{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
                              NUCLEAR REGULATORY COMMISSION
REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011
                                              REGION IV
-4511 August 31, 2016
                                          1600 E LAMAR BLVD
Mr. Michael R. Chisum
                                        ARLINGTON, TX 76011-4511
Site Vice President
                                          August 31, 2016
Entergy Operations, Inc.
Mr. Michael R. Chisum
17265 River Road
Site Vice President
Killona, LA 70057
Entergy Operations, Inc.
-0751 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (REPORT 05000382/201
17265 River Road
6005) D ear Mr. Chisum: On August 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of
Killona, LA 70057-0751
Waterford Steam Electric Station, Unit 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement  
SUBJECT:       MID-CYCLE ASSESSMENT LETTER FOR WATERFORD STEAM ELECTRIC
actions from July
                STATION, UNIT 3 (REPORT 05000382/2016005)
1, 2015 through June
Dear Mr. Chisum:
30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
On August 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle
The NRC determined that overall, Waterford Unit 3
performance review of Waterford Steam Electric Station, Unit 3. The NRC reviewed the most
operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at  
recent quarterly performance indicators (PIs) in addition to inspection results and enforcement
Waterford Unit 3
actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRCs
during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
assessment of your facility during this period and its plans for future inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan.
The NRC determined that overall, Waterford Unit 3 operated in a manner that preserved public
  The inspections listed during the second half
health and safety and met all cornerstone objectives. The NRC determined the performance at
of the inspection plan are tentative and may be revised at the end
Waterford Unit 3 during the most recent quarter was within the Licensee Response Column of
-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which  
the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had
will be sent via separate, non
very low (i.e., Green) safety significance, and all PIs indicated that your performance was within
-publicly available correspondence.
the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline
In response to the accident at Fukushima, the Commission issued Order EA
inspections at your facility.
-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine
-Design-Basis External Events
inspections performed by resident inspectors are not included in the inspection plan. The
," and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation.The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by
inspections listed during the second half of the inspection plan are tentative and may be revised
M. Chisum  - 2 - performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the
-Unit Dose Assessment Plans."  In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re
resolution of any scheduling conflicts and personnel availability issues. The NRC will contact
-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid
you as soon as possible to discuss changes to the inspection plan should circumstances
-cycle assessment process beginning in calendar year 2017.  This will be the final mid
warrant any changes. This inspection plan does not include security related inspections, which
-cycle assessment letter.  The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."
will be sent via separate, non-publicly available correspondence.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order
of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-
-rm/adams.html
Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to
(the Public Electronic Reading Room). 
Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts
Please contact
towards compliance with these Orders, and the information gathered will aid staff in
me at 817-200-1173 with any questions you have regarding this letter.
development of the ultimate Safety Evaluation for the site. After the NRC staff receives the
Sincerely, /RA/ Geoffrey B. Miller, Branch Chief Projects Branch D
Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff
Division of Reactor Projects
will confirm through inspections the full implementation of the orders mentioned above by
Docket No. 50
-382 License No. NPF
-38 Enclosure: Waterford Plant Inspection/Activity Plan
 
Page 1 of 2
08/30/2016
09:36:55 Report 22 Unit NumberPlanned Dates
Start          EndInspection ActivityTitle No. of Staff
on SiteWaterfordInspection / Activity Plan
07/01/2016
-06/30/2018
RS 24-RADIATION SAFETY
2 3 IP Occupational ALARA Planning and Controls71124.02 09/12/2016
09/16/2016
3 IP Occupational Dose Assessment71124.04 09/12/2016
09/16/2016
ISFSI-LOADING INSPECTION (ONE WEEK IN MONTH)
1 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants
60855.1 10/01/2016
10/30/2016EXAM-INITIAL EXAM
4 3 INITIAL EXAM WAT3 (04/2017)
X02588 02/15/2017
02/18/2017
3 INITIAL EXAM WAT3 (04/2017)
X02588 03/27/2017
03/31/2017TSB 52B-BIENNIAL PI&R INSPECTION
5 3 IP Problem Identification and Resolution71152B11/28/2016
12/02/2016
3 IP Problem Identification and Resolution71152B 12/12/2016
12/16/2016
EB2-02-LICENSE RENEWAL INSPECTION
4 3 IP License Renewal Inspection
71002 01/23/2017
01/27/2017
3 IP License Renewal Inspection
71002 02/06/2017
02/10/2017
EB1-07T-WAT HEAT SINK PERFORMANCE
1 3 IP Heat Sink Performance7111107T 03/20/2017
03/24/2017
RS 12 PI-RADIATION SAFETY
3 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/24/2017
04/28/2017
3 IP Occupational ALARA Planning and Controls71124.02 04/24/2017
04/28/2017
3 IP Occupational Exposure Control Effectiveness71151-OR01
04/24/2017
04/28/2017
3 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01
04/24/2017
04/28/201771111.08-INSERVICE INSPECTION RFO 21
1 3 IP Inservice Inspection Activities - PWR7111108P 04/24/2017
05/05/2017
BRQ-BRQ INSPECTION
3 3 IP Licensed Operator Requalification Program7111111B 07/24/2017
07/28/2017
EB1-21M-WAT COMPONENT DESIGN BASES INSPECTION
6 3 IP Component Design Bases Inspection (Teams)7111121M 10/16/201711/17/2017
RS 5678-RS TEAM 5 3 IP Radiation Monitoring Instrumentation71124.0511/27/2017
12/01/2017
3 IP Radioactive Gaseous and Liquid Effluent Treatment71124.0611/27/2017
12/01/2017
3 IP Radiological Environmental Monitoring Program71124.0711/27/2017
12/01/2017
3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/27/2017
12/01/2017
This report does not include INPO and OUTAGE activities. This report shows only on-site
and announced inspection procedures.
Page 2 of 2
08/30/2016
09:36:55 Report 22 Unit NumberPlanned Dates
Start          EndInspection ActivityTitle No. of Staff
on SiteWaterfordInspection / Activity Plan
07/01/2016
-06/30/2018
EP-2-BIENNIAL EP EXERCISE INSPECTION
4 3 IP Exercise Evaluation7111401 12/04/2017
12/08/2017
3 IP Emergency Action Level and Emergency Plan Changes7111404 12/04/2017
12/08/2017
EP-3-EP PERFORMANCE INDICATOR REVIEW
1 3 IP Drill/Exercise Performance71151-EP01
12/04/2017
12/08/2017
3 IP ERO Readiness71151-EP02
12/04/2017
12/08/2017
3 IP A lert & Notification System Reliability71151-EP03
12/04/2017
12/08/2017
EB1-17T-WAT PERM PLANT MODS AND 50.59
3 3 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 04/02/2018
04/06/2018
3 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 04/16/2018
04/20/2018
This report does not include INPO and OUTAGE activities. This report shows only on-site
and announced inspection procedures.


  ML16237A065 SUNSI ReviewBy:  GBM ADAMS Yes    NoPublicly Available Non-Publicly Available
M. Chisum                                          -2-
  Non-Sensitive Sensitive Keyword: NRC-002 OFFICE: RIV D: DRS D: DRP C: DRP/D NAME AVegel TWPruett GBMiller SIGNATURE /RA-JClark for /RA/ /RA/ DATE 8/19/16 8/18/16 8/22/16
performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies
and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness
Communication/Staffing/Multi-Unit Dose Assessment Plans.
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the
Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the
NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning
in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue
to conduct quarterly assessment meetings and communicate changes in the assessment of
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,
Operating Reactor Assessment Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs
Rules of Practice, a copy of this letter will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
Please contact me at 817-200-1173 with any questions you have regarding this letter.
                                                    Sincerely,
                                                    /RA/
                                                    Geoffrey B. Miller, Branch Chief
                                                    Projects Branch D
                                                    Division of Reactor Projects
Docket No. 50-382
License No. NPF-38
Enclosure:
Waterford Plant Inspection/Activity Plan
 
            Attachment 2 - Proposed Inspection Plan            Official Use Only - Sensitive Internal Information/Security-Related Information                              WAT
Page 1 of 2                                                                                      Waterford
08/30/2016    09:36:55                                                              Inspection / Activity Plan
Report 22
                                                                                      07/01/2016 - 06/30/2018
  Unit          Planned Dates                                                                                                                                            No. of Staff
Number          Start        End      Inspection Activity                                                                Title                                          on Site
                                        RS 24          - RADIATION SAFETY                                                                                                        2
    3      09/12/2016      09/16/2016    IP 71124.02              Occupational ALARA Planning and Controls
    3      09/12/2016      09/16/2016    IP 71124.04              Occupational Dose Assessment
                                        ISFSI          - LOADING INSPECTION (ONE WEEK IN MONTH)                                                                                  1
    3      10/01/2016      10/30/2016    IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants
                                        EXAM          - INITIAL EXAM                                                                                                            4
    3      02/15/2017      02/18/2017        X02588                INITIAL EXAM WAT3 (04/2017)
    3      03/27/2017      03/31/2017        X02588                INITIAL EXAM WAT3 (04/2017)
                                        TSB 52B        - BIENNIAL PI&R INSPECTION                                                                                                5
    3      11/28/2016      12/02/2016    IP 71152B                Problem Identification and Resolution
    3      12/12/2016      12/16/2016    IP 71152B                Problem Identification and Resolution
                                        EB2-02        - LICENSE RENEWAL INSPECTION                                                                                              4
    3      01/23/2017      01/27/2017    IP 71002                License Renewal Inspection
    3      02/06/2017      02/10/2017    IP 71002                License Renewal Inspection
                                        EB1-07T        - WAT HEAT SINK PERFORMANCE                                                                                                1
    3      03/20/2017      03/24/2017    IP 7111107T              Heat Sink Performance
                                        RS 12 PI      - RADIATION SAFETY                                                                                                        3
    3      04/24/2017      04/28/2017    IP 71124.01              Radiological Hazard Assessment and Exposure Controls
    3      04/24/2017      04/28/2017    IP 71124.02              Occupational ALARA Planning and Controls
    3      04/24/2017      04/28/2017    IP 71151-OR01            Occupational Exposure Control Effectiveness
    3      04/24/2017      04/28/2017    IP 71151-PR01            RETS/ODCM Radiological Effluent Occurrences
                                        71111.08      - INSERVICE INSPECTION RFO 21                                                                                              1
    3      04/24/2017      05/05/2017    IP 7111108P              Inservice Inspection Activities - PWR
                                        BRQ            - BRQ INSPECTION                                                                                                          3
    3      07/24/2017      07/28/2017    IP 7111111B              Licensed Operator Requalification Program
                                        EB1-21M        - WAT COMPONENT DESIGN BASES INSPECTION                                                                                    6
    3      10/16/2017      11/17/2017    IP 7111121M              Component Design Bases Inspection (Teams)
                                        RS 5678        - RS TEAM                                                                                                                  5
    3      11/27/2017      12/01/2017    IP 71124.05              Radiation Monitoring Instrumentation
    3      11/27/2017      12/01/2017    IP 71124.06              Radioactive Gaseous and Liquid Effluent Treatment
    3      11/27/2017      12/01/2017    IP 71124.07              Radiological Environmental Monitoring Program
    3      11/27/2017      12/01/2017    IP 71124.08              Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
                                                    This report does not include INPO and OUTAGE activities.
                                                    This report shows only on-site and announced inspection procedures.                                              Enclosure
                                                                Official Use Only - Sensitive Internal Information/Security-Related Information
 
            Attachment 2 - Proposed Inspection Plan            Official Use Only - Sensitive Internal Information/Security-Related Information              WAT
Page 2 of 2                                                                                      Waterford
08/30/2016    09:36:55                                                                Inspection / Activity Plan
Report 22
                                                                                        07/01/2016 - 06/30/2018
  Unit          Planned Dates                                                                                                                            No. of Staff
Number          Start        End        Inspection Activity                                                                Title                          on Site
                                        EP-2          - BIENNIAL EP EXERCISE INSPECTION                                                                          4
    3      12/04/2017      12/08/2017    IP 7111401              Exercise Evaluation
    3      12/04/2017      12/08/2017    IP 7111404              Emergency Action Level and Emergency Plan Changes
                                        EP-3          - EP PERFORMANCE INDICATOR REVIEW                                                                          1
    3      12/04/2017      12/08/2017    IP 71151-EP01            Drill/Exercise Performance
    3      12/04/2017      12/08/2017    IP 71151-EP02            ERO Readiness
    3      12/04/2017      12/08/2017    IP 71151-EP03            Alert & Notification System Reliability
                                        EB1-17T        - WAT PERM PLANT MODS AND 50.59                                                                            3
    3      04/02/2018      04/06/2018    IP 7111117T              Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
    3      04/16/2018      04/20/2018    IP 7111117T              Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
                                                    This report does not include INPO and OUTAGE activities.
                                                    This report shows only on-site and announced inspection procedures.
                                                                                                                                                    Enclosure
                                                                Official Use Only - Sensitive Internal Information/Security-Related Information
 
 
ML16237A065
  SUNSI Review              ADAMS             Publicly Available     Non-Sensitive    Keyword:
  By: GBM                      Yes  No Non-Publicly Available        Sensitive       NRC-002
  OFFICE: RIV   D: DRS         D: DRP           C: DRP/D
  NAME         AVegel         TWPruett         GBMiller
  SIGNATURE     /RA-JClark for /RA/             /RA/
  DATE         8/19/16       8/18/16         8/22/16
                                       
Letter to Michael R. Chisum from Geoffrey B. Miller dated August 31, 2016
Letter to Michael R. Chisum from Geoffrey B. Miller dated August 31, 2016
  SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (REPORT 05000382/201
SUBJECT:       MID-CYCLE ASSESSMENT LETTER FOR WATERFORD STEAM ELECTRIC
6005)  DISTRIBUTION
                STATION, UNIT 3 (REPORT 05000382/2016005)
Regional Administrator (Kriss.Kennedy@nrc.gov)
DISTRIBUTION:
Deputy Regional Administrator (Scott.Morris@nrc.gov)
Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)  
DRS Director (Anton.Vegel@nrc.gov)
Senior Resident Inspector (Frances.Ramirez@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Resident Inspector (Chris.Speer@nrc.gov)
Senior Resident Inspector (Frances.Ramirez@nrc.gov)
Administrative Assistant (Vacant) Senior Project Engineer, DRP/D (Vacant) Project Engineer (Jan.Tice@nrc.gov)
Resident Inspector (Chris.Speer@nrc.gov)
Project Engineer (Brian.Parks@nrc.gov)
Administrative Assistant (Vacant)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Senior Project Engineer, DRP/D (Vacant)
Project Manager (April.Pulvirenti@nrc.gov) Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
Project Engineer (Jan.Tice@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Project Engineer (Brian.Parks@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Project Manager (April.Pulvirenti@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov
Technical Support Assistant (Loretta.Williams@nrc.gov)
) Director, DIRS, NRR (Chris.Miller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.go
Director, DORL, NRR (Anne.Boland@nrc.gov)
v) DRS Branch Chiefs (R4DRSBC@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
ROPreports.Resource@nrc.gov
Director, NSIR (Brian.Holian@nrc.gov)
ROPassessment.Resource@nrc.gov
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov
ROPassessment.Resource@nrc.gov
}}
}}

Revision as of 14:50, 30 October 2019

Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382/2016005)
ML16237A065
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/31/2016
From: Geoffrey Miller
NRC/RGN-IV/DRP/RPB-D
To: Chisum M
Entergy Operations
Miller G
References
IR 2016005
Download: ML16237A065 (6)


See also: IR 05000382/2016005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

August 31, 2016

Mr. Michael R. Chisum

Site Vice President

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WATERFORD STEAM ELECTRIC

STATION, UNIT 3 (REPORT 05000382/2016005)

Dear Mr. Chisum:

On August 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle

performance review of Waterford Steam Electric Station, Unit 3. The NRC reviewed the most

recent quarterly performance indicators (PIs) in addition to inspection results and enforcement

actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRCs

assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Waterford Unit 3 operated in a manner that preserved public

health and safety and met all cornerstone objectives. The NRC determined the performance at

Waterford Unit 3 during the most recent quarter was within the Licensee Response Column of

the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had

very low (i.e., Green) safety significance, and all PIs indicated that your performance was within

the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline

inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine

inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the second half of the inspection plan are tentative and may be revised

at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the

resolution of any scheduling conflicts and personnel availability issues. The NRC will contact

you as soon as possible to discuss changes to the inspection plan should circumstances

warrant any changes. This inspection plan does not include security related inspections, which

will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order

Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-

Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to

Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts

towards compliance with these Orders, and the information gathered will aid staff in

development of the ultimate Safety Evaluation for the site. After the NRC staff receives the

Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff

will confirm through inspections the full implementation of the orders mentioned above by

M. Chisum -2-

performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies

and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness

Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the

Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the

NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning

in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue

to conduct quarterly assessment meetings and communicate changes in the assessment of

licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,

Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs

Rules of Practice, a copy of this letter will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Please contact me at 817-200-1173 with any questions you have regarding this letter.

Sincerely,

/RA/

Geoffrey B. Miller, Branch Chief

Projects Branch D

Division of Reactor Projects

Docket No. 50-382

License No. NPF-38

Enclosure:

Waterford Plant Inspection/Activity Plan

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information WAT

Page 1 of 2 Waterford

08/30/2016 09:36:55 Inspection / Activity Plan

Report 22

07/01/2016 - 06/30/2018

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

RS 24 - RADIATION SAFETY 2

3 09/12/2016 09/16/2016 IP 71124.02 Occupational ALARA Planning and Controls

3 09/12/2016 09/16/2016 IP 71124.04 Occupational Dose Assessment

ISFSI - LOADING INSPECTION (ONE WEEK IN MONTH) 1

3 10/01/2016 10/30/2016 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants

EXAM - INITIAL EXAM 4

3 02/15/2017 02/18/2017 X02588 INITIAL EXAM WAT3 (04/2017)

3 03/27/2017 03/31/2017 X02588 INITIAL EXAM WAT3 (04/2017)

TSB 52B - BIENNIAL PI&R INSPECTION 5

3 11/28/2016 12/02/2016 IP 71152B Problem Identification and Resolution

3 12/12/2016 12/16/2016 IP 71152B Problem Identification and Resolution

EB2-02 - LICENSE RENEWAL INSPECTION 4

3 01/23/2017 01/27/2017 IP 71002 License Renewal Inspection

3 02/06/2017 02/10/2017 IP 71002 License Renewal Inspection

EB1-07T - WAT HEAT SINK PERFORMANCE 1

3 03/20/2017 03/24/2017 IP 7111107T Heat Sink Performance

RS 12 PI - RADIATION SAFETY 3

3 04/24/2017 04/28/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

3 04/24/2017 04/28/2017 IP 71124.02 Occupational ALARA Planning and Controls

3 04/24/2017 04/28/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness

3 04/24/2017 04/28/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences

71111.08 - INSERVICE INSPECTION RFO 21 1

3 04/24/2017 05/05/2017 IP 7111108P Inservice Inspection Activities - PWR

BRQ - BRQ INSPECTION 3

3 07/24/2017 07/28/2017 IP 7111111B Licensed Operator Requalification Program

EB1-21M - WAT COMPONENT DESIGN BASES INSPECTION 6

3 10/16/2017 11/17/2017 IP 7111121M Component Design Bases Inspection (Teams)

RS 5678 - RS TEAM 5

3 11/27/2017 12/01/2017 IP 71124.05 Radiation Monitoring Instrumentation

3 11/27/2017 12/01/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment

3 11/27/2017 12/01/2017 IP 71124.07 Radiological Environmental Monitoring Program

3 11/27/2017 12/01/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Official Use Only - Sensitive Internal Information/Security-Related Information

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information WAT

Page 2 of 2 Waterford

08/30/2016 09:36:55 Inspection / Activity Plan

Report 22

07/01/2016 - 06/30/2018

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

EP-2 - BIENNIAL EP EXERCISE INSPECTION 4

3 12/04/2017 12/08/2017 IP 7111401 Exercise Evaluation

3 12/04/2017 12/08/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes

EP-3 - EP PERFORMANCE INDICATOR REVIEW 1

3 12/04/2017 12/08/2017 IP 71151-EP01 Drill/Exercise Performance

3 12/04/2017 12/08/2017 IP 71151-EP02 ERO Readiness

3 12/04/2017 12/08/2017 IP 71151-EP03 Alert & Notification System Reliability

EB1-17T - WAT PERM PLANT MODS AND 50.59 3

3 04/02/2018 04/06/2018 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications

3 04/16/2018 04/20/2018 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Official Use Only - Sensitive Internal Information/Security-Related Information

ML16237A065

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: GBM Yes No Non-Publicly Available Sensitive NRC-002

OFFICE: RIV D: DRS D: DRP C: DRP/D

NAME AVegel TWPruett GBMiller

SIGNATURE /RA-JClark for /RA/ /RA/

DATE 8/19/16 8/18/16 8/22/16

Letter to Michael R. Chisum from Geoffrey B. Miller dated August 31, 2016

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WATERFORD STEAM ELECTRIC

STATION, UNIT 3 (REPORT 05000382/2016005)

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Frances.Ramirez@nrc.gov)

Resident Inspector (Chris.Speer@nrc.gov)

Administrative Assistant (Vacant)

Senior Project Engineer, DRP/D (Vacant)

Project Engineer (Jan.Tice@nrc.gov)

Project Engineer (Brian.Parks@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (April.Pulvirenti@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.gov

ROPassessment.Resource@nrc.gov