{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
                              NUCLEAR REGULATORY COMMISSION
REGION IV 1600 E LAMAR BLVD
                                                REGION IV
ARLINGTON, TX 76011
                                            1600 E LAMAR BLVD
-4511 August 31, 2016
                                        ARLINGTON, TX 76011-4511
Adam C. Heflin, President and
                                            August 31, 2016
  Chief Executive Officer
Adam C. Heflin, President and
Wolf Creek Nuclear Operating Corporation
  Chief Executive Officer
P.O. Box 411
Wolf Creek Nuclear Operating Corporation
Burlington, KS 66839 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR
P.O. Box 411
WOLF CREEK GENERATING STATION (REPORT 05000482/2016005)
Burlington, KS 66839
Dear Mr. Heflin: O n August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC)
SUBJECT:       MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING
completed its mid-cycle performance review of Wolf Creek
                STATION (REPORT 05000482/2016005)
Generating Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions  
Dear Mr. Heflin:
from July 1, 2015, through June
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle
30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.     The NRC determined that overall, Wolf Creek Generating Station operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined  
performance review of Wolf Creek Generating Station. The NRC reviewed the most recent
the performance at Wolf Creek
quarterly performance indicators (PIs) in addition to inspection results and enforcement actions
Generating Station during the most recent quarter was within the Licensee Response Column of the NRC
from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of
's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. Although plant performance was within the Licensee Response
your facility during this period and its plans for future inspections at your facility.
Column, the NRC has not yet finalized the significance of Apparent Violation 05000482/2016008
The NRC determined that overall, Wolf Creek Generating Station operated in a manner that
-01 , "Failure to Adequately Establish and Adjust Preventive Maintenance for Emergency Diesel Generator Excitation  
preserved public health and safety and met all cornerstone objectives. The NRC determined
System Diodes
the performance at Wolf Creek Generating Station during the most recent quarter was within the
.This apparent violation is described in Inspection Report 05000482/2016008 (ML16235A132), issued in August 19, 2016. The final safety significance determination may affect the NRC's assessment of plant performance and the enclosed inspection plan.  
Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix
The enclosed inspection plan lists the inspections scheduled through June 30 , 2018. Routine inspections performed by resident inspectors are not included in the inspection plan.
because all inspection findings had very low (i.e., Green) safety significance, and all PIs
  The inspections listed during the second half
indicated that your performance was within the nominal, expected range (i.e., Green).
of the inspection plan are tentative and may be revised at the end
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which  
Although plant performance was within the Licensee Response Column, the NRC has not yet
will be sent via separate, non
finalized the significance of Apparent Violation 05000482/2016008-01, Failure to Adequately
-publicly available correspondence
Establish and Adjust Preventive Maintenance for Emergency Diesel Generator Excitation
 
System Diodes. This apparent violation is described in Inspection Report 05000482/2016008
A. Heflin - 2 - In response to the accident at Fukushima, the Commission issued Order EA
(ML16235A132), issued in August 19, 2016. The final safety significance determination may
-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
affect the NRCs assessment of plant performance and the enclosed inspection plan.
-Design-Basis External Events
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine
," and Order EA
inspections performed by resident inspectors are not included in the inspection plan. The
-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation."  The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site.  After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued.  Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
inspections listed during the second half of the inspection plan are tentative and may be revised
-Unit Dose Assessment Plans."  In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re
at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the
-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid
resolution of any scheduling conflicts and personnel availability issues. The NRC will contact
-cycle assessment process beginning in calendar year 2017.  This will be the final mid
you as soon as possible to discuss changes to the inspection plan should circumstances
-cycle assessment letter.  The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of
warrant any changes. This inspection plan does not include security related inspections, which
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."
will be sent via separate, non-publicly available correspondence.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide
Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Please contact
me at 817-200-1141 with any questions you have regarding this letter.
Sincerely, /RA/ Nicholas H. Taylor, Chief
Projects Branch B
Division of Reactor Projects
Docket No.: 50
-482 License No.: NPF
-42 Enclosure:  Wolf Creek Generating Station
Inspection/Activity Plan 
Page 1 of 2
08/30/2016
09:37:18 Report 22 Unit NumberPlanned Dates
Start          EndInspection ActivityTitle No. of Staff
on SiteWolf CreekInspection / Activity Plan
07/01/2016
-06/30/2018TSB 52B-BIENNIAL PI&R INSPECTION
4 1 IP Problem Identification and Resolution71152B 06/27/2016
07/01/2016
INSP-BIENNIAL REQUAL INSPECTION
2 1 IP Licensed Operator Requalification Program7111111B 06/27/2016
07/01/2016
EP-1-EP PERFORMANCE INDICATORS
1 1 IP ERO Readiness71151-EP02
08/01/2016
08/05/2016
1 IP A lert & Notification System Reliability71151-EP03
08/01/2016
08/05/2016
1 IP Unplanned Scrams per 7000 Critical Hrs71151-IE01
08/01/2016
08/05/2016
EP-2-BIENNIAL EP PROGRAM INSPECTION
1 1 IP A lert and Notification System Testing7111402 08/01/2016
08/05/2016
1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 08/01/2016
08/05/2016
1 IP Emergency Action Level and Emergency Plan Changes7111404 08/01/2016
08/05/2016
1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 08/01/2016
08/05/201671111.08-INSERVICE INSPECTION
1 1 IP Inservice Inspection Activities - PWR7111108P 10/03/2016
10/14/2016
RS 12 PI-RADIATION SAFETY
3 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/17/2016
10/21/2016
1 IP Occupational ALARA Planning and Controls71124.02 10/17/2016
10/21/2016
1 IP Occupational Exposure Control Effectiveness71151-OR01
10/17/2016
10/21/2016
1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01
10/17/2016
10/21/2016
INIT EXA-INITIAL EXAM
5 1 INITIAL EXAM WOLF CREEK (11/2017)
X02597 10/16/2017
10/20/2017
1 INITIAL EXAM WOLF CREEK (11/2017)
X0259711/13/201711/24/2017
RS 13 PI-RADIATION SAFETY
2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/08/2017
05/12/2017
1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 05/08/2017
05/12/2017
1 IP Occupational Exposure Control Effectiveness71151-OR01
05/08/2017
05/12/2017
1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01
05/08/2017
05/12/2017
RS 24-RADIATION SAFETY
2 1 IP Occupational ALARA Planning and Controls71124.02 06/12/2017
06/16/2017
1 IP Occupational Dose Assessment71124.04 06/12/2017
06/16/2017
EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION
4 1 IP Fire Protection [Triennial]7111105T 10/02/2017
10/06/2017
1 IP Fire Protection [Triennial]7111105T 10/16/2017
10/20/2017
This report does not include INPO and OUTAGE activities. This report shows only on-site
and announced inspection procedures.
Page 2 of 2
08/30/2016
09:37:18 Report 22 Unit NumberPlanned Dates
Start          EndInspection ActivityTitle No. of Staff
on SiteWolf CreekInspection / Activity Plan
07/01/2016
-06/30/2018
EP-2-BIENNIAL EP EXERCISE INSPECTION
4 1 IP Exercise Evaluation711140111/13/201711/17/2017
1 IP Emergency Action Level and Emergency Plan Changes711140411/13/201711/17/2017
EP-3-EP PERFORMANCE INDICATOR VERIFICATION
1 1 IP Drill/Exercise Performance71151-EP0111/13/201711/17/2017
1 IP ERO Readiness71151-EP0211/13/201711/17/2017
1 IP A lert & Notification System Reliability71151-EP0311/13/201711/17/20177111108-INSERVICE INSPECTION
1 1 IP Inservice Inspection Activities - PWR7111108P 04/02/2018
04/13/2018
This report does not include INPO and OUTAGE activities. This report shows only on-site
and announced inspection procedures.  


  ML16237A073
A. Heflin                                          -2-
SUNSI ReviewBy: NHT ADAMS Yes    NoPublicly Available Non-Publicly Available
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order
  Non-Sensitive Sensitive Keyword: NRC-002 OFFICE: RIV SPE:DRP/B D: DRS D: DRP C: DRP/B NAME DProulx AVegel TWPruett NTaylor SIGNATURE /RA/ /RA Jeff Clark for/
Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-
/RA/ /RA/ DATE 8/22/16 8/22/16 8/23/16 8/24/16
Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to
Letter to Adam C. Heflin
Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts
from Nicholas H. Taylor dated August 31, 2016
towards compliance with these Orders, and the information gathered will aid staff in
        SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2016005)
development of the ultimate Safety Evaluation for the site. After the NRC staff receives the
  DISTRIBUTION
Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff
: Regional Administrator (Kriss.Kennedy@nrc.gov)  
will confirm through inspections the full implementation of the orders mentioned above by
performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies
Deputy Regional Administrator (Scott.Morris@nrc.gov)  
and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness
DRP Director (Troy.Pruett@nrc.gov)  
Communication/Staffing/Multi-Unit Dose Assessment Plans.
DRP Deputy Director (Ryan.Lantz@nrc.gov)  
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the
DRS Director (Anton.Vegel@nrc.gov)  
Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the
DRS Deputy Director (Jeff.Clark@nrc.gov)  
NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning
Senior Resident Inspector (Douglas.Dodson@nrc.gov)
in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue
Resident Inspector (Fabian.Thomas@nrc.gov)
to conduct quarterly assessment meetings and communicate changes in the assessment of
  Branch Chief, DRP/B (Nick.Taylor@nrc.gov)  
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)  
Operating Reactor Assessment Program.
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)  
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs
Wolf Creek Administrative Assistant (Susan.Galemore@nrc.gov
Rules of Practice, a copy of this letter will be available electronically for public inspection in the
) Public Affairs Officer (Victor.Dricks@nrc.gov)  
NRC Public Document Room or from the Publicly Available Records (PARS) component of
Project Manager (Fred.Lyon@nrc.gov)  
NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)  
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
RITS Coordinator (Marisa.Herrera@nrc.gov)  
Electronic Reading Room).
Please contact me at 817-200-1141 with any questions you have regarding this letter.
                                                    Sincerely,
                                                    /RA/
                                                    Nicholas H. Taylor, Chief
                                                    Projects Branch B
                                                    Division of Reactor Projects
Docket No.: 50-482
License No.: NPF-42
Enclosure:
Wolf Creek Generating Station
Inspection/Activity Plan
 
            Attachment 2 - Proposed Inspection Plan            Official Use Only - Sensitive Internal Information/Security-Related Information        WC
Page 1 of 2                                                                                    Wolf Creek
08/30/2016    09:37:18                                                                Inspection / Activity Plan
Report 22
                                                                                        07/01/2016 - 06/30/2018
  Unit          Planned Dates                                                                                                                      No. of Staff
Number          Start        End      Inspection Activity                                                                Title                    on Site
                                        TSB 52B        - BIENNIAL PI&R INSPECTION                                                                          4
1          06/27/2016      07/01/2016    IP 71152B                Problem Identification and Resolution
                                        INSP          - BIENNIAL REQUAL INSPECTION                                                                        2
1          06/27/2016      07/01/2016    IP 7111111B              Licensed Operator Requalification Program
                                        EP-1          - EP PERFORMANCE INDICATORS                                                                        1
1          08/01/2016      08/05/2016    IP 71151-EP02            ERO Readiness
1          08/01/2016      08/05/2016    IP 71151-EP03            Alert & Notification System Reliability
1          08/01/2016      08/05/2016    IP 71151-IE01            Unplanned Scrams per 7000 Critical Hrs
                                        EP-2          - BIENNIAL EP PROGRAM INSPECTION                                                                    1
1          08/01/2016      08/05/2016    IP 7111402              Alert and Notification System Testing
1          08/01/2016      08/05/2016    IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System
1          08/01/2016      08/05/2016    IP 7111404              Emergency Action Level and Emergency Plan Changes
1          08/01/2016      08/05/2016    IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies
                                        71111.08      - INSERVICE INSPECTION                                                                              1
1          10/03/2016      10/14/2016    IP 7111108P              Inservice Inspection Activities - PWR
                                        RS 12 PI      - RADIATION SAFETY                                                                                  3
1          10/17/2016      10/21/2016    IP 71124.01              Radiological Hazard Assessment and Exposure Controls
1          10/17/2016      10/21/2016    IP 71124.02              Occupational ALARA Planning and Controls
1          10/17/2016      10/21/2016    IP 71151-OR01            Occupational Exposure Control Effectiveness
1          10/17/2016      10/21/2016    IP 71151-PR01            RETS/ODCM Radiological Effluent Occurrences
                                        INIT EXA      - INITIAL EXAM                                                                                      5
1          10/16/2017      10/20/2017        X02597                INITIAL EXAM WOLF CREEK (11/2017)
1          11/13/2017      11/24/2017        X02597                INITIAL EXAM WOLF CREEK (11/2017)
                                        RS 13 PI      - RADIATION SAFETY                                                                                  2
1          05/08/2017      05/12/2017    IP 71124.01              Radiological Hazard Assessment and Exposure Controls
1          05/08/2017      05/12/2017    IP 71124.03              In-Plant Airborne Radioactivity Control and Mitigation
1          05/08/2017      05/12/2017    IP 71151-OR01            Occupational Exposure Control Effectiveness
1          05/08/2017      05/12/2017    IP 71151-PR01            RETS/ODCM Radiological Effluent Occurrences
                                        RS 24          - RADIATION SAFETY                                                                                  2
1          06/12/2017      06/16/2017    IP 71124.02              Occupational ALARA Planning and Controls
1          06/12/2017      06/16/2017    IP 71124.04              Occupational Dose Assessment
                                        EB2-05T        - TRIENNIAL FIRE PROTECTION INSPECTION                                                              4
1          10/02/2017      10/06/2017    IP 7111105T              Fire Protection [Triennial]
1          10/16/2017      10/20/2017    IP 7111105T              Fire Protection [Triennial]
                                                    This report does not include INPO and OUTAGE activities.
                                                    This report shows only on-site and announced inspection procedures.                        Enclosure
                                                                Official Use Only - Sensitive Internal Information/Security-Related Information
 
            Attachment 2 - Proposed Inspection Plan            Official Use Only - Sensitive Internal Information/Security-Related Information          WC
Page 2 of 2                                                                                    Wolf Creek
08/30/2016    09:37:18                                                                Inspection / Activity Plan
Report 22
                                                                                        07/01/2016 - 06/30/2018
  Unit          Planned Dates                                                                                                                        No. of Staff
Number          Start        End      Inspection Activity                                                                Title                    on Site
                                        EP-2          - BIENNIAL EP EXERCISE INSPECTION                                                                    4
1          11/13/2017      11/17/2017    IP 7111401              Exercise Evaluation
1          11/13/2017      11/17/2017    IP 7111404              Emergency Action Level and Emergency Plan Changes
                                        EP-3          - EP PERFORMANCE INDICATOR VERIFICATION                                                              1
1          11/13/2017      11/17/2017    IP 71151-EP01            Drill/Exercise Performance
1          11/13/2017      11/17/2017    IP 71151-EP02            ERO Readiness
1          11/13/2017      11/17/2017    IP 71151-EP03            Alert & Notification System Reliability
                                        7111108        - INSERVICE INSPECTION                                                                                1
1          04/02/2018      04/13/2018    IP 7111108P              Inservice Inspection Activities - PWR
                                                    This report does not include INPO and OUTAGE activities.
                                                    This report shows only on-site and announced inspection procedures.                        Enclosure
                                                                Official Use Only - Sensitive Internal Information/Security-Related Information
 
 
ML16237A073
    SUNSI Review                    ADAMS                     Publicly Available           Non-Sensitive Keyword:
  By: NHT                            Yes No                Non-Publicly Available      Sensitive     NRC-002
  OFFICE: RIV       SPE:DRP/B       D: DRS                   D: DRP         C: DRP/B
  NAME             DProulx         AVegel                   TWPruett       NTaylor
  SIGNATURE         /RA/             /RA Jeff Clark for/     /RA/           /RA/
  DATE             8/22/16         8/22/16                 8/23/16         8/24/16
                                               
Letter to Adam C. Heflin from Nicholas H. Taylor dated August 31, 2016
SUBJECT:       MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING
                STATION (REPORT 05000482/2016005)
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Douglas.Dodson@nrc.gov)
Resident Inspector (Fabian.Thomas@nrc.gov)
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Wolf Creek Administrative Assistant (Susan.Galemore@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
(Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov
ROPreports.Resource@nrc.g
ROPassessment.Resource@nrc.gov
ov ROPassessment.Resource@nrc.gov
}}
}}

Revision as of 14:50, 30 October 2019

Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016005)
ML16237A073
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/31/2016
From: Nick Taylor
NRC/RGN-IV/DRP/RPB-B
To: Heflin A
Wolf Creek
Taylor N
References
IR 2016005
Download: ML16237A073 (6)


See also: IR 05000482/2016005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

August 31, 2016

Adam C. Heflin, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING

STATION (REPORT 05000482/2016005)

Dear Mr. Heflin:

On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle

performance review of Wolf Creek Generating Station. The NRC reviewed the most recent

quarterly performance indicators (PIs) in addition to inspection results and enforcement actions

from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of

your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Wolf Creek Generating Station operated in a manner that

preserved public health and safety and met all cornerstone objectives. The NRC determined

the performance at Wolf Creek Generating Station during the most recent quarter was within the

Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix

because all inspection findings had very low (i.e., Green) safety significance, and all PIs

indicated that your performance was within the nominal, expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

Although plant performance was within the Licensee Response Column, the NRC has not yet

finalized the significance of Apparent Violation 05000482/2016008-01, Failure to Adequately

Establish and Adjust Preventive Maintenance for Emergency Diesel Generator Excitation

System Diodes. This apparent violation is described in Inspection Report 05000482/2016008

(ML16235A132), issued in August 19, 2016. The final safety significance determination may

affect the NRCs assessment of plant performance and the enclosed inspection plan.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine

inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the second half of the inspection plan are tentative and may be revised

at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the

resolution of any scheduling conflicts and personnel availability issues. The NRC will contact

you as soon as possible to discuss changes to the inspection plan should circumstances

warrant any changes. This inspection plan does not include security related inspections, which

will be sent via separate, non-publicly available correspondence.

A. Heflin -2-

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order

Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-

Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to

Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts

towards compliance with these Orders, and the information gathered will aid staff in

development of the ultimate Safety Evaluation for the site. After the NRC staff receives the

Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff

will confirm through inspections the full implementation of the orders mentioned above by

performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies

and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness

Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the

Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the

NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning

in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue

to conduct quarterly assessment meetings and communicate changes in the assessment of

licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,

Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs

Rules of Practice, a copy of this letter will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Please contact me at 817-200-1141 with any questions you have regarding this letter.

Sincerely,

/RA/

Nicholas H. Taylor, Chief

Projects Branch B

Division of Reactor Projects

Docket No.: 50-482

License No.: NPF-42

Enclosure:

Wolf Creek Generating Station

Inspection/Activity Plan

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information WC

Page 1 of 2 Wolf Creek

08/30/2016 09:37:18 Inspection / Activity Plan

Report 22

07/01/2016 - 06/30/2018

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

TSB 52B - BIENNIAL PI&R INSPECTION 4

1 06/27/2016 07/01/2016 IP 71152B Problem Identification and Resolution

INSP - BIENNIAL REQUAL INSPECTION 2

1 06/27/2016 07/01/2016 IP 7111111B Licensed Operator Requalification Program

EP-1 - EP PERFORMANCE INDICATORS 1

1 08/01/2016 08/05/2016 IP 71151-EP02 ERO Readiness

1 08/01/2016 08/05/2016 IP 71151-EP03 Alert & Notification System Reliability

1 08/01/2016 08/05/2016 IP 71151-IE01 Unplanned Scrams per 7000 Critical Hrs

EP-2 - BIENNIAL EP PROGRAM INSPECTION 1

1 08/01/2016 08/05/2016 IP 7111402 Alert and Notification System Testing

1 08/01/2016 08/05/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System

1 08/01/2016 08/05/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes

1 08/01/2016 08/05/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies

71111.08 - INSERVICE INSPECTION 1

1 10/03/2016 10/14/2016 IP 7111108P Inservice Inspection Activities - PWR

RS 12 PI - RADIATION SAFETY 3

1 10/17/2016 10/21/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

1 10/17/2016 10/21/2016 IP 71124.02 Occupational ALARA Planning and Controls

1 10/17/2016 10/21/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness

1 10/17/2016 10/21/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences

INIT EXA - INITIAL EXAM 5

1 10/16/2017 10/20/2017 X02597 INITIAL EXAM WOLF CREEK (11/2017)

1 11/13/2017 11/24/2017 X02597 INITIAL EXAM WOLF CREEK (11/2017)

RS 13 PI - RADIATION SAFETY 2

1 05/08/2017 05/12/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

1 05/08/2017 05/12/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

1 05/08/2017 05/12/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness

1 05/08/2017 05/12/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences

RS 24 - RADIATION SAFETY 2

1 06/12/2017 06/16/2017 IP 71124.02 Occupational ALARA Planning and Controls

1 06/12/2017 06/16/2017 IP 71124.04 Occupational Dose Assessment

EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4

1 10/02/2017 10/06/2017 IP 7111105T Fire Protection [Triennial]

1 10/16/2017 10/20/2017 IP 7111105T Fire Protection [Triennial]

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Official Use Only - Sensitive Internal Information/Security-Related Information

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information WC

Page 2 of 2 Wolf Creek

08/30/2016 09:37:18 Inspection / Activity Plan

Report 22

07/01/2016 - 06/30/2018

Unit Planned Dates No. of Staff

Number Start End Inspection Activity Title on Site

EP-2 - BIENNIAL EP EXERCISE INSPECTION 4

1 11/13/2017 11/17/2017 IP 7111401 Exercise Evaluation

1 11/13/2017 11/17/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes

EP-3 - EP PERFORMANCE INDICATOR VERIFICATION 1

1 11/13/2017 11/17/2017 IP 71151-EP01 Drill/Exercise Performance

1 11/13/2017 11/17/2017 IP 71151-EP02 ERO Readiness

1 11/13/2017 11/17/2017 IP 71151-EP03 Alert & Notification System Reliability

7111108 - INSERVICE INSPECTION 1

1 04/02/2018 04/13/2018 IP 7111108P Inservice Inspection Activities - PWR

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Official Use Only - Sensitive Internal Information/Security-Related Information

ML16237A073

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: NHT Yes No Non-Publicly Available Sensitive NRC-002

OFFICE: RIV SPE:DRP/B D: DRS D: DRP C: DRP/B

NAME DProulx AVegel TWPruett NTaylor

SIGNATURE /RA/ /RA Jeff Clark for/ /RA/ /RA/

DATE 8/22/16 8/22/16 8/23/16 8/24/16

Letter to Adam C. Heflin from Nicholas H. Taylor dated August 31, 2016

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING

STATION (REPORT 05000482/2016005)

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Douglas.Dodson@nrc.gov)

Resident Inspector (Fabian.Thomas@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

Wolf Creek Administrative Assistant (Susan.Galemore@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Fred.Lyon@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.gov

ROPassessment.Resource@nrc.gov