:         The operator will evaluate the Technical Specifications/Technical Requirements against the Inoperable Equipment List and listed parameters and determines that CCW Pump C, V6-16B, WCCU-1A must be restored to operable prior to changing modes; that CVT 1 must be repaired and Instrument Bus 1 must be powered from MCC-5 prior to changing modes, and that DFO Storage tank level must be raised to > 19000 gallons prior to changing modes per the provided KEY.
- JPM A2 SRO NUREG 1021, Revision 10 Task Standard:
Required Materials:   Robinson Technical Specifications and Basis must be available.
The operator will evaluate the Technical Specifications/Technical Requirements against the Inoperable Equipment List and listed parameters and determines that CCW Pump "C", V6
-16B, WCCU-1A must be restored to operable prior to changing modes; that CVT 1 must be repaired and Instrument Bus 1 must be powered from MCC-5 prior to changing modes , and that DFO Storage tank level must be raised to > 19000 gallons prior to changing modes per the provided KEY. Required Materials:
Robinson Technical Specifications and Basis must be available.
General  
General  


==References:==
==References:==
OMM-001-12 (Minimum Equipment List and Shift Relief), Rev 85 Technical Specifications for H. B. Robinson Steam Electric Plant Unit No. 2 Handouts:              Handout 1: Attachment 2 of OMM-001-12 marked up for this JPM Time Critical Task:    NO Validation Time:      15 minutes Critical Step Justification Step 9        This step is critical because LCO 3.7.6 is NOT met, and meeting this LCO is necessary to change Modes.
Step 10      This step is critical because LCO 3.7.7 is NOT met, and meeting this LCO is necessary to change Modes.
Step 11      This step is critical because LCO 3.7.10 is NOT met, and meeting this LCO is necessary to change Modes.
Step 12      This step is critical because LCO 3.8.3 is NOT met, and meeting this LCO is necessary to change Modes.
Step 14      This step is critical because LCO 3.8.7 is NOT met, and meeting this LCO is necessary to change Modes.
Step 15      This step is critical because LCO 3.8.9 is NOT met, and meeting this LCO is necessary to change Modes.
Step 18      This step is critical because the report to the SM must be correct prior to changing Modes.
2016 Admin - JPM A2 SRO                                              NUREG 1021, Revision 10
Appendix C                                      Page 4 of 15                    Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
Provide Operator with Initial Conditions/Cue and the Available Equipment Inoperable List (Last Two Pages of this JPM), and Handout 1.
START TIME:
STEP 1:        Evaluate ITS LCO 3.4.17 requirements.
___ SAT STANDARD:      The operator recognizes that 2 Charging Pumps must be OPERABLE, and that the A Charging Pump is inoperable.
The operator determines minimum requirement is met with B and
___ UNSAT C Charging Pumps OPERABLE, and initials the appropriate block.
The operator recognizes that the Seal Water Injection flow to EACH of the RCPs is greater than 6 gpm, and initials the appropriate block.
EXAMINERS CUE:                  NONE EXAMINERS NOTE:                This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
STEP 2:        Evaluate ITS LCO 3.5.4 requirements.
___ SAT STANDARD: The operator recognizes that the RWST level is greater than 91 %,
and initials the appropriate block.
The operator recognizes that the RWST Boron concentration is          ___ UNSAT 1950 ppm and  2400 ppm, and initials the appropriate block.
The operator recognizes that the RWST temperature is  45°F and 100°F, and initials the appropriate block.
EXAMINERS CUE:                  NONE EXAMINERS NOTE:                This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
2016 Admin - JPM A2 SRO                                              NUREG 1021, Revision 10
Appendix C                                    Page 5 of 15                      Form ES-C-1 PERFORMANCE INFORMATION STEP 3:      Evaluate ITS LCO 3.6.4 requirements.
___ SAT STANDARD: The operator recognizes that the Containment Pressure is  -0.8 psig AND  +1.0 psig, and initials the appropriate block.
___ UNSAT EXAMINERS CUE:                NONE EXAMINERS NOTE:              This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
STEP 4:      Evaluate ITS LCO 3.6.5 requirements.
___ SAT STANDARD: The operator recognizes that the Containment Air Temperature is 120°F, and initials the appropriate block.
___ UNSAT EXAMINERS CUE:                NONE EXAMINERS NOTE:              This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
STEP 5:      Evaluate ITS LCO 3.6.7 requirements.
___ SAT STANDARD: The operator recognizes that the Spray Additive Tank Level is 32%,
and initials the appropriate block.
The operator recognizes that the Spray Additive Tank concentration is    ___ UNSAT 30% NAOH, and initials the appropriate block.
EXAMINERS CUE:                NONE EXAMINERS NOTE:              This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
2016 Admin - JPM A2 SRO                                          NUREG 1021, Revision 10
Appendix C                                    Page 6 of 15                      Form ES-C-1 PERFORMANCE INFORMATION STEP 6:      Evaluate ITS LCO 3.6.8 requirements.
___ SAT STANDARD: The operator recognizes that the IVSW pressure is 49 psig as indicated locally on PI-1910, and initials the appropriate block.
The operator recognizes that the IVSW tank level is 49%, and initials    ___ UNSAT the appropriate block.
EXAMINERS CUE:                NONE EXAMINERS NOTE:              This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
STEP 7:        Evaluate ITS LCO 3.7.4 requirements.
___ SAT STANDARD:      The operator recognizes that 1 MDAFW Pump (LCO-3.0.4.b N/A) is required to be OPERABLE, and that the B MDAFW Pump is inoperable.
The operator determines minimum requirement is met with the A        ___ UNSAT MDAFW Pump OPERABLE, and initials the appropriate block.
EXAMINERS CUE:                NONE EXAMINERS NOTE:              This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
STEP 8:        Evaluate ITS LCO 3.7.5 requirements.
STANDARD:      The operator recognizes that the Condensate Storage Tank level is      ___ SAT 26%, and initials the appropriate block.
EXAMINERS CUE:                NONE
___ UNSAT EXAMINERS NOTE:              This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
2016 Admin - JPM A2 SRO                                              NUREG 1021, Revision 10
Appendix C                                  Page 7 of 15                      Form ES-C-1 PERFORMANCE INFORMATION STEP 9:      Evaluate ITS LCO 3.7.6 requirements.                                      CRITICAL STEP STANDARD: The operator recognizes that 2 Trains powered from Emergency Power supplies ("B" and "C" pumps) are required to be OPERABLE,
___ SAT and that the C CCW Pump is inoperable.
The operator determines that the C CCW Pump must be restored to OPERABLE prior to changing modes, and does NOT initial the              ___ UNSAT associated block.
EXAMINERS CUE:              NONE EXAMINERS NOTE:              This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
STEP 10:      Evaluate ITS LCO 3.7.7 requirements.                                    CRITICAL STEP STANDARD:      The operator recognizes that the Turbine Bldg Loop Isolation valves are required to be OPERABLE, and that V6-16B is inoperable.
___ SAT The operator determines that V6-16B must be restored to OPERABLE prior to changing modes, and does NOT initial the associated block.
___ UNSAT EXAMINERS CUE:              NONE EXAMINERS NOTE:              This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
2016 Admin - JPM A2 SRO                                          NUREG 1021, Revision 10


OMM-001-12 (Minimum Equipment List and Shift Relief), Rev 8 5  Technical Specifications for H. B. Robinson Steam Electric Plant Unit No. 2  Handouts: Handout 1: Attachment 2 of OMM
Appendix C                                   Page 8 of 15                       Form ES-C-1 PERFORMANCE INFORMATION STEP 11:     Evaluate ITS LCO 3.7.10 requirements.                                   CRITICAL STEP STANDARD:     The operator recognizes that 2 HVAC WCCU Trains are required to be OPERABLE, and that WCCU-1A is inoperable.                           ___ SAT The operator determines that WCCU-1A must be restored to OPERABLE prior to changing modes, and does NOT initial the associated block.                                                       ___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:             This evaluation can be made in ANY order. See provided KEY.
-001-12 marked up for this JPM Time Critical Task:
COMMENTS:
NO  Validation Time:
STEP 12:     Evaluate ITS LCO 3.8.3 requirements.                                     CRITICAL STEP STANDARD:     The operator recognizes that 19,000 gallons is NOT available from DFO Storage tank, and recognizes that tank level must be          ___ SAT raised to > 19000 gallons prior to changing modes, and does NOT initial the associated block.
15 minutes        Critical Step Justification Step 9 This step is critical because LCO 3.7.6 is NOT met, and meeting this LCO is necessary to change Modes
The operator recognizes that  15,000 gallons is available from Unit    ___ UNSAT 1 IC Turbine Fuel Oil Storage tanks, and initials the appropriate block. (Not Critical)
. Step 10 This step is critical because LCO 3.7.7 is NOT met, and meeting this LCO is necessary to change Modes.
The operator recognizes that the A EDG Air receiver pressure is greater than 210 psig, and initials the appropriate block. (Not Critical)
Step 11 This step is critical because LCO 3.7.10 is NOT met, and meeting this LCO is necessary to change Modes.
The operator recognizes that the B EDG Air receiver pressure is greater than 210 psig, and initials the appropriate block. (Not Critical)
Step 12 This step is critical because LCO 3.8.3 is NOT met, and meeting this LCO is necessary to change Modes.
EXAMINERS CUE:               NONE EXAMINERS NOTE:             This evaluation can be made in ANY order. See provided KEY.
Step 14 This step is critical because LCO 3.8.7 is NOT met, and meeting this LCO is necessary to change Modes.
COMMENTS:
Step 15 This step is critical because LCO 3.8.9 is NOT met, and meeting this LCO is necessary to change Modes.
2016 Admin - JPM A2 SRO                                             NUREG 1021, Revision 10
Step 18 This step is critical because the report to the SM must be correct prior to changing Modes.
Appendix C Page 4 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
- JPM A2 SRO NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column)
Provide Operator with Initial Conditions/Cue and the Available Equipment Inoperable List (Last Two Page s of this JPM), and Handout
: 1. START TIME:
STEP 1: Evaluate ITS LCO 3.4.17 requirements.
STANDARD: The operator recognizes that 2 Charging Pumps must be OPERABLE, and that the "A" Charging Pump is inoperable.
The operator determines minimum requirement is met with "B" and "C" Charging Pumps OPERABLE, and initials the appropriate block
. The operator recognizes that the Seal Water Injection flow to EACH of the RCPs is greater than 6 gpm, and initials the appropriate block. EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:       ___ SAT    ___ UNSAT  STEP 2: Evaluate ITS LCO 3.5.4 requirements.
STANDARD: The operator recognizes that the RWST level is greater than 91 %, and initials the appropriate block.
initials the appropriate block.
100°F, and initials the appropriate block.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:       ___ SAT    ___ UNSAT Appendix C Page 5 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin  
- JPM A2 SRO NUREG 1021, Revision 10 STEP 3: Evaluate ITS LCO 3.6.4 requirements.
STANDARD: -0.8 psig AND    EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.


Appendix C                                    Page 9 of 15                  Form ES-C-1 PERFORMANCE INFORMATION STEP 13:      Evaluate ITS LCO 3.8.4 requirements.
___ SAT STANDARD:    The operator recognizes that MCC-A Voltage is > 126 VDC, and initials the appropriate block.
The operator recognizes that MCC-B Voltage is > 126 VDC, and        ___ UNSAT initials the appropriate block.
EXAMINERS CUE:                NONE EXAMINERS NOTE:              This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
COMMENTS:
___ SAT    ___ UNSAT  STEP 4: Evaluate ITS LCO 3.6.5 requirements.
STEP 14:     Evaluate ITS LCO 3.8.7 requirements.                                 CRITICAL STEP STANDARD:     The operator recognizes that Inverter A Voltage is > 114 VAC, and    ___ SAT initials the appropriate block. (Not Critical)
STANDARD: The operator recognizes that the Containment Air Temperature is block. EXAMINER'S CUE:
The operator recognizes that Inverter B Voltage is > 114 VAC, and initials the appropriate block. (Not Critical)                      ___ UNSAT The operator recognizes that CVT 1, must be OPERABLE, and that that it is currently inoperable.
NONE  EXAMINER'S NOTE:
The operator determines that CVT 1 must be restored to OPERABLE prior to changing modes, and does NOT initial the associated block.
This evaluation can be made in ANY order.
EXAMINERS CUE:               NONE EXAMINERS NOTE:               This evaluation can be made in ANY order. See provided KEY.
See provided KEY.
COMMENTS:    ___ SAT   ___ UNSAT  STEP 5: Evaluate ITS LCO 3.6.7 requirements.
STANDARD: The operator recognizes that the Spray Additive and initials the appropriate block.
The operator recognizes that the Spray Additive Tank concentration is   EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
This evaluation can be made in ANY order
. See provided KEY.
COMMENTS:    ___ SAT    ___ UNSAT Appendix C Page 6 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin
- JPM A2 SRO NUREG 1021, Revision 10 STEP 6: Evaluate ITS LCO 3.6.8 requirements.
STANDARD: indicated locally on PI
-1910, and initials the appropriate block.
The the appropriate block.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:    ___ SAT    ___ UNSAT   STEP 7: Evaluate ITS LCO 3.7.4 requirements.
STANDARD: The operator recognizes that 1 MDAFW Pump (LCO
-3.0.4.b N/A) is required to be OPERABLE, and that the "B" MDAFW Pump is inoperable.
The operator determines minimum requirement is met with the "A" MDAFW Pump OPERABLE, and initials the appropriate block.
EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:
COMMENTS:
___ SAT    ___ UNSAT  STEP 8: Evaluate ITS LCO 3.7.5 requirements.
2016 Admin - JPM A2 SRO                                           NUREG 1021, Revision 10
STANDARD: The operator recognizes that the Condensate Storage Tank level is  EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:      ___ SAT    ___ UNSAT Appendix C Page 7 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin
- JPM A2 SRO NUREG 1021, Revision 10 STEP 9: Evaluate ITS LCO 3.7.6 requirements.
STANDARD: The operator recognizes that 2 Trains powered from Emergency Power supplies ("B" and "C" pumps) are required to be OPERABLE, and that the "C" CCW Pump is inoperable.
The operator determines that the "C" CCW Pump must be restored to OPERABLE prior to changing modes , and does NOT initial the associated block. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:      CRITICAL STEP  ___ SAT    ___ UNSAT  STEP 10: Evaluate ITS LCO 3.7.
7 requirements.
STANDARD: The operator recognizes that the Turbine Bldg Loop Isolation valves are required to be OPERABLE, and that V6-16B is inoperable.
The operator determines that V6
-16B must be restored to OPERABLE prior to changing modes , and does NOT initial the associated block. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:      CRITICAL STEP
___ SAT    ___ UNSAT Appendix C Page 8 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin
- JPM A2 SRO NUREG 1021, Revision 10 STEP 11: Evaluate ITS LCO 3.7.10 requirements.
STANDARD: The operator recognizes that 2 HVAC WCCU Trains are required to be OPERABLE, and that WCCU
-1A is inoperable.
The operator determines that WCCU
-1A must be restored to OPERABLE prior to changing modes , and does NOT initial the associated block. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:    CRITICAL STEP
___ SAT    ___ UNSAT  STEP 12: Evaluate ITS LCO 3.8.3 requirements.
STANDARD: NOT available from DFO Storage tank, and recognizes that tank level must be raised to > 19000 gallons prior to changing modes , and does NOT initial the associated block. 0 gallons is available from Unit 1 IC Turbine Fuel Oil Storage tanks, and initials the appropriate block. (Not Critical)
The operator recognizes that the "A" EDG Air receiver pressure is greater than 210 psig, and initials the appropriate block.
(Not Critical)  The operator recognizes that the "B" EDG Air receiver pressure is greater than 210 psig, and initials the appropriate block.
(Not Critical)
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:    CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 9 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin  
- JPM A2 SRO NUREG 1021, Revision 10 STEP 13: Evaluate ITS LCO 3.8.4 requirements.
STANDARD: The operator recognizes that MCC
-A Voltage is > 126 VDC, and initials the appropriate block.
The operator recognizes that MCC-B Voltage is > 126 VDC, and initials the appropriate block.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.
COMMENTS:    ___ SAT    ___ UNSAT  STEP 14:  Evaluate ITS LCO 3.8.7 requirements.
STANDARD: The operator recognizes that Inverter A Voltage is > 114 VAC, and initials the appropriate block.
(Not Critical)


The operator recognizes that Inverter B Voltage is > 114 VAC, and initials the appropriate block.
Appendix C                                  Page 10 of 15                    Form ES-C-1 PERFORMANCE INFORMATION STEP 15:      Evaluate ITS LCO 3.8.9 requirements.                                  CRITICAL STEP STANDARD:    The operator recognizes that 4KV Bus 2 Voltage is > 3.2 KV, and initials the appropriate block. (Not Critical)
(Not Critical)
___ SAT The operator recognizes that 4KV Bus 3 Voltage is > 3.2 KV, and initials the appropriate block. (Not Critical)
The operator recognizes that CVT 1, must be OPERABLE, and that that it is currently inoperable.
The operator recognizes that 480V Bus E-1 Voltage (lowest phase)      ___ UNSAT is > 440 VAC, and initials the appropriate block. (Not Critical)
The operator determines that CVT 1 must be restored to OPERABLE prior to changing modes , and does NOT initial the associated block. EXAMINER'S CUE:
The operator recognizes that 480V Bus E-2 Voltage (lowest phase) is > 440 VAC, and initials the appropriate block. (Not Critical)
NONE EXAMINER'S NOTE: This evaluation can be made in ANY order.
The operator recognizes that MCC-5 breaker, CMPT NO. 4BL, FEED TO INSTRUMENT BUS 1, must be closed to be OPERABLE, and that that it is currently OPEN due to problem with No. 1 Constant Voltage Transformer.
See provided KEY.
The operator determines that MCC-5 breaker, CMPT NO. 4BL, FEED TO INSTRUMENT BUS 1, must be closed prior to changing modes, and does NOT initial the associated block.
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               This evaluation can be made in ANY order. See provided KEY.
COMMENTS:
2016 Admin - JPM A2 SRO                                            NUREG 1021, Revision 10


COMMENTS:      CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 10 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin
Appendix C                                 Page 11 of 15                     Form ES-C-1 PERFORMANCE INFORMATION STEP 16:     Evaluate TRMS 3.6.b requirements.
- JPM A2 SRO NUREG 1021, Revision 10 STEP 15: Evaluate ITS LCO 3.8.9 requirements.
STANDARD:     The operator recognizes that the "A" Boric Acid Tank Level is >       ___ SAT 42%, and initials the appropriate block.
STANDARD: The operator recognizes that 4KV Bus 2 Voltage is > 3.2 KV, and initials the appropriate block.
The operator recognizes that the "A" Boric Acid Tank boron
(Not Critical)
___ UNSAT concentration is between 20,000 ppm - 22,500 ppm, and initials the appropriate block.
The operator recognizes that 4KV Bus 3 Voltage is > 3.2 KV, and initials the appropriate block.  (Not Critical)
The operator recognizes that the "A" Boric Acid Tank temperature is
The operator recognizes that 480V Bus E
              > 145°F, and initials the appropriate block.
-1 Voltage (lowest phase) is > 440 VAC, and initials the appropriate block. (Not Critical)
The operator recognizes that the "B" Boric Acid Tank Level is >
The operator recognizes that 480V Bus E
42%, and initials the appropriate block.
-2 Voltage (lowest phase) is > 440 VAC, and initials the appropriate block. (Not Critical)
The operator recognizes that the "B" Boric Acid Tank boron concentration is between 20,000 ppm - 22,500 ppm, and initials the appropriate block.
The operator recognizes that MCC-5 breaker, CMPT NO. 4BL, FEED TO INSTRUMENT BUS 1, must be closed to be OPERABLE, and that that it is currently OPEN due to problem with No. 1 Constant Voltage Transformer
The operator recognizes that the "B" Boric Acid Tank temperature is
. The operator determines that MCC-5 breaker, CMPT NO. 4BL, FEED TO INSTRUMENT BUS 1, must be closed prior to changing modes , and does NOT initial the associated block. EXAMINER'S CUE:
              > 145°F, and initials the appropriate block.
NONE EXAMINER'S NOTE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:             This evaluation can be made in ANY order. See provided KEY.
This evaluation can be made in ANY order.
COMMENTS:
See provided KEY.
2016 Admin - JPM A2 SRO                                          NUREG 1021, Revision 10
COMMENTS:      CRITICAL STEP
___ SAT    ___ UNSAT Appendix C Page 11 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
- JPM A2 SRO NUREG 1021, Revision 10 STEP 16: Evaluate TRMS 3.6.b requirements.
STANDARD: The operator recognizes that the "A" Boric Acid Tank Level is > 42%, and initials the appropriate block.
The operator recognizes that the "A" Boric Acid Tank boron concentration is between 20,000 ppm  
- 22,500 ppm, and initials the appropriate block.
The operator recognizes that the "A" Boric Acid Tank temperature is > 145°F, and initials the appropriate block.
The operator recognizes that the "B" Boric Acid Tank Level is > 42%, and initials the appropriate block.
The operator recognizes that the " B" Boric Acid Tank boron concentration is between 20,000 ppm  
- 22,500 ppm, and initials the appropriate block.
The operator recognizes that the "B" Boric Acid Tank temperature is > 145°F, and initials the appropriate block.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
This evaluation can be made in ANY order.
See provided KEY.


COMMENTS:        ___ SAT    ___ UNSAT Appendix C Page 12 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
Appendix C                                   Page 12 of 15                   Form ES-C-1 PERFORMANCE INFORMATION STEP 17:     Evaluate TRMS 3.6.d requirements.
- JPM A2 SRO NUREG 1021, Revision 10 STEP 17: Evaluate TRMS 3.6.d requirements.
___ SAT STANDARD:     The operator recognizes that the Primary Water Storage Tank Level is > 45%, and initials the appropriate block.
STANDARD: The operator recognizes that the Primary Water Storage Tank Level is > 45%, and initials the appropriate block.
___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:             This evaluation can be made in ANY order. See provided KEY.
EXAMINER'S CUE:
COMMENTS:
NONE EXAMINER'S NOTE:
STEP 18:     The operator reports findings to the Shift Manager.                   CRITICAL STEP STANDARD:     The operator reports findings / provides applicable pages or all
This evaluation can be made in ANY order.
___ SAT pages of Attachment 2 to Shift Manager.
See provided KEY.
* CCW Pump C must be restored to operable prior to changing modes.
COMMENTS:   ___ SAT    ___ UNSAT  STEP 18: The operator reports findings to the Shift Manager.
* V6-16B must be restored to operable prior to changing modes.       ___ UNSAT
STANDARD: The operator reports findings / provides applicable pages or all pages of Attachment 2 to Shift Manager.
* WCCU-1A must be restored to operable prior to changing modes.
CCW Pump "C" must be restored to operable prior to changing modes. V6-16B must be restored to operable prior to changing modes.
* CVT #1 must be repaired
WCCU-1A must be restored to operable prior to changing modes. CVT #1 must be repaired Instrument Bus 1 must be powered from MCC
* Instrument Bus 1 must be powered from MCC-5 prior to changing modes.
-5 prior to changing modes.
* DFO Storage tank level must be raised to > 19000 gallons EXAMINERS CUE:               NONE EXAMINERS NOTE:             See provided KEY.
DFO Storage tank level must be raised to > 19000 gallons EXAMINER'S CUE:
COMMENTS:
NONE EXAMINER'S NOTE:
Terminating Cue:             Evaluation on this JPM is complete.
See provided KEY.
COMMENTS:       CRITICAL STEP  ___ SAT    ___ UNSAT Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Admin - JPM A2 SRO                                            NUREG 1021, Revision 10


Appendix C Page 13 of 15 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Admin
Appendix C                           Page 13 of 15               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A2 SRO Examinees Name:
- JPM A2 SRO NUREG 1021, Revision 10 Job Performance Measure No.:
2016 Admin  
- JPM A 2 S RO  Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 2,162: Line 1,616:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT            UNSAT Examiners Signature:                                Date:
2016 Admin - JPM A2 SRO                                  NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                                     Form ES-C-1 JPM CUE SHEET Inoperable Equipment List
Date:
* Charging Pump A
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 Inoperable Equipment List Charging Pump "A" Component Cooling Water Pump "C" MDAFW Pump "B" V6-16B, SW TURB BLDG SUPPLY, is OPEN with the motor leads disconnected for control circuit troubleshooting.
* Component Cooling Water Pump C
Instrument Bus 1 is being powered from MCC
* MDAFW Pump B
-8. MCC-5 feed to Instrument Bus 1 is de-energized due to problem with No. 1 Constant Voltage Transformer.
* V6-16B, SW TURB BLDG SUPPLY, is OPEN with the motor leads disconnected for control circuit troubleshooting.
Control Room Water Cooled Condensing Unit, WCCU-1A Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* Instrument Bus 1 is being powered from MCC-8. MCC-5 feed to Instrument Bus 1 is de-energized due to problem with No. 1 Constant Voltage Transformer.
The plant is in Mode 5, returning from a refueling outage.
* Control Room Water Cooled Condensing Unit, WCCU-1A NUREG 1021, Revision 10
RCS temperature is 165°F and there is a bubble in the PZR.
 
RHR Loop "A" is maintaining RCS temperature.
Appendix C                                                               Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
You are an extra SRO assigned to support the shift during re
* The plant is in Mode 5, returning from a refueling outage.
-start activities.
* RCS temperature is 165°F and there is a bubble in the PZR.
An Inoperable Equipment List is available.
* RHR Loop A is maintaining RCS temperature.
* You are an extra SRO assigned to support the shift during re-start activities.
* An Inoperable Equipment List is available.
INITIATING CUE:
INITIATING CUE:
The SM has directed you to complete the attached partially completed OMM
* The SM has directed you to complete the attached partially completed OMM-001-12, MINIMUM EQUIPMENT LIST AND SHIFT RELIEF, Att. 2, 200°F to 350°F (MODE 4) MEL that was started on the previous shift and determine if any Mode 4 restrictions exist.
-001-12, MINIMUM EQUIPMENT LIST AND SHIFT RELIEF, Att. 2, 200°F to 350°F (MODE 4) MEL that was started on the previous shift and determine if any Mode 4 restrictions exist
* The SM has indicated that it is expected to make the Mode change without reliance upon Technical Specification 3.0.4.b.
. The SM has indicated that it is expected to make the Mode change without reliance upon Technical Specification 3.0.4.b.
NUREG 1021, Revision 10
 
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Admin
- JPM A 3 RO (Rev_010816)  NUREG 1021, Revision 10


JPM A 3 RO     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet JPM A3 RO Developed By:     ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:     ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Admin - JPM A3 RO (Rev_010816)                  NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 7 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                         Page 2 of 7                         Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- JPM A 3 RO  NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Evaluate Stay Time with Lowered           JPM No.:     2016 Admin - JPM A3 SFP Level                                              RO K/A  
Evaluate Stay Time with Lowered SFP Level JPM No.: 2016 Admin - JPM A 3 RO     K/A  


==Reference:==
==Reference:==
 
2.3.7 (3.5)
2.3.7 (3.5)   Examinee: NRC Examiner:
Examinee:                                                   NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                         Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                       Actual Performance:       X Classroom           X     Simulator           Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
X Classroom X Simulator Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
Initial Conditions:
Initial Conditions:
A station wide accident has occurred due to an Earthquake
* A station wide accident has occurred due to an Earthquake.
. The plant is in Mode 6 with a full core off
* The plant is in Mode 6 with a full core off-load.
-load. The Spent Fuel Pool level has lowered to 10 feet above the top of the fuel, and has stabilized at this level.
* The Spent Fuel Pool level has lowered to 10 feet above the top of the fuel, and has stabilized at this level.
The crew is implementing AOP
* The crew is implementing AOP-036 (SFP Events).
-036 (SFP Events).
* R-5, Spent Fuel Building Rad Monitor, reads 1.93E+2 mr/hr.
R-5, Spent Fuel Building Rad Monitor, reads 1.93E+2 mr/hr. A dose limit of 25 mrem has been placed on all personnel performing emergency tasks within the building.
* A dose limit of 25 mrem has been placed on all personnel performing emergency tasks within the building.
You have been assigned a repetitive task within AOP
* You have been assigned a repetitive task within AOP-036 which will require you to enter the Spent Fuel Building and proceed to the area around the Spent Fuel Pool, and remain there for 3 minutes, before exiting the building.
-036 which will require you to enter the Spent Fuel Building and proceed to the area around the Spent Fuel Pool, and remain there for 3 minutes, before exiting the building.
* The exposure traveling to and from the Spent Fuel Pool area results in no appreciable exposure.
The exposure traveling to and from the Spent Fuel Pool area results in no appreciable exposure.
Initiating Cue:             The OSC Leader has directed you to estimate how many times you can perform this repetitive task before you must be replaced by another operator.
Initiating Cue:
2016 Admin - JPM A3 RO                                                      NUREG 1021, Revision 10
The OSC Leader has directed you to estimate how many times you can perform this repetitive task before you must be replaced by another operator.
 
Appendix C Page 3 of 7 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                       Page 3 of 7                     Form ES-C-1 Job Performance Measure Worksheet Task Standard:         The operator will determine that the repetitive task can be performed 2 times before another operator will need to perform the task.
- JPM A 3 RO  NUREG 1021, Revision 10 Task Standard:
Required Materials:   Calculator General  
The operator will determine that the repetitive task can be performed 2 times before another operator will need to perform the task.
Required Materials:
Calculator General  


==References:==
==References:==
AOP-036 (SFP Events), Rev 48 OMM-014 (Radiation Monitor Setpoints), Rev 51 Handouts:              None Time Critical Task:    NO Validation Time:      7 minutes Critical Step Justification Step 3        This step is critical because it is necessary to determine how many times the task can be performed without exceeding a limit.
2016 Admin - JPM A3 RO                                                NUREG 1021, Revision 10


AOP-036 (SFP Events
Appendix C                                     Page 4 of 7                   Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
), Rev 48  OMM-014 (Radiation Monitor Setpoints), Rev 51 Handouts: None  Time Critical Task:
NO  Validation Time:
7 minutes    Critical Step Justification Step 3 This step is critical because it is necessary to determine how many times the task can be performed without exceeding a limit.
 
Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
- JPM A 3 RO  NUREG 1021, Revision 10 (Critical Steps are identified as such in right
-hand column)
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
Provide Operator with Initial Conditions/Cue (Last Page of this JPM).
START TIME:
START TIME:
STEP 1: Determine dose rate in the Spent Fuel Pool Area STANDARD: The operator evaluates the R
STEP 1:         Determine dose rate in the Spent Fuel Pool Area
-5 reading and determines that the area radiation levels are 193 mrem/hour.
___ SAT STANDARD:             The operator evaluates the R-5 reading and determines that the area radiation levels are 193 mrem/hour.
EXAMINER'S CUE:
___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE COMMENTS:
NONE EXAMINER'S NOTE:
STEP 2:       Determine the accumulated Dose each time the repetitive task is performed.                                                           ___ SAT STANDARD: The operator determines that 3 minutes in a radiation field of 193 mrem/hour will yield a dose of 9.65 mrem
NONE COMMENTS:     ___ SAT    ___ UNSAT  STEP 2: Determine the accumulated Dose each time the repetitive task is performed.
___ UNSAT 193 mrem/hr x 1hr/60 minutes x 3 minutes/task = 9.65 mrem/task EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE COMMENTS:
STANDARD: The operator determines that 3 minutes in a radiation field of 193 mrem/hour will yield a dose of 9.65 mrem 193 mrem/hr x 1hr/60 minutes x 3 minutes/task = 9.65 mrem/task EXAMINER'S CUE:
2016 Admin - JPM A3 RO                                            NUREG 1021, Revision 10
NONE EXAMINER'S NOTE:
 
NONE COMMENTS:
Appendix C                                   Page 5 of 7                     Form ES-C-1 PERFORMANCE INFORMATION STEP 3:     Determine how many times the repetitive task can be performed           CRITICAL before allowable RWP limits have been reached.                             STEP STANDARD: The operator determines that a Task which accumulates 9.65 mrem           ___ SAT can be performed twice without exceeding a dose limit of 25 mrem.
___ SAT    ___ UNSAT Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
25 mrem x task/9.65 mrem = 2.6 tasks
- JPM A 3 RO  NUREG 1021, Revision 10 STEP 3: Determine how many times the repetitive task can be performed before allowable RWP limits have been reached.
___ UNSAT Since the task cannot be partially performed, the task can be performed twice before the operator must be replaced with another operator.
STANDARD: The operator determines that a Task which accumulates 9.65 mrem can be performed twice without exceeding a dose limit of 25 mrem.
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE COMMENTS:
25 mrem x task/9.65 mrem = 2.6 tasks Since the task cannot be partially performed, the task can be performed twice before the operator must be replaced with another operator. EXAMINER'S CUE:
Terminating Cue:             Evaluation on this JPM is complete.
NONE EXAMINER'S NOTE:
NONE   COMMENTS:   CRITICAL STEP
___ SAT    ___ UNSAT Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Admin - JPM A3 RO                                              NUREG 1021, Revision 10


Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Admin
Appendix C                             Page 6 of 7               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A3 RO Examinees Name:
- JPM A 3 RO  NUREG 1021, Revision 10 Job Performance Measure No.:
2016 Admin  
- JPM A3 RO   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 2,264: Line 1,696:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT            UNSAT Examiners Signature:                                Date:
2016 Admin - JPM A3 RO                                  NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                                 Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* A station wide accident has occurred due to an Earthquake.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* The plant is in Mode 6 with a full core off-load.
A station wide accident has occurred due to an Earthquake
* The Spent Fuel Pool level has lowered to 10 feet above the top of the fuel, and has stabilized at this level.
. The plant is in Mode 6 with a full core off
* The crew is implementing AOP-036 (SFP Events).
-load. The Spent Fuel Pool level has lowered to 10 feet above the top of the fuel, and has stabilized at this level.
* R-5, Spent Fuel Building Rad Monitor, reads 1.93E+2 mr/hr.
The crew is implementing AOP
* A dose limit of 25 mrem has been placed on all personnel performing emergency tasks within the building.
-036 (SFP Events).
* You have been assigned a repetitive task within AOP-036 which will require you to enter the Spent Fuel Building and proceed to the area around the Spent Fuel Pool, and remain there for 3 minutes, before exiting the building.
R-5, Spent Fuel Building Rad Monitor, reads 1.93E+2 mr/hr.
* The exposure traveling to and from the Spent Fuel Pool area results in no appreciable exposure.
A dose limit of 25 mrem has been placed on all personnel performing emergency tasks within the building.
INITIATING CUE:     The OSC Leader has directed you to estimate how many times you can perform this repetitive task before you must be replaced by another operator.
You have been assigned a repetitive task within AOP
NUREG 1021, Revision 10
-036 which will require you to enter the Spent Fuel Building and proceed to the area around the Spent Fuel Pool, and remain there for 3 minutes, before exiting the building.
The exposure traveling to and from the Spent Fuel Pool area results in no appreciable exposure.
INITIATING CUE:
The OSC Leader has directed you to estimate how many times you can perform this repetitive task before you must be replaced by another operator
.
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Admin
- JPM A3 SRO (Rev_010816)  NUREG 1021, Revision 10


JPM A 3 S RO      Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet JPM A3 SRO Developed By:     ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:     ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Admin - JPM A3 SRO (Rev_010816)                  NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 9 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                           Page 2 of 9                       Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- JPM A 3 S RO  NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Approve a Waste Gas Release               JPM No.:   2016 Admin - JPM A3 Permit                                                SRO K/A  
Approve a Waste Gas Release Permit JPM No.: 2016 Admin  
- JPM A 3 S RO    K/A  


==Reference:==
==Reference:==
 
2.3.8 (3.7)
2.3.8 (3.7)   Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                         Actual Performance:     X Classroom           X     Simulator             Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
X Classroom X Simulator Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
* The plant is in Mode 1 at 100% power.
: 1. Initial Conditions:
* A Waste Gas Release Permit for the A WGDT has been presented to the Shift Manager for review and approval.
The plant is in Mode 1 at 100% power. A Waste Gas Release Permit for the "A" WGDT has been presented to the Shift Manager for review and approval.
Initiating Cue:
Initiating Cue: Review and Approve the Waste Gas Release Permit.
* Review and Approve the Waste Gas Release Permit.
Identify all issues found (if any) which would prevent approval.
* Identify all issues found (if any) which would prevent approval.
Task Standard:
Task Standard:             The operator will review the WGDT Release Permit and identify that it cannot be approved because (1) it has been written for the wrong WGDT and (2) the R14C setpoint is less conservative than required.
The operator will review the WGDT Release Permit and identify that it cannot be approved because (1) it has been written for the wrong WGDT and (2) the R14C setpoint is less conservative than required.
Required Materials:         None General  
Required Materials:
None   General  


==References:==
==References:==
EMP-022 (Gaseous Waste Release Permits), Rev 56 OMM-014 (Radiation Monitor Setpoints), Rev 51 OP-706 (Waste Disposal - Gaseous Rad Waste Release), Rev 18 2016 Admin - JPM A3 SRO                                                    NUREG 1021, Revision 10


EMP-022 (Gaseous Waste Release Permits), Rev 56  OMM-014 (Radiation Monitor Setpoints), Rev 51 OP-706 (Waste Disposal - Gaseous Rad Waste Release), Rev 18
Appendix C                                      Page 3 of 9                          Form ES-C-1 Job Performance Measure Worksheet Handouts:              Handout 1: Completed Attachment 10.3 of EMP-022 marked up for this JPM.
Time Critical Task:    NO Validation Time:      8 minutes Critical Step Justification Step 4        This step is critical because denial of permit approval, and identification of the reasons for this denial is necessary to prevent an uncontrolled release of B WGDT and/or a release with the radiation monitor setpoint at a non-conservative value.
2016 Admin - JPM A3 SRO                                                NUREG 1021, Revision 10


Appendix C Page 3 of 9 Form ES-C-1  Job Performance Measure Worksheet 2016 Admin
Appendix C                                     Page 4 of 9                     Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- JPM A 3 S RO  NUREG 1021, Revision 10 Handouts: Handout 1: Completed Attachment 10.3 of EMP
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
-022 marked up for this JPM. Time Critical Task:
START TIME:
NO  Validation Time:
STEP 1:         Review the Waste Gas Release Permit preliminary Information
8 minutes        Critical Step Justification Step 4 This step is critical because denial of permit approval, and identification of the reasons for this denial is necessary to prevent an uncontrolled release of "B" WGDT and/or a release with the radiation monitor setpoint at a non
___ SAT STANDARD:       The operator observes that the following preliminary information is completed on Attachment 10.3 of EMP-022:
-conservative value.
* Release #: G-2016-015
Appendix C Page 4 of 9 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
* SSN (XXXX)                                                         ___ UNSAT
- JPM A 3 S RO  NUREG 1021, Revision 10 (Critical Steps are identified as such in right
* Date (of Permit preparation)
-hand column)
* Printed Name (of Individual preparing the Permit)
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
* Initial (of Individual preparing the Permit)
: 1. START TIME:
* Signature (of Individual preparing the Permit)
STEP 1: Review the Waste Gas Release Permit preliminary Information STANDARD: The operator observes that the following preliminary information is completed on Attachment 10.3 of EMP
* Date (of Signature)
-022: Release #: G-2016-015 SSN (XXXX) Date (of Permit preparation)
Printed Name (of Individual preparing the Permit)
Initial (of Individual preparing the Permit)
Signature (of Individual preparing the Permit)
Date (of Signature)
The operator recognizes that the preliminary information is acceptable and proceeds.
The operator recognizes that the preliminary information is acceptable and proceeds.
EXAMINER'S CUE:
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE COMMENTS:
NONE EXAMINER'S NOTE:
2016 Admin - JPM A3 SRO                                              NUREG 1021, Revision 10
NONE  COMMENTS:          ___ SAT    ___ UNSAT Appendix C Page 5 of 9 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin
- JPM A 3 S RO  NUREG 1021, Revision 10 STEP 2: Review the Waste Gas Release Permit PART I Information STANDARD: The operator observes that the following PART I information is completed on Attachment 10.3 of EMP
-022:  Waste Gas Decay Tank
: B  Estimated Release Start Date/Time: 2/6/16 21 00  Estimated Release Stop Date/Time:
2/6/16 213 0  Monitor R14C Setp oint: 5.6E3  Basis: Activity Circled  CV Purge:  Not In Service Circled  Maximum WGDT Flow Rate:
90 CFM  Prepared By: name of preparer Peer Review: name of reviewer Verified By: NA Chemistry Supervisor: NA The operator identifies that the Permit is for the "B" WGDT and the Permit was requested for the "
A" WGDT, and identifies that this must be modified before approval.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 6 of 9 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin  
- JPM A 3 S RO  NUREG 1021, Revision 10 STEP 3: Review the Waste Gas Release Permit PART II Information STANDARD: The operator observes that the following PART II information is completed on Attachment 10.3 of EMP
-022:  PRIOR1 (Channel Check)
: 19.9  SOURCE CHECK 2: Initialed  SETPOINT VERF. AT 3: 1.0E4  UPDATE STATUS BOARD 4: Initialed  DURING RELEASE
: Left Blank AFTER RELEASE
:  Left Blank SETPOINT RETURNED TO3,5: Left Blank STATUS BOARD UPDATED 4: Left Blank The operator identifies that the R14C setpoint is less conservative than required and identifies that this must be modified before approval. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE  COMMENTS:            ___ SAT    ___ UNSAT Appendix C Page 7 of 9 Form ES-C-1  PERFORMANCE INFORMATION 2016 Admin
- JPM A 3 S RO  NUREG 1021, Revision 10 STEP 4: Approve the Waste Gas Release Permit or identify all issues found which would prevent approval STANDARD: The operator identifies that the Waste Gas Permit cannot be approved until:
The Permit is identified with the correct WGDT in PART I ("
A" WGDT)  The R14C setpoint is verified in PART II to be at or less conservative than the setpoint listed in PART I


EXAMINER'S CUE:
Appendix C                                    Page 5 of 9                      Form ES-C-1 PERFORMANCE INFORMATION STEP 2:      Review the Waste Gas Release Permit PART I Information
NONE EXAMINER'S NOTE:
___ SAT STANDARD: The operator observes that the following PART I information is completed on Attachment 10.3 of EMP-022:
If the operator indicates after discovering only one of two errors that the permit would not be approved until corrected, correct the error, and return the permit and provide the Initiating CUE a second time.
* Waste Gas Decay Tank: B
* Estimated Release Start Date/Time: 2/6/16 2100                        ___ UNSAT
* Estimated Release Stop Date/Time: 2/6/16 2130
* Monitor R14C Setpoint: 5.6E3
* Basis: Activity Circled
* CV Purge: Not In Service Circled
* Maximum WGDT Flow Rate: 90 CFM
* Prepared By: name of preparer
* Peer Review: name of reviewer
* Verified By: NA
* Chemistry Supervisor: NA The operator identifies that the Permit is for the B WGDT and the Permit was requested for the A WGDT, and identifies that this must be modified before approval.
EXAMINERS CUE:             NONE EXAMINERS NOTE:            NONE COMMENTS:
2016 Admin - JPM A3 SRO                                            NUREG 1021, Revision 10
 
Appendix C                                    Page 6 of 9                      Form ES-C-1 PERFORMANCE INFORMATION STEP 3:      Review the Waste Gas Release Permit PART II Information STANDARD:      The operator observes that the following PART II information is completed on Attachment 10.3 of EMP-022:                              ___ SAT
* PRIOR1 (Channel Check): 19.9
* SOURCE CHECK2: Initialed
* SETPOINT VERF. AT3: 1.0E4                                          ___ UNSAT
* UPDATE STATUS BOARD4: Initialed
* DURING RELEASE: Left Blank
* AFTER RELEASE: Left Blank
* SETPOINT RETURNED TO3,5: Left Blank
* STATUS BOARD UPDATED4: Left Blank The operator identifies that the R14C setpoint is less conservative than required and identifies that this must be modified before approval.
EXAMINERS CUE:              NONE EXAMINERS NOTE:            NONE COMMENTS:
2016 Admin - JPM A3 SRO                                            NUREG 1021, Revision 10
 
Appendix C                                    Page 7 of 9                          Form ES-C-1 PERFORMANCE INFORMATION STEP 4:      Approve the Waste Gas Release Permit or identify all issues found          CRITICAL which would prevent approval                                                  STEP STANDARD:    The operator identifies that the Waste Gas Permit cannot be                ___ SAT approved until:
* The Permit is identified with the correct WGDT in PART I (A WGDT)
* The R14C setpoint is verified in PART II to be at or less                ___ UNSAT conservative than the setpoint listed in PART I EXAMINERS CUE:              NONE EXAMINERS NOTE:              If the operator indicates after discovering only one of two errors that the permit would not be approved until corrected, correct the error, and return the permit and provide the Initiating CUE a second time.
COMMENTS:
COMMENTS:
CRITICAL STEP  ___ SAT    ___ UNSAT Terminating Cue:
Terminating Cue:             Evaluation on this JPM is complete.
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Admin - JPM A3 SRO                                              NUREG 1021, Revision 10


Appendix C Page 8 of 9 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Admin
Appendix C                             Page 8 of 9               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A3 SRO Examinees Name:
- JPM A 3 S RO  NUREG 1021, Revision 10 Job Performance Measure No.:
2016 Admin  
- JPM A 3 S RO  Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 2,381: Line 1,800:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT            UNSAT Examiners Signature:                                Date:
2016 Admin - JPM A3 SRO                                  NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                               Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The plant is in Mode 1 at 100% power.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* A Waste Gas Release Permit for the A WGDT has been presented to the Shift Manager for review and approval.
The plant is in Mode 1 at 100% power. A Waste Gas Release Permit for the "A" WGDT has been presented to the Shift Manager for review and approval.
INITIATING CUE:
INITIATING CUE:
Review and Approve the Waste Gas Release Permit.
* Review and Approve the Waste Gas Release Permit.
Identify all issues found (if any) which would prevent approval.
* Identify all issues found (if any) which would prevent approval.
 
NUREG 1021, Revision 10
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Admin
- JPM A4 SRO (Rev_010816)  NUREG 1021, Revision 10


JPM A 4 S RO      Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet JPM A4 SRO Developed By:     ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:     ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Admin - JPM A4 SRO (Rev_010816)                  NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 6 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                         Page 2 of 6                         Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                             Task No.:
- JPM A4 S RO  NUREG 1021, Revision 10 Facility: H B Robinson Task No.:     Task Title:
Task Title:             Emergency Classification               JPM No.:     2016 Admin - JPM A4 SRO K/A  
Emergency Classification JPM No.: 2016 Admin  
- JPM A4 S RO    K/A  


==Reference:==
==Reference:==
 
2.4.41 (4.4)
2.4.4 1 (4.4)   Examinee: NRC Examiner:
Examinee:                                                   NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                         Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                       Actual Performance:       X Classroom           X   Simulator             Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handouts 1-2.
X Classroom X Simulator Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout s 1-2. Initial Conditions:
* The plant is operating at 100% power.
The plant is operating at 100% power.
* Protesters have illegally entered the plant, and have gained entry to the protected area.
Protesters have illegally entered the plant, and have gained entry to the protected area.
* Security has declared a Security Event (Confirmed Protected Area Intrusion).
Security has declared a Security Event (Confirmed Protected Area Intrusion)
* Security has all intruders under restraint and has prevented further entry into the plant.
. Security has all intruders under restraint and has prevented further entry into the plant.
* Other than minor damage to the security fences and protest slogans spray painted on some walls, there was no plant damage.
Other than minor damage to the security fences and protest slogans spray painted on some walls, there was no plant damage.
Initiating Cue:
Initiating Cue:
Classify the event in accordance with the Robinson Nuclear Plant Emergency Action Level Matrix.     Then prepare an Emergency Notification Form for this classification.
* Classify the event in accordance with the Robinson Nuclear Plant Emergency Action Level Matrix.
THIS JPM IS TIME CRITICAL
* Then prepare an Emergency Notification Form for this classification.
THIS JPM IS TIME CRITICAL 2016 Admin - JPM A4 SRO                                                  NUREG 1021, Revision 10


Appendix C Page 3 of 6 Form ES-C-1 Job Performance Measure Worksheet 2016 Admin
Appendix C                                       Page 3 of 6                         Form ES-C-1 Job Performance Measure Worksheet Task Standard:         The operator will declare an ALERT based on HA4.1, Confirmed Security event in a plant Protected Area or notification of either an airborne attack threat or hostile threat within the Owner Controlled Area, within 15 minutes. Then, the operator will prepare an Emergency Notification Form for this event in accordance with EPCLA-01 (Emergency Control) in accordance with the attached KEY, also within 15 minutes.
- JPM A4 S RO  NUREG 1021, Revision 10 Task Standard:
Required Materials:     None General  
The operator will declare an ALERT based on HA4.1 , Confirmed Security event in a plant Protected Area or notification of either an airborne attack threat or hostile threat within the Owner Controlled Area , within 15 minutes. Then, the operator will prepare an Emergency Notification Form for this event in accordance with EPCLA-01 (Emergency Control
) in accordance with the attached KEY , also within 15 minutes.
Required Materials:
None   General  


==References:==
==References:==
Robinson Nuclear Plant Emergency Action Level Matrix, Sheet 1 of 3, Rev 4 Robinson Nuclear Plant Emergency Action Level Matrix, Sheet 2 of 3, Rev 7 Robinson Nuclear Plant Emergency Action Level Matrix, Sheet 3 of 3, Rev 1 EPCLA-01 (Emergency Control), Rev 43 EPCLA-04 (Emergency Action Level Technical Basis Document), Rev 13 EPNOT-01 (CR/EOF Emergency Communicator), Rev 46 Handouts:              Handout 1: Robinson Nuclear Plant Emergency Action Level Matrix Sheets 1-3 Handout 2: Blank Copy of EPCLA-01 Time Critical Task:    YES - 15 Minutes to classify the event, and then 15 minutes to generate an ENF for the classification Validation Time:        15 minutes Critical Step Justification Step 1        This step is critical because accurately classifying the event is necessary to properly implement on-site and off-site response to an emergency event.
Step 2        This step is critical because the completion of the ENF is necessary to properly communicate to local, state and federal organizations the status of on-going emergency events.
2016 Admin - JPM A4 SRO                                                  NUREG 1021, Revision 10


Robinson Nuclear Plant Emergency Action Level Matrix, Sheet 1 of 3, Rev 4  Robinson Nuclear Plant Emergency Action Level Matrix, Sheet 2 of 3, Rev 7  Robinson Nuclear Plant Emergency Action Level Matrix, Sheet 3 of 3, Rev 1  EPCLA-01 (Emergency Control), Rev 43 EPCLA-04 (Emergency Action Level Technical Basis Document), Rev 13  EPNOT-01 (CR/EOF Emergency Communicator), Rev 46 Handouts: Handout 1: Robinson Nuclear Plant Emergency Action Level Matrix Sheets 1-3  Handout 2: Blank Copy of EPCLA
Appendix C                                   Page 4 of 6                     Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
-01  Time Critical Task:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handouts 1-2.
YES  - 15 Minutes to classify the event, and then 15 minutes to generate an ENF for the classification Validation Time:
START TIME:
15 minutes      Critical Step Justification Step 1 This step is critical because accurately classifying the event is necessary to properly implement on
STEP 1:         Classify the event in accordance with the Robinson Nuclear Plant     CRITICAL Emergency Action Level Matrix                                         STEP
-site and off
___ SAT STANDARD:       The operator will declare an ALERT based on HA4.1 due to threshold 1 (Security event in the plant Protected Area as determined and reported by Security shift supervision)
-site response to an emergency event
___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE COMMENTS:
. Step 2 This step is critical because the completion of the ENF is necessary to properly communicate to local, state and federal organizations the status of on
TIME CRITICAL STOP TIME #1: __________
-going emergency events
STEP 2:       Prepare an ENF                                                       CRITICAL STEP STANDARD: The operator completes Attachment 10.5, Page 9 of 10 (Or Equivalent       ___ SAT ENF Form) of EPCLA-01 IAW the provided KEY.
.
EXAMINERS CUE:               NONE
Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION 2016 Admin
___ UNSAT EXAMINERS NOTE:               NONE COMMENTS:
- JPM A4 S RO  NUREG 1021, Revision 10 (Critical Steps are identified as such in right
TIME CRITICAL STOP TIME #2: __________
-hand column)
Terminating Cue:               Evaluation on this JPM is complete.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout s 1-2. START TIME:
STEP 1: Classify the event in accordance with the Robinson Nuclear Plant Emergency Action Level Matrix STANDARD: The operator will declare an ALERT based on HA4.1 due to threshold 1 (Security event in the plant Protected Area as determined and reported by Security shift supervision
)  EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE COMMENTS:           TIME CRITICAL STOP TIME #1: __________
CRITICAL STEP  ___ SAT    ___ UNSAT  STEP 2: Prepare an ENF STANDARD: The operator completes Attachment 10.5, Page 9 of 10 (Or Equivalent ENF Form) of EPCLA-01 IAW the provided KEY.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE COMMENTS:         TIME CRITICAL STOP TIME #2: __________
CRITICAL STEP
___ SAT    ___ UNSAT            Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Admin - JPM A4 SRO                                            NUREG 1021, Revision 10


Appendix C Page 5 of 6 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Admin
Appendix C                             Page 5 of 6               Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A4 SRO Examinees Name:
- JPM A4 S RO  NUREG 1021, Revision 10 Job Performance Measure No.:
2016 Admin  
- JPM A4 S RO  Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 2,471: Line 1,866:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT            UNSAT Examiners Signature:                                Date:
2016 Admin - JPM A4 SRO                                  NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                               Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The plant is operating at 100% power.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* Protesters have illegally entered the plant, and have gained entry to the protected area.
The plant is operating at 100% power.
* Security has declared a Security Event (Confirmed Protected Area Intrusion).
Protesters have illegally entered the plant, and have gained entry to the protected area.
* Security has all intruders under restraint and has prevented further entry into the plant.
Security has declared a Security Event (Confirmed Protected Area Intrusion)
* Other than minor damage to the security fences and protest slogans spray painted on some walls, there was no plant damage.
. Security has all intruders under restraint and has prevented further entry into the plant.
INITIATING CUE:
Other than minor damage to the security fences and protest slogans spray painted on some walls, there was no plant damage. INITIATING CUE:
* Classify the event in accordance with the Robinson Nuclear Plant Emergency Action Level Matrix.
Classify the event in accordance with the Robinson Nuclear Plant Emergency Action Level Matrix.
* Then prepare an Emergency Notification Form for this classification.
Then prepare an Emergency Notification Form for this classification.
THIS JPM IS TIME CRITICAL NUREG 1021, Revision 10}}
THIS JPM IS TIME CRITICAL}}

Revision as of 19:45, 30 October 2019

(12) Robinson 2016-301 Final Administrative JPMs
ML16125A069
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/27/2016
From:
Division of Reactor Safety II
To:
Duke Energy Progress
References
50-261/OL-16-301
Download: ML16125A069 (78)


Text

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM A1a RO Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Admin - JPM A1a RO (Rev_010816) NUREG 1021, Revision 10

Appendix C Page 2 of 10 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Calculate QPTR JPM No.: 2016 Admin - JPM A1a RO K/A

Reference:

2.1.7 (4.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • The plant is in Mode 1 at 60% RTP.
  • The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation.
  • Detector Currents are as follows:
  • N41: Upper - 63 / Normalizing - 123
  • N41: Lower - 55 / Normalizing - 120
  • N42: Upper - 55 / Normalizing - 109
  • N42: Lower - 52 / Normalizing - 110
  • N43: Upper - 50 / Normalizing - 104
  • N43: Lower - 45 / Normalizing - 99
  • N44: Upper - 48 / Normalizing - 97
  • N44: Lower - 45 / Normalizing - 95 Initiating Cue:
  • The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT.

2016 Admin - JPM A1a RO NUREG 1021, Revision 10

Appendix C Page 3 of 10 Form ES-C-1 Job Performance Measure Worksheet

  • Round all calculations to three decimal places (Example: 1.2348 would be rounded to 1.235)
  • Identify any limits that are not being complied with.

Task Standard: The operator will complete the QPTR calculation in accordance with the provided KEY, and identify that Technical Specification LCO is NOT met.

Required Materials: Calculator Robinson Technical Specifications and Basis must be available.

General

References:

FMP-007 (Quadrant Power Tilt), Rev 15 Robinson Technical Specification LCO 3.2.4 (Quadrant Power Tilt Ratio), Amendment 176 Handouts: Handout 1: Blank copy of FMP-007.

Time Critical Task: NO Validation Time: 10 minutes Critical Step Justification Step 6 This step is critical because identifying that the maximum Upper Normalized Detector Ratio is N41 (0.512), and dividing it by the Average Upper Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY.

Step 7 This step is critical because identifying that the maximum Lower Normalized Detector Ratio is N44 (0.474), and dividing it by the Average Lower Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY.

Step 8 This step is critical because identifying that the Upper QPTR is larger than the Lower QPTR is necessary to complete the QPTR calculation in accordance with the provided KEY.

Step 9 This step is critical because determining that LCO 3.2.4 permits a maximum QPTR of 1.02 when power level is greater than 50% is necessary to identify that Technical Specification LCO is NOT met.

2016 Admin - JPM A1a RO NUREG 1021, Revision 10

Appendix C Page 4 of 10 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEP 1: Read the Upper (A) and the Lower (B) Indicated Detector Currents from the Detector Current meters of each operable Power Range channel and record on ATTACHMENT 10.2. ___ SAT (Step 8.2.4.1)

STANDARD: The operator records the provided Upper and Lower Detector

___ UNSAT Currents on Attachment 10.2 IAW the provided KEY.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 2: Record the Upper and Lower Normalizing Detector Currents from the Control Room Status Board for each operable Power Range channel on ATTACHMENT 10.2. ___ SAT (Step 8.2.4.2)

STANDARD: The operator records the provided Upper and Lower Detector ___ UNSAT Currents on Attachment 10.2 IAW the provided KEY.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

NOTE:

Normalized Ratios, Average Ratios and QPTR values should be recorded to at least 3 decimal places.

2016 Admin - JPM A1a RO NUREG 1021, Revision 10

Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: Divide each Indicated Detector Current by its corresponding Normalizing Detector Current and record the result as the Normalized Detector Ratio on ATTACHMENT 10.2.

(Step 8.2.4.3) ___ SAT STANDARD: The operator reads the Note, and proceeds.

___ UNSAT The operator divides each Indicated Detector Current by its corresponding Normalizing Detector Current and records the result as the Normalized Detector Ratio on ATTACHMENT 10.2 IAW the provided KEY.

Upper N41 = 0.512 Lower N41 = 0.458 Upper N42 = 0.505 Lower N42 = 0.473 Upper N43 = 0.481 Lower N43 = 0.455 Upper N44 = 0.495 Lower N44 = 0.474 EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 4: Average the Upper Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Upper column on ATTACHMENT 10.2.

(Step 8.2.4.4) ___ SAT STANDARD: The operator averages the Upper Normalized Detector Ratios and records the result as the Average Normalized Detector Ratio in the ___ UNSAT Upper column on Attachment 10.2 IAW the provided KEY.

Upper Average Normalized Detector Ratio = 0.498 (+.001/-0)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A1a RO NUREG 1021, Revision 10

Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 5: Average the Lower Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Lower column on ATTACHMENT 10.2. ___ SAT (Step 8.2.4.5)

STANDARD: The operator averages the Lower Normalized Detector Ratios and ___ UNSAT records the result as the Average Normalized Detector Ratio in the Lower column on Attachment 10.2 IAW the provided KEY.

Lower Average Normalized Detector Ratio = 0.465 (+.001/-0)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 6: Determine the maximum Upper Normalized Detector Ratio and CRITICAL divide it by the Average Upper Normalized Detector Ratio and STEP record the resulting Upper QPTR on ATTACHMENT 10.2.

(Step 8.2.4.6)

STANDARD: The operator identifies that the maximum Upper Normalized ___ SAT Detector Ratio is N41 (0.512), and divides it by the Average Upper Normalized Detector Ratio from Performance Step 4 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided KEY. ___ UNSAT Upper QPTR = 0.512 / 0.498 = 1.028 (+.001/-0)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A1a RO NUREG 1021, Revision 10

Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 7: Determine the maximum Lower Normalized Detector Ratio and divide it by the Average Lower Normalized Detector Ratio and CRITICAL record the resulting Lower QPTR on ATTACHMENT 10.2 STEP (Step 8.2.4.7)

___ SAT STANDARD: The operator observes that the maximum Lower Normalized Detector Ratio is N44 (0.474), and divides it by the Average Lower Normalized Detector Ratio from Performance Step 5 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided ___ UNSAT KEY.

Lower QPTR = 0.474 / 0.465 = 1.019 (+.001/-0)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 8: Record larger of the Upper QPTR or the Lower QPTR as the CRITICAL Maximum QPTR on ATTACHMENT 10.2 along with the reactor power STEP and any comments.

(Step 8.2.4.8) ___ SAT STANDARD: The operator identifies that the Upper QPTR is larger than the Lower QPTR and records the Maximum QPTR as 1.028 (+.001/-0)

___ UNSAT IAW the provided KEY.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A1a RO NUREG 1021, Revision 10

Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 9: Identify any limits that are not being complied with. CRITICAL STEP STANDARD: The operator reviews Technical Specification LCO 3.2.4 and

___ SAT determines that with the plant in Mode 1 at greater than 50% power, a maximum QPTR of 1.02 is permitted.

The operator identifies that LCO 3.2.4 is NOT met.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Admin - JPM A1a RO NUREG 1021, Revision 10

Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A1a RO Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Admin - JPM A1a RO NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is in Mode 1 at 60% RTP.
  • The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation.
  • Detector Currents are as follows:
  • N41: Upper - 63 / Normalizing - 123
  • N41: Lower - 55 / Normalizing - 120
  • N42: Upper - 55 / Normalizing - 109
  • N42: Lower - 52 / Normalizing - 110
  • N43: Upper - 50 / Normalizing - 104
  • N43: Lower - 45 / Normalizing - 99
  • N44: Upper - 48 / Normalizing - 97
  • N44: Lower - 45 / Normalizing - 95 INITIATING CUE:
  • The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT.
  • Round all calculations to three decimal places (Example:

1.2348 would be rounded to 1.235)

  • Identify any limits that are not being complied with.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM A1a SRO Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Admin - JPM A1a SRO (Rev_010816) NUREG 1021, Revision 10

Appendix C Page 2 of 10 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Calculate QPTR JPM No.: 2016 Admin - JPM A1a SRO K/A

Reference:

2.1.7 (4.7)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • The plant is in Mode 1 at 100% RTP.
  • The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation.
  • Detector Currents are as follows:
  • N41: Upper - 105 / Normalizing - 123
  • N41: Lower - 92 / Normalizing - 120
  • N42: Upper - 92 / Normalizing - 109
  • N42: Lower - 87 / Normalizing - 110
  • N43: Upper - 83 / Normalizing - 104
  • N43: Lower - 75 / Normalizing - 99
  • N44: Upper - 80 / Normalizing - 97
  • N44: Lower - 75 / Normalizing - 95 Initiating Cue:
  • The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT.
  • Round all calculations to three decimal places (Example: 1.2348 would be rounded to 1.235) 2016 Admin - JPM A1a SRO NUREG 1021, Revision 10

Appendix C Page 3 of 10 Form ES-C-1 Job Performance Measure Worksheet

  • Identify whether or not any limitations have been exceeded, and if so, what, if any ACTION, is required.

Task Standard: The operator will complete the QPTR calculation in accordance with the provided KEY, identify that Technical Specification LCO is NOT met, and identify that all six ACTIONs (A.1-A.6) must be taken for Condition A of LCO 3.2.4.

Required Materials: Calculator Robinson Technical Specifications and Basis must be available.

General

References:

FMP-007 (Quadrant Power Tilt), Rev 15 Robinson Technical Specification LCO 3.2.4 (Quadrant Power Tilt Ratio), Amendment 176 Handouts: Handout 1: Blank copy of FMP-007.

Time Critical Task: NO Validation Time: 15 minutes Critical Step Justification Step 6 This step is critical because identifying that the maximum Upper Normalized Detector Ratio is N41 (0.854), and dividing it by the Average Upper Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY.

Step 7 This step is critical because identifying that the maximum Lower Normalized Detector Ratio is N42 (0.791), and dividing it by the Average Lower Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY.

Step 8 This step is critical because identifying that the Upper QPTR is larger than the Lower QPTR is necessary to complete the QPTR calculation in accordance with the provided KEY.

Step 9 This step is critical because determining that LCO 3.2.4 permits a maximum QPTR of 1.02 when power level is greater than 50% is necessary to identify that Technical Specification LCO is NOT met; and identifying that ACTIONs A.1 through A.6 must be completed is necessary to identify all of the Technical Specification required ACTION.

2016 Admin - JPM A1a SRO NUREG 1021, Revision 10

Appendix C Page 4 of 10 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEP 1: Read the Upper (A) and the Lower (B) Indicated Detector Currents from the Detector Current meters of each operable Power Range channel and record on ATTACHMENT 10.2. ___ SAT (Step 8.2.4.1)

STANDARD: The operator records the provided Upper and Lower Detector

___ UNSAT Currents on Attachment 10.2 IAW the provided KEY.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 2: Record the Upper and Lower Normalizing Detector Currents from the Control Room Status Board for each operable Power Range channel on ATTACHMENT 10.2. ___ SAT (Step 8.2.4.2)

STANDARD: The operator records the provided Upper and Lower Detector ___ UNSAT Currents on Attachment 10.2 IAW the provided KEY.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

NOTE:

Normalized Ratios, Average Ratios and QPTR values should be recorded to at least 3 decimal places.

2016 Admin - JPM A1a SRO NUREG 1021, Revision 10

Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: Divide each Indicated Detector Current by its corresponding Normalizing Detector Current and record the result as the Normalized Detector Ratio on ATTACHMENT 10.2.

(Step 8.2.4.3) ___ SAT STANDARD: The operator reads the Note, and proceeds.

___ UNSAT The operator divides each Indicated Detector Current by its corresponding Normalizing Detector Current and records the result as the Normalized Detector Ratio on ATTACHMENT 10.2 IAW the provided KEY.

Upper N41 = 0.854 Lower N41 = 0.767 Upper N42 = 0.844 Lower N42 = 0.791 Upper N43 = 0.798 Lower N43 = 0.758 Upper N44 = 0.825 Lower N44 = 0.789 EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 4: Average the Upper Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Upper column on ATTACHMENT 10.2.

(Step 8.2.4.4) ___ SAT STANDARD: The operator averages the Upper Normalized Detector Ratios and records the result as the Average Normalized Detector Ratio in the ___ UNSAT Upper column on Attachment 10.2 IAW the provided KEY.

Upper Average Normalized Detector Ratio = 0.830 (+.001/-0)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A1a SRO NUREG 1021, Revision 10

Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 5: Average the Lower Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Lower column on ATTACHMENT 10.2. ___ SAT (Step 8.2.4.5)

STANDARD: The operator averages the Lower Normalized Detector Ratios and ___ UNSAT records the result as the Average Normalized Detector Ratio in the Lower column on Attachment 10.2 IAW the provided KEY.

Lower Average Normalized Detector Ratio = 0.776 (+.001/-0)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 6: Determine the maximum Upper Normalized Detector Ratio and CRITICAL divide it by the Average Upper Normalized Detector Ratio and STEP record the resulting Upper QPTR on ATTACHMENT 10.2.

(Step 8.2.4.6)

STANDARD: The operator identifies that the maximum Upper Normalized ___ SAT Detector Ratio is N41 (0.854), and divides it by the Average Upper Normalized Detector Ratio from Performance Step 4 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided KEY. ___ UNSAT Upper QPTR = 0.854 / 0.830 = 1.029 (+.001/-0)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A1a SRO NUREG 1021, Revision 10

Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 7: Determine the maximum Lower Normalized Detector Ratio and divide it by the Average Lower Normalized Detector Ratio and CRITICAL record the resulting Lower QPTR on ATTACHMENT 10.2 STEP (Step 8.2.4.7)

___ SAT STANDARD: The operator observes that the maximum Lower Normalized Detector Ratio is N42 (0.791), and divides it by the Average Lower Normalized Detector Ratio from Performance Step 5 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided ___ UNSAT KEY.

Lower QPTR = 0.791 / 0.776 = 1.019 (+.001/-0)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 8: Record larger of the Upper QPTR or the Lower QPTR as the CRITICAL Maximum QPTR on ATTACHMENT 10.2 along with the reactor power STEP and any comments.

(Step 8.2.4.8) ___ SAT STANDARD: The operator identifies that the Upper QPTR is larger than the Lower QPTR and records the Maximum QPTR as 1.029 (+.001/-0)

___ UNSAT IAW the provided KEY.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A1a SRO NUREG 1021, Revision 10

Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 9: Identify whether or not any limitations have been exceeded, and if so, CRITICAL what, if any ACTION, is required. STEP

___ SAT STANDARD: The operator reviews Technical Specification LCO 3.2.4 and determines that with the plant in Mode 1 at greater than 50% power, a maximum QPTR of 1.02 is permitted.

___ UNSAT The operator identifies that LCO 3.2.4 is NOT met.

The operator identifies that ACTIONS A.1 through A.6 must be taken for Condition A of LCO 3.2.4.

  • Reduce THERMAL POWER 3% from RTP for each 1% of QPTR > 1.00 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (Minimum of 8.7% power reduction OR Maximum allowable power of 91.3%).
  • Determine QPTR and reduce THERMAL POWER 3% from RTP for each 1% of QPTR > 1.00 once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
  • Perform SR 3.2.1.1 and SR 3.2.2.1 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and once per 7 days thereafter.
  • Reevaluate safety analyses and confirm results remain valid for duration of operation under this condition prior to increasing THERMAL POWER above the limit of Required Action A.1.
  • Prior to increasing THERMAL POWER above the limit of Required Action A.1 prior to increasing THERMAL POWER above the limit of Required Action A.1 or A.2.
  • Perform SR 3.2.1.1 and SR 3.2.2.1 Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after reaching RTP OR Within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after increasing THERMAL POWER above the limit of Required Action A.1 or A.2.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Admin - JPM A1a SRO NUREG 1021, Revision 10

Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A1a SRO Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Admin - JPM A1a SRO NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is in Mode 1 at 100% RTP.
  • The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation.
  • Detector Currents are as follows:
  • N41: Upper - 105 / Normalizing - 123
  • N41: Lower - 92 / Normalizing - 120
  • N42: Upper - 92 / Normalizing - 109
  • N42: Lower - 87 / Normalizing - 110
  • N43: Upper - 83 / Normalizing - 104
  • N43: Lower - 75 / Normalizing - 99
  • N44: Upper - 80 / Normalizing - 97
  • N44: Lower - 75 / Normalizing - 95 INITIATING CUE:
  • The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT.
  • Round all calculations to three decimal places (Example:

1.2348 would be rounded to 1.235)

  • Identify whether or not any limitations have been exceeded, and if so, what, if any ACTION, is required.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM A1b RO Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Admin - JPM A1b RO (Rev_010816) NUREG 1021, Revision 10

Appendix C Page 2 of 7 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Determine License Status JPM No.: 2016 Admin - JPM A1b RO K/A

Reference:

2.1.4 (3.3)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM).

Initial Conditions:

  • You are a Licensed Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
  • Your last medical exam was on 11/17/14.
  • Your last SCBA quantitative and qualitative fit test was on 1/18/15.
  • You have attended all required LOCT training sessions, and passed all exams administered.
  • Your supervisor has directed you to maintain your license active AND qualified to stand watch.
  • Your Control Room work history in the last three months is as follows:
  • 11/26/15, BOP for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (Day Shift)
  • 1/2/16, RO for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (Night Shift 1800-2400)
  • 1/4/16, Extra Operator for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
  • 1/10/16, BOP for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (Day Shift) 2016 Admin - JPM A1b RO NUREG 1021, Revision 10

Appendix C Page 3 of 7 Form ES-C-1 Job Performance Measure Worksheet Initiating Cue: Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.

Task Standard: The operator will evaluate their work history and identify that four 12-hour shifts must be completed as either the RO or the BOP prior to the end of the quarter to maintain their license ACTIVE, and that an SCBA quantitative and qualitative fit test must be completed prior to standing watch in the Control Room again.

Required Materials: Calculator General

References:

OMM-001-5 (Training and Qualification), Rev 53 AD-OP-ALL-1000 (Conduct of Operations), Rev 4 Handouts: None Time Critical Task: NO Validation Time: 6 minutes Critical Step Justification Step 1 This step is critical because identifying the watches that must be completed before the end of the quarter is necessary to maintain the license status ACTIVE.

Step 2 This step is critical because identifying the requirement to complete an annual fit test is necessary to maintain the ability to stand watch in the Control Room.

2016 Admin - JPM A1b RO NUREG 1021, Revision 10

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM).

START TIME:

STEP 1: Identify any requirements that must be met prior to the end of the CRITICAL quarter that are required to maintain your license ACTIVE. STEP

___ SAT STANDARD: The operator identifies that ROs must stand a minimum number of hours in a Licensed position, satisfactorily participate in the Licensed Operator Continuing Training Program, and have a biennial medical exam; and concludes

___ UNSAT that the LOCT and Medical requirements have been met.

The operator recognizes that Individuals with RO Licenses may maintain an active license by standing watch a minimum of five 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts per calendar quarter as RO or BOP.

The operator recognizes that the work on 11/26/15 does not count towards this calendar-quarters number of watches.

The operator recognizes that the work on 1/2/16 does not count towards the minimum of five 12-hour shifts.

The operator recognizes that the work on 1/4/16 does not count towards the minimum of five 12-hour shifts; because it was not stood as the BOP or the RO.

The operator recognizes that the work on 1/10/16 does count towards the minimum of five 12-hour shifts; and concludes that 4 additional 12-hour shifts as either the RO or BOP must be completed before the end of the quarter.

EXAMINERS CUE: NONE EXAMINERS NOTE: See Section 5.3 of OMM-001-5.

COMMENTS:

2016 Admin - JPM A1b RO NUREG 1021, Revision 10

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: Identify the requirements that are required to maintain your CRITICAL qualification to stand watch in the Control Room. STEP STANDARD: The operator recognizes that in order to maintain qualification to stand ___ SAT watch in the Control Room, the operator must be Respirator Qualified as defined in the section on Maintaining License and Qualification Active Status; and that this section requires an SCBA quantitative and qualitative fit test annually. ___ UNSAT The operator recognizes that the last SCBA quantitative and qualitative fit test was over a year ago, and identifies that this fit test must be completed prior to standing a watch in the Control Room.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Admin - JPM A1b RO NUREG 1021, Revision 10

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A1b RO Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Admin - JPM A1b RO NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • You are a Licensed Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
  • Your last medical exam was on 11/17/14.
  • Your last SCBA quantitative and qualitative fit test was on 1/18/15.
  • You have attended all required LOCT training sessions, and passed all exams administered.
  • Your supervisor has directed you to maintain your license active AND qualified to stand watch.
  • Your Control Room work history in the last three months is as follows:
  • 11/26/15, BOP for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (Day Shift)
  • 1/2/16, RO for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (Night Shift 1800-2400)
  • 1/4/16, Extra Operator for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
  • 1/10/16, BOP for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (Day Shift)

INITIATING CUE: Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.

Requirements that must be met before the end of the quarter to maintain an ACTIVE License:

Requirements that must be to maintain your qualification to stand watch in the Control Room:

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM A1b SRO Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Admin - JPM A1b SRO (Rev_010816) NUREG 1021, Revision 10

Appendix C Page 2 of 7 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Determine License Status JPM No.: 2016 Admin - JPM A1b SRO K/A

Reference:

2.1.4 (3.3)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM).

Initial Conditions:

  • You are a Licensed Senior Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
  • Your last medical exam was on 11/17/14.
  • Your last SCBA quantitative and qualitative fit test was on 1/18/15.
  • You have attended all required LOCT training sessions, and passed all exams administered.
  • Your supervisor has directed you to maintain your license active AND qualified to stand watch.
  • Your Control Room work history in the last three months is as follows:
  • 11/26/15, BOP for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (Day Shift)
  • 1/2/16, RO for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (Night Shift 1800-2400)
  • 1/4/16, Extra Operator for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
  • 1/10/16, CRS for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (Day Shift) 2016 Admin - JPM A1b SRO NUREG 1021, Revision 10

Appendix C Page 3 of 7 Form ES-C-1 Job Performance Measure Worksheet Initiating Cue: Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.

Task Standard: The operator will evaluate their work history and identify that four 12-hour shifts must be completed as either the SM, CRS, RO or the BOP prior to the end of the quarter to maintain their license ACTIVE, and that an SCBA quantitative and qualitative fit test must be completed prior to standing watch in the Control Room again.

Required Materials: Calculator General

References:

OMM-001-5 (Training and Qualification), Rev 53 AD-OP-ALL-1000 (Conduct of Operations), Rev 4 Handouts: None Time Critical Task: NO Validation Time: 7 minutes Critical Step Justification Step 1 This step is critical because identifying the watches that must be completed before the end of the quarter is necessary to maintain the license status ACTIVE.

Step 2 This step is critical because identifying the requirement to complete an annual fit test is necessary to maintain the ability to stand watch in the Control Room.

2016 Admin - JPM A1b SRO NUREG 1021, Revision 10

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM).

START TIME:

STEP 1: Identify any requirements that must be met prior to the end of the CRITICAL quarter that are required to maintain your license ACTIVE. STEP STANDARD: The operator identifies that SROs must stand a minimum

___ SAT number of hours in a Licensed position, satisfactorily participate in the Licensed Operator Continuing Training Program, and have a biennial medical exam; and conclude that the LOCT and Medical requirements have been met.

___ UNSAT The operator recognizes that Individuals with SRO Licenses may maintain an active license by standing watch a minimum of five 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts in a License required position, at least one of which must be in the SM or CRS position in the Main Control Room.

The operator recognizes that the work on 11/26/15 does not count towards this calendar-quarters number of watches.

The operator recognizes that the work on 1/2/16 does not count towards the minimum of five 12-hour shifts.

The operator recognizes that the work on 1/4/16 does not count towards the minimum of five 12-hour shifts; and was not stood as the SM, CRS, BOP or the RO.

The operator recognizes that the work on 1/10/16 does count towards the minimum of five 12-hour shifts; and concludes that 4 additional 12-hour shifts as either the SM, CRS, RO or BOP must be completed before the end of the quarter.

EXAMINERS CUE: NONE EXAMINERS NOTE: See Section 5.3 of OMM-001-5.

COMMENTS:

2016 Admin - JPM A1b SRO NUREG 1021, Revision 10

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: Identify the requirements that are required to maintain your CRITICAL qualification to stand watch in the Control Room. STEP STANDARD: The operator recognizes that in order to maintain qualification to stand ___ SAT watch in the Control Room, the operator must be Respirator Qualified as defined in the section on Maintaining License and Qualification Active Status; and that this section requires an SCBA quantitative and qualitative fit test annually. ___ UNSAT The operator recognizes that the last SCBA quantitative and qualitative fit test was over a year ago, and identifies that this fit test must be completed prior to standing a watch in the Control Room.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Admin - JPM A1b SRO NUREG 1021, Revision 10

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A1b SRO Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Admin - JPM A1b SRO NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • You are a Licensed Senior Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
  • Your last medical exam was on 11/17/14.
  • Your last SCBA quantitative and qualitative fit test was on 1/18/15.
  • You have attended all required LOCT training sessions, and passed all exams administered.
  • Your supervisor has directed you to maintain your license active AND qualified to stand watch.
  • Your Control Room work history in the last three months is as follows:
  • 11/26/15, BOP for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (Day Shift)
  • 1/2/16, RO for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (Night Shift 1800-2400)
  • 1/4/16, Extra Operator for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
  • 1/10/16, CRS for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (Day Shift)

INITIATING CUE: Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.

Requirements that must be met before the end of the quarter to maintain an ACTIVE License:

Requirements that must be to maintain your qualification to stand watch in the Control Room:

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM A2 RO Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Admin - JPM A2 RO (Rev_010816) NUREG 1021, Revision 10

Appendix C Page 2 of 7 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Determine Proper Equipment JPM No.: 2016 Admin - JPM A2 Boundaries RO K/A

Reference:

2.2.41 (3.5)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM).

Initial Conditions:

  • The plant is in Mode 1 at 100% power.
  • Charging Pump A suction relief valve CVC-2080 has failed open.
  • The operating crew has entered AOP-016, Excessive Primary Plant Leakage, to control the plant.

Initiating Cue: The CRS has directed you to use all available resources to identify the pump boundary valves needed to be closed to isolate the leak, and identify the motor breaker to electrically isolate the pump motor.

Task Standard: The operator will identify that the leak can be isolated by closing three valves; CVC-270, CVC-290 and CVC-291, and that the pump motor can be electrically isolated by opening Breaker 52/34B.

Required Materials: Set of P&IDs available to the operator Set of EDPs available to the operator General

References:

P&ID 5379-685 Sheet 2 of 3 (Chemical and Volume Control System Purification and Makeup Flow Diagram), Rev 61 2016 Admin - JPM A2 RO NUREG 1021, Revision 10

Appendix C Page 3 of 7 Form ES-C-1 Job Performance Measure Worksheet EDP-002 (480V AC Busses), Rev 16 OWP-005 (Chemical and Volume Control System (CVCS)), Rev 65 Handouts: None Time Critical Task: NO Validation Time: 5 minutes Critical Step Justification Step 1 This step is critical because closing CVC-270, CV-290 and CVC-291 is necessary to isolate the leak.

Step 2 This step is critical because opening Breaker 52/34B is necessary to electrically isolate the A Charging Pump.

2016 Admin - JPM A2 RO NUREG 1021, Revision 10

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM).

START TIME:

STEP 1: Review P&IDs to determine pump boundary valves. CRITICAL STEP STANDARD: The operator reviews the set of P&IDs, and determines that the boundary valves associated with the A Charging Pump and its

___ SAT relief valve are located on P&ID 5379-685 Sheet 2 of 3 (Chemical and Volume Control System Purification and Makeup Flow Diagram).

___ UNSAT As a MINIMUM, the operator identifies the following valves are required to be verified in the selected positions to ensure that the leak flow path is isolated :

  • CVC-270, Charging Pump A Suction - CLOSED
  • CVC-290, Charging Pump A to Charging Line - CLOSED
  • CVC-291, Charging Pump A to Seal Injection - CLOSED EXAMINERS CUE: NONE EXAMINERS NOTE: This JPM consists of identifying the boundaries necessary to isolate the leakage path from Charging Pump A suction relief valve CVC-2080. The sequence of the component isolation is NOT required for the performance of this JPM.

Not required for credit. Additional isolation valves that can be included are as follows:

  • CVC-465, Charging Pump A Suction Vent - CLOSED
  • CVC-275F, Charging Pump A Suction Line Vent - CLOSED
  • CVC-280C, Charging Pump A Drain - CLOSED
  • CVC-400A, Charging Pump A Leakage Isolation - OPEN
  • CVC-277C, Charging Pump A Recirc Root - CLOSED CVC-466, Charging Pump A Suction Stabilizer Drain - OPEN COMMENTS:

2016 Admin - JPM A2 RO NUREG 1021, Revision 10

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: Determine the power supply to Charging Pump A. CRITICAL STEP STANDARD: The operator reviews the EDPs and determines that EDP-002 must ___ SAT be addressed.

As a MINIMUM the operator that Charging Pump A power supply is breaker 52/34B must be OPENED.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: The sequence of the component isolation is NOT required for the performance of this JPM.

Not required for credit. Additional breakers/switches that can be included are as follows:

  • RTGB Control switch for Charging Pump A - CAPPED
  • Power Panel 37 Circuit 2, Charging Pump A Suction Stabilizer Heater Breaker -

OPEN COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Admin - JPM A2 RO NUREG 1021, Revision 10

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A2 RO Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Admin - JPM A2 RO NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is in Mode 1 at 100% power.
  • Charging Pump A suction relief valve CVC-2080 has failed open.
  • The operating crew has entered AOP-016, Excessive Primary Plant Leakage, to control the plant.

INITIATING CUE: The CRS has directed you to use all available resources to identify the pump boundary valves needed to be closed to isolate the leak, and identify the motor breaker to electrically isolate the pump motor.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM A2 SRO Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Admin - JPM A2 SRO (Rev_010816) NUREG 1021, Revision 10

Appendix C Page 2 of 15 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Determine if Mode Change is JPM No.: 2016 Admin - JPM A2 Permissible SRO K/A

Reference:

2.2.38 (4.5)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue and the Available Equipment Inoperable List (Last Two Pages of this JPM), and Handout 1.

Initial Conditions:

  • The plant is in Mode 5, returning from a refueling outage.
  • RCS temperature is 165°F and there is a bubble in the PZR.
  • RHR Loop A is maintaining RCS temperature.
  • You are an extra SRO assigned to support the shift during re-start activities.

Initiating Cue:

  • The SM has directed you to complete the attached partially completed OMM-001-12, MINIMUM EQUIPMENT LIST AND SHIFT RELIEF, Att. 2, 200°F to 350°F (MODE 4) MEL that was started on the previous shift and determine if any Mode 4 restrictions exist.

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 3 of 15 Form ES-C-1 Job Performance Measure Worksheet Task Standard: The operator will evaluate the Technical Specifications/Technical Requirements against the Inoperable Equipment List and listed parameters and determines that CCW Pump C, V6-16B, WCCU-1A must be restored to operable prior to changing modes; that CVT 1 must be repaired and Instrument Bus 1 must be powered from MCC-5 prior to changing modes, and that DFO Storage tank level must be raised to > 19000 gallons prior to changing modes per the provided KEY.

Required Materials: Robinson Technical Specifications and Basis must be available.

General

References:

OMM-001-12 (Minimum Equipment List and Shift Relief), Rev 85 Technical Specifications for H. B. Robinson Steam Electric Plant Unit No. 2 Handouts: Handout 1: Attachment 2 of OMM-001-12 marked up for this JPM Time Critical Task: NO Validation Time: 15 minutes Critical Step Justification Step 9 This step is critical because LCO 3.7.6 is NOT met, and meeting this LCO is necessary to change Modes.

Step 10 This step is critical because LCO 3.7.7 is NOT met, and meeting this LCO is necessary to change Modes.

Step 11 This step is critical because LCO 3.7.10 is NOT met, and meeting this LCO is necessary to change Modes.

Step 12 This step is critical because LCO 3.8.3 is NOT met, and meeting this LCO is necessary to change Modes.

Step 14 This step is critical because LCO 3.8.7 is NOT met, and meeting this LCO is necessary to change Modes.

Step 15 This step is critical because LCO 3.8.9 is NOT met, and meeting this LCO is necessary to change Modes.

Step 18 This step is critical because the report to the SM must be correct prior to changing Modes.

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 4 of 15 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue and the Available Equipment Inoperable List (Last Two Pages of this JPM), and Handout 1.

START TIME:

STEP 1: Evaluate ITS LCO 3.4.17 requirements.

___ SAT STANDARD: The operator recognizes that 2 Charging Pumps must be OPERABLE, and that the A Charging Pump is inoperable.

The operator determines minimum requirement is met with B and

___ UNSAT C Charging Pumps OPERABLE, and initials the appropriate block.

The operator recognizes that the Seal Water Injection flow to EACH of the RCPs is greater than 6 gpm, and initials the appropriate block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

STEP 2: Evaluate ITS LCO 3.5.4 requirements.

___ SAT STANDARD: The operator recognizes that the RWST level is greater than 91 %,

and initials the appropriate block.

The operator recognizes that the RWST Boron concentration is ___ UNSAT 1950 ppm and 2400 ppm, and initials the appropriate block.

The operator recognizes that the RWST temperature is 45°F and 100°F, and initials the appropriate block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 5 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: Evaluate ITS LCO 3.6.4 requirements.

___ SAT STANDARD: The operator recognizes that the Containment Pressure is -0.8 psig AND +1.0 psig, and initials the appropriate block.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

STEP 4: Evaluate ITS LCO 3.6.5 requirements.

___ SAT STANDARD: The operator recognizes that the Containment Air Temperature is 120°F, and initials the appropriate block.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

STEP 5: Evaluate ITS LCO 3.6.7 requirements.

___ SAT STANDARD: The operator recognizes that the Spray Additive Tank Level is 32%,

and initials the appropriate block.

The operator recognizes that the Spray Additive Tank concentration is ___ UNSAT 30% NAOH, and initials the appropriate block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 6 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 6: Evaluate ITS LCO 3.6.8 requirements.

___ SAT STANDARD: The operator recognizes that the IVSW pressure is 49 psig as indicated locally on PI-1910, and initials the appropriate block.

The operator recognizes that the IVSW tank level is 49%, and initials ___ UNSAT the appropriate block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

STEP 7: Evaluate ITS LCO 3.7.4 requirements.

___ SAT STANDARD: The operator recognizes that 1 MDAFW Pump (LCO-3.0.4.b N/A) is required to be OPERABLE, and that the B MDAFW Pump is inoperable.

The operator determines minimum requirement is met with the A ___ UNSAT MDAFW Pump OPERABLE, and initials the appropriate block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

STEP 8: Evaluate ITS LCO 3.7.5 requirements.

STANDARD: The operator recognizes that the Condensate Storage Tank level is ___ SAT 26%, and initials the appropriate block.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 7 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 9: Evaluate ITS LCO 3.7.6 requirements. CRITICAL STEP STANDARD: The operator recognizes that 2 Trains powered from Emergency Power supplies ("B" and "C" pumps) are required to be OPERABLE,

___ SAT and that the C CCW Pump is inoperable.

The operator determines that the C CCW Pump must be restored to OPERABLE prior to changing modes, and does NOT initial the ___ UNSAT associated block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

STEP 10: Evaluate ITS LCO 3.7.7 requirements. CRITICAL STEP STANDARD: The operator recognizes that the Turbine Bldg Loop Isolation valves are required to be OPERABLE, and that V6-16B is inoperable.

___ SAT The operator determines that V6-16B must be restored to OPERABLE prior to changing modes, and does NOT initial the associated block.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 8 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 11: Evaluate ITS LCO 3.7.10 requirements. CRITICAL STEP STANDARD: The operator recognizes that 2 HVAC WCCU Trains are required to be OPERABLE, and that WCCU-1A is inoperable. ___ SAT The operator determines that WCCU-1A must be restored to OPERABLE prior to changing modes, and does NOT initial the associated block. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

STEP 12: Evaluate ITS LCO 3.8.3 requirements. CRITICAL STEP STANDARD: The operator recognizes that 19,000 gallons is NOT available from DFO Storage tank, and recognizes that tank level must be ___ SAT raised to > 19000 gallons prior to changing modes, and does NOT initial the associated block.

The operator recognizes that 15,000 gallons is available from Unit ___ UNSAT 1 IC Turbine Fuel Oil Storage tanks, and initials the appropriate block. (Not Critical)

The operator recognizes that the A EDG Air receiver pressure is greater than 210 psig, and initials the appropriate block. (Not Critical)

The operator recognizes that the B EDG Air receiver pressure is greater than 210 psig, and initials the appropriate block. (Not Critical)

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 9 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 13: Evaluate ITS LCO 3.8.4 requirements.

___ SAT STANDARD: The operator recognizes that MCC-A Voltage is > 126 VDC, and initials the appropriate block.

The operator recognizes that MCC-B Voltage is > 126 VDC, and ___ UNSAT initials the appropriate block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

STEP 14: Evaluate ITS LCO 3.8.7 requirements. CRITICAL STEP STANDARD: The operator recognizes that Inverter A Voltage is > 114 VAC, and ___ SAT initials the appropriate block. (Not Critical)

The operator recognizes that Inverter B Voltage is > 114 VAC, and initials the appropriate block. (Not Critical) ___ UNSAT The operator recognizes that CVT 1, must be OPERABLE, and that that it is currently inoperable.

The operator determines that CVT 1 must be restored to OPERABLE prior to changing modes, and does NOT initial the associated block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 10 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 15: Evaluate ITS LCO 3.8.9 requirements. CRITICAL STEP STANDARD: The operator recognizes that 4KV Bus 2 Voltage is > 3.2 KV, and initials the appropriate block. (Not Critical)

___ SAT The operator recognizes that 4KV Bus 3 Voltage is > 3.2 KV, and initials the appropriate block. (Not Critical)

The operator recognizes that 480V Bus E-1 Voltage (lowest phase) ___ UNSAT is > 440 VAC, and initials the appropriate block. (Not Critical)

The operator recognizes that 480V Bus E-2 Voltage (lowest phase) is > 440 VAC, and initials the appropriate block. (Not Critical)

The operator recognizes that MCC-5 breaker, CMPT NO. 4BL, FEED TO INSTRUMENT BUS 1, must be closed to be OPERABLE, and that that it is currently OPEN due to problem with No. 1 Constant Voltage Transformer.

The operator determines that MCC-5 breaker, CMPT NO. 4BL, FEED TO INSTRUMENT BUS 1, must be closed prior to changing modes, and does NOT initial the associated block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 11 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 16: Evaluate TRMS 3.6.b requirements.

STANDARD: The operator recognizes that the "A" Boric Acid Tank Level is > ___ SAT 42%, and initials the appropriate block.

The operator recognizes that the "A" Boric Acid Tank boron

___ UNSAT concentration is between 20,000 ppm - 22,500 ppm, and initials the appropriate block.

The operator recognizes that the "A" Boric Acid Tank temperature is

> 145°F, and initials the appropriate block.

The operator recognizes that the "B" Boric Acid Tank Level is >

42%, and initials the appropriate block.

The operator recognizes that the "B" Boric Acid Tank boron concentration is between 20,000 ppm - 22,500 ppm, and initials the appropriate block.

The operator recognizes that the "B" Boric Acid Tank temperature is

> 145°F, and initials the appropriate block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 12 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 17: Evaluate TRMS 3.6.d requirements.

___ SAT STANDARD: The operator recognizes that the Primary Water Storage Tank Level is > 45%, and initials the appropriate block.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

STEP 18: The operator reports findings to the Shift Manager. CRITICAL STEP STANDARD: The operator reports findings / provides applicable pages or all

___ SAT pages of Attachment 2 to Shift Manager.

  • CCW Pump C must be restored to operable prior to changing modes.
  • V6-16B must be restored to operable prior to changing modes. ___ UNSAT
  • WCCU-1A must be restored to operable prior to changing modes.
  • CVT #1 must be repaired
  • Instrument Bus 1 must be powered from MCC-5 prior to changing modes.
  • DFO Storage tank level must be raised to > 19000 gallons EXAMINERS CUE: NONE EXAMINERS NOTE: See provided KEY.

COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 13 of 15 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A2 SRO Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET Inoperable Equipment List

  • Charging Pump A
  • Component Cooling Water Pump C
  • V6-16B, SW TURB BLDG SUPPLY, is OPEN with the motor leads disconnected for control circuit troubleshooting.
  • Instrument Bus 1 is being powered from MCC-8. MCC-5 feed to Instrument Bus 1 is de-energized due to problem with No. 1 Constant Voltage Transformer.
  • Control Room Water Cooled Condensing Unit, WCCU-1A NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is in Mode 5, returning from a refueling outage.
  • RCS temperature is 165°F and there is a bubble in the PZR.
  • RHR Loop A is maintaining RCS temperature.
  • You are an extra SRO assigned to support the shift during re-start activities.

INITIATING CUE:

  • The SM has directed you to complete the attached partially completed OMM-001-12, MINIMUM EQUIPMENT LIST AND SHIFT RELIEF, Att. 2, 200°F to 350°F (MODE 4) MEL that was started on the previous shift and determine if any Mode 4 restrictions exist.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM A3 RO Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Admin - JPM A3 RO (Rev_010816) NUREG 1021, Revision 10

Appendix C Page 2 of 7 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Evaluate Stay Time with Lowered JPM No.: 2016 Admin - JPM A3 SFP Level RO K/A

Reference:

2.3.7 (3.5)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM).

Initial Conditions:

  • A station wide accident has occurred due to an Earthquake.
  • The plant is in Mode 6 with a full core off-load.
  • The Spent Fuel Pool level has lowered to 10 feet above the top of the fuel, and has stabilized at this level.
  • R-5, Spent Fuel Building Rad Monitor, reads 1.93E+2 mr/hr.
  • A dose limit of 25 mrem has been placed on all personnel performing emergency tasks within the building.
  • You have been assigned a repetitive task within AOP-036 which will require you to enter the Spent Fuel Building and proceed to the area around the Spent Fuel Pool, and remain there for 3 minutes, before exiting the building.
  • The exposure traveling to and from the Spent Fuel Pool area results in no appreciable exposure.

Initiating Cue: The OSC Leader has directed you to estimate how many times you can perform this repetitive task before you must be replaced by another operator.

2016 Admin - JPM A3 RO NUREG 1021, Revision 10

Appendix C Page 3 of 7 Form ES-C-1 Job Performance Measure Worksheet Task Standard: The operator will determine that the repetitive task can be performed 2 times before another operator will need to perform the task.

Required Materials: Calculator General

References:

AOP-036 (SFP Events), Rev 48 OMM-014 (Radiation Monitor Setpoints), Rev 51 Handouts: None Time Critical Task: NO Validation Time: 7 minutes Critical Step Justification Step 3 This step is critical because it is necessary to determine how many times the task can be performed without exceeding a limit.

2016 Admin - JPM A3 RO NUREG 1021, Revision 10

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM).

START TIME:

STEP 1: Determine dose rate in the Spent Fuel Pool Area

___ SAT STANDARD: The operator evaluates the R-5 reading and determines that the area radiation levels are 193 mrem/hour.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 2: Determine the accumulated Dose each time the repetitive task is performed. ___ SAT STANDARD: The operator determines that 3 minutes in a radiation field of 193 mrem/hour will yield a dose of 9.65 mrem

___ UNSAT 193 mrem/hr x 1hr/60 minutes x 3 minutes/task = 9.65 mrem/task EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A3 RO NUREG 1021, Revision 10

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: Determine how many times the repetitive task can be performed CRITICAL before allowable RWP limits have been reached. STEP STANDARD: The operator determines that a Task which accumulates 9.65 mrem ___ SAT can be performed twice without exceeding a dose limit of 25 mrem.

25 mrem x task/9.65 mrem = 2.6 tasks

___ UNSAT Since the task cannot be partially performed, the task can be performed twice before the operator must be replaced with another operator.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Admin - JPM A3 RO NUREG 1021, Revision 10

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A3 RO Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Admin - JPM A3 RO NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • A station wide accident has occurred due to an Earthquake.
  • The plant is in Mode 6 with a full core off-load.
  • The Spent Fuel Pool level has lowered to 10 feet above the top of the fuel, and has stabilized at this level.
  • R-5, Spent Fuel Building Rad Monitor, reads 1.93E+2 mr/hr.
  • A dose limit of 25 mrem has been placed on all personnel performing emergency tasks within the building.
  • You have been assigned a repetitive task within AOP-036 which will require you to enter the Spent Fuel Building and proceed to the area around the Spent Fuel Pool, and remain there for 3 minutes, before exiting the building.
  • The exposure traveling to and from the Spent Fuel Pool area results in no appreciable exposure.

INITIATING CUE: The OSC Leader has directed you to estimate how many times you can perform this repetitive task before you must be replaced by another operator.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM A3 SRO Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Admin - JPM A3 SRO (Rev_010816) NUREG 1021, Revision 10

Appendix C Page 2 of 9 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Approve a Waste Gas Release JPM No.: 2016 Admin - JPM A3 Permit SRO K/A

Reference:

2.3.8 (3.7)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • The plant is in Mode 1 at 100% power.
  • A Waste Gas Release Permit for the A WGDT has been presented to the Shift Manager for review and approval.

Initiating Cue:

  • Review and Approve the Waste Gas Release Permit.
  • Identify all issues found (if any) which would prevent approval.

Task Standard: The operator will review the WGDT Release Permit and identify that it cannot be approved because (1) it has been written for the wrong WGDT and (2) the R14C setpoint is less conservative than required.

Required Materials: None General

References:

EMP-022 (Gaseous Waste Release Permits), Rev 56 OMM-014 (Radiation Monitor Setpoints), Rev 51 OP-706 (Waste Disposal - Gaseous Rad Waste Release), Rev 18 2016 Admin - JPM A3 SRO NUREG 1021, Revision 10

Appendix C Page 3 of 9 Form ES-C-1 Job Performance Measure Worksheet Handouts: Handout 1: Completed Attachment 10.3 of EMP-022 marked up for this JPM.

Time Critical Task: NO Validation Time: 8 minutes Critical Step Justification Step 4 This step is critical because denial of permit approval, and identification of the reasons for this denial is necessary to prevent an uncontrolled release of B WGDT and/or a release with the radiation monitor setpoint at a non-conservative value.

2016 Admin - JPM A3 SRO NUREG 1021, Revision 10

Appendix C Page 4 of 9 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEP 1: Review the Waste Gas Release Permit preliminary Information

___ SAT STANDARD: The operator observes that the following preliminary information is completed on Attachment 10.3 of EMP-022:

  • Release #: G-2016-015
  • SSN (XXXX) ___ UNSAT
  • Date (of Permit preparation)
  • Printed Name (of Individual preparing the Permit)
  • Initial (of Individual preparing the Permit)
  • Signature (of Individual preparing the Permit)
  • Date (of Signature)

The operator recognizes that the preliminary information is acceptable and proceeds.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A3 SRO NUREG 1021, Revision 10

Appendix C Page 5 of 9 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: Review the Waste Gas Release Permit PART I Information

___ SAT STANDARD: The operator observes that the following PART I information is completed on Attachment 10.3 of EMP-022:

  • Waste Gas Decay Tank: B
  • Estimated Release Start Date/Time: 2/6/16 2100 ___ UNSAT
  • Estimated Release Stop Date/Time: 2/6/16 2130
  • Monitor R14C Setpoint: 5.6E3
  • Basis: Activity Circled
  • CV Purge: Not In Service Circled
  • Maximum WGDT Flow Rate: 90 CFM
  • Prepared By: name of preparer
  • Peer Review: name of reviewer
  • Verified By: NA
  • Chemistry Supervisor: NA The operator identifies that the Permit is for the B WGDT and the Permit was requested for the A WGDT, and identifies that this must be modified before approval.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A3 SRO NUREG 1021, Revision 10

Appendix C Page 6 of 9 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: Review the Waste Gas Release Permit PART II Information STANDARD: The operator observes that the following PART II information is completed on Attachment 10.3 of EMP-022: ___ SAT

  • PRIOR1 (Channel Check): 19.9
  • SOURCE CHECK2: Initialed
  • SETPOINT VERF. AT3: 1.0E4 ___ UNSAT
  • UPDATE STATUS BOARD4: Initialed
  • DURING RELEASE: Left Blank
  • AFTER RELEASE: Left Blank
  • SETPOINT RETURNED TO3,5: Left Blank
  • STATUS BOARD UPDATED4: Left Blank The operator identifies that the R14C setpoint is less conservative than required and identifies that this must be modified before approval.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A3 SRO NUREG 1021, Revision 10

Appendix C Page 7 of 9 Form ES-C-1 PERFORMANCE INFORMATION STEP 4: Approve the Waste Gas Release Permit or identify all issues found CRITICAL which would prevent approval STEP STANDARD: The operator identifies that the Waste Gas Permit cannot be ___ SAT approved until:

  • The Permit is identified with the correct WGDT in PART I (A WGDT)
  • The R14C setpoint is verified in PART II to be at or less ___ UNSAT conservative than the setpoint listed in PART I EXAMINERS CUE: NONE EXAMINERS NOTE: If the operator indicates after discovering only one of two errors that the permit would not be approved until corrected, correct the error, and return the permit and provide the Initiating CUE a second time.

COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Admin - JPM A3 SRO NUREG 1021, Revision 10

Appendix C Page 8 of 9 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A3 SRO Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Admin - JPM A3 SRO NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is in Mode 1 at 100% power.
  • A Waste Gas Release Permit for the A WGDT has been presented to the Shift Manager for review and approval.

INITIATING CUE:

  • Review and Approve the Waste Gas Release Permit.
  • Identify all issues found (if any) which would prevent approval.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM A4 SRO Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Admin - JPM A4 SRO (Rev_010816) NUREG 1021, Revision 10

Appendix C Page 2 of 6 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Emergency Classification JPM No.: 2016 Admin - JPM A4 SRO K/A

Reference:

2.4.41 (4.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handouts 1-2.

Initial Conditions:

  • The plant is operating at 100% power.
  • Protesters have illegally entered the plant, and have gained entry to the protected area.
  • Security has declared a Security Event (Confirmed Protected Area Intrusion).
  • Security has all intruders under restraint and has prevented further entry into the plant.
  • Other than minor damage to the security fences and protest slogans spray painted on some walls, there was no plant damage.

Initiating Cue:

  • Classify the event in accordance with the Robinson Nuclear Plant Emergency Action Level Matrix.
  • Then prepare an Emergency Notification Form for this classification.

THIS JPM IS TIME CRITICAL 2016 Admin - JPM A4 SRO NUREG 1021, Revision 10

Appendix C Page 3 of 6 Form ES-C-1 Job Performance Measure Worksheet Task Standard: The operator will declare an ALERT based on HA4.1, Confirmed Security event in a plant Protected Area or notification of either an airborne attack threat or hostile threat within the Owner Controlled Area, within 15 minutes. Then, the operator will prepare an Emergency Notification Form for this event in accordance with EPCLA-01 (Emergency Control) in accordance with the attached KEY, also within 15 minutes.

Required Materials: None General

References:

Robinson Nuclear Plant Emergency Action Level Matrix, Sheet 1 of 3, Rev 4 Robinson Nuclear Plant Emergency Action Level Matrix, Sheet 2 of 3, Rev 7 Robinson Nuclear Plant Emergency Action Level Matrix, Sheet 3 of 3, Rev 1 EPCLA-01 (Emergency Control), Rev 43 EPCLA-04 (Emergency Action Level Technical Basis Document), Rev 13 EPNOT-01 (CR/EOF Emergency Communicator), Rev 46 Handouts: Handout 1: Robinson Nuclear Plant Emergency Action Level Matrix Sheets 1-3 Handout 2: Blank Copy of EPCLA-01 Time Critical Task: YES - 15 Minutes to classify the event, and then 15 minutes to generate an ENF for the classification Validation Time: 15 minutes Critical Step Justification Step 1 This step is critical because accurately classifying the event is necessary to properly implement on-site and off-site response to an emergency event.

Step 2 This step is critical because the completion of the ENF is necessary to properly communicate to local, state and federal organizations the status of on-going emergency events.

2016 Admin - JPM A4 SRO NUREG 1021, Revision 10

Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handouts 1-2.

START TIME:

STEP 1: Classify the event in accordance with the Robinson Nuclear Plant CRITICAL Emergency Action Level Matrix STEP

___ SAT STANDARD: The operator will declare an ALERT based on HA4.1 due to threshold 1 (Security event in the plant Protected Area as determined and reported by Security shift supervision)

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

TIME CRITICAL STOP TIME #1: __________

STEP 2: Prepare an ENF CRITICAL STEP STANDARD: The operator completes Attachment 10.5, Page 9 of 10 (Or Equivalent ___ SAT ENF Form) of EPCLA-01 IAW the provided KEY.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: NONE COMMENTS:

TIME CRITICAL STOP TIME #2: __________

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Admin - JPM A4 SRO NUREG 1021, Revision 10

Appendix C Page 5 of 6 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A4 SRO Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Admin - JPM A4 SRO NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is operating at 100% power.
  • Protesters have illegally entered the plant, and have gained entry to the protected area.
  • Security has declared a Security Event (Confirmed Protected Area Intrusion).
  • Security has all intruders under restraint and has prevented further entry into the plant.
  • Other than minor damage to the security fences and protest slogans spray painted on some walls, there was no plant damage.

INITIATING CUE:

  • Classify the event in accordance with the Robinson Nuclear Plant Emergency Action Level Matrix.
  • Then prepare an Emergency Notification Form for this classification.

THIS JPM IS TIME CRITICAL NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM A1a RO Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Admin - JPM A1a RO (Rev_010816) NUREG 1021, Revision 10

Appendix C Page 2 of 10 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Calculate QPTR JPM No.: 2016 Admin - JPM A1a RO K/A

Reference:

2.1.7 (4.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • The plant is in Mode 1 at 60% RTP.
  • The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation.
  • Detector Currents are as follows:
  • N41: Upper - 63 / Normalizing - 123
  • N41: Lower - 55 / Normalizing - 120
  • N42: Upper - 55 / Normalizing - 109
  • N42: Lower - 52 / Normalizing - 110
  • N43: Upper - 50 / Normalizing - 104
  • N43: Lower - 45 / Normalizing - 99
  • N44: Upper - 48 / Normalizing - 97
  • N44: Lower - 45 / Normalizing - 95 Initiating Cue:
  • The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT.

2016 Admin - JPM A1a RO NUREG 1021, Revision 10

Appendix C Page 3 of 10 Form ES-C-1 Job Performance Measure Worksheet

  • Round all calculations to three decimal places (Example: 1.2348 would be rounded to 1.235)
  • Identify any limits that are not being complied with.

Task Standard: The operator will complete the QPTR calculation in accordance with the provided KEY, and identify that Technical Specification LCO is NOT met.

Required Materials: Calculator Robinson Technical Specifications and Basis must be available.

General

References:

FMP-007 (Quadrant Power Tilt), Rev 15 Robinson Technical Specification LCO 3.2.4 (Quadrant Power Tilt Ratio), Amendment 176 Handouts: Handout 1: Blank copy of FMP-007.

Time Critical Task: NO Validation Time: 10 minutes Critical Step Justification Step 6 This step is critical because identifying that the maximum Upper Normalized Detector Ratio is N41 (0.512), and dividing it by the Average Upper Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY.

Step 7 This step is critical because identifying that the maximum Lower Normalized Detector Ratio is N44 (0.474), and dividing it by the Average Lower Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY.

Step 8 This step is critical because identifying that the Upper QPTR is larger than the Lower QPTR is necessary to complete the QPTR calculation in accordance with the provided KEY.

Step 9 This step is critical because determining that LCO 3.2.4 permits a maximum QPTR of 1.02 when power level is greater than 50% is necessary to identify that Technical Specification LCO is NOT met.

2016 Admin - JPM A1a RO NUREG 1021, Revision 10

Appendix C Page 4 of 10 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEP 1: Read the Upper (A) and the Lower (B) Indicated Detector Currents from the Detector Current meters of each operable Power Range channel and record on ATTACHMENT 10.2. ___ SAT (Step 8.2.4.1)

STANDARD: The operator records the provided Upper and Lower Detector

___ UNSAT Currents on Attachment 10.2 IAW the provided KEY.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 2: Record the Upper and Lower Normalizing Detector Currents from the Control Room Status Board for each operable Power Range channel on ATTACHMENT 10.2. ___ SAT (Step 8.2.4.2)

STANDARD: The operator records the provided Upper and Lower Detector ___ UNSAT Currents on Attachment 10.2 IAW the provided KEY.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

NOTE:

Normalized Ratios, Average Ratios and QPTR values should be recorded to at least 3 decimal places.

2016 Admin - JPM A1a RO NUREG 1021, Revision 10

Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: Divide each Indicated Detector Current by its corresponding Normalizing Detector Current and record the result as the Normalized Detector Ratio on ATTACHMENT 10.2.

(Step 8.2.4.3) ___ SAT STANDARD: The operator reads the Note, and proceeds.

___ UNSAT The operator divides each Indicated Detector Current by its corresponding Normalizing Detector Current and records the result as the Normalized Detector Ratio on ATTACHMENT 10.2 IAW the provided KEY.

Upper N41 = 0.512 Lower N41 = 0.458 Upper N42 = 0.505 Lower N42 = 0.473 Upper N43 = 0.481 Lower N43 = 0.455 Upper N44 = 0.495 Lower N44 = 0.474 EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 4: Average the Upper Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Upper column on ATTACHMENT 10.2.

(Step 8.2.4.4) ___ SAT STANDARD: The operator averages the Upper Normalized Detector Ratios and records the result as the Average Normalized Detector Ratio in the ___ UNSAT Upper column on Attachment 10.2 IAW the provided KEY.

Upper Average Normalized Detector Ratio = 0.498 (+.001/-0)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A1a RO NUREG 1021, Revision 10

Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 5: Average the Lower Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Lower column on ATTACHMENT 10.2. ___ SAT (Step 8.2.4.5)

STANDARD: The operator averages the Lower Normalized Detector Ratios and ___ UNSAT records the result as the Average Normalized Detector Ratio in the Lower column on Attachment 10.2 IAW the provided KEY.

Lower Average Normalized Detector Ratio = 0.465 (+.001/-0)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 6: Determine the maximum Upper Normalized Detector Ratio and CRITICAL divide it by the Average Upper Normalized Detector Ratio and STEP record the resulting Upper QPTR on ATTACHMENT 10.2.

(Step 8.2.4.6)

STANDARD: The operator identifies that the maximum Upper Normalized ___ SAT Detector Ratio is N41 (0.512), and divides it by the Average Upper Normalized Detector Ratio from Performance Step 4 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided KEY. ___ UNSAT Upper QPTR = 0.512 / 0.498 = 1.028 (+.001/-0)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A1a RO NUREG 1021, Revision 10

Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 7: Determine the maximum Lower Normalized Detector Ratio and divide it by the Average Lower Normalized Detector Ratio and CRITICAL record the resulting Lower QPTR on ATTACHMENT 10.2 STEP (Step 8.2.4.7)

___ SAT STANDARD: The operator observes that the maximum Lower Normalized Detector Ratio is N44 (0.474), and divides it by the Average Lower Normalized Detector Ratio from Performance Step 5 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided ___ UNSAT KEY.

Lower QPTR = 0.474 / 0.465 = 1.019 (+.001/-0)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 8: Record larger of the Upper QPTR or the Lower QPTR as the CRITICAL Maximum QPTR on ATTACHMENT 10.2 along with the reactor power STEP and any comments.

(Step 8.2.4.8) ___ SAT STANDARD: The operator identifies that the Upper QPTR is larger than the Lower QPTR and records the Maximum QPTR as 1.028 (+.001/-0)

___ UNSAT IAW the provided KEY.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A1a RO NUREG 1021, Revision 10

Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 9: Identify any limits that are not being complied with. CRITICAL STEP STANDARD: The operator reviews Technical Specification LCO 3.2.4 and

___ SAT determines that with the plant in Mode 1 at greater than 50% power, a maximum QPTR of 1.02 is permitted.

The operator identifies that LCO 3.2.4 is NOT met.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Admin - JPM A1a RO NUREG 1021, Revision 10

Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A1a RO Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Admin - JPM A1a RO NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is in Mode 1 at 60% RTP.
  • The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation.
  • Detector Currents are as follows:
  • N41: Upper - 63 / Normalizing - 123
  • N41: Lower - 55 / Normalizing - 120
  • N42: Upper - 55 / Normalizing - 109
  • N42: Lower - 52 / Normalizing - 110
  • N43: Upper - 50 / Normalizing - 104
  • N43: Lower - 45 / Normalizing - 99
  • N44: Upper - 48 / Normalizing - 97
  • N44: Lower - 45 / Normalizing - 95 INITIATING CUE:
  • The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT.
  • Round all calculations to three decimal places (Example:

1.2348 would be rounded to 1.235)

  • Identify any limits that are not being complied with.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM A1a SRO Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Admin - JPM A1a SRO (Rev_010816) NUREG 1021, Revision 10

Appendix C Page 2 of 10 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Calculate QPTR JPM No.: 2016 Admin - JPM A1a SRO K/A

Reference:

2.1.7 (4.7)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • The plant is in Mode 1 at 100% RTP.
  • The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation.
  • Detector Currents are as follows:
  • N41: Upper - 105 / Normalizing - 123
  • N41: Lower - 92 / Normalizing - 120
  • N42: Upper - 92 / Normalizing - 109
  • N42: Lower - 87 / Normalizing - 110
  • N43: Upper - 83 / Normalizing - 104
  • N43: Lower - 75 / Normalizing - 99
  • N44: Upper - 80 / Normalizing - 97
  • N44: Lower - 75 / Normalizing - 95 Initiating Cue:
  • The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT.
  • Round all calculations to three decimal places (Example: 1.2348 would be rounded to 1.235) 2016 Admin - JPM A1a SRO NUREG 1021, Revision 10

Appendix C Page 3 of 10 Form ES-C-1 Job Performance Measure Worksheet

  • Identify whether or not any limitations have been exceeded, and if so, what, if any ACTION, is required.

Task Standard: The operator will complete the QPTR calculation in accordance with the provided KEY, identify that Technical Specification LCO is NOT met, and identify that all six ACTIONs (A.1-A.6) must be taken for Condition A of LCO 3.2.4.

Required Materials: Calculator Robinson Technical Specifications and Basis must be available.

General

References:

FMP-007 (Quadrant Power Tilt), Rev 15 Robinson Technical Specification LCO 3.2.4 (Quadrant Power Tilt Ratio), Amendment 176 Handouts: Handout 1: Blank copy of FMP-007.

Time Critical Task: NO Validation Time: 15 minutes Critical Step Justification Step 6 This step is critical because identifying that the maximum Upper Normalized Detector Ratio is N41 (0.854), and dividing it by the Average Upper Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY.

Step 7 This step is critical because identifying that the maximum Lower Normalized Detector Ratio is N42 (0.791), and dividing it by the Average Lower Normalized Detector Ratio is necessary to complete the QPTR calculation in accordance with the provided KEY.

Step 8 This step is critical because identifying that the Upper QPTR is larger than the Lower QPTR is necessary to complete the QPTR calculation in accordance with the provided KEY.

Step 9 This step is critical because determining that LCO 3.2.4 permits a maximum QPTR of 1.02 when power level is greater than 50% is necessary to identify that Technical Specification LCO is NOT met; and identifying that ACTIONs A.1 through A.6 must be completed is necessary to identify all of the Technical Specification required ACTION.

2016 Admin - JPM A1a SRO NUREG 1021, Revision 10

Appendix C Page 4 of 10 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEP 1: Read the Upper (A) and the Lower (B) Indicated Detector Currents from the Detector Current meters of each operable Power Range channel and record on ATTACHMENT 10.2. ___ SAT (Step 8.2.4.1)

STANDARD: The operator records the provided Upper and Lower Detector

___ UNSAT Currents on Attachment 10.2 IAW the provided KEY.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 2: Record the Upper and Lower Normalizing Detector Currents from the Control Room Status Board for each operable Power Range channel on ATTACHMENT 10.2. ___ SAT (Step 8.2.4.2)

STANDARD: The operator records the provided Upper and Lower Detector ___ UNSAT Currents on Attachment 10.2 IAW the provided KEY.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

NOTE:

Normalized Ratios, Average Ratios and QPTR values should be recorded to at least 3 decimal places.

2016 Admin - JPM A1a SRO NUREG 1021, Revision 10

Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: Divide each Indicated Detector Current by its corresponding Normalizing Detector Current and record the result as the Normalized Detector Ratio on ATTACHMENT 10.2.

(Step 8.2.4.3) ___ SAT STANDARD: The operator reads the Note, and proceeds.

___ UNSAT The operator divides each Indicated Detector Current by its corresponding Normalizing Detector Current and records the result as the Normalized Detector Ratio on ATTACHMENT 10.2 IAW the provided KEY.

Upper N41 = 0.854 Lower N41 = 0.767 Upper N42 = 0.844 Lower N42 = 0.791 Upper N43 = 0.798 Lower N43 = 0.758 Upper N44 = 0.825 Lower N44 = 0.789 EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 4: Average the Upper Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Upper column on ATTACHMENT 10.2.

(Step 8.2.4.4) ___ SAT STANDARD: The operator averages the Upper Normalized Detector Ratios and records the result as the Average Normalized Detector Ratio in the ___ UNSAT Upper column on Attachment 10.2 IAW the provided KEY.

Upper Average Normalized Detector Ratio = 0.830 (+.001/-0)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A1a SRO NUREG 1021, Revision 10

Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 5: Average the Lower Normalized Detector Ratios and record the result as the Average Normalized Detector Ratio in the Lower column on ATTACHMENT 10.2. ___ SAT (Step 8.2.4.5)

STANDARD: The operator averages the Lower Normalized Detector Ratios and ___ UNSAT records the result as the Average Normalized Detector Ratio in the Lower column on Attachment 10.2 IAW the provided KEY.

Lower Average Normalized Detector Ratio = 0.776 (+.001/-0)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 6: Determine the maximum Upper Normalized Detector Ratio and CRITICAL divide it by the Average Upper Normalized Detector Ratio and STEP record the resulting Upper QPTR on ATTACHMENT 10.2.

(Step 8.2.4.6)

STANDARD: The operator identifies that the maximum Upper Normalized ___ SAT Detector Ratio is N41 (0.854), and divides it by the Average Upper Normalized Detector Ratio from Performance Step 4 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided KEY. ___ UNSAT Upper QPTR = 0.854 / 0.830 = 1.029 (+.001/-0)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A1a SRO NUREG 1021, Revision 10

Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 7: Determine the maximum Lower Normalized Detector Ratio and divide it by the Average Lower Normalized Detector Ratio and CRITICAL record the resulting Lower QPTR on ATTACHMENT 10.2 STEP (Step 8.2.4.7)

___ SAT STANDARD: The operator observes that the maximum Lower Normalized Detector Ratio is N42 (0.791), and divides it by the Average Lower Normalized Detector Ratio from Performance Step 5 and records the resulting Upper QPTR on Attachment 10.2 IAW the provided ___ UNSAT KEY.

Lower QPTR = 0.791 / 0.776 = 1.019 (+.001/-0)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 8: Record larger of the Upper QPTR or the Lower QPTR as the CRITICAL Maximum QPTR on ATTACHMENT 10.2 along with the reactor power STEP and any comments.

(Step 8.2.4.8) ___ SAT STANDARD: The operator identifies that the Upper QPTR is larger than the Lower QPTR and records the Maximum QPTR as 1.029 (+.001/-0)

___ UNSAT IAW the provided KEY.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A1a SRO NUREG 1021, Revision 10

Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 9: Identify whether or not any limitations have been exceeded, and if so, CRITICAL what, if any ACTION, is required. STEP

___ SAT STANDARD: The operator reviews Technical Specification LCO 3.2.4 and determines that with the plant in Mode 1 at greater than 50% power, a maximum QPTR of 1.02 is permitted.

___ UNSAT The operator identifies that LCO 3.2.4 is NOT met.

The operator identifies that ACTIONS A.1 through A.6 must be taken for Condition A of LCO 3.2.4.

  • Reduce THERMAL POWER 3% from RTP for each 1% of QPTR > 1.00 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (Minimum of 8.7% power reduction OR Maximum allowable power of 91.3%).
  • Determine QPTR and reduce THERMAL POWER 3% from RTP for each 1% of QPTR > 1.00 once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
  • Perform SR 3.2.1.1 and SR 3.2.2.1 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and once per 7 days thereafter.
  • Reevaluate safety analyses and confirm results remain valid for duration of operation under this condition prior to increasing THERMAL POWER above the limit of Required Action A.1.
  • Prior to increasing THERMAL POWER above the limit of Required Action A.1 prior to increasing THERMAL POWER above the limit of Required Action A.1 or A.2.
  • Perform SR 3.2.1.1 and SR 3.2.2.1 Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after reaching RTP OR Within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after increasing THERMAL POWER above the limit of Required Action A.1 or A.2.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Admin - JPM A1a SRO NUREG 1021, Revision 10

Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A1a SRO Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Admin - JPM A1a SRO NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is in Mode 1 at 100% RTP.
  • The CRS has directed you to perform a Manual QPTR calculation and analyze the results of the calculation.
  • Detector Currents are as follows:
  • N41: Upper - 105 / Normalizing - 123
  • N41: Lower - 92 / Normalizing - 120
  • N42: Upper - 92 / Normalizing - 109
  • N42: Lower - 87 / Normalizing - 110
  • N43: Upper - 83 / Normalizing - 104
  • N43: Lower - 75 / Normalizing - 99
  • N44: Upper - 80 / Normalizing - 97
  • N44: Lower - 75 / Normalizing - 95 INITIATING CUE:
  • The CRS has directed you to perform a MANUAL QPTR calculation IAW FMP-007, QUADRANT POWER TILT.
  • Round all calculations to three decimal places (Example:

1.2348 would be rounded to 1.235)

  • Identify whether or not any limitations have been exceeded, and if so, what, if any ACTION, is required.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM A1b RO Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Admin - JPM A1b RO (Rev_010816) NUREG 1021, Revision 10

Appendix C Page 2 of 7 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Determine License Status JPM No.: 2016 Admin - JPM A1b RO K/A

Reference:

2.1.4 (3.3)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM).

Initial Conditions:

  • You are a Licensed Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
  • Your last medical exam was on 11/17/14.
  • Your last SCBA quantitative and qualitative fit test was on 1/18/15.
  • You have attended all required LOCT training sessions, and passed all exams administered.
  • Your supervisor has directed you to maintain your license active AND qualified to stand watch.
  • Your Control Room work history in the last three months is as follows:
  • 11/26/15, BOP for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (Day Shift)
  • 1/2/16, RO for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (Night Shift 1800-2400)
  • 1/4/16, Extra Operator for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
  • 1/10/16, BOP for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (Day Shift) 2016 Admin - JPM A1b RO NUREG 1021, Revision 10

Appendix C Page 3 of 7 Form ES-C-1 Job Performance Measure Worksheet Initiating Cue: Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.

Task Standard: The operator will evaluate their work history and identify that four 12-hour shifts must be completed as either the RO or the BOP prior to the end of the quarter to maintain their license ACTIVE, and that an SCBA quantitative and qualitative fit test must be completed prior to standing watch in the Control Room again.

Required Materials: Calculator General

References:

OMM-001-5 (Training and Qualification), Rev 53 AD-OP-ALL-1000 (Conduct of Operations), Rev 4 Handouts: None Time Critical Task: NO Validation Time: 6 minutes Critical Step Justification Step 1 This step is critical because identifying the watches that must be completed before the end of the quarter is necessary to maintain the license status ACTIVE.

Step 2 This step is critical because identifying the requirement to complete an annual fit test is necessary to maintain the ability to stand watch in the Control Room.

2016 Admin - JPM A1b RO NUREG 1021, Revision 10

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM).

START TIME:

STEP 1: Identify any requirements that must be met prior to the end of the CRITICAL quarter that are required to maintain your license ACTIVE. STEP

___ SAT STANDARD: The operator identifies that ROs must stand a minimum number of hours in a Licensed position, satisfactorily participate in the Licensed Operator Continuing Training Program, and have a biennial medical exam; and concludes

___ UNSAT that the LOCT and Medical requirements have been met.

The operator recognizes that Individuals with RO Licenses may maintain an active license by standing watch a minimum of five 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts per calendar quarter as RO or BOP.

The operator recognizes that the work on 11/26/15 does not count towards this calendar-quarters number of watches.

The operator recognizes that the work on 1/2/16 does not count towards the minimum of five 12-hour shifts.

The operator recognizes that the work on 1/4/16 does not count towards the minimum of five 12-hour shifts; because it was not stood as the BOP or the RO.

The operator recognizes that the work on 1/10/16 does count towards the minimum of five 12-hour shifts; and concludes that 4 additional 12-hour shifts as either the RO or BOP must be completed before the end of the quarter.

EXAMINERS CUE: NONE EXAMINERS NOTE: See Section 5.3 of OMM-001-5.

COMMENTS:

2016 Admin - JPM A1b RO NUREG 1021, Revision 10

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: Identify the requirements that are required to maintain your CRITICAL qualification to stand watch in the Control Room. STEP STANDARD: The operator recognizes that in order to maintain qualification to stand ___ SAT watch in the Control Room, the operator must be Respirator Qualified as defined in the section on Maintaining License and Qualification Active Status; and that this section requires an SCBA quantitative and qualitative fit test annually. ___ UNSAT The operator recognizes that the last SCBA quantitative and qualitative fit test was over a year ago, and identifies that this fit test must be completed prior to standing a watch in the Control Room.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Admin - JPM A1b RO NUREG 1021, Revision 10

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A1b RO Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Admin - JPM A1b RO NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • You are a Licensed Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
  • Your last medical exam was on 11/17/14.
  • Your last SCBA quantitative and qualitative fit test was on 1/18/15.
  • You have attended all required LOCT training sessions, and passed all exams administered.
  • Your supervisor has directed you to maintain your license active AND qualified to stand watch.
  • Your Control Room work history in the last three months is as follows:
  • 11/26/15, BOP for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (Day Shift)
  • 1/2/16, RO for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (Night Shift 1800-2400)
  • 1/4/16, Extra Operator for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
  • 1/10/16, BOP for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (Day Shift)

INITIATING CUE: Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.

Requirements that must be met before the end of the quarter to maintain an ACTIVE License:

Requirements that must be to maintain your qualification to stand watch in the Control Room:

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM A1b SRO Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Admin - JPM A1b SRO (Rev_010816) NUREG 1021, Revision 10

Appendix C Page 2 of 7 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Determine License Status JPM No.: 2016 Admin - JPM A1b SRO K/A

Reference:

2.1.4 (3.3)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM).

Initial Conditions:

  • You are a Licensed Senior Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
  • Your last medical exam was on 11/17/14.
  • Your last SCBA quantitative and qualitative fit test was on 1/18/15.
  • You have attended all required LOCT training sessions, and passed all exams administered.
  • Your supervisor has directed you to maintain your license active AND qualified to stand watch.
  • Your Control Room work history in the last three months is as follows:
  • 11/26/15, BOP for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (Day Shift)
  • 1/2/16, RO for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (Night Shift 1800-2400)
  • 1/4/16, Extra Operator for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
  • 1/10/16, CRS for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (Day Shift) 2016 Admin - JPM A1b SRO NUREG 1021, Revision 10

Appendix C Page 3 of 7 Form ES-C-1 Job Performance Measure Worksheet Initiating Cue: Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.

Task Standard: The operator will evaluate their work history and identify that four 12-hour shifts must be completed as either the SM, CRS, RO or the BOP prior to the end of the quarter to maintain their license ACTIVE, and that an SCBA quantitative and qualitative fit test must be completed prior to standing watch in the Control Room again.

Required Materials: Calculator General

References:

OMM-001-5 (Training and Qualification), Rev 53 AD-OP-ALL-1000 (Conduct of Operations), Rev 4 Handouts: None Time Critical Task: NO Validation Time: 7 minutes Critical Step Justification Step 1 This step is critical because identifying the watches that must be completed before the end of the quarter is necessary to maintain the license status ACTIVE.

Step 2 This step is critical because identifying the requirement to complete an annual fit test is necessary to maintain the ability to stand watch in the Control Room.

2016 Admin - JPM A1b SRO NUREG 1021, Revision 10

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM).

START TIME:

STEP 1: Identify any requirements that must be met prior to the end of the CRITICAL quarter that are required to maintain your license ACTIVE. STEP STANDARD: The operator identifies that SROs must stand a minimum

___ SAT number of hours in a Licensed position, satisfactorily participate in the Licensed Operator Continuing Training Program, and have a biennial medical exam; and conclude that the LOCT and Medical requirements have been met.

___ UNSAT The operator recognizes that Individuals with SRO Licenses may maintain an active license by standing watch a minimum of five 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts in a License required position, at least one of which must be in the SM or CRS position in the Main Control Room.

The operator recognizes that the work on 11/26/15 does not count towards this calendar-quarters number of watches.

The operator recognizes that the work on 1/2/16 does not count towards the minimum of five 12-hour shifts.

The operator recognizes that the work on 1/4/16 does not count towards the minimum of five 12-hour shifts; and was not stood as the SM, CRS, BOP or the RO.

The operator recognizes that the work on 1/10/16 does count towards the minimum of five 12-hour shifts; and concludes that 4 additional 12-hour shifts as either the SM, CRS, RO or BOP must be completed before the end of the quarter.

EXAMINERS CUE: NONE EXAMINERS NOTE: See Section 5.3 of OMM-001-5.

COMMENTS:

2016 Admin - JPM A1b SRO NUREG 1021, Revision 10

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: Identify the requirements that are required to maintain your CRITICAL qualification to stand watch in the Control Room. STEP STANDARD: The operator recognizes that in order to maintain qualification to stand ___ SAT watch in the Control Room, the operator must be Respirator Qualified as defined in the section on Maintaining License and Qualification Active Status; and that this section requires an SCBA quantitative and qualitative fit test annually. ___ UNSAT The operator recognizes that the last SCBA quantitative and qualitative fit test was over a year ago, and identifies that this fit test must be completed prior to standing a watch in the Control Room.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Admin - JPM A1b SRO NUREG 1021, Revision 10

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A1b SRO Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Admin - JPM A1b SRO NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • You are a Licensed Senior Reactor Operator who was assigned to the day shift staff for a special project, and not routinely standing watch in the Control Room.
  • Your last medical exam was on 11/17/14.
  • Your last SCBA quantitative and qualitative fit test was on 1/18/15.
  • You have attended all required LOCT training sessions, and passed all exams administered.
  • Your supervisor has directed you to maintain your license active AND qualified to stand watch.
  • Your Control Room work history in the last three months is as follows:
  • 11/26/15, BOP for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (Day Shift)
  • 1/2/16, RO for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (Night Shift 1800-2400)
  • 1/4/16, Extra Operator for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> assigned to Monitor Feedwater Station during Reactor Startup (Day Shift).
  • 1/10/16, CRS for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (Day Shift)

INITIATING CUE: Your supervisor has asked you to identify any requirements that must be met prior to the end of the quarter that are required to maintain your license ACTIVE; and any additional requirements that are required to maintain your qualification to stand watch in the Control Room.

Requirements that must be met before the end of the quarter to maintain an ACTIVE License:

Requirements that must be to maintain your qualification to stand watch in the Control Room:

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM A2 RO Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Admin - JPM A2 RO (Rev_010816) NUREG 1021, Revision 10

Appendix C Page 2 of 7 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Determine Proper Equipment JPM No.: 2016 Admin - JPM A2 Boundaries RO K/A

Reference:

2.2.41 (3.5)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM).

Initial Conditions:

  • The plant is in Mode 1 at 100% power.
  • Charging Pump A suction relief valve CVC-2080 has failed open.
  • The operating crew has entered AOP-016, Excessive Primary Plant Leakage, to control the plant.

Initiating Cue: The CRS has directed you to use all available resources to identify the pump boundary valves needed to be closed to isolate the leak, and identify the motor breaker to electrically isolate the pump motor.

Task Standard: The operator will identify that the leak can be isolated by closing three valves; CVC-270, CVC-290 and CVC-291, and that the pump motor can be electrically isolated by opening Breaker 52/34B.

Required Materials: Set of P&IDs available to the operator Set of EDPs available to the operator General

References:

P&ID 5379-685 Sheet 2 of 3 (Chemical and Volume Control System Purification and Makeup Flow Diagram), Rev 61 2016 Admin - JPM A2 RO NUREG 1021, Revision 10

Appendix C Page 3 of 7 Form ES-C-1 Job Performance Measure Worksheet EDP-002 (480V AC Busses), Rev 16 OWP-005 (Chemical and Volume Control System (CVCS)), Rev 65 Handouts: None Time Critical Task: NO Validation Time: 5 minutes Critical Step Justification Step 1 This step is critical because closing CVC-270, CV-290 and CVC-291 is necessary to isolate the leak.

Step 2 This step is critical because opening Breaker 52/34B is necessary to electrically isolate the A Charging Pump.

2016 Admin - JPM A2 RO NUREG 1021, Revision 10

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM).

START TIME:

STEP 1: Review P&IDs to determine pump boundary valves. CRITICAL STEP STANDARD: The operator reviews the set of P&IDs, and determines that the boundary valves associated with the A Charging Pump and its

___ SAT relief valve are located on P&ID 5379-685 Sheet 2 of 3 (Chemical and Volume Control System Purification and Makeup Flow Diagram).

___ UNSAT As a MINIMUM, the operator identifies the following valves are required to be verified in the selected positions to ensure that the leak flow path is isolated :

  • CVC-270, Charging Pump A Suction - CLOSED
  • CVC-290, Charging Pump A to Charging Line - CLOSED
  • CVC-291, Charging Pump A to Seal Injection - CLOSED EXAMINERS CUE: NONE EXAMINERS NOTE: This JPM consists of identifying the boundaries necessary to isolate the leakage path from Charging Pump A suction relief valve CVC-2080. The sequence of the component isolation is NOT required for the performance of this JPM.

Not required for credit. Additional isolation valves that can be included are as follows:

  • CVC-465, Charging Pump A Suction Vent - CLOSED
  • CVC-275F, Charging Pump A Suction Line Vent - CLOSED
  • CVC-280C, Charging Pump A Drain - CLOSED
  • CVC-400A, Charging Pump A Leakage Isolation - OPEN
  • CVC-277C, Charging Pump A Recirc Root - CLOSED CVC-466, Charging Pump A Suction Stabilizer Drain - OPEN COMMENTS:

2016 Admin - JPM A2 RO NUREG 1021, Revision 10

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: Determine the power supply to Charging Pump A. CRITICAL STEP STANDARD: The operator reviews the EDPs and determines that EDP-002 must ___ SAT be addressed.

As a MINIMUM the operator that Charging Pump A power supply is breaker 52/34B must be OPENED.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: The sequence of the component isolation is NOT required for the performance of this JPM.

Not required for credit. Additional breakers/switches that can be included are as follows:

  • RTGB Control switch for Charging Pump A - CAPPED
  • Power Panel 37 Circuit 2, Charging Pump A Suction Stabilizer Heater Breaker -

OPEN COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Admin - JPM A2 RO NUREG 1021, Revision 10

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A2 RO Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Admin - JPM A2 RO NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is in Mode 1 at 100% power.
  • Charging Pump A suction relief valve CVC-2080 has failed open.
  • The operating crew has entered AOP-016, Excessive Primary Plant Leakage, to control the plant.

INITIATING CUE: The CRS has directed you to use all available resources to identify the pump boundary valves needed to be closed to isolate the leak, and identify the motor breaker to electrically isolate the pump motor.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM A2 SRO Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Admin - JPM A2 SRO (Rev_010816) NUREG 1021, Revision 10

Appendix C Page 2 of 15 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Determine if Mode Change is JPM No.: 2016 Admin - JPM A2 Permissible SRO K/A

Reference:

2.2.38 (4.5)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue and the Available Equipment Inoperable List (Last Two Pages of this JPM), and Handout 1.

Initial Conditions:

  • The plant is in Mode 5, returning from a refueling outage.
  • RCS temperature is 165°F and there is a bubble in the PZR.
  • RHR Loop A is maintaining RCS temperature.
  • You are an extra SRO assigned to support the shift during re-start activities.

Initiating Cue:

  • The SM has directed you to complete the attached partially completed OMM-001-12, MINIMUM EQUIPMENT LIST AND SHIFT RELIEF, Att. 2, 200°F to 350°F (MODE 4) MEL that was started on the previous shift and determine if any Mode 4 restrictions exist.

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 3 of 15 Form ES-C-1 Job Performance Measure Worksheet Task Standard: The operator will evaluate the Technical Specifications/Technical Requirements against the Inoperable Equipment List and listed parameters and determines that CCW Pump C, V6-16B, WCCU-1A must be restored to operable prior to changing modes; that CVT 1 must be repaired and Instrument Bus 1 must be powered from MCC-5 prior to changing modes, and that DFO Storage tank level must be raised to > 19000 gallons prior to changing modes per the provided KEY.

Required Materials: Robinson Technical Specifications and Basis must be available.

General

References:

OMM-001-12 (Minimum Equipment List and Shift Relief), Rev 85 Technical Specifications for H. B. Robinson Steam Electric Plant Unit No. 2 Handouts: Handout 1: Attachment 2 of OMM-001-12 marked up for this JPM Time Critical Task: NO Validation Time: 15 minutes Critical Step Justification Step 9 This step is critical because LCO 3.7.6 is NOT met, and meeting this LCO is necessary to change Modes.

Step 10 This step is critical because LCO 3.7.7 is NOT met, and meeting this LCO is necessary to change Modes.

Step 11 This step is critical because LCO 3.7.10 is NOT met, and meeting this LCO is necessary to change Modes.

Step 12 This step is critical because LCO 3.8.3 is NOT met, and meeting this LCO is necessary to change Modes.

Step 14 This step is critical because LCO 3.8.7 is NOT met, and meeting this LCO is necessary to change Modes.

Step 15 This step is critical because LCO 3.8.9 is NOT met, and meeting this LCO is necessary to change Modes.

Step 18 This step is critical because the report to the SM must be correct prior to changing Modes.

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 4 of 15 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue and the Available Equipment Inoperable List (Last Two Pages of this JPM), and Handout 1.

START TIME:

STEP 1: Evaluate ITS LCO 3.4.17 requirements.

___ SAT STANDARD: The operator recognizes that 2 Charging Pumps must be OPERABLE, and that the A Charging Pump is inoperable.

The operator determines minimum requirement is met with B and

___ UNSAT C Charging Pumps OPERABLE, and initials the appropriate block.

The operator recognizes that the Seal Water Injection flow to EACH of the RCPs is greater than 6 gpm, and initials the appropriate block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

STEP 2: Evaluate ITS LCO 3.5.4 requirements.

___ SAT STANDARD: The operator recognizes that the RWST level is greater than 91 %,

and initials the appropriate block.

The operator recognizes that the RWST Boron concentration is ___ UNSAT 1950 ppm and 2400 ppm, and initials the appropriate block.

The operator recognizes that the RWST temperature is 45°F and 100°F, and initials the appropriate block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 5 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: Evaluate ITS LCO 3.6.4 requirements.

___ SAT STANDARD: The operator recognizes that the Containment Pressure is -0.8 psig AND +1.0 psig, and initials the appropriate block.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

STEP 4: Evaluate ITS LCO 3.6.5 requirements.

___ SAT STANDARD: The operator recognizes that the Containment Air Temperature is 120°F, and initials the appropriate block.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

STEP 5: Evaluate ITS LCO 3.6.7 requirements.

___ SAT STANDARD: The operator recognizes that the Spray Additive Tank Level is 32%,

and initials the appropriate block.

The operator recognizes that the Spray Additive Tank concentration is ___ UNSAT 30% NAOH, and initials the appropriate block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 6 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 6: Evaluate ITS LCO 3.6.8 requirements.

___ SAT STANDARD: The operator recognizes that the IVSW pressure is 49 psig as indicated locally on PI-1910, and initials the appropriate block.

The operator recognizes that the IVSW tank level is 49%, and initials ___ UNSAT the appropriate block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

STEP 7: Evaluate ITS LCO 3.7.4 requirements.

___ SAT STANDARD: The operator recognizes that 1 MDAFW Pump (LCO-3.0.4.b N/A) is required to be OPERABLE, and that the B MDAFW Pump is inoperable.

The operator determines minimum requirement is met with the A ___ UNSAT MDAFW Pump OPERABLE, and initials the appropriate block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

STEP 8: Evaluate ITS LCO 3.7.5 requirements.

STANDARD: The operator recognizes that the Condensate Storage Tank level is ___ SAT 26%, and initials the appropriate block.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 7 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 9: Evaluate ITS LCO 3.7.6 requirements. CRITICAL STEP STANDARD: The operator recognizes that 2 Trains powered from Emergency Power supplies ("B" and "C" pumps) are required to be OPERABLE,

___ SAT and that the C CCW Pump is inoperable.

The operator determines that the C CCW Pump must be restored to OPERABLE prior to changing modes, and does NOT initial the ___ UNSAT associated block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

STEP 10: Evaluate ITS LCO 3.7.7 requirements. CRITICAL STEP STANDARD: The operator recognizes that the Turbine Bldg Loop Isolation valves are required to be OPERABLE, and that V6-16B is inoperable.

___ SAT The operator determines that V6-16B must be restored to OPERABLE prior to changing modes, and does NOT initial the associated block.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 8 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 11: Evaluate ITS LCO 3.7.10 requirements. CRITICAL STEP STANDARD: The operator recognizes that 2 HVAC WCCU Trains are required to be OPERABLE, and that WCCU-1A is inoperable. ___ SAT The operator determines that WCCU-1A must be restored to OPERABLE prior to changing modes, and does NOT initial the associated block. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

STEP 12: Evaluate ITS LCO 3.8.3 requirements. CRITICAL STEP STANDARD: The operator recognizes that 19,000 gallons is NOT available from DFO Storage tank, and recognizes that tank level must be ___ SAT raised to > 19000 gallons prior to changing modes, and does NOT initial the associated block.

The operator recognizes that 15,000 gallons is available from Unit ___ UNSAT 1 IC Turbine Fuel Oil Storage tanks, and initials the appropriate block. (Not Critical)

The operator recognizes that the A EDG Air receiver pressure is greater than 210 psig, and initials the appropriate block. (Not Critical)

The operator recognizes that the B EDG Air receiver pressure is greater than 210 psig, and initials the appropriate block. (Not Critical)

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 9 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 13: Evaluate ITS LCO 3.8.4 requirements.

___ SAT STANDARD: The operator recognizes that MCC-A Voltage is > 126 VDC, and initials the appropriate block.

The operator recognizes that MCC-B Voltage is > 126 VDC, and ___ UNSAT initials the appropriate block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

STEP 14: Evaluate ITS LCO 3.8.7 requirements. CRITICAL STEP STANDARD: The operator recognizes that Inverter A Voltage is > 114 VAC, and ___ SAT initials the appropriate block. (Not Critical)

The operator recognizes that Inverter B Voltage is > 114 VAC, and initials the appropriate block. (Not Critical) ___ UNSAT The operator recognizes that CVT 1, must be OPERABLE, and that that it is currently inoperable.

The operator determines that CVT 1 must be restored to OPERABLE prior to changing modes, and does NOT initial the associated block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 10 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 15: Evaluate ITS LCO 3.8.9 requirements. CRITICAL STEP STANDARD: The operator recognizes that 4KV Bus 2 Voltage is > 3.2 KV, and initials the appropriate block. (Not Critical)

___ SAT The operator recognizes that 4KV Bus 3 Voltage is > 3.2 KV, and initials the appropriate block. (Not Critical)

The operator recognizes that 480V Bus E-1 Voltage (lowest phase) ___ UNSAT is > 440 VAC, and initials the appropriate block. (Not Critical)

The operator recognizes that 480V Bus E-2 Voltage (lowest phase) is > 440 VAC, and initials the appropriate block. (Not Critical)

The operator recognizes that MCC-5 breaker, CMPT NO. 4BL, FEED TO INSTRUMENT BUS 1, must be closed to be OPERABLE, and that that it is currently OPEN due to problem with No. 1 Constant Voltage Transformer.

The operator determines that MCC-5 breaker, CMPT NO. 4BL, FEED TO INSTRUMENT BUS 1, must be closed prior to changing modes, and does NOT initial the associated block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 11 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 16: Evaluate TRMS 3.6.b requirements.

STANDARD: The operator recognizes that the "A" Boric Acid Tank Level is > ___ SAT 42%, and initials the appropriate block.

The operator recognizes that the "A" Boric Acid Tank boron

___ UNSAT concentration is between 20,000 ppm - 22,500 ppm, and initials the appropriate block.

The operator recognizes that the "A" Boric Acid Tank temperature is

> 145°F, and initials the appropriate block.

The operator recognizes that the "B" Boric Acid Tank Level is >

42%, and initials the appropriate block.

The operator recognizes that the "B" Boric Acid Tank boron concentration is between 20,000 ppm - 22,500 ppm, and initials the appropriate block.

The operator recognizes that the "B" Boric Acid Tank temperature is

> 145°F, and initials the appropriate block.

EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 12 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 17: Evaluate TRMS 3.6.d requirements.

___ SAT STANDARD: The operator recognizes that the Primary Water Storage Tank Level is > 45%, and initials the appropriate block.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: This evaluation can be made in ANY order. See provided KEY.

COMMENTS:

STEP 18: The operator reports findings to the Shift Manager. CRITICAL STEP STANDARD: The operator reports findings / provides applicable pages or all

___ SAT pages of Attachment 2 to Shift Manager.

  • CCW Pump C must be restored to operable prior to changing modes.
  • V6-16B must be restored to operable prior to changing modes. ___ UNSAT
  • WCCU-1A must be restored to operable prior to changing modes.
  • CVT #1 must be repaired
  • Instrument Bus 1 must be powered from MCC-5 prior to changing modes.
  • DFO Storage tank level must be raised to > 19000 gallons EXAMINERS CUE: NONE EXAMINERS NOTE: See provided KEY.

COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Page 13 of 15 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A2 SRO Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Admin - JPM A2 SRO NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET Inoperable Equipment List

  • Charging Pump A
  • Component Cooling Water Pump C
  • V6-16B, SW TURB BLDG SUPPLY, is OPEN with the motor leads disconnected for control circuit troubleshooting.
  • Instrument Bus 1 is being powered from MCC-8. MCC-5 feed to Instrument Bus 1 is de-energized due to problem with No. 1 Constant Voltage Transformer.
  • Control Room Water Cooled Condensing Unit, WCCU-1A NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is in Mode 5, returning from a refueling outage.
  • RCS temperature is 165°F and there is a bubble in the PZR.
  • RHR Loop A is maintaining RCS temperature.
  • You are an extra SRO assigned to support the shift during re-start activities.

INITIATING CUE:

  • The SM has directed you to complete the attached partially completed OMM-001-12, MINIMUM EQUIPMENT LIST AND SHIFT RELIEF, Att. 2, 200°F to 350°F (MODE 4) MEL that was started on the previous shift and determine if any Mode 4 restrictions exist.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM A3 RO Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Admin - JPM A3 RO (Rev_010816) NUREG 1021, Revision 10

Appendix C Page 2 of 7 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Evaluate Stay Time with Lowered JPM No.: 2016 Admin - JPM A3 SFP Level RO K/A

Reference:

2.3.7 (3.5)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM).

Initial Conditions:

  • A station wide accident has occurred due to an Earthquake.
  • The plant is in Mode 6 with a full core off-load.
  • The Spent Fuel Pool level has lowered to 10 feet above the top of the fuel, and has stabilized at this level.
  • R-5, Spent Fuel Building Rad Monitor, reads 1.93E+2 mr/hr.
  • A dose limit of 25 mrem has been placed on all personnel performing emergency tasks within the building.
  • You have been assigned a repetitive task within AOP-036 which will require you to enter the Spent Fuel Building and proceed to the area around the Spent Fuel Pool, and remain there for 3 minutes, before exiting the building.
  • The exposure traveling to and from the Spent Fuel Pool area results in no appreciable exposure.

Initiating Cue: The OSC Leader has directed you to estimate how many times you can perform this repetitive task before you must be replaced by another operator.

2016 Admin - JPM A3 RO NUREG 1021, Revision 10

Appendix C Page 3 of 7 Form ES-C-1 Job Performance Measure Worksheet Task Standard: The operator will determine that the repetitive task can be performed 2 times before another operator will need to perform the task.

Required Materials: Calculator General

References:

AOP-036 (SFP Events), Rev 48 OMM-014 (Radiation Monitor Setpoints), Rev 51 Handouts: None Time Critical Task: NO Validation Time: 7 minutes Critical Step Justification Step 3 This step is critical because it is necessary to determine how many times the task can be performed without exceeding a limit.

2016 Admin - JPM A3 RO NUREG 1021, Revision 10

Appendix C Page 4 of 7 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM).

START TIME:

STEP 1: Determine dose rate in the Spent Fuel Pool Area

___ SAT STANDARD: The operator evaluates the R-5 reading and determines that the area radiation levels are 193 mrem/hour.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 2: Determine the accumulated Dose each time the repetitive task is performed. ___ SAT STANDARD: The operator determines that 3 minutes in a radiation field of 193 mrem/hour will yield a dose of 9.65 mrem

___ UNSAT 193 mrem/hr x 1hr/60 minutes x 3 minutes/task = 9.65 mrem/task EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A3 RO NUREG 1021, Revision 10

Appendix C Page 5 of 7 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: Determine how many times the repetitive task can be performed CRITICAL before allowable RWP limits have been reached. STEP STANDARD: The operator determines that a Task which accumulates 9.65 mrem ___ SAT can be performed twice without exceeding a dose limit of 25 mrem.

25 mrem x task/9.65 mrem = 2.6 tasks

___ UNSAT Since the task cannot be partially performed, the task can be performed twice before the operator must be replaced with another operator.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Admin - JPM A3 RO NUREG 1021, Revision 10

Appendix C Page 6 of 7 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A3 RO Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Admin - JPM A3 RO NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • A station wide accident has occurred due to an Earthquake.
  • The plant is in Mode 6 with a full core off-load.
  • The Spent Fuel Pool level has lowered to 10 feet above the top of the fuel, and has stabilized at this level.
  • R-5, Spent Fuel Building Rad Monitor, reads 1.93E+2 mr/hr.
  • A dose limit of 25 mrem has been placed on all personnel performing emergency tasks within the building.
  • You have been assigned a repetitive task within AOP-036 which will require you to enter the Spent Fuel Building and proceed to the area around the Spent Fuel Pool, and remain there for 3 minutes, before exiting the building.
  • The exposure traveling to and from the Spent Fuel Pool area results in no appreciable exposure.

INITIATING CUE: The OSC Leader has directed you to estimate how many times you can perform this repetitive task before you must be replaced by another operator.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM A3 SRO Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Admin - JPM A3 SRO (Rev_010816) NUREG 1021, Revision 10

Appendix C Page 2 of 9 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Approve a Waste Gas Release JPM No.: 2016 Admin - JPM A3 Permit SRO K/A

Reference:

2.3.8 (3.7)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • The plant is in Mode 1 at 100% power.
  • A Waste Gas Release Permit for the A WGDT has been presented to the Shift Manager for review and approval.

Initiating Cue:

  • Review and Approve the Waste Gas Release Permit.
  • Identify all issues found (if any) which would prevent approval.

Task Standard: The operator will review the WGDT Release Permit and identify that it cannot be approved because (1) it has been written for the wrong WGDT and (2) the R14C setpoint is less conservative than required.

Required Materials: None General

References:

EMP-022 (Gaseous Waste Release Permits), Rev 56 OMM-014 (Radiation Monitor Setpoints), Rev 51 OP-706 (Waste Disposal - Gaseous Rad Waste Release), Rev 18 2016 Admin - JPM A3 SRO NUREG 1021, Revision 10

Appendix C Page 3 of 9 Form ES-C-1 Job Performance Measure Worksheet Handouts: Handout 1: Completed Attachment 10.3 of EMP-022 marked up for this JPM.

Time Critical Task: NO Validation Time: 8 minutes Critical Step Justification Step 4 This step is critical because denial of permit approval, and identification of the reasons for this denial is necessary to prevent an uncontrolled release of B WGDT and/or a release with the radiation monitor setpoint at a non-conservative value.

2016 Admin - JPM A3 SRO NUREG 1021, Revision 10

Appendix C Page 4 of 9 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEP 1: Review the Waste Gas Release Permit preliminary Information

___ SAT STANDARD: The operator observes that the following preliminary information is completed on Attachment 10.3 of EMP-022:

  • Release #: G-2016-015
  • SSN (XXXX) ___ UNSAT
  • Date (of Permit preparation)
  • Printed Name (of Individual preparing the Permit)
  • Initial (of Individual preparing the Permit)
  • Signature (of Individual preparing the Permit)
  • Date (of Signature)

The operator recognizes that the preliminary information is acceptable and proceeds.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A3 SRO NUREG 1021, Revision 10

Appendix C Page 5 of 9 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: Review the Waste Gas Release Permit PART I Information

___ SAT STANDARD: The operator observes that the following PART I information is completed on Attachment 10.3 of EMP-022:

  • Waste Gas Decay Tank: B
  • Estimated Release Start Date/Time: 2/6/16 2100 ___ UNSAT
  • Estimated Release Stop Date/Time: 2/6/16 2130
  • Monitor R14C Setpoint: 5.6E3
  • Basis: Activity Circled
  • CV Purge: Not In Service Circled
  • Maximum WGDT Flow Rate: 90 CFM
  • Prepared By: name of preparer
  • Peer Review: name of reviewer
  • Verified By: NA
  • Chemistry Supervisor: NA The operator identifies that the Permit is for the B WGDT and the Permit was requested for the A WGDT, and identifies that this must be modified before approval.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A3 SRO NUREG 1021, Revision 10

Appendix C Page 6 of 9 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: Review the Waste Gas Release Permit PART II Information STANDARD: The operator observes that the following PART II information is completed on Attachment 10.3 of EMP-022: ___ SAT

  • PRIOR1 (Channel Check): 19.9
  • SOURCE CHECK2: Initialed
  • SETPOINT VERF. AT3: 1.0E4 ___ UNSAT
  • UPDATE STATUS BOARD4: Initialed
  • DURING RELEASE: Left Blank
  • AFTER RELEASE: Left Blank
  • SETPOINT RETURNED TO3,5: Left Blank
  • STATUS BOARD UPDATED4: Left Blank The operator identifies that the R14C setpoint is less conservative than required and identifies that this must be modified before approval.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Admin - JPM A3 SRO NUREG 1021, Revision 10

Appendix C Page 7 of 9 Form ES-C-1 PERFORMANCE INFORMATION STEP 4: Approve the Waste Gas Release Permit or identify all issues found CRITICAL which would prevent approval STEP STANDARD: The operator identifies that the Waste Gas Permit cannot be ___ SAT approved until:

  • The Permit is identified with the correct WGDT in PART I (A WGDT)
  • The R14C setpoint is verified in PART II to be at or less ___ UNSAT conservative than the setpoint listed in PART I EXAMINERS CUE: NONE EXAMINERS NOTE: If the operator indicates after discovering only one of two errors that the permit would not be approved until corrected, correct the error, and return the permit and provide the Initiating CUE a second time.

COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Admin - JPM A3 SRO NUREG 1021, Revision 10

Appendix C Page 8 of 9 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A3 SRO Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Admin - JPM A3 SRO NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is in Mode 1 at 100% power.
  • A Waste Gas Release Permit for the A WGDT has been presented to the Shift Manager for review and approval.

INITIATING CUE:

  • Review and Approve the Waste Gas Release Permit.
  • Identify all issues found (if any) which would prevent approval.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet JPM A4 SRO Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Admin - JPM A4 SRO (Rev_010816) NUREG 1021, Revision 10

Appendix C Page 2 of 6 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Emergency Classification JPM No.: 2016 Admin - JPM A4 SRO K/A

Reference:

2.4.41 (4.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom X Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handouts 1-2.

Initial Conditions:

  • The plant is operating at 100% power.
  • Protesters have illegally entered the plant, and have gained entry to the protected area.
  • Security has declared a Security Event (Confirmed Protected Area Intrusion).
  • Security has all intruders under restraint and has prevented further entry into the plant.
  • Other than minor damage to the security fences and protest slogans spray painted on some walls, there was no plant damage.

Initiating Cue:

  • Classify the event in accordance with the Robinson Nuclear Plant Emergency Action Level Matrix.
  • Then prepare an Emergency Notification Form for this classification.

THIS JPM IS TIME CRITICAL 2016 Admin - JPM A4 SRO NUREG 1021, Revision 10

Appendix C Page 3 of 6 Form ES-C-1 Job Performance Measure Worksheet Task Standard: The operator will declare an ALERT based on HA4.1, Confirmed Security event in a plant Protected Area or notification of either an airborne attack threat or hostile threat within the Owner Controlled Area, within 15 minutes. Then, the operator will prepare an Emergency Notification Form for this event in accordance with EPCLA-01 (Emergency Control) in accordance with the attached KEY, also within 15 minutes.

Required Materials: None General

References:

Robinson Nuclear Plant Emergency Action Level Matrix, Sheet 1 of 3, Rev 4 Robinson Nuclear Plant Emergency Action Level Matrix, Sheet 2 of 3, Rev 7 Robinson Nuclear Plant Emergency Action Level Matrix, Sheet 3 of 3, Rev 1 EPCLA-01 (Emergency Control), Rev 43 EPCLA-04 (Emergency Action Level Technical Basis Document), Rev 13 EPNOT-01 (CR/EOF Emergency Communicator), Rev 46 Handouts: Handout 1: Robinson Nuclear Plant Emergency Action Level Matrix Sheets 1-3 Handout 2: Blank Copy of EPCLA-01 Time Critical Task: YES - 15 Minutes to classify the event, and then 15 minutes to generate an ENF for the classification Validation Time: 15 minutes Critical Step Justification Step 1 This step is critical because accurately classifying the event is necessary to properly implement on-site and off-site response to an emergency event.

Step 2 This step is critical because the completion of the ENF is necessary to properly communicate to local, state and federal organizations the status of on-going emergency events.

2016 Admin - JPM A4 SRO NUREG 1021, Revision 10

Appendix C Page 4 of 6 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handouts 1-2.

START TIME:

STEP 1: Classify the event in accordance with the Robinson Nuclear Plant CRITICAL Emergency Action Level Matrix STEP

___ SAT STANDARD: The operator will declare an ALERT based on HA4.1 due to threshold 1 (Security event in the plant Protected Area as determined and reported by Security shift supervision)

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

TIME CRITICAL STOP TIME #1: __________

STEP 2: Prepare an ENF CRITICAL STEP STANDARD: The operator completes Attachment 10.5, Page 9 of 10 (Or Equivalent ___ SAT ENF Form) of EPCLA-01 IAW the provided KEY.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: NONE COMMENTS:

TIME CRITICAL STOP TIME #2: __________

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Admin - JPM A4 SRO NUREG 1021, Revision 10

Appendix C Page 5 of 6 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Admin - JPM A4 SRO Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Admin - JPM A4 SRO NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is operating at 100% power.
  • Protesters have illegally entered the plant, and have gained entry to the protected area.
  • Security has declared a Security Event (Confirmed Protected Area Intrusion).
  • Security has all intruders under restraint and has prevented further entry into the plant.
  • Other than minor damage to the security fences and protest slogans spray painted on some walls, there was no plant damage.

INITIATING CUE:

  • Classify the event in accordance with the Robinson Nuclear Plant Emergency Action Level Matrix.
  • Then prepare an Emergency Notification Form for this classification.

THIS JPM IS TIME CRITICAL NUREG 1021, Revision 10