ML16253A025: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023) Richland, WA 99352-0968 November 3, 201 6
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 201 6 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968


==SUBJECT:==
==SUBJECT:==
COLUMBIA GENERATING STATION -ISSUANCE OF AMENDMENT RE: ADOPTION OF TECHNICAL SPECIFICATION TASK FORCE TRAVELER TSTF-425, REVISION 3 (CAC NO. MF6042)  
COLUMBIA GENERATING STATION - ISSUANCE OF AMENDMENT RE:
ADOPTION OF TECHNICAL SPECIFICATION TASK FORCE TRAVELER TSTF-425, REVISION 3 (CAC NO. MF6042)


==Dear Mr. Reddemann:==
==Dear Mr. Reddemann:==


The U.S. Nuclear Regulatory Commission (NRC, the Commission) has issued the enclosed Amendment No. 238 to Renewed Facility Operating License No. NPF-21 for the Columbia Generating Station. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated March 17, 2015, as supplemented by letters dated September 17, October29, November 17, and December28, 2015; and April 7, May 11, and June 22, 2016. The amendment revises the TSs by relocating specific surveillance frequencies to a licensee-controlled program consistent with NRC-approved Technical Specifications Task Force Traveler TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control -RITSTF [Risk-Informed Technical Specifications Task Force] Initiative 5b," dated March 18, 2009. The availability of this TS improvement program was announced in the Federal Register on July 6, 2009 (7 4 FR 31996). Energy Northwest has proposed certain plant-specific variations and deviations from TSTF-425, Revision 3, as described in its application dated March 17, 2015.
The U.S. Nuclear Regulatory Commission (NRC, the Commission) has issued the enclosed Amendment No. 238 to Renewed Facility Operating License No. NPF-21 for the Columbia Generating Station. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated March 17, 2015, as supplemented by letters dated September 17, October29, November 17, and December28, 2015; and April 7, May 11, and June 22, 2016.
M. Reddemann A copy of the related Safety Evaluation is also enclosed.
The amendment revises the TSs by relocating specific surveillance frequencies to a licensee-controlled program consistent with NRC-approved Technical Specifications Task Force Traveler TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control -
The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Docket No. 50-397  
RITSTF [Risk-Informed Technical Specifications Task Force] Initiative 5b," dated March 18, 2009. The availability of this TS improvement program was announced in the Federal Register on July 6, 2009 (7 4 FR 31996). Energy Northwest has proposed certain plant-specific variations and deviations from TSTF-425, Revision 3, as described in its application dated March 17, 2015.
 
M. Reddemann                                   A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
L. J  n os, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 238 to NPF-21 2. Safety Evaluation cc w/encls: Distribution via Listserv L. J n os, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 ENERGY NORTHWEST DOCKET NO. 50-397 COLUMBIA GENERATING STATION AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 238 License No. NPF-21 1. The Nuclear Regulatory Commission (the Commission) has found that: A. The application for amendment by Energy Northwest (licensee), dated March 17, 2015, as supplemented by letters dated September 17, October 29, November 17, and December 28, 2015; and April 7, May 11, and June 22, 2016, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 1 O CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
: 1. Amendment No. 238 to NPF-21
Enclosure 1   2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-21 is hereby amended to read as follows: (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 238 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. 3. The license amendment is effective as of its date of issuance and shall be implemented within 120 days from the date of issuance.  
: 2. Safety Evaluation cc w/encls: Distribution via Listserv
 
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 ENERGY NORTHWEST DOCKET NO. 50-397 COLUMBIA GENERATING STATION AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 238 License No. NPF-21
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Energy Northwest (licensee), dated March 17, 2015, as supplemented by letters dated September 17, October 29, November 17, and December 28, 2015; and April 7, May 11, and June 22, 2016, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 1O CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 1
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-21 is hereby amended to read as follows:
(2)     Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 238 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
: 3. The license amendment is effective as of its date of issuance and shall be implemented within 120 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Robert J. Pascarelli, Chief Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


==Attachment:==
==Attachment:==


Changes to the Renewed Facility Operating License No. NPF-21 and Technical Specifications FOR THE NUCLEAR REGULATORY COMMISSION Robert J. Pascarelli, Chief Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Date of Issuance:
Changes to the Renewed Facility Operating License No. NPF-21 and Technical Specifications Date of Issuance: November 3 ,       2O1 6
November 3 , 2O1 6 ATTACHMENT TO LICENSE AMENDMENT NO. 238 COLUMBIA GENERATING STATION RENEWED FACILITY OPERATING LICENSE NO. NPF-21 DOCKET NO. 50-397 Replace the following pages of the Renewed Facility Operating License No. NPF-21 and Appendix A, Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change. Facility Operating License REMOVE INSERT -4-Technical Specifications REMOVE 3.1.3-4 3.1.4-2 3.1.5-3 3.1.6-2 3.1.7-1 3.1.7-2 3.1.7-3 3.1.8-2 3.2.1-1 3.2.2-1 3.2.3-1 3.3.1.1-11


3.3.1.1-12 3.3.1.1-13 3.3.1.1-14  
ATTACHMENT TO LICENSE AMENDMENT NO. 238 COLUMBIA GENERATING STATION RENEWED FACILITY OPERATING LICENSE NO. NPF-21 DOCKET NO. 50-397 Replace the following pages of the Renewed Facility Operating License No. NPF-21 and Appendix A, Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
Facility Operating License REMOVE                    INSERT Technical Specifications REMOVE                    INSERT 3.1.3-4                    3.1.3-4 3.1.4-2                    3.1.4-2 3.1.5-3                    3.1.5-3 3.1.6-2                    3.1.6-2 3.1.7-1                    3.1.7-1 3.1.7-2                    3.1.7-2 3.1.7-3                    3.1.7-3 3.1.8-2                    3.1.8-2 3.2.1-1                    3.2.1-1 3.2.2-1                    3.2.2-1 3.2.3-1                    3.2.3-1 3.3.1.1-11                3.3.1.1-11 3.3.1.1-12                3.3.1.1-12 3.3.1.1-13                 3.3.1.1-13 3.3.1.1-14                3.3.1.1-14 3.3.1.2-2                  3.3.1.2-2 3.3.1.2-3                  3.3.1.2-3 3.3.1.2-4                  3.3.1.2-4 3.3.2.1-9                  3.3.2.1-9 3.3.2.1-10                3.3.2.1-10 3.3.2.1-11                3.3.2.1-11 3.3.2.1-12                3.3.2.1-12 3.3.2.1-13 3.3.2.2-2                3.3.2.2-2 3.3.3.1-2                3.3.3.1-2 3.3.3.1-3                3.3.3.1-3 3.3.3.1-4 3.3.3.2-1                3.3.3.2-1


3.3.1.2-2 3.3.1.2-3 3.3.1.2-4 3.3.2.1-9 3.3.2.1-10 3.3.2.1-11 3.3.2.1-12 3.3.2.2-2 3.3.3.1-2  
REMOVE        INSERT 3.3.3.2-2      3.3.3.2-2 3.3.4.1-2      3.3.4.1-2 3.3.4.1-3      3.3.4.1-3 3.3.4.2-2     3.3.4.2-2 3.3.4.2-3      3.3.4.2-3 3.3.5.1-5      3.3.5.1-5 3.3.5.1-6      3.3.5.1-6 3.3.5.1-7      3.3.5.1-7 3.3.5.1-8      3.3.5.1-8 3.3.5.1-9      3.3.5.1-9 3.3.5.1-10    3.3.5.1-10
----------    3.3.5.1-11 3.3.5.2-3      3.3.5.2-3 3.3.6.1-3      3.3.6.1-3 3.3.6.1-4      3.3.6.1-4 3.3.6.2-2      3.3.6.2-2 3.3.6.2-3      3.3.6.2-3
----------    3.3.6.2-4 3.3.7.1-2     3.3.7.1-2 3.3.7.1-3      3.3.7.1-3
----------    3.3.7.1-4 3.3.8.1-2      3.3.8.1-2 3.3.8.1-3      3.3.8.1-3
----------    3.3.8.1-4 3.3.8.2-2      3.3.8.2-2 3.3.8.2-3      3.3.8.2-3 3.4.1-4        3.4.1-4 3.4.2-2        3.4.2-2 3.4.3-1       3.4.3-1 3.4.4-2        3.4.4-2 3.4.5-2        3.4.5-2 3.4.7-3        3.4.7-3 3.4.8-2        3.4.8-2 3.4.9-2        3.4.9-2 3.4.10-2      3.4.10-2 3.4.11-2      3.4.11-2 3.4.11-4      3.4.11-4 3.4.12-1      3.4.12-1 3.5.1-4        3.5.1-4 3.5.1-5        3.5.1-5 3.5.2-2       3.5.2-2 3.5.2-3        3.5.2-3
----------    3.5.2-4 3.5.3-2        3.5.3-2
----------    3.5.3-3 3.6.1.1-2      3.6.1.1-2


3.3.3.1-3 3.3.3.2-1 INSERT 3.1.3-4 3.1.4-2 3.1.5-3 3.1.6-2 3.1.7-1 3.1.7-2 3.1.7-3 3.1.8-2 3.2.1-1 3.2.2-1 3.2.3-1 3.3.1.1-11 3.3.1.1-12  
REMOVE        INSERT 3.6.1.1-3     3.6.1.1-3 3.6.1.2-4      3.6.1.2-4 3.6.1.3-6      3.6.1.3-6 3.6.1.3-7      3.6.1.3-7 3.6.1.3-8      3.6.1.3-8 3.6.1.4-1      3.6.1.4-1 3.6.1.5-2     3.6.1.5-2 3.6.1.6-2      3.6.1.6-2
----------    3.6.1.6-3 3.6.1.7-2      3.6.1.7-2
----------    3.6.1.7-3 3.6.2.1-3      3.6.2.1-3 3.6.2.2-1      3.6.2.2-1 3.6.2.3-2      3.6.2.3-2 3.6.3.2-1     3.6.3.2-1
----------    3.6.3.2-2 3.6.3.3-1     3.6.3.3-1 3.6.4.1-2      3.6.4.1-2 3.6.4.2-3      3.6.4.2-3 3.6.4.3-2     3.6.4.3-2 3.7.1-2        3.7.1-2 3.7.1-3        3.7.1-3 3.7.2-1        3.7.2-1 3.7.3-3        3.7.3-3 3.7.4-2        3.7.4-2 3.7.5-2        3.7.5-2 3.7.6-1        3.7.6-1
----------    3.7.6-2 3.7.7-1        3.7.7-1 3.8.1-5        3.8.1-5 3.8.1-6        3.8.1-6 3.8.1-7        3.8.1-7 3.8.1-8        3.8.1-8 3.8.1-9        3.8.1-9 3.8.1-10      3.8.1-10 3.8.1-11       3.8.1-11 3.8.1-12      3.8.1-12 3.8.1-13      3.8.1-13 3.8.1-14      3.8.1-14 3.8.1-15      3.8.1-15 3.8.1-16      3.8.1-16 3.8.3-2        3.8.3-2 3.8.3-3        3.8.3-3 3.8.4-4        3.8.4-4 3.8.6-3        3.8.6-3 3.8.6-4        3.8.6-4


3.3.1.1-13 3.3.1.1-14
REMOVE        INSERT 3.8.6-5 3.8.7-2      3.8.7-2 3.8.8-2      3.8.8-2 3.9.1-1      3.9.1-1 3.9.2-1      3.9.2-1 3.9.2-2 3.9.3-1     3.9.3-1 3.9.5-1      3.9.5-1 3.9.6-1      3.9.6-1 3.9.7-1     3.9.7-1 3.9.8-2      3.9.8-2 3.9.9-2      3.9.9-2 3.10.2-2    3.10.2-2 3.10.3-3    3.10.3-3 3.10.4-3    3.10.4-3 3.10.5-2    3.10.5-2 3.10.6-2    3.10.6-2 3.10.8-7    3.10.8-7 5.5-11      5.5-11 5.5-12


3.3.1.2-2
(2)    Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 238 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
: a. For Surveillance Requirements (SRs) not previously performed by existing SRs or other plant tests, the requirement will be considered met on the implementation date and the next required test will be at the interval specified in the Technical Specifications as revised in Amendment No. 149.
(3)    Deleted.
(4)    Deleted.
(5)    Deleted.
(6)    Deleted.
(7)    Deleted.
(8)    Deleted.
(9)    Deleted.
(10)    Deleted.
(11)    Shield Wall Deferral (Section 12.3.2, SSER #4, License Amendment #7)
The licensee shall complete construction of the deferred shield walls and window as identified in Attachment 3, as amended by this license amendment.
(12)    Deleted.
(13)    Deleted.
*The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
Renewed License No. NPF-21 Amendment No. 238


3.3.1.2-3  
Control Rod OPERABILITY 3.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                              FREQUENCY SR 3.1.3.1        Determine the position of each control rod.                        In accordance with the Surveillance Frequency Control Program SR 3.1.3.2       -------------------------------NOTE------------------------------
Not required to be performed until 31 days after the control rod is withdrawn and THERMAL POWER is greater than the LPSP of the RWM.
Insert each partially withdrawn control rod at least              In accordance one notch.                                                        with the Surveillance Frequency Control Program SR 3.1.3.3        Verify each control rod scram time from fully                    In accordance withdrawn to notch position 5 is ~ 7 seconds.                    with SR 3.1 .4.1, SR 3.1.4.2, SR 3.1.4.3, and SR 3.1.4.4 SR 3.1.3.4        Verify each control rod does not go to the withdrawn              Each time the overtravel position.                                              control rod is withdrawn to "full out" position Prior to declaring control rod OPERABLE after work on control rod or CRD System that could affect coupling Columbia Generating Station                      3.1.3-4          Amendment No. a:t-2,~ ~ 238


3.3.1.2-4 3.3.2.1-9 3.3.2.1-10 3.3.2.1-11 3.3.2.1-12 3.3.2.1-13 3.3.2.2-2 3.3.3.1-2 3.3.3.1-3 3.3.3.1-4 3.3.3.2-1  REMOVE INSERT 3.3.3.2-2 3.3.3.2-2 3.3.4.1-2 3.3.4.1-2 3.3.4.1-3 3.3.4.1-3 3.3.4.2-2 3.3.4.2-2 3.3.4.2-3 3.3.4.2-3 3.3.5.1-5 3.3.5.1-5 3.3.5.1-6 3.3.5.1-6 3.3.5.1-7 3.3.5.1-7 3.3.5.1-8 3.3.5.1-8 3.3.5.1-9 3.3.5.1-9 3.3.5.1-10 3.3.5.1-10
Control Rod Scram Times 3.1.4 SURVEILLANCE REQUIREMENTS
----------
--------------------- ----------------------- ----------- -----N 0 TE--------------- --------------------------------------------
3.3.5.1-11 3.3.5.2-3 3.3.5.2-3 3.3.6.1-3 3.3.6.1-3 3.3.6.1-4 3.3.6.1-4 3.3.6.2-2 3.3.6.2-2 3.3.6.2-3 3.3.6.2-3
----------
3.3.6.2-4 3.3.7.1-2 3.3.7.1-2 3.3.7.1-3 3.3.7.1-3
----------
3.3.7.1-4 3.3.8.1-2 3.3.8.1-2 3.3.8.1-3 3.3.8.1-3
----------
3.3.8.1-4 3.3.8.2-2 3.3.8.2-2 3.3.8.2-3 3.3.8.2-3 3.4.1-4 3.4.1-4 3.4.2-2 3.4.2-2 3.4.3-1 3.4.3-1 3.4.4-2 3.4.4-2 3.4.5-2 3.4.5-2 3.4.7-3 3.4.7-3 3.4.8-2 3.4.8-2 3.4.9-2 3.4.9-2 3.4.10-2 3.4.10-2 3.4.11-2 3.4.11-2 3.4.11-4 3.4.11-4 3.4.12-1 3.4.12-1 3.5.1-4 3.5.1-4 3.5.1-5 3.5.1-5 3.5.2-2 3.5.2-2 3.5.2-3 3.5.2-3 ----------
3.5.2-4 3.5.3-2 3.5.3-2 ----------
3.5.3-3 3.6.1.1-2 3.6.1.1-2  REMOVE INSERT 3.6.1.1-3 3.6.1.1-3 3.6.1.2-4 3.6.1.2-4 3.6.1.3-6 3.6.1.3-6 3.6.1.3-7 3.6.1.3-7 3.6.1.3-8 3.6.1.3-8 3.6.1.4-1 3.6.1.4-1 3.6.1.5-2 3.6.1.5-2 3.6.1.6-2 3.6.1.6-2
----------
3.6.1.6-3 3.6.1.7-2 3.6.1.7-2
----------
3.6.1.7-3 3.6.2.1-3 3.6.2.1-3 3.6.2.2-1 3.6.2.2-1 3.6.2.3-2 3.6.2.3-2 3.6.3.2-1 3.6.3.2-1
----------
3.6.3.2-2 3.6.3.3-1 3.6.3.3-1 3.6.4.1-2 3.6.4.1-2 3.6.4.2-3 3.6.4.2-3 3.6.4.3-2 3.6.4.3-2 3.7.1-2 3.7.1-2 3.7.1-3 3.7.1-3 3.7.2-1 3.7.2-1 3.7.3-3 3.7.3-3 3.7.4-2 3.7.4-2 3.7.5-2 3.7.5-2 3.7.6-1 3.7.6-1 ----------
3.7.6-2 3.7.7-1 3.7.7-1 3.8.1-5 3.8.1-5 3.8.1-6 3.8.1-6 3.8.1-7 3.8.1-7 3.8.1-8 3.8.1-8 3.8.1-9 3.8.1-9 3.8.1-10 3.8.1-10 3.8.1-11 3.8.1-11 3.8.1-12 3.8.1-12 3.8.1-13 3.8.1-13 3.8.1-14 3.8.1-14 3.8.1-15 3.8.1-15 3.8.1-16 3.8.1-16 3.8.3-2 3.8.3-2 3.8.3-3 3.8.3-3 3.8.4-4 3.8.4-4 3.8.6-3 3.8.6-3 3.8.6-4 3.8.6-4 REMOVE 3.8.7-2 3.8.8-2 3.9.1-1 3.9.2-1 3.9.3-1 3.9.5-1 3.9.6-1 3.9.7-1 3.9.8-2 3.9.9-2 3.10.2-2 3.10.3-3 3.10.4-3 3.10.5-2 3.10.6-2 3.10.8-7 5.5-11 INSERT 3.8.6-5 3.8.7-2 3.8.8-2 3.9.1-1 3.9.2-1 3.9.2-2 3.9.3-1 3.9.5-1 3.9.6-1 3.9.7-1 3.9.8-2 3.9.9-2 3.10.2-2 3.10.3-3 3.10.4-3 3.10.5-2 3.10.6-2 3.10.8-7 5.5-11 5.5-12  (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 238 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. a. For Surveillance Requirements (SRs) not previously performed by existing SRs or other plant tests, the requirement will be considered met on the implementation date and the next required test will be at the interval specified in the Technical Specifications as revised in Amendment No. 149. (3) Deleted. ( 4) Deleted. (5) Deleted. (6) Deleted. (7) Deleted. (8) Deleted. (9) Deleted. (10) Deleted. (11) Shield Wall Deferral (Section 12.3.2, SSER #4, License Amendment
#7) The licensee shall complete construction of the deferred shield walls and window as identified in Attachment 3, as amended by this license amendment.
(12) Deleted. (13) Deleted. *The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
Renewed License No. NPF-21 Amendment No. 238 Control Rod OPERABILITY 3.1.3 SURVEILLANCE REQUIREMENTS SR 3.1.3.1 SR 3.1.3.2 SR 3.1.3.3 SR 3.1.3.4 SURVEILLANCE Determine the position of each control rod. ---------------------
----------NOTE------------
------------------Not required to be performed until 31 days after the control rod is withdrawn and THERMAL POWER is greater than the LPSP of the RWM. Insert each partially withdrawn control rod at least one notch. Verify each control rod scram time from fully withdrawn to notch position 5 is 7 seconds. Verify each control rod does not go to the withdrawn overtravel position.
FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with SR 3.1 .4.1, SR 3.1.4.2, SR 3.1.4.3, and SR 3.1.4.4 Each time the control rod is withdrawn to "full out" position Prior to declaring control rod OPERABLE after work on control rod or CRD System that could affect coupling Columbia Generating Station 3.1.3-4 Amendment No. 238 Control Rod Scram Times 3.1.4 SURVEILLANCE REQUIREMENTS  
--------------
----------------------------------------------N 0 TE-------------
----------------------------------------------
During single control rod scram time Surveillances, the control rod drive (CRD) pumps shall be isolated from the associated scram accumulator.
During single control rod scram time Surveillances, the control rod drive (CRD) pumps shall be isolated from the associated scram accumulator.
SR 3.1.4.1 SR 3.1.4.2 SR 3.1.4.3 SR 3.1.4.4 SURVEILLANCE Verify each control rod scram time is within the limits of Table 3.1.4-1 with reactor steam dome pressure 800 psig. Verify, for a representative sample, each tested control rod scram time is within the limits of Table 3.1.4-1 with reactor steam dome pressure 800 psig. Verify each affected control rod scram time is within the limits of Table 3.1.4-1 with any reactor steam dome pressure.
SURVEILLANCE                                                      FREQUENCY SR 3.1.4.1               Verify each control rod scram time is within the limits                   Prior to exceeding of Table 3.1.4-1 with reactor steam dome pressure                         40% RTP after
Verify each affected control rod scram time is within the limits of Table 3.1.4-1 with reactor steam dome 800 psig. FREQUENCY Prior to exceeding 40% RTP after each reactor shutdown <:: 120 days In accordance with the Surveillance Frequency Control Program Prior to declaring control rod OPERABLE after work on control rod or CRD System that could affect scram time Prior to exceeding 40% RTP after fuel movement within the affected core cell Prior to exceeding 40% RTP after work on control rod or CRD System that could affect scram time Columbia Generating Station 3.1.4-2 Amendment No. +94,2-++ 238 ACTION CONDITION C. One or more control rod C.1 scram accumulators inoperable with reactor steam dome pressure < 900 psig. AND C.2 D. Required Action B.1 or D.1 C.1 and associated Completion Time not met. SURVEILLANCE REQUIREMENTS Control Rod Scram Accumulators 3.1.5 REQUIRED ACTION COMPLETION TIME Verify the associated Immediately upon control rod is fully inserted.
                            ~ 800 psig.                                                               each reactor shutdown <:: 120 days SR 3.1.4.2                Verify, for a representative sample, each tested                           In accordance control rod scram time is within the limits of                             with the Table 3.1.4-1 with reactor steam dome pressure                             Surveillance
discovery of charging water header pressure < 940 psig Declare the associated 1 hour control rod inoperable.  
                            ~ 800 psig.                                                               Frequency Control Program SR 3.1.4.3                Verify each affected control rod scram time is within                     Prior to declaring the limits of Table 3.1.4-1 with any reactor steam                         control rod dome pressure.                                                             OPERABLE after work on control rod or CRD System that could affect scram time SR 3.1.4.4                Verify each affected control rod scram time is within                     Prior to exceeding the limits of Table 3.1.4-1 with reactor steam dome                        40% RTP after pressure~ 800 psig.                                                       fuel movement within the affected core cell Prior to exceeding 40% RTP after work on control rod or CRD System that could affect scram time Columbia Generating Station                                  3.1.4-2            Amendment No. +94,2-++ ~ 238
---------------NOTE--------------
 
Not applicable if all inoperable control rod scram accumulators are associated with fully inserted control rods. -------------------------------------Place the reactor mode Immediately switch in the shutdown position.
Control Rod Scram Accumulators 3.1.5 ACTION CONDITION                      REQUIRED ACTION                                 COMPLETION TIME C. One or more control rod    C.1      Verify the associated                         Immediately upon scram accumulators                  control rod is fully inserted.                 discovery of charging inoperable with reactor                                                            water header steam dome pressure                                                                pressure < 940 psig
SURVEILLANCE FREQUENCY SR 3.1.5.1 Verify each control rod scram accumulator pressure is 2 940 psig. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.1.5-3 Amendment No . .WS,a+e 2ae 238 ACTIONS CONDITION REQUIRED ACTION B (continued)
    < 900 psig.
B.2 Place the reactor mode switch in the shutdown position.
AND C.2      Declare the associated                         1 hour control rod inoperable.
SURVEILLANCE REQUIREMENTS SR 3.1.6.1 SURVEILLANCE Verify all OPERABLE control rods comply with BPWS. Rod Pattern Control 3.1.6 COMPLETION TIME 1 hour FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.1.6-2 Amendment No. +49,.+w 2aa 238 3.1 REACTIVITY CONTROL SYSTEMS 3.1.7 Standby Liquid Control (SLC) System LCO 3.1. 7 Two SLC subsystems shall be OPERABLE.
D. Required Action B.1 or      D.1      ---------------NOTE--------------
APPLICABILITY:
C.1 and associated                  Not applicable if all Completion Time not                  inoperable control rod met.                                scram accumulators are associated with fully inserted control rods.
MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION A. One SLC subsystem A.1 Restore SLC subsystem to inoperable.
                                        ----- ---- ---- -------- --- ---- - --- ---- -
OPERABLE status. B. Two SLC subsystems B.1 Restore one SLC inoperable.
Place the reactor mode                         Immediately switch in the shutdown position.
subsystem to OPERABLE status. C. Required Action and C.1 Be in MODE 3. associated Completion Time not met. AND C.2 Be in MODE 4. SURVEILLANCE REQUIREMENTS SR 3.1.7.1 SURVEILLANCE Verify available volume of sodium pentaborate solution is 4587 gallons. SLC System 3.1.7 COMPLETION TIME 7 days 8 hours 12 hours 36 hours FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.1.7-1 Amendment No. +e9,+9-9 238 SURVEILLANCE REQUIREMENTS SR 3.1.7.2 SR 3.1.7.3 SR 3.1.7.4 SR 3.1.7.5 SURVEILLANCE Verify temperature of sodium pentaborate solution is within the limits of Figure 3.1. 7-1. Verify continuity of explosive charge. Verify the concentration of boron in solution is within the limits of Figure 3.1. 7-1. Verify each SLC subsystem manual and power operated valve in the flow path that is not locked, sealed, or otherwise secured in position, is in the correct position or can be aligned to the correct position.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                      FREQUENCY SR 3.1.5.1       Verify each control rod scram accumulator pressure                       In accordance is 2 940 psig.                                                           with the Surveillance Frequency Control Program Columbia Generating Station                 3.1.5-3                   Amendment No . .WS,a+e 2ae 238
SLC System 3.1.7 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Once within 24 hours after water or boron is added to solution AND Once within 24 hours after solution temperature is restored within the limits of Figure 3.1.7-1 In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.1.7-2 Amendment No. +es,.:t-99 238 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.1.7.6 Verify each pump develops a flow rate z 41.2 gpm at a discharge pressure z 1220 psig. SR 3.1.7.7 Verify flow through one SLC subsystem from pump into reactor pressure vessel. SR 3.1.7.8 Verify all heat traced piping between storage tank and pump suction valve is unblocked.
 
SR 3.1.7.9 Verify sodium pentaborate enrichment is z 44.0 atom percent B-10. SLC System 3.1.7 FREQUENCY In accordance with the lnservice Testing Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program AND Once within 24 hours after solution temperature is restored within the limits of Figure 3.1.7-1 Prior to addition to SLC Tank Columbia Generating Station 3.1.7-3 Amendment No. -+99,22+ 238 SDV Vent and Drain Valves 3.1.8 SURVEILLANCE REQUIREMENTS SR 3.1.8.1 SR 3.1.8.2 SR 3.1.8.3 SURVEILLANCE
Rod Pattern Control 3.1.6 ACTIONS CONDITION                   REQUIRED ACTION             COMPLETION TIME B (continued)                 B.2   Place the reactor mode     1 hour switch in the shutdown position.
-------------------------------NOTE------------
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                FREQUENCY SR 3.1.6.1       Verify all OPERABLE control rods comply with     In accordance BPWS.                                             with the Surveillance Frequency Control Program Columbia Generating Station             3.1.6-2         Amendment No. +49,.+w 2aa 238
---------------
 
---Not required to be met on vent and drain valves closed during performance of SR 3.1 .8.2. Verify each SDV vent and drain valve is open. Cycle each SDV vent and drain valve to the fully closed and fully open positiqn.
SLC System 3.1.7 3.1  REACTIVITY CONTROL SYSTEMS 3.1.7       Standby Liquid Control (SLC) System LCO 3.1. 7           Two SLC subsystems shall be OPERABLE.
Verify each SDV vent and drain valve: a. Closes in s; 30 seconds after receipt of an actual or simulated scram signal; and b. Opens when the actual or simulated scram signal is reset. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.1.8-2 Amendment No. +49-,+e9 238 3.2 POWER DISTRIBUTION LIMITS APLHGR 3.2.1 3.2.1 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) LCO 3.2.1 All APLHGRs shall be less than or equal to the limits specified in the COLR. APPLICABILITY:
APPLICABILITY:       MODES 1, 2, and 3.
THERMAL POWER :2: 25% RTP. ACTIONS CONDITION REQUIRED ACTION A. Any APLHGR not within A.1 Restore APLHGR(s) to limits. within limits. B. Required Action and B.1 Reduce THERMAL associated Completion POWER to< 25% RTP. Time not met. SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.2.1.1 Verify all APLHGRs are less than or equal to the limits specified in the COLR. COMPLETION TIME 2 hours 4 hours FREQUENCY Once within 12 hours after :2:25% RTP In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.2.1-1 Amendment No. +49,-+W 238 3.2 POWER DISTRIBUTION LIMITS 3.2.2 MINIMUM CRITICAL POWER RATIO (MCPR) MCPR 3.2.2 LCO 3.2.2 All MCPRs shall be greater than or equal to the MCPR operating limits specified in the COLR. APPLICABILITY:
ACTIONS CONDITION                     REQUIRED ACTION             COMPLETION TIME A. One SLC subsystem           A.1   Restore SLC subsystem to   7 days inoperable.                       OPERABLE status.
THERMAL POWER :2'. 25% RTP. ACTIONS CONDITION REQUIRED ACTION A. Any MCPR not within A.1 Restore MCPR(s) to within limits. limits. B. Required Action and B.1 Reduce THERMAL associated Completion POWER to< 25% RTP. Time not met. SURVEILLANCE REQUIREMENTS SR 3.2.2.1 SURVEILLANCE Verify all MCPRs are greater than or equal to the limits specified in the COLR. COMPLETION TIME 2 hours 4 hours FREQUENCY Once within 12 hours after :2'. 25% RTP AND In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.2.2-1 Amendment No. +w,a++ 238 3.2 POWER DISTRIBUTION LIMITS 3.2.3 LINEAR HEAT GENERATION RATE (LHGR) LHGR 3.2.3 LCO 3.2.3 All LHGRs shall be less than or equal to the limits specified in the COLR. APPLICABILITY:
B. Two SLC subsystems           B.1   Restore one SLC           8 hours inoperable.                       subsystem to OPERABLE status.
THERMAL POWER 2 25% RTP. ACTIONS CONDITION REQUIRED ACTION A. Any LHGR not within A.1 Restore LHGR(s) to within limits. limits. B. Required Action and B.1 Reduce THERMAL associated Completion POWER to< 25% RTP. Time not met. SURVEILLANCE REQUIREMENTS SR 3.2.3.1 SURVEILLANCE Verify all LHGRs are less than or equal to the limits specified in the COLR. COMPLETION TIME 2 hours 4 hours FREQUENCY Once within 12 hours after 2 25% RTP In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.2.3-1 Amendment No. +49,+w 22-&sect; 238 ACTIONS CONDITION I. As required by Required Action D .1 and referenced in Table 3.3.1.1-1.
C. Required Action and         C.1   Be in MODE 3.             12 hours associated Completion Time not met.               AND C.2   Be in MODE 4.             36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE                                  FREQUENCY SR 3.1.7.1       Verify available volume of sodium pentaborate     In accordance solution is ~ 4587 gallons.                       with the Surveillance Frequency Control Program Columbia Generating Station                  3.1.7-1      Amendment No. +e9,+9-9 ~ 238
J. Required Action and associated Completion Time of Condition I not met. RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 REQUIRED ACTION COMPLETION TIME 1.1 Initiate alternate method to 12 hours detect and suppress thermal hydraulic instability oscillations.
 
AND ---------------N 0 TE------------
SLC System 3.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY SR 3.1.7.2        Verify temperature of sodium pentaborate solution is   In accordance within the limits of Figure 3.1. 7-1.                   with the Surveillance Frequency Control Program SR 3.1.7.3        Verify continuity of explosive charge.                 In accordance with the Surveillance Frequency Control Program SR 3.1.7.4        Verify the concentration of boron in solution is within In accordance the limits of Figure 3.1. 7-1.                         with the Surveillance Frequency Control Program Once within 24 hours after water or boron is added to solution AND Once within 24 hours after solution temperature is restored within the limits of Figure 3.1.7-1 SR 3.1.7.5        Verify each SLC subsystem manual and power              In accordance operated valve in the flow path that is not locked,    with the sealed, or otherwise secured in position, is in the    Surveillance correct position or can be aligned to the correct      Frequency position.                                              Control Program Columbia Generating Station                  3.1.7-2        Amendment No. +es,.:t-99 ~ 238
-LCO 3.0.4 is not applicable.  
 
-------------------------------------1.2 Restore required channels 120 days to OPERABLE J.1 Reduce THERMAL 4 hours POWER to less than the value specified in the COLR. SURVEILLANCE REQUIREMENTS  
SLC System 3.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                  FREQUENCY SR 3.1.7.6        Verify each pump develops a flow rate   z 41.2 gpm   In accordance at a discharge pressure z 1220 psig.                 with the lnservice Testing Program SR 3.1.7.7       Verify flow through one SLC subsystem from pump     In accordance into reactor pressure vessel.                       with the Surveillance Frequency Control Program SR 3.1.7.8       Verify all heat traced piping between storage tank   In accordance and pump suction valve is unblocked.                 with the Surveillance Frequency Control Program AND Once within 24 hours after solution temperature is restored within the limits of Figure 3.1.7-1 SR 3.1.7.9       Verify sodium pentaborate enrichment is   z 44.0     Prior to addition to atom percent B-10.                                   SLC Tank Columbia Generating Station                  3.1.7-3        Amendment No. -+99,22+ ~      238
 
SDV Vent and Drain Valves 3.1.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                              FREQUENCY SR 3.1.8.1        --------------------- ----------NOTE------------------------------
Not required to be met on vent and drain valves closed during performance of SR 3.1 .8.2.
Verify each SDV vent and drain valve is open.                     In accordance with the Surveillance Frequency Control Program SR 3.1.8.2        Cycle each SDV vent and drain valve to the fully                   In accordance closed and fully open positiqn.                                   with the Surveillance Frequency Control Program SR 3.1.8.3        Verify each SDV vent and drain valve:                              In accordance with the
: a. Closes in s; 30 seconds after receipt of an                 Surveillance actual or simulated scram signal; and                       Frequency Control Program
: b. Opens when the actual or simulated scram signal is reset.
Columbia Generating Station                       3.1.8-2           Amendment No. +49-,+e9 ~ 238
 
APLHGR 3.2.1 3.2 POWER DISTRIBUTION LIMITS 3.2.1         AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)
LCO 3.2.1             All APLHGRs shall be less than or equal to the limits specified in the COLR.
APPLICABILITY:       THERMAL POWER :2: 25% RTP.
ACTIONS CONDITION                       REQUIRED ACTION               COMPLETION TIME A. Any APLHGR not within       A.1     Restore APLHGR(s) to         2 hours limits.                             within limits.
B. Required Action and         B.1     Reduce THERMAL               4 hours associated Completion               POWER to< 25% RTP.
Time not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                       FREQUENCY SR 3.2.1.1         Verify all APLHGRs are less than or equal to the         Once within limits specified in the COLR.                           12 hours after
:2:25% RTP In accordance with the Surveillance Frequency Control Program Columbia Generating Station                   3.2.1-1     Amendment No. +49,-+W ~ 238
 
MCPR 3.2.2 3.2 POWER DISTRIBUTION LIMITS 3.2.2         MINIMUM CRITICAL POWER RATIO (MCPR)
LCO 3.2.2             All MCPRs shall be greater than or equal to the MCPR operating limits specified in the COLR.
APPLICABILITY:         THERMAL POWER :2'. 25% RTP.
ACTIONS CONDITION                       REQUIRED ACTION             COMPLETION TIME A. Any MCPR not within           A.1     Restore MCPR(s) to within   2 hours limits.                               limits.
B. Required Action and           B.1     Reduce THERMAL             4 hours associated Completion                 POWER to< 25% RTP.
Time not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY SR 3.2.2.1         Verify all MCPRs are greater than or equal to the     Once within limits specified in the COLR.                         12 hours after
:2'. 25% RTP AND In accordance with the Surveillance Frequency Control Program Columbia Generating Station                     3.2.2-1     Amendment No. +w,a++ ~ 238
 
LHGR 3.2.3 3.2 POWER DISTRIBUTION LIMITS 3.2.3         LINEAR HEAT GENERATION RATE (LHGR)
LCO 3.2.3             All LHGRs shall be less than or equal to the limits specified in the COLR.
APPLICABILITY:       THERMAL POWER 2 25% RTP.
ACTIONS CONDITION                     REQUIRED ACTION                   COMPLETION TIME A. Any LHGR not within           A.1   Restore LHGR(s) to within         2 hours limits.                           limits.
B. Required Action and           B.1   Reduce THERMAL                   4 hours associated Completion             POWER to< 25% RTP.
Time not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY SR 3.2.3.1         Verify all LHGRs are less than or equal to the limits   Once within specified in the COLR.                                   12 hours after 2 25% RTP In accordance with the Surveillance Frequency Control Program Columbia Generating Station                 3.2.3-1         Amendment No. +49,+w 22-&sect; 238
 
RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 ACTIONS CONDITION                               REQUIRED ACTION                                COMPLETION TIME I. As required by Required             1.1        Initiate alternate method to                12 hours Action D .1 and                                 detect and suppress referenced in                                   thermal hydraulic instability Table 3.3.1.1-1.                                oscillations.
AND
                                                      ----- ---- ---- --N 0 TE------------ -
LCO 3.0.4 is not applicable.
                                                      ----- -------- ---- ---- ------- ---- ---- -
1.2       Restore required channels                   120 days to OPERABLE J. Required Action and                  J.1       Reduce THERMAL                               4 hours associated Completion                          POWER to less than the Time of Condition I not                        value specified in the met.                                            COLR.
SURVEILLANCE REQUIREMENTS
-----------------------------------------------------------NOTES----------------------------------------------------------
-----------------------------------------------------------NOTES----------------------------------------------------------
: 1. Refer to Table 3.3.1.1-1 to determine which SRs apply for each RPS Function.
: 1. Refer to Table 3.3.1.1-1 to determine which SRs apply for each RPS Function.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains RPS trip capability.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains RPS trip capability.
SURVEILLANCE SR 3.3.1.1.1 Perform CHANNEL CHECK. Columbia Generating Station 3.3.1.1-11 FREQUENCY In accordance with the Surveillance Frequency Control Program Amendment No. +e9 238 RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 SURVEILLANCE REQUIREMENTS SR 3.3.1.1.2 SR 3.3.1 .1 .3 SR 3.3.1.1.4 SR 3.3.1 .1 .5 SR 3.3.1.1.6 SURVEILLANCE
SURVEILLANCE                                                       FREQUENCY SR 3.3.1.1.1             Perform CHANNEL CHECK.                                                 In accordance with the Surveillance Frequency Control Program Columbia Generating Station                             3.3.1.1-11                 Amendment No. +e9 ~ ~ 238
-------------------------------NOTE------------------------------
 
Not required to be performed until 12 hours after THERMAL POWER 2 25% RTP. Verify the absolute difference between the average power range monitor (APRM) channels and the calculated power ::=:; 2% RTP while operating at 225% RTP. ------------------------
RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                    FREQUENCY SR 3.3.1.1.2     -------------------------------NOTE------------------------------
-------N 0 TE------------
Not required to be performed until 12 hours after THERMAL POWER 2 25% RTP.
------------------Not required to be performed when entering MODE 2 from MODE 1 until 12 hours after entering MODE 2. Perform CHANNEL FUNCTIONAL TEST. Perform CHANNEL FUNCTIONAL TEST. Verify the source range monitor (SRM) and intermediate range monitor (IRM) channels overlap. ---------------------
Verify the absolute difference between the average                       In accordance power range monitor (APRM) channels and the                               with the Surveillance calculated power ::=:; 2% RTP while operating at Frequency 225% RTP.
----------N 0 TE---------------------------
Control Program SR 3.3.1 .1 .3    ------------------------ ---- ---N 0 TE------------ -- ----- ---- -------
---0 n ly required to be met during entry into MODE 2 from MODE 1. Verify the IRM and APRM channels overlap. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Prior to withdrawing SRMs from the fully inserted position In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.1.1-12 Amendment No.
Not required to be performed when entering MODE 2 from MODE 1 until 12 hours after entering MODE 2.
2ae 238 RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.1.1.7 Calibrate the local power range monitors.
Perform CHANNEL FUNCTIONAL TEST.                                         In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.4      Perform CHANNEL FUNCTIONAL TEST.                                         In accordance with the Surveillance Frequency Control Program SR 3.3.1 .1 .5    Verify the source range monitor (SRM) and                                 Prior to intermediate range monitor (IRM) channels overlap.                       withdrawing SRMs from the fully inserted position SR 3.3.1.1.6      --------- ------------ --- ---- ---N 0 TE--------------------------- ---
In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.8 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.9 Deleted. SR 3.3.1.1.10  
0 n ly required to be met during entry into MODE 2 from MODE 1.
------------------------------NOTES---------------------------
Verify the IRM and APRM channels overlap.                                 In accordance with the Surveillance Frequency Control Program Columbia Generating Station                         3.3.1.1-12           Amendment No.       +SQ.~    2ae 238
 
RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                 FREQUENCY SR 3.3.1.1.7     Calibrate the local power range monitors.                           In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.8     Perform CHANNEL FUNCTIONAL TEST.                                   In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.9     Deleted.
SR 3.3.1.1.10     ------------------------------NOTES---------------------------
: 1. Neutron detectors are excluded.
: 1. Neutron detectors are excluded.
: 2. For Function 1, not required to be performed when entering MODE 2 from MODE 1 until 12 hours after entering MODE 2. 3. For Functions 2.b and 2.f, the recirculation flow transmitters that feed the APRMs are included.  
: 2. For Function 1, not required to be performed when entering MODE 2 from MODE 1 until 12 hours after entering MODE 2.
-------------------------------------------------------------------
: 3. For Functions 2.b and 2.f, the recirculation flow transmitters that feed the APRMs are included.
Perform CHANNEL CALIBRATION.
                  -------------------------------------------------------------------
In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.11 Deleted. SR 3.3.1.1.12 Verify Turbine Throttle Valve -Closure, and In accordance with Turbine Governor Valve Fast Closure Trip Oil the Surveillance Pressure -Low Functions are not bypassed when Frequency Control THERMAL POWER is 2 30% RTP. Program SR 3.3.1.1.13 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.1.1-13 Amendment No. +-79 22a 238 RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 SURVEILLANCE REQUIREMENTS SR 3.3.1.1.14 SR 3.3.1.1.15 SR 3.3.1.1.16 SR 3.3.1.1.17 SURVEILLANCE Perform LOGIC SYSTEM FUNCTIONAL TEST. ------------------------------NOTES-----------------------------
Perform CHANNEL CALIBRATION.                                       In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.11     Deleted.
SR 3.3.1.1.12     Verify Turbine Throttle Valve - Closure, and                       In accordance with Turbine Governor Valve Fast Closure Trip Oil                       the Surveillance Pressure - Low Functions are not bypassed when                     Frequency Control THERMAL POWER is 2 30% RTP.                                         Program SR 3.3.1.1.13     Perform CHANNEL FUNCTIONAL TEST.                                   In accordance with the Surveillance Frequency Control Program Columbia Generating Station                     3.3.1.1-13             Amendment No. +-79 22a ~ 238
 
RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                            FREQUENCY SR 3.3.1.1.14     Perform LOGIC SYSTEM FUNCTIONAL TEST.                            In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.15     ------------------------------NOTES-----------------------------
: 1. Neutron detectors are excluded.
: 1. Neutron detectors are excluded.
: 2. Channel sensors for Functions 3 and 4 are excluded.
: 2. Channel sensors for Functions 3 and 4 are excluded.
Verify the RPS RESPONSE TIME is within limits. ------------------------------NOTES-----------------------------
Verify the RPS RESPONSE TIME is within limits.                   In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.16    ------------------------------NOTES-----------------------------
: 1. For Function 2.a, not required to be performed when entering MODE 2 from MODE 1 until 12 hours after entering MODE 2. 2. For Functions 2.b and 2.f, the CHANNEL FUNCTIONAL TEST includes the recirculation flow input processing, excluding the flow transmitters.
: 1. For Function 2.a, not required to be performed when entering MODE 2 from MODE 1 until 12 hours after entering MODE 2.
Perform CHANNEL FUNCTIONAL TEST. Verify the OPRM is not bypassed when APRM Simulated Thermal Power is greater than or equal to the value specified in the COLR and recirculation drive flow is less than the value specified in the COLR. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.1.1-14 Amendment No. +w 238 ACTIONS CONDITION E. One or more required SRMs inoperable in MODE 5. E.1 REQUIRED ACTION Suspend CORE AL TE RATIONS except for control rod insertion.
: 2. For Functions 2.b and 2.f, the CHANNEL FUNCTIONAL TEST includes the recirculation flow input processing, excluding the flow transmitters.
SRM Instrumentation 3.3.1.2 COMPLETION TIME Immediately E.2 Initiate action to fully insert Immediately all insertable control rods in core cells containing one or more fuel assemblies.
Perform CHANNEL FUNCTIONAL TEST.                                 In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.17    Verify the OPRM is not bypassed when APRM                       In accordance Simulated Thermal Power is greater than or equal to             with the the value specified in the COLR and recirculation               Surveillance drive flow is less than the value specified in the               Frequency COLR.                                                           Control Program Columbia Generating Station                     3.3.1.1-14         Amendment No.     +w ~ ~ 238
SURVEILLANCE REQUIREMENTS  
 
SRM Instrumentation 3.3.1.2 ACTIONS CONDITION                                 REQUIRED ACTION                      COMPLETION TIME E. One or more required                   E.1       Suspend CORE                         Immediately SRMs inoperable in                              AL TE RATIONS except for MODE 5.                                        control rod insertion.
E.2       Initiate action to fully insert     Immediately all insertable control rods in core cells containing one or more fuel assemblies.
SURVEILLANCE REQUIREMENTS
------------------------------------------------------------NOTE-----------------------------------------------------------
------------------------------------------------------------NOTE-----------------------------------------------------------
Refer to Table 3.3.1.2-1 to determine which SRs apply for each applicable MODE or other specified conditions.
Refer to Table 3.3.1.2-1 to determine which SRs apply for each applicable MODE or other specified conditions.
SURVEILLANCE SR 3.3.1.2.1 Perform CHANNEL CHECK. Columbia Generating Station 3.3.1.2-2 FREQUENCY In accordance with the Surveillance Frequency Control Program Amendment No. +49,+e9 238 SURVEILLANCE REQUIREMENTS SR 3.3.1.2.2 SR 3.3.1.2.3 . SR 3.3.1 .2.4 SURVEILLANCE
SURVEILLANCE                                                 FREQUENCY SR 3.3.1.2.1             Perform CHANNEL CHECK.                                               In accordance with the Surveillance Frequency Control Program Columbia Generating Station                               3.3.1.2-2           Amendment No. +49,+e9 ~ 238
------------------------------NOTES-----------------------------1 . Only required to be met during CORE AL TE RATIONS. 2. One SRM may be used to satisfy more than one of the following.
 
Verify an OPERABLE SRM detector is located in: a. The fueled region; b. The core quadrant where CORE AL TE RATIONS are being performed when the associated SRM is included in the fueled region; and c. A core quadrant adjacent to where CORE ALTERATIONS are being performed, when the associated SRM is included in the fueled region. Perform CHANNEL CHECK. ------------------------
SRM Instrumentation 3.3.1 .2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                    FREQUENCY SR 3.3.1.2.2     ------------------------------NOTES-----------------------------
-------N 0 TE---------------------------
1 . Only required to be met during CORE AL TE RATIONS.
---Not required to be met with less than or equal to four fuel assemblies adjacent to the SRM and no other fuel assemblies in the associated core quadrant.
: 2. One SRM may be used to satisfy more than one of the following.
Verify count rate is: a. 2 3.0 cps with a signal to noise ratio 2 2:1 or b. 2 0.7 cps with a signal to noise ratio 2 20:1. SRM Instrumentation 3.3.1 .2 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.1.2-3 Amendment No. +49,.:t-W 22-&sect; 238 SURVEILLANCE REQUIREMENTS SR 3.3.1.2.5 SR 3.3.1 .2.6 SR 3.3.1.2.7 SURVEILLANCE
Verify an OPERABLE SRM detector is located in:                            In accordance with the
-------------
: a. The fueled region;                                                 Surveillance Frequency
------------------N 0 TE---------------------------
: b. The core quadrant where CORE                                       Control Program AL TE RATIONS are being performed when the associated SRM is included in the fueled region; and
---The determination of signal to noise ratio is not required to be met with less than or equal to four fuel assemblies adjacent to the SRM and no other fuel assemblies in the associated core quadrant.
: c. A core quadrant adjacent to where CORE ALTERATIONS are being performed, when the associated SRM is included in the fueled region.
Perform CHANNEL FUNCTIONAL TEST and determination of signal to noise ratio. -------------------------------NO TE------------
SR 3.3.1.2.3      Perform CHANNEL CHECK.                                                   In accordance with the Surveillance Frequency Control Program
---------------
. SR 3.3.1 .2.4    --------- ---- ----------- ---- ---N 0 TE--------------------------- ---
---Not required to be performed until 12 hours after IRMs on Range 2 or below. Perform CHANNEL FUNCTIONAL TEST and determination of signal to noise ratio. ------------------------------NOTES--------------------------
Not required to be met with less than or equal to four fuel assemblies adjacent to the SRM and no other fuel assemblies in the associated core quadrant.
---1. Neutron detectors are excluded.
Verify count rate is:                                                    In accordance with the
: 2. Not required to be performed until 12 hours after IRMs on Range 2 or below. Perform CHANNEL CALIBRATION.
: a. 2 3.0 cps with a signal to noise ratio 2 2:1 or                     Surveillance Frequency
SRM Instrumentation 3.3.1.2 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.1.2-4 Amendment No. -+49,.+w 22-9 238 Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 SURVEILLANCE REQUIREMENTS  
: b. 2 0.7 cps with a signal to noise ratio 2 20:1.                     Control Program Columbia Generating Station                         3.3.1.2-3           Amendment No. +49,.:t-W 22-&sect; 238
 
SRM Instrumentation 3.3.1.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                    FREQUENCY SR 3.3.1.2.5      ------------- ------------------N 0 TE--------------------------- -- -
The determination of signal to noise ratio is not required to be met with less than or equal to four fuel assemblies adjacent to the SRM and no other fuel assemblies in the associated core quadrant.
Perform CHANNEL FUNCTIONAL TEST and                                     In accordance determination of signal to noise ratio.                                 with the Surveillance Frequency Control Program SR 3.3.1 .2.6    -------------------------------NOTE------------------------------
Not required to be performed until 12 hours after IRMs on Range 2 or below.
Perform CHANNEL FUNCTIONAL TEST and                                     In accordance determination of signal to noise ratio.                                 with the Surveillance Frequency Control Program SR 3.3.1.2.7      ----------------- -------------NOTES-----------------------------
: 1. Neutron detectors are excluded.
: 2. Not required to be performed until 12 hours after IRMs on Range 2 or below.
Perform CHANNEL CALIBRATION.                                           In accordance with the Surveillance Frequency Control Program Columbia Generating Station                       3.3.1.2-4           Amendment No. -+49,.+w 22-9 238
 
Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 SURVEILLANCE REQUIREMENTS
-----------------------------------------------------------NOTES----------------------------------------------------------
-----------------------------------------------------------NOTES----------------------------------------------------------
: 1. Refer to Table 3.3.2.1-1 to determine which SRs apply for each Control Rod Block Function.
: 1.     Refer to Table 3.3.2.1-1 to determine which SRs apply for each Control Rod Block Function.
: 2. When an RBM channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains control rod block capability.
: 2. When an RBM channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains control rod block capability.
SR 3.3.2.1 .1 SR 3.3.2.1.2 SR 3.3.2.1 .3 SURVEILLANCE Perform CHANNEL FUNCTIONAL TEST. -------------------------------N 0 TE---------------------------
SURVEILLANCE                                                    FREQUENCY SR 3.3.2.1 .1             Perform CHANNEL FUNCTIONAL TEST.                                          In accordance with the Surveillance Frequency Control Program SR 3.3.2.1.2             ----- ---- ---- ---- ------- ---- ---N 0 TE--------------------------- ---
---Not required to be performed until 1 hour after any control rod is withdrawn at 10% RTP in MODE 2. Perform CHANNEL FUNCTIONAL TEST. -------------------------------N 0 TE---------------------------
Not required to be performed until 1 hour after any control rod is withdrawn at ~ 10% RTP in MODE 2.
---Not required to be performed until 1 hour after THERMAL POWER is:.::: 10% RTP in MODE 1. Perform CHANNEL FUNCTIONAL TEST. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.2.1-9 Amendment No. +SQ. 2ae 2ae 238 Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 SURVEILLANCE REQUIREMENTS SR 3.3.2.1.4 SR 3.3.2.1.5 SR 3.3.2.1.6 SURVEILLANCE
Perform CHANNEL FUNCTIONAL TEST.                                         In accordance with the Surveillance Frequency Control Program SR 3.3.2.1 .3            --------- -------- ---- --- ---- ---N 0 TE--------------------------- ---
-------------------------------NOTE------------------------------
Not required to be performed until 1 hour after THERMAL POWER is:.::: 10% RTP in MODE 1.
Perform CHANNEL FUNCTIONAL TEST.                                           In accordance with the Surveillance Frequency Control Program Columbia Generating Station                                   3.3.2.1-9           Amendment No. +SQ. 2ae 2ae 238
 
Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                  FREQUENCY SR 3.3.2.1.4     -------------------------------NOTE------------------------------
Neutron detectors are excluded.
Neutron detectors are excluded.
Verify the RBM is not bypassed:
Verify the RBM is not bypassed:                                       In accordance with the
: a. Low Power Range -Upscale Function is not bypassed when APRM Simulated Thermal Power is ;;:: 28% and < 63% RTP and peripheral control rod is not selected.
: a. Low Power Range - Upscale Function is not                       Surveillance bypassed when APRM Simulated Thermal                           Frequency Power is ;;:: 28% and < 63% RTP and peripheral                 Control Program control rod is not selected.
: b. Intermediate Power Range -Upscale Function is not bypassed when APRM Simulated Thermal Power is ;;:: 63% and < 83% RTP and peripheral control rod is not selected.
: b. Intermediate Power Range - Upscale Function is not bypassed when APRM Simulated Thermal Power is ;;:: 63% and < 83% RTP and peripheral control rod is not selected.
: c. High Power Range -Upscale Function is not bypassed when APRM Simulated Thermal Power is ;;:: 83% and peripheral control rod is not selected.  
: c. High Power Range - Upscale Function is not bypassed when APRM Simulated Thermal Power is ;;:: 83% and peripheral control rod is not selected.
-------------
SR 3.3.2.1.5      ------------- ------------------N 0 TE--------------------------- ---
------------------N 0 TE---------------------------
Neutron detectors are excluded.
---Neutron detectors are excluded.
Perform CHANNEL CALIBRATION.                                         In accordance with the Surveillance Frequency Control Program SR 3.3.2.1.6      Verify the RWM is not bypassed when THERMAL                           In accordance POWER is:::;; 10% RTP.                                               with the Surveillance Frequency Control Program Columbia Generating Station                     3.3.2.1-10           Amendment No. +79 ~ ~ 238
Perform CHANNEL CALIBRATION.
 
Verify the RWM is not bypassed when THERMAL POWER is:::;; 10% RTP. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.2.1-10 Amendment No. +79 238 Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 SURVEILLANCE REQUIREMENTS SR 3.3.2.1.7 SR 3.3.2.1.8 SURVEILLANCE
Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                FREQUENCY SR 3.3.2.1.7     -------------------------------N 0 TE--------------------------- ---
-------------------------------N 0 TE---------------------------
Not required to be performed until 1 hour after reactor mode switch is in the shutdown position.
---Not required to be performed until 1 hour after reactor mode switch is in the shutdown position.
Perform CHANNEL FUNCTIONAL TEST.                                     In accordance with the Surveillance Frequency Control Program SR 3.3.2.1.8      Verify control rod sequences input to the RWM are                   Prior to declaring in conformance with BPWS.                                           RWM OPERABLE following loading of sequence into RWM Columbia Generating Station                     3.3.2.1-11                       Amendment No. ~ 238
Perform CHANNEL FUNCTIONAL TEST. Verify control rod sequences input to the RWM are in conformance with BPWS. FREQUENCY In accordance with the Surveillance Frequency Control Program Prior to declaring RWM OPERABLE following loading of sequence into RWM Columbia Generating Station 3.3.2.1-11 Amendment No. 238 Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 Table 3.3.2.1-1 (page 1 of 2) Control Rod Block Instrumentation APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS CHANNELS REQUIREMENTS VALUE 1. Rod Block Monitor a. Low Power Range -Upscale (a) 2 SR 3.3.2.1.1 (f) SR 3.3.2.1.4 SR 3.3.2.1.5 1 dl.lel b. Intermediate Power Range -(b) 2 SR 3.3.2.1.1 (f) Upscale SR 3.3.2.1.4 SR 3.3.2.1.5 1 di.lel c. High Power Range -Upscale (c) 2 SR 3.3.2.1.1 (f) SR 3.3.2.1.4 SR 3.3.2.1.5 1 dJ,leJ d. lnop (a),(b),(c) 2 SR 3.3.2.1.1 NA (a) APRM Simulated Thermal Power is ;e: 28% and< 63% RTP and MCPR is less than the limit specified in the COLR and no peripheral control rod selected. (b) APRM Simulated Thermal Power is ;e: 63% and< 83% RTP and MCPR is less than the limit specified in the COLR and no peripheral control rod selected. (c) APRM Simulated Thermal Power is ;e: 83% and MCPR is less than the limit specified in the COLR and no peripheral control rod selected. (d) If the as-found channel setpoint is outside its predefined as-found tolerance, then the channel shall be evaluated to verify that it is functioning as required before returning the channel to service. (e) The instrument channel setpoint shall be reset to a value that is within the as-left tolerance around the Limiting Trip Setpoint (L TSP) at the completion of the surveillance; otherwise, the channel shall be declared inoperable.
 
Setpoints more conservative than the L TSP are acceptable provided that the as-found and as-left tolerances apply to the actual setpoint implemented in the surveillance procedures (Nominal Trip Setpoint) to confirm channel performance.
Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 Table 3.3.2.1-1 (page 1 of 2)
The L TSP and the methodologies used to determine the as-found and as-left tolerances are specified in the Licensee Controlled Specifications. (f) Allowable Value Specified in the COLR. Columbia Generating Station 3.3.2.1-12 Amendment No. 226 238 Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 Table 3.3.2.1-1 (page 2 of 2) Control Rod Block Instrumentation FUNCTION 2. Rod Worth Minimizer
Control Rod Block Instrumentation APPLICABLE MODES OR OTHER SPECIFIED     REQUIRED         SURVEILLANCE           ALLOWABLE FUNCTION                         CONDITIONS     CHANNELS         REQUIREMENTS             VALUE
: 3. Reactor Mode Switch -Shutdown Position (g) With THERMAL 10% RTP. APPLICABLE MODES OR OTHER SPECIFIED REQUIRED CONDITIONS CHANNELS 1191, 2191 (h) 2 (h) Reactor mode switch in the shutdown position.
: 1. Rod Block Monitor
Columbia Generating Station 3.3.2.1-13 SURVEILLANCE REQUIREMENTS SR 3.3.2.1.2 SR 3.3.2.1.3 SR 3.3.2.1.6 SR 3.3.2.1.8 SR 3.3.2.1.7 ALLOWABLE VALUE NA NA Amendment No. 238 Feedwater and Main Turbine High Water Level Trip Instrumentation 3.3.2.2 SURVEILLANCE REQUIREMENTS  
: a. Low Power Range - Upscale                 (a)             2             SR 3.3.2.1.1         (f)
SR 3.3.2.1.4 SR 3.3.2.1.5 1dl.lel
: b. Intermediate Power Range -                 (b)             2             SR 3.3.2.1.1         (f)
Upscale                                                                 SR 3.3.2.1.4 SR 3.3.2.1.5 1di.lel
: c. High Power Range - Upscale                 (c)             2             SR 3.3.2.1.1         (f)
SR 3.3.2.1.4 SR 3.3.2.1.5 1dJ,leJ
: d. lnop                                   (a),(b),(c)         2             SR 3.3.2.1.1         NA (a)   APRM Simulated Thermal Power is ;e: 28% and< 63% RTP and MCPR is less than the limit specified in the COLR and no peripheral control rod selected.
(b)   APRM Simulated Thermal Power is ;e: 63% and< 83% RTP and MCPR is less than the limit specified in the COLR and no peripheral control rod selected.
(c)   APRM Simulated Thermal Power is ;e: 83% and MCPR is less than the limit specified in the COLR and no peripheral control rod selected.
(d)   If the as-found channel setpoint is outside its predefined as-found tolerance, then the channel shall be evaluated to verify that it is functioning as required before returning the channel to service.
(e)   The instrument channel setpoint shall be reset to a value that is within the as-left tolerance around the Limiting Trip Setpoint (LTSP) at the completion of the surveillance; otherwise, the channel shall be declared inoperable.
Setpoints more conservative than the LTSP are acceptable provided that the as-found and as-left tolerances apply to the actual setpoint implemented in the surveillance procedures (Nominal Trip Setpoint) to confirm channel performance. The LTSP and the methodologies used to determine the as-found and as-left tolerances are specified in the Licensee Controlled Specifications.
(f)   Allowable Value Specified in the COLR.
Columbia Generating Station                               3.3.2.1-12                     Amendment No. 226 238
 
Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 Table 3.3.2.1-1 (page 2 of 2)
Control Rod Block Instrumentation APPLICABLE MODES OR OTHER SPECIFIED     REQUIRED SURVEILLANCE  ALLOWABLE FUNCTION                    CONDITIONS     CHANNELS REQUIREMENTS    VALUE
: 2. Rod Worth Minimizer                      1191, 2191             SR 3.3.2.1.2 NA SR 3.3.2.1.3 SR 3.3.2.1.6 SR 3.3.2.1.8
: 3. Reactor Mode Switch - Shutdown              (h)        2      SR 3.3.2.1.7 NA Position (g)    With THERMAL  POWER~      10% RTP.
(h)    Reactor mode switch in the shutdown position.
Columbia Generating Station                          3.3.2.1-13                Amendment No. 238
 
Feedwater and Main Turbine High Water Level Trip Instrumentation 3.3.2.2 SURVEILLANCE REQUIREMENTS
------------------------------------------------------------NOTE-----------------------------------------------------------
------------------------------------------------------------NOTE-----------------------------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided feedwater and main turbine high water level trip capability is maintained.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided feedwater and main turbine high water level trip capability is maintained.
SR 3.3.2.2.1 SR 3.3.2.2.2 SR 3.3.2.2.3 SR 3.3.2.2.4 SURVEILLANCE Perform CHANNEL CHECK. Perform CHANNEL FUNCTIONAL TEST. Perform CHANNEL CALIBRATION.
SURVEILLANCE                                                  FREQUENCY SR 3.3.2.2.1             Perform CHANNEL CHECK.                                              In accordance with the Surveillance Frequency Control Program SR 3.3.2.2.2             Perform CHANNEL FUNCTIONAL TEST.                                    In accordance with the Surveillance Frequency Control Program SR 3.3.2.2.3             Perform CHANNEL CALIBRATION. The Allowable                           In accordance Value shall be~ 56.0 inches.                                         with the Surveillance Frequency Control Program SR 3.3.2.2.4              Perform LOGIC SYSTEM FUNCTIONAL TEST,                               In accordance including valve actuation.                                           with the Surveillance Frequency Control Program Columbia Gene.rating Station                             3.3.2.2-2         Amendment No. +49,.:f.6.9 22&sect; 238
The Allowable Value shall 56.0 inches. Perform LOGIC SYSTEM FUNCTIONAL TEST, including valve actuation.
 
FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Gene.rating Station 3.3.2.2-2 Amendment No. +49,.:f.6.9 22&sect; 238 ACTIONS CONDITION E. As required by Required E.1 Action D.1 and referenced in Table 3.3.3.1-1.
PAM Instrumentation 3.3.3.1 ACTIONS CONDITION                                 REQUIRED ACTION                      COMPLETION TIME E. As required by Required                 E.1       Be in MODE 3.                      12 hours Action D.1 and referenced in Table 3.3.3.1-1.
F. As required by Required F.1 Action D .1 and referenced in Table 3.3.3.1-1.
F. As required by Required                 F.1       Initiate action in accordance      Immediately Action D.1 and                                 with Specification 5.6.4.
SURVEILLANCE REQUIREMENTS REQUIRED ACTION Be in MODE 3. Initiate action in accordance with Specification 5.6.4. PAM Instrumentation 3.3.3.1 COMPLETION TIME 12 hours Immediately
referenced in Table 3.3.3.1-1.
SURVEILLANCE REQUIREMENTS
-----------------------------------------------------------NOTES----------------------------------------------------------
-----------------------------------------------------------NOTES----------------------------------------------------------
: 1. These SRs apply to each Function in Table 3.3.3.1-1.
: 1.       These SRs apply to each Function in Table 3.3.3.1-1.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the other required channel(s) in the associated Function is OPERABLE.
: 2.       When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the other required channel(s) in the associated Function is OPERABLE.
SR 3.3.3.1 .1 SR 3.3.3.1 .2 SR 3.3.3.1.3 SURVEILLANCE Perform CHANNEL CHECK. Deleted Perform CHANNEL CALIBRATION for Functions 1, 2, 4, 5, and 10. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.3.1-2 Amendment No . .:t-89,+w-22-6 238 SURVEILLANCE REQUIREMENTS SR 3.3.3.1.4 SURVEILLANCE Perform CHANNEL CALIBRATION for Functions 3, 6, and 7. Columbia Generating Station 3.3.3.1-3 PAM Instrumentation 3.3.3.1 FREQUENCY In accordance with the Surveillance Frequency Control Program Amendment No.+39,200 238 Table 3.3.3.1-1 (page 1 of 1) Post Accident Monitoring Instrumentation FUNCTION 1. Reactor Vessel Pressure 2. Reactor Vessel Water Level a. -150 inches to +60 inches b. -310 inches to -110 inches 3. Suppression Pool Water Level a. -25 inches to +25 inches b. 2 ft to 52 ft 4. Suppression Chamber Pressure 5. Drywell Pressure a. -5 psig to +3 psig b. O psig to 25 psig c. 0 psig to 180 psig 6. Primary Containment Area Radiation
SURVEILLANCE                                                FREQUENCY SR 3.3.3.1 .1             Perform CHANNEL CHECK.                                              In accordance with the Surveillance Frequency Control Program SR 3.3.3.1 .2             Deleted SR 3.3.3.1.3             Perform CHANNEL CALIBRATION for Functions 1,                       In accordance 2, 4, 5, and 10.                                                     with the Surveillance Frequency Control Program Columbia Generating Station                               3.3.3.1-2         Amendment No ..:t-89,+w- 22-6 238
: 7. Penetration Flow Path PCIV Position 8. Deleted 9. Deleted 10. ECCS Pump Room Flood Level REQUIRED CHANNELS 2 2 2 2 2 2 2 2 2 2 2 per penetration flow path(a) (bl 5 PAM Instrumentation 3.3.3.1 CONDITIONS REFERENCED FROM REQUIRED ACTION D.1 E E E E E E E E E F E E (a) Not required for isolation valves whose associated penetration flow path is isolated by at least one closed and de-activated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured. (b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel. Columbia Generating Station 3.3.3.1-4 Amendment No. 238 3.3 INSTRUMENTATION 3.3.3.2 Remote Shutdown System Remote Shutdown System 3.3.3.2 LCO 3.3.3.2 The Remote Shutdown System Functions shall be OPERABLE.
 
APPLICABILITY:
PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                          FREQUENCY SR 3.3.3.1.4     Perform CHANNEL CALIBRATION for             In accordance Functions 3, 6, and 7.                       with the Surveillance Frequency Control Program Columbia Generating Station               3.3.3.1-3 Amendment No.+39,200 ~ 238
MODES 1 and 2. ACTIONS -----------------------------------------------------------N 0 T E-----------------------------------------------------------
 
PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page 1 of 1)
Post Accident Monitoring Instrumentation CONDITIONS REFERENCED REQUIRED                FROM REQUIRED FUNCTION                                     CHANNELS                    ACTION D.1
: 1. Reactor Vessel Pressure                                                 2                          E
: 2. Reactor Vessel Water Level
: a.   -150 inches to +60 inches                                         2                          E
: b.   -310 inches to -110 inches                                       2                          E
: 3. Suppression Pool Water Level
: a.   -25 inches to +25 inches                                           2                          E
: b. 2 ft to 52 ft                                                     2                          E
: 4. Suppression Chamber Pressure                                           2                          E
: 5. Drywell Pressure
: a.   -5 psig to +3 psig                                                 2                          E
: b. O psig to 25 psig                                                 2                          E
: c. 0 psig to 180 psig                                                 2                          E
: 6. Primary Containment Area Radiation                                     2                          F
: 7. Penetration Flow Path PCIV Position                         2 per penetration flow                E path(a) (bl
: 8. Deleted
: 9. Deleted
: 10. ECCS Pump Room Flood Level                                             5                           E (a)   Not required for isolation valves whose associated penetration flow path is isolated by at least one closed and de-activated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.
(b)   Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.
Columbia Generating Station                           3.3.3.1-4                             Amendment No. 238
 
Remote Shutdown System 3.3.3.2 3.3 INSTRUMENTATION 3.3.3.2         Remote Shutdown System LCO 3.3.3.2                   The Remote Shutdown System Functions shall be OPERABLE.
APPLICABILITY:               MODES 1 and 2.
ACTIONS
-----------------------------------------------------------N 0 T E-----------------------------------------------------------
Separate Condition entry is allowed for each Function.
Separate Condition entry is allowed for each Function.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore required Function 30 days Functions inoperable.
CONDITION                               REQUIRED ACTION                           COMPLETION TIME A. One or more required                   A.1       Restore required Function               30 days Functions inoperable.                           to OPERABLE status.
to OPERABLE status. B. Required Action and B.1 Be in MODE 3. 12 hours associated Completion Time not met. SURVEILLANCE REQUIREMENTS  
B. Required Action and                   B.1       Be in MODE 3.                           12 hours associated Completion Time not met.
SURVEILLANCE REQUIREMENTS
-----------------------------------------------------------NOTE-----------------------------------------------------------
-----------------------------------------------------------NOTE-----------------------------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours. SR 3.3.3.2.1 SURVEILLANCE Perform CHANNEL CHECK for each required instrumentation channel that is normally energized.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours.
FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.3.2-1 Amendment No. +es,+&7 a29 238 SURVEILLANCE REQUIREMENTS SR 3.3.3.2.2 SR 3.3.3.2.3 SR 3.3.3.2.4 SURVEILLANCE Perform CHANNEL CALIBRATION for each required instrumentation channel, except the suppression pool water level instrumentation channel. Perform CHANNEL CALIBRATION tor the suppression pool water level instrumentation channel. Verify each required control circuit and transfer switch is capable of performing the intended functions.
SURVEILLANCE                                                    FREQUENCY SR 3.3.3.2.1             Perform CHANNEL CHECK for each required                                 In accordance instrumentation channel that is normally energized.                     with the Surveillance Frequency Control Program Columbia Generating Station                               3.3.3.2-1           Amendment No. +es,+&7 a29 238
Remote Shutdown System 3.3.3.2 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.3.2-2 Amendment No. +49,-+W 238 ACTIONS CONDITION
 
: 8. One or more Functions 8.1 with EOC-RPT trip capability not maintained.
Remote Shutdown System 3.3.3.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY SR 3.3.3.2.2     Perform CHANNEL CALIBRATION for each                   In accordance required instrumentation channel, except the          with the suppression pool water level instrumentation           Surveillance channel.                                               Frequency Control Program SR 3.3.3.2.3      Perform CHANNEL CALIBRATION tor the                   In accordance suppression pool water level instrumentation           with the channel.                                               Surveillance Frequency Control Program SR 3.3.3.2.4      Verify each required control circuit and transfer     In accordance switch is capable of performing the intended           with the functions.                                             Surveillance Frequency Control Program Columbia Generating Station               3.3.3.2-2         Amendment No. +49,-+W ~ 238
OR AND 8.2 MCPR limit for inoperable EOC-RPT not made applicable.
 
C. Required Action and C.1 associated Completion Time not met. OR C.2 SURVEILLANCE REQUIREMENTS REQUIRED ACTION Restore EOC-RPT trip capability.
EOC-RPT Instrumentation 3.3.4.1 ACTIONS CONDITION                                 REQUIRED ACTION                      COMPLETION TIME
Apply the MCPR limit for inoperable EOC-RPT as specified in the COLR. Remove the associated recirculation pump from service. Reduce THERMAL POWER to< 30% RTP. EOC-RPT Instrumentation 3.3.4.1 COMPLETION TIME 2 hours 2 hours 4 hours 4 hours ------------------------------------------------------------NOTE-----------------------------------------------------------
: 8. One or more Functions                   8.1       Restore EOC-RPT trip                2 hours with EOC-RPT trip                               capability.
capability not maintained.                         OR AND                                   8.2       Apply the MCPR limit for             2 hours inoperable EOC-RPT as MCPR limit for                                  specified in the COLR.
inoperable EOC-RPT not made applicable.
C. Required Action and                   C.1       Remove the associated                4 hours associated Completion                           recirculation pump from Time not met.                                   service.
OR C.2       Reduce THERMAL                       4 hours POWER to< 30% RTP.
SURVEILLANCE REQUIREMENTS
------------------------------------------------------------NOTE-----------------------------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains EOC-RPT trip capability.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains EOC-RPT trip capability.
SURVEILLANCE FREQUENCY SR 3.3.4.1 .1 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.4.1-2 Amendment No. +49,.:t-W 238 EOC-RPT Instrumentation 3.3.4.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.4.1.2.a Perform CHANNEL CALIBRATION.
SURVEILLANCE                                                 FREQUENCY SR 3.3.4.1 .1             Perform CHANNEL FUNCTIONAL TEST.                                     In accordance with the Surveillance Frequency Control Program Columbia Generating Station                               3.3.4.1-2         Amendment No. +49,.:t-W ~ 238
The Allowable In accordance with Value shall be: the Surveillance Frequency Control TTV -
 
7% closed. Program SR 3.3.4.1.2.b Perform CHANNEL CALIBRATION.
EOC-RPT Instrumentation 3.3.4.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                   FREQUENCY SR 3.3.4.1.2.a   Perform CHANNEL CALIBRATION. The Allowable                           In accordance with Value shall be:                                                       the Surveillance Frequency Control TTV -   Closure:~    7% closed.                                     Program SR 3.3.4.1.2.b   Perform CHANNEL CALIBRATION. The Allowable                             In accordance with Value shall be:                                                       the Surveillance Frequency Control TGV Fast Closure, Trip Oil Pressure - Low:                           Program
The Allowable In accordance with Value shall be: the Surveillance Frequency Control TGV Fast Closure, Trip Oil Pressure -Low: Program 1000 psig. SR 3.3.4.1.3 Verify TTV -Closure and TGV Fast Closure, Trip In accordance with Oil Pressure -Low Functions are not bypassed the Surveillance when THERMAL POWER 30% RTP. Frequency Control Program SR 3.3.4.1.4 Perform LOGIC SYSTEM FUNCTIONAL TEST, In accordance with including breaker actuation.
                  ~ 1000 psig.
the Surveillance Frequency Control Program SR 3.3.4.1.5  
SR 3.3.4.1.3     Verify TTV - Closure and TGV Fast Closure, Trip                       In accordance with Oil Pressure - Low Functions are not bypassed                         the Surveillance when THERMAL POWER is~ 30% RTP.                                       Frequency Control Program SR 3.3.4.1.4     Perform LOGIC SYSTEM FUNCTIONAL TEST,                                 In accordance with including breaker actuation.                                         the Surveillance Frequency Control Program SR 3.3.4.1.5     -------------------------------N 0 TE------------------------------
-------------------------------N 0 TE---------------------------
Breaker arc suppression time may be assumed from the most recent performance of SR 3.3.4.1 .6.
---Breaker arc suppression time may be assumed from the most recent performance of SR 3.3.4.1 .6. ---------------------------------------------------------------------
                  ---------------------------------------------------------------------
Verify the EOC-RPT SYSTEM RESPONSE TIME is In accordance with within limits. the Surveillance Frequency Control Program SR 3.3.4.1 .6 Determine RPT breaker arc suppression time. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.4.1-3 Amendment No. 168, 169 225 238 ACTIONS CONDITION C. Both Functions with C.1 REQUIRED ACTION Restore A TWS-RPT trip A TWS-RPT Instrumentation 3.3.4.2 COMPLETION TIME 1 hour A TWS-RPT trip capability for one Function.
Verify the EOC-RPT SYSTEM RESPONSE TIME is                           In accordance with within limits.                                                       the Surveillance Frequency Control Program SR 3.3.4.1 .6     Determine RPT breaker arc suppression time.                           In accordance with the Surveillance Frequency Control Program Columbia Generating Station                     3.3.4.1-3             Amendment No. 168, 169 225 238
 
A TWS-RPT Instrumentation 3.3.4.2 ACTIONS CONDITION                               REQUIRED ACTION                        COMPLETION TIME C. Both Functions with                   C.1       Restore A TWS-RPT trip               1 hour A TWS-RPT trip                                 capability for one Function.
capability not maintained.
capability not maintained.
D. Required Action and D.1 Remove the associated 6 hours associated Completion recirculation pump from Time not met. service. OR D.2 Be in MODE 2. 6 hours SURVEILLANCE REQUIREMENTS  
D. Required Action and                     D.1       Remove the associated               6 hours associated Completion                           recirculation pump from Time not met.                                   service.
OR D.2       Be in MODE 2.                       6 hours SURVEILLANCE REQUIREMENTS
------------------------------------------------------------NOTE-----------------------------------------------------------
------------------------------------------------------------NOTE-----------------------------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains A TWS-RPT trip capability.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains A TWS-RPT trip capability.
SR 3.3.4.2.1 SR 3.3.4.2.2 SURVEILLANCE Perform CHANNEL CHECK for Reactor Vessel Water Level -Low Low, Level 2 Function.
SURVEILLANCE                                                  FREQUENCY SR 3.3.4.2.1             Perform CHANNEL CHECK for Reactor Vessel                             In accordance Water Level - Low Low, Level 2 Function.                             with the Surveillance Frequency Control Program SR 3.3.4.2.2              Perform CHANNEL FUNCTIONAL TEST.                                    In accordance with the Surveillance Frequency Control Program Columbia Generating Station                               3.3.4.2-2         Amendment No. +49,+w ~ 238
Perform CHANNEL FUNCTIONAL TEST. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.4.2-2 Amendment No. +49,+w 238 A TWS-RPT Instrumentation 3.3.4.2 SURVEILLANCE REQUIREMENTS SR 3.3.4.2.3 SR 3.3.4.2.4 SURVEILLANCE Perform CHANNEL CALIBRATION.
 
The Allowable Values shall be: a. Reactor Vessel Water Level -Low Low, Level 2: 2". -58 inches; and b. Reactor Vessel Steam Dome Pressure -High: ::::; 1143 psig. Perform LOGIC SYSTEM FUNCTIONAL TEST, including breaker actuation.
A TWS-RPT Instrumentation 3.3.4.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                FREQUENCY SR 3.3.4.2.3     Perform CHANNEL CALIBRATION. The Allowable           In accordance Values shall be:                                    with the Surveillance
FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.4.2-3 Amendment No . .:t-49,+69 22&sect; 238 ACTIONS CONDITION H. Required Action and associated Completion Time of Condition B, C, D, E, F, or G not met. H.1 SURVEILLANCE REQUIREMENTS REQUIRED ACTION Declare associated supported feature(s) inoperable.
: a. Reactor Vessel Water Level - Low Low, Level 2: Frequency 2". -58 inches; and                             Control Program
ECCS Instrumentation 3.3.5.1 COMPLETION TIME Immediately
: b. Reactor Vessel Steam Dome Pressure - High:
::::; 1143 psig.
SR 3.3.4.2.4      Perform LOGIC SYSTEM FUNCTIONAL TEST,               In accordance including breaker actuation.                         with the Surveillance Frequency Control Program Columbia Generating Station                 3.3.4.2-3     Amendment No . .:t-49,+69 22&sect; 238
 
ECCS Instrumentation 3.3.5.1 ACTIONS CONDITION                               REQUIRED ACTION                      COMPLETION TIME H. Required Action and                   H.1        Declare associated                  Immediately associated Completion                           supported feature(s)
Time of Condition B, C,                         inoperable.
D, E, F, or G not met.
SURVEILLANCE REQUIREMENTS
-----------------------------------------------------------NOTES----------------------------------------------------------
-----------------------------------------------------------NOTES----------------------------------------------------------
: 1. Refer to Table 3.3.5.1-1 to determine which SRs apply for each ECCS Function.
: 1. Refer to Table 3.3.5.1-1 to determine which SRs apply for each ECCS Function.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours for Functions 3.c, 3.f, and 3.g; and (b) for up to 6 hours for Functions other than 3.c, 3.f, and 3.g provided the associated Function or the redundant Function maintains ECCS initiation capability.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours for Functions 3.c, 3.f, and 3.g; and (b) for up to 6 hours for Functions other than 3.c, 3.f, and 3.g provided the associated Function or the redundant Function maintains ECCS initiation capability.
SURVEILLANCE SR 3.3.5.1 .1 Perform CHANNEL CHECK. SR 3.3.5.1 .2 Perform CHANNEL FUNCTIONAL TEST. SR 3.3.5.1.3 Perform CHANNEL CALIBRATION.
SURVEILLANCE                                                 FREQUENCY SR 3.3.5.1 .1             Perform CHANNEL CHECK.                                             In accordance with the Surveillance Frequency Control Program SR 3.3.5.1 .2             Perform CHANNEL FUNCTIONAL TEST.                                   In accordance with the Surveillance Frequency Control Program SR 3.3.5.1.3             Perform CHANNEL CALIBRATION.                                       In accordance with the Surveillance Frequency Control Program Columbia Generating Station                               3.3.5.1-5           Amendment No . .:t-W,+e9 ~ 238
Columbia Generating Station 3.3.5.1-5 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Amendment No . .:t-W,+e9 238 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.3.5.1.4 Perform CHANNEL CALIBRATION.
 
SR 3.3.5.1.5 Perform CHANNEL CALIBRATION.
ECCS Instrumentation 3.3.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                         FREQUENCY SR 3.3.5.1.4     Perform CHANNEL CALIBRATION.               In accordance with the Surveillance Frequency Control Program SR 3.3.5.1.5     Perform CHANNEL CALIBRATION.               In accordance with the Surveillance Frequency
ECCS Instrumentation 3.3.5.1 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency  
                                                            *Control Program SR 3.3.5.1.6     Perform LOGIC SYSTEM FUNCTIONAL TEST.     In accordance with the Surveillance Frequency Control Program Columbia Generating Station           3.3.5.1-6   Amendment No. +w +-72, ~    238
*Control Program SR 3.3.5.1.6 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.5.1-6 Amendment No. +w +-72, 238
 
: 1. (a) (b) (e) ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 1 of 5) Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE Low Pressure Coolant Injection-A (LPCI) and Low Pressure Core Spray (LPCS) Subsystems
ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 1 of 5)
: a. Reactor Vessel 1, 2, 3, 2(b) B SR 3.3.5.1.1 -142.3 inches Water Level -Low 4(a), 5(a) SR 3.3.5.1.2 Low Low, Level 1 SR 3.3.5.1.4 SR 3.3.5.1.6
Emergency Core Cooling System Instrumentation APPLICABLE                   CONDITIONS MODES OR       REQUIRED     REFERENCED OTHER         CHANNELS       FROM SPECIFIED         PER       REQUIRED   SURVEILLANCE       ALLOWABLE FUNCTION                 CONDITIONS     FUNCTION     ACTION A.1 REQUIREMENTS         VALUE
: b. Drywell Pressure -1, 2, 3 2(b) B SR 3.3.5.1.2 s 1.88 psig High SR 3.3.5.1.4 SR 3.3.5.1.6
: 1. Low Pressure Coolant Injection-A (LPCI) and Low Pressure Core Spray (LPCS)
: c. LPCS Pump Start -1, 2, 3, 1 (e) c SR 3.3.5.1.5 8.53 seconds LOCA Time Delay 4 (a), 5 1a) SR 3.3.5.1.6 and Relay s 10.64 seconds d. LPCI Pump A Start -1, 2, 3, 1 (e) c SR 3.3.5.1.5 17.24 seconds LOCA Time Delay 4lal, 5(a) SR 3.3.5.1.6 ands 21.53 Relay seconds e. LPCI Pump A Start -1, 2, 3, c SR 3.3.5.1.2 3.04 seconds LOCA/LOOP Time 4 1a1, 5 1a1 SR 3.3.5.1.3 and Delay Relay SR 3.3.5.1.6 s 6.00 seconds f. Reactor Vessel 1, 2, 3 1 per valve c SR 3.3.5.1.2 448 psig and Pressure -Low SR 3.3.5.1.4 s 492 psig (Injection SR 3.3.5.1.6 Permissive) 4 1a1, 5(a) 1 per valve B SR 3.3.5.1.2 448 psig and SR 3.3.5.1.4 s 492 psig SR 3.3.5.1.6 When associated subsystem(s) are required to be OPERABLE.
Subsystems 2(b)
Also required to initiate the associated diesel generator (DG). Also supports OPERABILITY of 230 kV offsite power circuit pursuant to LCO 3.8.1 and LCO 3.8.2. Columbia Generating Station 3.3.5.1-7 Amendment No. +w,+72 2-2.a 238 ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 2 of 5) Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE 1. LPCI and LPCS Subsystems
: a. Reactor Vessel             1, 2, 3,                       B     SR 3.3.5.1.1   ~  -142.3 inches Water Level - Low           4(a), 5(a)                             SR 3.3.5.1.2 Low Low, Level 1                                                   SR 3.3.5.1.4 SR 3.3.5.1.6
: g. LPCS Pump 1, 2, 3, E SR 3.3.5.1.2 2 668 gpm and Discharge Flow -4(a), 5(a) SR 3.3.5.1.4 s 1067 gpm Low (Minimum Flow) SR 3.3.5.1.6
: b. Drywell Pressure -           1, 2, 3         2(b)         B     SR 3.3.5.1.2   s 1.88 psig High                                                               SR 3.3.5.1.4 SR 3.3.5.1.6 1 (e)        c
: h. LPCI Pump A 1, 2, 3, E SR 3.3.5.1.2 2 605 gpm and Discharge Flow -4 (a), 5 1a) SR 3.3.5.1.4 s 984 gpm Low (Minimum Flow) SR 3.3.5.1.6
: c. LPCS Pump Start -           1, 2, 3,                               SR 3.3.5.1.5   ~ 8.53 seconds LOCA Time Delay               (a), 1a) 4      5                              SR 3.3.5.1.6   and Relay                                                                             s 10.64 seconds 1 (e)
: i. Manual Initiation 1, 2, 3, 2 c SR 3.3.5.1.6 NA 4(a), 5(a) 2. LPCI Band LPCI C Subsystems
: d. LPCI Pump A Start -         1, 2, 3, 4lal, 5(a) c     SR 3.3.5.1.5   ~ 17.24 seconds LOCA Time Delay                                                   SR 3.3.5.1.6   ands 21.53 Relay                                                                             seconds
: a. Reactor Vessel 1, 2, 3, 2(b) B SR 3.3.5.1.1 2 -142.3 inches Water Level -Low 4(a), 5(a) SR 3.3.5.1.2 Low Low, Level 1 SR 3.3.5.1.4 SR 3.3.5.1.6
: e. LPCI Pump A Start -         1, 2, 3,                       c     SR 3.3.5.1.2   ~  3.04 seconds LOCA/LOOP Time             4 1a1, 5 1a1                           SR 3.3.5.1.3   and Delay Relay                                                       SR 3.3.5.1.6   s 6.00 seconds
: b. Drywell Pressure -1, 2, 3 2(b) B SR 3.3.5.1.2 s 1.88 psig High SR 3.3.5.1.4 SR 3.3.5.1.6
: f. Reactor Vessel               1, 2, 3     1 per valve       c     SR 3.3.5.1.2   ~ 448 psig and Pressure - Low                                                     SR 3.3.5.1.4   s 492 psig (Injection                                                         SR 3.3.5.1.6 Permissive) 4 1a1, 5(a)   1 per valve       B     SR 3.3.5.1.2   ~ 448 psig and SR 3.3.5.1.4   s 492 psig SR 3.3.5.1.6 (a)    When associated subsystem(s) are required to be OPERABLE.
: c. LPCI Pump B Start -10 2, 3, 1 (e) c SR 3.3.5.1.5 2 17.24 seconds LOCA Time Delay 4 a) 5 (a) SR 3.3.5.1.6 and ' Relay s 21.53 seconds d. LPCI Pump C Start -1, 2, 3, 1 (e) c SR 3.3.5.1.5  
(b)    Also required to initiate the associated diesel generator (DG).
? 8.53 seconds LOCA Time Delay 4(a), 5(a) SR 3.3.5.1.6 and Relay s 1 0.64 seconds e. LPCI Pump B Start -1, 2, 3, c SR 3.3.5.1.2 2 3.04 seconds LOCA/LOOP Time 4 (a), 5 (a) SR 3.3.5.1.3 and Delay Relay SR 3.3.5.1.6 s 6.00 seconds (a) When associated subsystem(s) are required to be OPERABLE. (b) Also required to initiate the associated DG. ( e) Also supports OPERABILITY of 230 kV off site power circuit pursuant to LCO 3.8.1 and LCO 3.8.2. Columbia Generating Station 3.3.5.1-8 Amendment No.+ee,+e9 238 ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 3 of 5) Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE 2. LPCI B and LPCI C Subsystems
(e)    Also supports OPERABILITY of 230 kV offsite power circuit pursuant to LCO 3.8.1 and LCO 3.8.2.
: f. Reactor Vessel 1, 2, 3, 1 per valve c SR 3.3.5.1.2
Columbia Generating Station                               3.3.5.1-7         Amendment No. +w,+72 2-2.a 238
:::: 448 psig Pressure -Low SR 3.3.5.1.4 and (Injection SR 3.3.5.1.6 s 492 psig Permissive) 4(a), 5(a) 1 per valve B SR 3.3.5.1.2
 
:::: 448 psig SR 3.3.5.1.4 and SR 3.3.5.1.6 s 492 psig g. LPCI Pumps B & C 1, 2, 3, 1 per pump E SR 3.3.5.1.2
ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 2 of 5)
::=: 605 gpm Discharge Flow -4(a), 5(a) SR 3.3.5.1.4 and Low (Minimum flow) SR 3.3.5.1.6 s 984 gpm h. Manual Initiation 1, 2, 3, 2 c SR 3.3.5.1.6 NA 4(a), 5(a) 3. High Pressure Core Spray (HPCS) System a. Reactor Vessel 1, 2, 3, 4(b) B SR 3.3.5.1.1
Emergency Core Cooling System Instrumentation APPLICABLE                   CONDITIONS MODES OR       REQUIRED     REFERENCED OTHER         CHANNELS       FROM SPECIFIED         PER       REQUIRED   SURVEILLANCE       ALLOWABLE FUNCTION                 CONDITIONS     FUNCTION     ACTION A.1 REQUIREMENTS         VALUE
:::: -58 inches Water Level -Low 4(a), 5(a) SR 3.3.5.1.2 Low, Level 2 SR 3.3.5.1.4 SR 3.3.5.1.6
: 1. LPCI and LPCS Subsystems
: b. Drywell Pressure -1, 2, 3 4(b) B SR 3.3.5.1.2 s 1.88 psig High SR 3.3.5.1.4 SR 3.3.5.1.6
: g. LPCS Pump                   1, 2, 3,                       E     SR 3.3.5.1.2     2 668 gpm and Discharge Flow -           4(a), 5(a)                             SR 3.3.5.1.4     s 1067 gpm Low (Minimum Flow)                                                 SR 3.3.5.1.6
: c. Reactor Vessel 1, 2, 3, 2 c SR 3.3.5.1.1 s 56.0 inches Water Level -High, 4(a), 5(a) SR 3.3.5.1.2 Level 8 SR 3.3.5.1.4 SR 3.3.5.1.6
: h. LPCI Pump A                 1, 2, 3,                       E     SR 3.3.5.1.2     2 605 gpm and Discharge Flow -             (a), 1a)                             SR 3.3.5.1.4 4      5                                                s 984 gpm Low (Minimum Flow)                                                 SR 3.3.5.1.6
: d. Condensate Storage 1, 2, 3, 2 D SR 3.3.5.1.2
: i. Manual Initiation           1, 2, 3, 4(a), 5(a) 2           c     SR 3.3.5.1.6     NA
::=: 448 ft 1 inch Tank Level -Low 4(c), 5(c) SR 3.3.5.1.4 elevation SR 3.3.5.1.6 (a) When associated subsystem(s) are required to be OPERABLE. (b) Also required to initiate the associated DG. (c) When HPCS is OPERABLE for compliance with LCO 3.5.2, "ECCS -Shutdown," and aligned to the condensate storage tank while tank water level is not within the limit of SR 3.5.2.2. Columbia Generating Station 3.3.5.1-9 Amendment No. +ee,+69 22&sect; 238 ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 4 of 5) Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE 3. HPCS System e. Suppression Pool 1, 2, 3 2 D SR 3.3.5.1.2 s 466 ft Water Level -High SR 3.3.5.1.4 11 inches SR 3.3.5.1.6 elevation
: 2. LPCI Band LPCI C Subsystems
: f. HPCS System Flow 1, 2, 3, E SR 3.3.5.1.2 2 1200 gpm and Rate -Low 4ia), 5ia) SR 3.3.5.1.4 s 1512 gpm (Minimum Flow) SR 3.3.5.1.6
: a. Reactor Vessel               1, 2, 3,         2(b)         B     SR 3.3.5.1.1   2 -142.3 inches Water Level - Low           4(a), 5(a)                             SR 3.3.5.1.2 Low Low, Level 1                                                   SR 3.3.5.1.4 SR 3.3.5.1.6
: g. Manual Initiation 1, 2, 3, 4 1a), 5 (a) 2 c SR 3.3.5.1.6 NA 4. Automatic Depressurization System (ADS) Trip System A a. Reactor Vessel 1, 2ld), 3ld) 2 F SR 3.3.5.1.1 2 -142.3 inches Water Level -Low SR 3.3.5.1.2 Low Low, Level 1 SR 3.3.5.1.4 SR 3.3.5.1.6
: b. Drywell Pressure -           1, 2, 3         2(b)         B     SR 3.3.5.1.2     s 1.88 psig High                                                               SR 3.3.5.1.4 SR 3.3.5.1.6 1(e)
: b. ADS Initiation Timer 1, 2ld), 3id) G SR 3.3.5.1.2 s 115.0 seconds SR 3.3.5.1.3 SR 3.3.5.1.6
: c. LPCI Pump B Start -         10 2, 3, a) (a) c     SR 3.3.5.1.5     2 17.24 seconds LOCA Time Delay             4     5                              SR 3.3.5.1.6     and Relay
: c. Reactor Vessel 1, 2ld), 3ld) F SR 3.3.5.1.1 2 9.5 inches Water Level -Low, SR 3.3.5.1.2 Level 3 (Permissive)
                                              '
SR 3.3.5.1.4 SR 3.3.5.1.6
s 21.53 seconds
: d. LPCS Pump 1, 2ld), 3ld) 2 G SR 3.3.5.1.2 2 119 psig and Discharge Pressure SR 3.3.5.1.4 s 171 psig -High SR 3.3.5.1.6
: d. LPCI Pump C Start -         1, 2, 3,         1 (e)         c     SR 3.3.5.1.5     ? 8.53 seconds LOCA Time Delay             4(a), 5(a)                             SR 3.3.5.1.6     and Relay                                                                               s 1 0.64 seconds
: e. LPCI Pump A 1, 2ld), 3id) 2 G SR 3.3.5.1.2 2 11 6 psig and Discharge Pressure SR 3.3.5.1.4 s 134 psig -High SR 3.3.5.1.6 (a) When associated subsystem(s) are required to be OPERABLE. (d) With reactor steam dome pressure > 150 psig. Columbia Generating Station 3.3.5.1-10 Amendment No. +ee,+e9 238 ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 5 of 5) Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE 4. ADS Trip System A f. Accumulator Backup 1, 2'dl, 3(d) 3 F SR 3.3.5.1.2 2 151.4 psig Compressed Gas SR 3.3.5.1.4 System Pressure -SR 3.3.5.1.6 Low g. Manual Initiation 1, 2(d), 3(d) 4 G SR 3.3.5.1.6 NA 5. ADS Trip System B a. Reactor Vessel 1, 2(dl, 3(d) 2 F SR 3.3.5.1.1 2 -142.3 inches Water Level -Low SR 3.3.5.1.2 Low Low, Level 1 SR 3.3.5.1.4 SR 3.3.5.1.6
: e. LPCI Pump B Start -         1, 2, 3, (a), (a) c     SR 3.3.5.1.2     2 3.04 seconds LOCA/LOOP Time             4     5                               SR 3.3.5.1.3     and Delay Relay                                                       SR 3.3.5.1.6     s 6.00 seconds (a)   When associated subsystem(s) are required to be OPERABLE.
: b. ADS Initiation Timer 1 ' 2(d)' 3(d) G SR 3.3.5.1.2
(b)   Also required to initiate the associated DG.
:::: 115.0 seconds SR 3.3.5.1.3 SR 3.3.5.1.6
(e)   Also supports OPERABILITY of 230 kV off site power circuit pursuant to LCO 3.8.1 and LCO 3.8.2.
: c. Reactor Vessel 1, 2(d), 3(d) F SR 3.3.5.1.1 2 9.5 inches Water Level -SR 3.3.5.1.2 Low, Level 3 SR 3.3.5.1.4 (Permissive)
Columbia Generating Station                               3.3.5.1-8         Amendment No.+ee,+e9 ~ 238
SR 3.3.5.1.6
 
: d. LPCI Pumps B & C 1 , 2(d), 3(d) 2 per pump G SR 3.3.5.1.2 2 11 6 psig and Discharge Pressure SR 3.3.5.1.4
ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 3 of 5)
:::: 134 psig -High SR 3.3.5.1.6
Emergency Core Cooling System Instrumentation APPLICABLE                     CONDITIONS MODES OR     REQUIRED       REFERENCED OTHER       CHANNELS           FROM SPECIFIED         PER           REQUIRED     SURVEILLANCE         ALLOWABLE FUNCTION                 CONDITIONS     FUNCTION         ACTION A.1   REQUIREMENTS           VALUE
: e. Accumulator Backup 1' 2(d)' 3(d) 3 F SR 3.3.5.1.2 2 151.4 psig Compressed Gas SR 3.3.5.1.4 System Pressure -SR 3.3.5.1.6 Low f. Manual Initiation 1, 2(d), 3(d) 4 G SR 3.3.5.1.6 NA (d) With reactor steam dome pressure > 150 psig. Columbia Generating Station 3.3.5.1-11 Amendment No. 238 I SURVEILLANCE REQUIREMENTS RCIC System Instrumentation 3.3.5.2 -----------------------------------------------------------N 0 TES---------------------------------------------
: 2. LPCI B and LPCI C Subsystems
-------------1. Refer to Table 3.3.5.2-1 to determine which SRs apply for each RCIC Function.
: f. Reactor Vessel               1, 2, 3,   1 per valve           c       SR 3.3.5.1.2     :::: 448 psig Pressure - Low                                                         SR 3.3.5.1.4     and (Injection                                                             SR 3.3.5.1.6     s 492 psig Permissive) 4(a), 5(a)   1 per valve           B       SR 3.3.5.1.2     :::: 448 psig SR 3.3.5.1.4     and SR 3.3.5.1.6     s 492 psig
: g. LPCI Pumps B & C             1, 2, 3,   1 per pump           E       SR 3.3.5.1.2     ::=: 605 gpm Discharge Flow -           4(a), 5(a)                               SR 3.3.5.1.4     and Low (Minimum flow)                                                   SR 3.3.5.1.6     s 984 gpm
: h. Manual Initiation           1, 2, 3,         2               c     SR 3.3.5.1.6     NA 4(a), 5(a)
: 3. High Pressure Core Spray (HPCS) System
: a. Reactor Vessel               1, 2, 3,       4(b)             B     SR   3.3.5.1.1   :::: -58 inches Water Level - Low           4(a), 5(a)                               SR   3.3.5.1.2 Low, Level 2                                                         SR 3.3.5.1.4 SR 3.3.5.1.6
: b. Drywell Pressure -           1, 2, 3         4(b)             B     SR 3.3.5.1.2     s 1.88 psig High                                                                 SR 3.3.5.1.4 SR 3.3.5.1.6
: c. Reactor Vessel               1, 2, 3, 4(a), 5(a) 2               c     SR 3.3.5.1.1   s 56.0 inches Water Level - High,                                                   SR 3.3.5.1.2 Level 8                                                               SR 3.3.5.1.4 SR 3.3.5.1.6
: d. Condensate Storage           1, 2, 3,         2               D     SR 3.3.5.1.2     ::=: 448 ft 1 inch Tank Level - Low           4(c), 5(c)                               SR 3.3.5.1.4     elevation SR 3.3.5.1.6 (a)   When associated subsystem(s) are required to be OPERABLE.
(b)   Also required to initiate the associated DG.
(c)   When HPCS is OPERABLE for compliance with LCO 3.5.2, "ECCS - Shutdown," and aligned to the condensate storage tank while tank water level is not within the limit of SR 3.5.2.2.
Columbia Generating Station                             3.3.5.1-9             Amendment No. +ee,+69 22&sect; 238
 
ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 4 of 5)
Emergency Core Cooling System Instrumentation APPLICABLE                   CONDITIONS MODES OR       REQUIRED   REFERENCED OTHER       CHANNELS       FROM SPECIFIED         PER       REQUIRED   SURVEILLANCE     ALLOWABLE FUNCTION             CONDITIONS     FUNCTION     ACTION A.1 REQUIREMENTS         VALUE
: 3. HPCS System
: e. Suppression Pool         1, 2, 3         2             D     SR 3.3.5.1.2   s 466 ft Water Level - High                                             SR 3.3.5.1.4   11 inches SR 3.3.5.1.6   elevation
: f. HPCS System Flow         1, 2, 3,                       E     SR 3.3.5.1.2   2 1200 gpm and Rate - Low             4ia), 5ia)                             SR 3.3.5.1.4   s 1512 gpm (Minimum Flow)                                                 SR 3.3.5.1.6
: g. Manual Initiation       1, 2, 3,         2             c     SR 3.3.5.1.6   NA 4 1a), 5(a)
: 4. Automatic Depressurization System (ADS) Trip System A
: a. Reactor Vessel         1, 2ld), 3ld)     2             F     SR 3.3.5.1.1   2 -142.3 inches Water Level - Low                                             SR 3.3.5.1.2 Low Low, Level 1                                               SR 3.3.5.1.4 SR 3.3.5.1.6
: b. ADS Initiation Timer   1, 2ld), 3id)                   G     SR 3.3.5.1.2   s 115.0 seconds SR 3.3.5.1.3 SR 3.3.5.1.6
: c. Reactor Vessel         1, 2ld), 3ld)                   F     SR 3.3.5.1.1   2 9.5 inches Water Level - Low,                                             SR 3.3.5.1.2 Level 3 (Permissive)                                           SR 3.3.5.1.4 SR 3.3.5.1.6
: d. LPCS Pump             1, 2ld), 3ld)     2             G     SR 3.3.5.1.2   2 119 psig and Discharge Pressure                                             SR 3.3.5.1.4   s 171 psig
            - High                                                         SR 3.3.5.1.6
: e. LPCI Pump A           1, 2ld), 3id)     2             G     SR 3.3.5.1.2   2 11 6 psig and Discharge Pressure                                             SR 3.3.5.1.4   s 134 psig
            - High                                                         SR 3.3.5.1.6 (a)   When associated subsystem(s) are required to be OPERABLE.
(d)   With reactor steam dome pressure > 150 psig.
Columbia Generating Station                         3.3.5.1-10         Amendment No. +ee,+e9 ~ 238
 
ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 5 of 5)
Emergency Core Cooling System Instrumentation APPLICABLE                   CONDITIONS MODES OR       REQUIRED   REFERENCED OTHER       CHANNELS       FROM SPECIFIED         PER       REQUIRED   SURVEILLANCE       ALLOWABLE FUNCTION               CONDITIONS       FUNCTION     ACTION A.1 REQUIREMENTS           VALUE
: 4. ADS Trip System A
: f. Accumulator Backup     1, 2'dl, 3(d)       3           F     SR 3.3.5.1.2   2 151.4 psig Compressed Gas                                                 SR 3.3.5.1.4 System Pressure -                                             SR 3.3.5.1.6 Low
: g. Manual Initiation     1, 2(d), 3(d)       4           G     SR 3.3.5.1.6     NA
: 5. ADS Trip System B
: a. Reactor Vessel         1, 2(dl, 3(d)       2           F     SR 3.3.5.1.1   2 -142.3 inches Water Level - Low                                             SR 3.3.5.1.2 Low Low, Level 1                                               SR 3.3.5.1.4 SR 3.3.5.1.6
: b. ADS Initiation Timer   1 ' 2(d)' 3(d)                   G     SR 3.3.5.1.2   :::: 115.0 seconds SR 3.3.5.1.3 SR 3.3.5.1.6
: c. Reactor Vessel         1, 2(d), 3(d)                   F     SR 3.3.5.1.1   2 9.5 inches Water Level -                                                 SR 3.3.5.1.2 Low, Level 3                                                   SR 3.3.5.1.4 (Permissive)                                                   SR 3.3.5.1.6
: d. LPCI Pumps B & C       1 , 2(d), 3(d) 2 per pump       G     SR 3.3.5.1.2   2 11 6 psig and Discharge Pressure                                             SR 3.3.5.1.4   :::: 134 psig
            - High                                                         SR 3.3.5.1.6
: e. Accumulator Backup     1' 2(d)' 3(d)       3           F     SR 3.3.5.1.2   2 151.4 psig Compressed Gas                                                 SR 3.3.5.1.4 System Pressure -                                             SR 3.3.5.1.6 Low
: f. Manual Initiation     1, 2(d), 3(d)       4           G     SR 3.3.5.1.6   NA (d)   With reactor steam dome pressure > 150 psig.
Columbia Generating Station                         3.3.5.1-11                         Amendment No. 238       I
 
RCIC System Instrumentation 3.3.5.2 SURVEILLANCE REQUIREMENTS
-------------------------------------------- ---------------N0 TES--------- ----------------------- --------------- -----------
: 1. Refer to Table 3.3.5.2-1 to determine which SRs apply for each RCIC Function.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours for Functions 2 and 4; and (b) for up to 6 hours for Functions 1 and 3 provided the associated Function maintains RCIC initiation capability.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours for Functions 2 and 4; and (b) for up to 6 hours for Functions 1 and 3 provided the associated Function maintains RCIC initiation capability.
SURVEILLANCE SR 3.3.5.2.1 Perform CHANNEL CHECK. SR 3.3.5.2.2 Perform CHANNEL FUNCTIONAL TEST. SR 3.3.5.2.3 Perform CHANNEL CALIBRATION.
SURVEILLANCE                                                     FREQUENCY SR 3.3.5.2.1             Perform CHANNEL CHECK.                                                 In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.2             Perform CHANNEL FUNCTIONAL TEST.                                       In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.3             Perform CHANNEL CALIBRATION.                                             In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.4             Perform LOGIC SYSTEM FUNCTIONAL TEST.                                   In accordance with the Surveillance Frequency Control Program Columbia Generating Station                               3.3.5.2-3         Amendment No. +49,+e9 ~ 238
SR 3.3.5.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.5.2-3 Amendment No. +49,+e9 238 ACTIONS CONDITION I. As required by Required 1.1 Action C.1 and referenced in Table 3.3.6.1-1.
 
OR 1.2 J. As required by Required J.1 Action C.1 and referenced in Table 3.3.6.1-1.
Primary Containment Isolation Instrumentation 3.3.6.1 ACTIONS CONDITION                               REQUIRED ACTION                      COMPLETION TIME I. As required by Required               1.1       Declare associated standby          1 hour Action C.1 and                                 liquid control (SLC) referenced in                                   subsystem inoperable.
OR J.2 SURVEILLANCE REQUIREMENTS Primary Containment Isolation Instrumentation 3.3.6.1 REQUIRED ACTION COMPLETION TIME Declare associated standby 1 hour liquid control (SLC) subsystem inoperable.
Table 3.3.6.1-1.
Isolate the Reactor Water 1 hour Cleanup (RWCU) System. Initiate action to restore Immediately channel to OPERABLE status. Initiate action to isolate the Immediately Residual Heat Removal (RHR) Shutdown Cooling (SOC) System. -----------------------------------------------------------NOTES----------------------------------------------------------
OR 1.2       Isolate the Reactor Water          1 hour Cleanup (RWCU) System.
J. As required by Required             J.1       Initiate action to restore          Immediately Action C.1 and                                 channel to OPERABLE referenced in                                   status.
Table 3.3.6.1-1.
OR J.2       Initiate action to isolate the     Immediately Residual Heat Removal (RHR) Shutdown Cooling (SOC) System.
SURVEILLANCE REQUIREMENTS
-----------------------------------------------------------NOTES----------------------------------------------------------
: 1. Refer to Table 3.3.6.1-1 to determine which SRs apply for each Primary Containment Isolation Function.
: 1. Refer to Table 3.3.6.1-1 to determine which SRs apply for each Primary Containment Isolation Function.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains isolation capability.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains isolation capability.
SURVEILLANCE SR 3.3.6.1.1 Perform CHANNEL CHECK. Columbia Generating Station 3.3.6.1-3 FREQUENCY In accordance with the Surveillance Frequency Control Program Amendment No. +49,+w 2-2-a 238 Primary Containment Isolation Instrumentation 3.3.6.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.6.1 .2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.6.1 .3 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.6.1.4 Perform CHANNEL CALIBRATION.
SURVEILLANCE                                                 FREQUENCY SR 3.3.6.1.1             Perform CHANNEL CHECK.                                             In accordance with the Surveillance Frequency Control Program Columbia Generating Station                               3.3.6.1-3         Amendment No. +49,+w 2-2-a 238
In accordance with the Surveillance Frequency Control Program SR 3.3.6.1 .5 Perform CHANNEL CALIBRATION In accordance with the Surveillance Frequency Control Program SR 3.3.6.1 .6 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.6.1 .7 -------------------------------N 0 TE---------------------------
 
---Channel sensors for Functions 1 .a, 1 .b, and 1 .c are excluded.  
Primary Containment Isolation Instrumentation 3.3.6.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                 FREQUENCY SR 3.3.6.1 .2     Perform CHANNEL FUNCTIONAL TEST.                                     In accordance with the Surveillance Frequency Control Program SR 3.3.6.1 .3     Perform CHANNEL FUNCTIONAL TEST.                                     In accordance with the Surveillance Frequency Control Program SR 3.3.6.1.4     Perform CHANNEL CALIBRATION.                                         In accordance with the Surveillance Frequency Control Program SR 3.3.6.1 .5     Perform CHANNEL CALIBRATION                                           In accordance with the Surveillance Frequency Control Program SR 3.3.6.1 .6     Perform LOGIC SYSTEM FUNCTIONAL TEST.                                 In accordance with the Surveillance Frequency Control Program SR 3.3.6.1 .7     -------------------------------N 0 TE------------------------------
---------------------------------------------------------------------
Channel sensors for Functions 1.a, 1 .b, and 1.c are excluded.
Verify the ISOLATION SYSTEM RESPONSE TIME In accordance is within limits. with the Surveillance Frequency Control Program Columbia Generating Station 3.3.6.1-4 Amendment No. +w,+w 22a 238 ACTIONS CONDITION C. (continued)
                  ---------------------------------------------------------------------
Secondary Containment Isolation Instrumentation 3.3.6.2 REQUIRED ACTION C.2.1 Place the associated standby gas treatment (SGT) subsystem in operation.
Verify the ISOLATION SYSTEM RESPONSE TIME                             In accordance is within limits.                                                     with the Surveillance Frequency Control Program Columbia Generating Station                       3.3.6.1-4             Amendment No.     +w,+w 22a   238
OR C.2.2 Declare associated SGT subsystem inoperable.
 
COMPLETION TIME 1 hour 1 hour SURVEILLANCE REQUIREMENTS  
Secondary Containment Isolation Instrumentation 3.3.6.2 ACTIONS CONDITION                                REQUIRED ACTION                         COMPLETION TIME C. (continued)                            C.2.1     Place the associated                   1 hour standby gas treatment (SGT) subsystem in operation.
-----------------------------------------------------------N 0 T ES------------------------------------
OR C.2.2     Declare associated SGT                 1 hour subsystem inoperable.
-------------------
SURVEILLANCE REQUIREMENTS
---1. Refer to Table 3.3.6.2-1 to determine which SRs apply for each Secondary Containment Isolation Function.
-----------------------------------------------------------N 0 T ES----------------------------------------------------------
: 1. Refer to Table 3.3.6.2-1 to determine which SRs apply for each Secondary Containment Isolation Function.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed tor up to 6 hours provided the associated Function maintains isolation capability.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed tor up to 6 hours provided the associated Function maintains isolation capability.
SURVEILLANCE SR 3.3.6.2.1 Perform CHANNEL CHECK. FREQUENCY In accordance with the Surveillance Frequency Control Program SR 3.3.6.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.6.2-2 Amendment No. +49,+w 225 238 Secondary Containment Isolation Instrumentation 3.3.6.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.3.6.2.3 Perform CHANNEL CALIBRATION.
SURVEILLANCE                                                   FREQUENCY SR 3.3.6.2.1             Perform CHANNEL CHECK.                                                 In accordance with the Surveillance Frequency Control Program SR 3.3.6.2.2             Perform CHANNEL FUNCTIONAL TEST.                                       In accordance with the Surveillance Frequency Control Program Columbia Generating Station                               3.3.6.2-2           Amendment No. +49,+w 225 238
FREQUENCY In accordance with the Surveillance Frequency Control Program SR 3.3.6.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.6.2-3 Amendment No.
 
22&sect; 238 Secondary Containment Isolation Instrumentation 3.3.6.2 Table 3.3.6.2-1(page1of1)
Secondary Containment Isolation Instrumentation 3.3.6.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                               FREQUENCY SR 3.3.6.2.3     Perform CHANNEL CALIBRATION.                     In accordance with the Surveillance Frequency Control Program SR 3.3.6.2.4     Perform LOGIC SYSTEM FUNCTIONAL TEST.           In accordance with the Surveillance Frequency Control Program Columbia Generating Station           3.3.6.2-3     Amendment No.   ~.+99 22&sect;   238
Secondary Containment Isolation Instrumentation FUNCTION 1. Reactor Vessel Water Level -Low Low, Level 2 2. Drywell Pressure -High 3. Reactor Building Vent Exhaust Plenum Radiation
 
-High 4. Manual Initiation APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS 1, 2, 3, (a) 1, 2, 3 1, 2, 3, (a) 1, 2, 3, (a) REQUIRED CHANNELS PER TRIP SYSTEM 2 4 (a) During operations with a potential for draining the reactor vessel. (b) Deleted SURVEILLANCE REQUIREMENTS SR 3.3.6.2.2 SR 3.3.6.2.3 SR 3.3.6.2.4 SR 3.3.6.2.2 SR 3.3.6.2.3 SR 3.3.6.2.4 SR 3.3.6.2.1 SR 3.3.6.2.2 SR 3.3.6.2.3 SR 3.3.6.2.4 SR 3.3.6.2.4 ALLOWABLE VALUE 2 -58 inches :::; 1.88 psig :::; 16.0 mR/hr NA (c) Also required to initiate the associated LOCA Time Delay Relay Function pursuant to LCO 3.3.5.1. Columbia Generating Station 3.3.6.2-4 Amendment No. 238 ACTIONS CONDITION D. Required Action and D.1 associated Completion Time of Condition B or C not met. REQUIRED ACTION Place associated CREF subsystem in the pressurization mode of operation.
Secondary Containment Isolation Instrumentation 3.3.6.2 Table 3.3.6.2-1(page1of1)
CREF System Instrumentation 3.3.7.1 COMPLETION TIME 1 hour D.2 Declare associated CREF subsystem inoperable.
Secondary Containment Isolation Instrumentation APPLICABLE      REQUIRED MODES OR      CHANNELS OTHER          PER SPECIFIED        TRIP    SURVEILLANCE          ALLOWABLE FUNCTION                       CONDITIONS        SYSTEM    REQUIREMENTS                VALUE
1 hour SURVEILLANCE REQUIREMENTS  
: 1. Reactor Vessel Water Level - Low           1, 2, 3, (a)               SR 3.3.6.2.2         2 -58 inches Low, Level 2                                                          SR 3.3.6.2.3 SR 3.3.6.2.4
----------------------------
: 2. Drywell Pressure - High                      1, 2, 3                  SR 3.3.6.2.2           :::; 1.88 psig SR 3.3.6.2.3 SR 3.3.6.2.4
-------------------------------N 0 TES----------------------------------------------------------1. Refer to Table 3.3.7.1-1 to determine which SRs apply for each CREF System Function.
: 3. Reactor Building Vent Exhaust              1, 2, 3, (a)      2      SR 3.3.6.2.1       :::; 16.0 mR/hr Plenum Radiation - High                                                SR 3.3.6.2.2 SR 3.3.6.2.3 SR 3.3.6.2.4
: 4. Manual Initiation                          1, 2, 3, (a)      4      SR 3.3.6.2.4                 NA (a)    During operations with a potential for draining the reactor vessel.
(b)    Deleted (c)   Also required to initiate the associated LOCA Time Delay Relay Function pursuant to LCO 3.3.5.1.
Columbia Generating Station                             3.3.6.2-4                       Amendment No. 238
 
CREF System Instrumentation 3.3.7.1 ACTIONS CONDITION                                 REQUIRED ACTION                        COMPLETION TIME D. Required Action and                     D.1       Place associated CREF                1 hour associated Completion                           subsystem in the Time of Condition B or C                         pressurization mode of not met.                                         operation.
D.2       Declare associated CREF             1 hour subsystem inoperable.
SURVEILLANCE REQUIREMENTS
-------------------------------------------- ---------------N0 TES----------------------------------------------------------
: 1. Refer to Table 3.3.7.1-1 to determine which SRs apply for each CREF System Function.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains CREF initiation capability.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains CREF initiation capability.
SURVEILLANCE SR 3.3.7.1.1 Perform CHANNEL CHECK. FREQUENCY In accordance with the Surveillance Frequency Control Program SR 3.3.7.1.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.7.1.3 Perform CHANNEL CALIBRATION.
SURVEILLANCE                                                   FREQUENCY SR 3.3.7.1.1             Perform CHANNEL CHECK.                                               In accordance with the Surveillance Frequency Control Program SR 3.3.7.1.2             Perform CHANNEL FUNCTIONAL TEST.                                       In accordance with the Surveillance Frequency Control Program SR 3.3.7.1.3             Perform CHANNEL CALIBRATION.                                           In accordance with the Surveillance Frequency Control Program Columbia Generating Station                               3.3.7.1-2         Amendment No. +8-7,+99 22a 238
Columbia Generating Station 3.3.7.1-2 In accordance with the Surveillance Frequency Control Program Amendment No. +8-7,+99 22a 238 SURVEILLANCE REQUIREMENTS SURVEILLANCE CREF System Instrumentation 3.3.7.1 FREQUENCY SR 3.3.7.1.4 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.7.1-3 Amendment No. +e9,+99 22-9 238 Table 3.3.7.1-1(page1of1)
 
CREF System Instrumentation 3.3.7.1 Control Room Emergency Filtration System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION A.1 REQUIREMENTS VALUE 1. Reactor Vessel Water 1, 2, 3, (a) 2 B SR 3.3.7.1.1 Level -Low Low, Level 2 SR 3.3.7.1.2 SR 3.3.7.1.3 SR 3.3.7.1.4
CREF System Instrumentation 3.3.7.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                        FREQUENCY SR 3.3.7.1.4     Perform LOGIC SYSTEM FUNCTIONAL TEST.     In accordance with the Surveillance Frequency Control Program Columbia Generating Station           3.3.7.1-3 Amendment No. +e9,+99 22-9 238
: 2. Drywell Pressure -High 1, 2, 3 2 c SR 3.3.7.1.1
 
:s: 1.88 psig SR 3.3.7.1.2 SR 3.3.7.1.3 SR 3.3.7.1.4
CREF System Instrumentation 3.3.7.1 Table 3.3.7.1-1(page1of1)
: 3. Reactor Building Vent 1, 2, 3, (a) 2 B SR 3.3.7.1.1
Control Room Emergency Filtration System Instrumentation APPLICABLE                     CONDITIONS MODES OR         REQUIRED     REFERENCED OTHER         CHANNELS         FROM SPECIFIED       PER TRIP       REQUIRED   SURVEILLANCE     ALLOWABLE FUNCTION               CONDITIONS         SYSTEM       ACTION A.1 REQUIREMENTS         VALUE
:s: 16.0 mR/hr Exhaust Plenum SR 3.3.7.1.2 Radiation  
: 1. Reactor Vessel Water         1, 2, 3, (a)         2               B   SR 3.3.7.1.1 ~-58inches Level - Low Low, Level 2                                               SR 3.3.7.1.2 SR 3.3.7.1.3 SR 3.3.7.1.4
-High SR 3.3.7.1.3 SR 3.3.7.1.4 (a) During operations with a potential for draining the reactor vessel. Columbia Generating Station 3.3.7.1-4 Amendment No. 238 ACTIONS CONDITION REQUIRED ACTION D. Required Action and D.1 Declare associated DG inoperable.
: 2. Drywell Pressure - High         1, 2, 3           2               c   SR 3.3.7.1.1 :s: 1.88 psig SR 3.3.7.1.2 SR 3.3.7.1.3 SR 3.3.7.1.4
associated Completion Time of Condition B or C not met. OR --------------------NOTE-------------------
: 3. Reactor Building Vent       1, 2, 3, (a)         2               B   SR 3.3.7.1.1 :s: 16.0 mR/hr Exhaust Plenum                                                         SR 3.3.7.1.2 Radiation - High                                                       SR 3.3.7.1.3 SR 3.3.7.1.4 (a) During operations with a potential for draining the reactor vessel.
Only applicable for Functions 1 .c and 1.d. D.2.1 Open offsite circuit supply breaker to associated 4.16 kV ESF bus. D.2.2 Declare associated offsite circuit inoperable.
Columbia Generating Station                           3.3.7.1-4                       Amendment No. 238
SURVEILLANCE REQUIREMENTS LOP Instrumentation 3.3.8.1 COMPLETION TIME Immediately Immediately Immediately
 
-----------------------------------------------------------N 0 TES-----------------------------
LOP Instrumentation 3.3.8.1 ACTIONS CONDITION                                 REQUIRED ACTION                       COMPLETION TIME D. Required Action and                   D.1       Declare associated DG                 Immediately associated Completion                          inoperable.
----------------
Time of Condition B or C not met.                             OR
-------------1. Refer to Table 3.3.8.1-1 to determine which SRs apply for each LOP Function.
                                            --------------------NOTE-------------------
Only applicable for Functions 1 .c and 1.d.
D.2.1     Open offsite circuit supply           Immediately breaker to associated 4.16 kV ESF bus.
D.2.2     Declare associated offsite           Immediately circuit inoperable.
SURVEILLANCE REQUIREMENTS
-----------------------------------------------------------N 0 TES----------------------------------------------------------
: 1. Refer to Table 3.3.8.1-1 to determine which SRs apply for each LOP Function.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 2 hours provided the associated Function maintains initiation capability.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 2 hours provided the associated Function maintains initiation capability.
SURVEILLANCE FREQUENCY SR 3.3.8.1.1 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.8.1-2 Amendment No. +49,-+S9 2aa 238 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.3.8.1.2 Perform CHANNEL CALIBRATION.
SURVEILLANCE                                                   FREQUENCY SR 3.3.8.1.1             Perform CHANNEL FUNCTIONAL TEST.                                     In accordance with the Surveillance Frequency Control Program Columbia Generating Station                               3.3.8.1-2         Amendment No. +49,-+S9 2aa 238
SR 3.3.8.1 .3 Perform CHANNEL CALIBRATION LOP Instrumentation 3.3.8.1 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program SR 3.3.8.1 .4 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.8.1-3 Amendment No. +49,-:t-eQ 238 LOP Instrumentation 3.3.8.1 Table 3.3.8.1-1(page1of1)
 
Loss of Power Instrumentation CONDITIONS REQUIRED REFERENCED CHANNELS FROM PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION DIVISION ACTION A.1 REQUIREMENTS VALUE 1. Divisions 1 and 2 -4.16 kV Emergency Bus Undervoltage
LOP Instrumentation 3.3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                         FREQUENCY SR 3.3.8.1.2     Perform CHANNEL CALIBRATION.               In accordance with the Surveillance Frequency Control Program SR 3.3.8.1 .3     Perform CHANNEL CALIBRATION               In accordance with the Surveillance Frequency Control Program SR 3.3.8.1 .4     Perform LOGIC SYSTEM FUNCTIONAL TEST.     In accordance with the Surveillance Frequency Control Program Columbia Generating Station           3.3.8.1-3 Amendment No. +49,-:t-eQ ~ 238
: a. TR-S Loss of Voltage -2 B SR 3.3.8.1.2 2 2450 V ands 3135 V 4.16 kV Basis SR 3.3.8.1.4
 
: b. TR-S Loss of Voltage -2 B SR 3.3.8.1.3 2 2.95 seconds and Time Delay SR 3.3.8.1.4 s 7.1 seconds c. TR-B Loss of Voltage -c SR 3.3.8.1.3 2 2450 V ands 3135 V 4.16 kV Basis SR 3.3.8.1.4
LOP Instrumentation 3.3.8.1 Table 3.3.8.1-1(page1of1)
: d. TR-B Loss of Voltage -c SR 3.3.8.1.3 2 3.06 seconds and Time Delay SR 3.3.8.1.4 s 9.28 seconds e. Degraded Voltage -2(a) c SR 3.3.8.1.1 2 3685 V and s 3755 V 4. 16 kV Basis SR 3.3.8.1.2 SR 3.3.8.1.4
Loss of Power Instrumentation CONDITIONS REQUIRED     REFERENCED CHANNELS         FROM PER         REQUIRED     SURVEILLANCE             ALLOWABLE FUNCTION                 DIVISION     ACTION A.1   REQUIREMENTS                 VALUE
: f. Degraded Voltage -2 1a) c SR 3.3.8.1.1 2 5.0 seconds and Primary Time Delay SR 3.3.8.1.2 s 5.3 seconds SR 3.3.8.1.4
: 1. Divisions 1 and 2 - 4.16 kV Emergency Bus Undervoltage
: g. Degraded Voltage -c SR 3.3.8.1.2 2 2.63 seconds and Secondary Time Delay SR 3.3.8.1.4 s 3.39 seconds 2. Division 3 -4.16 kV Emergency Bus Undervoltage
: a. TR-S Loss of Voltage -           2             B         SR 3.3.8.1.2   2 2450 V ands 3135 V 4.16 kV Basis                                             SR 3.3.8.1.4
: a. Los of Voltage -2 B SR 3.3.8.1.2 2 2450 V ands 3135 V 4.16 kV Basis SR 3.3.8.1.4
: b. TR-S Loss of Voltage -           2             B         SR 3.3.8.1.3   2 2.95 seconds and Time Delay                                               SR 3.3.8.1.4   s 7.1 seconds
: b. Loss of voltage -2 B SR 3.3.8.1.3 2 1.87 seconds and Time Delay SR 3.3.8.1.4 s 3. 73 seconds c. Degraded Voltage -2 c SR 3.3.8.1.2 2 3685 V and s 3755 V 4. 16 kV Basis SR 3.3.8.1.4
: c. TR-B Loss of Voltage -                         c         SR 3.3.8.1.3   2 2450 V ands 3135 V 4.16 kV Basis                                             SR 3.3.8.1.4
: d. Degraded Voltage -2 c SR 3.3.8.1.2 2 7.36 seconds and Time Delay SR 3.3.8.1.4 s 8.34 seconds (a) The Degraded Voltage -4.16 kV Basis and -Primary Time Delay Functions must be associated with one another. Columbia Generating Station 3.3.8.1-4 Amendment No. 238 ACTIONS CONDITION D. Required Action and associated Completion Time of Condition A or B not met in MODE 4 or 5 with both RHR SOC suction isolation valves open. E. Required Action and associated Completion Time of Condition A or B not met in MODE 5 with any control rod withdrawn from a core cell containing one or more fuel assemblies.
: d. TR-B Loss of Voltage -                         c         SR 3.3.8.1.3   2 3.06 seconds and Time Delay                                               SR 3.3.8.1.4   s 9.28 seconds
Columbia Generating Station D.1 OR D.2 E.1 RPS Electric Power Monitoring 3.3.8.2 REQUIRED ACTION COMPLETION TIME Initiate action to restore one Immediately electric power monitoring assembly to OPERABLE status for inservice power supply(s) supplying required instrumentation.
: e. Degraded Voltage -             2(a)           c         SR 3.3.8.1.1   2 3685 V and s 3755 V
Initiate action to isolate the Immediately RHR SOC System. Initiate action to fully insert Immediately all insertable control rods in core cells containing one or more fuel assemblies.
: 4. 16 kV Basis                                           SR 3.3.8.1.2 SR 3.3.8.1.4
3.3.8.2-2 Amendment No . .:t-49,+w 238 RPS Electric Power Monitoring 3.3.8.2 SURVEILLANCE REQUIREMENTS  
: f. Degraded Voltage -             2 1a)         c         SR 3.3.8.1.1   2 5.0 seconds and Primary Time Delay                                       SR 3.3.8.1.2   s 5.3 seconds SR 3.3.8.1.4
-----------------------------------------------------------N 0 TE--------------------------
: g. Degraded Voltage -                             c         SR 3.3.8.1.2   2 2.63 seconds and Secondary Time Delay                                     SR 3.3.8.1.4   s 3.39 seconds
----------------------------------
: 2. Division 3 - 4.16 kV Emergency Bus Undervoltage
: a. Los of Voltage -                 2             B         SR 3.3.8.1.2   2 2450 V ands 3135 V 4.16 kV Basis                                             SR 3.3.8.1.4
: b. Loss of voltage -               2             B         SR 3.3.8.1.3   2 1.87 seconds and Time Delay                                               SR 3.3.8.1.4   s 3. 73 seconds
: c. Degraded Voltage -               2             c         SR 3.3.8.1.2   2 3685 V and s 3755 V
: 4. 16 kV Basis                                           SR 3.3.8.1.4
: d. Degraded Voltage -               2             c         SR 3.3.8.1.2   2 7.36 seconds and Time Delay                                               SR 3.3.8.1.4   s 8.34 seconds (a)       The Degraded Voltage - 4.16 kV Basis and - Primary Time Delay Functions must be associated with one another.
Columbia Generating Station                         3.3.8.1-4                         Amendment No. 238
 
RPS Electric Power Monitoring 3.3.8.2 ACTIONS CONDITION              REQUIRED ACTION                   COMPLETION TIME D. Required Action and      D.1 Initiate action to restore one   Immediately associated Completion        electric power monitoring Time of Condition A or B    assembly to OPERABLE not met in MODE 4 or 5      status for inservice power with both RHR SOC            supply(s) supplying suction isolation valves    required instrumentation.
open.
OR D.2 Initiate action to isolate the   Immediately RHR SOC System.
E. Required Action and      E.1 Initiate action to fully insert   Immediately associated Completion        all insertable control rods in Time of Condition A or B    core cells containing one or not met in MODE 5 with      more fuel assemblies.
any control rod withdrawn from a core cell containing one or more fuel assemblies.
Columbia Generating Station        3.3.8.2-2           Amendment No . .:t-49,+w ~ 238
 
RPS Electric Power Monitoring 3.3.8.2 SURVEILLANCE REQUIREMENTS
----------------- ----------- ------------------- ------------N 0 TE------- ---------------------------------- -------- -----------
When an RPS electric power monitoring assembly is placed in an inoperable status solely for performance of required Surveillances, entry into the associated Conditions and Required Actions may be delayed for up to 6 hours provided the other RPS electric power monitoring assembly for the associated power supply maintains trip capability.
When an RPS electric power monitoring assembly is placed in an inoperable status solely for performance of required Surveillances, entry into the associated Conditions and Required Actions may be delayed for up to 6 hours provided the other RPS electric power monitoring assembly for the associated power supply maintains trip capability.
SR 3.3.8.2.1 SR 3.3.8.2.2 SR 3.3.8.2.3 SURVEILLANCE
SURVEILLANCE                                                      FREQUENCY SR 3.3.8.2.1               -------------------------------N 0 TE------------------------------
-----------------
On Iy required to be performed prior to entering MODE 2 or 3 from MODE 4, when in MODE 4 for 2". 24 hours.
--------------N 0 TE------------------------------
Perform CHANNEL FUNCTIONAL TEST.                                         In accordance with the Surveillance Frequency Control Program SR 3.3.8.2.2              Perform CHANNEL CALIBRATION. The Allowable                               In accordance Values shall be:                                                          with the Surveillance
On I y required to be performed prior to entering MODE 2 or 3 from MODE 4, when in MODE 4 for 2". 24 hours. Perform CHANNEL FUNCTIONAL TEST. Perform CHANNEL CALIBRATION.
: a. Overvoltage :.: : 133.8 V, with time delay                         Frequency s 3.46 seconds;                                                     Control Program
The Allowable Values shall be: a. Overvoltage
: b. Undervoltage 2". 110.8 V, with time delay s 3.46 seconds; and
:.:::: 133.8 V, with time delay s 3.46 seconds; b. Undervoltage 2". 110.8 V, with time delay s 3.46 seconds; and c. Underfrequency 57 Hz, with time delay s 3.46 seconds. Perform a system functional test. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.8.2-3 Amendment No. +s9,+.79 238 Recirculation Loops Operating (After Implementation of PRNM Upgrade) 3.4.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Be in MODE 3. 12 hours associated Completion Time of Condition A or B not met. No recirculation loops in operation.
: c. Underfrequency         ~  57 Hz, with time delay s 3.46 seconds.
SURVEILLANCE REQUIREMENTS SR 3.4.1.1 SURVEILLANCE
SR 3.3.8.2.3              Perform a system functional test.                                         In accordance with the Surveillance Frequency Control Program Columbia Generating Station                                 3.3.8.2-3           Amendment No. +s9,+.79 ~ 238
-------------------------------NOTE------------------------------
 
Recirculation Loops Operating (After Implementation of PRNM Upgrade) 3.4.1 ACTIONS CONDITION                             REQUIRED ACTION                       COMPLETION TIME C. Required Action and               C.1       Be in MODE 3.                       12 hours associated Completion Time of Condition A or B not met.
No recirculation loops in operation.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                FREQUENCY SR 3.4.1.1         -------------------------------NOTE------------------------------
Not required to be performed until 24 hours after both recirculation loops are in operation.
Not required to be performed until 24 hours after both recirculation loops are in operation.
Verify recirculation loop drive flow mismatch with both recirculation loops in operation is: a. 10% of rated recirculation loop drive flow when operating at < 70% of rated core flow; and b. 5% of rated recirculation loop drive flow when operating at 70% of rated core flow. FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.4.1-4 Amendment No. +++ 238 SURVEILLANCE REQUIREMENTS SR 3.4.2.1 SURVEILLANCE
Verify recirculation loop drive flow mismatch with                 In accordance both recirculation loops in operation is:                          with the Surveillance
------------------------------NOTES-----------------------------
: a.   ~ 10% of rated recirculation loop drive flow                 Frequency when operating at < 70% of rated core flow; and               Control Program
: b.   ~ 5% of rated recirculation loop drive flow when operating at ~ 70% of rated core flow.
Columbia Generating Station                         3.4.1-4           Amendment No.       +++ ~ ~ 238
 
Jet Pumps 3.4.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                            FREQUENCY SR 3.4.2.1       ------------------------------NOTES-----------------------------
: 1. Not required to be performed until 4 hours after associated recirculation loop is in operation.
: 1. Not required to be performed until 4 hours after associated recirculation loop is in operation.
: 2. Not required to be performed until 24 hours after > 25% RTP. Verify at least two of the following criteria (a, b, and c) are satisfied for each operating recirculation loop: a. Recirculation loop drive flow versus recirculation pump speed differs by:<:;; 10% from established patterns.
: 2. Not required to be performed until 24 hours after > 25% RTP.
: b. Recirculation loop drive flow versus total core flow differs by :<:;; 10% from established patterns.
Verify at least two of the following criteria (a, b,             In accordance and c) are satisfied for each operating recirculation           with the loop:                                                            Surveillance Frequency
: c. Each jet pump diffuser to lower plenum differential pressure differs by :<:;; 20% from established patterns, or each jet pump flow differs by :<:;; 10% from established patterns.
: a. Recirculation loop drive flow versus                       Control Program recirculation pump speed differs by:<:;; 10% from established patterns.
Jet Pumps 3.4.2 FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.4.2-2 Amendment No. +49,+w 238 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.3 Safety/Relief Valves (SRVs) -25% RTP SRVs -25% RTP 3.4.3 LCO 3.4.3 The safety function of 12 SRVs shall be OPERABLE, with two SRVs in the lowest two lift setpoint groups OPERABLE.
: b. Recirculation loop drive flow versus total core flow differs by :<:; 10% from established patterns.
APPLICABILITY:
: c. Each jet pump diffuser to lower plenum differential pressure differs by :<:; 20% from established patterns, or each jet pump flow differs by :<:; 10% from established patterns.
THERMAL 25% RTP. ACTIONS CONDITION A. One or more required SRVs inoperable.
Columbia Generating Station                       3.4.2-2         Amendment No. +49,+w ~ 238
A.1 REQUIRED ACTION Reduce THERMAL POWER to< 25% RTP. SURVEILLANCE REQUIREMENTS SURVEILLANCE COMPLETION TIME 4 hours FREQUENCY SR 3.4.3.1 Verify the safety function lift setpoints of the required In accordance SR 3.4.3.2 SRVs are as follows: with the lnservice Testing Program Number of SRVs 2 4 4 4 4 Setpoint _{Qfilg} 1165 +/-34.9 1175 +/- 35.2 1185 +/- 35.5 1195 +/- 35.8 1205 +/-36.1 Verify each required SRV opens when manually actuated.
 
In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.4.3-1 Amendment No. +49,-+W 238 SURVEILLANCE REQUIREMENTS SR 3.4.4.1 SR 3.4.4.2 SURVEILLANCE Verify the safety function lift setpoints of the required SRVs are as follows: Number of SRVs 2 4 4 4 4 Setpoint 1165 +/- 34.9 1175 +/- 35.2 1185 +/- 35.5 1195 +/- 35.8 1205 +/- 36.1 -------------------------------N 0 TE---------------------------
SRVs -  ~ 25% RTP 3.4.3 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.3     Safety/Relief Valves (SRVs) -   ~ 25% RTP LCO 3.4.3           The safety function of 12 SRVs shall be OPERABLE, with two SRVs in the lowest two lift setpoint groups OPERABLE.
---Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test. Verify each required SRV opens when manually actuated.
APPLICABILITY:       THERMAL     POWER~      25% RTP.
SRVs -< 25% RTP 3.4.4 FREQUENCY In accordance with the lnservice Testing Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.4.4-2 Amendment No. +49,169,225,236 238 ACTIONS RCS Operational LEAKAGE 3.4.5 CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Be in MODE 3. associated Completion Time of Condition A or B AND not met. Pressure boundary LEAKAGE exists. C.2 SURVEILLANCE REQUIREMENTS Be in MODE 4. SURVEILLANCE SR 3.4.5.1 Verify RCS unidentified and total LEAKAGE and unidentified LEAKAGE increase are within limits. 12 hours 36 hours FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.4.5-2 Amendment No . .:t-49-,+69 238 RCS Leakage Detection Instrumentation 3.4.7 SURVEILLANCE REQUIREMENTS  
ACTIONS CONDITION                       REQUIRED ACTION                    COMPLETION TIME A. One or more required         A.1     Reduce THERMAL                   4 hours SRVs inoperable.                    POWER to< 25% RTP.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                         FREQUENCY SR 3.4.3.1       Verify the safety function lift setpoints of the required   In accordance SRVs are as follows:                                       with the lnservice Testing Program Number of                   Setpoint SRVs                     _{Qfilg}
2                  1165   +/-34.9 4                  1175   +/- 35.2 4                  1185   +/- 35.5 4                  1195   +/- 35.8 4                  1205   +/-36.1 SR 3.4.3.2        Verify each required SRV opens when manually               In accordance actuated.                                                   with the Surveillance Frequency Control Program Columbia Generating Station                   3.4.3-1         Amendment No. +49,-+W ~ 238
 
SRVs - < 25% RTP 3.4.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                    FREQUENCY SR 3.4.4.1        Verify the safety function lift setpoints of the required                 In accordance with SRVs are as follows:                                                     the lnservice Testing Program Number of                             Setpoint SRVs                               ~
2                           1165 +/- 34.9 4                            1175 +/- 35.2 4                            1185 +/- 35.5 4                            1195 +/- 35.8 4                            1205 +/- 36.1 SR 3.4.4.2        ----- -------- ---- ------- ---- ---N 0 TE--------------------------- ---
Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test.
Verify each required SRV opens when manually                             In accordance with actuated.                                                                the Surveillance Frequency Control Program Columbia Generating Station                           3.4.4-2       Amendment No. +49,169,225,236 238
 
RCS Operational LEAKAGE 3.4.5 ACTIONS CONDITION                     REQUIRED ACTION               COMPLETION TIME C. Required Action and         C.1     Be in MODE 3.               12 hours associated Completion Time of Condition A or B   AND not met.
C.2     Be in MODE 4.               36 hours Pressure boundary LEAKAGE exists.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                  FREQUENCY SR 3.4.5.1       Verify RCS unidentified and total LEAKAGE and       In accordance unidentified LEAKAGE increase are within limits. with the Surveillance Frequency Control Program Columbia Generating Station               3.4.5-2       Amendment No . .:t-49-,+69 ~ 238
 
RCS Leakage Detection Instrumentation 3.4.7 SURVEILLANCE REQUIREMENTS
-----------------------------------------------------------NOTE------------------------------------------------------------
-----------------------------------------------------------NOTE------------------------------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the other required leakage detection instrumentation is OPERABLE.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the other required leakage detection instrumentation is OPERABLE.
SR 3.4.7.1 SR 3.4.7.2 SR 3.4.7.3 SURVEILLANCE Perform CHANNEL CHECK of required drywell atmospheric monitoring system. Perform CHANNEL FUNCTIONAL TEST of required leakage detection instrumentation.
SURVEILLANCE                                                  FREQUENCY SR 3.4.7.1               Perform CHANNEL CHECK of required drywell                           In accordance atmospheric monitoring system.                                       with the Surveillance Frequency Control Program SR 3.4.7.2                Perform CHANNEL FUNCTIONAL TEST of required                         In accordance leakage detection instrumentation.                                   with the Surveillance Frequency Control Program SR 3.4.7.3                Perform CHANNEL CALIBRATION of required                             In accordance leakage detection instrumentation.                                   with the Surveillance Frequency Control Program Columbia Generating Station                               3.4.7-3         Amendment No . .:t-49,+w 2ae 238
Perform CHANNEL CALIBRATION of required leakage detection instrumentation.
 
FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.4.7-3 Amendment No . .:t-49,+w 2ae 238 SURVEILLANCE REQUIREMENTS SR 3.4.8.1 SURVEILLANCE
RCS Specific Activity 3.4.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                FREQUENCY SR 3.4.8.1       ----- ---- -------- --------------NOTE--------------------------- ---
-------------------------------NOTE---------------------------
Only required to be performed in MODE 1.
---Only required to be performed in MODE 1. Verify reactor coolant DOSE EQUIVALENT 1-131 specific activity is 0.2 &#xb5;Ci/gm. RCS Specific Activity 3.4.8 FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.4.8-2 Amendment No. +49,-+W 2.aa 238 RHR Shutdown Cooling System -Hot Shutdown 3.4.9 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. No RHR shutdown B.1 Initiate action to restore one Immediately cooling subsystem in RHR shutdown cooling operation.
Verify reactor coolant DOSE EQUIVALENT 1-131                           In accordance specific activity is ~ 0.2 &#xb5;Ci/gm.                                     with the Surveillance Frequency Control Program Columbia Generating Station                         3.4.8-2           Amendment No. +49,-+W 2.aa 238
subsystem or one recirculation pump to AND operation.
 
No recirculation pump in AND operation.
RHR Shutdown Cooling System - Hot Shutdown 3.4.9 ACTIONS CONDITION                                   REQUIRED ACTION                         COMPLETION TIME B. No RHR shutdown                     B.1         Initiate action to restore one       Immediately cooling subsystem in                             RHR shutdown cooling operation.                                       subsystem or one recirculation pump to AND                                               operation.
B.2 Verify reactor coolant 1 hour from discovery circulation by an alternate of no reactor coolant method. circulation AND Once per 12 hours thereafter AND B.3 Monitor reactor coolant Once per hour temperature and pressure.
No recirculation pump in           AND operation.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.9.1 -------------------------------NOTE---------------------------
B.2         Verify reactor coolant               1 hour from discovery circulation by an alternate         of no reactor coolant method.                             circulation AND Once per 12 hours thereafter AND B.3           Monitor reactor coolant             Once per hour temperature and pressure.
---Not required to be met until 2 hours after reactor steam dome pressure is less than 48 psig. Verify one RHR shutdown cooling subsystem or recirculation pump is operating.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                     FREQUENCY SR 3.4.9.1         ----- -------- ---- ---- --- -------NOTE------------------------------
In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.4.9-2 Amendment No. +e4,+&9 22-e 238 ACTIONS CONDITION
Not required to be met until 2 hours after reactor steam dome pressure is less than 48 psig.
: 8. No RHR shutdown 8.1 cooling subsystem in operation.
Verify one RHR shutdown cooling subsystem or                             In accordance recirculation pump is operating.                                         with the Surveillance Frequency Control Program Columbia Generating Station                               3.4.9-2           Amendment No. +e4,+&9 22-e 238
AND No recirculation pump in operation.
 
AND 8.2 SURVEILLANCE REQUIREMENTS RHR Shutdown Cooling System -Cold Shutdown 3.4.10 REQUIRED ACTION COMPLETION TIME Verify reactor coolant 1 hour from discovery circulating by an alternate of no reactor coolant method. circulation AND Once per 12 hours thereafter Monitor reactor coolant Once per hour temperature and pressure.
RHR Shutdown Cooling System - Cold Shutdown 3.4.10 ACTIONS CONDITION                        REQUIRED ACTION               COMPLETION TIME
SURVEILLANCE FREQUENCY SR 3.4.10.1 Verify one RHR shutdown cooling subsystem or recirculation pump is operating.
: 8. No RHR shutdown                8.1    Verify reactor coolant       1 hour from discovery cooling subsystem in                  circulating by an alternate   of no reactor coolant operation.                            method.                       circulation AND                                                                 AND No recirculation pump in                                          Once per 12 hours operation.                                                          thereafter AND 8.2    Monitor reactor coolant       Once per hour temperature and pressure.
In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.4.10-2 Amendment No. +49,+e9 238 SURVEILLANCE REQUIREMENTS SR 3.4.11.1 SR 3.4.11.2 SR 3.4.11.3 SURVEILLANCE
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY SR 3.4.10.1         Verify one RHR shutdown cooling subsystem or           In accordance recirculation pump is operating.                       with the Surveillance Frequency Control Program Columbia Generating Station                 3.4.10-2         Amendment No. +49,+e9 ~ 238
-------------------------------NOTE------------------------------
 
Only required to be performed during RCS heatup and cooldown operations, and RCS inservice leak and hydrostatic testing. Verify: a. RCS pressure and RCS temperature are within the applicable limits specified in Figures 3.4.11-1, 3.4.11-2, and 3.4.11-3;
RCS PIT Limits 3.4.11 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                    FREQUENCY SR 3.4.11.1      -------------------------------NOTE------------------------------
: b. RCS heatup and cooldown rates are 100 "F in any 1 hour period; and c. RCS temperature change during inservice leak and hydrostatic testing is 20 "F in any 1 hour period when the RCS pressure and RCS temperature are not within the limits of Figure 3.4.11-2.
Only required to be performed during RCS heatup and cooldown operations, and RCS inservice leak and hydrostatic testing.
Verify RCS pressure and RCS temperature are within the criticality limits specified in Figure 3.4.11-3.  
Verify:                                                                  In accordance with the
---------------------
: a. RCS pressure and RCS temperature are within                     Surveillance the applicable limits specified in                               Frequency Figures 3.4.11-1, 3.4.11-2, and 3.4.11-3;                       Control Program
----------N 0 TE------------
: b. RCS heatup and cooldown rates are                 ~  100 "F in any 1 hour period; and
------------------Only required to be met in MODES 1, 2, 3, and 4 during recirculation pump startup. Verify the difference between the bottom head coolant temperature and the reactor pressure vessel (RPV) coolant temperature 145"F. RCS PIT Limits 3.4.11 FREQUENCY In accordance with the Surveillance Frequency Control Program Once within 15 minutes prior to control rod withdrawal for the purpose of achieving criticality Once within 15 minutes prior to each startup of a recirculation pump Columbia Generating Station 3.4.11-2 Amendment No. +49,-+W 238 SURVEILLANCE REQUIREMENTS SR 3.4.11.7 SR 3.4.11.8 SR 3.4.11.9 SURVEILLANCE
: c. RCS temperature change during inservice leak and hydrostatic testing is ~ 20 "F in any 1 hour period when the RCS pressure and RCS temperature are not within the limits of Figure 3.4.11-2.
-------------------------------NO TE------------
SR 3.4.11.2      Verify RCS pressure and RCS temperature are                             Once within within the criticality limits specified in                             15 minutes prior Figure 3.4.11-3.                                                       to control rod withdrawal for the purpose of achieving criticality SR 3.4.11.3      ----- ---------------- --- ---- ---N 0 TE------------------------------
------------------Only required to be performed when tensioning the reactor vessel head bolting studs. Verify reactor vessel flange and head flange temperatures are 80 &deg;F. -------------------------------NOTE------------------------------
Only required to be met in MODES 1, 2, 3, and 4 during recirculation pump startup.
Not required to be performed until 30 minutes after RCS temperatures 90&deg;F in MODE 4. Verify reactor vessel flange and head flange temperatures are 80 &deg;F. -----------------
Verify the difference between the bottom head                           Once within coolant temperature and the reactor pressure vessel                     15 minutes prior (RPV) coolant temperature is~ 145"F.                                   to each startup of a recirculation pump Columbia Generating Station                           3.4.11-2           Amendment No. +49,-+W ~ 238
--------------NO TE---------------------------
 
---Not required to be performed until 12 hours after RCS temperature s 100&deg;F in MODE 4. Verify reactor vessel flange and head flange temperatures 80&deg;F. RCS PIT Limits 3.4.11 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.4.11-4 Amendment No. +49,+e-9 22-9 238 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.12 Reactor Steam Dome Pressure Reactor Steam Dome Pressure 3.4.12 LCO 3.4.12 The reactor steam dome pressure shall 1035 psig. APPLICABILITY:
RCS PIT Limits 3.4.11 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                FREQUENCY SR 3.4.11.7      -------------------------------NOTE------------------------------
MODES 1 and 2. ACTIONS CONDITION REQUIRED ACTION A. Reactor steam dome A.1 Restore reactor steam pressure not within limit. dome pressure to within limit. B. Required Action and B.1 Be in MODE 3. associated Completion Time not met. SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.4.12.1 Verify reactor steam dome pressure 1035 psig. COMPLETION TIME 15 minutes 12 hours FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.4.12-1 Amendment No. -+49,+e9 238 SURVEILLANCE REQUIREMENTS SR 3.5.1.1 SR 3.5.1.2 SR 3.5.1.3 SR 3.5.1.4 SURVEILLANCE Verify, for each ECCS injection/spray subsystem, the piping is filled with water from the pump discharge valve to the injection valve. ---------------------
Only required to be performed when tensioning the reactor vessel head bolting studs.
---------NOTE----------------------------
Verify reactor vessel flange and head flange                       In accordance temperatures are ~ 80 &deg;F.                                           with the Surveillance Frequency Control Program SR 3.4.11.8      -------------------------------NOTE------------------------------
---Low pressure coolant injection (LPCI) subsystems may be considered OPERABLE during alignment and operation for decay heat removal with reactor steam dome pressure less than 48 psig in MODE 3, if capable of being manually realigned and not otherwise inoperable.
Not required to be performed until 30 minutes after RCS temperatures 90&deg;F in MODE 4.
Verify each ECCS injection/spray subsystem manual, power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.
Verify reactor vessel flange and head flange                       In accordance temperatures are ~ 80 &deg;F.                                           with the Surveillance Frequency Control Program SR 3.4.11.9      -------------------------------NO TE--------------------------- ---
Verify ADS accumulator backup compressed gas system average pressure in the required bottles is 2 2200 psig. Verify each ECCS pump develops the specified flow rate with the specified differential pressure between reactor and suction source. SYSTEM LPCS LPCI HPCS FLOW RATE 2 6200 gpm 2 7200 gpm 2 6350 gpm DIFFERENTIAL PRESSURE BETWEEN REACTOR AND SUCTION SOURCE 2 128 psid 2 26 psid 2 200 psid ECCS -Operating 3.5.1 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the lnservice Testing Program Columbia Generating Station 3.5.1-4 Amendment No. 169,205,225,229,236 238 SURVEILLANCE REQUIREMENTS SR 3.5.1.5 SR 3.5.1.6 SR 3.5.1.7 SR 3.5.1.8 SURVEILLANCE
Not required to be performed until 12 hours after RCS temperature s 100&deg;F in MODE 4.
-----------------
Verify reactor vessel flange and head flange                       In accordance temperatures are~ 80&deg;F.                                             with the Surveillance Frequency Control Program Columbia Generating Station                       3.4.11-4           Amendment No. +49,+e-9 22-9 238
--------------NO TE------------
 
------------------Vesse I injection/spray may be excluded.
Reactor Steam Dome Pressure 3.4.12 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.12     Reactor Steam Dome Pressure LCO 3.4.12           The reactor steam dome pressure shall   be~ 1035 psig.
Verify each ECCS injection/spray subsystem actuates on an actual or simulated automatic initiation signal. -------------------------------N 0 TE------------
APPLICABILITY:       MODES 1 and 2.
------------------Valve actuation may be excluded.
ACTIONS CONDITION                     REQUIRED ACTION                 COMPLETION TIME A. Reactor steam dome           A.1     Restore reactor steam         15 minutes pressure not within limit.         dome pressure to within limit.
Verify the ADS actuates on an actual or simulated automatic initiation signal. -------------------------------N 0 TE---------------------------
B. Required Action and         B.1     Be in MODE 3.                 12 hours associated Completion Time not met.
---Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test. Verify each required ADS valve opens when manually actuated.  
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                   FREQUENCY SR 3.4.12.1       Verify reactor steam dome pressure is~  1035 psig. In accordance with the Surveillance Frequency Control Program Columbia Generating Station                 3.4.12-1       Amendment No. -+49,+e9 ~ 238
-------------------------------N 0 TE------------
 
------------------ECCS actuation instrumentation is excluded.
ECCS - Operating 3.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                              FREQUENCY SR 3.5.1.1       Verify, for each ECCS injection/spray subsystem,                 In accordance the piping is filled with water from the pump                     with the discharge valve to the injection valve.                           Surveillance Frequency Control Program SR 3.5.1.2        ------------------------------NOTE-------------------------------
Verify the ECCS RESPONSE TIME for each ECCS injection/spray subsystem is within limits. ECCS -Operating 3.5.1 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.5.1-5 Amendment No. 169,205,225,236 238 ACTIONS CONDITION D. Required Action C.2 and D.1 associated Completion Time not met. REQUIRED ACTION Initiate action to restore secondary containment to OPERABLE status. ECCS -Shutdown 3.5.2 COMPLETION TIME Immediately D.2 Initiate action to restore one Immediately standby gas treatment AND D.3 subsystem to OPERABLE status. Initiate action to restore isolation capability in each required secondary containment penetration flow path not isolated.
Low pressure coolant injection (LPCI) subsystems may be considered OPERABLE during alignment and operation for decay heat removal with reactor steam dome pressure less than 48 psig in MODE 3, if capable of being manually realigned and not otherwise inoperable.
SURVEILLANCE REQUIREMENTS SR 3.5.2.1 SR 3.5.2.2 SURVEILLANCE Verify, for each required low pressure ECCS injection/spray subsystem, the suppression pool water level 18 ft 6 inches. Verify, for the required High Pressure Core Spray (HPCS) System, the: a. Suppression pool water level is;?: 18 ft 6 inches; or b. Condensate storage tank (CST) water level is ;?: 16.5 ft in a single CST or;?: 10.5 ft in each CST. Immediately FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.5.2-2 Amendment No. -WQ.,a+-0 22a 238 SURVEILLANCE REQUIREMENTS SR 3.5.2.3 SR 3.5.2.4 SR 3.5.2.5 SURVEILLANCE Verify, for each required ECCS injection/spray subsystem, the piping is filled with water from the pump discharge valve to the injection valve. ------------------------------NOTE----------------------------
Verify each ECCS injection/spray subsystem                       In accordance manual, power operated, and automatic valve in the                with the flow path, that is not locked, sealed, or otherwise               Surveillance secured in position, is in the correct position.                 Frequency Control Program SR 3.5.1.3        Verify ADS accumulator backup compressed gas                     In accordance system average pressure in the required bottles is               with the 2 2200 psig.                                                     Surveillance Frequency Control Program SR 3.5.1.4        Verify each ECCS pump develops the specified flow                 In accordance rate with the specified differential pressure between             with the lnservice reactor and suction source.                                       Testing Program DIFFERENTIAL PRESSURE BETWEEN REACTOR AND SYSTEM          FLOW RATE                SUCTION SOURCE LPCS          2 6200 gpm                2 128 psid LPCI          2 7200 gpm                2 26 psid HPCS          2 6350 gpm                2 200 psid Columbia Generating Station                      3.5.1-4    Amendment No. 169,205,225,229,236 238
---0 n e low pressure coolant injection (LPCI) subsystem may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned and not otherwise inoperable.
 
Verify each required ECCS injection/spray subsystem manual, power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.
ECCS - Operating 3.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                          FREQUENCY SR 3.5.1.5       ----------------- --------------NO TE------------ --- ---- ---- ---- ---
Verify each required ECCS pump develops the specified flow rate with the specified differential pressure between reactor and suction source. SYSTEM FLOW RATE LPCS LPCI HPCS 2 6200 gpm 2 7200 gpm 2 6350 gpm DIFFERENTIAL PRESSURE BETWEEN REACTOR AND SUCTION SOURCE 2 128 psid 2 26 psid 2 200 psid ECCS -Shutdown 3.5.2 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the lnservice Testing Program Columbia Generating Station 3.5.2-3 Amendment No. +e9,2Ge 22&sect; 229 238 SURVEILLANCE REQUIREMENTS SR 3.5.2.6 SURVEILLANCE
Vesse I injection/spray may be excluded.
-------------------------------NO TE---------------------------
Verify each ECCS injection/spray subsystem                                     In accordance actuates on an actual or simulated automatic                                   with the initiation signal.                                                             Surveillance Frequency Control Program SR 3.5.1.6        --------- ---- ---- ---- --- ---- ---N 0 TE------------ --- ---- ---- ---- ---
---Vesse I injection/spray may be excluded.
Valve actuation may be excluded.
Verify each required ECCS injection/spray subsystem actuates on an actual or simulated automatic initiation signal. Columbia Generating Station 3.5.2-4 ECCS -Shutdown 3.5.2 FREQUENCY In accordance with the Surveillance Frequency Control Program Amendment No. 238 SURVEILLANCE REQUIREMENTS SR 3.5.3.1 SR 3.5.3.2 SR 3.5.3.3 SR 3.5.3.4 SURVEILLANCE Verify the RCIC System piping is filled with water from the pump discharge valve to the injection valve. Verify each RCIC System manual, power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.  
Verify the ADS actuates on an actual or simulated                             In accordance automatic initiation signal.                                                   with the Surveillance Frequency Control Program SR 3.5.1.7        -------------------------------N 0 TE--------------------------- ---
-------------------------------NOTE------------------------------
Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test.
Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test. Verify, with reactor pressure :::; 1035 psig and 935 psig, the RCIC pump can develop a flow rate 600 gpm against a system head corresponding to reactor pressure.  
Verify each required ADS valve opens when                                     In accordance manually actuated.                                                             with the Surveillance Frequency Control Program SR 3.5.1.8        --------- ---- ---- ------- ---- ---N 0 TE------------ --- ---- ---- ---- -- -
-------------------------------NO TE---------------------------
ECCS actuation instrumentation is excluded.
---Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test. Verify, with reactor pressure:::;
Verify the ECCS RESPONSE TIME for each ECCS                                   In accordance injection/spray subsystem is within limits.                                   with the Surveillance Frequency Control Program Columbia Generating Station                            3.5.1-5       Amendment No. 169,205,225,236 238
165 psig, the RCIC pump can develop a flow rate 600 gpm against a system head corresponding to reactor pressure.
 
RCIC System 3.5.3 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.5.3-2 Amendment No. +w,+w 238 SURVEILLANCE REQUIREMENTS SR 3.5.3.5 SURVEILLANCE
ECCS - Shutdown 3.5.2 ACTIONS CONDITION                           REQUIRED ACTION                  COMPLETION TIME D. Required Action C.2 and         D.1     Initiate action to restore     Immediately associated Completion                    secondary containment to Time not met.                          OPERABLE status.
-------------------------------N 0 TE------------
D.2       Initiate action to restore one Immediately standby gas treatment subsystem to OPERABLE status.
---------------
AND D.3      Initiate action to restore     Immediately isolation capability in each required secondary containment penetration flow path not isolated.
---Vesse I injection may be excluded.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                        FREQUENCY SR 3.5.2.1       Verify, for each required low pressure ECCS                 In accordance injection/spray subsystem, the suppression pool             with the water level is~ 18 ft 6 inches.                             Surveillance Frequency Control Program SR 3.5.2.2        Verify, for the required High Pressure Core Spray           In accordance (HPCS) System, the:                                        with the Surveillance
Verify the RCIC System actuates on an actual or simulated automatic initiation signal. Columbia Generating Station 3.5.3-3 RCIC System 3.5.3 FREQUENCY In accordance with the Surveillance Frequency Control Program Amendment No. 238 SURVEILLANCE REQUIREMENTS SR 3.6.1.1.2 SR 3.6.1.1.3 SURVEILLANCE Verify drywell to suppression chamber bypass leakage is s; 1 0% of the acceptable A I JK design value of 0.050 ft 2 at an initial differential pressure of :?: 1.5 psid. -------------------------------N 0 TE---------------------------
: a. Suppression pool water level is;?: 18 ft 6 inches;     Frequency or                                                     Control Program
---Performance of SR 3.6.1.1.2 satisfies this surveillance.
: b. Condensate storage tank (CST) water level is
Verify individual drywell to suppression chamber vacuum relief valve bypass pathway leakage is s; 1 .2% of the acceptable A I JK design value of 0.050 ft 2 at an initial differential pressure of 1.5 psid. Primary Containment 3.6.1.1 FREQUENCY In accordance with the Surveillance Frequency Control Program 48 months following a test with bypass leakage greater than the bypass leakage limit 24 months following two consecutive tests with bypass leakage greater than the bypass leakage limit until two consecutive tests are less than or equal to the bypass leakage limit In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.1-2 Amendment No. 238 SURVEILLANCE REQUIREMENTS SR 3.6.1.1.4 SURVEILLANCE
                        ;?: 16.5 ft in a single CST or;?: 10.5 ft in each CST.
-------------------------------NOTE------------------------------
Columbia Generating Station                     3.5.2-2           Amendment No. -WQ.,a+-0 22a 238
 
ECCS - Shutdown 3.5.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                FREQUENCY SR 3.5.2.3       Verify, for each required ECCS injection/spray                       In accordance subsystem, the piping is filled with water from the                  with the pump discharge valve to the injection valve.                         Surveillance Frequency Control Program SR 3.5.2.4        --------- ---- -----------------NOTE---------------------------- ---
0 n e low pressure coolant injection (LPCI) subsystem may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned and not otherwise inoperable.
Verify each required ECCS injection/spray                           In accordance subsystem manual, power operated, and automatic                     with the valve in the flow path, that is not locked, sealed, or               Surveillance otherwise secured in position, is in the correct                     Frequency position.                                                           Control Program SR 3.5.2.5        Verify each required ECCS pump develops the                         In accordance specified flow rate with the specified differential                 with the lnservice pressure between reactor and suction source.                         Testing Program DIFFERENTIAL PRESSURE BETWEEN REACTOR AND SYSTEM           FLOW RATE               SUCTION SOURCE LPCS           2 6200 gpm               2 128 psid LPCI            2 7200 gpm               2 26 psid HPCS            2 6350 gpm               2 200 psid Columbia Generating Station                         3.5.2-3     Amendment No. +e9,2Ge 22&sect; 229 238
 
ECCS - Shutdown 3.5.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                FREQUENCY SR 3.5.2.6       -------------------------------NOTE--------------------------- ---
Vesse I injection/spray may be excluded.
Verify each required ECCS injection/spray                           In accordance subsystem actuates on an actual or simulated                       with the automatic initiation signal.                                       Surveillance Frequency Control Program Columbia Generating Station                       3.5.2-4                             Amendment No. 238
 
RCIC System 3.5.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                              FREQUENCY SR 3.5.3.1       Verify the RCIC System piping is filled with water               In accordance from the pump discharge valve to the injection                   with the valve.                                                           Surveillance Frequency Control Program SR 3.5.3.2        Verify each RCIC System manual, power operated,                   In accordance and automatic valve in the flow path, that is not                 with the locked, sealed, or otherwise secured in position, is             Surveillance in the correct position.                                         Frequency Control Program SR 3.5.3.3        -------------------------------NOTE------------------------------
Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test.
Verify, with reactor pressure :::; 1035 psig and                 In accordance
                  ~ 935 psig, the RCIC pump can develop a flow rate                 with the
                  ~ 600 gpm against a system head corresponding to                 Surveillance reactor pressure.                                                 Frequency Control Program SR 3.5.3.4        -------------------------------NOTE------------------------------
Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test.
Verify, with reactor pressure:::; 165 psig, the RCIC             In accordance pump can develop a flow rate ~ 600 gpm against a                 with the system head corresponding to reactor pressure.                   Surveillance Frequency Control Program Columbia Generating Station                      3.5.3-2          Amendment No.     +w,+w ~ 238
 
RCIC System 3.5.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                      FREQUENCY SR 3.5.3.5       --------- ---- ---- ------- ---- ---N 0 TE------------------------------
Vesse I injection may be excluded.
Verify the RCIC System actuates on an actual or                           In accordance simulated automatic initiation signal.                                     with the Surveillance Frequency Control Program Columbia Generating Station                           3.5.3-3                             Amendment No. 238
 
Primary Containment 3.6.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                      FREQUENCY SR 3.6.1.1.2      Verify drywell to suppression chamber bypass                               In accordance leakage is s; 1 0% of the acceptable A I JK design                         with the value of 0.050 ft 2 at an initial differential pressure of                 Surveillance
:?: 1.5 psid.                                                             Frequency Control Program 48 months following a test with bypass leakage greater than the bypass leakage limit 24 months following two consecutive tests with bypass leakage greater than the bypass leakage limit until two consecutive tests are less than or equal to the bypass leakage limit SR 3.6.1.1.3      --------- ---- ---- ------- ---- ---N 0 TE--------------------------- ---
Performance of SR 3.6.1.1.2 satisfies this surveillance.
Performance of SR 3.6.1.1.2 satisfies this surveillance.
Verify total drywell to suppression chamber vacuum relief valve bypass leakage is s. 3.0% of the acceptable A I ,JK design value of 0.050 ft2 at an initial differential pressure of 1 .5 psid. Primary Containment 3.6.1.1 FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.1-3 Amendment No. 2Q.:I.-229 238 Primary Containment Air Lock 3.6.1.2 SURVEILLANCE REQUIREMENTS SR 3.6.1.2.1 SR 3.6.1 .2.2 SURVEILLANCE
Verify individual drywell to suppression chamber                           In accordance vacuum relief valve bypass pathway leakage is                             with the s; 1 .2% of the acceptable A I JK design value of                         Surveillance 2
------------------------------NOTES-----------------------------
0.050 ft at an initial differential pressure of                           Frequency
: 1. An inoperable air lock door does not invalidate the previous successful performance of the overall air lock leakage test. 2. Results shall be evaluated against acceptance criteria applicable to SR 3.6.1.1.1.
                  ~ 1.5 psid.                                                               Control Program Columbia Generating Station                            3.6.1.1-2          Amendment No. +w-,~ ~ 238
Perform required primary containment air lock leakage rate testing in accordance with the Primary Containment Leakage Rate Testing Program. Verify only one door in the primary containment air lock can be opened at a time. FREQUENCY In accordance with the Primary Containment Leakage Rate Testing Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.2-4 Amendment No. +49-,+w 22-e 238 SURVEILLANCE REQUIREMENTS SR 3.6.1.3.1 SR 3.6.1 .3.2 SURVEILLANCE
 
-------------------------------N 0 TE---------------------------
Primary Containment 3.6.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                              FREQUENCY SR 3.6.1.1.4      -------------------------------NOTE------------------------------
---Not required to be met when the 24 inch and 30 inch primary containment purge valves are open for inerting, de-inerting, pressure control, ALARA or air quality considerations for personnel entry, or Surveillances that require the valves to be open. Verify each 24 inch and 30 inch primary containment purge valve is closed. ------------------------------N 0 TES-----------------------
Performance of SR 3.6.1.1.2 satisfies this surveillance.
------1. Valves and blind flanges in high radiation areas may be verified by use of administrative means. 2. Not required to be met for PCIVs that are open under administrative controls.
Verify total drywell to suppression chamber vacuum                In accordance relief valve bypass leakage is s. 3.0% of the                     with the acceptable A I ,JK design value of 0.050 ft2 at an                Surveillance initial differential pressure of ~ 1.5 psid.                      Frequency Control Program Columbia Generating Station                      3.6.1.1-3                Amendment No. 2Q.:I.- 229 238
Verify each primary containment isolation manual valve and blind flange that is located outside primary containment and not locked, sealed, or otherwise secured and is required to be closed during accident conditions is closed. PC IVs 3.6.1 .3 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.3-6 Amendment No.
 
22e 238 SURVEILLANCE REQUIREMENTS SR 3.6.1.3.3 SR 3.6.1.3.4 SR 3.6.1.3.5 SR 3.6.1 .3.6 SR 3.6.1.3.7 SURVEILLANCE
Primary Containment Air Lock 3.6.1.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                            FREQUENCY SR 3.6.1.2.1     ------------------------------NOTES-----------------------------
------------------------------NOTES-----------------------------
: 1. An inoperable air lock door does not invalidate the previous successful performance of the overall air lock leakage test.
: 1. Valves and blind flanges in high radiation areas may be verified by use of administrative means. 2. Not required to be met for PCIVs that are open under administrative controls.
: 2. Results shall be evaluated against acceptance criteria applicable to SR 3.6.1.1.1.
Verify each primary containment isolation manual valve and blind flange that is located inside primary containment and not locked, sealed, or otherwise secured and is required to be closed during accident conditions is closed. Verify continuity of the traversing incore probe (TIP) shear isolation valve explosive charge. Verify the isolation time of each power operated, automatic PCIV, except for MSIVs, is within limits. Verify the isolation time of each MSIV is 2:'. 3 seconds and 5 seconds. Verify each automatic PCIV actuates to the isolation position on an actual or simulated isolation signal. PC IVs 3.6.1.3 FREQUENCY Prior to entering MODE 2 or 3 from MODE 4 if primary containment was de-inerted while in MODE 4, if not performed within the previous 92 days In accordance with the Surveillance Frequency Control Program In accordance with the lnservice Testing Program In accordance with the lnservice Testing Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.3-7 Amendment No. -+99,200 22&sect; 238 SURVEILLANCE REQUIREMENTS SR 3.6.1 .3.8 SR 3.6.1 .3.9 SR 3.6.1.3.10 SR 3.6.1.3.11 SR 3.6.1.3.12 SURVEILLANCE Verify a representative sample of reactor instrument line EFCVs actuate to the isolation position on an actual or simulated instrument line break signal. Remove and test the explosive squib from each shear isolation valve of the TIP System. Verify the combined leakage rate for all secondary containment bypass leakage paths is :-:::; 0.04% primary containment volume/day when pressurized Pa. Verify leakage rate through each MSIV is :-:::; 16.0 scfh when tested 25.0 psig. Verify combined leakage rate through hydrostatically tested lines that penetrate the primary containment is within limits. PC IVs 3.6.1.3 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Primary Containment Leakage Rate Testing Program In accordance with the Primary Containment Leakage Rate Testing Program In accordance with the Primary Containment Leakage Rate Testing Program Columbia Generating Station 3.6.1 .3-8 Amendment No. +99,200 229 238 3.6 CONTAINMENT SYSTEMS 3.6.1.4 Drywell Air Temperature LCO 3.6.1.4 Drywell average air temperature shall 135 "F. APPLICABILITY:
Perform required primary containment air lock                    In accordance leakage rate testing in accordance with the Primary              with the Primary Containment Leakage Rate Testing Program.                       Containment Leakage Rate Testing Program SR 3.6.1 .2.2    Verify only one door in the primary containment air              In accordance lock can be opened at a time.                                    with the Surveillance Frequency Control Program Columbia Generating Station                      3.6.1.2-4          Amendment No. +49-,+w 22-e 238
MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION A. Drywell average air A.1 Restore drywell average air temperature not within temperature to within limit. limit. B. Required Action and B.1 Be in MODE 3. associated Completion Time not met. AND B.2 Be in MODE 4. SURVEILLANCE REQUIREMENTS SURVEILLANCE Drywell Air Temperature 3.6.1.4 COMPLETION TIME 8 hours 12 hours 36 hours FREQUENCY SR 3.6.1 .4.1 Verify drywell average air temperature is within limit. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.4-1 Amendment No. +49,.+w 238 SURVEILLANCE REQUIREMENTS SR 3.6.1.5.1 SR 3.6.1 .5.2 SURVEILLANCE Verify each RHR drywell spray subsystem manual, power operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position, is in the correct position or can be aligned to the correct position.
 
Verify each spray nozzle is unobstructed.
PC IVs 3.6.1 .3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                    FREQUENCY SR 3.6.1.3.1      --------- ---- ---- ------- -------N 0 TE--------------------------- ---
RHR Drywell Spray 3.6.1.5 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.5-2 Amendment No. 2W 238 Reactor Building-to-Suppression Chamber Vacuum Breakers 3.6.1.6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. Two or more lines with E.1 Restore all vacuum 1 hour one or more reactor breakers in two lines to building-to-suppression OPERABLE status. chamber vacuum breakers inoperable for opening. F. Required Action and F.1 Be in MODE 3. 12 hours associated Completion Time of Condition A, B AND or E not met. F.2 Be in MODE 4. 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.6.1  
Not required to be met when the 24 inch and 30 inch primary containment purge valves are open for inerting, de-inerting, pressure control, ALARA or air quality considerations for personnel entry, or Surveillances that require the valves to be open.
------------------------------NOTES-----------------------------
Verify each 24 inch and 30 inch primary                                  In accordance containment purge valve is closed.                                       with the Surveillance Frequency Control Program SR 3.6.1 .3.2    ------------------------ ------N 0 TES---------- -------------------
SR 3.6.1.6.2
: 1. Valves and blind flanges in high radiation areas may be verified by use of administrative means.
: 2. Not required to be met for PCIVs that are open under administrative controls.
Verify each primary containment isolation manual                         In accordance valve and blind flange that is located outside primary                   with the containment and not locked, sealed, or otherwise                         Surveillance secured and is required to be closed during accident                     Frequency conditions is closed.                                                   Control Program Columbia Generating Station                          3.6.1.3-6            Amendment No. +-69,~ 22e 238
 
PC IVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                            FREQUENCY SR 3.6.1.3.3     ------------------------------NOTES-----------------------------
: 1. Valves and blind flanges in high radiation areas may be verified by use of administrative means.
: 2.     Not required to be met for PCIVs that are open under administrative controls.
Verify each primary containment isolation manual                Prior to entering valve and blind flange that is located inside primary            MODE 2 or 3 from containment and not locked, sealed, or otherwise                MODE 4 if secured and is required to be closed during accident            primary conditions is closed.                                           containment was de-inerted while in MODE 4, if not performed within the previous 92 days SR 3.6.1.3.4      Verify continuity of the traversing incore probe (TIP)          In accordance shear isolation valve explosive charge.                          with the Surveillance Frequency Control Program SR 3.6.1.3.5      Verify the isolation time of each power operated,                In accordance automatic PCIV, except for MSIVs, is within limits.              with the lnservice Testing Program SR 3.6.1 .3.6    Verify the isolation time of each MSIV is                       In accordance 2:'. 3 seconds and ~ 5 seconds.                                 with the lnservice Testing Program SR 3.6.1.3.7      Verify each automatic PCIV actuates to the isolation            In accordance position on an actual or simulated isolation signal.            with the Surveillance Frequency Control Program Columbia Generating Station                      3.6.1.3-7        Amendment No. -+99,200 22&sect; 238
 
PC IVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                  FREQUENCY SR 3.6.1 .3.8      Verify a representative sample of reactor instrument  In accordance line EFCVs actuate to the isolation position on an    with the actual or simulated instrument line break signal.     Surveillance Frequency Control Program SR 3.6.1 .3.9      Remove and test the explosive squib from each          In accordance shear isolation valve of the TIP System.               with the Surveillance Frequency Control Program SR 3.6.1.3.10    Verify the combined leakage rate for all secondary      In accordance containment bypass leakage paths is :-: :; 0.04%        with the Primary primary containment volume/day when pressurized        Containment to~      Pa.                                           Leakage Rate Testing Program SR 3.6.1.3.11    Verify leakage rate through each MSIV is               In accordance
:-: :; 16.0 scfh when tested at~ 25.0 psig.            with the Primary Containment Leakage Rate Testing Program SR 3.6.1.3.12    Verify combined leakage rate through hydrostatically    In accordance tested lines that penetrate the primary containment    with the Primary is within limits.                                      Containment Leakage Rate Testing Program Columbia Generating Station                  3.6.1 .3-8      Amendment No. +99,200 229 238
 
Drywell Air Temperature 3.6.1.4 3.6 CONTAINMENT SYSTEMS 3.6.1.4      Drywell Air Temperature LCO 3.6.1.4            Drywell average air temperature shall be~  135 "F.
APPLICABILITY:          MODES 1, 2, and 3.
ACTIONS CONDITION                    REQUIRED ACTION                    COMPLETION TIME A. Drywell average air            A.1    Restore drywell average air      8 hours temperature not within                temperature to within limit.
limit.
B. Required Action and            B.1    Be in MODE 3.                    12 hours associated Completion Time not met.                AND B.2    Be in MODE 4.                    36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE                                        FREQUENCY SR 3.6.1 .4.1        Verify drywell average air temperature is within limit. In accordance with the Surveillance Frequency Control Program Columbia Generating Station                  3.6.1.4-1        Amendment No. +49,.+w ~ 238
 
RHR Drywell Spray 3.6.1.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY SR 3.6.1.5.1    Verify each RHR drywell spray subsystem manual,        In accordance power operated, and automatic valve in the flow        with the path that is not locked, sealed, or otherwise secured  Surveillance in position, is in the correct position or can be      Frequency aligned to the correct position.                      Control Program SR 3.6.1 .5.2    Verify each spray nozzle is unobstructed.              In accordance with the Surveillance Frequency Control Program Columbia Generating Station                3.6.1.5-2              Amendment No. 2W 238
 
Reactor Building-to-Suppression Chamber Vacuum Breakers 3.6.1.6 ACTIONS CONDITION                            REQUIRED ACTION                      COMPLETION TIME E. Two or more lines with           E.1       Restore all vacuum                  1 hour one or more reactor                        breakers in two lines to building-to-suppression                    OPERABLE status.
chamber vacuum breakers inoperable for opening.
F. Required Action and              F.1       Be in MODE 3.                       12 hours associated Completion Time of Condition A, B          AND or E not met.
F.2       Be in MODE 4.                       36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE                                               FREQUENCY SR 3.6.1.6.1       ------------------------------NOTES-----------------------------
: 1. Not required to be met for vacuum breakers that are open during Surveillances.
: 1. Not required to be met for vacuum breakers that are open during Surveillances.
: 2. Not required to be met for vacuum breakers open when performing their intended function.
: 2. Not required to be met for vacuum breakers open when performing their intended function.
Verify each vacuum breaker is closed. Perform a functional test of each vacuum breaker. In accordance with the Surveillance Frequency Control Program In accordance with the lnservice Testing Program Columbia Generating Station 3.6.1.6-2 Amendment No. 149,169,225,236 238 Reactor Building-to-Suppression Chamber Vacuum Breakers 3.6.1 .6 SURVEILLANCE REQUIREMENTS SR 3.6.1.6.3 SURVEILLANCE Verify the full open setpoint of each vacuum breaker is s 0.5 psid. Columbia Generating Station 3.6.1.6-3 FREQUENCY In accordance with the Surveillance Frequency Control Program Amendment No. 238 Suppression Chamber-to-Drywell Vacuum Breakers 3.6.1.7 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. One or more D.1 Close one open vacuum 2 hours suppression chamber-to-breaker disk. drywell vacuum breakers with two disks not closed. E. Required Action and E.1 Be in MODE 3. 12 hours associated Completion Time of Condition C or D AND not met. E.2 Be in MODE 4. 36 hours SURVEILLANCE REQUIREMENTS SR 3.6.1.7.1 SURVEILLANCE
Verify each vacuum breaker is closed.                               In accordance with the Surveillance Frequency Control Program SR 3.6.1.6.2      Perform a functional test of each vacuum breaker.                 In accordance with the lnservice Testing Program Columbia Generating Station                       3.6.1.6-2   Amendment No. 149,169,225,236 238
-------------------------------N 0 TE---------------------------
 
---Not required to be met for vacuum breakers that are open during Surveillances.
Reactor Building-to-Suppression Chamber Vacuum Breakers 3.6.1 .6 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY SR 3.6.1.6.3     Verify the full open setpoint of each vacuum breaker   In accordance is s 0.5 psid.                                         with the Surveillance Frequency Control Program Columbia Generating Station                 3.6.1.6-3                   Amendment No. 238
Verify each vacuum breaker is closed. FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.7-2 Amendment No. 169,202,225,236 238 Suppression Chamber-to-Drywell Vacuum Breakers 3.6.1.7 SURVEILLANCE REQUIREMENTS SR 3.6.1.7.2 SR 3.6.1.7.3 SURVEILLANCE Perform a functional test of each required vacuum breaker. Verify the full open setpoint of each required vacuum breaker is 0.5 psid. Columbia Generating Station 3.6.1.7-3 FREQUENCY In accordance with the Surveillance Frequency Control Program Within 12 hours after any discharge of steam to the suppression chamber from the safety/relief valves In accordance with the Surveillance Frequency Control Program Amendment No. 238 SURVEILLANCE REQUIREMENTS SURVEILLANCE Suppression Pool Average Temperature 3.6.2.1 FREQUENCY SR 3.6.2.1.1 Verify suppression pool average temperature is within the applicable limits. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.2.1-3 5 minutes when performing testing that adds heat to the suppression pool Amendment No. +49,+w 238 Suppression Pool Water Level 3.6.2.2 3.6 CONTAINMENT SYSTEMS 3.6.2.2 Suppression Pool Water Level LCO 3.6.2.2 Suppression pool water level shall be 30 ft 9. 75 inches and :.:::: 31 ft 1.75 inches. APPLICABILITY:
 
MODES 1 , 2, and 3. ACTIONS CONDITION REQUIRED ACTION A. Suppression pool water A.1 Restore suppression pool level not within limits. water level to within limits. B. Required Action and B.1 Be in MODE 3. associated Completion Time not met. AND B.2 Be in MODE 4. SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.6.2.2.1 Verify suppression pool water level is within limits. COMPLETION TIME 2 hours 12 hours 36 hours FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.2.2-1 Amendment No. +49,+e.Q 2ae 238 RHR Suppression Pool Cooling 3.6.2.3 SURVEILLANCE REQUIREMENTS SR 3.6.2.3.1 SR 3.6.2.3.2 SURVEILLANCE Verify each RHR suppression pool cooling subsystem manual, power operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position, is in the correct position or can be aligned to the correct position.
Suppression Chamber-to-Drywell Vacuum Breakers 3.6.1.7 ACTIONS CONDITION                                 REQUIRED ACTION                         COMPLETION TIME D. One or more                       D.1         Close one open vacuum                 2 hours suppression chamber-to-                         breaker disk.
Verify each RHR pump develops a flow rate :2: 7100 gpm through the associated heat exchanger while operating in the suppression pool cooling mode. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the lnservice Testing Program Columbia Generating Station 3.6.2.3-2 Amendment No. 169 225 230 238 3.6 CONTAINMENT SYSTEMS Primary Containment Atmosphere Mixing System 3.6.3.2 3.6.3.2 Primary Containment Atmosphere Mixing System LCO 3.6.3.2 Two head area return fans shall be OPERABLE.
drywell vacuum breakers with two disks not closed.
APPLICABILITY:
E. Required Action and               E.1         Be in MODE 3.                           12 hours associated Completion Time of Condition C or D           AND not met.
MODES 1 and 2. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One head area return A.1 Restore head area return 30 days fan inoperable.
E.2         Be in MODE 4.                         36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                      FREQUENCY SR 3.6.1.7.1       --------- ---- ---- ------- -------N 0 TE------------------------------
fan to OPERABLE status. B. Two head area return B.1 Verify by administrative 1 hour fans inoperable.
Not required to be met for vacuum breakers that are open during Surveillances.
means that the hydrogen and oxygen control function is maintained.
Verify each vacuum breaker is closed.                                     In accordance with the Surveillance Frequency Control Program Columbia Generating Station                           3.6.1.7-2     Amendment No. 169,202,225,236 238
AND B.2 Restore one head area 7 days return fan to OPERABLE status. C. Required Action and C.1 Be in MODE 3. 12 hours associated Completion Time not met. Columbia Generating Station 3.6.3.2-1 Amendment No. -+W,+87 226 238 Primary Containment Atmosphere Mixing System 3.6.3.2 SURVEILLANCE REQUIREMENTS SR 3.6.3.2.1 SURVEILLANCE FREQUENCY Operate each head area return fan for 15 minutes. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.3.2-2 Amendment No. 238 Primary Containment Oxygen Concentration 3.6.3.3 3.6 CONTAINMENT SYSTEMS 3.6.3.3 Primary Containment Oxygen Concentration LCO 3.6.3.3 The primary containment oxygen concentration shall be < 3.5 volume percent. APPLICABILITY:
 
MODE 1 during the time period: a. From 24 hours after THERMAL POWER is > 15% RTP following startup, to b. 24 hours prior to reducing THERMAL POWER to< 15% RTP prior to the next scheduled reactor shutdown.
Suppression Chamber-to-Drywell Vacuum Breakers 3.6.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                  FREQUENCY SR 3.6.1.7.2     Perform a functional test of each required vacuum   In accordance breaker.                                             with the Surveillance Frequency Control Program Within 12 hours after any discharge of steam to the suppression chamber from the safety/relief valves SR 3.6.1.7.3     Verify the full open setpoint of each required      In accordance vacuum breaker is ~ 0.5 psid.                        with the Surveillance Frequency Control Program Columbia Generating Station                3.6.1.7-3                  Amendment No. 238
ACTIONS CONDITION REQUIRED ACTION A. Primary containment A.1 Restore oxygen oxygen concentration concentration to within limit. not within limit. B. Required Action and B.1 Reduce THERMAL associated Completion POWER to::;; 15% RTP. Time not met. SURVEILLANCE REQUIREMENTS SR 3.6.3.3.1 SURVEILLANCE Verify primary containment oxygen concentration is within limits. COMPLETION TIME 24 hours 8 hours FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.3.3-1 Amendment No. -+49,+es 22&sect; 238 Secondary Containment 3.6.4.1 SURVEILLANCE REQUIREMENTS SR 3.6.4.1.1 SR 3.6.4.1 .2 SR 3.6.4.1.3 SR 3.6.4.1 .4 SR 3.6.4.1.5 SURVEILLANCE Verify secondary containment vacuum is 2:: 0.25 inch of vacuum water gauge. Verify all secondary containment equipment hatches are closed and sealed. Verify each secondary containment access inner door or each secondary containment access outer door in each access opening is closed. Verify each standby gas treatment (SGT) subsystem will draw down the secondary containment to 2:: 0.25 inch of vacuum water gauge in 120 seconds. Verify each SGT subsystem can maintain 0.25 inch of vacuum water gauge in the secondary containment for 1 hour at a flow rate 2240 cfm. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.4.1-2 Amendment No. +w,-+99 22-6 238 SURVEILLANCE REQUIREMENTS SR 3.6.4.2.1 SR 3.6.4.2.2 SR 3.6.4.2.3 SURVEILLANCE
 
------------------------------NOTES-----------------------------
Suppression Pool Average Temperature 3.6.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                  FREQUENCY SR 3.6.2.1.1     Verify suppression pool average temperature is       In accordance within the applicable limits.                       with the Surveillance Frequency Control Program 5 minutes when performing testing that adds heat to the suppression pool Columbia Generating Station               3.6.2.1-3       Amendment No. +49,+w ~ 238
 
Suppression Pool Water Level 3.6.2.2 3.6 CONTAINMENT SYSTEMS 3.6.2.2     Suppression Pool Water Level LCO 3.6.2.2             Suppression pool water level shall be ~ 30 ft 9. 75 inches and
:.: : 31 ft 1.75 inches.
APPLICABILITY:           MODES 1 , 2, and 3.
ACTIONS CONDITION                             REQUIRED ACTION                   COMPLETION TIME A. Suppression pool water               A.1     Restore suppression pool         2 hours level not within limits.                   water level to within limits.
B. Required Action and                 B.1     Be in MODE 3.                   12 hours associated Completion Time not met.                       AND B.2     Be in MODE 4.                   36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE                                         FREQUENCY SR 3.6.2.2.1         Verify suppression pool water level is within limits.         In accordance with the Surveillance Frequency Control Program Columbia Generating Station                         3.6.2.2-1         Amendment No. +49,+e.Q 2ae 238
 
RHR Suppression Pool Cooling 3.6.2.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY SR 3.6.2.3.1     Verify each RHR suppression pool cooling               In accordance subsystem manual, power operated, and automatic         with the valve in the flow path that is not locked, sealed, or   Surveillance otherwise secured in position, is in the correct       Frequency position or can be aligned to the correct position. Control Program SR 3.6.2.3.2      Verify each RHR pump develops a flow rate               In accordance
:2: 7100 gpm through the associated heat exchanger     with the lnservice while operating in the suppression pool cooling         Testing Program mode.
Columbia Generating Station                3.6.2.3-2         Amendment No. 169 225 230 238
 
Primary Containment Atmosphere Mixing System 3.6.3.2 3.6 CONTAINMENT SYSTEMS 3.6.3.2     Primary Containment Atmosphere Mixing System LCO 3.6.3.2           Two head area return fans shall be OPERABLE.
APPLICABILITY:         MODES 1 and 2.
ACTIONS CONDITION                   REQUIRED ACTION                 COMPLETION TIME A. One head area return         A.1     Restore head area return     30 days fan inoperable.                   fan to OPERABLE status.
B. Two head area return         B.1     Verify by administrative     1 hour fans inoperable.                   means that the hydrogen and oxygen control function is maintained.
AND B.2     Restore one head area         7 days return fan to OPERABLE status.
C. Required Action and         C.1     Be in MODE 3.                 12 hours associated Completion Time not met.
Columbia Generating Station                 3.6.3.2-1       Amendment No. -+W,+87 226 238
 
Primary Containment Atmosphere Mixing System 3.6.3.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY SR 3.6.3.2.1     Operate each head area return fan for ~ 15 minutes. In accordance with the Surveillance Frequency Control Program Columbia Generating Station           3.6.3.2-2                       Amendment No. 238
 
Primary Containment Oxygen Concentration 3.6.3.3 3.6 CONTAINMENT SYSTEMS 3.6.3.3     Primary Containment Oxygen Concentration LCO 3.6.3.3             The primary containment oxygen concentration shall be < 3.5 volume percent.
APPLICABILITY:           MODE 1 during the time period:
: a. From 24 hours after THERMAL POWER is > 15% RTP following startup, to
: b. 24 hours prior to reducing THERMAL POWER to< 15% RTP prior to the next scheduled reactor shutdown.
ACTIONS CONDITION                         REQUIRED ACTION                 COMPLETION TIME A. Primary containment               A.1   Restore oxygen                 24 hours oxygen concentration                   concentration to within limit.
not within limit.
B. Required Action and               B.1   Reduce THERMAL                 8 hours associated Completion                   POWER to::;; 15% RTP.
Time not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY SR 3.6.3.3.1           Verify primary containment oxygen concentration is     In accordance within limits.                                         with the Surveillance Frequency Control Program Columbia Generating Station                     3.6.3.3-1         Amendment No. -+49,+es 22&sect; 238
 
Secondary Containment 3.6.4.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                  FREQUENCY SR 3.6.4.1.1     Verify secondary containment vacuum is 2:: 0.25 inch  In accordance of vacuum water gauge.                               with the Surveillance Frequency Control Program SR 3.6.4.1 .2    Verify all secondary containment equipment hatches    In accordance are closed and sealed.                                with the Surveillance Frequency Control Program SR 3.6.4.1.3     Verify each secondary containment access inner        In accordance door or each secondary containment access outer      with the door in each access opening is closed.                Surveillance Frequency Control Program SR 3.6.4.1 .4    Verify each standby gas treatment (SGT) subsystem    In accordance will draw down the secondary containment to          with the 2:: 0.25 inch of vacuum water gauge in               Surveillance
                  ~ 120 seconds.                                        Frequency Control Program SR 3.6.4.1.5      Verify each SGT subsystem can maintain                In accordance
                  ~ 0.25 inch of vacuum water gauge in the secondary    with the containment for 1 hour at a flow rate ~ 2240 cfm. Surveillance Frequency Control Program Columbia Generating Station                3.6.4.1-2        Amendment No. +w,-+99 22-6 238
 
SC IVs 3.6.4.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                            FREQUENCY SR 3.6.4.2.1     ------------------------------NOTES-----------------------------
: 1. Valves and blind flanges in high radiation areas may be verified by use of administrative controls.
: 1. Valves and blind flanges in high radiation areas may be verified by use of administrative controls.
: 2. Not required to be met for SCIVs that are open under administrative controls.
: 2. Not required to be met for SCIVs that are open under administrative controls.
Verify each secondary containment isolation manual valve and blind flange that is not locked, sealed, or otherwise secured, and is required to be closed during accident conditions is closed. Verify the isolation time of each power operated, automatic SCIV is within limits. Verify each automatic SCIV actuates to the isolation position on an actual or simulated automatic isolation signal. SC IVs 3.6.4.2 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the lnservice Testing Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.4.2-3 Amendment No. 200 238 ACTIONS CONDITION REQUIRED ACTION SGT System 3.6.4.3 COMPLETION TIME E. Two SGT subsystems inoperable during OPDRVs. E.1 Initiate action to suspend OPDRVs. Immediately SURVEILLANCE REQUIREMENTS SR 3.6.4.3.1 SR 3.6.4.3.2 SR 3.6.4.3.3 SR 3.6.4.3.4 SURVEILLANCE Operate each SGT subsystem for 2 10 continuous hours with heaters operating.
Verify each secondary containment isolation manual               In accordance valve and blind flange that is not locked, sealed, or           with the otherwise secured, and is required to be closed                 Surveillance during accident conditions is closed.                           Frequency Control Program SR 3.6.4.2.2      Verify the isolation time of each power operated,               In accordance automatic SCIV is within limits.                                 with the lnservice Testing Program SR 3.6.4.2.3      Verify each automatic SCIV actuates to the isolation             In accordance position on an actual or simulated automatic                     with the isolation signal.                                               Surveillance Frequency Control Program Columbia Generating Station                     3.6.4.2-3             Amendment No. 200 ~ 238
Perform required SGT filter testing in accordance with the Ventilation Filter Testing Program (VFTP). Verify each SGT subsystem actuates on an actual or simulated initiation signal. Verify each SGT filter cooling recirculation valve can be opened and the fan started. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the VFTP In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.4.3-2 Amendment No.
 
22&sect; 238 ACTIONS CONDITION REQUIRED ACTION C. Required Action and C.1 --------------NO TE-------------
SGT System 3.6.4.3 ACTIONS CONDITION                        REQUIRED ACTION                  COMPLETION TIME E. Two SGT subsystems         E.1       Initiate action to suspend     Immediately inoperable during                    OPDRVs.
--associated Completion LCO 3.0.4.a is not Time of Condition B not applicable when entering met. MODE 3. ---------------------
OPDRVs.
-----------------Be in MODE 3. D. Required Action and D.1 Be in MODE 3. associated Completion Time of Condition A not AND met. D.2 Be in MODE 4. OR Both SW subsystems inoperable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY SR 3.6.4.3.1     Operate each SGT subsystem for 2 10 continuous           In accordance hours with heaters operating.                           with the Surveillance Frequency Control Program SR 3.6.4.3.2      Perform required SGT filter testing in accordance        In accordance with the Ventilation Filter Testing Program (VFTP).     with the VFTP SR 3.6.4.3.3      Verify each SGT subsystem actuates on an actual         In accordance or simulated initiation signal.                         with the Surveillance Frequency Control Program SR 3.6.4.3.4      Verify each SGT filter cooling recirculation valve can   In accordance be opened and the fan started.                           with the Surveillance Frequency Control Program Columbia Generating Station                 3.6.4.3-2         Amendment No. ~.+99 22&sect; 238
OR UHS inoperable for reasons other than Condition A. SURVEILLANCE REQUIREMENTS SR 3.7.1.1 SR 3.7.1.2 SURVEILLANCE Verify the average water level in the UHS spray ponds is 432 feet 9 inches mean sea level. Verify the average water temperature of each UHS spray pond is::;; 77&deg;F. SW System and UHS 3.7.1 COMPLETION TIME 12 hours 12 hours 36 hours FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.7.1-2 Amendment No. +49,169,225,2:3:3,2:36 238 SURVEILLANCE REQUIREMENTS SR 3.7.1.3 SR 3.7.1.4 SR 3.7.1.5 SURVEILLANCE
 
-------------------------------NOTE------------------------------
SW System and UHS 3.7.1 ACTIONS CONDITION                       REQUIRED ACTION                         COMPLETION TIME C. Required Action and         C.1       --------------NO TE---------------
associated Completion                 LCO 3.0.4.a is not Time of Condition B not               applicable when entering met.                                 MODE 3.
                                        ----- ---- -----------------------------
Be in MODE 3.                           12 hours D. Required Action and         D.1       Be in MODE 3.                           12 hours associated Completion Time of Condition A not     AND met.
D.2       Be in MODE 4.                           36 hours OR Both SW subsystems inoperable.
OR UHS inoperable for reasons other than Condition A.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                FREQUENCY SR 3.7.1.1       Verify the average water level in the UHS spray                   In accordance ponds is ~ 432 feet 9 inches mean sea level.                     with the Surveillance Frequency Control Program SR 3.7.1.2        Verify the average water temperature of each UHS                 In accordance spray pond is::;; 77&deg;F.                                           with the Surveillance Frequency Control Program Columbia Generating Station                   3.7.1-2         Amendment No. +49,169,225,2:3:3,2:36 238
 
SW System and UHS 3.7.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                              FREQUENCY SR 3.7.1.3       -------------------------------NOTE------------------------------
lsolation of flow to individual components does not render SW subsystem inoperable.
lsolation of flow to individual components does not render SW subsystem inoperable.
Verify each SW subsystem manual, power operated, and automatic valve in the flow path servicing safety related systems or components, that is not locked, sealed, or otherwise secured in position, is in the correct position.
Verify each SW subsystem manual, power                             In accordance operated, and automatic valve in the flow path                     with the servicing safety related systems or components,                   Surveillance that is not locked, sealed, or otherwise secured in               Frequency position, is in the correct position.                             Control Program SR 3.7.1.4        Verify average sediment depth in each UHS spray                   In accordance pond is < 0.5 ft.                                                 with the Surveillance Frequency Control Program SR 3.7.1.5        Verify each SW subsystem actuates on an actual or                 In accordance simulated initiation signal.                                       with the Surveillance Frequency Control Program Columbia Generating Station                       3.7.1-3     Amendment No. 149,169,225,236 238
Verify average sediment depth in each UHS spray pond is < 0.5 ft. Verify each SW subsystem actuates on an actual or simulated initiation signal. SW System and UHS 3.7.1 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.7.1-3 Amendment No. 149,169,225,236 238
 
: 3. 7 PLANT SYSTEMS HPCS SW System 3.7.2 3.7.2 High Pressure Core Spray (HPCS) Service Water (SW) System LCO 3.7.2 The HPCS SW System shall be OPERABLE.
HPCS SW System 3.7.2
APPLICABILITY:
: 3. 7 PLANT SYSTEMS 3.7.2       High Pressure Core Spray (HPCS) Service Water (SW) System LCO 3.7.2             The HPCS SW System shall be OPERABLE.
MODES 1, 2, and 3. ACTIONS CONDITION A. HPCS SW System inoperable.
APPLICABILITY:       MODES 1, 2, and 3.
A.1 REQUIRED ACTION Declare HPCS System inoperable.
ACTIONS CONDITION                                 REQUIRED ACTION                                COMPLETION TIME A. HPCS SW System                     A.1         Declare HPCS System                         Immediately inoperable.                                    inoperable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE COMPLETION TIME Immediately FREQUENCY SR 3.7.2.1 -------------------------------N 0 TE------------
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                           FREQUENCY SR 3.7.2.1       ----- ---- ---- ---- ------- ---- ---N 0 TE------------ --- ---- ---- ---- ---
------------------SR 3.7.2.2 lso I a tio n of flow to individual components does not render HPCS SW System inoperable.
lso Ia tio n of flow to individual components does not render HPCS SW System inoperable.
Verify each HPCS SW System manual, power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.
Verify each HPCS SW System manual, power                                         In accordance operated, and automatic valve in the flow path, that                             with the is not locked, sealed, or otherwise secured in                                   Surveillance position, is in the correct position.                                           Frequency Control Program SR 3.7.2.2        Verify the HPCS SW System actuates on an actual                                 In accordance or simulated initiation signal.                                                 with the Surveillance Frequency Control Program Columbia Generating Station                             3.7.2-1             Amendment No. +49,+e9 22&sect; 238
Verify the HPCS SW System actuates on an actual or simulated initiation signal. In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.7.2-1 Amendment No. +49,+e9 22&sect; 238 SURVEILLANCE REQUIREMENTS SR 3.7.3.1 SR 3.7.3.2 SR 3.7.3.3 SR 3.7.3.4 SURVEILLANCE Operate each CREF subsystem for 1 O continuous hours with the heaters operating.
 
Perform required CREF filter testing in accordance with the Ventilation Filter Testing Program (VFTP). Verify each CREF subsystem actuates on an actual or simulated initiation signal. Perform required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program. CREF System 3.7.3 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the VFTP In accordance with the Surveillance Frequency Control Program In accordance with the Control Room Envelope Habitability Program Columbia Generating Station 3.7.3-3 Amendment No . .:t--99,207 225 238 ACTIONS CONDITION REQUIRED ACTION D. Required Action and D.1 Place OPERABLE control associated Completion room AC subsystem in Time of Condition A not operation.
CREF System 3.7.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY SR 3.7.3.1        Operate each CREF subsystem for ~ 1O continuous       In accordance hours with the heaters operating.                     with the Surveillance Frequency Control Program SR 3.7.3.2        Perform required CREF filter testing in accordance    In accordance with the Ventilation Filter Testing Program (VFTP). with the VFTP SR 3.7.3.3        Verify each CREF subsystem actuates on an actual       In accordance or simulated initiation signal.                       with the Surveillance Frequency Control Program SR 3.7.3.4        Perform required CRE unfiltered air inleakage          In accordance testing in accordance with the Control Room          with the Control Envelope Habitability Program.                        Room Envelope Habitability Program Columbia Generating Station                 3.7.3-3         Amendment No . .:t--99,207 225 238
met during OPDRVs. OR D.2 Initiate action to suspend OPDRVs. E. Required Action and E.1 Initiate action to suspend associated Completion OPDRVs. Time of Condition B not met during OPDRVs. SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.4.1 Verify each control room AC subsystem has the capability to remove the assumed heat load. Control Room AC System 3.7.4 COMPLETION TIME Immediately Immediately Immediately FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.7.4-2 Amendment No. 169,199,225,227,236 238 Main Condenser Offgas 3.7.5 SURVEILLANCE REQUIR5EMENTS SR 3.7.5.1 SURVEILLANCE
 
-------------
Control Room AC System 3.7.4 ACTIONS CONDITION                       REQUIRED ACTION                 COMPLETION TIME D. Required Action and           D.1     Place OPERABLE control         Immediately associated Completion               room AC subsystem in Time of Condition A not             operation.
------------------N 0 TE---------------------------
met during OPDRVs.
---Not required to be performed until 31 days after any main steam line not isolated and SJAE in operation.
OR D.2     Initiate action to suspend     Immediately OPDRVs.
Verify the gross gamma activity rate of the noble gases is 332 mCi/second after decay of 30 minutes. FREQUENCY In accordance with the Surveillance Frequency Control Program Once within 4 hours after a 50% increase in the nominal steady state fission gas release after factoring out increases due to changes in THERMAL POWER level Columbia Generating Station 3.7.5-2 Amendment No. +49,-+W 238 Main Turbine Bypass System 3.7.6 3. 7 PLANT SYSTEMS 3.7.6 Main Turbine Bypass System LCO 3.7.6 The Main Turbine Bypass System shall be OPERABLE.
E. Required Action and           E.1     Initiate action to suspend     Immediately associated Completion                 OPDRVs.
Time of Condition B not met during OPDRVs.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                     FREQUENCY SR 3.7.4.1         Verify each control room AC subsystem has the           In accordance capability to remove the assumed heat load.             with the Surveillance Frequency Control Program Columbia Generating Station                   3.7.4-2     Amendment No. 169,199,225,227,236 238
 
Main Condenser Offgas 3.7.5 SURVEILLANCE REQUIR5EMENTS SURVEILLANCE                                                    FREQUENCY SR 3.7.5.1       ------------- ---- ------- -------N 0 TE--------------------------- ---
Not required to be performed until 31 days after any main steam line not isolated and SJAE in operation.
Verify the gross gamma activity rate of the noble gases is ~ 332 mCi/second after decay of                                 In accordance 30 minutes.                                                             with the Surveillance Frequency Control Program Once within 4 hours after a
                                                                                            ~ 50% increase in the nominal steady state fission gas release after factoring out increases due to changes in THERMAL POWER level Columbia Generating Station                         3.7.5-2             Amendment No. +49,-+W ~ 238
 
Main Turbine Bypass System 3.7.6
: 3. 7 PLANT SYSTEMS 3.7.6       Main Turbine Bypass System LCO 3.7.6             The Main Turbine Bypass System shall be OPERABLE.
LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for an inoperable Main Turbine Bypass System, as specified in the COLR, are made applicable.
LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for an inoperable Main Turbine Bypass System, as specified in the COLR, are made applicable.
APPLICABILITY:
APPLICABILITY:       THERMAL POWER 2 25% RTP.
THERMAL POWER 2 25% RTP. ACTIONS CONDITION REQUIRED ACTION A. Requirements of the A.1 Satisfy the requirements of LCO not met. the LCO. B. Required Action and B.1 Reduce THERMAL associated Completion POWER to< 25% RTP. Time not met. SURVEILLANCE REQUIREMENTS SR 3.7.6.1 SURVEILLANCE Verify one complete cycle of each main turbine bypass valve. COMPLETION TIME 2 hours 4 hours FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.7.6-1 Amendment No. +49,+e9 225 238 SURVEILLANCE REQUIREMENTS SR 3.7.6.2 SR 3.7.6.3 SURVEILLANCE Perform a system functional test. Verify the TURBINE BYPASS SYSTEM RESPONSE TIME is within limits. Columbia Generating Station 3.7.6-2 Main Turbine Bypass System 3.7.6 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Amendment No. 238 Spent Fuel Storage Pool Water Level 3.7.7 3.7 PLANT SYSTEMS 3.7.7 Spent Fuel Storage Pool Water Level LCO 3.7.7 The spent fuel storage pool water level shall 22 ft over the top of irradiated fuel assemblies seated in the spent fuel storage pool racks. APPLICABILITY:
ACTIONS CONDITION                     REQUIRED ACTION                 COMPLETION TIME A. Requirements of the         A.1   Satisfy the requirements of   2 hours LCO not met.                     the LCO.
During movement of irradiated fuel assemblies in the spent fuel storage pool. ACTIONS CONDITION A. Spent fuel storage pool water level not within limit. A.1 REQUIRED ACTION COMPLETION TIME -------------
B. Required Action and         B.1   Reduce THERMAL                 4 hours associated Completion             POWER to< 25% RTP.
--N 0 TE------------
Time not met.
--L CO 3.0.3 is not applicable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY SR 3.7.6.1         Verify one complete cycle of each main turbine         In accordance bypass valve.                                         with the Surveillance Frequency Control Program Columbia Generating Station               3.7.6-1         Amendment No. +49,+e9 225 238
Suspend movement of Immediately irradiated fuel assemblies in the spent fuel storage pool. SURVEILLANCE REQUIREMENTS SR 3.7.7.1 SURVEILLANCE Verify the spent fuel storage pool water level is 22 ft over the top of irradiated fuel assemblies seated in the spent fuel storage pool racks. FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.7.7-1 Amendment No. +49,-+W 2aa 238 ACTIONS CONDITION REQUIRED ACTION F. Required Action and F.1 ---------------NOTE--------------
 
associated Completion LCO 3.0.4.a is not Time of Condition A, B, applicable when entering C, D, or E not met. MODE 3. -------------------------------------Be in MODE 3. G. Three or more required G.1 Enter LCO 3.0.3. AC sources inoperable.
Main Turbine Bypass System 3.7.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE                        FREQUENCY SR 3.7.6.2        Perform a system functional test.         In accordance with the Surveillance Frequency Control Program SR 3.7.6.3        Verify the TURBINE BYPASS SYSTEM           In accordance RESPONSE TIME is within limits.           with the Surveillance Frequency Control Program Columbia Generating Station               3.7.6-2         Amendment No. 238
SURVEILLANCE REQUIREMENTS SR 3.8.1.1 SR 3.8.1.2 SURVEILLANCE Verify correct breaker alignment and indicated power availability for each offsite circuit. ------------------------------NOTES----------------------------
 
: 1. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading. 2. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer.
Spent Fuel Storage Pool Water Level 3.7.7 3.7 PLANT SYSTEMS 3.7.7       Spent Fuel Storage Pool Water Level LCO 3.7.7               The spent fuel storage pool water level shall be~ 22 ft over the top of irradiated fuel assemblies seated in the spent fuel storage pool racks.
When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1. 7 must be met. Verify each required DG starts from standby conditions and achieves steady state: a. Voltage 2". 3910 V and 4400 V and frequency 2". 58 .8 Hz and 61.2 Hz for DG-1 and DG-2; and b. Voltage 2". 3910 V and 4400 V and frequency 2". 58.8 Hz 61.2 Hz for DG-3. AC Sources -Operating 3.8.1 COMPLETION TIME 12 hours Immediately FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.1-5 Amendment No. 169,181,225,236 238 AC Sources -Operating 3.8.1 SURVEILLANCE REQUIREMENTS SR 3.8.1.3 SR 3.8.1.4 SR 3.8.1.5 SURVEILLANCE
APPLICABILITY:         During movement of irradiated fuel assemblies in the spent fuel storage pool.
----------------------------
ACTIONS CONDITION                       REQUIRED ACTION                        COMPLETION TIME A. Spent fuel storage pool         A.1     ------------- --N 0 TE------------ --
--N 0 TES--------------------------
water level not within                L CO 3.0.3 is not applicable.
---1. DG loadings may include gradual loading as recommended by the manufacturer.
limit.
: 2. Momentary transients outside the load range do not invalidate this test. 3. This Surveillance shall be conducted on only one DG at a time. 4. This SR shall be preceded by, and immediately follow, without shutdown, a successful performance of SR 3.8.1.2 or SR 3.8.1.7. 5. The endurance test of SR 3.8.1 .14 may be performed in lieu of the load-run test in SR 3.8.1.3 provided the requirements, except the upper load limits, of SR 3.8.1.3 are met. Verify each required DG is synchronized and loaded and operates for;:::: 60 minutes at a load ;:::: 4000 kW and :s; 4400 kW for DG-1 and DG-2, and ;:::: 2340 kW and :s; 2600 kW for DG-3. Verify each required day tank contains fuel oil to support greater than or equal to one hour of operation at full load plus 10%. Check for and remove accumulated water from each required day tank. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.1-6 Amendment No. 238 AC Sources -Operating 3.8.1 SURVEILLANCE REQUIREMENTS SR 3.8.1.6 SR 3.8.1.7 SR 3.8.1.8 SURVEILLANCE Verify each required fuel oil transfer subsystem operates to automatically transfer fuel oil from the storage tank to the day tank. ------------------------
Suspend movement of                   Immediately irradiated fuel assemblies in the spent fuel storage pool.
-------N 0 TE-----------------
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                            FREQUENCY SR 3.7.7.1           Verify the spent fuel storage pool water level is             In accordance
-------------All DG starts may be preceded by an engine prelube period. Verify each required DG starts from standby condition and achieves:
                      ~ 22 ft over the top of irradiated fuel assemblies             with the seated in the spent fuel storage pool racks.                   Surveillance Frequency Control Program Columbia Generating Station                     3.7.7-1           Amendment No. +49,-+W 2aa 238
: a. For DG-1 and DG-2 in s 15 seconds, voltage z 3910 V and frequency z 58.8 Hz, and after steady state conditions are reached, maintains voltage z 3910 V and s 4400 V and frequency z 58.8 Hz ands 61.2 Hz; and b. For DG-3, in s 15 seconds, voltage z 3910 V and frequency z 58.8 Hz, and after steady state conditions are reached, maintains voltage z 3910 V and s 4400 V and frequency z 58.8 Hz ands 61.2 Hz. -------------------------------N 0 TE---------------------------
 
---The automatic transfer function of this Surveillance shall not normally be performed in MODE 1 or 2. However, this Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
AC Sources - Operating 3.8.1 ACTIONS CONDITION                              REQUIRED ACTION                                COMPLETION TIME F. Required Action and             F.1       ---------------NOTE--------------
Credit may be taken for unplanned events that satisfy this SR. Verify automatic and manual transfer of the power supply to safety related buses from the startup offsite circuit to the backup offsite circuit. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.1-7 Amendment No . .+s+,204 225 238 AC Sources -Operating 3.8.1 SURVEILLANCE REQUIREMENTS SR 3.8.1.9 SR 3.8.1.10 SURVEILLANCE
associated Completion                       LCO 3.0.4.a is not Time of Condition A, B,                     applicable when entering C, D, or E not met.                         MODE 3.
------------------------------NOTES-----------------------------
                                                ----- ---- ---- ---- ---- ------- ---- ---- -
1 . Credit may be taken for unplanned events that satisfy this SR. 2. If performed with the DG synchronized with offsite power, it shall be performed at a power factor as close to the power factor of the single largest post-accident load as practicable.
Be in MODE 3.                                 12 hours G. Three or more required           G.1       Enter LCO 3.0.3.                             Immediately AC sources inoperable.
However, if grid conditions do not permit, the power factor limit is not required to be met. Under this condition, the power factor shall be maintained as close to the limit as practicable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                          FREQUENCY SR 3.8.1.1         Verify correct breaker alignment and indicated                               In accordance with power availability for each offsite circuit.                                 the Surveillance Frequency Control Program SR 3.8.1.2        ------------------------------NOTES----------------------------
Verify each required DG rejects a load greater than or equal to its associated single largest accident load, and following load rejection, the frequency is:::::; 66.75 Hz. ------------------------------NOTES-----------------------------
: 1. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
: 1. Credit may be taken for unplanned events that satisfy this SR. 2. If performed with the DG synchronized with offsite power, it shall be performed at a power factor of :::::; 0.9 for DG-1 and DG-2, and :::::; 0.91 for DG-3. However, if grid conditions do not permit, the power factor limit is not required to be met. Under this condition, the power factor shall be maintained as close to the limit as practicable.
: 2. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer. When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1. 7 must be met.
Verify each required DG does not trip and voltage is maintained:::::;
Verify each required DG starts from standby                                   In accordance with conditions and achieves steady state:                                        the Surveillance Frequency Control
4784 V during and following a load rejection of a load 2': 4400 kW for DG-1 and DG-2 and 2': 2600 kW for DG-3. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.1-8 Amendment No. aw,2G4 22&sect; 238 AC Sources -Operating 3.8.1 SURVEILLANCE REQUIREMENTS SR 3.8.1.11 SURVEILLANCE
: a. Voltage 2". 3910 V and ~ 4400 V and frequency                             Program 2". 58 .8 Hz and ~ 61.2 Hz for DG-1 and DG-2; and
------------------------------NOTES-----------------------------
: b. Voltage 2". 3910 V and ~ 4400 V and frequency 2". 58.8 Hz and~ 61.2 Hz for DG-3.
: 1. All DG starts may be preceded by an engine prelube period. 2. This Surveillance shall not normally be performed in MODE 1, 2, or 3 (not applicable to DG-3). However, portions of the Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Columbia Generating Station                         3.8.1-5             Amendment No. 169,181,225,236 238
Credit may be taken for unplanned events that satisfy this SR. Verify on an actual or simulated loss of offsite power signal: a. De-energization of emergency buses; b. Load shedding from emergency buses for Divisions 1 and 2; and c. DG auto-starts from standby condition and: 1. energizes permanently connected loads in 15 seconds for DG-1 and DG-2, and in 18 seconds for DG-3, 2. energizes auto-connected shutdown loads, 3. maintains steady state voltage 2'. 3910 Vand V, 4. maintains steady state frequency 2'. 58.8 Hz and 61.2 Hz, and 5. supplies permanently connected and auto-connected shutdown loads for 2'. 5 minutes. FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.1-9 Amendment No. 238 AC Sources -Operating 3.8.1 SURVEILLANCE REQUIREMENTS SR 3.8.1.12 SURVEILLANCE
 
------------------------------NOTES-----------------------------
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                FREQUENCY SR 3.8.1.3       ------------------------------N 0 TES-----------------------------
: 1. All DG starts may be preceded by an engine prelube period. 2. This Surveillance shall not normally be performed in MODE 1 or 2 (not applicable to DG-3). However, portions of the Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
: 1. DG loadings may include gradual loading as recommended by the manufacturer.
Credit may be taken for unplanned events that satisfy this SR. Verify on an actual or simulated Emergency Core Cooling System (ECCS) initiation signal each required DG auto-starts from standby condition and: a. For DG-1 and DG-2, ins 15 seconds achieves voltage 2 3910 V, and after steady state conditions are reached, maintains voltage 2 3910 V and s 4400 V and, for DG-3, in s 15 seconds achieves voltage 2 3910 V, and after steady state conditions are reached, maintains voltage 2 391 O V and s 4400 V; b. In s 15 seconds, achieves frequency 2 58.8 Hz and after steady state conditions are achieved, maintains frequency 2 58.8 Hz ands 61.2 Hz; c. Operates for 2 5 minutes; d. Permanently connected loads remain energized from the offsite power system; and e. Emergency loads are auto-connected to the offsite power system. FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.1-10 Amendment No. 238 AC Sources -Operating 3.8.1 SURVEILLANCE REQUIREMENTS SR 3.8.1.13 SR 3.8.1.14 SURVEILLANCE
: 2. Momentary transients outside the load range do not invalidate this test.
-------------------------------N 0 TE---------------------------
: 3. This Surveillance shall be conducted on only one DG at a time.
---Credit may be taken for unplanned events that satisfy this SR. Verify each required DG's automatic trips are bypassed on an actual or simulated ECCS initiation signal except: a. Engine overspeed;
: 4. This SR shall be preceded by, and immediately follow, without shutdown, a successful performance of SR 3.8.1.2 or SR 3.8.1.7.
: b. Generator differential current; and c. Incomplete starting sequence.  
: 5. The endurance test of SR 3.8.1 .14 may be performed in lieu of the load-run test in SR 3.8.1.3 provided the requirements, except the upper load limits, of SR 3.8.1.3 are met.
------------------------------NO TES--------------------------
Verify each required DG is synchronized and loaded                 In accordance and operates for;:::: 60 minutes at a load ;:::: 4000 kW           with the and :s; 4400 kW for DG-1 and DG-2, and ;:::: 2340 kW               Surveillance and :s; 2600 kW for DG-3.                                           Frequency Control Program SR 3.8.1.4        Verify each required day tank contains fuel oil to                 In accordance support greater than or equal to one hour of                       with the operation at full load plus 10%.                                   Surveillance Frequency Control Program SR 3.8.1.5        Check for and remove accumulated water from each                   In accordance required day tank.                                                 with the Surveillance Frequency Control Program Columbia Generating Station                       3.8.1-6           Amendment No. ~.a+a ~ 238
---1. Momentary transients outside the load, excitation current, and power factor ranges do not invalidate this test. 2. Credit may be taken for unplanned events that satisfy this SR. 3. If performed with the DG synchronized with offsite power, it shall be performed at a power factor 0.9 for DG-1 and DG-2, 0.91 for DG-3. However, if grid conditions do not permit, the power factor limit is not required to be met. Under this condition, the power factor shall be maintained as close to the limit as practicable.
 
Verify each required DG operates for 2 24 hours: a. For 2 2 hours loaded 2 4650 kW for DG-1 and DG-2, and 2 2850 kW for DG-3; and b. For the remaining hours of the test loaded 2 4400 kW for DG-1 and DG-2, and 2 2600 kW for DG-3. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.1-11 Amendment No. +8+,:w4 238 AC Sources -Operating 3.8.1 SURVEILLANCE REQUIREMENTS SR 3.8.1.15 SURVEILLANCE
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                    FREQUENCY SR 3.8.1.6       Verify each required fuel oil transfer subsystem                         In accordance operates to automatically transfer fuel oil from the                    with the storage tank to the day tank.                                           Surveillance Frequency Control Program SR 3.8.1.7        -------------------------------N 0 TE----------------- -- ---- ---- ---
------------------------------NOTES-----------------------------
All DG starts may be preceded by an engine prelube period.
: 1. This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated 2 1 hour loaded 2 4000 kW for DG-1 and DG-2, and 2 2340 kW for DG-3. Momentary transients outside of load range do not invalidate this test. 2. All DG starts may be preceded by an engine prelube period. Verify each required DG starts and achieves:
Verify each required DG starts from standby                             In accordance condition and achieves:                                                 with the Surveillance
: a. For DG-1 and DG-2, in s 15 seconds, voltage 2 391 O V and frequency 2 58.8 Hz, and after steady state conditions are reached, maintains voltage 2 391 O V and s 4400 V and frequency 2 58.8 Hz ands 61.2 Hz; and b. For DG-3, in s 15 seconds, voltage 2 3910 V and frequency 2 58.8 Hz, and after steady state conditions are reached, maintains voltage 2 3910 V and s 4400 V and frequency 2 58.8 Hz ands 61.2 Hz. FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.1-12 Amendment No. 2W,2M 226 238 AC Sources -Operating 3.8.1 SURVEILLANCE REQUIREMENTS SR 3.8.1.16 SR 3.8.1.17 SURVEILLANCE
: a. For DG-1 and DG-2 in s 15 seconds, voltage                         Frequency z 3910 V and frequency z 58.8 Hz, and after                       Control Program steady state conditions are reached, maintains voltage z 3910 V and s 4400 V and frequency z 58.8 Hz ands 61.2 Hz; and
-------------------------------NOTE------------
: b. For DG-3, in s 15 seconds, voltage z 3910 V and frequency z 58.8 Hz, and after steady state conditions are reached, maintains voltage z 3910 V and s 4400 V and frequency z 58.8 Hz ands 61.2 Hz.
---------------
SR 3.8.1.8        -------------------------------N 0 TE--------------------------- ---
---Th is Surveillance shall not normally be performed in MODE 1, 2, or 3 (not applicable to DG-3). However, this Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
The automatic transfer function of this Surveillance shall not normally be performed in MODE 1 or 2.
Credit may be taken for unplanned events that satisfy this SR. Verify each required DG: a. Synchronizes with offsite power source while loaded with emergency loads upon a simulated restoration of offsite power; b. Transfers loads to offsite power source; and c. Returns to ready-to-load operation.  
However, this Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.
-------------------------------NOTE------------------------------
Verify automatic and manual transfer of the power                       In accordance supply to safety related buses from the startup                         with the offsite circuit to the backup offsite circuit.                           Surveillance Frequency Control Program Columbia Generating Station                       3.8.1-7             Amendment No . .+s+,204 225 238
Credit may be taken for unplanned events that satisfy this SR. Verify, with a DG operating in test mode and connected to its bus, an actual or simulated ECCS initiation signal overrides the test mode by: a. Returning DG to ready-to-load operation; and b. Automatically energizing the emergency load from offsite power. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.1-13 Amendment No. 2-W,204 225 238 AC Sources -Operating 3.8.1 SURVEILLANCE REQUIREMENTS SR 3.8.1.18 SURVEILLANCE
 
-------------------------------NOTE------------------------------
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                              FREQUENCY SR 3.8.1.9       ------------------------------NOTES-----------------------------
This Surveillance shall not normally be performed in MODE 1, 2, or 3. However, this Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
1 . Credit may be taken for unplanned events that satisfy this SR.
Credit may be taken for unplanned events that satisfy this SR. Verify interval between each sequenced load block is within +/- 10% of design interval for each time delay relay. FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.1-14 Amendment No. 2W,2G4 238 AC Sources -Operating 3.8.1 SURVEILLANCE REQUIREMENTS SR 3.8.1.19 SURVEILLANCE
: 2. If performed with the DG synchronized with offsite power, it shall be performed at a power factor as close to the power factor of the single largest post-accident load as practicable.
------------------------------NOTES-----------------------------
However, if grid conditions do not permit, the power factor limit is not required to be met.
: 1. All DG starts may be preceded by an engine prelube period. 2. This Surveillance shall not normally be performed in MODE 1, 2, or 3 (not applicable to DG-3). However, portions of the Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Under this condition, the power factor shall be maintained as close to the limit as practicable.
Credit may be taken for unplanned events that satisfy this SR. Verify, on an actual or simulated loss of offsite power signal in conjunction with an actual or simulated ECCS initiation signal: a. De-energization of emergency buses; b. Load shedding from emergency buses for DG-1 and DG-2; and c. DG auto-starts from standby condition and: 1. energizes permanently connected loads in s 15 seconds, 2. energizes auto-connected emergency loads, 3. maintains steady state voltage 2:'. 3910 V ands 4400 V, 4. maintains steady state frequency 2:'. 58.8 Hz ands 61.2 Hz, and 5. supplies permanently connected and auto-connected emergency loads for 2:'. 5 minutes. FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.1-15 Amendment No. 2W,204 225 238 AC Sources -Operating 3.8.1 SURVEILLANCE REQUIREMENTS SR 3.8.1.20 SURVEILLANCE
Verify each required DG rejects a load greater than               In accordance or equal to its associated single largest post-                  with the accident load, and following load rejection, the                 Surveillance frequency is:::::; 66.75 Hz.                                     Frequency Control Program SR 3.8.1.10      ------------------------------NOTES-----------------------------
------------------------
: 1. Credit may be taken for unplanned events that satisfy this SR.
-------N 0 TE------------
: 2. If performed with the DG synchronized with offsite power, it shall be performed at a power factor of : : :; 0.9 for DG-1 and DG-2, and : : :; 0.91 for DG-3. However, if grid conditions do not permit, the power factor limit is not required to be met. Under this condition, the power factor shall be maintained as close to the limit as practicable.
------------------All DG starts may be preceded by an engine prelube period. Verify, when started simultaneously from standby condition, DG-1 and DG-2 achieves, in :::;: 15 seconds, voltage:::::
Verify each required DG does not trip and voltage is             In accordance maintained:::::; 4784 V during and following a load               with the rejection of a load 2': 4400 kW for DG-1 and DG-2                 Surveillance and 2': 2600 kW for DG-3.                                         Frequency Control Program Columbia Generating Station                       3.8.1-8         Amendment No. aw,2G4 22&sect; 238
391 O V and frequency
 
::::: 58.8 Hz, and DG-3 achieves, in :::;: 15 seconds, voltage ::::: 391 O V and frequency
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                              FREQUENCY SR 3.8.1.11       ------------------------------NOTES-----------------------------
::::: 58.8 Hz. FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.1-16 Amendment No. 2:G4 22&sect; 238 ACTIONS CONDITION E. One or more DGs with E.1 required starting air receiver pressure:
: 1. All DG starts may be preceded by an engine prelube period.
: 1. For DG-1 and DG-2, < 230 psig and 150 psig; and 2. For DG-3, < 223 psig and 150 psig. F. Required Action and F.1 associated Completion Time of Condition A, B, C, D, or E not met. OR One or more DGs with stored diesel fuel oil, lube oil, or starting air subsystem not within limits for reasons other than Condition A, B, C, D, or E. SURVEILLANCE REQUIREMENTS Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 REQUIRED ACTION COMPLETION TIME Restore required starting air 48 hours receiver pressure to within limit. Declare associated DG Immediately inoperable.
: 2. This Surveillance shall not normally be performed in MODE 1, 2, or 3 (not applicable to DG-3). However, portions of the Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.
SURVEILLANCE FREQUENCY SR 3.8.3.1 Verify each fuel oil storage subsystem contains greater than or equal to a seven day supply of fuel. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.3-2 Amendment No. +w,a+-9 238 Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SR 3.8.3.2 SR 3.8.3.3 SR 3.8.3.4 SR 3.8.3.5 SURVEILLANCE Verify lube oil inventory is greater than or equal to a seven day supply. Verify fuel oil properties of new and stored fuel oil are tested in accordance with, and maintained within the limits of, the Diesel Fuel Oil Testing Program. Verify each required DG air start receiver pressure is: a. :2'. 230 psig for DG-1 and DG-2; and b. :2'. 223 psig for DG-3.
Verify on an actual or simulated loss of offsite power           In accordance signal:                                                          with the Surveillance
* Check for and remove accumulated water from each fuel oil storage tank. FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Diesel Fuel Oil Testing Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.3-3 Amendment No . ..f.69.,2-+e 2aa 238 SURVEILLANCE REQUIREMENTS SR 3.8.4.1 SR 3.8.4.2 SURVEILLANCE Verify battery terminal voltage is greater than or equal to the minimum established float voltage. Verify each required battery charger supplies the required load for;:?: 1.5 hours at: a. ;:?: 126 V for the 125 V battery chargers; and b. ;:?: 252 V for the 250 V battery charger. DC Sources -Operating 3.8.4 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program SR 3.8.4.3 ------------------------------NOTES-----------------------------
: a. De-energization of emergency buses;                         Frequency Control Program
: 1. The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3. 2. This Surveillance shall not be performed in MODE 1, 2, or 3 for the Division 1 and 2 125 V DC batteries.
: b. Load shedding from emergency buses for Divisions 1 and 2; and
However, credit may be taken for unplanned events that satisfy this SR. Verify battery capacity is adequate to supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.4-4 Amendment  
: c. DG auto-starts from standby condition and:
+s9,2G4 238 ACTIONS CONDITION F. One or more batteries with a required battery parameter not met for reasons other than Condition A, B, C, D, or E. OR Required Action and associated Completion Time of Condition A, B, C, D, or E not met. OR One or more batteries with one or more battery cell(s) float voltage < 2.07 V and float current> 2 amps. F.1 SURVEILLANCE REQUIREMENTS REQUIRED ACTION Declare associated battery inoperable.
: 1.     energizes permanently connected loads in ~ 15 seconds for DG-1 and DG-2, and in ~ 18 seconds for DG-3,
SURVEILLANCE SR 3.8.6.1 -------------------------------NOTE------------------------------
: 2.     energizes auto-connected shutdown loads,
Not required to be met when battery terminal voltage is less than the minimum established float voltage of SR 3.8.4.1. Verify each battery float current 2 amps. Battery Parameters 3.8.6 COMPLETION TIME Immediately FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.6-3 Amendment  
: 3.     maintains steady state voltage 2'. 3910 Vand     ~4400 V,
+69,2G4 22a 238 SURVEILLANCE REQUIREMENTS SR 3.8.6.2 SR 3.8.6.3 SR 3.8.6.4 SR 3.8.6.5 SURVEILLANCE Verify each battery pilot cell voltage is 2.07 V. Verify each battery connected cell electrolyte level is greater than or equal to minimum established design limits. Verify each battery pilot cell temperature is greater than or equal to minimum established design limits. Verify each battery connected cell voltage is 2.07 V. Battery Parameters 3.8.6 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.6-4 Amendment  
: 4.     maintains steady state frequency 2'. 58.8 Hz and ~ 61.2 Hz, and
+e-9,294 238 SR 3.8.6.6 SURVEILLANCE
: 5.     supplies permanently connected and auto-connected shutdown loads for 2'. 5 minutes.
----------------------------
Columbia Generating Station                      3.8.1-9         Amendment No.       2W,~ ~      238
---N 0 TE---------------------------
 
---Th is Surveillance shall not be performed in MODE 1 , 2, or 3 for the Division 1 and 2 125 V DC batteries.
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                              FREQUENCY SR 3.8.1.12       ------------------------------NOTES-----------------------------
However, credit may be taken for unplanned events that satisfy this SR. Verify battery capacity is 80% of the manufacturer's rating for the 125 V batteries and :::: 83.4% of the manufacturer's rating for the 250 V battery, when subjected to a performance discharge test or a modified performance discharge test. Columbia Generating Station 3.8.6-5 Battery Parameters 3.8.6 FREQUENCY In accordance with the Surveillance Frequency Control Program 12 months when battery shows degradation or has reached 85% of expected life with capacity < 100% of manufacturer's rating 24 months when battery has reached 85% of the expected life with capacity 100% of manufacturer's rating Amendment 238 Distribution Systems -Operating 3.8.7 ACTIONS CONDITION REQUIRED ACTION C. Required Action and C.1 ---------------NOTE--------------
: 1. All DG starts may be preceded by an engine prelube period.
associated Completion LCO 3.0.4.a is not Time of Condition A or B applicable when entering not met. MODE 3. Be in MODE 3. D. Division 1 250 V DC D.1 Declare associated electrical power supported feature(s) distribution subsystem inoperable.
: 2. This Surveillance shall not normally be performed in MODE 1 or 2 (not applicable to DG-3). However, portions of the Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.
Verify on an actual or simulated Emergency Core                   In accordance Cooling System (ECCS) initiation signal each                     with the required DG auto-starts from standby condition and:              Surveillance Frequency
: a. For DG-1 and DG-2, ins 15 seconds achieves                 Control Program voltage 2 3910 V, and after steady state conditions are reached, maintains voltage 2 3910 V and s 4400 V and, for DG-3, in s 15 seconds achieves voltage 2 3910 V, and after steady state conditions are reached, maintains voltage 2 391 O V and s 4400 V;
: b. In s 15 seconds, achieves frequency 2 58.8 Hz and after steady state conditions are achieved, maintains frequency 2 58.8 Hz ands 61.2 Hz;
: c. Operates for 2 5 minutes;
: d. Permanently connected loads remain energized from the offsite power system; and
: e. Emergency loads are auto-connected to the offsite power system.
Columbia Generating Station                     3.8.1-10         Amendment No.       ~.2G4 ~    238
 
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                    FREQUENCY SR 3.8.1.13       ----- ---- ---- ---- ------- -------N 0 TE--------------------------- ---
Credit may be taken for unplanned events that satisfy this SR.
Verify each required DG's automatic trips are                             In accordance bypassed on an actual or simulated ECCS initiation                         with the signal except:                                                            Surveillance Frequency
: a. Engine overspeed;                                                   Control Program
: b. Generator differential current; and
: c. Incomplete starting sequence.
SR 3.8.1.14      --------- ---- ---- -------------NO TES-------------------------- ---
: 1. Momentary transients outside the load, excitation current, and power factor ranges do not invalidate this test.
: 2. Credit may be taken for unplanned events that satisfy this SR.
: 3. If performed with the DG synchronized with offsite power, it shall be performed at a power factor of~ 0.9 for DG-1 and DG-2, and~ 0.91 for DG-3. However, if grid conditions do not permit, the power factor limit is not required to be met. Under this condition, the power factor shall be maintained as close to the limit as practicable.
Verify each required DG operates for 2 24 hours:                          In accordance with the
: a. For 2 2 hours loaded 2 4650 kW for DG-1 and                         Surveillance DG-2, and 2 2850 kW for DG-3; and                                   Frequency Control Program
: b. For the remaining hours of the test loaded 2 4400 kW for DG-1 and DG-2, and 2 2600 kW for DG-3.
Columbia Generating Station                           3.8.1-11           Amendment No. +8+,:w4 ~ 238
 
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                              FREQUENCY SR 3.8.1.15       ------------------------------NOTES-----------------------------
: 1. This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated 2 1 hour loaded 2 4000 kW for DG-1 and DG-2, and 2 2340 kW for DG-3.
Momentary transients outside of load range do not invalidate this test.
: 2. All DG starts may be preceded by an engine prelube period.
Verify each required DG starts and achieves:                     In accordance with the
: a. For DG-1 and DG-2, in s 15 seconds, voltage                 Surveillance 2 391 O V and frequency 2 58.8 Hz, and after               Frequency steady state conditions are reached, maintains             Control Program voltage 2 391 O V and s 4400 V and frequency 2 58.8 Hz ands 61.2 Hz; and
: b. For DG-3, in s 15 seconds, voltage 2 3910 V and frequency 2 58.8 Hz, and after steady state conditions are reached, maintains voltage 2 3910 V and s 4400 V and frequency 2 58.8 Hz ands 61.2 Hz.
Columbia Generating Station                      3.8.1-12         Amendment No. 2W,2M 226 238
 
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                              FREQUENCY SR 3.8.1.16       -------------------------------NOTE------------------------------
Th is Surveillance shall not normally be performed in MODE 1, 2, or 3 (not applicable to DG-3). However, this Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.
Credit may be taken for unplanned events that satisfy this SR.
Verify each required DG:                                          In accordance with the
: a. Synchronizes with offsite power source while                 Surveillance loaded with emergency loads upon a simulated                 Frequency restoration of offsite power;                               Control Program
: b. Transfers loads to offsite power source; and
: c. Returns to ready-to-load operation.
SR 3.8.1.17      -------------------------------NOTE------------------------------
Credit may be taken for unplanned events that satisfy this SR.
Verify, with a DG operating in test mode and                       In accordance connected to its bus, an actual or simulated ECCS                 with the initiation signal overrides the test mode by:                      Surveillance Frequency
: a. Returning DG to ready-to-load operation; and                 Control Program
: b. Automatically energizing the emergency load from offsite power.
Columbia Generating Station                       3.8.1-13         Amendment No. 2-W,204 225 238
 
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                              FREQUENCY SR 3.8.1.18       -------------------------------NOTE------------------------------
This Surveillance shall not normally be performed in MODE 1, 2, or 3. However, this Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.
Verify interval between each sequenced load block                 In accordance is within +/- 10% of design interval for each time delay             with the relay.                                                             Surveillance Frequency Control Program Columbia Generating Station                     3.8.1-14           Amendment No. 2W,2G4 ~ 238
 
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                              FREQUENCY SR 3.8.1.19       ------------------------------NOTES-----------------------------
: 1. All DG starts may be preceded by an engine prelube period.
: 2. This Surveillance shall not normally be performed in MODE 1, 2, or 3 (not applicable to DG-3). However, portions of the Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.
Verify, on an actual or simulated loss of offsite                 In accordance power signal in conjunction with an actual or                     with the simulated ECCS initiation signal:                                Surveillance Frequency
: a. De-energization of emergency buses;                         Control Program
: b. Load shedding from emergency buses for DG-1 and DG-2; and
: c. DG auto-starts from standby condition and:
: 1.     energizes permanently connected loads in s 15 seconds,
: 2.     energizes auto-connected emergency loads,
: 3.     maintains steady state voltage 2:'. 3910 V ands 4400 V,
: 4.       maintains steady state frequency 2:'. 58.8 Hz ands 61.2 Hz, and
: 5.     supplies permanently connected and auto-connected emergency loads for 2:'. 5 minutes.
Columbia Generating Station                     3.8.1-15         Amendment No. 2W,204 225 238
 
AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                        FREQUENCY SR 3.8.1.20       --------- ---- ----------- ---- ---N 0 TE------------ --- ---- ---- ---- ---
All DG starts may be preceded by an engine prelube period.
Verify, when started simultaneously from standby                             In accordance condition, DG-1 and DG-2 achieves, in                                         with the
:::;: 15 seconds, voltage::::: 391 O V and frequency                         Surveillance
::::: 58.8 Hz, and DG-3 achieves, in :::;: 15 seconds,                       Frequency voltage ::::: 391 O V and frequency ::::: 58.8 Hz.                           Control Program Columbia Generating Station                           3.8.1-16                   Amendment No. 2:G4 22&sect; 238
 
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 ACTIONS CONDITION                           REQUIRED ACTION                  COMPLETION TIME E. One or more DGs with           E.1       Restore required starting air 48 hours required starting air                  receiver pressure to within receiver pressure:                     limit.
: 1. For DG-1 and DG-2,
        < 230 psig and
        ~ 150 psig; and
: 2. For DG-3, < 223 psig and ~ 150 psig.
F. Required Action and             F.1     Declare associated DG          Immediately associated Completion                   inoperable.
Time of Condition A, B, C, D, or E not met.
OR One or more DGs with stored diesel fuel oil, lube oil, or starting air subsystem not within limits for reasons other than Condition A, B, C, D, or E.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                       FREQUENCY SR 3.8.3.1           Verify each fuel oil storage subsystem contains         In accordance greater than or equal to a seven day supply of fuel. with the Surveillance Frequency Control Program Columbia Generating Station                     3.8.3-2         Amendment No. +w,a+-9 ~ 238
 
Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY SR 3.8.3.2         Verify lube oil inventory is greater than or equal to a   In accordance seven day supply.                                         with the Surveillance Frequency Control Program SR 3.8.3.3        Verify fuel oil properties of new and stored fuel oil     In accordance are tested in accordance with, and maintained within       with the Diesel the limits of, the Diesel Fuel Oil Testing Program.       Fuel Oil Testing Program SR 3.8.3.4        Verify each required DG air start receiver pressure       In accordance is:                                                        with the Surveillance
: a.   :2'. 230 psig for DG-1 and DG-2; and                 Frequency Control Program
: b.   :2'. 223 psig for DG-3.
SR 3.8.3.5
* Check for and remove accumulated water from each           In accordance fuel oil storage tank.                                     with the Surveillance Frequency Control Program Columbia Generating Station                    3.8.3-3         Amendment No . ..f.69.,2-+e 2aa 238
 
DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                            FREQUENCY SR 3.8.4.1        Verify battery terminal voltage is greater than or               In accordance equal to the minimum established float voltage.                   with the Surveillance Frequency Control Program SR 3.8.4.2        Verify each required battery charger supplies the                 In accordance required load for;:?: 1.5 hours at:                              with the Surveillance
: a.   ;:?: 126 V for the 125 V battery chargers; and             Frequency Control Program
: b.   ;:?: 252 V for the 250 V battery charger.
SR 3.8.4.3       ------------------------------NOTES-----------------------------
: 1. The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3.
: 2. This Surveillance shall not be performed in MODE 1, 2, or 3 for the Division 1 and 2 125 V DC batteries. However, credit may be taken for unplanned events that satisfy this SR.
Verify battery capacity is adequate to supply, and               In accordance maintain in OPERABLE status, the required                         with the emergency loads for the design duty cycle when                   Surveillance subjected to a battery service test.                             Frequency Control Program Columbia Generating Station                       3.8.4-4               Amendment +s9,2G4 ~ 238
 
Battery Parameters 3.8.6 ACTIONS CONDITION                               REQUIRED ACTION                        COMPLETION TIME F. One or more batteries             F.1        Declare associated battery            Immediately with a required battery                       inoperable.
parameter not met for reasons other than Condition A, B, C, D, or E.
OR Required Action and associated Completion Time of Condition A, B, C, D, or E not met.
OR One or more batteries with one or more battery cell(s) float voltage
    < 2.07 V and float current> 2 amps.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                FREQUENCY SR 3.8.6.1           -------------------------------NOTE------------------------------
Not required to be met when battery terminal voltage is less than the minimum established float voltage of SR 3.8.4.1.
Verify each battery float current       is~ 2 amps.                 In accordance with the Surveillance Frequency Control Program Columbia Generating Station                         3.8.6-3               Amendment +69,2G4 22a 238
 
Battery Parameters 3.8.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY SR 3.8.6.2        Verify each battery pilot cell voltage is ~ 2.07 V. In accordance with the Surveillance Frequency Control Program SR 3.8.6.3        Verify each battery connected cell electrolyte level is In accordance greater than or equal to minimum established           with the design limits.                                         Surveillance Frequency Control Program SR 3.8.6.4        Verify each battery pilot cell temperature is greater   In accordance than or equal to minimum established design limits. with the Surveillance Frequency Control Program SR 3.8.6.5        Verify each battery connected cell voltage is           In accordance
                  ~ 2.07 V.                                               with the Surveillance Frequency Control Program Columbia Generating Station                 3.8.6-4               Amendment +e-9,294 ~ 238
 
Battery Parameters 3.8.6 SURVEILLANCE                                                FREQUENCY SR 3.8.6.6       -------------------------------N 0 TE------------------------------
Th is Surveillance shall not be performed in MODE 1 , 2, or 3 for the Division 1 and 2 125 V DC batteries. However, credit may be taken for unplanned events that satisfy this SR.
Verify battery capacity is ~ 80% of the                             In accordance manufacturer's rating for the 125 V batteries and                   with the
:::: 83.4% of the manufacturer's rating for the 250 V               Surveillance battery, when subjected to a performance discharge                 Frequency test or a modified performance discharge test.                     Control Program 12 months when battery shows degradation or has reached 85%
of expected life with capacity
                                                                                      < 100% of manufacturer's rating 24 months when battery has reached 85% of the expected life with capacity
                                                                                      ~ 100% of manufacturer's rating Columbia Generating Station                      3.8.6-5                                Amendment 238
 
Distribution Systems - Operating 3.8.7 ACTIONS CONDITION                         REQUIRED ACTION                     COMPLETION TIME C. Required Action and           C.1       ---------------NOTE--------------
associated Completion                   LCO 3.0.4.a is not Time of Condition A or B               applicable when entering not met.                               MODE 3.
Be in MODE 3.                     12 hours D. Division 1 250 V DC           D.1       Declare associated                 Immediately electrical power                       supported feature(s) distribution subsystem                 inoperable.
inoperable.
inoperable.
E. One or more Division 3 E.1 Declare High Pressure AC or DC electrical Core Spray System power distribution inoperable.
E. One or more Division 3       E.1       Declare High Pressure             Immediately AC or DC electrical                     Core Spray System power distribution                     inoperable.
subsystems inoperable.
subsystems inoperable.
F. Two or more divisions F.1 Enter LCO 3.0.3. with inoperable electrical power distribution subsystems that result in a loss of function.
F. Two or more divisions         F.1       Enter LCO 3.0.3.                   Immediately with inoperable electrical power distribution subsystems that result in a loss of function.
SURVEILLANCE REQUIREMENTS SR 3.8.7.1 SURVEILLANCE Verify correct breaker alignments and indicated power availability to required AC and DC electrical power distribution subsystems.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                            FREQUENCY SR 3.8.7.1         Verify correct breaker alignments and indicated             In accordance power availability to required AC and DC electrical         with the power distribution subsystems.                               Surveillance Frequency Control Program Columbia Generating Station                     3.8.7-2     Amendment No. 149,169,225,236 238
COMPLETION TIME 12 hours Immediately Immediately Immediately FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.7-2 Amendment No. 149,169,225,236 238 Distribution Systems -Shutdown 3.8.8 SURVEILLANCE REQUIREMENTS SR 3.8.8.1 SURVEILLANCE Verify correct breaker alignments and indicated power availability to required AC and DC electrical power distribution subsystems.
 
FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.8-2 Amendment  
Distribution Systems - Shutdown 3.8.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY SR 3.8.8.1       Verify correct breaker alignments and indicated         In accordance power availability to required AC and DC electrical     with the power distribution subsystems.                         Surveillance Frequency Control Program Columbia Generating Station                 3.8.8-2             Amendment +e9,+w 2ae 238
+e9,+w 2ae 238 Refueling Equipment Interlocks 3.9.1 3.9 REFUELING OPERATIONS 3.9.1 Refueling Equipment Interlocks LCO 3.9.1 The refueling equipment interlocks associated with the refuel position shall be OPERABLE.
 
APPLICABILITY:
Refueling Equipment Interlocks 3.9.1 3.9   REFUELING OPERATIONS 3.9.1       Refueling Equipment Interlocks LCO 3.9.1               The refueling equipment interlocks associated with the refuel position shall be OPERABLE.
During in-vessel fuel movement with equipment associated with the interlocks when the reactor mode switch is in the refuel position.
APPLICABILITY:           During in-vessel fuel movement with equipment associated with the interlocks when the reactor mode switch is in the refuel position.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required refueling equipment interlocks inoperable.
ACTIONS CONDITION                       REQUIRED ACTION                   COMPLETION TIME A. One or more required             A.1     Suspend in-vessel fuel           Immediately refueling equipment                    movement with equipment interlocks inoperable.                associated with the inoperable interlock(s).
A.1 Suspend in-vessel fuel movement with equipment associated with the inoperable interlock(s).
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                        FREQUENCY SR 3.9.1.1         Perform CHANNEL FUNCTIONAL TEST on each of                 In accordance the following required refueling equipment interlock       with the inputs:                                                    Surveillance Frequency
Immediately SURVEILLANCE REQUIREMENTS SR 3.9.1.1 SURVEILLANCE Perform CHANNEL FUNCTIONAL TEST on each of the following required refueling equipment interlock inputs: a. All-rods-in, b. Refueling platform position, c. Refueling platform fuel grapple fuel-loaded, d. Refueling platform frame-mounted hoist loaded, and e. Refueling platform trolley-mounted hoist loaded. FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.9.1-1 Amendment  
: a. All-rods-in,                                         Control Program
+49,+69 238 Refuel Position One-Rod-Out Interlock 3.9.2 3.9 REFUELING OPERATIONS 3.9.2 Refuel Position One-Rod-Out Interlock LCO 3.9.2 The refuel position one-rod-out interlock shall be OPERABLE.
: b. Refueling platform position,
APPLICABILITY:
: c. Refueling platform fuel grapple fuel-loaded,
ACTIONS MODE 5 with the reactor mode switch in the refuel position and any control rod withdrawn.
: d. Refueling platform frame-mounted hoist fuel-loaded, and
CONDITION REQUIRED ACTION COMPLETION TIME A. Refuel position one-rod-A.1 Suspend control rod withdrawal.
: e. Refueling platform trolley-mounted hoist fuel-loaded.
Immediately out interlock inoperable.
Columbia Generating Station                     3.9.1-1               Amendment +49,+69 ~ 238
AND A.2 Initiate action to fully insert Immediately all insertable control rods in core cells containing one or more fuel assemblies.
 
SURVEILLANCE REQUIREMENTS SR 3.9.2.1 SURVEILLANCE FREQUENCY Verify reactor mode switch locked in refuel position.
Refuel Position One-Rod-Out Interlock 3.9.2 3.9 REFUELING OPERATIONS 3.9.2       Refuel Position One-Rod-Out Interlock LCO 3.9.2               The refuel position one-rod-out interlock shall be OPERABLE.
In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.9.2-1 Amendment  
APPLICABILITY:         MODE 5 with the reactor mode switch in the refuel position and any control rod withdrawn.
+49,+09 238 Refuel Position One-Rod-Out Interlock 3.9.2 SURVEILLANCE REQUIREMENTS SR 3.9.2.2 SURVEILLANCE
ACTIONS CONDITION                         REQUIRED ACTION                     COMPLETION TIME A. Refuel position one-rod-         A.1     Suspend control rod               Immediately out interlock inoperable.              withdrawal.
-------------------------------N 0 TE---------------------------
AND A.2     Initiate action to fully insert   Immediately all insertable control rods in core cells containing one or more fuel assemblies.
---Not required to be performed until 1 hour after any control rod is withdrawn.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                          FREQUENCY SR 3.9.2.1           Verify reactor mode switch locked in refuel position.       In accordance with the Surveillance Frequency Control Program Columbia Generating Station                       3.9.2-1               Amendment +49,+09 ~ 238
Perform CHANNEL FUNCTIONAL TEST. Columbia Generating Station 3.9.2-2 FREQUENCY In accordance with the Surveillance Frequency Control Program Amendment 238 3.9 REFUELING OPERATIONS 3.9.3 Control Rod Position LCO 3.9.3 All control rods shall be fully inserted.
 
APPLICABILITY:
Refuel Position One-Rod-Out Interlock 3.9.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                  FREQUENCY SR 3.9.2.2       --------------------- ----------N 0 TE--------------------------- ---
When loading fuel assemblies into the core. ACTIONS CONDITION A. One or more control rods not fully inserted.
Not required to be performed until 1 hour after any control rod is withdrawn.
A.1 REQUIRED ACTION Suspend loading fuel assemblies into the core. SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.9.3.1 Verify all control rods are fully inserted.
Perform CHANNEL FUNCTIONAL TEST.                                     In accordance with the Surveillance Frequency Control Program Columbia Generating Station                       3.9.2-2                                 Amendment 238
Control Rod Position 3.9.3 COMPLETION TIME Immediately .FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.9.3-1 Amendment  
 
+49,+eB 238 Control Rod OPERABILITY  
Control Rod Position 3.9.3 3.9 REFUELING OPERATIONS 3.9.3       Control Rod Position LCO 3.9.3               All control rods shall be fully inserted.
-Refueling 3.9.5 3.9 REFUELING OPERATIONS 3.9.5 Control Rod OPERABILITY  
APPLICABILITY:         When loading fuel assemblies into the core.
-Refueling LCO 3.9.5 Each withdrawn control rod shall be OPERABLE.
ACTIONS CONDITION                         REQUIRED ACTION              COMPLETION TIME A. One or more control             A.1     Suspend loading fuel       Immediately rods not fully inserted.                assemblies into the core.
APPLICABILITY:
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                   .FREQUENCY SR 3.9.3.1           Verify all control rods are fully inserted.           In accordance with the Surveillance Frequency Control Program Columbia Generating Station                     3.9.3-1             Amendment +49,+eB ~ 238
MODE 5. ACTIONS CONDITION REQUIRED ACTION A. One or more withdrawn control rods inoperable.
 
A.1 Initiate action to fully insert inoperable withdrawn control rods. SURVEILLANCE REQUIREMENTS SR 3.9.5.1 SURVEILLANCE
Control Rod OPERABILITY - Refueling 3.9.5 3.9 REFUELING OPERATIONS 3.9.5       Control Rod OPERABILITY - Refueling LCO 3.9.5               Each withdrawn control rod shall be OPERABLE.
----------------------------
APPLICABILITY:         MODE 5.
---N 0 TE---------------------------
ACTIONS CONDITION                             REQUIRED ACTION                         COMPLETION TIME A. One or more withdrawn             A.1       Initiate action to fully insert       Immediately control rods inoperable.                    inoperable withdrawn control rods.
---Not required to be performed until 7 days after the control rod is withdrawn.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                  FREQUENCY SR 3.9.5.1           -------------------------------N 0 TE------------------------------
COMPLETION TIME Immediately FREQUENCY Insert each withdrawn control rod at least one notch. In accordance with the Surveillance Frequency Control Program SR 3.9.5.2 Verify each withdrawn control rod scram accumulator pressure is;;::: 940 psig. Columbia Generating Station 3.9.5-1 In accordance with the Surveillance Frequency Control Program Amendment  
Not required to be performed until 7 days after the control rod is withdrawn.
+49,+e9 22-&sect; 238 3.9 REFUELING OPERATIONS RPV Water Level -Irradiated Fuel 3.9.6 3.9.6 Reactor Pressure Vessel (RPV) Water Level -Irradiated Fuel LCO 3.9.6 RPV water level shall be 22 ft above the top of the RPV flange. APPLICABILITY:
Insert each withdrawn control rod at least one notch.                 In accordance with the Surveillance Frequency Control Program SR 3.9.5.2           Verify each withdrawn control rod scram                               In accordance accumulator pressure is;;::: 940 psig.                               with the Surveillance Frequency Control Program Columbia Generating Station                           3.9.5-1                         Amendment +49,+e9 22-&sect; 238
During movement of irradiated fuel assemblies within the RPV. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RPV water level not within limit. A.1 Suspend movement of irradiated fuel assemblies within the RPV. Immediately SURVEILLANCE REQUIREMENTS SR 3.9.6.1 SURVEILLANCE Verify RPV water level 22 ft above the top of the RPV flange. FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.9.6-1 Amendment  
 
.:t-49,+e9 2ae 238 3.9 REFUELING OPERATIONS RPV Water Level -New Fuel or Control Rods 3.9.7 3.9.7 Reactor Pressure Vessel (RPV) Water Level -New Fuel or Control Rods LCO 3.9.7 RPV water level shall be::?: 23 ft above the top of irradiated fuel assemblies seated within the RPV. APPLICABILITY:
RPV Water Level - Irradiated Fuel 3.9.6 3.9 REFUELING OPERATIONS 3.9.6       Reactor Pressure Vessel (RPV) Water Level - Irradiated Fuel LCO 3.9.6             RPV water level shall be ~ 22 ft above the top of the RPV flange.
During movement of new fuel assemblies or handling of control rods within the RPV when irradiated fuel assemblies are seated within the RPV. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RPV water level not within limit. A.1 Suspend movement of new Immediately fuel assemblies and handling of control rods within the RPV. SURVEILLANCE REQUIREMENTS SR 3.9.7.1 SURVEILLANCE Verify RPV water level is::?: 23 ft above the top of irradiated fuel assemblies seated within the RPV. FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.9.7-1 Amendment  
APPLICABILITY:         During movement of irradiated fuel assemblies within the RPV.
.:t-69,.+99 238 ACTIONS CONDITION REQUIRED ACTION B. (continued) 8.3 Initiate action to restore one standby gas treatment subsystem to OPERABLE status. AND 8.4 Initiate action to restore isolation capability in each required secondary containment penetration flow path not isolated.
ACTIONS CONDITION                     REQUIRED ACTION                     COMPLETION TIME A. RPV water level not         A.1     Suspend movement of               Immediately within limit.                      irradiated fuel assemblies within the RPV.
C. No RHR shutdown C.1 Verify reactor coolant cooling subsystem in circulation by an alternate operation.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                        FREQUENCY SR 3.9.6.1         Verify RPV water level is~  22 ft above the top of the   In accordance RPV flange.                                               with the Surveillance Frequency Control Program Columbia Generating Station                 3.9.6-1               Amendment .:t-49,+e9 2ae 238
method. AND C.2 Monitor reactor coolant temperature.
 
SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.9.8.1 Verify one RHR shutdown cooling subsystem is operating.
RPV Water Level - New Fuel or Control Rods 3.9.7 3.9 REFUELING OPERATIONS 3.9.7       Reactor Pressure Vessel (RPV) Water Level - New Fuel or Control Rods LCO 3.9.7             RPV water level shall be::?: 23 ft above the top of irradiated fuel assemblies seated within the RPV.
RHR -High Water Level 3.9.8 COMPLETION TIME Immediately Immediately 1 hour from discovery of no reactor coolant circulation AND Once per 12 hours thereafter Once per hour FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.9.8-2 Amendment  
APPLICABILITY:         During movement of new fuel assemblies or handling of control rods within the RPV when irradiated fuel assemblies are seated within the RPV.
+49,+e9 238 ACTIONS CONDITION REQUIRED ACTION B. (continued)
ACTIONS CONDITION                     REQUIRED ACTION                     COMPLETION TIME A. RPV water level not           A.1   Suspend movement of new           Immediately within limit.                      fuel assemblies and handling of control rods within the RPV.
B.3 Initiate action to restore isolation capability in each required secondary containment penetration flow path not isolated.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                          FREQUENCY SR 3.9.7.1         Verify RPV water level is::?: 23 ft above the top of       In accordance irradiated fuel assemblies seated within the RPV.           with the Surveillance Frequency Control Program Columbia Generating Station                 3.9.7-1                 Amendment .:t-69,.+99 ~ 238
C. No RHR shutdown C.1 Verify reactor coolant cooling subsystem in circulation by an alternate operation.
 
method. AND C.2 Monitor reactor coolant temperature.
RHR - High Water Level 3.9.8 ACTIONS CONDITION                   REQUIRED ACTION                 COMPLETION TIME B. (continued)               8.3   Initiate action to restore one Immediately standby gas treatment subsystem to OPERABLE status.
SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.9.9.1 Verify one RHR shutdown cooling subsystem is operating.
AND 8.4   Initiate action to restore     Immediately isolation capability in each required secondary containment penetration flow path not isolated.
RHR -Low Water Level 3.9.9 COMPLETION TIME Immediately 1 hour from discovery of no reactor coolant circulation AND Once per 12 hours thereafter Once per hour FREQUENCY In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.9.9-2 Amendment  
C. No RHR shutdown           C.1   Verify reactor coolant         1 hour from discovery cooling subsystem in             circulation by an alternate   of no reactor coolant operation.                       method.                       circulation AND Once per 12 hours thereafter AND C.2   Monitor reactor coolant       Once per hour temperature.
+49,+&9 238 Reactor Mode Switch Interlock Testing 3.10.2 ACTIONS CONDITION REQUIRED ACTION A. (continued)
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                     FREQUENCY SR 3.9.8.1       Verify one RHR shutdown cooling subsystem is         In accordance operating.                                           with the Surveillance Frequency Control Program Columbia Generating Station              3.9.8-2              Amendment +49,+e9 ~ 238
A .3 .2 On ly applicable in MODE 5. Place the reactor mode switch in the refuel position.
 
SURVEILLANCE REQUIREMENTS SR 3.10.2.1 SR 3.10.2.2 SURVEILLANCE Verity all control rods are fully inserted in core cells containing one or more fuel assemblies.
RHR - Low Water Level 3.9.9 ACTIONS CONDITION                    REQUIRED ACTION                  COMPLETION TIME B. (continued)                B.3    Initiate action to restore      Immediately isolation capability in each required secondary containment penetration flow path not isolated.
Verity no CORE ALTERATIONS are in progress.
C. No RHR shutdown            C.1    Verify reactor coolant         1 hour from discovery cooling subsystem in              circulation by an alternate    of no reactor coolant operation.                        method.                        circulation AND Once per 12 hours thereafter AND C.2    Monitor reactor coolant        Once per hour temperature.
COMPLETION TIME 1 hour FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.10.2-2 Amendment
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY SR 3.9.9.1        Verify one RHR shutdown cooling subsystem is          In accordance operating.                                            with the Surveillance Frequency Control Program Columbia Generating Station               3.9.9-2               Amendment +49,+&9 ~ 238
+49,+w 22a 238 Single Control Rod Withdrawal
 
-Hot Shutdown 3.10.3 SURVEILLANCE REQUIREMENTS SR 3.10.3.2 SR 3.10.3.3 SURVEILLANCE
Reactor Mode Switch Interlock Testing 3.10.2 ACTIONS CONDITION                        REQUIRED ACTION                    COMPLETION TIME A. (continued)                 A .3 .2  ---------------NOTE--------------
-------------------------------NO TE------------
On ly applicable in MODE 5.
------------------Not required to be met if SR 3.10.3.1 is satisfied for LCO 3.10.3.d.1 requirements.
Place the reactor mode            1 hour switch in the refuel position.
Verify all control rods, other than the control rod being withdrawn, in a five by five array centered on the control rod being withdrawn, are disarmed.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                         FREQUENCY SR 3.10.2.1       Verity all control rods are fully inserted in core cells    In accordance containing one or more fuel assemblies.                     with the Surveillance Frequency Control Program SR 3.10.2.2      Verity no CORE ALTERATIONS are in progress.                In accordance with the Surveillance Frequency Control Program Columbia Generating Station                 3.10.2-2               Amendment +49,+w 22a 238
Verify all control rods, other than the control rod being withdrawn, are fully inserted.
 
FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.10.3-3 Amendment
Single Control Rod Withdrawal - Hot Shutdown 3.10.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                FREQUENCY SR 3.10.3.2       -------------------------------NO TE--------------------------- -- -
+49,+w 22-a 238 Single Control Rod Withdrawal
Not required to be met if SR 3.10.3.1 is satisfied for LCO 3.10.3.d.1 requirements.
-Cold Shutdown 3.10.4 ACTIONS CONDITION REQUIRED ACTION B. (continued)
Verify all control rods, other than the control rod                  In accordance being withdrawn, in a five by five array centered on                with the the control rod being withdrawn, are disarmed.                      Surveillance Frequency Control Program SR 3.10.3.3      Verify all control rods, other than the control rod                  In accordance being withdrawn, are fully inserted.                                with the Surveillance Frequency Control Program Columbia Generating Station                      3.10.3-3                Amendment +49,+w 22-a 238
B.2.2 Initiate action to satisfy the requirements of this LCO. SURVEILLANCE REQUIREMENTS SR 3.10.4.1 SR 3.10.4.2 SR 3.10.4.3 SR 3.10.4.4 SURVEILLANCE Perform the applicable SRs for the required LCOs. -------------------------------N 0 TE ------------------------------
 
Single Control Rod Withdrawal - Cold Shutdown 3.10.4 ACTIONS CONDITION                            REQUIRED ACTION                            COMPLETION TIME B. (continued)                    B.2.2      Initiate action to satisfy the          Immediately requirements of this LCO.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                    FREQUENCY SR 3.10.4.1      Perform the applicable SRs for the required LCOs.                       According to the applicable SRs SR 3.10.4.2       -------------------------------N 0 TE ------------ ------------------
Not required to be met if SR 3.10.4.1 is satisfied for LCO 3.10.4.c.1 requirements.
Not required to be met if SR 3.10.4.1 is satisfied for LCO 3.10.4.c.1 requirements.
Verify all control rods, other than the control rod being withdrawn, in a five by five array centered on the control rod being withdrawn, are disarmed.
Verify all control rods, other than the control rod                     In accordance being withdrawn, in a five by five array centered on                   with the the control rod being withdrawn, are disarmed.                         Surveillance Frequency Control Program SR 3.10.4.3      Verify all control rods, other than the control rod                     In accordance being withdrawn, are fully inserted.                                   with the Surveillance Frequency Control Program SR 3.10.4.4      -------------------------------NO TE-------------------- --------- -
Verify all control rods, other than the control rod being withdrawn, are fully inserted.  
Not required to be met if SR 3.10.4.1 is satisfied for LCO 3.10.4.b.1 requirements.
-------------------------------NO TE--------------------
Verify a control rod withdrawal block is inserted.                     In accordance with the Surveillance Frequency Control Program Columbia Generating Station                       3.10.4-3                   Amendment +49,-+S9 ~ 238
----------Not required to be met if SR 3.10.4.1 is satisfied for LCO 3.10.4.b.1 requirements.
 
Verify a control rod withdrawal block is inserted.
Single CRD Removal - Refueling 3.10.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                       FREQUENCY SR 3.10.5.1       Verify all control rods, other than the control rod     In accordance withdrawn for the removal of the associated CRD,         with the are fully inserted.                                     Surveillance Frequency Control Program SR 3.10.5.2       Verify all control rods, other than the control rod     In accordance withdrawn for the removal of the associated CRD, in     with the a five by five array centered on the control rod         Surveillance withdrawn for the removal of the associated CRD,         Frequency are disarmed.                                           Control Program SR 3.10.5.3       Verify a control rod withdrawal block is inserted.       In accordance with the Surveillance Frequency Control Program SR 3.10.5.4       Perform SR 3.1 .1 .1.                                   According to SR3.1.1.1 SR 3.10.5.5       Verify no other CORE ALTERATIONS are in                 In accordance progress.                                               with the Surveillance Frequency Control Program Columbia Generating Station                 3.10.5-2             Amendment ..:t-49,+69 ~ 238
COMPLETION TIME Immediately FREQUENCY According to the applicable SRs In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.10.4-3 Amendment  
 
+49,-+S9 238 Single CRD Removal -Refueling 3.10.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.5.1 Verify all control rods, other than the control rod In accordance withdrawn for the removal of the associated CRD, with the are fully inserted.
Multiple Control Rod Withdrawal - Refueling 3.10.6 ACTIONS CONDITION                             REQUIRED ACTION                           COMPLETION TIME A. (continued)                     A.3.1     Initiate action tc;> fully insert       Immediately all control rods in core cells containing one or more fuel assemblies.
Surveillance Frequency Control Program SR 3.10.5.2 Verify all control rods, other than the control rod In accordance withdrawn for the removal of the associated CRD, in with the a five by five array centered on the control rod Surveillance withdrawn for the removal of the associated CRD, Frequency are disarmed.
A.3.2     Initiate action to satisfy the         Immediately requirements of this LCO.
Control Program SR 3.10.5.3 Verify a control rod withdrawal block is inserted.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                    FREQUENCY SR 3.10.6.1       Verify the four fuel assemblies are removed from                       In accordance core cells associated with each control rod or CRD                     with the removed.                                                               Surveillance Frequency Control Program SR 3.10.6.2      Verify all other control rods in core cells containing                 In accordance one or more fuel assemblies are fully inserted.                         with the Surveillance Frequency Control Program SR 3.10.6.3      ------------- ------------------NOTE--------------- -------- ---- ---
In accordance with the Surveillance Frequency Control Program SR 3.10.5.4 Perform SR 3.1 .1 .1. According to SR3.1.1.1 SR 3.10.5.5 Verify no other CORE ALTERATIONS are in In accordance progress.
Only required to be met during fuel loading.
with the Surveillance Frequency Control Program Columbia Generating Station 3.10.5-2 Amendment  
Verify fuel assemblies being loaded are in                             In accordance compliance with an approved spiral reload                               with the sequence.                                                               Surveillance Frequency Control Program Columbia Generating Station                       3.10.6-2                 Amendment +49,+e9 22.a 238
..:t-49,+69 238 ACTIONS Multiple Control Rod Withdrawal  
 
-Refueling 3.10.6 CONDITION REQUIRED ACTION COMPLETION TIME A. (continued)
SDM Test - Refueling (After Implementation of PRNM Upgrade) 3.10.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                                    FREQUENCY SR 3.10.8.3       --------- ---- ---- ---- --- ---- ---N 0 TE------------------------------
A.3.1 Initiate action tc;> fully insert Immediately all control rods in core cells containing one or more fuel assemblies.
Not required to be met if SR 3.10.8.2 satisfied.
A.3.2 Initiate action to satisfy the requirements of this LCO. Immediately SURVEILLANCE REQUIREMENTS SR 3.10.6.1 SR 3.10.6.2 SR 3.10.6.3 SURVEILLANCE Verify the four fuel assemblies are removed from core cells associated with each control rod or CRD removed. Verify all other control rods in core cells containing one or more fuel assemblies are fully inserted.  
Verify movement of control rods is in compliance                         During control rod with the approved control rod sequence for the SDM                       movement test by a second licensed operator or other qualified member of the technical staff.
-------------
SR 3.10.8.4      Verify no other CORE ALTERATIONS are in                                   In accordance progress.                                                                 with the Surveillance Frequency Control Program SR 3.10.8.5      Verify each withdrawn control rod does not go to the                      Each time the withdrawn overtravel position.                                            control rod is withdrawn to "full out" position Prior to satisfying LCO 3.10.8.c requirement after work on control rod or CRD System that could affect coupling SR 3.10.8.6      Verify CRD charging water header pressure                                In accordance
------------------NOTE------------
                  ~ 940 psig.                                                              with the Surveillance Frequency Control Program Columbia Generating Station                             3.10.8-7           Amendment No. +e9 ~ 226 238
------------------Only required to be met during fuel loading. Verify fuel assemblies being loaded are in compliance with an approved spiral reload sequence.
 
FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.10.6-2 Amendment  
Programs and Manuals 5.5 5.5   Programs and Manuals 5.5.14 Control Room Envelope Habitability Program A Control Room Envelope (CRE) Habitability Program shall be established and implemented to ensure that CRE habitability is maintained such that, with an OPERABLE Control Room Emergency Filtration (CREF) System, CRE occupants can control the reactor safely under normal conditions and maintain it in a safe condition following a radiological event, hazardous chemical release, or a smoke challenge. The program shall ensure that adequate radiation protection is provided to permit access and occupancy of the CRE under design basis accident (OBA) conditions without personnel receiving radiation exposures in excess of 5 rem total effective dose equivalent (TEDE) for the duration of the accident. The program shall include the following elements:
+49,+e9 22.a 238 SDM Test -Refueling (After Implementation of PRNM Upgrade) 3.10.8 SURVEILLANCE REQUIREMENTS SR 3.10.8.3 SR 3.10.8.4 SR 3.10.8.5 SR 3.10.8.6 SURVEILLANCE FREQUENCY
: a.     The definition of the CRE and the CRE boundary.
-------------------------------N 0 TE------------
: b.       Requirements for maintaining the CRE boundary in its design condition including configuration control and preventive maintenance.
---------------
: c.       Requirements for (i) determining the unfiltered air inleakage past the CRE boundary into the CRE in accordance with the testing methods and at the Frequencies specified in Sections C.1 and C.2 of Regulatory Guide 1 .197, "Demonstrating Control Room Envelope Integrity at Nuclear Power Reactors,"
---Not required to be met if SR 3.10.8.2 satisfied.
Revision 0, May 2003, and (ii) assessing CRE habitability at Frequencies specified in Sections C.1 and C.2 of Regulatory Guide 1.197, Revision 0.
Verify movement of control rods is in compliance During control rod with the approved control rod sequence for the SDM movement test by a second licensed operator or other qualified member of the technical staff. Verify no other CORE ALTERATIONS are in progress.
: d.       Measurement, at designated locations, of the CRE pressure relative to all external areas adjacent to the CRE boundary during the pressurization mode of operation by one subsystem of the CREF System, operating at the flow rate required by the VFTP, at a Frequency of 24 months on a STAGGERED TEST BASIS. The results shall be trended and used as part of the 24 month assessment of the CRE boundary.
Verify each withdrawn control rod does not go to the withdrawn overtravel position.
: e.       The quantitative limits on unfiltered air inleakage into the CRE. These limits shall be stated in a manner to allow direct comparison to the unfiltered air inleakage measured by the testing described in paragraph c. The unfiltered air inleakage limit for radiological challenges is the inleakage flow rate assumed in the licensing basis analyses for OBA consequences. Unfiltered air inleakage limits for hazardous chemicals must ensure that exposure of CRE occupants to these hazards will be within the assumptions in the licensing basis.
Verify CRD charging water header pressure 940 psig. In accordance with the Surveillance Frequency Control Program Each time the control rod is withdrawn to "full out" position Prior to satisfying LCO 3.10.8.c requirement after work on control rod or CRD System that could affect coupling In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.10.8-7 Amendment No. +e9 226 238 5.5 Programs and Manuals 5.5.14 Control Room Envelope Habitability Program Programs and Manuals 5.5 A Control Room Envelope (CRE) Habitability Program shall be established and implemented to ensure that CRE habitability is maintained such that, with an OPERABLE Control Room Emergency Filtration (CREF) System, CRE occupants can control the reactor safely under normal conditions and maintain it in a safe condition following a radiological event, hazardous chemical release, or a smoke challenge.
: f.       The provisions of SR 3.0.2 are applicable to the Frequencies for assessing CRE habitability, determining CRE unfiltered inleakage, and measuring CRE pressure and assessing the CRE boundary as required by paragraphs c and d, respectively.
The program shall ensure that adequate radiation protection is provided to permit access and occupancy of the CRE under design basis accident (OBA) conditions without personnel receiving radiation exposures in excess of 5 rem total effective dose equivalent (TEDE) for the duration of the accident.
Columbia Generating Station                     5.5-11               Amendment 2G-7,a+e ~ 238       I
The program shall include the following elements:
: a. The definition of the CRE and the CRE boundary.
: b. Requirements for maintaining the CRE boundary in its design condition including configuration control and preventive maintenance.
: c. Requirements for (i) determining the unfiltered air inleakage past the CRE boundary into the CRE in accordance with the testing methods and at the Frequencies specified in Sections C.1 and C.2 of Regulatory Guide 1 .197, "Demonstrating Control Room Envelope Integrity at Nuclear Power Reactors," Revision 0, May 2003, and (ii) assessing CRE habitability at Frequencies specified in Sections C.1 and C.2 of Regulatory Guide 1.197, Revision 0. d. Measurement, at designated locations, of the CRE pressure relative to all external areas adjacent to the CRE boundary during the pressurization mode of operation by one subsystem of the CREF System, operating at the flow rate required by the VFTP, at a Frequency of 24 months on a STAGGERED TEST BASIS. The results shall be trended and used as part of the 24 month assessment of the CRE boundary.
: e. The quantitative limits on unfiltered air inleakage into the CRE. These limits shall be stated in a manner to allow direct comparison to the unfiltered air inleakage measured by the testing described in paragraph
: c. The unfiltered air inleakage limit for radiological challenges is the inleakage flow rate assumed in the licensing basis analyses for OBA consequences.
Unfiltered air inleakage limits for hazardous chemicals must ensure that exposure of CRE occupants to these hazards will be within the assumptions in the licensing basis. f. The provisions of SR 3.0.2 are applicable to the Frequencies for assessing CRE habitability, determining CRE unfiltered inleakage, and measuring CRE pressure and assessing the CRE boundary as required by paragraphs c and d, respectively.
Columbia Generating Station 5.5-11 Amendment 2G-7,a+e 238 I 5.5 Programs and Manuals 5.5.15 Surveillance Frequency Control Program Programs and Manuals 5.5 This program provides controls for Surveillance Frequencies.
The program shall ensure that Surveillance Requirements specified in the Technical Specifications are performed at intervals sufficient to assure the associated Limiting Conditions for Operation are met. a. The Surveillance Frequency Control Program shall contain a list of Frequencies of those Surveillance Requirements for which the Frequency is controlled by the program. b. Changes to the Frequencies listed in the Surveillance Frequency Control Program shall be made in accordance with NEI 04-10, "Risk-Informed Method for Control of Surveillance Frequencies," Revision 1. c. The provisions of Surveillance Requirements 3.0.2 and 3.0.3 are applicable to the Frequencies established in the Surveillance Frequency Control Program. Columbia Generating Station 5.5-12 Amendment 238 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 238 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-21 ENERGY NORTHWEST COLUMBIA GENERATING STATION DOCKET NO. 50-397


==1.0 INTRODUCTION==
Programs and Manuals 5.5 5.5  Programs and Manuals 5.5.15 Surveillance Frequency Control Program This program provides controls for Surveillance Frequencies. The program shall ensure that Surveillance Requirements specified in the Technical Specifications are performed at intervals sufficient to assure the associated Limiting Conditions for Operation are met.
: a.      The Surveillance Frequency Control Program shall contain a list of Frequencies of those Surveillance Requirements for which the Frequency is controlled by the program.
: b.      Changes to the Frequencies listed in the Surveillance Frequency Control Program shall be made in accordance with NEI 04-10, "Risk-Informed Method for Control of Surveillance Frequencies," Revision 1.
: c.      The provisions of Surveillance Requirements 3.0.2 and 3.0.3 are applicable to the Frequencies established in the Surveillance Frequency Control Program.
Columbia Generating Station                    5.5-12                            Amendment 238


By application dated March 17, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15093A178), Energy Northwest, the licensee, requested changes to the technical specifications (TSs) (Appendix A to Renewed Facility Operating License No. NPF-21) for the Columbia Generating Station (Columbia).
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 238 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-21 ENERGY NORTHWEST COLUMBIA GENERATING STATION DOCKET NO. 50-397
The licensee requested to revise the Columbia TSs by relocating specific surveillance requirement (SR) frequencies to a licensee-controlled program. The licensee requested to revise the TSs to require that changes to such surveillance frequencies will be made in accordance with Nuclear Energy Institute (NEI) 04-10, Revision 1, "Risk-Informed Technical Specifications Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies," April 2007 (ADAMS Accession No. ML071360456).
The requested change is the adoption of the U.S. Nuclear Regulatory Commission (NRC)-approved Technical Specification Task Force (TSTF) Standard Technical Specifications (STS) Change Traveler TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control-RITSTF
[Risk-Informed TSTF] Initiative 5b" (ADAMS Accession No. ML090850642).
The Federal Register (FR) notice published on July 6, 2009 (74 FR 31996), announced the availability of TSTF-425, Revision 3. By e-mails dated August 12, 2015 (ADAMS Accession No. ML15224B646), November 3, 2015 (ADAMS Accession No. ML15307A825), March 9, 2016 (ADAMS Accession No. ML16069A359), and May 31, 2016 (ADAMS Accession No. ML16152A737), the NRC sent requests for additional information (RAls) to the licensee.
By letters dated September 17, 2015 (ADAMS Accession No. ML15260A570), October 29, 2015 (ADAMS Accession No. ML15302A492), November 17, 2015 (ADAMS Accession No. ML15321A426), April 7, 2016 (ADAMS Accession No. ML16098A387), and June 22, 2016 (ADAMS Accession No. ML16174A432), the licensee responded to these requests.
The letters provided clarifying information that did not expand the scope of the application and did not change the staffs original proposed no significant hazards consideration determination as published in the FR on May 24, 2015 (80 FR 30100). Enclosure 2 


==2.0 REGULATORY EVALUATION==
==1.0     INTRODUCTION==


2.1 Description of the Proposed Changes The licensee proposed to modify the Columbia TSs by relocating specific surveillance frequencies to a licensee-controlled program (i.e., the Surveillance Frequency Control Program (SFCP)) in accordance with NEI 04-10, Revision 1. The licensee stated that the proposed change is consistent with the adoption of NRG-approved TSTF-425, Revision 3. When implemented, TSTF-425, Revision 3, relocates most periodic frequencies of TS surveillances to the SFCP, and provides requirements for the new SFCP in the Administrative Controls section of the TSs. All surveillance frequencies can be relocated except the following:
By application dated March 17, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15093A178), Energy Northwest, the licensee, requested changes to the technical specifications (TSs) (Appendix A to Renewed Facility Operating License No. NPF-21) for the Columbia Generating Station (Columbia). The licensee requested to revise the Columbia TSs by relocating specific surveillance requirement (SR) frequencies to a licensee-controlled program. The licensee requested to revise the TSs to require that changes to such surveillance frequencies will be made in accordance with Nuclear Energy Institute (NEI) 04-10, Revision 1, "Risk-Informed Technical Specifications Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies," April 2007 (ADAMS Accession No. ML071360456). The requested change is the adoption of the U.S. Nuclear Regulatory Commission (NRC)-approved Technical Specification Task Force (TSTF) Standard Technical Specifications (STS) Change Traveler TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control-RITSTF [Risk-Informed TSTF] Initiative 5b" (ADAMS Accession No. ML090850642). The Federal Register (FR) notice published on July 6, 2009 (74 FR 31996), announced the availability of TSTF-425, Revision 3.
By e-mails dated August 12, 2015 (ADAMS Accession No. ML15224B646), November 3, 2015 (ADAMS Accession No. ML15307A825), March 9, 2016 (ADAMS Accession No. ML16069A359), and May 31, 2016 (ADAMS Accession No. ML16152A737), the NRC sent requests for additional information (RAls) to the licensee. By letters dated September 17, 2015 (ADAMS Accession No. ML15260A570), October 29, 2015 (ADAMS Accession No. ML15302A492), November 17, 2015 (ADAMS Accession No. ML15321A426), April 7, 2016 (ADAMS Accession No. ML16098A387), and June 22, 2016 (ADAMS Accession No. ML16174A432), the licensee responded to these requests. The letters provided clarifying information that did not expand the scope of the application and did not change the staffs original proposed no significant hazards consideration determination as published in the FR on May 24, 2015 (80 FR 30100).
Enclosure 2
 
==2.0      REGULATORY EVALUATION==
 
2.1     Description of the Proposed Changes The licensee proposed to modify the Columbia TSs by relocating specific surveillance frequencies to a licensee-controlled program (i.e., the Surveillance Frequency Control Program (SFCP)) in accordance with NEI 04-10, Revision 1. The licensee stated that the proposed change is consistent with the adoption of NRG-approved TSTF-425, Revision 3. When implemented, TSTF-425, Revision 3, relocates most periodic frequencies of TS surveillances to the SFCP, and provides requirements for the new SFCP in the Administrative Controls section of the TSs. All surveillance frequencies can be relocated except the following:
* Frequencies that reference other approved programs for the specific interval, such as the lnservice Testing Program or the Primary Containment Leakage Rate Testing Program;
* Frequencies that reference other approved programs for the specific interval, such as the lnservice Testing Program or the Primary Containment Leakage Rate Testing Program;
* Frequencies that are purely event-driven (e.g., "each time the control rod is withdrawn to the 'full out' position");
* Frequencies that are purely event-driven (e.g., "each time the control rod is withdrawn to the 'full out' position");
* Frequencies that are event-driven, but have a time component for performing the surveillance on a one-time basis once the event occurs (e.g., "within 24 hours after thermal power 95% RTP"); and
* Frequencies that are event-driven, but have a time component for performing the surveillance on a one-time basis once the event occurs (e.g., "within 24 hours after thermal power reaching~ 95% RTP"); and
* Frequencies that are related to specific conditions (e.g., battery degradation, age and capacity) or conditions for the performance of a surveillance requirement (e.g., "drywell to suppression chamber differential pressure decrease").
* Frequencies that are related to specific conditions (e.g., battery degradation, age and capacity) or conditions for the performance of a surveillance requirement (e.g., "drywell to suppression chamber differential pressure decrease").
The licensee proposed to add the SFCP to TS Section 5.0, "Administrative Controls," Subsection 5.5.15, "Surveillance Frequency Control Program." The SFCP describes the requirements for the program to control changes to the relocated surveillance frequencies.
The licensee proposed to add the SFCP to TS Section 5.0, "Administrative Controls,"
The TS Bases for each affected surveillance would be revised to state that the frequency is controlled under the SFCP. The proposed changes to the Administrative Controls section of the TSs to incorporate the SFCP include a specific reference to NEI 04-10, Revision 1, as the basis for making any changes to the surveillance frequencies once they are relocated out of the TSs. In a letter dated September 19, 2007 (ADAMS Accession No. ML072570267), the NRC staff approved Topical Report NEI 04-10, Revision 1, as acceptable for referencing in licensing actions, to the extent specified and under the limitations delineated in NEI 04-10, Revision 1, and in the NRC staff's safety evaluation (SE) for NEI 04-10, Revision 1, dated September 19, 2007 (ADAMS Accession No. ML072570267).
Subsection 5.5.15, "Surveillance Frequency Control Program." The SFCP describes the requirements for the program to control changes to the relocated surveillance frequencies. The TS Bases for each affected surveillance would be revised to state that the frequency is controlled under the SFCP. The proposed changes to the Administrative Controls section of the TSs to incorporate the SFCP include a specific reference to NEI 04-10, Revision 1, as the basis for making any changes to the surveillance frequencies once they are relocated out of the TSs.
The licensee proposed other changes and deviations from TSTF-425 which are discussed in Section 3.3 of this SE. 2.2 Applicable Commission Policy Statements In the "Final Policy Statement:
In a letter dated September 19, 2007 (ADAMS Accession No. ML072570267), the NRC staff approved Topical Report NEI 04-10, Revision 1, as acceptable for referencing in licensing actions, to the extent specified and under the limitations delineated in NEI 04-10, Revision 1, and in the NRC staff's safety evaluation (SE) for NEI 04-10, Revision 1, dated September 19, 2007 (ADAMS Accession No. ML072570267).
Technical Specifications for Nuclear Power Plants," dated July 22, 1993 (58 FR 39132), the NRC addressed the use of Probabilistic Safety Analysis (PSA, currently referred to as Probabilistic Risk Assessment or PRA) in Standard Technical Specifications.
The licensee proposed other changes and deviations from TSTF-425 which are discussed in Section 3.3 of this SE.
In this 1993 publication, the NRC stated: The Commission believes that it would be inappropriate at this time to allow requirements which meet one or more of the first three criteria [of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.36] to be deleted from Technical Specifications based solely on probabilistic safety assessment (Criterion 4). However, if the results of PSA indicate that Technical Specifications can be relaxed or removed, a deterministic review will be performed  
 
.... The Commission Policy in this regard is consistent with its Policy Statement on "Safety Goals for the Operation of Nuclear Power Plants," 51 FR 30028, published on August 21, 1986. The Policy Statement on Safety Goals states in part, "* *
2.2     Applicable Commission Policy Statements In the "Final Policy Statement: Technical Specifications for Nuclear Power Plants," dated July 22, 1993 (58 FR 39132), the NRC addressed the use of Probabilistic Safety Analysis (PSA, currently referred to as Probabilistic Risk Assessment or PRA) in Standard Technical Specifications. In this 1993 publication, the NRC stated:
* probabilistic results should also be reasonably balanced and supported through use of deterministic arguments.
The Commission believes that it would be inappropriate at this time to allow requirements which meet one or more of the first three criteria [of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.36] to be deleted from Technical Specifications based solely on probabilistic safety assessment (Criterion 4). However, if the results of PSA indicate that Technical Specifications can be relaxed or removed, a deterministic review will be performed ....
In this way, judgments can be made * *
The Commission Policy in this regard is consistent with its Policy Statement on "Safety Goals for the Operation of Nuclear Power Plants," 51 FR 30028, published on August 21, 1986. The Policy Statement on Safety Goals states in part, "* *
* probabilistic results should also be reasonably balanced and supported through use of deterministic arguments. In this way, judgments can be made * *
* about the degree of confidence to be given these [probabilistic]
* about the degree of confidence to be given these [probabilistic]
estimates and assumptions.
estimates and assumptions. This is a key part of the process for determining the degree of regulatory conservatism that may be warranted for particular decisions.
This is a key part of the process for determining the degree of regulatory conservatism that may be warranted for particular decisions.
This defense-in-depth approach is expected to continue to ensure the protection of public health and safety."
This defense-in-depth approach is expected to continue to ensure the protection of public health and safety." The Commission will continue to use PSA, consistent with its policy on Safety Goals, as a tool in evaluating specific line-item improvements to Technical Specifications, new requirements, and industry proposals for risk-based Technical Specification changes. Approximately 2 years later, the NRC provided additional detail concerning the use of PRA in the "Final Policy Statement:
The Commission will continue to use PSA, consistent with its policy on Safety Goals, as a tool in evaluating specific line-item improvements to Technical Specifications, new requirements, and industry proposals for risk-based Technical Specification changes.
Use of Probabilistic Risk Assessment in Nuclear Regulatory Activities," dated August 16, 1995 (60 FR 42622). In this publication, the NRC stated: The Commission believes that an overall policy on the use of PRA methods in nuclear regulatory activities should be established so that the many potential applications of PRA can be implemented in a consistent and predictable manner that would promote regulatory stability and efficiency.
Approximately 2 years later, the NRC provided additional detail concerning the use of PRA in the "Final Policy Statement: Use of Probabilistic Risk Assessment in Nuclear Regulatory Activities," dated August 16, 1995 (60 FR 42622). In this publication, the NRC stated:
In addition, the Commission believes that the use of PRA technology in NRC regulatory activities should be increased to the extent supported by the state-of-the-art in PRA methods and data and in a manner that complements the NRC's deterministic approach .... PRA addresses a broad spectrum of initiating events by assessing the event frequency.
The Commission believes that an overall policy on the use of PRA methods in nuclear regulatory activities should be established so that the many potential applications of PRA can be implemented in a consistent and predictable manner that would promote regulatory stability and efficiency. In addition, the Commission believes that the use of PRA technology in NRC regulatory activities should be increased to the extent supported by the state-of-the-art in PRA methods and data and in a manner that complements the NRC's deterministic approach ....
Mitigating system reliability is then assessed, including the potential for multiple and common cause failures.
PRA addresses a broad spectrum of initiating events by assessing the event frequency. Mitigating system reliability is then assessed, including the potential for multiple and common cause failures. The treatment therefore goes beyond the single failure requirements in the deterministic approach. The probabilistic
The treatment therefore goes beyond the single failure requirements in the deterministic approach.
 
The probabilistic   approach to regulation is, therefore, considered an extension and enhancement of traditional regulation by considering risk in a more coherent and complete manner .... Therefore, the Commission believes that an overall policy on the use of PRA in nuclear regulatory activities should be established so that the many potential applications of PRA can be implemented in a consistent and predictable manner that promotes regulatory stability and efficiency.
approach to regulation is, therefore, considered an extension and enhancement of traditional regulation by considering risk in a more coherent and complete manner....
This policy statement sets forth the Commission's intention to encourage the use of PRA and to expand the scope of PRA applications in all nuclear regulatory matters to the extent supported by the state-of-the-art in terms of methods and data .... Therefore, the Commission adopts the following policy statement regarding the expanded NRC use of PRA: ( 1) The use of PRA technology should be increased in all regulatory matters to the extent supported by the state-of-the-art in PRA methods and data and in a manner that complements the NRC's deterministic approach and supports the NRC's traditional defense-in-depth philosophy.
Therefore, the Commission believes that an overall policy on the use of PRA in nuclear regulatory activities should be established so that the many potential applications of PRA can be implemented in a consistent and predictable manner that promotes regulatory stability and efficiency. This policy statement sets forth the Commission's intention to encourage the use of PRA and to expand the scope of PRA applications in all nuclear regulatory matters to the extent supported by the state-of-the-art in terms of methods and data ....
(2) PRA and associated analyses (e.g., sensitivity studies, uncertainty analyses, and importance measures) should be used in regulatory matters, where practical within the bounds of the state-of-the-art, to reduce unnecessary conservatism associated with current regulatory requirements, regulatory guides, license commitments, and staff practices.
Therefore, the Commission adopts the following policy statement regarding the expanded NRC use of PRA:
Where appropriate, PRA should be used to support the proposal for additional regulatory requirements in accordance with 10 CFR 50.109 (Backfit Rule). Appropriate procedures for including PRA in the process for changing regulatory requirements should be developed and followed.
( 1) The use of PRA technology should be increased in all regulatory matters to the extent supported by the state-of-the-art in PRA methods and data and in a manner that complements the NRC's deterministic approach and supports the NRC's traditional defense-in-depth philosophy.
It is, of course, understood that the intent of this policy is that existing rules and regulations shall be complied with unless these rules and regulations are revised. (3) PRA evaluations in support of regulatory decisions should be as realistic as practicable and appropriate supporting data should be publicly available for review. (4) The Commission's safety goals for nuclear power plants and subsidiary numerical objectives are to be used with appropriate consideration of uncertainties in making regulatory judgments on the need for proposing and backfitting new generic requirements on nuclear power plant licensees.
(2) PRA and associated analyses (e.g., sensitivity studies, uncertainty analyses, and importance measures) should be used in regulatory matters, where practical within the bounds of the state-of-the-art, to reduce unnecessary conservatism associated with current regulatory requirements, regulatory guides, license commitments, and staff practices. Where appropriate, PRA should be used to support the proposal for additional regulatory requirements in accordance with 10 CFR 50.109 (Backfit Rule). Appropriate procedures for including PRA in the process for changing regulatory requirements should be developed and followed. It is, of course, understood that the intent of this policy is that existing rules and regulations shall be complied with unless these rules and regulations are revised.
2.3 Applicable Regulations In 10 CFR, Section 50.36, the NRC established its regulatory requirements related to the content of TSs. Pursuant to 1 O CFR 50.36, TSs are required to include items in the following five specific categories related to station operation:
(3) PRA evaluations in support of regulatory decisions should be as realistic as practicable and appropriate supporting data should be publicly available for review.
(1) safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation; (3) SRs; (4) design features; and (5) administrative controls.
(4) The Commission's safety goals for nuclear power plants and subsidiary numerical objectives are to be used with appropriate consideration of uncertainties in making regulatory judgments on the need for proposing and backfitting new generic requirements on nuclear power plant licensees.
These categories will remain in the Columbia TSs. Paragraph 50.36(c)(3) of 10 CFR states, "Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met." The FR notice published on July 6, 2009 (74 FR 31996), which announced the availability of TSTF-425, Revision 3, stated that the addition of the SFCP to the TSs provides the necessary administrative controls to require that surveillance frequencies relocated to the SFCP are conducted at a frequency to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met. The FR notice also states that changes to surveillance frequencies in the SFCP are made using the methodology contained in NEI 04-10, Revision 1, including qualitative considerations, results of risk analyses, sensitivity studies and any bounding analyses, and recommended monitoring of structures, systems, and components (SSCs), and are required to be documented.
2.3     Applicable Regulations In 10 CFR, Section 50.36, the NRC established its regulatory requirements related to the content of TSs. Pursuant to 1O CFR 50.36, TSs are required to include items in the following five specific categories related to station operation: (1) safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation; (3) SRs; (4) design features; and (5) administrative controls. These categories will remain in the Columbia TSs.
Existing regulatory requirements, such as 10 CFR 50.65, "Requirements for monitoring the effectiveness of maintenance at nuclear power plants" (i.e., the Maintenance Rule), and 10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Action," require licensee monitoring of surveillance test failures and implementing corrective actions to address such failures.
 
Such failures can result in the licensee increasing the frequency of a surveillance test. In addition, by having the TSs require that changes to the frequencies listed in the SFCP be made in accordance with NEI 04-10, Revision 1, the licensee will be required to monitor the performance of SSCs for which surveillance frequencies are decreased to assure reduced testing does not adversely impact the SSCs. 2.4 Applicable NRG Regulatory Guides Regulatory Guide (RG) 1.17 4, Revision 2, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis," May 2011 (ADAMS Accession No. ML100910006), describes an acceptable risk-informed approach for assessing the nature and impact of proposed permanent licensing-basis changes by considering engineering issues and applying risk insights.
Paragraph 50.36(c)(3) of 10 CFR states, "Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met." The FR notice published on July 6, 2009 (74 FR 31996),
This regulatory guide also provides risk acceptance guidelines for evaluating the results of such evaluations.
which announced the availability of TSTF-425, Revision 3, stated that the addition of the SFCP to the TSs provides the necessary administrative controls to require that surveillance frequencies relocated to the SFCP are conducted at a frequency to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met. The FR notice also states that changes to surveillance frequencies in the SFCP are made using the methodology contained in NEI 04-10, Revision 1, including qualitative considerations, results of risk analyses, sensitivity studies and any bounding analyses, and recommended monitoring of structures, systems, and components (SSCs), and are required to be documented.
Existing regulatory requirements, such as 10 CFR 50.65, "Requirements for monitoring the effectiveness of maintenance at nuclear power plants" (i.e., the Maintenance Rule), and 10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Action," require licensee monitoring of surveillance test failures and implementing corrective actions to address such failures. Such failures can result in the licensee increasing the frequency of a surveillance test. In addition, by having the TSs require that changes to the frequencies listed in the SFCP be made in accordance with NEI 04-10, Revision 1, the licensee will be required to monitor the performance of SSCs for which surveillance frequencies are decreased to assure reduced testing does not adversely impact the SSCs.
2.4     Applicable NRG Regulatory Guides Regulatory Guide (RG) 1.174, Revision 2, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis,"
May 2011 (ADAMS Accession No. ML100910006), describes an acceptable risk-informed approach for assessing the nature and impact of proposed permanent licensing-basis changes by considering engineering issues and applying risk insights. This regulatory guide also provides risk acceptance guidelines for evaluating the results of such evaluations.
RG 1.177, Revision 1, "An Approach for Plant-Specific, Risk-Informed Decisionmaking:
RG 1.177, Revision 1, "An Approach for Plant-Specific, Risk-Informed Decisionmaking:
Technical Specifications," May 2011 (ADAMS Accession No. ML100910008), describes an acceptable risk-informed approach specifically for assessing proposed TS changes. RG 1.200, Revision 2, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities," March 2009 (ADAMS Accession No. ML090410014), describes an acceptable approach for determining whether the quality of the PRA, in total or the parts that are used to support an application, is sufficient to provide confidence in the results, such that the PRA can be used in regulatory decisionmaking for light-water reactors (LWRs). 3.0 TECHNICAL EVALUATION The licensee's adoption of TSTF-425, Revision 3, provides for administrative relocation of applicable surveillance frequencies to the SFCP, and provides for the addition of the SFCP to the Administrative Controls section of TSs. The changes to the Administrative Controls section of the TSs will also require the application of NEI 04-10, Revision 1, for any changes to surveillance frequencies within the SFCP. The licensee's application to implement the changes described in TSTF-425, Revision 3, included documentation regarding the PRA technical adequacy consistent with RG 1.200, Revision 2. NEI 04-10, Revision 1, states that PRA methods are used with plant performance data and other considerations to identify and justify modifications to the surveillance frequencies of equipment at nuclear power plants. This is consistent with guidance provided in RG 1.17 4, Revision 2, and RG 1.177, Revision 1, in support of changes to Surveillance Test Intervals.
Technical Specifications," May 2011 (ADAMS Accession No. ML100910008), describes an acceptable risk-informed approach specifically for assessing proposed TS changes.
3.1 Review Methodology RG 1.177, Revision 1, identifies five key safety principles required for risk-informed changes to TSs. Each of these principles is addressed by NEI 04-10, Revision 1. 3.1.1 The Proposed Change Meets Current Regulations Paragraph 50.36(c)(3) of 10 CFR requires that TSs include surveillances which are "requirements relating to test, calibration, or inspection to assure that necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met." The licensee is required by its TSs to perform surveillance tests, calibration, or inspection on specific safety-related equipment (e.g., reactivity control, power distribution, electrical, and instrumentation) to verify system operability.
RG 1.200, Revision 2, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities," March 2009 (ADAMS Accession No. ML090410014), describes an acceptable approach for determining whether the quality of the PRA, in total or the parts that are used to support an application, is sufficient to provide confidence in the results, such that the PRA can be used in regulatory decisionmaking for light-water reactors (LWRs).
Surveillance frequencies are based primarily upon deterministic methods such as engineering judgment, operating experience, and manufacturer's recommendations.
 
The licensee's use of NRG-approved methodologies identified in NEI 04-10, Revision 1, provides a way to establish risk-informed surveillance frequencies that complements the deterministic approach and supports the NRC's traditional defense-in-depth philosophy.
==3.0     TECHNICAL EVALUATION==
The SRs themselves are remaining in the TSs, as required by 10 CFR 50.36(c)(3). This change is analogous with other NRG-approved TS changes in which the SRs are retained in TSs, but the related surveillance frequencies are relocated to licensee-controlled documents, such as surveillances performed in accordance with the lnservice Testing Program and the Primary Containment Leakage Rate Testing Program. Thus, this proposed change complies with 10 CFR 50.36(c)(3) by retaining the requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met. The regulatory requirements in 10 CFR 50.65, 10 CFR Part 50, Appendix B, and the monitoring required by NEI 04-10, Revision 1, ensure that surveillance frequencies are sufficient to assure that the requirements of 10 CFR 50.36 are satisfied, and that any performance deficiencies will be identified and appropriate corrective actions taken. The licensee's SFCP ensures that SRs specified in the TSs are performed at intervals sufficient to assure the above regulatory requirements are met. Based on the above, the NRC staff concludes that the proposed change   meets the first key safety principle of RG 1.177, Revision 1, by complying with current regulations.
 
3.1.2 The Proposed Change Is Consistent With the Defense-in-Depth Philosophy The defense-in-depth philosophy (i.e., the second key safety principle of RG 1.177, Revision 1), is maintained if:
The licensee's adoption of TSTF-425, Revision 3, provides for administrative relocation of applicable surveillance frequencies to the SFCP, and provides for the addition of the SFCP to the Administrative Controls section of TSs. The changes to the Administrative Controls section of the TSs will also require the application of NEI 04-10, Revision 1, for any changes to surveillance frequencies within the SFCP. The licensee's application to implement the changes described in TSTF-425, Revision 3, included documentation regarding the PRA technical adequacy consistent with RG 1.200, Revision 2. NEI 04-10, Revision 1, states that PRA methods are used with plant performance data and other considerations to identify and justify modifications to the surveillance frequencies of equipment at nuclear power plants. This is consistent with guidance provided in RG 1.174, Revision 2, and RG 1.177, Revision 1, in support of changes to Surveillance Test Intervals.
3.1     Review Methodology RG 1.177, Revision 1, identifies five key safety principles required for risk-informed changes to TSs. Each of these principles is addressed by NEI 04-10, Revision 1.
3.1.1   The Proposed Change Meets Current Regulations Paragraph 50.36(c)(3) of 10 CFR requires that TSs include surveillances which are "requirements relating to test, calibration, or inspection to assure that necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met." The licensee is required by its TSs to perform surveillance tests, calibration, or inspection on specific safety-related equipment (e.g.,
reactivity control, power distribution, electrical, and instrumentation) to verify system operability.
Surveillance frequencies are based primarily upon deterministic methods such as engineering judgment, operating experience, and manufacturer's recommendations. The licensee's use of NRG-approved methodologies identified in NEI 04-10, Revision 1, provides a way to establish risk-informed surveillance frequencies that complements the deterministic approach and supports the NRC's traditional defense-in-depth philosophy.
The SRs themselves are remaining in the TSs, as required by 10 CFR 50.36(c)(3). This change is analogous with other NRG-approved TS changes in which the SRs are retained in TSs, but the related surveillance frequencies are relocated to licensee-controlled documents, such as surveillances performed in accordance with the lnservice Testing Program and the Primary Containment Leakage Rate Testing Program. Thus, this proposed change complies with 10 CFR 50.36(c)(3) by retaining the requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
The regulatory requirements in 10 CFR 50.65, 10 CFR Part 50, Appendix B, and the monitoring required by NEI 04-10, Revision 1, ensure that surveillance frequencies are sufficient to assure that the requirements of 10 CFR 50.36 are satisfied, and that any performance deficiencies will be identified and appropriate corrective actions taken. The licensee's SFCP ensures that SRs specified in the TSs are performed at intervals sufficient to assure the above regulatory requirements are met. Based on the above, the NRC staff concludes that the proposed change
 
meets the first key safety principle of RG 1.177, Revision 1, by complying with current regulations.
3.1.2   The Proposed Change Is Consistent With the Defense-in-Depth Philosophy The defense-in-depth philosophy (i.e., the second key safety principle of RG 1.177, Revision 1),
is maintained if:
* A reasonable balance is preserved among prevention of core damage, prevention of containment failure, and consequence mitigation.
* A reasonable balance is preserved among prevention of core damage, prevention of containment failure, and consequence mitigation.
* Over-reliance on programmatic activities to compensate for weaknesses in plant design is avoided.
* Over-reliance on programmatic activities to compensate for weaknesses in plant design is avoided.
Line 705: Line 1,182:
* Defenses against human errors are preserved.
* Defenses against human errors are preserved.
* The intent of the General Design Criteria in 10 CFR Part 50, Appendix A, is maintained.
* The intent of the General Design Criteria in 10 CFR Part 50, Appendix A, is maintained.
The changes to the Administrative Controls section of the TSs will require the application of NEI 04-10, Revision 1, for any changes to surveillance frequencies within the SFCP. NEI 04-10, Revision 1, uses both the core damage frequency (CDF) and the large early release frequency (LERF) metrics to evaluate the impact of proposed changes to surveillance frequencies.
The changes to the Administrative Controls section of the TSs will require the application of NEI 04-10, Revision 1, for any changes to surveillance frequencies within the SFCP.
The guidance of RG 1.174, Revision 2, and RG 1.177, Revision 1, for changes to CDF and LERF is achieved by evaluation using a comprehensive risk analysis, which assesses the impact of proposed changes including contributions from human errors and CCFs. Defense-in-depth is also included in the methodology explicitly as a qualitative consideration outside of the risk analysis, as is the potential impact on detection of component degradation that could lead to an increased likelihood of CCFs. Therefore, the NRC staff concludes that both the quantitative risk analysis and the qualitative considerations assure a reasonable balance of defense-in-depth is maintained to ensure protection of public health and safety, satisfying the second key safety principle of RG 1.177, Revision 1. 3.1.3 The Proposed Change Maintains Sufficient Safety Margins The engineering evaluation that will be conducted by the licensee under the SFCP when frequencies are revised will assess the impact of the proposed frequency change to assure that   sufficient safety margins are maintained.
NEI 04-10, Revision 1, uses both the core damage frequency (CDF) and the large early release frequency (LERF) metrics to evaluate the impact of proposed changes to surveillance frequencies. The guidance of RG 1.174, Revision 2, and RG 1.177, Revision 1, for changes to CDF and LERF is achieved by evaluation using a comprehensive risk analysis, which assesses the impact of proposed changes including contributions from human errors and CCFs.
The guidelines used for making that assessment will include ensuring the proposed surveillance test frequency change is not in conflict with approved industry codes and standards or adversely affects any assumptions or inputs to the safety analysis; or, if such inputs are affected, justification is provided to ensure sufficient safety margin will continue to exist. The design, operation, testing methods, and acceptance criteria for SSCs specified in applicable codes and standards (or alternatives approved for use by the NRC) will continue to be met as described in the plants' licensing bases, including the Updated Final Safety Analysis Report and TS Bases, because these are not affected by changes to the surveillance frequencies.
Defense-in-depth is also included in the methodology explicitly as a qualitative consideration outside of the risk analysis, as is the potential impact on detection of component degradation that could lead to an increased likelihood of CCFs. Therefore, the NRC staff concludes that both the quantitative risk analysis and the qualitative considerations assure a reasonable balance of defense-in-depth is maintained to ensure protection of public health and safety, satisfying the second key safety principle of RG 1.177, Revision 1.
3.1.3   The Proposed Change Maintains Sufficient Safety Margins The engineering evaluation that will be conducted by the licensee under the SFCP when frequencies are revised will assess the impact of the proposed frequency change to assure that
 
sufficient safety margins are maintained. The guidelines used for making that assessment will include ensuring the proposed surveillance test frequency change is not in conflict with approved industry codes and standards or adversely affects any assumptions or inputs to the safety analysis; or, if such inputs are affected, justification is provided to ensure sufficient safety margin will continue to exist.
The design, operation, testing methods, and acceptance criteria for SSCs specified in applicable codes and standards (or alternatives approved for use by the NRC) will continue to be met as described in the plants' licensing bases, including the Updated Final Safety Analysis Report and TS Bases, because these are not affected by changes to the surveillance frequencies.
Similarly, there is no impact to safety analysis acceptance criteria as described in the plant licensing basis. Based on the above, the NRC staff concludes that safety margins are maintained by the proposed methodology, and the third key safety principle of RG 1.177, Revision 1, is satisfied.
Similarly, there is no impact to safety analysis acceptance criteria as described in the plant licensing basis. Based on the above, the NRC staff concludes that safety margins are maintained by the proposed methodology, and the third key safety principle of RG 1.177, Revision 1, is satisfied.
3.1.4 When Proposed Changes Result in an Increase in CDF or Risk, the Increases Should Be Small and Consistent with the Intent of the Commission's Safety Goal Policy Statement RG 1.177, Revision 1, provides a framework for evaluating the risk impact of proposed changes to surveillance frequencies which requires identification of the risk contribution from impacted surveillances, determination of the risk impact from the change to the proposed surveillance frequency, and performance of sensitivity and uncertainty evaluations.
3.1.4   When Proposed Changes Result in an Increase in CDF or Risk, the Increases Should Be Small and Consistent with the Intent of the Commission's Safety Goal Policy Statement RG 1.177, Revision 1, provides a framework for evaluating the risk impact of proposed changes to surveillance frequencies which requires identification of the risk contribution from impacted surveillances, determination of the risk impact from the change to the proposed surveillance frequency, and performance of sensitivity and uncertainty evaluations. The changes to the Administrative Controls section of the TSs will require application of NEI 04-10, Revision 1, in the SFCP. NEI 04-10, Revision 1, satisfies the intent of RG 1.177, Revision 1, guidance for evaluation of the change in risk, and for assuring that such changes are small by providing the technical methodology to support risk-informed TSs for control of surveillance frequencies.
The changes to the Administrative Controls section of the TSs will require application of NEI 04-10, Revision 1, in the SFCP. NEI 04-10, Revision 1, satisfies the intent of RG 1.177, Revision 1, guidance for evaluation of the change in risk, and for assuring that such changes are small by providing the technical methodology to support risk-informed TSs for control of surveillance frequencies.
3.1.4.1     Quality of the PRA The quality of the licensee's PRA must be commensurate with the safety significance of the proposed TS change and the role the PRA plays in justifying the change. That is, the greater the change in risk or the greater the uncertainty in that risk from the requested TS change, or both, the more rigor that must go into ensuring the quality of the PRA.
3.1.4.1 Quality of the PRA The quality of the licensee's PRA must be commensurate with the safety significance of the proposed TS change and the role the PRA plays in justifying the change. That is, the greater the change in risk or the greater the uncertainty in that risk from the requested TS change, or both, the more rigor that must go into ensuring the quality of the PRA. RG 1.200 provides regulatory guidance for assessing the technical adequacy of a PRA. The current revision (i.e., Revision 2) of this RG endorses, with clarifications and qualifications, the use of (1) American Society of Mechanical Engineers (ASME)/American Nuclear Society (ANS) RA-Sa-2009, "Addenda to ASME RA-S-2008 Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications" (i.e., the PRA Standard), (2) NEI 00-02, Revision 1, "PRA Peer Review Process Guidance," May 2006 (ADAMS Accession Nos. ML061510619 and ML063390593), and (3) NEI 05-04, Revision 2, "Process for Performing Internal Events PRA Peer Reviews Using the ASME/ANS PRA Standard," November 2008 (ADAMS Accession No. ML083430462).
RG 1.200 provides regulatory guidance for assessing the technical adequacy of a PRA. The current revision (i.e., Revision 2) of this RG endorses, with clarifications and qualifications, the use of (1) American Society of Mechanical Engineers (ASME)/American Nuclear Society (ANS)
The licensee has performed an assessment of the Columbia internal events PRA model, as discussed below, used to support the SFCP using the guidance of RG 1.200 to assure that the PRA models are capable of determining the change in risk due to changes to surveillance   frequencies of SSCs, using plant-specific data and models. Capability Category II of the NRC-endorsed PRA standard is the target capability level for supporting requirements for the internal events PRA for this application.
RA-Sa-2009, "Addenda to ASME RA-S-2008 Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications" (i.e., the PRA Standard), (2) NEI 00-02, Revision 1, "PRA Peer Review Process Guidance," May 2006 (ADAMS Accession Nos. ML061510619 and ML063390593), and (3) NEI 05-04, Revision 2, "Process for Performing Internal Events PRA Peer Reviews Using the ASME/ANS PRA Standard," November 2008 (ADAMS Accession No. ML083430462).
Any identified deficiencies to those requirements are assessed further to determine any impacts to proposed decreases to surveillance frequencies, including the use of sensitivity studies where appropriate, in accordance with NEI 04-10, Revision 1. A full-scope peer review was performed in 2009 of the internal events, at-power PRA model. The peer review was based on RG 1.200, Revision 2 and ASME/ANS PRA Standard RA-Sa-2009.
The licensee has performed an assessment of the Columbia internal events PRA model, as discussed below, used to support the SFCP using the guidance of RG 1.200 to assure that the PRA models are capable of determining the change in risk due to changes to surveillance
It was performed by the Boiling Water Reactor (BWR) Owners' Group, and it followed peer review guidance in NEI 05-04, Revision 2. An earlier version of the internal events PRA model had received a full-scope peer review in 2004 against ASME/ANS PRA Standard RA-Sa-2003, as clarified by RG 1.200 (DRAFT), and followed NEI 00-02, Revision A-3, "Probabilistic Risk Assessment (PRA) Peer Review Process Guidance," March 2003 (ADAMS Accession No. ML003728023).
 
Subsequent to the 2009 full scope peer review, the licensee addressed the facts and observations (F&Os) as well as self-assessment F&Os. In its letter dated September 17, 2015, in response to PRA RAI 1, the licensee explained that self-assessment refers to the process in which PRA self-identified F&Os are entered into an F&O database for inclusion in the next modeling update. The LAR provided those F&Os remaining open in Table 2-1 with a disposition for the TSTF-425 program. In its response to PRA RAI 1, the licensee provided the peer review and self-assessment F&Os for internal events, including internal flooding, PRA standard supporting requirements which had been graded as Capability Category I or "not met," with a resolution of the F&O. The NRC staff reviewed these internal events and flooding F&Os and their dispositions to determine whether any gaps in the PRA model were identified that could impact the application.
frequencies of SSCs, using plant-specific data and models. Capability Category II of the NRC-endorsed PRA standard is the target capability level for supporting requirements for the internal events PRA for this application. Any identified deficiencies to those requirements are assessed further to determine any impacts to proposed decreases to surveillance frequencies, including the use of sensitivity studies where appropriate, in accordance with NEI 04-10, Revision 1.
The NRC staff assessed these peer review F&Os to ensure any deficiencies in meeting Capability Category II can be addressed for the SFCP per the NRC-approved NEI 04-10, Revision 1 methodology.
A full-scope peer review was performed in 2009 of the internal events, at-power PRA model.
The peer review was based on RG 1.200, Revision 2 and ASME/ANS PRA Standard RA-Sa-2009. It was performed by the Boiling Water Reactor (BWR) Owners' Group, and it followed peer review guidance in NEI 05-04, Revision 2. An earlier version of the internal events PRA model had received a full-scope peer review in 2004 against ASME/ANS PRA Standard RA-Sa-2003, as clarified by RG 1.200 (DRAFT), and followed NEI 00-02, Revision A-3, "Probabilistic Risk Assessment (PRA) Peer Review Process Guidance,"
March 2003 (ADAMS Accession No. ML003728023).
Subsequent to the 2009 full scope peer review, the licensee addressed the facts and observations (F&Os) as well as self-assessment F&Os. In its letter dated September 17, 2015, in response to PRA RAI 1, the licensee explained that self-assessment refers to the process in which PRA self-identified F&Os are entered into an F&O database for inclusion in the next modeling update. The LAR provided those F&Os remaining open in Table 2-1 with a disposition for the TSTF-425 program. In its response to PRA RAI 1, the licensee provided the peer review and self-assessment F&Os for internal events, including internal flooding, PRA standard supporting requirements which had been graded as Capability Category I or "not met," with a resolution of the F&O.
The NRC staff reviewed these internal events and flooding F&Os and their dispositions to determine whether any gaps in the PRA model were identified that could impact the application.
The NRC staff reviewed these internal events and flooding F&Os and their dispositions to determine whether any gaps in the PRA model were identified that could impact the application.
The NRC staff assessed these peer review F&Os to ensure any deficiencies in meeting Capability Category II can be addressed for the SFCP per the NRC-approved NEI 04-10, Revision 1 methodology.
The NRC staff assessed these peer review F&Os to ensure any deficiencies in meeting Capability Category II can be addressed for the SFCP per the NRC-approved NEI 04-10, Revision 1 methodology. The NRC staff reviewed these internal events and flooding F&Os and their dispositions to determine whether any gaps in the PRA model were identified that could impact the application. The NRC staff assessed these peer review F&Os to ensure any deficiencies in meeting Capability Category II can be addressed for the SFCP per the NRC-approved NEI 04-10, Revision 1 methodology. The NRC staff found that the F&Os were mainly documentation-related with no impact on the application and the PRA documentation was updated, or that the licensee's F&O disposition was technically adequate for the application. F&O dispositions which required additional information for the review are discussed below.
The NRC staff found that the F&Os were mainly documentation-related with no impact on the application and the PRA documentation was updated, or that the licensee's F&O disposition was technically adequate for the application.
F&O 2-2 is related to Supporting Requirement DA-C6. The F&O states that estimates based on the surveillance tests and maintenance acts as described in Supporting Requirement DA-C6 and DA-C7 should be performed for significant components whose data are not tracked in the Mitigating Systems Performance Index (MSPI) data. The licensee performed a sensitivity analysis for applicable components by using generic data, and determined the sensitivity analysis represented a bounding analysis. In its letter dated April 7, 2016, in response to PRA RAI 4.1, the licensee addressed the staff's concern that Supporting Requirement DA-C6 and DA-C7 include consideration of plant-specific data and the use of generic data may not be
F&O dispositions which required additional information for the review are discussed below. F&O 2-2 is related to Supporting Requirement DA-C6. The F&O states that estimates based on the surveillance tests and maintenance acts as described in Supporting Requirement DA-C6 and DA-C7 should be performed for significant components whose data are not tracked in the Mitigating Systems Performance Index (MSPI) data. The licensee performed a sensitivity analysis for applicable components by using generic data, and determined the sensitivity analysis represented a bounding analysis.
 
In its letter dated April 7, 2016, in response to PRA RAI 4.1, the licensee addressed the staff's concern that Supporting Requirement DA-C6 and DA-C7 include consideration of plant-specific data and the use of generic data may not be  necessarily provide a bounding assessment.
necessarily provide a bounding assessment. The licensee's response stated that estimates for significant events not tracked in the MSPI data are now based on plant-specific surveillance test and maintenance records. This resolution applied to the following component failure modes:
The licensee's response stated that estimates for significant events not tracked in the MSPI data are now based on plant-specific surveillance test and maintenance records. This resolution applied to the following component failure modes: C-W2 (compressors fails to start), C-W4 (compressor fails to run), FN-R3 (fan fails to start), FR-W4 (fan fails to run), AHUS-S3 (air handling unit fails to start), and AHUR-S4 (air handling unit fails to run); furthermore, the model incorporates this resolution.
C-W2 (compressors fails to start), C-W4 (compressor fails to run), FN-R3 (fan fails to start),
The NRC staff finds that this F&O has been adequately addressed for the application because components not tracked in the MSPI have accounted for plant-specific data and the model has incorporated these changes. F&O 2-14 is related to Supporting Requirement SY-A4 which states that interviews with plant system engineers or operators have not been documented and cannot be verified by the peer review team. The licensee determined that this F&O could be handled by performing sensitivity analysis to examine whether the application is impacted.
FR-W4 (fan fails to run), AHUS-S3 (air handling unit fails to start), and AHUR-S4 (air handling unit fails to run); furthermore, the model incorporates this resolution. The NRC staff finds that this F&O has been adequately addressed for the application because components not tracked in the MSPI have accounted for plant-specific data and the model has incorporated these changes.
In its letter dated October 29, 2015, in response to PRA RAI 3, the licensee addressed the staff's concern on how a sensitivity analysis could be defined to address the lack of documented interviews.
F&O 2-14 is related to Supporting Requirement SY-A4 which states that interviews with plant system engineers or operators have not been documented and cannot be verified by the peer review team. The licensee determined that this F&O could be handled by performing sensitivity analysis to examine whether the application is impacted. In its letter dated October 29, 2015, in response to PRA RAI 3, the licensee addressed the staff's concern on how a sensitivity analysis could be defined to address the lack of documented interviews. The response stated that system reviews with the system engineers were completed for all PRA systems with a focus on confirming that the PRA system analyses correctly reflect the as-built, as-operated plant, as well as to discuss recent operating history and any problems in system operation. The interviews and reviews were documented. The response identified two modeling conservatisms which did not have a risk-significant impact on the PRA results. The NRC staff finds that this F&O has been adequately addressed because the licensee completed the interviews for Supporting Requirement SY-A4 Capability Category II, and have documented the interviews and reviews.
The response stated that system reviews with the system engineers were completed for all PRA systems with a focus on confirming that the PRA system analyses correctly reflect the as-built, as-operated plant, as well as to discuss recent operating history and any problems in system operation.
F&O 1-3 is related to Supporting Requirement HR-G3, LE-C7, and IFQU-A6. It pertains to the use of human error probability stress factors from NUREG/CR-1278, "Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications," August 1983 (ADAMS Accession No. ML071210299). The F&O stated that in almost all of the post-initiator human error probabilities (HEPs) where optimal stress is assumed, time is a factor with core damage occurring between 30 minutes and an hour[s]. The peer review recommendation was to apply high stress factors per Table 17-1 or NUREG/CR-1278 to HEPs where time pressure is present during an accident situation. In its letter dated April 7, 2016, in response to PRA RAI 1.1 on how optimal and high stress factors were applied for HEPs, the licensee stated that as part of the PRA update performed in 2014, all post-initiator human failure events (HFEs) utilize stress levels recommended by the Human Reliability Analysis (HRA) Calculator. Further, that by utilizing the HRA Calculator, stress levels for the HFEs follow the NUREG/CR-1278 guidelines, including addressing the impact to stress levels from time pressure. In response to a follow-up RAI, in its letter dated June 22, 2016, the licensee clarified that post-initiator HEP stress levels were determined on a case-by-case basis to represent optimal (low), moderate stress, or high stress, as appropriate, including those where time is a factor with core damage occurring between 30 minutes and an hour. The NRC staff concludes the F&O is adequately dispositioned because the licensee followed the HRA Calculator guidance to account for stress factors, and determined the stress factors on a case-by-case basis during the time frame of concern mentioned in the F&O.
The interviews and reviews were documented.
Based on the licensee's assessments using the currently applicable PRA standard and revision of RG 1.200, the NRC staff concludes that the level of PRA quality, combined with the evaluation and disposition of F&Os, is sufficient to support the evaluation of changes proposed
The response identified two modeling conservatisms which did not have a risk-significant impact on the PRA results. The NRC staff finds that this F&O has been adequately addressed because the licensee completed the interviews for Supporting Requirement SY-A4 Capability Category II, and have documented the interviews and reviews. F&O 1-3 is related to Supporting Requirement HR-G3, LE-C7, and IFQU-A6. It pertains to the use of human error probability stress factors from NUREG/CR-1278, "Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications," August 1983 (ADAMS Accession No. ML071210299).
 
The F&O stated that in almost all of the post-initiator human error probabilities (HEPs) where optimal stress is assumed, time is a factor with core damage occurring between 30 minutes and an hour[s]. The peer review recommendation was to apply high stress factors per Table 17-1 or NUREG/CR-1278 to HEPs where time pressure is present during an accident situation.
to surveillance frequencies within the SFCP, and is consistent with Regulatory Position 2.3.1 of RG 1.177, Revision 1.
In its letter dated April 7, 2016, in response to PRA RAI 1.1 on how optimal and high stress factors were applied for HEPs, the licensee stated that as part of the PRA update performed in 2014, all post-initiator human failure events (HFEs) utilize stress levels recommended by the Human Reliability Analysis (HRA) Calculator.
3.1.4.2     Scope of the PRA The changes to the Administrative Controls section of the TSs will require the licensee to evaluate each proposed change to a relocated surveillance frequency using NEI 04-10, Revision 1, to determine its potential impact on risk (i.e., CDF and LERF) from internal events, fires, external events, and shutdown conditions. In cases where a PRA of sufficient scope or quantitative risk models were unavailable, the licensee uses bounding analyses, or other conservative quantitative evaluations. A qualitative screening analysis may be used when the surveillance frequency impact on plant risk is shown to be negligible or zero.
Further, that by utilizing the HRA Calculator, stress levels for the HFEs follow the NUREG/CR-1278 guidelines, including addressing the impact to stress levels from time pressure.
In addition to the at-power internal events PRA model, Columbia has a fire PRA model, a seismic PRA model, and a shutdown PRA model. According to the response to PRA RAI 1, the fire and seismic PRAs have not been reviewed against ASME/ANS PRA Standard RA-Sa-2009.
In response to a follow-up RAI, in its letter dated June 22, 2016, the licensee clarified that post-initiator HEP stress levels were determined on a case-by-case basis to represent optimal (low), moderate stress, or high stress, as appropriate, including those where time is a factor with core damage occurring between 30 minutes and an hour. The NRC staff concludes the F&O is adequately dispositioned because the licensee followed the HRA Calculator guidance to account for stress factors, and determined the stress factors on a case-by-case basis during the time frame of concern mentioned in the F&O. Based on the licensee's assessments using the currently applicable PRA standard and revision of RG 1.200, the NRC staff concludes that the level of PRA quality, combined with the evaluation and disposition of F&Os, is sufficient to support the evaluation of changes proposed   to surveillance frequencies within the SFCP, and is consistent with Regulatory Position 2.3.1 of RG 1.177, Revision 1. 3.1.4.2 Scope of the PRA The changes to the Administrative Controls section of the TSs will require the licensee to evaluate each proposed change to a relocated surveillance frequency using NEI 04-10, Revision 1, to determine its potential impact on risk (i.e., CDF and LERF) from internal events, fires, external events, and shutdown conditions.
The licensee stated that no PRA models other than the internal events PRA will be used for detailed quantitative analysis. NEI 04-10 Step 11 allows detailed quantitative analysis using the PRA model, by making necessary PRA modifications, if qualitative or bounding analysis is not sufficient for the STI analysis. By letter dated September 17, 2015, in response to PRA RAI 2, the licensee explained that the evaluation of fire risk and other external events risk will qualitatively reflect and consider the current plant configuration and operation, and referenced NEI 04-10 Step 10b, which provides guidance on using qualitative reasoning in conjunction with internal events risk evaluations. The NRC staff finds that the licensee's approach is consistent with NEI 04-10 guidance because the internal events PRA model supports detailed quantitative analysis, and for fire-related and external events, qualitative analysis will be performed based on current plant configuration and operation.
In cases where a PRA of sufficient scope or quantitative risk models were unavailable, the licensee uses bounding analyses, or other conservative quantitative evaluations.
Based on the above, the NRC staff concludes that through the application of NRG-approved NEI 04-10, Revision 1, the licensee's evaluation methodology is sufficient to ensure that the scope of the risk contribution of each surveillance frequency change is properly identified for evaluation and is consistent with Regulatory Position 2.3.2 of RG 1.177, Revision 1.
A qualitative screening analysis may be used when the surveillance frequency impact on plant risk is shown to be negligible or zero. In addition to the at-power internal events PRA model, Columbia has a fire PRA model, a seismic PRA model, and a shutdown PRA model. According to the response to PRA RAI 1, the fire and seismic PRAs have not been reviewed against ASME/ANS PRA Standard RA-Sa-2009.
3.1.4.3     PRA Modeling The licensee's methodology includes the determination of whether the SSCs affected by a proposed change to a surveillance frequency are modeled in the PRA. Where the SSC is directly or implicitly modeled, a quantitative evaluation of the risk impact may be carried out.
The licensee stated that no PRA models other than the internal events PRA will be used for detailed quantitative analysis.
The methodology adjusts the failure probability of the impacted SSCs, including any impacted CCF modes, based on the proposed change to the surveillance frequency. Where the SSC is not modeled in the PRA, bounding analyses are performed to characterize the impact of the proposed change to the surveillance frequency. Potential impacts on the risk analyses due to screening criteria and truncation levels are addressed by the requirements for PRA technical adequacy consistent with guidance contained in RG 1.200, and by sensitivity studies identified in NEI 04-10, Revision 1.
NEI 04-10 Step 11 allows detailed quantitative analysis using the PRA model, by making necessary PRA modifications, if qualitative or bounding analysis is not sufficient for the STI analysis.
Based on the above, the NRC staff concludes that through the application of NRG-approved NEI 04-10, Revision 1, the Columbia PRA modeling is sufficient to ensure an acceptable
By letter dated September 17, 2015, in response to PRA RAI 2, the licensee explained that the evaluation of fire risk and other external events risk will qualitatively reflect and consider the current plant configuration and operation, and referenced NEI 04-10 Step 10b, which provides guidance on using qualitative reasoning in conjunction with internal events risk evaluations.
 
The NRC staff finds that the licensee's approach is consistent with NEI 04-10 guidance because the internal events PRA model supports detailed quantitative analysis, and for fire-related and external events, qualitative analysis will be performed based on current plant configuration and operation.
evaluation of risk for the proposed changes in surveillance frequency, and is consistent with Regulatory Position 2.3.3 of RG 1.177, Revision 1.
Based on the above, the NRC staff concludes that through the application of NRG-approved NEI 04-10, Revision 1, the licensee's evaluation methodology is sufficient to ensure that the scope of the risk contribution of each surveillance frequency change is properly identified for evaluation and is consistent with Regulatory Position 2.3.2 of RG 1.177, Revision 1. 3.1.4.3 PRA Modeling The licensee's methodology includes the determination of whether the SSCs affected by a proposed change to a surveillance frequency are modeled in the PRA. Where the SSC is directly or implicitly modeled, a quantitative evaluation of the risk impact may be carried out. The methodology adjusts the failure probability of the impacted SSCs, including any impacted CCF modes, based on the proposed change to the surveillance frequency.
3.1.4.4     Assumptions for Time-Related Failure Contributions The failure probabilities of SSCs modeled in PRAs may include a standby time-related contribution and a cyclic demand-related contribution. NEI 04-10 criteria adjust the time-related failure contribution of SSCs affected by the proposed change to surveillance frequency. This is consistent with RG 1.177, Revision 1, Regulatory Position 2.3.3 which permits separation of the failure rate contributions into demand and standby for evaluation of SRs. If the available data does not support distinguishing between the time-related failures and demand failures, then the change to surveillance frequency is conservatively assumed to impact the total failure probability of the SSC, including both standby and demand contributions. The SSC failure rate (per unit time) is assumed to be unaffected by the change in test frequency such that the failure probability is assumed to increase linearly with time, and will be confirmed by the required monitoring and feedback implemented after the change in surveillance frequency is implemented. The process requires consideration of qualitative sources of information with regards to potential impacts of test frequency on SSC performance, including industry and plant-specific operating experience, vendor recommendations, industry standards, and code specified test intervals. Thus the process is not reliant upon risk analyses as the sole basis for the proposed changes.
Where the SSC is not modeled in the PRA, bounding analyses are performed to characterize the impact of the proposed change to the surveillance frequency.
The potential beneficial risk impacts of reduced surveillance frequency, including reduced downtime, lesser potential for restoration errors, reduction of potential for test caused transients, and reduced test-caused wear of equipment, are identified qualitatively, but are conservatively not required to be quantitatively assessed. Thus, through the application of NEI 04-10, the licensee has employed reasonable assumptions with regard to extensions of surveillance test intervals, and is consistent with Regulatory Position 2.3.4 of RG 1.177, Revision 1.
Potential impacts on the risk analyses due to screening criteria and truncation levels are addressed by the requirements for PRA technical adequacy consistent with guidance contained in RG 1.200, and by sensitivity studies identified in NEI 04-10, Revision 1. Based on the above, the NRC staff concludes that through the application of NRG-approved NEI 04-10, Revision 1, the Columbia PRA modeling is sufficient to ensure an acceptable   evaluation of risk for the proposed changes in surveillance frequency, and is consistent with Regulatory Position 2.3.3 of RG 1.177, Revision 1. 3.1.4.4 Assumptions for Time-Related Failure Contributions The failure probabilities of SSCs modeled in PRAs may include a standby time-related contribution and a cyclic demand-related contribution.
3.1.4.5     Sensitivity and Uncertainty Analyses By having the TSs require that changes to the frequencies listed in the SFCP be made in accordance with NEI 04-10, Revision 1, the licensee will be required to have sensitivity studies that assess the impact of uncertainties from key assumptions of the PRA, uncertainty in the failure probabilities of the affected SSCs, impact on the frequency of initiating events, and any identified deviations from Capability Category II of the PRA standard. Where the sensitivity analyses identify a potential impact on the proposed change, revised surveillance frequencies are considered, along with any qualitative considerations that may bear on the results of such sensitivity studies. The licensee will also be required to perform monitoring and feedback of SSC performance, once the revised surveillance frequencies are implemented. Based on the above, the NRC staff concludes that through the application of NRG-approved NEI 04-10, Revision 1, the licensee has appropriately considered the possible impact of PRA model uncertainty and sensitivity to key assumptions and model limitations and is consistent with Regulatory Position 2.3.5 of RG 1.177, Revision 1.
NEI 04-10 criteria adjust the time-related failure contribution of SSCs affected by the proposed change to surveillance frequency.
 
This is consistent with RG 1.177, Revision 1, Regulatory Position 2.3.3 which permits separation of the failure rate contributions into demand and standby for evaluation of SRs. If the available data does not support distinguishing between the time-related failures and demand failures, then the change to surveillance frequency is conservatively assumed to impact the total failure probability of the SSC, including both standby and demand contributions.
3.1.4.6     Acceptance Guidelines The licensee will be required to quantitatively evaluate the change in total risk (including internal and external events contributions) in terms of CDF and LERF for both the individual risk impact of a proposed change in surveillance frequency and the cumulative impact from all individual changes to surveillance frequencies using NEI 04-10, Revision 1, in accordance with the TS SFCP. Each individual change to surveillance frequency must show a risk impact below 1E-6 per year for change to CDF and below 1E-7 per year for change to LERF. These changes to CDF and LERF are consistent with the acceptance criteria of RG 1.174, Revision 2, for very small changes in risk. Where the RG 1.174, Revision 2, acceptance criteria are not met, the process in NEI 04-10, Revision 1, either considers revised surveillance frequencies, which are consistent with RG 1.174, Revision 2, or the process terminates without permitting the proposed changes. Where quantitative results are unavailable for comparison with the acceptance guidelines, appropriate qualitative analyses are required to demonstrate that the associated risk impact of a proposed change to surveillance frequency is negligible or zero. Otherwise, bounding quantitative analyses are required which demonstrate the risk impact is at least one order of magnitude lower than the RG 1.174, Revision 2, acceptance guidelines for very small changes in risk. In addition to assessing each individual SSC surveillance frequency change, the cumulative impact of all changes must result in a risk impact less than 1E-5 per year for change to CDF, and less than 1E-6 per year for change to LERF, and the total CDF and total LERF must be reasonably shown to be less than 1E-4 per year and 1E-5 per year, respectively.
The SSC failure rate (per unit time) is assumed to be unaffected by the change in test frequency such that the failure probability is assumed to increase linearly with time, and will be confirmed by the required monitoring and feedback implemented after the change in surveillance frequency is implemented.
These values are consistent with the acceptance criteria of RG 1.174, Revision 2, as referenced by RG 1.177, Revision 1, for changes to surveillance frequencies.
The process requires consideration of qualitative sources of information with regards to potential impacts of test frequency on SSC performance, including industry and plant-specific operating experience, vendor recommendations, industry standards, and code specified test intervals.
Consistent with the NRC's SE dated September 19, 2007, for NEI 04-10, Revision 1, the TS SFCP will require the licensee to calculate the total change in risk (i.e., the cumulative risk) by comparing a baseline model that uses failure probabilities based on surveillance frequencies prior to being changed per the SFCP to a revised model that uses failure probabilities based on the changed surveillance frequencies. The NRC staff further notes that the licensee includes a provision to exclude the contribution to cumulative risk from individual changes to surveillance frequencies associated with insignificant risk increases (i.e., less than 5E-8 CDF and 5E-9 LERF) once the baseline PRA models are updated to include the effects of the revised surveillance frequencies.
Thus the process is not reliant upon risk analyses as the sole basis for the proposed changes. The potential beneficial risk impacts of reduced surveillance frequency, including reduced downtime, lesser potential for restoration errors, reduction of potential for test caused transients, and reduced test-caused wear of equipment, are identified qualitatively, but are conservatively not required to be quantitatively assessed.
The quantitative acceptance guidance of RG 1.174, Revision 2, is supplemented by qualitative information to evaluate the proposed changes to surveillance frequencies, including industry and plant-specific operating experience, vendor recommendations, industry standards, the results of sensitivity studies, and SSC performance data and test history. The final acceptability of the proposed change is based on all of these considerations and not solely on the PRA results. Post-implementation performance monitoring and feedback are also required to assure continued reliability of the components. Based on the above, the NRC staff concludes that the licensee's application of NRG-approved NEI 04-10, Revision 1, provides acceptable methods for evaluating the risk increase associated with proposed changes to surveillance frequencies, consistent with Regulatory Position 2.4 of RG 1.177, Revision 1.
Thus, through the application of NEI 04-10, the licensee has employed reasonable assumptions with regard to extensions of surveillance test intervals, and is consistent with Regulatory Position 2.3.4 of RG 1.177, Revision 1. 3.1.4.5 Sensitivity and Uncertainty Analyses By having the TSs require that changes to the frequencies listed in the SFCP be made in accordance with NEI 04-10, Revision 1, the licensee will be required to have sensitivity studies that assess the impact of uncertainties from key assumptions of the PRA, uncertainty in the failure probabilities of the affected SSCs, impact on the frequency of initiating events, and any identified deviations from Capability Category II of the PRA standard.
Therefore, the NRC staff concludes that the proposed methodology satisfies the fourth key safety principle of RG 1.177, Revision 1, by assuring any increase in risk is small consistent with the intent of the Commission's Safety Goal Policy Statement.
Where the sensitivity analyses identify a potential impact on the proposed change, revised surveillance frequencies are considered, along with any qualitative considerations that may bear on the results of such sensitivity studies. The licensee will also be required to perform monitoring and feedback of SSC performance, once the revised surveillance frequencies are implemented.
 
Based on the above, the NRC staff concludes that through the application of NRG-approved NEI 04-10, Revision 1, the licensee has appropriately considered the possible impact of PRA model uncertainty and sensitivity to key assumptions and model limitations and is consistent with Regulatory Position 2.3.5 of RG 1.177, Revision 1. 3.1.4.6 Acceptance Guidelines The licensee will be required to quantitatively evaluate the change in total risk (including internal and external events contributions) in terms of CDF and LERF for both the individual risk impact of a proposed change in surveillance frequency and the cumulative impact from all individual changes to surveillance frequencies using NEI 04-10, Revision 1, in accordance with the TS SFCP. Each individual change to surveillance frequency must show a risk impact below 1 E-6 per year for change to CDF and below 1 E-7 per year for change to LERF. These changes to CDF and LERF are consistent with the acceptance criteria of RG 1.174, Revision 2, for very small changes in risk. Where the RG 1.174, Revision 2, acceptance criteria are not met, the process in NEI 04-10, Revision 1, either considers revised surveillance frequencies, which are consistent with RG 1.17 4, Revision 2, or the process terminates without permitting the proposed changes. Where quantitative results are unavailable for comparison with the acceptance guidelines, appropriate qualitative analyses are required to demonstrate that the associated risk impact of a proposed change to surveillance frequency is negligible or zero. Otherwise, bounding quantitative analyses are required which demonstrate the risk impact is at least one order of magnitude lower than the RG 1.17 4, Revision 2, acceptance guidelines for very small changes in risk. In addition to assessing each individual SSC surveillance frequency change, the cumulative impact of all changes must result in a risk impact less than 1 E-5 per year for change to CDF, and less than 1 E-6 per year for change to LERF, and the total CDF and total LERF must be reasonably shown to be less than 1 E-4 per year and 1 E-5 per year, respectively.
3.1.5   The Impact of the Proposed Change Should Be Monitored Using Performance Measurement Strategies The licensee's adoption of TSTF-425, Revision 3, requires application of NEI 04-10, Revision 1, in the SFCP. NEI 04-10, Revision 1, requires performance monitoring of SSCs whose surveillance frequencies have been revised as part of a feedback process to assure that the change in test frequency has not resulted in degradation of equipment performance and operational safety. The monitoring and feedback includes consideration of Maintenance Rule monitoring of equipment performance. In the event of SSC performance degradation, the surveillance frequency will be reassessed in accordance with the methodology, in addition to any corrective actions which may be required by the Maintenance Rule. The performance monitoring and feedback specified in NEI 04-10, Revision 1, is sufficient to reasonably assure acceptable SSC performance and is consistent with Regulatory Position 3.2 of RG 1.177, Revision 1. Thus, the NRC staff concludes that the fifth key safety principle of RG 1.177, Revision 1, is satisfied.
These values are consistent with the acceptance criteria of RG 1.17 4, Revision 2, as referenced by RG 1.177, Revision 1, for changes to surveillance frequencies.
3.2     Addition of Surveillance Frequency Control Program to Administrative Controls The licensee proposed including the SFCP and specific requirements into the Columbia TSs, Section 5.5.15, as follows:
Consistent with the NRC's SE dated September 19, 2007, for NEI 04-10, Revision 1, the TS SFCP will require the licensee to calculate the total change in risk (i.e., the cumulative risk) by comparing a baseline model that uses failure probabilities based on surveillance frequencies prior to being changed per the SFCP to a revised model that uses failure probabilities based on the changed surveillance frequencies.
Surveillance Frequency Control Program This program provides controls for Surveillance Frequencies. The program shall ensure that Surveillance Requirements specified in the Technical Specifications are performed at intervals sufficient to assure that the associated Limiting Conditions for Operation are met.
The NRC staff further notes that the licensee includes a provision to exclude the contribution to cumulative risk from individual changes to surveillance frequencies associated with insignificant risk increases (i.e., less than 5E-8 CDF and 5E-9 LERF) once the baseline PRA models are updated to include the effects of the revised surveillance frequencies.
: a.     The Surveillance Frequency Control Program shall contain a list of Frequencies of those Surveillance Requirements for which the Frequency is controlled by the program.
The quantitative acceptance guidance of RG 1.17 4, Revision 2, is supplemented by qualitative information to evaluate the proposed changes to surveillance frequencies, including industry and plant-specific operating experience, vendor recommendations, industry standards, the results of sensitivity studies, and SSC performance data and test history. The final acceptability of the proposed change is based on all of these considerations and not solely on the PRA results. Post-implementation performance monitoring and feedback are also required to assure continued reliability of the components.
: b.     Changes to the Frequencies listed in the Surveillance Frequency Control Program shall be made in accordance with NEI 04-10, "Risk-Informed Technical Specifications Initiative Sb, Risk-Informed Method for Control of Surveillance Frequencies,'' Revision 1.
Based on the above, the NRC staff concludes that the licensee's application of NRG-approved NEI 04-10, Revision 1, provides acceptable methods for evaluating the risk increase associated with proposed changes to surveillance frequencies, consistent with Regulatory Position 2.4 of RG 1.177, Revision 1. Therefore, the NRC staff concludes that the proposed methodology satisfies the fourth key safety principle of RG 1.177, Revision 1, by assuring any increase in risk is small consistent with the intent of the Commission's Safety Goal Policy Statement. 3.1.5 The Impact of the Proposed Change Should Be Monitored Using Performance Measurement Strategies The licensee's adoption of TSTF-425, Revision 3, requires application of NEI 04-10, Revision 1, in the SFCP. NEI 04-10, Revision 1, requires performance monitoring of SSCs whose surveillance frequencies have been revised as part of a feedback process to assure that the change in test frequency has not resulted in degradation of equipment performance and operational safety. The monitoring and feedback includes consideration of Maintenance Rule monitoring of equipment performance.
: c.     The provisions of Surveillance Requirements 3.0.2 and 3.0.3 are applicable to the Frequencies established in the Surveillance Frequency Control Program.
In the event of SSC performance degradation, the surveillance frequency will be reassessed in accordance with the methodology, in addition to any corrective actions which may be required by the Maintenance Rule. The performance monitoring and feedback specified in NEI 04-10, Revision 1, is sufficient to reasonably assure acceptable SSC performance and is consistent with Regulatory Position 3.2 of RG 1.177, Revision 1. Thus, the NRC staff concludes that the fifth key safety principle of RG 1.177, Revision 1, is satisfied.
The proposed program is consistent with the model application of TSTF-425 and, therefore, the NRC staff concludes that it is acceptable.
3.2 Addition of Surveillance Frequency Control Program to Administrative Controls The licensee proposed including the SFCP and specific requirements into the Columbia TSs, Section 5.5.15, as follows: Surveillance Frequency Control Program This program provides controls for Surveillance Frequencies.
 
The program shall ensure that Surveillance Requirements specified in the Technical Specifications are performed at intervals sufficient to assure that the associated Limiting Conditions for Operation are met. a. The Surveillance Frequency Control Program shall contain a list of Frequencies of those Surveillance Requirements for which the Frequency is controlled by the program. b. Changes to the Frequencies listed in the Surveillance Frequency Control Program shall be made in accordance with NEI 04-10, "Risk-Informed Technical Specifications Initiative Sb, Risk-Informed Method for Control of Surveillance Frequencies,''
3.3     Deviations from TSTF-425 and Other Changes The surveillances being revised by the licensee have different surveillance identification numbers as compared to the surveillances found in TSTF-425. These differences have no impact on the technical content of the amendment, and the amendment changes are consistent with the current formatting and content of the Columbia TSs. These differences are administrative in nature and are, therefore, acceptable and consistent with the intent of the NRG-approved TSTF-425.
Revision 1. c. The provisions of Surveillance Requirements 3.0.2 and 3.0.3 are applicable to the Frequencies established in the Surveillance Frequency Control Program. The proposed program is consistent with the model application of TSTF-425 and, therefore, the NRC staff concludes that it is acceptable. 3.3 Deviations from TSTF-425 and Other Changes The surveillances being revised by the licensee have different surveillance identification numbers as compared to the surveillances found in TSTF-425.
There are surveillances included in TSTF-425 that are not included in the Columbia TSs.
These differences have no impact on the technical content of the amendment, and the amendment changes are consistent with the current formatting and content of the Columbia TSs. These differences are administrative in nature and are, therefore, acceptable and consistent with the intent of the NRG-approved TSTF-425.
TSTF-425 transfers control of frequencies for existing surveillances to the SFCP, but it does not add, delete, or modify the content of the surveillance actions themselves. Based on this, the amendment, which represents a plant-specific adoption of TSTF-425, only changes frequencies for existing surveillances in the Columbia TSs. Therefore, these differences between the amendment and TSTF-425 are administrative in nature and are, therefore, acceptable and consistent with the intent of the NRG-approved TSTF-425.
There are surveillances included in TSTF-425 that are not included in the Columbia TSs. TSTF-425 transfers control of frequencies for existing surveillances to the SFCP, but it does not add, delete, or modify the content of the surveillance actions themselves.
This amendment transfers control of frequencies for plant specific surveillances (i.e.,
Based on this, the amendment, which represents a plant-specific adoption of TSTF-425, only changes frequencies for existing surveillances in the Columbia TSs. Therefore, these differences between the amendment and TSTF-425 are administrative in nature and are, therefore, acceptable and consistent with the intent of the NRG-approved TSTF-425.
surveillances not included in TSTF-425 or surveillances with modified wording as compared to TSTF-425) to the SFCP. Although these changes are not included in the marked-up TS pages for TSTF-425, the TSTF states, in part, that 'The proposed change relocates all periodic Surveillance Frequencies from the Technical Specifications and places the Frequencies under licensee control in accordance with a new program," and "All surveillances are relocated except. .. [4 exclusion criteria for the surveillance frequencies are listed]." These statements denote that TSTF-425 applies to all surveillances, including the Columbia plant specific surveillances, that are periodic and do not meet one of the exclusion criteria. The NRC staff has determined that all of the surveillance frequencies being changed by this amendment are periodic and do not meet the exclusion criteria; therefore, it is acceptable to relocate them to the SFCP. These differences between the amendment and TSTF-425 are consistent with the intent of the NRG-approved TSTF-425.
This amendment transfers control of frequencies for plant specific surveillances (i.e., surveillances not included in TSTF-425 or surveillances with modified wording as compared to TSTF-425) to the SFCP. Although these changes are not included in the marked-up TS pages for TSTF-425, the TSTF states, in part, that 'The proposed change relocates all periodic Surveillance Frequencies from the Technical Specifications and places the Frequencies under licensee control in accordance with a new program," and "All surveillances are relocated except. .. [4 exclusion criteria for the surveillance frequencies are listed]." These statements denote that TSTF-425 applies to all surveillances, including the Columbia plant specific surveillances, that are periodic and do not meet one of the exclusion criteria.
The NRC staff has determined that all of the surveillance frequencies being changed by this amendment are periodic and do not meet the exclusion criteria; therefore, it is acceptable to relocate them to the SFCP. These differences between the amendment and TSTF-425 are consistent with the intent of the NRG-approved TSTF-425.
In accordance with TSTF-425, this amendment relocated surveillance frequencies to the SFCP that were being performed at a given periodicity on a STAGGERED TEST BASIS. Since these specific surveillance frequencies are being relocated, TSTF-425 deletes the STAGGERED TEST BASIS definition from TS. In contrast, the licensee will relocate the same frequencies but retain the definition because the term STAGGERED TEST BASIS is referenced in administrative section 5.5.14, "Control Room Envelope Habitability Program," of the Columbia TSs. Since 5.5.14 is outside the scope of this TSTF, this difference is considered acceptable and consistent with the intent of the NRG-approved TSTF-425.
In accordance with TSTF-425, this amendment relocated surveillance frequencies to the SFCP that were being performed at a given periodicity on a STAGGERED TEST BASIS. Since these specific surveillance frequencies are being relocated, TSTF-425 deletes the STAGGERED TEST BASIS definition from TS. In contrast, the licensee will relocate the same frequencies but retain the definition because the term STAGGERED TEST BASIS is referenced in administrative section 5.5.14, "Control Room Envelope Habitability Program," of the Columbia TSs. Since 5.5.14 is outside the scope of this TSTF, this difference is considered acceptable and consistent with the intent of the NRG-approved TSTF-425.
3.4 Summary and Conclusions The NRC staff has reviewed the licensee's proposed relocation of specific surveillance frequencies to a licensee-controlled document, and controlling changes to these surveillance frequencies in accordance with a new program, the SFCP, identified in the Administrative Controls of TSs. The SFCP and TSs Section 5.0, Subsection 5.5.15 references NEI 04-10, Revision 1, which provides a risk-informed methodology using plant-specific risk insights and performance data to revise surveillance frequencies within the SFCP. This methodology   supports relocating surveillance frequencies from TSs to a licensee-controlled document, provided those frequencies are changed in accordance with the NEI 04-10, Revision 1, which is specified in the Administrative Controls section of the TSs. The proposed licensee adoption of TSTF-425, Revision 3, and risk-informed methodology of NRG-approved NEI 04-10, Revision 1, as referenced in the Administrative Controls section of TSs, satisfies the key principles of risk-informed decision making applied to changes to TSs as delineated in RG 1.177 and RG 1.17 4, in that:
3.4     Summary and Conclusions The NRC staff has reviewed the licensee's proposed relocation of specific surveillance frequencies to a licensee-controlled document, and controlling changes to these surveillance frequencies in accordance with a new program, the SFCP, identified in the Administrative Controls of TSs. The SFCP and TSs Section 5.0, Subsection 5.5.15 references NEI 04-10, Revision 1, which provides a risk-informed methodology using plant-specific risk insights and performance data to revise surveillance frequencies within the SFCP. This methodology
 
supports relocating surveillance frequencies from TSs to a licensee-controlled document, provided those frequencies are changed in accordance with the NEI 04-10, Revision 1, which is specified in the Administrative Controls section of the TSs.
The proposed licensee adoption of TSTF-425, Revision 3, and risk-informed methodology of NRG-approved NEI 04-10, Revision 1, as referenced in the Administrative Controls section of TSs, satisfies the key principles of risk-informed decision making applied to changes to TSs as delineated in RG 1.177 and RG 1.174, in that:
* The proposed change meets current regulations;
* The proposed change meets current regulations;
* The proposed change is consistent with defense-in-depth philosophy;
* The proposed change is consistent with defense-in-depth philosophy;
Line 770: Line 1,255:
* Increases in risk resulting from the proposed change are small and consistent with the Commission's Safety Goal Policy Statement; and
* Increases in risk resulting from the proposed change are small and consistent with the Commission's Safety Goal Policy Statement; and
* The impact of the proposed change is monitored with performance measurement strategies.
* The impact of the proposed change is monitored with performance measurement strategies.
Paragraph 50.36(c) of 10 CFR discusses the categories that will be included in TSs. Paragraph 50.36(c)(3) of 10 CFR discusses the specific category of SRs and states, "Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met." Based on the above evaluation, the NRC staff concludes that, with the proposed relocation of surveillance frequencies to a licensee-controlled document and administratively controlled in accordance with the TS SFCP, the licensee continues to meet the requirements in 10 CFR 50.36.  
Paragraph 50.36(c) of 10 CFR discusses the categories that will be included in TSs.
Paragraph 50.36(c)(3) of 10 CFR discusses the specific category of SRs and states, "Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met." Based on the above evaluation, the NRC staff concludes that, with the proposed relocation of surveillance frequencies to a licensee-controlled document and administratively controlled in accordance with the TS SFCP, the licensee continues to meet the requirements in 10 CFR 50.36.


==4.0 STATE CONSULTATION==
==4.0     STATE CONSULTATION==


In accordance with the Commission's regulations, the Washington State official was notified of the proposed issuance of the amendment.
In accordance with the Commission's regulations, the Washington State official was notified of the proposed issuance of the amendment. The State official had no comments.
The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 1 O CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure.
The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding published in the Federal Register on May 26, 2015 (80 FR 30100). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment. 


==6.0 CONCLUSION==
==5.0     ENVIRONMENTAL CONSIDERATION==


The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. Principal Contributors:
The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 1O CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding published in the Federal Register on May 26, 2015 (80 FR 30100). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
W. Satterfield, P. Snyder, and D. O'Neal Date: November 3 , 201 6 M. Reddemann A copy of the related Safety Evaluation is also enclosed.
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice. Docket No. 50-397


==Enclosures:==
==6.0    CONCLUSION==
 
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: W. Satterfield, P. Snyder, and D. O'Neal Date:  November 3 ,    201 6


Sincerely, /RAJ L. John Klos, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
ML16253A025                       *via email                     **SE input dated OFFICE   NRR/DORL/LPL4-1 /PM   NRR/DORL/LPL4-1 /LA     NRR/DSS/STSB/BC(A)**           NRR/DRA/APLA/BC**
: 1. Amendment No. 238 to NPF-21 2. Safety Evaluation cc w/encls: Distribution via Listserv DISTRIBUTION:
NAME     JKlos                 JBurkhardt               SAnderson                     SRosenberg DATE     10/18/16               10/14/16                 3/21/16                       7/18/16 OFFICE   NRR/DSS/SBPB/BC*       NRR/DE/EICB/BC*         NRR/DE/EEEB                   NRR/DE/EEEB NAME     RDennig               MWaters                 TMartinez-Navedo (non-concur) SSom (non-concur)
PUBLIC LPL4-1 Reading RidsACRS_MailCTR Resource RidsNrrDorllpl4-1 Resource RidsNrrDeEicb Resource RidsNrrDeEeeb Resource RidsNrrDraApla Resource RidsNrrDssSbpb Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMColumbia Resource RidsRgn4Mai1Center Resource DONeal, NRR/DRA/APLA TMartinez-Navedo, NRR/DE/EEEB KWest, NRR/DE/EEEB GSingh, NRR/DE/EICB GCurran, NRR/DSS/SBPB PSnyder, NRR/DSS/STSB ADAMS Accession No.: ML16253A025  
DATE     10/12/16             9/30/16                 10/19/16                       10/19/16 OFFICE   NRR/DE/EEEB           NRR/DE/EEEB             NRR/DE/EEEB                   NRR/DE/EEEB/BC NAME     SRay (non-concur)     GMatharu (non-concur)   RMathew (non-concur)           JZimmerman (non-concur)
*via email **SE input dated OFFICE NRR/DORL/LPL4-1  
DATE     10/19/16             10/19/16                 10/19/16                       10/24/16 OFFICE   OGC-NLO               NRR/DORL/LPL4-1 /BC     NRR/DORL/LPL4-1 /PM NAME     VHoang                 RPascarelli             JKlos DATE     10/28/16             11/3/16                 11/3/16}}
/PM NRR/DORL/LPL4-1  
/LA NRR/DSS/STSB/BC(A)**
NRR/DRA/APLA/BC**
NAME JKlos JBurkhardt SAnderson SRosenberg DATE 10/18/16 10/14/16 3/21/16 7/18/16 OFFICE NRR/DSS/SBPB/BC*
NRR/DE/EICB/BC*
NRR/DE/EEEB NRR/DE/EEEB NAME RDennig MWaters TMartinez-Navedo (non-concur)
SSom (non-concur)
DATE 10/12/16 9/30/16 10/19/16 10/19/16 OFFICE NRR/DE/EEEB NRR/DE/EEEB NRR/DE/EEEB NRR/DE/EEEB/BC NAME SRay (non-concur)
GMatharu (non-concur)
RMathew (non-concur)
JZimmerman (non-concur)
DATE 10/19/16 10/19/16 10/19/16 10/24/16 OFFICE OGC-NLO NRR/DORL/LPL4-1  
/BC NRR/DORL/LPL4-1  
/PM NAME VHoang RPascarelli JKlos DATE 10/28/16 11/3/16 11/3/16 OFFICIAL RECORD COPY}}

Revision as of 14:23, 30 October 2019

Issuance of Amendment No. 238, Adopt Technical Specification Task Force Traveler TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b
ML16253A025
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/03/2016
From: Klos L
Plant Licensing Branch IV
To: Reddemann M
Energy Northwest
Klos L, /NRR/DORL/LPLIV-1, 415-5136
References
CAC MF6042
Download: ML16253A025 (167)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 3, 201 6 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)

Richland, WA 99352-0968

SUBJECT:

COLUMBIA GENERATING STATION - ISSUANCE OF AMENDMENT RE:

ADOPTION OF TECHNICAL SPECIFICATION TASK FORCE TRAVELER TSTF-425, REVISION 3 (CAC NO. MF6042)

Dear Mr. Reddemann:

The U.S. Nuclear Regulatory Commission (NRC, the Commission) has issued the enclosed Amendment No. 238 to Renewed Facility Operating License No. NPF-21 for the Columbia Generating Station. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated March 17, 2015, as supplemented by letters dated September 17, October29, November 17, and December28, 2015; and April 7, May 11, and June 22, 2016.

The amendment revises the TSs by relocating specific surveillance frequencies to a licensee-controlled program consistent with NRC-approved Technical Specifications Task Force Traveler TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control -

RITSTF [Risk-Informed Technical Specifications Task Force] Initiative 5b," dated March 18, 2009. The availability of this TS improvement program was announced in the Federal Register on July 6, 2009 (7 4 FR 31996). Energy Northwest has proposed certain plant-specific variations and deviations from TSTF-425, Revision 3, as described in its application dated March 17, 2015.

M. Reddemann A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.

L. J n os, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397

Enclosures:

1. Amendment No. 238 to NPF-21
2. Safety Evaluation cc w/encls: Distribution via Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 ENERGY NORTHWEST DOCKET NO. 50-397 COLUMBIA GENERATING STATION AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 238 License No. NPF-21

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Energy Northwest (licensee), dated March 17, 2015, as supplemented by letters dated September 17, October 29, November 17, and December 28, 2015; and April 7, May 11, and June 22, 2016, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 1O CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

Enclosure 1

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-21 is hereby amended to read as follows:

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 238 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3. The license amendment is effective as of its date of issuance and shall be implemented within 120 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Robert J. Pascarelli, Chief Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Renewed Facility Operating License No. NPF-21 and Technical Specifications Date of Issuance: November 3 , 2O1 6

ATTACHMENT TO LICENSE AMENDMENT NO. 238 COLUMBIA GENERATING STATION RENEWED FACILITY OPERATING LICENSE NO. NPF-21 DOCKET NO. 50-397 Replace the following pages of the Renewed Facility Operating License No. NPF-21 and Appendix A, Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.

Facility Operating License REMOVE INSERT Technical Specifications REMOVE INSERT 3.1.3-4 3.1.3-4 3.1.4-2 3.1.4-2 3.1.5-3 3.1.5-3 3.1.6-2 3.1.6-2 3.1.7-1 3.1.7-1 3.1.7-2 3.1.7-2 3.1.7-3 3.1.7-3 3.1.8-2 3.1.8-2 3.2.1-1 3.2.1-1 3.2.2-1 3.2.2-1 3.2.3-1 3.2.3-1 3.3.1.1-11 3.3.1.1-11 3.3.1.1-12 3.3.1.1-12 3.3.1.1-13 3.3.1.1-13 3.3.1.1-14 3.3.1.1-14 3.3.1.2-2 3.3.1.2-2 3.3.1.2-3 3.3.1.2-3 3.3.1.2-4 3.3.1.2-4 3.3.2.1-9 3.3.2.1-9 3.3.2.1-10 3.3.2.1-10 3.3.2.1-11 3.3.2.1-11 3.3.2.1-12 3.3.2.1-12 3.3.2.1-13 3.3.2.2-2 3.3.2.2-2 3.3.3.1-2 3.3.3.1-2 3.3.3.1-3 3.3.3.1-3 3.3.3.1-4 3.3.3.2-1 3.3.3.2-1

REMOVE INSERT 3.3.3.2-2 3.3.3.2-2 3.3.4.1-2 3.3.4.1-2 3.3.4.1-3 3.3.4.1-3 3.3.4.2-2 3.3.4.2-2 3.3.4.2-3 3.3.4.2-3 3.3.5.1-5 3.3.5.1-5 3.3.5.1-6 3.3.5.1-6 3.3.5.1-7 3.3.5.1-7 3.3.5.1-8 3.3.5.1-8 3.3.5.1-9 3.3.5.1-9 3.3.5.1-10 3.3.5.1-10


3.3.5.1-11 3.3.5.2-3 3.3.5.2-3 3.3.6.1-3 3.3.6.1-3 3.3.6.1-4 3.3.6.1-4 3.3.6.2-2 3.3.6.2-2 3.3.6.2-3 3.3.6.2-3


3.3.6.2-4 3.3.7.1-2 3.3.7.1-2 3.3.7.1-3 3.3.7.1-3


3.3.7.1-4 3.3.8.1-2 3.3.8.1-2 3.3.8.1-3 3.3.8.1-3


3.3.8.1-4 3.3.8.2-2 3.3.8.2-2 3.3.8.2-3 3.3.8.2-3 3.4.1-4 3.4.1-4 3.4.2-2 3.4.2-2 3.4.3-1 3.4.3-1 3.4.4-2 3.4.4-2 3.4.5-2 3.4.5-2 3.4.7-3 3.4.7-3 3.4.8-2 3.4.8-2 3.4.9-2 3.4.9-2 3.4.10-2 3.4.10-2 3.4.11-2 3.4.11-2 3.4.11-4 3.4.11-4 3.4.12-1 3.4.12-1 3.5.1-4 3.5.1-4 3.5.1-5 3.5.1-5 3.5.2-2 3.5.2-2 3.5.2-3 3.5.2-3


3.5.2-4 3.5.3-2 3.5.3-2


3.5.3-3 3.6.1.1-2 3.6.1.1-2

REMOVE INSERT 3.6.1.1-3 3.6.1.1-3 3.6.1.2-4 3.6.1.2-4 3.6.1.3-6 3.6.1.3-6 3.6.1.3-7 3.6.1.3-7 3.6.1.3-8 3.6.1.3-8 3.6.1.4-1 3.6.1.4-1 3.6.1.5-2 3.6.1.5-2 3.6.1.6-2 3.6.1.6-2


3.6.1.6-3 3.6.1.7-2 3.6.1.7-2


3.6.1.7-3 3.6.2.1-3 3.6.2.1-3 3.6.2.2-1 3.6.2.2-1 3.6.2.3-2 3.6.2.3-2 3.6.3.2-1 3.6.3.2-1


3.6.3.2-2 3.6.3.3-1 3.6.3.3-1 3.6.4.1-2 3.6.4.1-2 3.6.4.2-3 3.6.4.2-3 3.6.4.3-2 3.6.4.3-2 3.7.1-2 3.7.1-2 3.7.1-3 3.7.1-3 3.7.2-1 3.7.2-1 3.7.3-3 3.7.3-3 3.7.4-2 3.7.4-2 3.7.5-2 3.7.5-2 3.7.6-1 3.7.6-1


3.7.6-2 3.7.7-1 3.7.7-1 3.8.1-5 3.8.1-5 3.8.1-6 3.8.1-6 3.8.1-7 3.8.1-7 3.8.1-8 3.8.1-8 3.8.1-9 3.8.1-9 3.8.1-10 3.8.1-10 3.8.1-11 3.8.1-11 3.8.1-12 3.8.1-12 3.8.1-13 3.8.1-13 3.8.1-14 3.8.1-14 3.8.1-15 3.8.1-15 3.8.1-16 3.8.1-16 3.8.3-2 3.8.3-2 3.8.3-3 3.8.3-3 3.8.4-4 3.8.4-4 3.8.6-3 3.8.6-3 3.8.6-4 3.8.6-4

REMOVE INSERT 3.8.6-5 3.8.7-2 3.8.7-2 3.8.8-2 3.8.8-2 3.9.1-1 3.9.1-1 3.9.2-1 3.9.2-1 3.9.2-2 3.9.3-1 3.9.3-1 3.9.5-1 3.9.5-1 3.9.6-1 3.9.6-1 3.9.7-1 3.9.7-1 3.9.8-2 3.9.8-2 3.9.9-2 3.9.9-2 3.10.2-2 3.10.2-2 3.10.3-3 3.10.3-3 3.10.4-3 3.10.4-3 3.10.5-2 3.10.5-2 3.10.6-2 3.10.6-2 3.10.8-7 3.10.8-7 5.5-11 5.5-11 5.5-12

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 238 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

a. For Surveillance Requirements (SRs) not previously performed by existing SRs or other plant tests, the requirement will be considered met on the implementation date and the next required test will be at the interval specified in the Technical Specifications as revised in Amendment No. 149.

(3) Deleted.

(4) Deleted.

(5) Deleted.

(6) Deleted.

(7) Deleted.

(8) Deleted.

(9) Deleted.

(10) Deleted.

(11) Shield Wall Deferral (Section 12.3.2, SSER #4, License Amendment #7)

The licensee shall complete construction of the deferred shield walls and window as identified in Attachment 3, as amended by this license amendment.

(12) Deleted.

(13) Deleted.

  • The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.

Renewed License No. NPF-21 Amendment No. 238

Control Rod OPERABILITY 3.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.3.1 Determine the position of each control rod. In accordance with the Surveillance Frequency Control Program SR 3.1.3.2 -------------------------------NOTE------------------------------

Not required to be performed until 31 days after the control rod is withdrawn and THERMAL POWER is greater than the LPSP of the RWM.

Insert each partially withdrawn control rod at least In accordance one notch. with the Surveillance Frequency Control Program SR 3.1.3.3 Verify each control rod scram time from fully In accordance withdrawn to notch position 5 is ~ 7 seconds. with SR 3.1 .4.1, SR 3.1.4.2, SR 3.1.4.3, and SR 3.1.4.4 SR 3.1.3.4 Verify each control rod does not go to the withdrawn Each time the overtravel position. control rod is withdrawn to "full out" position Prior to declaring control rod OPERABLE after work on control rod or CRD System that could affect coupling Columbia Generating Station 3.1.3-4 Amendment No. a:t-2,~ ~ 238

Control Rod Scram Times 3.1.4 SURVEILLANCE REQUIREMENTS


----------------------- ----------- -----N 0 TE--------------- --------------------------------------------

During single control rod scram time Surveillances, the control rod drive (CRD) pumps shall be isolated from the associated scram accumulator.

SURVEILLANCE FREQUENCY SR 3.1.4.1 Verify each control rod scram time is within the limits Prior to exceeding of Table 3.1.4-1 with reactor steam dome pressure 40% RTP after

~ 800 psig. each reactor shutdown <:: 120 days SR 3.1.4.2 Verify, for a representative sample, each tested In accordance control rod scram time is within the limits of with the Table 3.1.4-1 with reactor steam dome pressure Surveillance

~ 800 psig. Frequency Control Program SR 3.1.4.3 Verify each affected control rod scram time is within Prior to declaring the limits of Table 3.1.4-1 with any reactor steam control rod dome pressure. OPERABLE after work on control rod or CRD System that could affect scram time SR 3.1.4.4 Verify each affected control rod scram time is within Prior to exceeding the limits of Table 3.1.4-1 with reactor steam dome 40% RTP after pressure~ 800 psig. fuel movement within the affected core cell Prior to exceeding 40% RTP after work on control rod or CRD System that could affect scram time Columbia Generating Station 3.1.4-2 Amendment No. +94,2-++ ~ 238

Control Rod Scram Accumulators 3.1.5 ACTION CONDITION REQUIRED ACTION COMPLETION TIME C. One or more control rod C.1 Verify the associated Immediately upon scram accumulators control rod is fully inserted. discovery of charging inoperable with reactor water header steam dome pressure pressure < 940 psig

< 900 psig.

AND C.2 Declare the associated 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> control rod inoperable.

D. Required Action B.1 or D.1 ---------------NOTE--------------

C.1 and associated Not applicable if all Completion Time not inoperable control rod met. scram accumulators are associated with fully inserted control rods.


---- ---- -------- --- ---- - --- ---- -

Place the reactor mode Immediately switch in the shutdown position.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.5.1 Verify each control rod scram accumulator pressure In accordance is 2 940 psig. with the Surveillance Frequency Control Program Columbia Generating Station 3.1.5-3 Amendment No . .WS,a+e 2ae 238

Rod Pattern Control 3.1.6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B (continued) B.2 Place the reactor mode 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> switch in the shutdown position.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.6.1 Verify all OPERABLE control rods comply with In accordance BPWS. with the Surveillance Frequency Control Program Columbia Generating Station 3.1.6-2 Amendment No. +49,.+w 2aa 238

SLC System 3.1.7 3.1 REACTIVITY CONTROL SYSTEMS 3.1.7 Standby Liquid Control (SLC) System LCO 3.1. 7 Two SLC subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One SLC subsystem A.1 Restore SLC subsystem to 7 days inoperable. OPERABLE status.

B. Two SLC subsystems B.1 Restore one SLC 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> inoperable. subsystem to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met. AND C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.7.1 Verify available volume of sodium pentaborate In accordance solution is ~ 4587 gallons. with the Surveillance Frequency Control Program Columbia Generating Station 3.1.7-1 Amendment No. +e9,+9-9 ~ 238

SLC System 3.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.7.2 Verify temperature of sodium pentaborate solution is In accordance within the limits of Figure 3.1. 7-1. with the Surveillance Frequency Control Program SR 3.1.7.3 Verify continuity of explosive charge. In accordance with the Surveillance Frequency Control Program SR 3.1.7.4 Verify the concentration of boron in solution is within In accordance the limits of Figure 3.1. 7-1. with the Surveillance Frequency Control Program Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after water or boron is added to solution AND Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after solution temperature is restored within the limits of Figure 3.1.7-1 SR 3.1.7.5 Verify each SLC subsystem manual and power In accordance operated valve in the flow path that is not locked, with the sealed, or otherwise secured in position, is in the Surveillance correct position or can be aligned to the correct Frequency position. Control Program Columbia Generating Station 3.1.7-2 Amendment No. +es,.:t-99 ~ 238

SLC System 3.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.7.6 Verify each pump develops a flow rate z 41.2 gpm In accordance at a discharge pressure z 1220 psig. with the lnservice Testing Program SR 3.1.7.7 Verify flow through one SLC subsystem from pump In accordance into reactor pressure vessel. with the Surveillance Frequency Control Program SR 3.1.7.8 Verify all heat traced piping between storage tank In accordance and pump suction valve is unblocked. with the Surveillance Frequency Control Program AND Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after solution temperature is restored within the limits of Figure 3.1.7-1 SR 3.1.7.9 Verify sodium pentaborate enrichment is z 44.0 Prior to addition to atom percent B-10. SLC Tank Columbia Generating Station 3.1.7-3 Amendment No. -+99,22+ ~ 238

SDV Vent and Drain Valves 3.1.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.8.1 --------------------- ----------NOTE------------------------------

Not required to be met on vent and drain valves closed during performance of SR 3.1 .8.2.

Verify each SDV vent and drain valve is open. In accordance with the Surveillance Frequency Control Program SR 3.1.8.2 Cycle each SDV vent and drain valve to the fully In accordance closed and fully open positiqn. with the Surveillance Frequency Control Program SR 3.1.8.3 Verify each SDV vent and drain valve: In accordance with the

a. Closes in s; 30 seconds after receipt of an Surveillance actual or simulated scram signal; and Frequency Control Program
b. Opens when the actual or simulated scram signal is reset.

Columbia Generating Station 3.1.8-2 Amendment No. +49-,+e9 ~ 238

APLHGR 3.2.1 3.2 POWER DISTRIBUTION LIMITS 3.2.1 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)

LCO 3.2.1 All APLHGRs shall be less than or equal to the limits specified in the COLR.

APPLICABILITY: THERMAL POWER :2: 25% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Any APLHGR not within A.1 Restore APLHGR(s) to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> limits. within limits.

B. Required Action and B.1 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion POWER to< 25% RTP.

Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.1.1 Verify all APLHGRs are less than or equal to the Once within limits specified in the COLR. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after

2:25% RTP In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.2.1-1 Amendment No. +49,-+W ~ 238

MCPR 3.2.2 3.2 POWER DISTRIBUTION LIMITS 3.2.2 MINIMUM CRITICAL POWER RATIO (MCPR)

LCO 3.2.2 All MCPRs shall be greater than or equal to the MCPR operating limits specified in the COLR.

APPLICABILITY: THERMAL POWER :2'. 25% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Any MCPR not within A.1 Restore MCPR(s) to within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> limits. limits.

B. Required Action and B.1 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion POWER to< 25% RTP.

Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.2.1 Verify all MCPRs are greater than or equal to the Once within limits specified in the COLR. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after

2'. 25% RTP AND In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.2.2-1 Amendment No. +w,a++ ~ 238

LHGR 3.2.3 3.2 POWER DISTRIBUTION LIMITS 3.2.3 LINEAR HEAT GENERATION RATE (LHGR)

LCO 3.2.3 All LHGRs shall be less than or equal to the limits specified in the COLR.

APPLICABILITY: THERMAL POWER 2 25% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Any LHGR not within A.1 Restore LHGR(s) to within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> limits. limits.

B. Required Action and B.1 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion POWER to< 25% RTP.

Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.3.1 Verify all LHGRs are less than or equal to the limits Once within specified in the COLR. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after 2 25% RTP In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.2.3-1 Amendment No. +49,+w 22-§ 238

RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME I. As required by Required 1.1 Initiate alternate method to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Action D .1 and detect and suppress referenced in thermal hydraulic instability Table 3.3.1.1-1. oscillations.

AND


---- ---- --N 0 TE------------ -

LCO 3.0.4 is not applicable.


-------- ---- ---- ------- ---- ---- -

1.2 Restore required channels 120 days to OPERABLE J. Required Action and J.1 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion POWER to less than the Time of Condition I not value specified in the met. COLR.

SURVEILLANCE REQUIREMENTS


NOTES----------------------------------------------------------

1. Refer to Table 3.3.1.1-1 to determine which SRs apply for each RPS Function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains RPS trip capability.

SURVEILLANCE FREQUENCY SR 3.3.1.1.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.1.1-11 Amendment No. +e9 ~ ~ 238

RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.1.1.2 -------------------------------NOTE------------------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after THERMAL POWER 2 25% RTP.

Verify the absolute difference between the average In accordance power range monitor (APRM) channels and the with the Surveillance calculated power ::=:; 2% RTP while operating at Frequency 225% RTP.

Control Program SR 3.3.1 .1 .3 ------------------------ ---- ---N 0 TE------------ -- ----- ---- -------

Not required to be performed when entering MODE 2 from MODE 1 until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering MODE 2.

Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.4 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.1 .1 .5 Verify the source range monitor (SRM) and Prior to intermediate range monitor (IRM) channels overlap. withdrawing SRMs from the fully inserted position SR 3.3.1.1.6 --------- ------------ --- ---- ---N 0 TE--------------------------- ---

0 n ly required to be met during entry into MODE 2 from MODE 1.

Verify the IRM and APRM channels overlap. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.1.1-12 Amendment No. +SQ.~ 2ae 238

RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.1.1.7 Calibrate the local power range monitors. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.8 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.9 Deleted.

SR 3.3.1.1.10 ------------------------------NOTES---------------------------

1. Neutron detectors are excluded.
2. For Function 1, not required to be performed when entering MODE 2 from MODE 1 until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering MODE 2.
3. For Functions 2.b and 2.f, the recirculation flow transmitters that feed the APRMs are included.

Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.11 Deleted.

SR 3.3.1.1.12 Verify Turbine Throttle Valve - Closure, and In accordance with Turbine Governor Valve Fast Closure Trip Oil the Surveillance Pressure - Low Functions are not bypassed when Frequency Control THERMAL POWER is 2 30% RTP. Program SR 3.3.1.1.13 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.1.1-13 Amendment No. +-79 22a ~ 238

RPS Instrumentation (After Implementation of PRNM Upgrade) 3.3.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.1.1.14 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.15 ------------------------------NOTES-----------------------------

1. Neutron detectors are excluded.
2. Channel sensors for Functions 3 and 4 are excluded.

Verify the RPS RESPONSE TIME is within limits. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.16 ------------------------------NOTES-----------------------------

1. For Function 2.a, not required to be performed when entering MODE 2 from MODE 1 until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering MODE 2.
2. For Functions 2.b and 2.f, the CHANNEL FUNCTIONAL TEST includes the recirculation flow input processing, excluding the flow transmitters.

Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.1.1.17 Verify the OPRM is not bypassed when APRM In accordance Simulated Thermal Power is greater than or equal to with the the value specified in the COLR and recirculation Surveillance drive flow is less than the value specified in the Frequency COLR. Control Program Columbia Generating Station 3.3.1.1-14 Amendment No. +w ~ ~ 238

SRM Instrumentation 3.3.1.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. One or more required E.1 Suspend CORE Immediately SRMs inoperable in AL TE RATIONS except for MODE 5. control rod insertion.

E.2 Initiate action to fully insert Immediately all insertable control rods in core cells containing one or more fuel assemblies.

SURVEILLANCE REQUIREMENTS


NOTE-----------------------------------------------------------

Refer to Table 3.3.1.2-1 to determine which SRs apply for each applicable MODE or other specified conditions.

SURVEILLANCE FREQUENCY SR 3.3.1.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.1.2-2 Amendment No. +49,+e9 ~ 238

SRM Instrumentation 3.3.1 .2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.1.2.2 ------------------------------NOTES-----------------------------

1 . Only required to be met during CORE AL TE RATIONS.

2. One SRM may be used to satisfy more than one of the following.

Verify an OPERABLE SRM detector is located in: In accordance with the

a. The fueled region; Surveillance Frequency
b. The core quadrant where CORE Control Program AL TE RATIONS are being performed when the associated SRM is included in the fueled region; and
c. A core quadrant adjacent to where CORE ALTERATIONS are being performed, when the associated SRM is included in the fueled region.

SR 3.3.1.2.3 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program

. SR 3.3.1 .2.4 --------- ---- ----------- ---- ---N 0 TE--------------------------- ---

Not required to be met with less than or equal to four fuel assemblies adjacent to the SRM and no other fuel assemblies in the associated core quadrant.

Verify count rate is: In accordance with the

a. 2 3.0 cps with a signal to noise ratio 2 2:1 or Surveillance Frequency
b. 2 0.7 cps with a signal to noise ratio 2 20:1. Control Program Columbia Generating Station 3.3.1.2-3 Amendment No. +49,.:t-W 22-§ 238

SRM Instrumentation 3.3.1.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.1.2.5 ------------- ------------------N 0 TE--------------------------- -- -

The determination of signal to noise ratio is not required to be met with less than or equal to four fuel assemblies adjacent to the SRM and no other fuel assemblies in the associated core quadrant.

Perform CHANNEL FUNCTIONAL TEST and In accordance determination of signal to noise ratio. with the Surveillance Frequency Control Program SR 3.3.1 .2.6 -------------------------------NOTE------------------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after IRMs on Range 2 or below.

Perform CHANNEL FUNCTIONAL TEST and In accordance determination of signal to noise ratio. with the Surveillance Frequency Control Program SR 3.3.1.2.7 ----------------- -------------NOTES-----------------------------

1. Neutron detectors are excluded.
2. Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after IRMs on Range 2 or below.

Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.1.2-4 Amendment No. -+49,.+w 22-9 238

Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 SURVEILLANCE REQUIREMENTS


NOTES----------------------------------------------------------

1. Refer to Table 3.3.2.1-1 to determine which SRs apply for each Control Rod Block Function.
2. When an RBM channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains control rod block capability.

SURVEILLANCE FREQUENCY SR 3.3.2.1 .1 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.2.1.2 ----- ---- ---- ---- ------- ---- ---N 0 TE--------------------------- ---

Not required to be performed until 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after any control rod is withdrawn at ~ 10% RTP in MODE 2.

Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.2.1 .3 --------- -------- ---- --- ---- ---N 0 TE--------------------------- ---

Not required to be performed until 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after THERMAL POWER is:.::: 10% RTP in MODE 1.

Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.2.1-9 Amendment No. +SQ. 2ae 2ae 238

Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.2.1.4 -------------------------------NOTE------------------------------

Neutron detectors are excluded.

Verify the RBM is not bypassed: In accordance with the

a. Low Power Range - Upscale Function is not Surveillance bypassed when APRM Simulated Thermal Frequency Power is ;;:: 28% and < 63% RTP and peripheral Control Program control rod is not selected.
b. Intermediate Power Range - Upscale Function is not bypassed when APRM Simulated Thermal Power is ;;:: 63% and < 83% RTP and peripheral control rod is not selected.
c. High Power Range - Upscale Function is not bypassed when APRM Simulated Thermal Power is ;;:: 83% and peripheral control rod is not selected.

SR 3.3.2.1.5 ------------- ------------------N 0 TE--------------------------- ---

Neutron detectors are excluded.

Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program SR 3.3.2.1.6 Verify the RWM is not bypassed when THERMAL In accordance POWER is:::;; 10% RTP. with the Surveillance Frequency Control Program Columbia Generating Station 3.3.2.1-10 Amendment No. +79 ~ ~ 238

Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.2.1.7 -------------------------------N 0 TE--------------------------- ---

Not required to be performed until 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after reactor mode switch is in the shutdown position.

Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.2.1.8 Verify control rod sequences input to the RWM are Prior to declaring in conformance with BPWS. RWM OPERABLE following loading of sequence into RWM Columbia Generating Station 3.3.2.1-11 Amendment No. ~ 238

Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 Table 3.3.2.1-1 (page 1 of 2)

Control Rod Block Instrumentation APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS CHANNELS REQUIREMENTS VALUE

1. Rod Block Monitor
a. Low Power Range - Upscale (a) 2 SR 3.3.2.1.1 (f)

SR 3.3.2.1.4 SR 3.3.2.1.5 1dl.lel

b. Intermediate Power Range - (b) 2 SR 3.3.2.1.1 (f)

Upscale SR 3.3.2.1.4 SR 3.3.2.1.5 1di.lel

c. High Power Range - Upscale (c) 2 SR 3.3.2.1.1 (f)

SR 3.3.2.1.4 SR 3.3.2.1.5 1dJ,leJ

d. lnop (a),(b),(c) 2 SR 3.3.2.1.1 NA (a) APRM Simulated Thermal Power is ;e: 28% and< 63% RTP and MCPR is less than the limit specified in the COLR and no peripheral control rod selected.

(b) APRM Simulated Thermal Power is ;e: 63% and< 83% RTP and MCPR is less than the limit specified in the COLR and no peripheral control rod selected.

(c) APRM Simulated Thermal Power is ;e: 83% and MCPR is less than the limit specified in the COLR and no peripheral control rod selected.

(d) If the as-found channel setpoint is outside its predefined as-found tolerance, then the channel shall be evaluated to verify that it is functioning as required before returning the channel to service.

(e) The instrument channel setpoint shall be reset to a value that is within the as-left tolerance around the Limiting Trip Setpoint (LTSP) at the completion of the surveillance; otherwise, the channel shall be declared inoperable.

Setpoints more conservative than the LTSP are acceptable provided that the as-found and as-left tolerances apply to the actual setpoint implemented in the surveillance procedures (Nominal Trip Setpoint) to confirm channel performance. The LTSP and the methodologies used to determine the as-found and as-left tolerances are specified in the Licensee Controlled Specifications.

(f) Allowable Value Specified in the COLR.

Columbia Generating Station 3.3.2.1-12 Amendment No. 226 238

Control Rod Block Instrumentation (After Implementation of PRNM Upgrade) 3.3.2.1 Table 3.3.2.1-1 (page 2 of 2)

Control Rod Block Instrumentation APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS CHANNELS REQUIREMENTS VALUE

2. Rod Worth Minimizer 1191, 2191 SR 3.3.2.1.2 NA SR 3.3.2.1.3 SR 3.3.2.1.6 SR 3.3.2.1.8
3. Reactor Mode Switch - Shutdown (h) 2 SR 3.3.2.1.7 NA Position (g) With THERMAL POWER~ 10% RTP.

(h) Reactor mode switch in the shutdown position.

Columbia Generating Station 3.3.2.1-13 Amendment No. 238

Feedwater and Main Turbine High Water Level Trip Instrumentation 3.3.2.2 SURVEILLANCE REQUIREMENTS


NOTE-----------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided feedwater and main turbine high water level trip capability is maintained.

SURVEILLANCE FREQUENCY SR 3.3.2.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.2.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.2.2.3 Perform CHANNEL CALIBRATION. The Allowable In accordance Value shall be~ 56.0 inches. with the Surveillance Frequency Control Program SR 3.3.2.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST, In accordance including valve actuation. with the Surveillance Frequency Control Program Columbia Gene.rating Station 3.3.2.2-2 Amendment No. +49,.:f.6.9 22§ 238

PAM Instrumentation 3.3.3.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. As required by Required E.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Action D.1 and referenced in Table 3.3.3.1-1.

F. As required by Required F.1 Initiate action in accordance Immediately Action D.1 and with Specification 5.6.4.

referenced in Table 3.3.3.1-1.

SURVEILLANCE REQUIREMENTS


NOTES----------------------------------------------------------

1. These SRs apply to each Function in Table 3.3.3.1-1.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the other required channel(s) in the associated Function is OPERABLE.

SURVEILLANCE FREQUENCY SR 3.3.3.1 .1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.3.1 .2 Deleted SR 3.3.3.1.3 Perform CHANNEL CALIBRATION for Functions 1, In accordance 2, 4, 5, and 10. with the Surveillance Frequency Control Program Columbia Generating Station 3.3.3.1-2 Amendment No ..:t-89,+w- 22-6 238

PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.3.1.4 Perform CHANNEL CALIBRATION for In accordance Functions 3, 6, and 7. with the Surveillance Frequency Control Program Columbia Generating Station 3.3.3.1-3 Amendment No.+39,200 ~ 238

PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page 1 of 1)

Post Accident Monitoring Instrumentation CONDITIONS REFERENCED REQUIRED FROM REQUIRED FUNCTION CHANNELS ACTION D.1

1. Reactor Vessel Pressure 2 E
2. Reactor Vessel Water Level
a. -150 inches to +60 inches 2 E
b. -310 inches to -110 inches 2 E
3. Suppression Pool Water Level
a. -25 inches to +25 inches 2 E
b. 2 ft to 52 ft 2 E
4. Suppression Chamber Pressure 2 E
5. Drywell Pressure
a. -5 psig to +3 psig 2 E
b. O psig to 25 psig 2 E
c. 0 psig to 180 psig 2 E
6. Primary Containment Area Radiation 2 F
7. Penetration Flow Path PCIV Position 2 per penetration flow E path(a) (bl
8. Deleted
9. Deleted
10. ECCS Pump Room Flood Level 5 E (a) Not required for isolation valves whose associated penetration flow path is isolated by at least one closed and de-activated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.

(b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.

Columbia Generating Station 3.3.3.1-4 Amendment No. 238

Remote Shutdown System 3.3.3.2 3.3 INSTRUMENTATION 3.3.3.2 Remote Shutdown System LCO 3.3.3.2 The Remote Shutdown System Functions shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTIONS


N 0 T E-----------------------------------------------------------

Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore required Function 30 days Functions inoperable. to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

SURVEILLANCE REQUIREMENTS


NOTE-----------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE FREQUENCY SR 3.3.3.2.1 Perform CHANNEL CHECK for each required In accordance instrumentation channel that is normally energized. with the Surveillance Frequency Control Program Columbia Generating Station 3.3.3.2-1 Amendment No. +es,+&7 a29 238

Remote Shutdown System 3.3.3.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.3.2.2 Perform CHANNEL CALIBRATION for each In accordance required instrumentation channel, except the with the suppression pool water level instrumentation Surveillance channel. Frequency Control Program SR 3.3.3.2.3 Perform CHANNEL CALIBRATION tor the In accordance suppression pool water level instrumentation with the channel. Surveillance Frequency Control Program SR 3.3.3.2.4 Verify each required control circuit and transfer In accordance switch is capable of performing the intended with the functions. Surveillance Frequency Control Program Columbia Generating Station 3.3.3.2-2 Amendment No. +49,-+W ~ 238

EOC-RPT Instrumentation 3.3.4.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME

8. One or more Functions 8.1 Restore EOC-RPT trip 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> with EOC-RPT trip capability.

capability not maintained. OR AND 8.2 Apply the MCPR limit for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> inoperable EOC-RPT as MCPR limit for specified in the COLR.

inoperable EOC-RPT not made applicable.

C. Required Action and C.1 Remove the associated 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion recirculation pump from Time not met. service.

OR C.2 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> POWER to< 30% RTP.

SURVEILLANCE REQUIREMENTS


NOTE-----------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains EOC-RPT trip capability.

SURVEILLANCE FREQUENCY SR 3.3.4.1 .1 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.4.1-2 Amendment No. +49,.:t-W ~ 238

EOC-RPT Instrumentation 3.3.4.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.4.1.2.a Perform CHANNEL CALIBRATION. The Allowable In accordance with Value shall be: the Surveillance Frequency Control TTV - Closure:~ 7% closed. Program SR 3.3.4.1.2.b Perform CHANNEL CALIBRATION. The Allowable In accordance with Value shall be: the Surveillance Frequency Control TGV Fast Closure, Trip Oil Pressure - Low: Program

~ 1000 psig.

SR 3.3.4.1.3 Verify TTV - Closure and TGV Fast Closure, Trip In accordance with Oil Pressure - Low Functions are not bypassed the Surveillance when THERMAL POWER is~ 30% RTP. Frequency Control Program SR 3.3.4.1.4 Perform LOGIC SYSTEM FUNCTIONAL TEST, In accordance with including breaker actuation. the Surveillance Frequency Control Program SR 3.3.4.1.5 -------------------------------N 0 TE------------------------------

Breaker arc suppression time may be assumed from the most recent performance of SR 3.3.4.1 .6.


Verify the EOC-RPT SYSTEM RESPONSE TIME is In accordance with within limits. the Surveillance Frequency Control Program SR 3.3.4.1 .6 Determine RPT breaker arc suppression time. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.4.1-3 Amendment No. 168, 169 225 238

A TWS-RPT Instrumentation 3.3.4.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Both Functions with C.1 Restore A TWS-RPT trip 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> A TWS-RPT trip capability for one Function.

capability not maintained.

D. Required Action and D.1 Remove the associated 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion recirculation pump from Time not met. service.

OR D.2 Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> SURVEILLANCE REQUIREMENTS


NOTE-----------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains A TWS-RPT trip capability.

SURVEILLANCE FREQUENCY SR 3.3.4.2.1 Perform CHANNEL CHECK for Reactor Vessel In accordance Water Level - Low Low, Level 2 Function. with the Surveillance Frequency Control Program SR 3.3.4.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.4.2-2 Amendment No. +49,+w ~ 238

A TWS-RPT Instrumentation 3.3.4.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.4.2.3 Perform CHANNEL CALIBRATION. The Allowable In accordance Values shall be: with the Surveillance

a. Reactor Vessel Water Level - Low Low, Level 2: Frequency 2". -58 inches; and Control Program
b. Reactor Vessel Steam Dome Pressure - High:
1143 psig.

SR 3.3.4.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST, In accordance including breaker actuation. with the Surveillance Frequency Control Program Columbia Generating Station 3.3.4.2-3 Amendment No . .:t-49,+69 22§ 238

ECCS Instrumentation 3.3.5.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME H. Required Action and H.1 Declare associated Immediately associated Completion supported feature(s)

Time of Condition B, C, inoperable.

D, E, F, or G not met.

SURVEILLANCE REQUIREMENTS


NOTES----------------------------------------------------------

1. Refer to Table 3.3.5.1-1 to determine which SRs apply for each ECCS Function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 3.c, 3.f, and 3.g; and (b) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions other than 3.c, 3.f, and 3.g provided the associated Function or the redundant Function maintains ECCS initiation capability.

SURVEILLANCE FREQUENCY SR 3.3.5.1 .1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.5.1 .2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.5.1.3 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.5.1-5 Amendment No . .:t-W,+e9 ~ 238

ECCS Instrumentation 3.3.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.5.1.4 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program SR 3.3.5.1.5 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency

ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 1 of 5)

Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE

1. Low Pressure Coolant Injection-A (LPCI) and Low Pressure Core Spray (LPCS)

Subsystems 2(b)

a. Reactor Vessel 1, 2, 3, B SR 3.3.5.1.1 ~ -142.3 inches Water Level - Low 4(a), 5(a) SR 3.3.5.1.2 Low Low, Level 1 SR 3.3.5.1.4 SR 3.3.5.1.6
b. Drywell Pressure - 1, 2, 3 2(b) B SR 3.3.5.1.2 s 1.88 psig High SR 3.3.5.1.4 SR 3.3.5.1.6 1 (e) c
c. LPCS Pump Start - 1, 2, 3, SR 3.3.5.1.5 ~ 8.53 seconds LOCA Time Delay (a), 1a) 4 5 SR 3.3.5.1.6 and Relay s 10.64 seconds 1 (e)
d. LPCI Pump A Start - 1, 2, 3, 4lal, 5(a) c SR 3.3.5.1.5 ~ 17.24 seconds LOCA Time Delay SR 3.3.5.1.6 ands 21.53 Relay seconds
e. LPCI Pump A Start - 1, 2, 3, c SR 3.3.5.1.2 ~ 3.04 seconds LOCA/LOOP Time 4 1a1, 5 1a1 SR 3.3.5.1.3 and Delay Relay SR 3.3.5.1.6 s 6.00 seconds
f. Reactor Vessel 1, 2, 3 1 per valve c SR 3.3.5.1.2 ~ 448 psig and Pressure - Low SR 3.3.5.1.4 s 492 psig (Injection SR 3.3.5.1.6 Permissive) 4 1a1, 5(a) 1 per valve B SR 3.3.5.1.2 ~ 448 psig and SR 3.3.5.1.4 s 492 psig SR 3.3.5.1.6 (a) When associated subsystem(s) are required to be OPERABLE.

(b) Also required to initiate the associated diesel generator (DG).

(e) Also supports OPERABILITY of 230 kV offsite power circuit pursuant to LCO 3.8.1 and LCO 3.8.2.

Columbia Generating Station 3.3.5.1-7 Amendment No. +w,+72 2-2.a 238

ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 2 of 5)

Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE

1. LPCI and LPCS Subsystems
g. LPCS Pump 1, 2, 3, E SR 3.3.5.1.2 2 668 gpm and Discharge Flow - 4(a), 5(a) SR 3.3.5.1.4 s 1067 gpm Low (Minimum Flow) SR 3.3.5.1.6
h. LPCI Pump A 1, 2, 3, E SR 3.3.5.1.2 2 605 gpm and Discharge Flow - (a), 1a) SR 3.3.5.1.4 4 5 s 984 gpm Low (Minimum Flow) SR 3.3.5.1.6
i. Manual Initiation 1, 2, 3, 4(a), 5(a) 2 c SR 3.3.5.1.6 NA
2. LPCI Band LPCI C Subsystems
a. Reactor Vessel 1, 2, 3, 2(b) B SR 3.3.5.1.1 2 -142.3 inches Water Level - Low 4(a), 5(a) SR 3.3.5.1.2 Low Low, Level 1 SR 3.3.5.1.4 SR 3.3.5.1.6
b. Drywell Pressure - 1, 2, 3 2(b) B SR 3.3.5.1.2 s 1.88 psig High SR 3.3.5.1.4 SR 3.3.5.1.6 1(e)
c. LPCI Pump B Start - 10 2, 3, a) (a) c SR 3.3.5.1.5 2 17.24 seconds LOCA Time Delay 4 5 SR 3.3.5.1.6 and Relay

'

s 21.53 seconds

d. LPCI Pump C Start - 1, 2, 3, 1 (e) c SR 3.3.5.1.5  ? 8.53 seconds LOCA Time Delay 4(a), 5(a) SR 3.3.5.1.6 and Relay s 1 0.64 seconds
e. LPCI Pump B Start - 1, 2, 3, (a), (a) c SR 3.3.5.1.2 2 3.04 seconds LOCA/LOOP Time 4 5 SR 3.3.5.1.3 and Delay Relay SR 3.3.5.1.6 s 6.00 seconds (a) When associated subsystem(s) are required to be OPERABLE.

(b) Also required to initiate the associated DG.

(e) Also supports OPERABILITY of 230 kV off site power circuit pursuant to LCO 3.8.1 and LCO 3.8.2.

Columbia Generating Station 3.3.5.1-8 Amendment No.+ee,+e9 ~ 238

ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 3 of 5)

Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE

2. LPCI B and LPCI C Subsystems
f. Reactor Vessel 1, 2, 3, 1 per valve c SR 3.3.5.1.2  :::: 448 psig Pressure - Low SR 3.3.5.1.4 and (Injection SR 3.3.5.1.6 s 492 psig Permissive) 4(a), 5(a) 1 per valve B SR 3.3.5.1.2  :::: 448 psig SR 3.3.5.1.4 and SR 3.3.5.1.6 s 492 psig
g. LPCI Pumps B & C 1, 2, 3, 1 per pump E SR 3.3.5.1.2  ::=: 605 gpm Discharge Flow - 4(a), 5(a) SR 3.3.5.1.4 and Low (Minimum flow) SR 3.3.5.1.6 s 984 gpm
h. Manual Initiation 1, 2, 3, 2 c SR 3.3.5.1.6 NA 4(a), 5(a)
3. High Pressure Core Spray (HPCS) System
a. Reactor Vessel 1, 2, 3, 4(b) B SR 3.3.5.1.1  :::: -58 inches Water Level - Low 4(a), 5(a) SR 3.3.5.1.2 Low, Level 2 SR 3.3.5.1.4 SR 3.3.5.1.6
b. Drywell Pressure - 1, 2, 3 4(b) B SR 3.3.5.1.2 s 1.88 psig High SR 3.3.5.1.4 SR 3.3.5.1.6
c. Reactor Vessel 1, 2, 3, 4(a), 5(a) 2 c SR 3.3.5.1.1 s 56.0 inches Water Level - High, SR 3.3.5.1.2 Level 8 SR 3.3.5.1.4 SR 3.3.5.1.6
d. Condensate Storage 1, 2, 3, 2 D SR 3.3.5.1.2  ::=: 448 ft 1 inch Tank Level - Low 4(c), 5(c) SR 3.3.5.1.4 elevation SR 3.3.5.1.6 (a) When associated subsystem(s) are required to be OPERABLE.

(b) Also required to initiate the associated DG.

(c) When HPCS is OPERABLE for compliance with LCO 3.5.2, "ECCS - Shutdown," and aligned to the condensate storage tank while tank water level is not within the limit of SR 3.5.2.2.

Columbia Generating Station 3.3.5.1-9 Amendment No. +ee,+69 22§ 238

ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 4 of 5)

Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE

3. HPCS System
e. Suppression Pool 1, 2, 3 2 D SR 3.3.5.1.2 s 466 ft Water Level - High SR 3.3.5.1.4 11 inches SR 3.3.5.1.6 elevation
f. HPCS System Flow 1, 2, 3, E SR 3.3.5.1.2 2 1200 gpm and Rate - Low 4ia), 5ia) SR 3.3.5.1.4 s 1512 gpm (Minimum Flow) SR 3.3.5.1.6
g. Manual Initiation 1, 2, 3, 2 c SR 3.3.5.1.6 NA 4 1a), 5(a)
4. Automatic Depressurization System (ADS) Trip System A
a. Reactor Vessel 1, 2ld), 3ld) 2 F SR 3.3.5.1.1 2 -142.3 inches Water Level - Low SR 3.3.5.1.2 Low Low, Level 1 SR 3.3.5.1.4 SR 3.3.5.1.6
b. ADS Initiation Timer 1, 2ld), 3id) G SR 3.3.5.1.2 s 115.0 seconds SR 3.3.5.1.3 SR 3.3.5.1.6
c. Reactor Vessel 1, 2ld), 3ld) F SR 3.3.5.1.1 2 9.5 inches Water Level - Low, SR 3.3.5.1.2 Level 3 (Permissive) SR 3.3.5.1.4 SR 3.3.5.1.6
d. LPCS Pump 1, 2ld), 3ld) 2 G SR 3.3.5.1.2 2 119 psig and Discharge Pressure SR 3.3.5.1.4 s 171 psig

- High SR 3.3.5.1.6

e. LPCI Pump A 1, 2ld), 3id) 2 G SR 3.3.5.1.2 2 11 6 psig and Discharge Pressure SR 3.3.5.1.4 s 134 psig

- High SR 3.3.5.1.6 (a) When associated subsystem(s) are required to be OPERABLE.

(d) With reactor steam dome pressure > 150 psig.

Columbia Generating Station 3.3.5.1-10 Amendment No. +ee,+e9 ~ 238

ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 5 of 5)

Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE

4. ADS Trip System A
f. Accumulator Backup 1, 2'dl, 3(d) 3 F SR 3.3.5.1.2 2 151.4 psig Compressed Gas SR 3.3.5.1.4 System Pressure - SR 3.3.5.1.6 Low
g. Manual Initiation 1, 2(d), 3(d) 4 G SR 3.3.5.1.6 NA
5. ADS Trip System B
a. Reactor Vessel 1, 2(dl, 3(d) 2 F SR 3.3.5.1.1 2 -142.3 inches Water Level - Low SR 3.3.5.1.2 Low Low, Level 1 SR 3.3.5.1.4 SR 3.3.5.1.6
b. ADS Initiation Timer 1 ' 2(d)' 3(d) G SR 3.3.5.1.2  :::: 115.0 seconds SR 3.3.5.1.3 SR 3.3.5.1.6
c. Reactor Vessel 1, 2(d), 3(d) F SR 3.3.5.1.1 2 9.5 inches Water Level - SR 3.3.5.1.2 Low, Level 3 SR 3.3.5.1.4 (Permissive) SR 3.3.5.1.6
d. LPCI Pumps B & C 1 , 2(d), 3(d) 2 per pump G SR 3.3.5.1.2 2 11 6 psig and Discharge Pressure SR 3.3.5.1.4  :::: 134 psig

- High SR 3.3.5.1.6

e. Accumulator Backup 1' 2(d)' 3(d) 3 F SR 3.3.5.1.2 2 151.4 psig Compressed Gas SR 3.3.5.1.4 System Pressure - SR 3.3.5.1.6 Low
f. Manual Initiation 1, 2(d), 3(d) 4 G SR 3.3.5.1.6 NA (d) With reactor steam dome pressure > 150 psig.

Columbia Generating Station 3.3.5.1-11 Amendment No. 238 I

RCIC System Instrumentation 3.3.5.2 SURVEILLANCE REQUIREMENTS


---------------N0 TES--------- ----------------------- --------------- -----------

1. Refer to Table 3.3.5.2-1 to determine which SRs apply for each RCIC Function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 2 and 4; and (b) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 1 and 3 provided the associated Function maintains RCIC initiation capability.

SURVEILLANCE FREQUENCY SR 3.3.5.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.3 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.5.2-3 Amendment No. +49,+e9 ~ 238

Primary Containment Isolation Instrumentation 3.3.6.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME I. As required by Required 1.1 Declare associated standby 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Action C.1 and liquid control (SLC) referenced in subsystem inoperable.

Table 3.3.6.1-1.

OR 1.2 Isolate the Reactor Water 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Cleanup (RWCU) System.

J. As required by Required J.1 Initiate action to restore Immediately Action C.1 and channel to OPERABLE referenced in status.

Table 3.3.6.1-1.

OR J.2 Initiate action to isolate the Immediately Residual Heat Removal (RHR) Shutdown Cooling (SOC) System.

SURVEILLANCE REQUIREMENTS


NOTES----------------------------------------------------------

1. Refer to Table 3.3.6.1-1 to determine which SRs apply for each Primary Containment Isolation Function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains isolation capability.

SURVEILLANCE FREQUENCY SR 3.3.6.1.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.6.1-3 Amendment No. +49,+w 2-2-a 238

Primary Containment Isolation Instrumentation 3.3.6.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.6.1 .2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.6.1 .3 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.6.1.4 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program SR 3.3.6.1 .5 Perform CHANNEL CALIBRATION In accordance with the Surveillance Frequency Control Program SR 3.3.6.1 .6 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.6.1 .7 -------------------------------N 0 TE------------------------------

Channel sensors for Functions 1.a, 1 .b, and 1.c are excluded.


Verify the ISOLATION SYSTEM RESPONSE TIME In accordance is within limits. with the Surveillance Frequency Control Program Columbia Generating Station 3.3.6.1-4 Amendment No. +w,+w 22a 238

Secondary Containment Isolation Instrumentation 3.3.6.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. (continued) C.2.1 Place the associated 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> standby gas treatment (SGT) subsystem in operation.

OR C.2.2 Declare associated SGT 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> subsystem inoperable.

SURVEILLANCE REQUIREMENTS


N 0 T ES----------------------------------------------------------

1. Refer to Table 3.3.6.2-1 to determine which SRs apply for each Secondary Containment Isolation Function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed tor up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains isolation capability.

SURVEILLANCE FREQUENCY SR 3.3.6.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.6.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.6.2-2 Amendment No. +49,+w 225 238

Secondary Containment Isolation Instrumentation 3.3.6.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.6.2.3 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program SR 3.3.6.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.6.2-3 Amendment No. ~.+99 22§ 238

Secondary Containment Isolation Instrumentation 3.3.6.2 Table 3.3.6.2-1(page1of1)

Secondary Containment Isolation Instrumentation APPLICABLE REQUIRED MODES OR CHANNELS OTHER PER SPECIFIED TRIP SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM REQUIREMENTS VALUE

1. Reactor Vessel Water Level - Low 1, 2, 3, (a) SR 3.3.6.2.2 2 -58 inches Low, Level 2 SR 3.3.6.2.3 SR 3.3.6.2.4
2. Drywell Pressure - High 1, 2, 3 SR 3.3.6.2.2  :::; 1.88 psig SR 3.3.6.2.3 SR 3.3.6.2.4
3. Reactor Building Vent Exhaust 1, 2, 3, (a) 2 SR 3.3.6.2.1  :::; 16.0 mR/hr Plenum Radiation - High SR 3.3.6.2.2 SR 3.3.6.2.3 SR 3.3.6.2.4
4. Manual Initiation 1, 2, 3, (a) 4 SR 3.3.6.2.4 NA (a) During operations with a potential for draining the reactor vessel.

(b) Deleted (c) Also required to initiate the associated LOCA Time Delay Relay Function pursuant to LCO 3.3.5.1.

Columbia Generating Station 3.3.6.2-4 Amendment No. 238

CREF System Instrumentation 3.3.7.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Place associated CREF 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> associated Completion subsystem in the Time of Condition B or C pressurization mode of not met. operation.

D.2 Declare associated CREF 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> subsystem inoperable.

SURVEILLANCE REQUIREMENTS


---------------N0 TES----------------------------------------------------------

1. Refer to Table 3.3.7.1-1 to determine which SRs apply for each CREF System Function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains CREF initiation capability.

SURVEILLANCE FREQUENCY SR 3.3.7.1.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.7.1.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.7.1.3 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.7.1-2 Amendment No. +8-7,+99 22a 238

CREF System Instrumentation 3.3.7.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.7.1.4 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.7.1-3 Amendment No. +e9,+99 22-9 238

CREF System Instrumentation 3.3.7.1 Table 3.3.7.1-1(page1of1)

Control Room Emergency Filtration System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION A.1 REQUIREMENTS VALUE

1. Reactor Vessel Water 1, 2, 3, (a) 2 B SR 3.3.7.1.1 ~-58inches Level - Low Low, Level 2 SR 3.3.7.1.2 SR 3.3.7.1.3 SR 3.3.7.1.4
2. Drywell Pressure - High 1, 2, 3 2 c SR 3.3.7.1.1 :s: 1.88 psig SR 3.3.7.1.2 SR 3.3.7.1.3 SR 3.3.7.1.4
3. Reactor Building Vent 1, 2, 3, (a) 2 B SR 3.3.7.1.1 :s: 16.0 mR/hr Exhaust Plenum SR 3.3.7.1.2 Radiation - High SR 3.3.7.1.3 SR 3.3.7.1.4 (a) During operations with a potential for draining the reactor vessel.

Columbia Generating Station 3.3.7.1-4 Amendment No. 238

LOP Instrumentation 3.3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Declare associated DG Immediately associated Completion inoperable.

Time of Condition B or C not met. OR


NOTE-------------------

Only applicable for Functions 1 .c and 1.d.

D.2.1 Open offsite circuit supply Immediately breaker to associated 4.16 kV ESF bus.

D.2.2 Declare associated offsite Immediately circuit inoperable.

SURVEILLANCE REQUIREMENTS


N 0 TES----------------------------------------------------------

1. Refer to Table 3.3.8.1-1 to determine which SRs apply for each LOP Function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> provided the associated Function maintains initiation capability.

SURVEILLANCE FREQUENCY SR 3.3.8.1.1 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.8.1-2 Amendment No. +49,-+S9 2aa 238

LOP Instrumentation 3.3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.8.1.2 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program SR 3.3.8.1 .3 Perform CHANNEL CALIBRATION In accordance with the Surveillance Frequency Control Program SR 3.3.8.1 .4 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.8.1-3 Amendment No. +49,-:t-eQ ~ 238

LOP Instrumentation 3.3.8.1 Table 3.3.8.1-1(page1of1)

Loss of Power Instrumentation CONDITIONS REQUIRED REFERENCED CHANNELS FROM PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION DIVISION ACTION A.1 REQUIREMENTS VALUE

1. Divisions 1 and 2 - 4.16 kV Emergency Bus Undervoltage
a. TR-S Loss of Voltage - 2 B SR 3.3.8.1.2 2 2450 V ands 3135 V 4.16 kV Basis SR 3.3.8.1.4
b. TR-S Loss of Voltage - 2 B SR 3.3.8.1.3 2 2.95 seconds and Time Delay SR 3.3.8.1.4 s 7.1 seconds
c. TR-B Loss of Voltage - c SR 3.3.8.1.3 2 2450 V ands 3135 V 4.16 kV Basis SR 3.3.8.1.4
d. TR-B Loss of Voltage - c SR 3.3.8.1.3 2 3.06 seconds and Time Delay SR 3.3.8.1.4 s 9.28 seconds
e. Degraded Voltage - 2(a) c SR 3.3.8.1.1 2 3685 V and s 3755 V
4. 16 kV Basis SR 3.3.8.1.2 SR 3.3.8.1.4
f. Degraded Voltage - 2 1a) c SR 3.3.8.1.1 2 5.0 seconds and Primary Time Delay SR 3.3.8.1.2 s 5.3 seconds SR 3.3.8.1.4
g. Degraded Voltage - c SR 3.3.8.1.2 2 2.63 seconds and Secondary Time Delay SR 3.3.8.1.4 s 3.39 seconds
2. Division 3 - 4.16 kV Emergency Bus Undervoltage
a. Los of Voltage - 2 B SR 3.3.8.1.2 2 2450 V ands 3135 V 4.16 kV Basis SR 3.3.8.1.4
b. Loss of voltage - 2 B SR 3.3.8.1.3 2 1.87 seconds and Time Delay SR 3.3.8.1.4 s 3. 73 seconds
c. Degraded Voltage - 2 c SR 3.3.8.1.2 2 3685 V and s 3755 V
4. 16 kV Basis SR 3.3.8.1.4
d. Degraded Voltage - 2 c SR 3.3.8.1.2 2 7.36 seconds and Time Delay SR 3.3.8.1.4 s 8.34 seconds (a) The Degraded Voltage - 4.16 kV Basis and - Primary Time Delay Functions must be associated with one another.

Columbia Generating Station 3.3.8.1-4 Amendment No. 238

RPS Electric Power Monitoring 3.3.8.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Initiate action to restore one Immediately associated Completion electric power monitoring Time of Condition A or B assembly to OPERABLE not met in MODE 4 or 5 status for inservice power with both RHR SOC supply(s) supplying suction isolation valves required instrumentation.

open.

OR D.2 Initiate action to isolate the Immediately RHR SOC System.

E. Required Action and E.1 Initiate action to fully insert Immediately associated Completion all insertable control rods in Time of Condition A or B core cells containing one or not met in MODE 5 with more fuel assemblies.

any control rod withdrawn from a core cell containing one or more fuel assemblies.

Columbia Generating Station 3.3.8.2-2 Amendment No . .:t-49,+w ~ 238

RPS Electric Power Monitoring 3.3.8.2 SURVEILLANCE REQUIREMENTS


----------- ------------------- ------------N 0 TE------- ---------------------------------- -------- -----------

When an RPS electric power monitoring assembly is placed in an inoperable status solely for performance of required Surveillances, entry into the associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the other RPS electric power monitoring assembly for the associated power supply maintains trip capability.

SURVEILLANCE FREQUENCY SR 3.3.8.2.1 -------------------------------N 0 TE------------------------------

On Iy required to be performed prior to entering MODE 2 or 3 from MODE 4, when in MODE 4 for 2". 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.8.2.2 Perform CHANNEL CALIBRATION. The Allowable In accordance Values shall be: with the Surveillance

a. Overvoltage :.: : 133.8 V, with time delay Frequency s 3.46 seconds; Control Program
b. Undervoltage 2". 110.8 V, with time delay s 3.46 seconds; and
c. Underfrequency ~ 57 Hz, with time delay s 3.46 seconds.

SR 3.3.8.2.3 Perform a system functional test. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.3.8.2-3 Amendment No. +s9,+.79 ~ 238

Recirculation Loops Operating (After Implementation of PRNM Upgrade) 3.4.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or B not met.

No recirculation loops in operation.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.1.1 -------------------------------NOTE------------------------------

Not required to be performed until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after both recirculation loops are in operation.

Verify recirculation loop drive flow mismatch with In accordance both recirculation loops in operation is: with the Surveillance

a. ~ 10% of rated recirculation loop drive flow Frequency when operating at < 70% of rated core flow; and Control Program
b. ~ 5% of rated recirculation loop drive flow when operating at ~ 70% of rated core flow.

Columbia Generating Station 3.4.1-4 Amendment No. +++ ~ ~ 238

Jet Pumps 3.4.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.2.1 ------------------------------NOTES-----------------------------

1. Not required to be performed until 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after associated recirculation loop is in operation.
2. Not required to be performed until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after > 25% RTP.

Verify at least two of the following criteria (a, b, In accordance and c) are satisfied for each operating recirculation with the loop: Surveillance Frequency

a. Recirculation loop drive flow versus Control Program recirculation pump speed differs by:<:;; 10% from established patterns.
b. Recirculation loop drive flow versus total core flow differs by :<:; 10% from established patterns.
c. Each jet pump diffuser to lower plenum differential pressure differs by :<:; 20% from established patterns, or each jet pump flow differs by :<:; 10% from established patterns.

Columbia Generating Station 3.4.2-2 Amendment No. +49,+w ~ 238

SRVs - ~ 25% RTP 3.4.3 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.3 Safety/Relief Valves (SRVs) - ~ 25% RTP LCO 3.4.3 The safety function of 12 SRVs shall be OPERABLE, with two SRVs in the lowest two lift setpoint groups OPERABLE.

APPLICABILITY: THERMAL POWER~ 25% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> SRVs inoperable. POWER to< 25% RTP.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.3.1 Verify the safety function lift setpoints of the required In accordance SRVs are as follows: with the lnservice Testing Program Number of Setpoint SRVs _{Qfilg}

2 1165 +/-34.9 4 1175 +/- 35.2 4 1185 +/- 35.5 4 1195 +/- 35.8 4 1205 +/-36.1 SR 3.4.3.2 Verify each required SRV opens when manually In accordance actuated. with the Surveillance Frequency Control Program Columbia Generating Station 3.4.3-1 Amendment No. +49,-+W ~ 238

SRVs - < 25% RTP 3.4.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.4.1 Verify the safety function lift setpoints of the required In accordance with SRVs are as follows: the lnservice Testing Program Number of Setpoint SRVs ~

2 1165 +/- 34.9 4 1175 +/- 35.2 4 1185 +/- 35.5 4 1195 +/- 35.8 4 1205 +/- 36.1 SR 3.4.4.2 ----- -------- ---- ------- ---- ---N 0 TE--------------------------- ---

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify each required SRV opens when manually In accordance with actuated. the Surveillance Frequency Control Program Columbia Generating Station 3.4.4-2 Amendment No. +49,169,225,236 238

RCS Operational LEAKAGE 3.4.5 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or B AND not met.

C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Pressure boundary LEAKAGE exists.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.5.1 Verify RCS unidentified and total LEAKAGE and In accordance unidentified LEAKAGE increase are within limits. with the Surveillance Frequency Control Program Columbia Generating Station 3.4.5-2 Amendment No . .:t-49-,+69 ~ 238

RCS Leakage Detection Instrumentation 3.4.7 SURVEILLANCE REQUIREMENTS


NOTE------------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the other required leakage detection instrumentation is OPERABLE.

SURVEILLANCE FREQUENCY SR 3.4.7.1 Perform CHANNEL CHECK of required drywell In accordance atmospheric monitoring system. with the Surveillance Frequency Control Program SR 3.4.7.2 Perform CHANNEL FUNCTIONAL TEST of required In accordance leakage detection instrumentation. with the Surveillance Frequency Control Program SR 3.4.7.3 Perform CHANNEL CALIBRATION of required In accordance leakage detection instrumentation. with the Surveillance Frequency Control Program Columbia Generating Station 3.4.7-3 Amendment No . .:t-49,+w 2ae 238

RCS Specific Activity 3.4.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.8.1 ----- ---- -------- --------------NOTE--------------------------- ---

Only required to be performed in MODE 1.

Verify reactor coolant DOSE EQUIVALENT 1-131 In accordance specific activity is ~ 0.2 µCi/gm. with the Surveillance Frequency Control Program Columbia Generating Station 3.4.8-2 Amendment No. +49,-+W 2.aa 238

RHR Shutdown Cooling System - Hot Shutdown 3.4.9 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. No RHR shutdown B.1 Initiate action to restore one Immediately cooling subsystem in RHR shutdown cooling operation. subsystem or one recirculation pump to AND operation.

No recirculation pump in AND operation.

B.2 Verify reactor coolant 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery circulation by an alternate of no reactor coolant method. circulation AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND B.3 Monitor reactor coolant Once per hour temperature and pressure.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.9.1 ----- -------- ---- ---- --- -------NOTE------------------------------

Not required to be met until 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after reactor steam dome pressure is less than 48 psig.

Verify one RHR shutdown cooling subsystem or In accordance recirculation pump is operating. with the Surveillance Frequency Control Program Columbia Generating Station 3.4.9-2 Amendment No. +e4,+&9 22-e 238

RHR Shutdown Cooling System - Cold Shutdown 3.4.10 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME

8. No RHR shutdown 8.1 Verify reactor coolant 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery cooling subsystem in circulating by an alternate of no reactor coolant operation. method. circulation AND AND No recirculation pump in Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> operation. thereafter AND 8.2 Monitor reactor coolant Once per hour temperature and pressure.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.10.1 Verify one RHR shutdown cooling subsystem or In accordance recirculation pump is operating. with the Surveillance Frequency Control Program Columbia Generating Station 3.4.10-2 Amendment No. +49,+e9 ~ 238

RCS PIT Limits 3.4.11 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.11.1 -------------------------------NOTE------------------------------

Only required to be performed during RCS heatup and cooldown operations, and RCS inservice leak and hydrostatic testing.

Verify: In accordance with the

a. RCS pressure and RCS temperature are within Surveillance the applicable limits specified in Frequency Figures 3.4.11-1, 3.4.11-2, and 3.4.11-3; Control Program
b. RCS heatup and cooldown rates are ~ 100 "F in any 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period; and
c. RCS temperature change during inservice leak and hydrostatic testing is ~ 20 "F in any 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period when the RCS pressure and RCS temperature are not within the limits of Figure 3.4.11-2.

SR 3.4.11.2 Verify RCS pressure and RCS temperature are Once within within the criticality limits specified in 15 minutes prior Figure 3.4.11-3. to control rod withdrawal for the purpose of achieving criticality SR 3.4.11.3 ----- ---------------- --- ---- ---N 0 TE------------------------------

Only required to be met in MODES 1, 2, 3, and 4 during recirculation pump startup.

Verify the difference between the bottom head Once within coolant temperature and the reactor pressure vessel 15 minutes prior (RPV) coolant temperature is~ 145"F. to each startup of a recirculation pump Columbia Generating Station 3.4.11-2 Amendment No. +49,-+W ~ 238

RCS PIT Limits 3.4.11 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.11.7 -------------------------------NOTE------------------------------

Only required to be performed when tensioning the reactor vessel head bolting studs.

Verify reactor vessel flange and head flange In accordance temperatures are ~ 80 °F. with the Surveillance Frequency Control Program SR 3.4.11.8 -------------------------------NOTE------------------------------

Not required to be performed until 30 minutes after RCS temperatures 90°F in MODE 4.

Verify reactor vessel flange and head flange In accordance temperatures are ~ 80 °F. with the Surveillance Frequency Control Program SR 3.4.11.9 -------------------------------NO TE--------------------------- ---

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after RCS temperature s 100°F in MODE 4.

Verify reactor vessel flange and head flange In accordance temperatures are~ 80°F. with the Surveillance Frequency Control Program Columbia Generating Station 3.4.11-4 Amendment No. +49,+e-9 22-9 238

Reactor Steam Dome Pressure 3.4.12 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.12 Reactor Steam Dome Pressure LCO 3.4.12 The reactor steam dome pressure shall be~ 1035 psig.

APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Reactor steam dome A.1 Restore reactor steam 15 minutes pressure not within limit. dome pressure to within limit.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.12.1 Verify reactor steam dome pressure is~ 1035 psig. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.4.12-1 Amendment No. -+49,+e9 ~ 238

ECCS - Operating 3.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.1.1 Verify, for each ECCS injection/spray subsystem, In accordance the piping is filled with water from the pump with the discharge valve to the injection valve. Surveillance Frequency Control Program SR 3.5.1.2 ------------------------------NOTE-------------------------------

Low pressure coolant injection (LPCI) subsystems may be considered OPERABLE during alignment and operation for decay heat removal with reactor steam dome pressure less than 48 psig in MODE 3, if capable of being manually realigned and not otherwise inoperable.

Verify each ECCS injection/spray subsystem In accordance manual, power operated, and automatic valve in the with the flow path, that is not locked, sealed, or otherwise Surveillance secured in position, is in the correct position. Frequency Control Program SR 3.5.1.3 Verify ADS accumulator backup compressed gas In accordance system average pressure in the required bottles is with the 2 2200 psig. Surveillance Frequency Control Program SR 3.5.1.4 Verify each ECCS pump develops the specified flow In accordance rate with the specified differential pressure between with the lnservice reactor and suction source. Testing Program DIFFERENTIAL PRESSURE BETWEEN REACTOR AND SYSTEM FLOW RATE SUCTION SOURCE LPCS 2 6200 gpm 2 128 psid LPCI 2 7200 gpm 2 26 psid HPCS 2 6350 gpm 2 200 psid Columbia Generating Station 3.5.1-4 Amendment No. 169,205,225,229,236 238

ECCS - Operating 3.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.1.5 ----------------- --------------NO TE------------ --- ---- ---- ---- ---

Vesse I injection/spray may be excluded.

Verify each ECCS injection/spray subsystem In accordance actuates on an actual or simulated automatic with the initiation signal. Surveillance Frequency Control Program SR 3.5.1.6 --------- ---- ---- ---- --- ---- ---N 0 TE------------ --- ---- ---- ---- ---

Valve actuation may be excluded.

Verify the ADS actuates on an actual or simulated In accordance automatic initiation signal. with the Surveillance Frequency Control Program SR 3.5.1.7 -------------------------------N 0 TE--------------------------- ---

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify each required ADS valve opens when In accordance manually actuated. with the Surveillance Frequency Control Program SR 3.5.1.8 --------- ---- ---- ------- ---- ---N 0 TE------------ --- ---- ---- ---- -- -

ECCS actuation instrumentation is excluded.

Verify the ECCS RESPONSE TIME for each ECCS In accordance injection/spray subsystem is within limits. with the Surveillance Frequency Control Program Columbia Generating Station 3.5.1-5 Amendment No. 169,205,225,236 238

ECCS - Shutdown 3.5.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action C.2 and D.1 Initiate action to restore Immediately associated Completion secondary containment to Time not met. OPERABLE status.

D.2 Initiate action to restore one Immediately standby gas treatment subsystem to OPERABLE status.

AND D.3 Initiate action to restore Immediately isolation capability in each required secondary containment penetration flow path not isolated.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.2.1 Verify, for each required low pressure ECCS In accordance injection/spray subsystem, the suppression pool with the water level is~ 18 ft 6 inches. Surveillance Frequency Control Program SR 3.5.2.2 Verify, for the required High Pressure Core Spray In accordance (HPCS) System, the: with the Surveillance

a. Suppression pool water level is;?: 18 ft 6 inches; Frequency or Control Program
b. Condensate storage tank (CST) water level is
?
16.5 ft in a single CST or;?: 10.5 ft in each CST.

Columbia Generating Station 3.5.2-2 Amendment No. -WQ.,a+-0 22a 238

ECCS - Shutdown 3.5.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.2.3 Verify, for each required ECCS injection/spray In accordance subsystem, the piping is filled with water from the with the pump discharge valve to the injection valve. Surveillance Frequency Control Program SR 3.5.2.4 --------- ---- -----------------NOTE---------------------------- ---

0 n e low pressure coolant injection (LPCI) subsystem may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned and not otherwise inoperable.

Verify each required ECCS injection/spray In accordance subsystem manual, power operated, and automatic with the valve in the flow path, that is not locked, sealed, or Surveillance otherwise secured in position, is in the correct Frequency position. Control Program SR 3.5.2.5 Verify each required ECCS pump develops the In accordance specified flow rate with the specified differential with the lnservice pressure between reactor and suction source. Testing Program DIFFERENTIAL PRESSURE BETWEEN REACTOR AND SYSTEM FLOW RATE SUCTION SOURCE LPCS 2 6200 gpm 2 128 psid LPCI 2 7200 gpm 2 26 psid HPCS 2 6350 gpm 2 200 psid Columbia Generating Station 3.5.2-3 Amendment No. +e9,2Ge 22§ 229 238

ECCS - Shutdown 3.5.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.2.6 -------------------------------NOTE--------------------------- ---

Vesse I injection/spray may be excluded.

Verify each required ECCS injection/spray In accordance subsystem actuates on an actual or simulated with the automatic initiation signal. Surveillance Frequency Control Program Columbia Generating Station 3.5.2-4 Amendment No. 238

RCIC System 3.5.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.3.1 Verify the RCIC System piping is filled with water In accordance from the pump discharge valve to the injection with the valve. Surveillance Frequency Control Program SR 3.5.3.2 Verify each RCIC System manual, power operated, In accordance and automatic valve in the flow path, that is not with the locked, sealed, or otherwise secured in position, is Surveillance in the correct position. Frequency Control Program SR 3.5.3.3 -------------------------------NOTE------------------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with reactor pressure :::; 1035 psig and In accordance

~ 935 psig, the RCIC pump can develop a flow rate with the

~ 600 gpm against a system head corresponding to Surveillance reactor pressure. Frequency Control Program SR 3.5.3.4 -------------------------------NOTE------------------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with reactor pressure:::; 165 psig, the RCIC In accordance pump can develop a flow rate ~ 600 gpm against a with the system head corresponding to reactor pressure. Surveillance Frequency Control Program Columbia Generating Station 3.5.3-2 Amendment No. +w,+w ~ 238

RCIC System 3.5.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.3.5 --------- ---- ---- ------- ---- ---N 0 TE------------------------------

Vesse I injection may be excluded.

Verify the RCIC System actuates on an actual or In accordance simulated automatic initiation signal. with the Surveillance Frequency Control Program Columbia Generating Station 3.5.3-3 Amendment No. 238

Primary Containment 3.6.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.1.2 Verify drywell to suppression chamber bypass In accordance leakage is s; 1 0% of the acceptable A I JK design with the value of 0.050 ft 2 at an initial differential pressure of Surveillance

?: 1.5 psid. Frequency Control Program 48 months following a test with bypass leakage greater than the bypass leakage limit 24 months following two consecutive tests with bypass leakage greater than the bypass leakage limit until two consecutive tests are less than or equal to the bypass leakage limit SR 3.6.1.1.3 --------- ---- ---- ------- ---- ---N 0 TE--------------------------- ---

Performance of SR 3.6.1.1.2 satisfies this surveillance.

Verify individual drywell to suppression chamber In accordance vacuum relief valve bypass pathway leakage is with the s; 1 .2% of the acceptable A I JK design value of Surveillance 2

0.050 ft at an initial differential pressure of Frequency

~ 1.5 psid. Control Program Columbia Generating Station 3.6.1.1-2 Amendment No. +w-,~ ~ 238

Primary Containment 3.6.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.1.4 -------------------------------NOTE------------------------------

Performance of SR 3.6.1.1.2 satisfies this surveillance.

Verify total drywell to suppression chamber vacuum In accordance relief valve bypass leakage is s. 3.0% of the with the acceptable A I ,JK design value of 0.050 ft2 at an Surveillance initial differential pressure of ~ 1.5 psid. Frequency Control Program Columbia Generating Station 3.6.1.1-3 Amendment No. 2Q.:I.- 229 238

Primary Containment Air Lock 3.6.1.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.2.1 ------------------------------NOTES-----------------------------

1. An inoperable air lock door does not invalidate the previous successful performance of the overall air lock leakage test.
2. Results shall be evaluated against acceptance criteria applicable to SR 3.6.1.1.1.

Perform required primary containment air lock In accordance leakage rate testing in accordance with the Primary with the Primary Containment Leakage Rate Testing Program. Containment Leakage Rate Testing Program SR 3.6.1 .2.2 Verify only one door in the primary containment air In accordance lock can be opened at a time. with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.2-4 Amendment No. +49-,+w 22-e 238

PC IVs 3.6.1 .3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.3.1 --------- ---- ---- ------- -------N 0 TE--------------------------- ---

Not required to be met when the 24 inch and 30 inch primary containment purge valves are open for inerting, de-inerting, pressure control, ALARA or air quality considerations for personnel entry, or Surveillances that require the valves to be open.

Verify each 24 inch and 30 inch primary In accordance containment purge valve is closed. with the Surveillance Frequency Control Program SR 3.6.1 .3.2 ------------------------ ------N 0 TES---------- -------------------

1. Valves and blind flanges in high radiation areas may be verified by use of administrative means.
2. Not required to be met for PCIVs that are open under administrative controls.

Verify each primary containment isolation manual In accordance valve and blind flange that is located outside primary with the containment and not locked, sealed, or otherwise Surveillance secured and is required to be closed during accident Frequency conditions is closed. Control Program Columbia Generating Station 3.6.1.3-6 Amendment No. +-69,~ 22e 238

PC IVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.3.3 ------------------------------NOTES-----------------------------

1. Valves and blind flanges in high radiation areas may be verified by use of administrative means.
2. Not required to be met for PCIVs that are open under administrative controls.

Verify each primary containment isolation manual Prior to entering valve and blind flange that is located inside primary MODE 2 or 3 from containment and not locked, sealed, or otherwise MODE 4 if secured and is required to be closed during accident primary conditions is closed. containment was de-inerted while in MODE 4, if not performed within the previous 92 days SR 3.6.1.3.4 Verify continuity of the traversing incore probe (TIP) In accordance shear isolation valve explosive charge. with the Surveillance Frequency Control Program SR 3.6.1.3.5 Verify the isolation time of each power operated, In accordance automatic PCIV, except for MSIVs, is within limits. with the lnservice Testing Program SR 3.6.1 .3.6 Verify the isolation time of each MSIV is In accordance 2:'. 3 seconds and ~ 5 seconds. with the lnservice Testing Program SR 3.6.1.3.7 Verify each automatic PCIV actuates to the isolation In accordance position on an actual or simulated isolation signal. with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.3-7 Amendment No. -+99,200 22§ 238

PC IVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1 .3.8 Verify a representative sample of reactor instrument In accordance line EFCVs actuate to the isolation position on an with the actual or simulated instrument line break signal. Surveillance Frequency Control Program SR 3.6.1 .3.9 Remove and test the explosive squib from each In accordance shear isolation valve of the TIP System. with the Surveillance Frequency Control Program SR 3.6.1.3.10 Verify the combined leakage rate for all secondary In accordance containment bypass leakage paths is :-: :; 0.04% with the Primary primary containment volume/day when pressurized Containment to~ Pa. Leakage Rate Testing Program SR 3.6.1.3.11 Verify leakage rate through each MSIV is In accordance

-: :; 16.0 scfh when tested at~ 25.0 psig. with the Primary Containment Leakage Rate Testing Program SR 3.6.1.3.12 Verify combined leakage rate through hydrostatically In accordance tested lines that penetrate the primary containment with the Primary is within limits. Containment Leakage Rate Testing Program Columbia Generating Station 3.6.1 .3-8 Amendment No. +99,200 229 238

Drywell Air Temperature 3.6.1.4 3.6 CONTAINMENT SYSTEMS 3.6.1.4 Drywell Air Temperature LCO 3.6.1.4 Drywell average air temperature shall be~ 135 "F.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Drywell average air A.1 Restore drywell average air 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> temperature not within temperature to within limit.

limit.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1 .4.1 Verify drywell average air temperature is within limit. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.4-1 Amendment No. +49,.+w ~ 238

RHR Drywell Spray 3.6.1.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.5.1 Verify each RHR drywell spray subsystem manual, In accordance power operated, and automatic valve in the flow with the path that is not locked, sealed, or otherwise secured Surveillance in position, is in the correct position or can be Frequency aligned to the correct position. Control Program SR 3.6.1 .5.2 Verify each spray nozzle is unobstructed. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.5-2 Amendment No. 2W 238

Reactor Building-to-Suppression Chamber Vacuum Breakers 3.6.1.6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. Two or more lines with E.1 Restore all vacuum 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> one or more reactor breakers in two lines to building-to-suppression OPERABLE status.

chamber vacuum breakers inoperable for opening.

F. Required Action and F.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A, B AND or E not met.

F.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.6.1 ------------------------------NOTES-----------------------------

1. Not required to be met for vacuum breakers that are open during Surveillances.
2. Not required to be met for vacuum breakers open when performing their intended function.

Verify each vacuum breaker is closed. In accordance with the Surveillance Frequency Control Program SR 3.6.1.6.2 Perform a functional test of each vacuum breaker. In accordance with the lnservice Testing Program Columbia Generating Station 3.6.1.6-2 Amendment No. 149,169,225,236 238

Reactor Building-to-Suppression Chamber Vacuum Breakers 3.6.1 .6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.6.3 Verify the full open setpoint of each vacuum breaker In accordance is s 0.5 psid. with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.6-3 Amendment No. 238

Suppression Chamber-to-Drywell Vacuum Breakers 3.6.1.7 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. One or more D.1 Close one open vacuum 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> suppression chamber-to- breaker disk.

drywell vacuum breakers with two disks not closed.

E. Required Action and E.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition C or D AND not met.

E.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.7.1 --------- ---- ---- ------- -------N 0 TE------------------------------

Not required to be met for vacuum breakers that are open during Surveillances.

Verify each vacuum breaker is closed. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.7-2 Amendment No. 169,202,225,236 238

Suppression Chamber-to-Drywell Vacuum Breakers 3.6.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.7.2 Perform a functional test of each required vacuum In accordance breaker. with the Surveillance Frequency Control Program Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after any discharge of steam to the suppression chamber from the safety/relief valves SR 3.6.1.7.3 Verify the full open setpoint of each required In accordance vacuum breaker is ~ 0.5 psid. with the Surveillance Frequency Control Program Columbia Generating Station 3.6.1.7-3 Amendment No. 238

Suppression Pool Average Temperature 3.6.2.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.1.1 Verify suppression pool average temperature is In accordance within the applicable limits. with the Surveillance Frequency Control Program 5 minutes when performing testing that adds heat to the suppression pool Columbia Generating Station 3.6.2.1-3 Amendment No. +49,+w ~ 238

Suppression Pool Water Level 3.6.2.2 3.6 CONTAINMENT SYSTEMS 3.6.2.2 Suppression Pool Water Level LCO 3.6.2.2 Suppression pool water level shall be ~ 30 ft 9. 75 inches and

.: : 31 ft 1.75 inches.

APPLICABILITY: MODES 1 , 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Suppression pool water A.1 Restore suppression pool 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> level not within limits. water level to within limits.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.2.1 Verify suppression pool water level is within limits. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.2.2-1 Amendment No. +49,+e.Q 2ae 238

RHR Suppression Pool Cooling 3.6.2.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.3.1 Verify each RHR suppression pool cooling In accordance subsystem manual, power operated, and automatic with the valve in the flow path that is not locked, sealed, or Surveillance otherwise secured in position, is in the correct Frequency position or can be aligned to the correct position. Control Program SR 3.6.2.3.2 Verify each RHR pump develops a flow rate In accordance

2: 7100 gpm through the associated heat exchanger with the lnservice while operating in the suppression pool cooling Testing Program mode.

Columbia Generating Station 3.6.2.3-2 Amendment No. 169 225 230 238

Primary Containment Atmosphere Mixing System 3.6.3.2 3.6 CONTAINMENT SYSTEMS 3.6.3.2 Primary Containment Atmosphere Mixing System LCO 3.6.3.2 Two head area return fans shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One head area return A.1 Restore head area return 30 days fan inoperable. fan to OPERABLE status.

B. Two head area return B.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> fans inoperable. means that the hydrogen and oxygen control function is maintained.

AND B.2 Restore one head area 7 days return fan to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

Columbia Generating Station 3.6.3.2-1 Amendment No. -+W,+87 226 238

Primary Containment Atmosphere Mixing System 3.6.3.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.3.2.1 Operate each head area return fan for ~ 15 minutes. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.6.3.2-2 Amendment No. 238

Primary Containment Oxygen Concentration 3.6.3.3 3.6 CONTAINMENT SYSTEMS 3.6.3.3 Primary Containment Oxygen Concentration LCO 3.6.3.3 The primary containment oxygen concentration shall be < 3.5 volume percent.

APPLICABILITY: MODE 1 during the time period:

a. From 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after THERMAL POWER is > 15% RTP following startup, to
b. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to reducing THERMAL POWER to< 15% RTP prior to the next scheduled reactor shutdown.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Primary containment A.1 Restore oxygen 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> oxygen concentration concentration to within limit.

not within limit.

B. Required Action and B.1 Reduce THERMAL 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> associated Completion POWER to::;; 15% RTP.

Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.3.3.1 Verify primary containment oxygen concentration is In accordance within limits. with the Surveillance Frequency Control Program Columbia Generating Station 3.6.3.3-1 Amendment No. -+49,+es 22§ 238

Secondary Containment 3.6.4.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1.1 Verify secondary containment vacuum is 2:: 0.25 inch In accordance of vacuum water gauge. with the Surveillance Frequency Control Program SR 3.6.4.1 .2 Verify all secondary containment equipment hatches In accordance are closed and sealed. with the Surveillance Frequency Control Program SR 3.6.4.1.3 Verify each secondary containment access inner In accordance door or each secondary containment access outer with the door in each access opening is closed. Surveillance Frequency Control Program SR 3.6.4.1 .4 Verify each standby gas treatment (SGT) subsystem In accordance will draw down the secondary containment to with the 2:: 0.25 inch of vacuum water gauge in Surveillance

~ 120 seconds. Frequency Control Program SR 3.6.4.1.5 Verify each SGT subsystem can maintain In accordance

~ 0.25 inch of vacuum water gauge in the secondary with the containment for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at a flow rate ~ 2240 cfm. Surveillance Frequency Control Program Columbia Generating Station 3.6.4.1-2 Amendment No. +w,-+99 22-6 238

SC IVs 3.6.4.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.2.1 ------------------------------NOTES-----------------------------

1. Valves and blind flanges in high radiation areas may be verified by use of administrative controls.
2. Not required to be met for SCIVs that are open under administrative controls.

Verify each secondary containment isolation manual In accordance valve and blind flange that is not locked, sealed, or with the otherwise secured, and is required to be closed Surveillance during accident conditions is closed. Frequency Control Program SR 3.6.4.2.2 Verify the isolation time of each power operated, In accordance automatic SCIV is within limits. with the lnservice Testing Program SR 3.6.4.2.3 Verify each automatic SCIV actuates to the isolation In accordance position on an actual or simulated automatic with the isolation signal. Surveillance Frequency Control Program Columbia Generating Station 3.6.4.2-3 Amendment No. 200 ~ 238

SGT System 3.6.4.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. Two SGT subsystems E.1 Initiate action to suspend Immediately inoperable during OPDRVs.

OPDRVs.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.3.1 Operate each SGT subsystem for 2 10 continuous In accordance hours with heaters operating. with the Surveillance Frequency Control Program SR 3.6.4.3.2 Perform required SGT filter testing in accordance In accordance with the Ventilation Filter Testing Program (VFTP). with the VFTP SR 3.6.4.3.3 Verify each SGT subsystem actuates on an actual In accordance or simulated initiation signal. with the Surveillance Frequency Control Program SR 3.6.4.3.4 Verify each SGT filter cooling recirculation valve can In accordance be opened and the fan started. with the Surveillance Frequency Control Program Columbia Generating Station 3.6.4.3-2 Amendment No. ~.+99 22§ 238

SW System and UHS 3.7.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 --------------NO TE---------------

associated Completion LCO 3.0.4.a is not Time of Condition B not applicable when entering met. MODE 3.


---- -----------------------------

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not AND met.

D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR Both SW subsystems inoperable.

OR UHS inoperable for reasons other than Condition A.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.1.1 Verify the average water level in the UHS spray In accordance ponds is ~ 432 feet 9 inches mean sea level. with the Surveillance Frequency Control Program SR 3.7.1.2 Verify the average water temperature of each UHS In accordance spray pond is::;; 77°F. with the Surveillance Frequency Control Program Columbia Generating Station 3.7.1-2 Amendment No. +49,169,225,2:3:3,2:36 238

SW System and UHS 3.7.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.1.3 -------------------------------NOTE------------------------------

lsolation of flow to individual components does not render SW subsystem inoperable.

Verify each SW subsystem manual, power In accordance operated, and automatic valve in the flow path with the servicing safety related systems or components, Surveillance that is not locked, sealed, or otherwise secured in Frequency position, is in the correct position. Control Program SR 3.7.1.4 Verify average sediment depth in each UHS spray In accordance pond is < 0.5 ft. with the Surveillance Frequency Control Program SR 3.7.1.5 Verify each SW subsystem actuates on an actual or In accordance simulated initiation signal. with the Surveillance Frequency Control Program Columbia Generating Station 3.7.1-3 Amendment No. 149,169,225,236 238

HPCS SW System 3.7.2

3. 7 PLANT SYSTEMS 3.7.2 High Pressure Core Spray (HPCS) Service Water (SW) System LCO 3.7.2 The HPCS SW System shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. HPCS SW System A.1 Declare HPCS System Immediately inoperable. inoperable.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.2.1 ----- ---- ---- ---- ------- ---- ---N 0 TE------------ --- ---- ---- ---- ---

lso Ia tio n of flow to individual components does not render HPCS SW System inoperable.

Verify each HPCS SW System manual, power In accordance operated, and automatic valve in the flow path, that with the is not locked, sealed, or otherwise secured in Surveillance position, is in the correct position. Frequency Control Program SR 3.7.2.2 Verify the HPCS SW System actuates on an actual In accordance or simulated initiation signal. with the Surveillance Frequency Control Program Columbia Generating Station 3.7.2-1 Amendment No. +49,+e9 22§ 238

CREF System 3.7.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Operate each CREF subsystem for ~ 1O continuous In accordance hours with the heaters operating. with the Surveillance Frequency Control Program SR 3.7.3.2 Perform required CREF filter testing in accordance In accordance with the Ventilation Filter Testing Program (VFTP). with the VFTP SR 3.7.3.3 Verify each CREF subsystem actuates on an actual In accordance or simulated initiation signal. with the Surveillance Frequency Control Program SR 3.7.3.4 Perform required CRE unfiltered air inleakage In accordance testing in accordance with the Control Room with the Control Envelope Habitability Program. Room Envelope Habitability Program Columbia Generating Station 3.7.3-3 Amendment No . .:t--99,207 225 238

Control Room AC System 3.7.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Place OPERABLE control Immediately associated Completion room AC subsystem in Time of Condition A not operation.

met during OPDRVs.

OR D.2 Initiate action to suspend Immediately OPDRVs.

E. Required Action and E.1 Initiate action to suspend Immediately associated Completion OPDRVs.

Time of Condition B not met during OPDRVs.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.4.1 Verify each control room AC subsystem has the In accordance capability to remove the assumed heat load. with the Surveillance Frequency Control Program Columbia Generating Station 3.7.4-2 Amendment No. 169,199,225,227,236 238

Main Condenser Offgas 3.7.5 SURVEILLANCE REQUIR5EMENTS SURVEILLANCE FREQUENCY SR 3.7.5.1 ------------- ---- ------- -------N 0 TE--------------------------- ---

Not required to be performed until 31 days after any main steam line not isolated and SJAE in operation.

Verify the gross gamma activity rate of the noble gases is ~ 332 mCi/second after decay of In accordance 30 minutes. with the Surveillance Frequency Control Program Once within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after a

~ 50% increase in the nominal steady state fission gas release after factoring out increases due to changes in THERMAL POWER level Columbia Generating Station 3.7.5-2 Amendment No. +49,-+W ~ 238

Main Turbine Bypass System 3.7.6

3. 7 PLANT SYSTEMS 3.7.6 Main Turbine Bypass System LCO 3.7.6 The Main Turbine Bypass System shall be OPERABLE.

LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for an inoperable Main Turbine Bypass System, as specified in the COLR, are made applicable.

APPLICABILITY: THERMAL POWER 2 25% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Requirements of the A.1 Satisfy the requirements of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> LCO not met. the LCO.

B. Required Action and B.1 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion POWER to< 25% RTP.

Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.6.1 Verify one complete cycle of each main turbine In accordance bypass valve. with the Surveillance Frequency Control Program Columbia Generating Station 3.7.6-1 Amendment No. +49,+e9 225 238

Main Turbine Bypass System 3.7.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.6.2 Perform a system functional test. In accordance with the Surveillance Frequency Control Program SR 3.7.6.3 Verify the TURBINE BYPASS SYSTEM In accordance RESPONSE TIME is within limits. with the Surveillance Frequency Control Program Columbia Generating Station 3.7.6-2 Amendment No. 238

Spent Fuel Storage Pool Water Level 3.7.7 3.7 PLANT SYSTEMS 3.7.7 Spent Fuel Storage Pool Water Level LCO 3.7.7 The spent fuel storage pool water level shall be~ 22 ft over the top of irradiated fuel assemblies seated in the spent fuel storage pool racks.

APPLICABILITY: During movement of irradiated fuel assemblies in the spent fuel storage pool.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Spent fuel storage pool A.1 ------------- --N 0 TE------------ --

water level not within L CO 3.0.3 is not applicable.

limit.

Suspend movement of Immediately irradiated fuel assemblies in the spent fuel storage pool.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.7.1 Verify the spent fuel storage pool water level is In accordance

~ 22 ft over the top of irradiated fuel assemblies with the seated in the spent fuel storage pool racks. Surveillance Frequency Control Program Columbia Generating Station 3.7.7-1 Amendment No. +49,-+W 2aa 238

AC Sources - Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME F. Required Action and F.1 ---------------NOTE--------------

associated Completion LCO 3.0.4.a is not Time of Condition A, B, applicable when entering C, D, or E not met. MODE 3.


---- ---- ---- ---- ------- ---- ---- -

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> G. Three or more required G.1 Enter LCO 3.0.3. Immediately AC sources inoperable.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and indicated In accordance with power availability for each offsite circuit. the Surveillance Frequency Control Program SR 3.8.1.2 ------------------------------NOTES----------------------------

1. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
2. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer. When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1. 7 must be met.

Verify each required DG starts from standby In accordance with conditions and achieves steady state: the Surveillance Frequency Control

a. Voltage 2". 3910 V and ~ 4400 V and frequency Program 2". 58 .8 Hz and ~ 61.2 Hz for DG-1 and DG-2; and
b. Voltage 2". 3910 V and ~ 4400 V and frequency 2". 58.8 Hz and~ 61.2 Hz for DG-3.

Columbia Generating Station 3.8.1-5 Amendment No. 169,181,225,236 238

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.3 ------------------------------N 0 TES-----------------------------

1. DG loadings may include gradual loading as recommended by the manufacturer.
2. Momentary transients outside the load range do not invalidate this test.
3. This Surveillance shall be conducted on only one DG at a time.
4. This SR shall be preceded by, and immediately follow, without shutdown, a successful performance of SR 3.8.1.2 or SR 3.8.1.7.
5. The endurance test of SR 3.8.1 .14 may be performed in lieu of the load-run test in SR 3.8.1.3 provided the requirements, except the upper load limits, of SR 3.8.1.3 are met.

Verify each required DG is synchronized and loaded In accordance and operates for;:::: 60 minutes at a load ;:::: 4000 kW with the and :s; 4400 kW for DG-1 and DG-2, and ;:::: 2340 kW Surveillance and :s; 2600 kW for DG-3. Frequency Control Program SR 3.8.1.4 Verify each required day tank contains fuel oil to In accordance support greater than or equal to one hour of with the operation at full load plus 10%. Surveillance Frequency Control Program SR 3.8.1.5 Check for and remove accumulated water from each In accordance required day tank. with the Surveillance Frequency Control Program Columbia Generating Station 3.8.1-6 Amendment No. ~.a+a ~ 238

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.6 Verify each required fuel oil transfer subsystem In accordance operates to automatically transfer fuel oil from the with the storage tank to the day tank. Surveillance Frequency Control Program SR 3.8.1.7 -------------------------------N 0 TE----------------- -- ---- ---- ---

All DG starts may be preceded by an engine prelube period.

Verify each required DG starts from standby In accordance condition and achieves: with the Surveillance

a. For DG-1 and DG-2 in s 15 seconds, voltage Frequency z 3910 V and frequency z 58.8 Hz, and after Control Program steady state conditions are reached, maintains voltage z 3910 V and s 4400 V and frequency z 58.8 Hz ands 61.2 Hz; and
b. For DG-3, in s 15 seconds, voltage z 3910 V and frequency z 58.8 Hz, and after steady state conditions are reached, maintains voltage z 3910 V and s 4400 V and frequency z 58.8 Hz ands 61.2 Hz.

SR 3.8.1.8 -------------------------------N 0 TE--------------------------- ---

The automatic transfer function of this Surveillance shall not normally be performed in MODE 1 or 2.

However, this Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.

Verify automatic and manual transfer of the power In accordance supply to safety related buses from the startup with the offsite circuit to the backup offsite circuit. Surveillance Frequency Control Program Columbia Generating Station 3.8.1-7 Amendment No . .+s+,204 225 238

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.9 ------------------------------NOTES-----------------------------

1 . Credit may be taken for unplanned events that satisfy this SR.

2. If performed with the DG synchronized with offsite power, it shall be performed at a power factor as close to the power factor of the single largest post-accident load as practicable.

However, if grid conditions do not permit, the power factor limit is not required to be met.

Under this condition, the power factor shall be maintained as close to the limit as practicable.

Verify each required DG rejects a load greater than In accordance or equal to its associated single largest post- with the accident load, and following load rejection, the Surveillance frequency is:::::; 66.75 Hz. Frequency Control Program SR 3.8.1.10 ------------------------------NOTES-----------------------------

1. Credit may be taken for unplanned events that satisfy this SR.
2. If performed with the DG synchronized with offsite power, it shall be performed at a power factor of : : :; 0.9 for DG-1 and DG-2, and : : :; 0.91 for DG-3. However, if grid conditions do not permit, the power factor limit is not required to be met. Under this condition, the power factor shall be maintained as close to the limit as practicable.

Verify each required DG does not trip and voltage is In accordance maintained:::::; 4784 V during and following a load with the rejection of a load 2': 4400 kW for DG-1 and DG-2 Surveillance and 2': 2600 kW for DG-3. Frequency Control Program Columbia Generating Station 3.8.1-8 Amendment No. aw,2G4 22§ 238

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.11 ------------------------------NOTES-----------------------------

1. All DG starts may be preceded by an engine prelube period.
2. This Surveillance shall not normally be performed in MODE 1, 2, or 3 (not applicable to DG-3). However, portions of the Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.

Verify on an actual or simulated loss of offsite power In accordance signal: with the Surveillance

a. De-energization of emergency buses; Frequency Control Program
b. Load shedding from emergency buses for Divisions 1 and 2; and
c. DG auto-starts from standby condition and:
1. energizes permanently connected loads in ~ 15 seconds for DG-1 and DG-2, and in ~ 18 seconds for DG-3,
2. energizes auto-connected shutdown loads,
3. maintains steady state voltage 2'. 3910 Vand ~4400 V,
4. maintains steady state frequency 2'. 58.8 Hz and ~ 61.2 Hz, and
5. supplies permanently connected and auto-connected shutdown loads for 2'. 5 minutes.

Columbia Generating Station 3.8.1-9 Amendment No. 2W,~ ~ 238

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.12 ------------------------------NOTES-----------------------------

1. All DG starts may be preceded by an engine prelube period.
2. This Surveillance shall not normally be performed in MODE 1 or 2 (not applicable to DG-3). However, portions of the Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.

Verify on an actual or simulated Emergency Core In accordance Cooling System (ECCS) initiation signal each with the required DG auto-starts from standby condition and: Surveillance Frequency

a. For DG-1 and DG-2, ins 15 seconds achieves Control Program voltage 2 3910 V, and after steady state conditions are reached, maintains voltage 2 3910 V and s 4400 V and, for DG-3, in s 15 seconds achieves voltage 2 3910 V, and after steady state conditions are reached, maintains voltage 2 391 O V and s 4400 V;
b. In s 15 seconds, achieves frequency 2 58.8 Hz and after steady state conditions are achieved, maintains frequency 2 58.8 Hz ands 61.2 Hz;
c. Operates for 2 5 minutes;
d. Permanently connected loads remain energized from the offsite power system; and
e. Emergency loads are auto-connected to the offsite power system.

Columbia Generating Station 3.8.1-10 Amendment No. ~.2G4 ~ 238

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.13 ----- ---- ---- ---- ------- -------N 0 TE--------------------------- ---

Credit may be taken for unplanned events that satisfy this SR.

Verify each required DG's automatic trips are In accordance bypassed on an actual or simulated ECCS initiation with the signal except: Surveillance Frequency

a. Engine overspeed; Control Program
b. Generator differential current; and
c. Incomplete starting sequence.

SR 3.8.1.14 --------- ---- ---- -------------NO TES-------------------------- ---

1. Momentary transients outside the load, excitation current, and power factor ranges do not invalidate this test.
2. Credit may be taken for unplanned events that satisfy this SR.
3. If performed with the DG synchronized with offsite power, it shall be performed at a power factor of~ 0.9 for DG-1 and DG-2, and~ 0.91 for DG-3. However, if grid conditions do not permit, the power factor limit is not required to be met. Under this condition, the power factor shall be maintained as close to the limit as practicable.

Verify each required DG operates for 2 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s: In accordance with the

a. For 2 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded 2 4650 kW for DG-1 and Surveillance DG-2, and 2 2850 kW for DG-3; and Frequency Control Program
b. For the remaining hours of the test loaded 2 4400 kW for DG-1 and DG-2, and 2 2600 kW for DG-3.

Columbia Generating Station 3.8.1-11 Amendment No. +8+,:w4 ~ 238

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.15 ------------------------------NOTES-----------------------------

1. This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated 2 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> loaded 2 4000 kW for DG-1 and DG-2, and 2 2340 kW for DG-3.

Momentary transients outside of load range do not invalidate this test.

2. All DG starts may be preceded by an engine prelube period.

Verify each required DG starts and achieves: In accordance with the

a. For DG-1 and DG-2, in s 15 seconds, voltage Surveillance 2 391 O V and frequency 2 58.8 Hz, and after Frequency steady state conditions are reached, maintains Control Program voltage 2 391 O V and s 4400 V and frequency 2 58.8 Hz ands 61.2 Hz; and
b. For DG-3, in s 15 seconds, voltage 2 3910 V and frequency 2 58.8 Hz, and after steady state conditions are reached, maintains voltage 2 3910 V and s 4400 V and frequency 2 58.8 Hz ands 61.2 Hz.

Columbia Generating Station 3.8.1-12 Amendment No. 2W,2M 226 238

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.16 -------------------------------NOTE------------------------------

Th is Surveillance shall not normally be performed in MODE 1, 2, or 3 (not applicable to DG-3). However, this Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced.

Credit may be taken for unplanned events that satisfy this SR.

Verify each required DG: In accordance with the

a. Synchronizes with offsite power source while Surveillance loaded with emergency loads upon a simulated Frequency restoration of offsite power; Control Program
b. Transfers loads to offsite power source; and
c. Returns to ready-to-load operation.

SR 3.8.1.17 -------------------------------NOTE------------------------------

Credit may be taken for unplanned events that satisfy this SR.

Verify, with a DG operating in test mode and In accordance connected to its bus, an actual or simulated ECCS with the initiation signal overrides the test mode by: Surveillance Frequency

a. Returning DG to ready-to-load operation; and Control Program
b. Automatically energizing the emergency load from offsite power.

Columbia Generating Station 3.8.1-13 Amendment No. 2-W,204 225 238

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.18 -------------------------------NOTE------------------------------

This Surveillance shall not normally be performed in MODE 1, 2, or 3. However, this Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.

Verify interval between each sequenced load block In accordance is within +/- 10% of design interval for each time delay with the relay. Surveillance Frequency Control Program Columbia Generating Station 3.8.1-14 Amendment No. 2W,2G4 ~ 238

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.19 ------------------------------NOTES-----------------------------

1. All DG starts may be preceded by an engine prelube period.
2. This Surveillance shall not normally be performed in MODE 1, 2, or 3 (not applicable to DG-3). However, portions of the Surveillance may be performed to re-establish OPERABILITY provided an assessment determines the safety of the plant is maintained or enhanced. Credit may be taken for unplanned events that satisfy this SR.

Verify, on an actual or simulated loss of offsite In accordance power signal in conjunction with an actual or with the simulated ECCS initiation signal: Surveillance Frequency

a. De-energization of emergency buses; Control Program
b. Load shedding from emergency buses for DG-1 and DG-2; and
c. DG auto-starts from standby condition and:
1. energizes permanently connected loads in s 15 seconds,
2. energizes auto-connected emergency loads,
3. maintains steady state voltage 2:'. 3910 V ands 4400 V,
4. maintains steady state frequency 2:'. 58.8 Hz ands 61.2 Hz, and
5. supplies permanently connected and auto-connected emergency loads for 2:'. 5 minutes.

Columbia Generating Station 3.8.1-15 Amendment No. 2W,204 225 238

AC Sources - Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.20 --------- ---- ----------- ---- ---N 0 TE------------ --- ---- ---- ---- ---

All DG starts may be preceded by an engine prelube period.

Verify, when started simultaneously from standby In accordance condition, DG-1 and DG-2 achieves, in with the

15 seconds, voltage
:::: 391 O V and frequency Surveillance
58.8 Hz, and DG-3 achieves, in :::;: 15 seconds, Frequency voltage ::::: 391 O V and frequency ::::: 58.8 Hz. Control Program Columbia Generating Station 3.8.1-16 Amendment No. 2:G4 22§ 238

Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. One or more DGs with E.1 Restore required starting air 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> required starting air receiver pressure to within receiver pressure: limit.

1. For DG-1 and DG-2,

< 230 psig and

~ 150 psig; and

2. For DG-3, < 223 psig and ~ 150 psig.

F. Required Action and F.1 Declare associated DG Immediately associated Completion inoperable.

Time of Condition A, B, C, D, or E not met.

OR One or more DGs with stored diesel fuel oil, lube oil, or starting air subsystem not within limits for reasons other than Condition A, B, C, D, or E.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.3.1 Verify each fuel oil storage subsystem contains In accordance greater than or equal to a seven day supply of fuel. with the Surveillance Frequency Control Program Columbia Generating Station 3.8.3-2 Amendment No. +w,a+-9 ~ 238

Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.3.2 Verify lube oil inventory is greater than or equal to a In accordance seven day supply. with the Surveillance Frequency Control Program SR 3.8.3.3 Verify fuel oil properties of new and stored fuel oil In accordance are tested in accordance with, and maintained within with the Diesel the limits of, the Diesel Fuel Oil Testing Program. Fuel Oil Testing Program SR 3.8.3.4 Verify each required DG air start receiver pressure In accordance is: with the Surveillance

a. :2'. 230 psig for DG-1 and DG-2; and Frequency Control Program
b. :2'. 223 psig for DG-3.

SR 3.8.3.5

  • Check for and remove accumulated water from each In accordance fuel oil storage tank. with the Surveillance Frequency Control Program Columbia Generating Station 3.8.3-3 Amendment No . ..f.69.,2-+e 2aa 238

DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is greater than or In accordance equal to the minimum established float voltage. with the Surveillance Frequency Control Program SR 3.8.4.2 Verify each required battery charger supplies the In accordance required load for;:?: 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> at: with the Surveillance

a.  ;:?: 126 V for the 125 V battery chargers; and Frequency Control Program
b.  ;:?: 252 V for the 250 V battery charger.

SR 3.8.4.3 ------------------------------NOTES-----------------------------

1. The modified performance discharge test in SR 3.8.6.6 may be performed in lieu of SR 3.8.4.3.
2. This Surveillance shall not be performed in MODE 1, 2, or 3 for the Division 1 and 2 125 V DC batteries. However, credit may be taken for unplanned events that satisfy this SR.

Verify battery capacity is adequate to supply, and In accordance maintain in OPERABLE status, the required with the emergency loads for the design duty cycle when Surveillance subjected to a battery service test. Frequency Control Program Columbia Generating Station 3.8.4-4 Amendment +s9,2G4 ~ 238

Battery Parameters 3.8.6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME F. One or more batteries F.1 Declare associated battery Immediately with a required battery inoperable.

parameter not met for reasons other than Condition A, B, C, D, or E.

OR Required Action and associated Completion Time of Condition A, B, C, D, or E not met.

OR One or more batteries with one or more battery cell(s) float voltage

< 2.07 V and float current> 2 amps.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.6.1 -------------------------------NOTE------------------------------

Not required to be met when battery terminal voltage is less than the minimum established float voltage of SR 3.8.4.1.

Verify each battery float current is~ 2 amps. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.8.6-3 Amendment +69,2G4 22a 238

Battery Parameters 3.8.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.6.2 Verify each battery pilot cell voltage is ~ 2.07 V. In accordance with the Surveillance Frequency Control Program SR 3.8.6.3 Verify each battery connected cell electrolyte level is In accordance greater than or equal to minimum established with the design limits. Surveillance Frequency Control Program SR 3.8.6.4 Verify each battery pilot cell temperature is greater In accordance than or equal to minimum established design limits. with the Surveillance Frequency Control Program SR 3.8.6.5 Verify each battery connected cell voltage is In accordance

~ 2.07 V. with the Surveillance Frequency Control Program Columbia Generating Station 3.8.6-4 Amendment +e-9,294 ~ 238

Battery Parameters 3.8.6 SURVEILLANCE FREQUENCY SR 3.8.6.6 -------------------------------N 0 TE------------------------------

Th is Surveillance shall not be performed in MODE 1 , 2, or 3 for the Division 1 and 2 125 V DC batteries. However, credit may be taken for unplanned events that satisfy this SR.

Verify battery capacity is ~ 80% of the In accordance manufacturer's rating for the 125 V batteries and with the

83.4% of the manufacturer's rating for the 250 V Surveillance battery, when subjected to a performance discharge Frequency test or a modified performance discharge test. Control Program 12 months when battery shows degradation or has reached 85%

of expected life with capacity

< 100% of manufacturer's rating 24 months when battery has reached 85% of the expected life with capacity

~ 100% of manufacturer's rating Columbia Generating Station 3.8.6-5 Amendment 238

Distribution Systems - Operating 3.8.7 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 ---------------NOTE--------------

associated Completion LCO 3.0.4.a is not Time of Condition A or B applicable when entering not met. MODE 3.

Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> D. Division 1 250 V DC D.1 Declare associated Immediately electrical power supported feature(s) distribution subsystem inoperable.

inoperable.

E. One or more Division 3 E.1 Declare High Pressure Immediately AC or DC electrical Core Spray System power distribution inoperable.

subsystems inoperable.

F. Two or more divisions F.1 Enter LCO 3.0.3. Immediately with inoperable electrical power distribution subsystems that result in a loss of function.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.7.1 Verify correct breaker alignments and indicated In accordance power availability to required AC and DC electrical with the power distribution subsystems. Surveillance Frequency Control Program Columbia Generating Station 3.8.7-2 Amendment No. 149,169,225,236 238

Distribution Systems - Shutdown 3.8.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.8.1 Verify correct breaker alignments and indicated In accordance power availability to required AC and DC electrical with the power distribution subsystems. Surveillance Frequency Control Program Columbia Generating Station 3.8.8-2 Amendment +e9,+w 2ae 238

Refueling Equipment Interlocks 3.9.1 3.9 REFUELING OPERATIONS 3.9.1 Refueling Equipment Interlocks LCO 3.9.1 The refueling equipment interlocks associated with the refuel position shall be OPERABLE.

APPLICABILITY: During in-vessel fuel movement with equipment associated with the interlocks when the reactor mode switch is in the refuel position.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Suspend in-vessel fuel Immediately refueling equipment movement with equipment interlocks inoperable. associated with the inoperable interlock(s).

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.1.1 Perform CHANNEL FUNCTIONAL TEST on each of In accordance the following required refueling equipment interlock with the inputs: Surveillance Frequency

a. All-rods-in, Control Program
b. Refueling platform position,
c. Refueling platform fuel grapple fuel-loaded,
d. Refueling platform frame-mounted hoist fuel-loaded, and
e. Refueling platform trolley-mounted hoist fuel-loaded.

Columbia Generating Station 3.9.1-1 Amendment +49,+69 ~ 238

Refuel Position One-Rod-Out Interlock 3.9.2 3.9 REFUELING OPERATIONS 3.9.2 Refuel Position One-Rod-Out Interlock LCO 3.9.2 The refuel position one-rod-out interlock shall be OPERABLE.

APPLICABILITY: MODE 5 with the reactor mode switch in the refuel position and any control rod withdrawn.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Refuel position one-rod- A.1 Suspend control rod Immediately out interlock inoperable. withdrawal.

AND A.2 Initiate action to fully insert Immediately all insertable control rods in core cells containing one or more fuel assemblies.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.2.1 Verify reactor mode switch locked in refuel position. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.9.2-1 Amendment +49,+09 ~ 238

Refuel Position One-Rod-Out Interlock 3.9.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.2.2 --------------------- ----------N 0 TE--------------------------- ---

Not required to be performed until 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after any control rod is withdrawn.

Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.9.2-2 Amendment 238

Control Rod Position 3.9.3 3.9 REFUELING OPERATIONS 3.9.3 Control Rod Position LCO 3.9.3 All control rods shall be fully inserted.

APPLICABILITY: When loading fuel assemblies into the core.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more control A.1 Suspend loading fuel Immediately rods not fully inserted. assemblies into the core.

SURVEILLANCE REQUIREMENTS SURVEILLANCE .FREQUENCY SR 3.9.3.1 Verify all control rods are fully inserted. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.9.3-1 Amendment +49,+eB ~ 238

Control Rod OPERABILITY - Refueling 3.9.5 3.9 REFUELING OPERATIONS 3.9.5 Control Rod OPERABILITY - Refueling LCO 3.9.5 Each withdrawn control rod shall be OPERABLE.

APPLICABILITY: MODE 5.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more withdrawn A.1 Initiate action to fully insert Immediately control rods inoperable. inoperable withdrawn control rods.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.5.1 -------------------------------N 0 TE------------------------------

Not required to be performed until 7 days after the control rod is withdrawn.

Insert each withdrawn control rod at least one notch. In accordance with the Surveillance Frequency Control Program SR 3.9.5.2 Verify each withdrawn control rod scram In accordance accumulator pressure is;;::: 940 psig. with the Surveillance Frequency Control Program Columbia Generating Station 3.9.5-1 Amendment +49,+e9 22-§ 238

RPV Water Level - Irradiated Fuel 3.9.6 3.9 REFUELING OPERATIONS 3.9.6 Reactor Pressure Vessel (RPV) Water Level - Irradiated Fuel LCO 3.9.6 RPV water level shall be ~ 22 ft above the top of the RPV flange.

APPLICABILITY: During movement of irradiated fuel assemblies within the RPV.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RPV water level not A.1 Suspend movement of Immediately within limit. irradiated fuel assemblies within the RPV.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.6.1 Verify RPV water level is~ 22 ft above the top of the In accordance RPV flange. with the Surveillance Frequency Control Program Columbia Generating Station 3.9.6-1 Amendment .:t-49,+e9 2ae 238

RPV Water Level - New Fuel or Control Rods 3.9.7 3.9 REFUELING OPERATIONS 3.9.7 Reactor Pressure Vessel (RPV) Water Level - New Fuel or Control Rods LCO 3.9.7 RPV water level shall be::?: 23 ft above the top of irradiated fuel assemblies seated within the RPV.

APPLICABILITY: During movement of new fuel assemblies or handling of control rods within the RPV when irradiated fuel assemblies are seated within the RPV.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RPV water level not A.1 Suspend movement of new Immediately within limit. fuel assemblies and handling of control rods within the RPV.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.7.1 Verify RPV water level is::?: 23 ft above the top of In accordance irradiated fuel assemblies seated within the RPV. with the Surveillance Frequency Control Program Columbia Generating Station 3.9.7-1 Amendment .:t-69,.+99 ~ 238

RHR - High Water Level 3.9.8 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) 8.3 Initiate action to restore one Immediately standby gas treatment subsystem to OPERABLE status.

AND 8.4 Initiate action to restore Immediately isolation capability in each required secondary containment penetration flow path not isolated.

C. No RHR shutdown C.1 Verify reactor coolant 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery cooling subsystem in circulation by an alternate of no reactor coolant operation. method. circulation AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND C.2 Monitor reactor coolant Once per hour temperature.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.8.1 Verify one RHR shutdown cooling subsystem is In accordance operating. with the Surveillance Frequency Control Program Columbia Generating Station 3.9.8-2 Amendment +49,+e9 ~ 238

RHR - Low Water Level 3.9.9 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.3 Initiate action to restore Immediately isolation capability in each required secondary containment penetration flow path not isolated.

C. No RHR shutdown C.1 Verify reactor coolant 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery cooling subsystem in circulation by an alternate of no reactor coolant operation. method. circulation AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND C.2 Monitor reactor coolant Once per hour temperature.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.9.1 Verify one RHR shutdown cooling subsystem is In accordance operating. with the Surveillance Frequency Control Program Columbia Generating Station 3.9.9-2 Amendment +49,+&9 ~ 238

Reactor Mode Switch Interlock Testing 3.10.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A .3 .2 ---------------NOTE--------------

On ly applicable in MODE 5.

Place the reactor mode 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> switch in the refuel position.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.2.1 Verity all control rods are fully inserted in core cells In accordance containing one or more fuel assemblies. with the Surveillance Frequency Control Program SR 3.10.2.2 Verity no CORE ALTERATIONS are in progress. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.10.2-2 Amendment +49,+w 22a 238

Single Control Rod Withdrawal - Hot Shutdown 3.10.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.3.2 -------------------------------NO TE--------------------------- -- -

Not required to be met if SR 3.10.3.1 is satisfied for LCO 3.10.3.d.1 requirements.

Verify all control rods, other than the control rod In accordance being withdrawn, in a five by five array centered on with the the control rod being withdrawn, are disarmed. Surveillance Frequency Control Program SR 3.10.3.3 Verify all control rods, other than the control rod In accordance being withdrawn, are fully inserted. with the Surveillance Frequency Control Program Columbia Generating Station 3.10.3-3 Amendment +49,+w 22-a 238

Single Control Rod Withdrawal - Cold Shutdown 3.10.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.2.2 Initiate action to satisfy the Immediately requirements of this LCO.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.4.1 Perform the applicable SRs for the required LCOs. According to the applicable SRs SR 3.10.4.2 -------------------------------N 0 TE ------------ ------------------

Not required to be met if SR 3.10.4.1 is satisfied for LCO 3.10.4.c.1 requirements.

Verify all control rods, other than the control rod In accordance being withdrawn, in a five by five array centered on with the the control rod being withdrawn, are disarmed. Surveillance Frequency Control Program SR 3.10.4.3 Verify all control rods, other than the control rod In accordance being withdrawn, are fully inserted. with the Surveillance Frequency Control Program SR 3.10.4.4 -------------------------------NO TE-------------------- --------- -

Not required to be met if SR 3.10.4.1 is satisfied for LCO 3.10.4.b.1 requirements.

Verify a control rod withdrawal block is inserted. In accordance with the Surveillance Frequency Control Program Columbia Generating Station 3.10.4-3 Amendment +49,-+S9 ~ 238

Single CRD Removal - Refueling 3.10.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.5.1 Verify all control rods, other than the control rod In accordance withdrawn for the removal of the associated CRD, with the are fully inserted. Surveillance Frequency Control Program SR 3.10.5.2 Verify all control rods, other than the control rod In accordance withdrawn for the removal of the associated CRD, in with the a five by five array centered on the control rod Surveillance withdrawn for the removal of the associated CRD, Frequency are disarmed. Control Program SR 3.10.5.3 Verify a control rod withdrawal block is inserted. In accordance with the Surveillance Frequency Control Program SR 3.10.5.4 Perform SR 3.1 .1 .1. According to SR3.1.1.1 SR 3.10.5.5 Verify no other CORE ALTERATIONS are in In accordance progress. with the Surveillance Frequency Control Program Columbia Generating Station 3.10.5-2 Amendment ..:t-49,+69 ~ 238

Multiple Control Rod Withdrawal - Refueling 3.10.6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.3.1 Initiate action tc;> fully insert Immediately all control rods in core cells containing one or more fuel assemblies.

A.3.2 Initiate action to satisfy the Immediately requirements of this LCO.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.6.1 Verify the four fuel assemblies are removed from In accordance core cells associated with each control rod or CRD with the removed. Surveillance Frequency Control Program SR 3.10.6.2 Verify all other control rods in core cells containing In accordance one or more fuel assemblies are fully inserted. with the Surveillance Frequency Control Program SR 3.10.6.3 ------------- ------------------NOTE--------------- -------- ---- ---

Only required to be met during fuel loading.

Verify fuel assemblies being loaded are in In accordance compliance with an approved spiral reload with the sequence. Surveillance Frequency Control Program Columbia Generating Station 3.10.6-2 Amendment +49,+e9 22.a 238

SDM Test - Refueling (After Implementation of PRNM Upgrade) 3.10.8 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.8.3 --------- ---- ---- ---- --- ---- ---N 0 TE------------------------------

Not required to be met if SR 3.10.8.2 satisfied.

Verify movement of control rods is in compliance During control rod with the approved control rod sequence for the SDM movement test by a second licensed operator or other qualified member of the technical staff.

SR 3.10.8.4 Verify no other CORE ALTERATIONS are in In accordance progress. with the Surveillance Frequency Control Program SR 3.10.8.5 Verify each withdrawn control rod does not go to the Each time the withdrawn overtravel position. control rod is withdrawn to "full out" position Prior to satisfying LCO 3.10.8.c requirement after work on control rod or CRD System that could affect coupling SR 3.10.8.6 Verify CRD charging water header pressure In accordance

~ 940 psig. with the Surveillance Frequency Control Program Columbia Generating Station 3.10.8-7 Amendment No. +e9 ~ 226 238

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.14 Control Room Envelope Habitability Program A Control Room Envelope (CRE) Habitability Program shall be established and implemented to ensure that CRE habitability is maintained such that, with an OPERABLE Control Room Emergency Filtration (CREF) System, CRE occupants can control the reactor safely under normal conditions and maintain it in a safe condition following a radiological event, hazardous chemical release, or a smoke challenge. The program shall ensure that adequate radiation protection is provided to permit access and occupancy of the CRE under design basis accident (OBA) conditions without personnel receiving radiation exposures in excess of 5 rem total effective dose equivalent (TEDE) for the duration of the accident. The program shall include the following elements:

a. The definition of the CRE and the CRE boundary.
b. Requirements for maintaining the CRE boundary in its design condition including configuration control and preventive maintenance.
c. Requirements for (i) determining the unfiltered air inleakage past the CRE boundary into the CRE in accordance with the testing methods and at the Frequencies specified in Sections C.1 and C.2 of Regulatory Guide 1 .197, "Demonstrating Control Room Envelope Integrity at Nuclear Power Reactors,"

Revision 0, May 2003, and (ii) assessing CRE habitability at Frequencies specified in Sections C.1 and C.2 of Regulatory Guide 1.197, Revision 0.

d. Measurement, at designated locations, of the CRE pressure relative to all external areas adjacent to the CRE boundary during the pressurization mode of operation by one subsystem of the CREF System, operating at the flow rate required by the VFTP, at a Frequency of 24 months on a STAGGERED TEST BASIS. The results shall be trended and used as part of the 24 month assessment of the CRE boundary.
e. The quantitative limits on unfiltered air inleakage into the CRE. These limits shall be stated in a manner to allow direct comparison to the unfiltered air inleakage measured by the testing described in paragraph c. The unfiltered air inleakage limit for radiological challenges is the inleakage flow rate assumed in the licensing basis analyses for OBA consequences. Unfiltered air inleakage limits for hazardous chemicals must ensure that exposure of CRE occupants to these hazards will be within the assumptions in the licensing basis.
f. The provisions of SR 3.0.2 are applicable to the Frequencies for assessing CRE habitability, determining CRE unfiltered inleakage, and measuring CRE pressure and assessing the CRE boundary as required by paragraphs c and d, respectively.

Columbia Generating Station 5.5-11 Amendment 2G-7,a+e ~ 238 I

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.15 Surveillance Frequency Control Program This program provides controls for Surveillance Frequencies. The program shall ensure that Surveillance Requirements specified in the Technical Specifications are performed at intervals sufficient to assure the associated Limiting Conditions for Operation are met.

a. The Surveillance Frequency Control Program shall contain a list of Frequencies of those Surveillance Requirements for which the Frequency is controlled by the program.
b. Changes to the Frequencies listed in the Surveillance Frequency Control Program shall be made in accordance with NEI 04-10, "Risk-Informed Method for Control of Surveillance Frequencies," Revision 1.
c. The provisions of Surveillance Requirements 3.0.2 and 3.0.3 are applicable to the Frequencies established in the Surveillance Frequency Control Program.

Columbia Generating Station 5.5-12 Amendment 238

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 238 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-21 ENERGY NORTHWEST COLUMBIA GENERATING STATION DOCKET NO. 50-397

1.0 INTRODUCTION

By application dated March 17, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15093A178), Energy Northwest, the licensee, requested changes to the technical specifications (TSs) (Appendix A to Renewed Facility Operating License No. NPF-21) for the Columbia Generating Station (Columbia). The licensee requested to revise the Columbia TSs by relocating specific surveillance requirement (SR) frequencies to a licensee-controlled program. The licensee requested to revise the TSs to require that changes to such surveillance frequencies will be made in accordance with Nuclear Energy Institute (NEI) 04-10, Revision 1, "Risk-Informed Technical Specifications Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies," April 2007 (ADAMS Accession No. ML071360456). The requested change is the adoption of the U.S. Nuclear Regulatory Commission (NRC)-approved Technical Specification Task Force (TSTF) Standard Technical Specifications (STS) Change Traveler TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control-RITSTF [Risk-Informed TSTF] Initiative 5b" (ADAMS Accession No. ML090850642). The Federal Register (FR) notice published on July 6, 2009 (74 FR 31996), announced the availability of TSTF-425, Revision 3.

By e-mails dated August 12, 2015 (ADAMS Accession No. ML15224B646), November 3, 2015 (ADAMS Accession No. ML15307A825), March 9, 2016 (ADAMS Accession No. ML16069A359), and May 31, 2016 (ADAMS Accession No. ML16152A737), the NRC sent requests for additional information (RAls) to the licensee. By letters dated September 17, 2015 (ADAMS Accession No. ML15260A570), October 29, 2015 (ADAMS Accession No. ML15302A492), November 17, 2015 (ADAMS Accession No. ML15321A426), April 7, 2016 (ADAMS Accession No. ML16098A387), and June 22, 2016 (ADAMS Accession No. ML16174A432), the licensee responded to these requests. The letters provided clarifying information that did not expand the scope of the application and did not change the staffs original proposed no significant hazards consideration determination as published in the FR on May 24, 2015 (80 FR 30100).

Enclosure 2

2.0 REGULATORY EVALUATION

2.1 Description of the Proposed Changes The licensee proposed to modify the Columbia TSs by relocating specific surveillance frequencies to a licensee-controlled program (i.e., the Surveillance Frequency Control Program (SFCP)) in accordance with NEI 04-10, Revision 1. The licensee stated that the proposed change is consistent with the adoption of NRG-approved TSTF-425, Revision 3. When implemented, TSTF-425, Revision 3, relocates most periodic frequencies of TS surveillances to the SFCP, and provides requirements for the new SFCP in the Administrative Controls section of the TSs. All surveillance frequencies can be relocated except the following:

  • Frequencies that reference other approved programs for the specific interval, such as the lnservice Testing Program or the Primary Containment Leakage Rate Testing Program;
  • Frequencies that are purely event-driven (e.g., "each time the control rod is withdrawn to the 'full out' position");
  • Frequencies that are event-driven, but have a time component for performing the surveillance on a one-time basis once the event occurs (e.g., "within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after thermal power reaching~ 95% RTP"); and
  • Frequencies that are related to specific conditions (e.g., battery degradation, age and capacity) or conditions for the performance of a surveillance requirement (e.g., "drywell to suppression chamber differential pressure decrease").

The licensee proposed to add the SFCP to TS Section 5.0, "Administrative Controls,"

Subsection 5.5.15, "Surveillance Frequency Control Program." The SFCP describes the requirements for the program to control changes to the relocated surveillance frequencies. The TS Bases for each affected surveillance would be revised to state that the frequency is controlled under the SFCP. The proposed changes to the Administrative Controls section of the TSs to incorporate the SFCP include a specific reference to NEI 04-10, Revision 1, as the basis for making any changes to the surveillance frequencies once they are relocated out of the TSs.

In a letter dated September 19, 2007 (ADAMS Accession No. ML072570267), the NRC staff approved Topical Report NEI 04-10, Revision 1, as acceptable for referencing in licensing actions, to the extent specified and under the limitations delineated in NEI 04-10, Revision 1, and in the NRC staff's safety evaluation (SE) for NEI 04-10, Revision 1, dated September 19, 2007 (ADAMS Accession No. ML072570267).

The licensee proposed other changes and deviations from TSTF-425 which are discussed in Section 3.3 of this SE.

2.2 Applicable Commission Policy Statements In the "Final Policy Statement: Technical Specifications for Nuclear Power Plants," dated July 22, 1993 (58 FR 39132), the NRC addressed the use of Probabilistic Safety Analysis (PSA, currently referred to as Probabilistic Risk Assessment or PRA) in Standard Technical Specifications. In this 1993 publication, the NRC stated:

The Commission believes that it would be inappropriate at this time to allow requirements which meet one or more of the first three criteria [of Title 10 of the Code of Federal Regulations (10 CFR), Section 50.36] to be deleted from Technical Specifications based solely on probabilistic safety assessment (Criterion 4). However, if the results of PSA indicate that Technical Specifications can be relaxed or removed, a deterministic review will be performed ....

The Commission Policy in this regard is consistent with its Policy Statement on "Safety Goals for the Operation of Nuclear Power Plants," 51 FR 30028, published on August 21, 1986. The Policy Statement on Safety Goals states in part, "* *

  • probabilistic results should also be reasonably balanced and supported through use of deterministic arguments. In this way, judgments can be made * *
  • about the degree of confidence to be given these [probabilistic]

estimates and assumptions. This is a key part of the process for determining the degree of regulatory conservatism that may be warranted for particular decisions.

This defense-in-depth approach is expected to continue to ensure the protection of public health and safety."

The Commission will continue to use PSA, consistent with its policy on Safety Goals, as a tool in evaluating specific line-item improvements to Technical Specifications, new requirements, and industry proposals for risk-based Technical Specification changes.

Approximately 2 years later, the NRC provided additional detail concerning the use of PRA in the "Final Policy Statement: Use of Probabilistic Risk Assessment in Nuclear Regulatory Activities," dated August 16, 1995 (60 FR 42622). In this publication, the NRC stated:

The Commission believes that an overall policy on the use of PRA methods in nuclear regulatory activities should be established so that the many potential applications of PRA can be implemented in a consistent and predictable manner that would promote regulatory stability and efficiency. In addition, the Commission believes that the use of PRA technology in NRC regulatory activities should be increased to the extent supported by the state-of-the-art in PRA methods and data and in a manner that complements the NRC's deterministic approach ....

PRA addresses a broad spectrum of initiating events by assessing the event frequency. Mitigating system reliability is then assessed, including the potential for multiple and common cause failures. The treatment therefore goes beyond the single failure requirements in the deterministic approach. The probabilistic

approach to regulation is, therefore, considered an extension and enhancement of traditional regulation by considering risk in a more coherent and complete manner....

Therefore, the Commission believes that an overall policy on the use of PRA in nuclear regulatory activities should be established so that the many potential applications of PRA can be implemented in a consistent and predictable manner that promotes regulatory stability and efficiency. This policy statement sets forth the Commission's intention to encourage the use of PRA and to expand the scope of PRA applications in all nuclear regulatory matters to the extent supported by the state-of-the-art in terms of methods and data ....

Therefore, the Commission adopts the following policy statement regarding the expanded NRC use of PRA:

( 1) The use of PRA technology should be increased in all regulatory matters to the extent supported by the state-of-the-art in PRA methods and data and in a manner that complements the NRC's deterministic approach and supports the NRC's traditional defense-in-depth philosophy.

(2) PRA and associated analyses (e.g., sensitivity studies, uncertainty analyses, and importance measures) should be used in regulatory matters, where practical within the bounds of the state-of-the-art, to reduce unnecessary conservatism associated with current regulatory requirements, regulatory guides, license commitments, and staff practices. Where appropriate, PRA should be used to support the proposal for additional regulatory requirements in accordance with 10 CFR 50.109 (Backfit Rule). Appropriate procedures for including PRA in the process for changing regulatory requirements should be developed and followed. It is, of course, understood that the intent of this policy is that existing rules and regulations shall be complied with unless these rules and regulations are revised.

(3) PRA evaluations in support of regulatory decisions should be as realistic as practicable and appropriate supporting data should be publicly available for review.

(4) The Commission's safety goals for nuclear power plants and subsidiary numerical objectives are to be used with appropriate consideration of uncertainties in making regulatory judgments on the need for proposing and backfitting new generic requirements on nuclear power plant licensees.

2.3 Applicable Regulations In 10 CFR, Section 50.36, the NRC established its regulatory requirements related to the content of TSs. Pursuant to 1O CFR 50.36, TSs are required to include items in the following five specific categories related to station operation: (1) safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation; (3) SRs; (4) design features; and (5) administrative controls. These categories will remain in the Columbia TSs.

Paragraph 50.36(c)(3) of 10 CFR states, "Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met." The FR notice published on July 6, 2009 (74 FR 31996),

which announced the availability of TSTF-425, Revision 3, stated that the addition of the SFCP to the TSs provides the necessary administrative controls to require that surveillance frequencies relocated to the SFCP are conducted at a frequency to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met. The FR notice also states that changes to surveillance frequencies in the SFCP are made using the methodology contained in NEI 04-10, Revision 1, including qualitative considerations, results of risk analyses, sensitivity studies and any bounding analyses, and recommended monitoring of structures, systems, and components (SSCs), and are required to be documented.

Existing regulatory requirements, such as 10 CFR 50.65, "Requirements for monitoring the effectiveness of maintenance at nuclear power plants" (i.e., the Maintenance Rule), and 10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Action," require licensee monitoring of surveillance test failures and implementing corrective actions to address such failures. Such failures can result in the licensee increasing the frequency of a surveillance test. In addition, by having the TSs require that changes to the frequencies listed in the SFCP be made in accordance with NEI 04-10, Revision 1, the licensee will be required to monitor the performance of SSCs for which surveillance frequencies are decreased to assure reduced testing does not adversely impact the SSCs.

2.4 Applicable NRG Regulatory Guides Regulatory Guide (RG) 1.174, Revision 2, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis,"

May 2011 (ADAMS Accession No. ML100910006), describes an acceptable risk-informed approach for assessing the nature and impact of proposed permanent licensing-basis changes by considering engineering issues and applying risk insights. This regulatory guide also provides risk acceptance guidelines for evaluating the results of such evaluations.

RG 1.177, Revision 1, "An Approach for Plant-Specific, Risk-Informed Decisionmaking:

Technical Specifications," May 2011 (ADAMS Accession No. ML100910008), describes an acceptable risk-informed approach specifically for assessing proposed TS changes.

RG 1.200, Revision 2, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities," March 2009 (ADAMS Accession No. ML090410014), describes an acceptable approach for determining whether the quality of the PRA, in total or the parts that are used to support an application, is sufficient to provide confidence in the results, such that the PRA can be used in regulatory decisionmaking for light-water reactors (LWRs).

3.0 TECHNICAL EVALUATION

The licensee's adoption of TSTF-425, Revision 3, provides for administrative relocation of applicable surveillance frequencies to the SFCP, and provides for the addition of the SFCP to the Administrative Controls section of TSs. The changes to the Administrative Controls section of the TSs will also require the application of NEI 04-10, Revision 1, for any changes to surveillance frequencies within the SFCP. The licensee's application to implement the changes described in TSTF-425, Revision 3, included documentation regarding the PRA technical adequacy consistent with RG 1.200, Revision 2. NEI 04-10, Revision 1, states that PRA methods are used with plant performance data and other considerations to identify and justify modifications to the surveillance frequencies of equipment at nuclear power plants. This is consistent with guidance provided in RG 1.174, Revision 2, and RG 1.177, Revision 1, in support of changes to Surveillance Test Intervals.

3.1 Review Methodology RG 1.177, Revision 1, identifies five key safety principles required for risk-informed changes to TSs. Each of these principles is addressed by NEI 04-10, Revision 1.

3.1.1 The Proposed Change Meets Current Regulations Paragraph 50.36(c)(3) of 10 CFR requires that TSs include surveillances which are "requirements relating to test, calibration, or inspection to assure that necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met." The licensee is required by its TSs to perform surveillance tests, calibration, or inspection on specific safety-related equipment (e.g.,

reactivity control, power distribution, electrical, and instrumentation) to verify system operability.

Surveillance frequencies are based primarily upon deterministic methods such as engineering judgment, operating experience, and manufacturer's recommendations. The licensee's use of NRG-approved methodologies identified in NEI 04-10, Revision 1, provides a way to establish risk-informed surveillance frequencies that complements the deterministic approach and supports the NRC's traditional defense-in-depth philosophy.

The SRs themselves are remaining in the TSs, as required by 10 CFR 50.36(c)(3). This change is analogous with other NRG-approved TS changes in which the SRs are retained in TSs, but the related surveillance frequencies are relocated to licensee-controlled documents, such as surveillances performed in accordance with the lnservice Testing Program and the Primary Containment Leakage Rate Testing Program. Thus, this proposed change complies with 10 CFR 50.36(c)(3) by retaining the requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.

The regulatory requirements in 10 CFR 50.65, 10 CFR Part 50, Appendix B, and the monitoring required by NEI 04-10, Revision 1, ensure that surveillance frequencies are sufficient to assure that the requirements of 10 CFR 50.36 are satisfied, and that any performance deficiencies will be identified and appropriate corrective actions taken. The licensee's SFCP ensures that SRs specified in the TSs are performed at intervals sufficient to assure the above regulatory requirements are met. Based on the above, the NRC staff concludes that the proposed change

meets the first key safety principle of RG 1.177, Revision 1, by complying with current regulations.

3.1.2 The Proposed Change Is Consistent With the Defense-in-Depth Philosophy The defense-in-depth philosophy (i.e., the second key safety principle of RG 1.177, Revision 1),

is maintained if:

  • A reasonable balance is preserved among prevention of core damage, prevention of containment failure, and consequence mitigation.
  • Over-reliance on programmatic activities to compensate for weaknesses in plant design is avoided.
  • System redundancy, independence, and diversity are preserved commensurate with the expected frequency, consequences of challenges to the system, and uncertainties (e.g., no risk outliers). (Because the scope of the proposed methodology is limited to revision of surveillance frequencies, the redundancy, independence, and diversity of plant systems are not impacted.)
  • Defenses against potential common cause failures (CCFs) are preserved, and the potential for the introduction of new CCF mechanisms is assessed.
  • Independence of barriers is not degraded.
  • Defenses against human errors are preserved.

The changes to the Administrative Controls section of the TSs will require the application of NEI 04-10, Revision 1, for any changes to surveillance frequencies within the SFCP.

NEI 04-10, Revision 1, uses both the core damage frequency (CDF) and the large early release frequency (LERF) metrics to evaluate the impact of proposed changes to surveillance frequencies. The guidance of RG 1.174, Revision 2, and RG 1.177, Revision 1, for changes to CDF and LERF is achieved by evaluation using a comprehensive risk analysis, which assesses the impact of proposed changes including contributions from human errors and CCFs.

Defense-in-depth is also included in the methodology explicitly as a qualitative consideration outside of the risk analysis, as is the potential impact on detection of component degradation that could lead to an increased likelihood of CCFs. Therefore, the NRC staff concludes that both the quantitative risk analysis and the qualitative considerations assure a reasonable balance of defense-in-depth is maintained to ensure protection of public health and safety, satisfying the second key safety principle of RG 1.177, Revision 1.

3.1.3 The Proposed Change Maintains Sufficient Safety Margins The engineering evaluation that will be conducted by the licensee under the SFCP when frequencies are revised will assess the impact of the proposed frequency change to assure that

sufficient safety margins are maintained. The guidelines used for making that assessment will include ensuring the proposed surveillance test frequency change is not in conflict with approved industry codes and standards or adversely affects any assumptions or inputs to the safety analysis; or, if such inputs are affected, justification is provided to ensure sufficient safety margin will continue to exist.

The design, operation, testing methods, and acceptance criteria for SSCs specified in applicable codes and standards (or alternatives approved for use by the NRC) will continue to be met as described in the plants' licensing bases, including the Updated Final Safety Analysis Report and TS Bases, because these are not affected by changes to the surveillance frequencies.

Similarly, there is no impact to safety analysis acceptance criteria as described in the plant licensing basis. Based on the above, the NRC staff concludes that safety margins are maintained by the proposed methodology, and the third key safety principle of RG 1.177, Revision 1, is satisfied.

3.1.4 When Proposed Changes Result in an Increase in CDF or Risk, the Increases Should Be Small and Consistent with the Intent of the Commission's Safety Goal Policy Statement RG 1.177, Revision 1, provides a framework for evaluating the risk impact of proposed changes to surveillance frequencies which requires identification of the risk contribution from impacted surveillances, determination of the risk impact from the change to the proposed surveillance frequency, and performance of sensitivity and uncertainty evaluations. The changes to the Administrative Controls section of the TSs will require application of NEI 04-10, Revision 1, in the SFCP. NEI 04-10, Revision 1, satisfies the intent of RG 1.177, Revision 1, guidance for evaluation of the change in risk, and for assuring that such changes are small by providing the technical methodology to support risk-informed TSs for control of surveillance frequencies.

3.1.4.1 Quality of the PRA The quality of the licensee's PRA must be commensurate with the safety significance of the proposed TS change and the role the PRA plays in justifying the change. That is, the greater the change in risk or the greater the uncertainty in that risk from the requested TS change, or both, the more rigor that must go into ensuring the quality of the PRA.

RG 1.200 provides regulatory guidance for assessing the technical adequacy of a PRA. The current revision (i.e., Revision 2) of this RG endorses, with clarifications and qualifications, the use of (1) American Society of Mechanical Engineers (ASME)/American Nuclear Society (ANS)

RA-Sa-2009, "Addenda to ASME RA-S-2008 Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications" (i.e., the PRA Standard), (2) NEI 00-02, Revision 1, "PRA Peer Review Process Guidance," May 2006 (ADAMS Accession Nos. ML061510619 and ML063390593), and (3) NEI 05-04, Revision 2, "Process for Performing Internal Events PRA Peer Reviews Using the ASME/ANS PRA Standard," November 2008 (ADAMS Accession No. ML083430462).

The licensee has performed an assessment of the Columbia internal events PRA model, as discussed below, used to support the SFCP using the guidance of RG 1.200 to assure that the PRA models are capable of determining the change in risk due to changes to surveillance

frequencies of SSCs, using plant-specific data and models. Capability Category II of the NRC-endorsed PRA standard is the target capability level for supporting requirements for the internal events PRA for this application. Any identified deficiencies to those requirements are assessed further to determine any impacts to proposed decreases to surveillance frequencies, including the use of sensitivity studies where appropriate, in accordance with NEI 04-10, Revision 1.

A full-scope peer review was performed in 2009 of the internal events, at-power PRA model.

The peer review was based on RG 1.200, Revision 2 and ASME/ANS PRA Standard RA-Sa-2009. It was performed by the Boiling Water Reactor (BWR) Owners' Group, and it followed peer review guidance in NEI 05-04, Revision 2. An earlier version of the internal events PRA model had received a full-scope peer review in 2004 against ASME/ANS PRA Standard RA-Sa-2003, as clarified by RG 1.200 (DRAFT), and followed NEI 00-02, Revision A-3, "Probabilistic Risk Assessment (PRA) Peer Review Process Guidance,"

March 2003 (ADAMS Accession No. ML003728023).

Subsequent to the 2009 full scope peer review, the licensee addressed the facts and observations (F&Os) as well as self-assessment F&Os. In its letter dated September 17, 2015, in response to PRA RAI 1, the licensee explained that self-assessment refers to the process in which PRA self-identified F&Os are entered into an F&O database for inclusion in the next modeling update. The LAR provided those F&Os remaining open in Table 2-1 with a disposition for the TSTF-425 program. In its response to PRA RAI 1, the licensee provided the peer review and self-assessment F&Os for internal events, including internal flooding, PRA standard supporting requirements which had been graded as Capability Category I or "not met," with a resolution of the F&O.

The NRC staff reviewed these internal events and flooding F&Os and their dispositions to determine whether any gaps in the PRA model were identified that could impact the application.

The NRC staff assessed these peer review F&Os to ensure any deficiencies in meeting Capability Category II can be addressed for the SFCP per the NRC-approved NEI 04-10, Revision 1 methodology. The NRC staff reviewed these internal events and flooding F&Os and their dispositions to determine whether any gaps in the PRA model were identified that could impact the application. The NRC staff assessed these peer review F&Os to ensure any deficiencies in meeting Capability Category II can be addressed for the SFCP per the NRC-approved NEI 04-10, Revision 1 methodology. The NRC staff found that the F&Os were mainly documentation-related with no impact on the application and the PRA documentation was updated, or that the licensee's F&O disposition was technically adequate for the application. F&O dispositions which required additional information for the review are discussed below.

F&O 2-2 is related to Supporting Requirement DA-C6. The F&O states that estimates based on the surveillance tests and maintenance acts as described in Supporting Requirement DA-C6 and DA-C7 should be performed for significant components whose data are not tracked in the Mitigating Systems Performance Index (MSPI) data. The licensee performed a sensitivity analysis for applicable components by using generic data, and determined the sensitivity analysis represented a bounding analysis. In its letter dated April 7, 2016, in response to PRA RAI 4.1, the licensee addressed the staff's concern that Supporting Requirement DA-C6 and DA-C7 include consideration of plant-specific data and the use of generic data may not be

necessarily provide a bounding assessment. The licensee's response stated that estimates for significant events not tracked in the MSPI data are now based on plant-specific surveillance test and maintenance records. This resolution applied to the following component failure modes:

C-W2 (compressors fails to start), C-W4 (compressor fails to run), FN-R3 (fan fails to start),

FR-W4 (fan fails to run), AHUS-S3 (air handling unit fails to start), and AHUR-S4 (air handling unit fails to run); furthermore, the model incorporates this resolution. The NRC staff finds that this F&O has been adequately addressed for the application because components not tracked in the MSPI have accounted for plant-specific data and the model has incorporated these changes.

F&O 2-14 is related to Supporting Requirement SY-A4 which states that interviews with plant system engineers or operators have not been documented and cannot be verified by the peer review team. The licensee determined that this F&O could be handled by performing sensitivity analysis to examine whether the application is impacted. In its letter dated October 29, 2015, in response to PRA RAI 3, the licensee addressed the staff's concern on how a sensitivity analysis could be defined to address the lack of documented interviews. The response stated that system reviews with the system engineers were completed for all PRA systems with a focus on confirming that the PRA system analyses correctly reflect the as-built, as-operated plant, as well as to discuss recent operating history and any problems in system operation. The interviews and reviews were documented. The response identified two modeling conservatisms which did not have a risk-significant impact on the PRA results. The NRC staff finds that this F&O has been adequately addressed because the licensee completed the interviews for Supporting Requirement SY-A4 Capability Category II, and have documented the interviews and reviews.

F&O 1-3 is related to Supporting Requirement HR-G3, LE-C7, and IFQU-A6. It pertains to the use of human error probability stress factors from NUREG/CR-1278, "Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications," August 1983 (ADAMS Accession No. ML071210299). The F&O stated that in almost all of the post-initiator human error probabilities (HEPs) where optimal stress is assumed, time is a factor with core damage occurring between 30 minutes and an hour[s]. The peer review recommendation was to apply high stress factors per Table 17-1 or NUREG/CR-1278 to HEPs where time pressure is present during an accident situation. In its letter dated April 7, 2016, in response to PRA RAI 1.1 on how optimal and high stress factors were applied for HEPs, the licensee stated that as part of the PRA update performed in 2014, all post-initiator human failure events (HFEs) utilize stress levels recommended by the Human Reliability Analysis (HRA) Calculator. Further, that by utilizing the HRA Calculator, stress levels for the HFEs follow the NUREG/CR-1278 guidelines, including addressing the impact to stress levels from time pressure. In response to a follow-up RAI, in its letter dated June 22, 2016, the licensee clarified that post-initiator HEP stress levels were determined on a case-by-case basis to represent optimal (low), moderate stress, or high stress, as appropriate, including those where time is a factor with core damage occurring between 30 minutes and an hour. The NRC staff concludes the F&O is adequately dispositioned because the licensee followed the HRA Calculator guidance to account for stress factors, and determined the stress factors on a case-by-case basis during the time frame of concern mentioned in the F&O.

Based on the licensee's assessments using the currently applicable PRA standard and revision of RG 1.200, the NRC staff concludes that the level of PRA quality, combined with the evaluation and disposition of F&Os, is sufficient to support the evaluation of changes proposed

to surveillance frequencies within the SFCP, and is consistent with Regulatory Position 2.3.1 of RG 1.177, Revision 1.

3.1.4.2 Scope of the PRA The changes to the Administrative Controls section of the TSs will require the licensee to evaluate each proposed change to a relocated surveillance frequency using NEI 04-10, Revision 1, to determine its potential impact on risk (i.e., CDF and LERF) from internal events, fires, external events, and shutdown conditions. In cases where a PRA of sufficient scope or quantitative risk models were unavailable, the licensee uses bounding analyses, or other conservative quantitative evaluations. A qualitative screening analysis may be used when the surveillance frequency impact on plant risk is shown to be negligible or zero.

In addition to the at-power internal events PRA model, Columbia has a fire PRA model, a seismic PRA model, and a shutdown PRA model. According to the response to PRA RAI 1, the fire and seismic PRAs have not been reviewed against ASME/ANS PRA Standard RA-Sa-2009.

The licensee stated that no PRA models other than the internal events PRA will be used for detailed quantitative analysis. NEI 04-10 Step 11 allows detailed quantitative analysis using the PRA model, by making necessary PRA modifications, if qualitative or bounding analysis is not sufficient for the STI analysis. By letter dated September 17, 2015, in response to PRA RAI 2, the licensee explained that the evaluation of fire risk and other external events risk will qualitatively reflect and consider the current plant configuration and operation, and referenced NEI 04-10 Step 10b, which provides guidance on using qualitative reasoning in conjunction with internal events risk evaluations. The NRC staff finds that the licensee's approach is consistent with NEI 04-10 guidance because the internal events PRA model supports detailed quantitative analysis, and for fire-related and external events, qualitative analysis will be performed based on current plant configuration and operation.

Based on the above, the NRC staff concludes that through the application of NRG-approved NEI 04-10, Revision 1, the licensee's evaluation methodology is sufficient to ensure that the scope of the risk contribution of each surveillance frequency change is properly identified for evaluation and is consistent with Regulatory Position 2.3.2 of RG 1.177, Revision 1.

3.1.4.3 PRA Modeling The licensee's methodology includes the determination of whether the SSCs affected by a proposed change to a surveillance frequency are modeled in the PRA. Where the SSC is directly or implicitly modeled, a quantitative evaluation of the risk impact may be carried out.

The methodology adjusts the failure probability of the impacted SSCs, including any impacted CCF modes, based on the proposed change to the surveillance frequency. Where the SSC is not modeled in the PRA, bounding analyses are performed to characterize the impact of the proposed change to the surveillance frequency. Potential impacts on the risk analyses due to screening criteria and truncation levels are addressed by the requirements for PRA technical adequacy consistent with guidance contained in RG 1.200, and by sensitivity studies identified in NEI 04-10, Revision 1.

Based on the above, the NRC staff concludes that through the application of NRG-approved NEI 04-10, Revision 1, the Columbia PRA modeling is sufficient to ensure an acceptable

evaluation of risk for the proposed changes in surveillance frequency, and is consistent with Regulatory Position 2.3.3 of RG 1.177, Revision 1.

3.1.4.4 Assumptions for Time-Related Failure Contributions The failure probabilities of SSCs modeled in PRAs may include a standby time-related contribution and a cyclic demand-related contribution. NEI 04-10 criteria adjust the time-related failure contribution of SSCs affected by the proposed change to surveillance frequency. This is consistent with RG 1.177, Revision 1, Regulatory Position 2.3.3 which permits separation of the failure rate contributions into demand and standby for evaluation of SRs. If the available data does not support distinguishing between the time-related failures and demand failures, then the change to surveillance frequency is conservatively assumed to impact the total failure probability of the SSC, including both standby and demand contributions. The SSC failure rate (per unit time) is assumed to be unaffected by the change in test frequency such that the failure probability is assumed to increase linearly with time, and will be confirmed by the required monitoring and feedback implemented after the change in surveillance frequency is implemented. The process requires consideration of qualitative sources of information with regards to potential impacts of test frequency on SSC performance, including industry and plant-specific operating experience, vendor recommendations, industry standards, and code specified test intervals. Thus the process is not reliant upon risk analyses as the sole basis for the proposed changes.

The potential beneficial risk impacts of reduced surveillance frequency, including reduced downtime, lesser potential for restoration errors, reduction of potential for test caused transients, and reduced test-caused wear of equipment, are identified qualitatively, but are conservatively not required to be quantitatively assessed. Thus, through the application of NEI 04-10, the licensee has employed reasonable assumptions with regard to extensions of surveillance test intervals, and is consistent with Regulatory Position 2.3.4 of RG 1.177, Revision 1.

3.1.4.5 Sensitivity and Uncertainty Analyses By having the TSs require that changes to the frequencies listed in the SFCP be made in accordance with NEI 04-10, Revision 1, the licensee will be required to have sensitivity studies that assess the impact of uncertainties from key assumptions of the PRA, uncertainty in the failure probabilities of the affected SSCs, impact on the frequency of initiating events, and any identified deviations from Capability Category II of the PRA standard. Where the sensitivity analyses identify a potential impact on the proposed change, revised surveillance frequencies are considered, along with any qualitative considerations that may bear on the results of such sensitivity studies. The licensee will also be required to perform monitoring and feedback of SSC performance, once the revised surveillance frequencies are implemented. Based on the above, the NRC staff concludes that through the application of NRG-approved NEI 04-10, Revision 1, the licensee has appropriately considered the possible impact of PRA model uncertainty and sensitivity to key assumptions and model limitations and is consistent with Regulatory Position 2.3.5 of RG 1.177, Revision 1.

3.1.4.6 Acceptance Guidelines The licensee will be required to quantitatively evaluate the change in total risk (including internal and external events contributions) in terms of CDF and LERF for both the individual risk impact of a proposed change in surveillance frequency and the cumulative impact from all individual changes to surveillance frequencies using NEI 04-10, Revision 1, in accordance with the TS SFCP. Each individual change to surveillance frequency must show a risk impact below 1E-6 per year for change to CDF and below 1E-7 per year for change to LERF. These changes to CDF and LERF are consistent with the acceptance criteria of RG 1.174, Revision 2, for very small changes in risk. Where the RG 1.174, Revision 2, acceptance criteria are not met, the process in NEI 04-10, Revision 1, either considers revised surveillance frequencies, which are consistent with RG 1.174, Revision 2, or the process terminates without permitting the proposed changes. Where quantitative results are unavailable for comparison with the acceptance guidelines, appropriate qualitative analyses are required to demonstrate that the associated risk impact of a proposed change to surveillance frequency is negligible or zero. Otherwise, bounding quantitative analyses are required which demonstrate the risk impact is at least one order of magnitude lower than the RG 1.174, Revision 2, acceptance guidelines for very small changes in risk. In addition to assessing each individual SSC surveillance frequency change, the cumulative impact of all changes must result in a risk impact less than 1E-5 per year for change to CDF, and less than 1E-6 per year for change to LERF, and the total CDF and total LERF must be reasonably shown to be less than 1E-4 per year and 1E-5 per year, respectively.

These values are consistent with the acceptance criteria of RG 1.174, Revision 2, as referenced by RG 1.177, Revision 1, for changes to surveillance frequencies.

Consistent with the NRC's SE dated September 19, 2007, for NEI 04-10, Revision 1, the TS SFCP will require the licensee to calculate the total change in risk (i.e., the cumulative risk) by comparing a baseline model that uses failure probabilities based on surveillance frequencies prior to being changed per the SFCP to a revised model that uses failure probabilities based on the changed surveillance frequencies. The NRC staff further notes that the licensee includes a provision to exclude the contribution to cumulative risk from individual changes to surveillance frequencies associated with insignificant risk increases (i.e., less than 5E-8 CDF and 5E-9 LERF) once the baseline PRA models are updated to include the effects of the revised surveillance frequencies.

The quantitative acceptance guidance of RG 1.174, Revision 2, is supplemented by qualitative information to evaluate the proposed changes to surveillance frequencies, including industry and plant-specific operating experience, vendor recommendations, industry standards, the results of sensitivity studies, and SSC performance data and test history. The final acceptability of the proposed change is based on all of these considerations and not solely on the PRA results. Post-implementation performance monitoring and feedback are also required to assure continued reliability of the components. Based on the above, the NRC staff concludes that the licensee's application of NRG-approved NEI 04-10, Revision 1, provides acceptable methods for evaluating the risk increase associated with proposed changes to surveillance frequencies, consistent with Regulatory Position 2.4 of RG 1.177, Revision 1.

Therefore, the NRC staff concludes that the proposed methodology satisfies the fourth key safety principle of RG 1.177, Revision 1, by assuring any increase in risk is small consistent with the intent of the Commission's Safety Goal Policy Statement.

3.1.5 The Impact of the Proposed Change Should Be Monitored Using Performance Measurement Strategies The licensee's adoption of TSTF-425, Revision 3, requires application of NEI 04-10, Revision 1, in the SFCP. NEI 04-10, Revision 1, requires performance monitoring of SSCs whose surveillance frequencies have been revised as part of a feedback process to assure that the change in test frequency has not resulted in degradation of equipment performance and operational safety. The monitoring and feedback includes consideration of Maintenance Rule monitoring of equipment performance. In the event of SSC performance degradation, the surveillance frequency will be reassessed in accordance with the methodology, in addition to any corrective actions which may be required by the Maintenance Rule. The performance monitoring and feedback specified in NEI 04-10, Revision 1, is sufficient to reasonably assure acceptable SSC performance and is consistent with Regulatory Position 3.2 of RG 1.177, Revision 1. Thus, the NRC staff concludes that the fifth key safety principle of RG 1.177, Revision 1, is satisfied.

3.2 Addition of Surveillance Frequency Control Program to Administrative Controls The licensee proposed including the SFCP and specific requirements into the Columbia TSs, Section 5.5.15, as follows:

Surveillance Frequency Control Program This program provides controls for Surveillance Frequencies. The program shall ensure that Surveillance Requirements specified in the Technical Specifications are performed at intervals sufficient to assure that the associated Limiting Conditions for Operation are met.

a. The Surveillance Frequency Control Program shall contain a list of Frequencies of those Surveillance Requirements for which the Frequency is controlled by the program.
b. Changes to the Frequencies listed in the Surveillance Frequency Control Program shall be made in accordance with NEI 04-10, "Risk-Informed Technical Specifications Initiative Sb, Risk-Informed Method for Control of Surveillance Frequencies, Revision 1.
c. The provisions of Surveillance Requirements 3.0.2 and 3.0.3 are applicable to the Frequencies established in the Surveillance Frequency Control Program.

The proposed program is consistent with the model application of TSTF-425 and, therefore, the NRC staff concludes that it is acceptable.

3.3 Deviations from TSTF-425 and Other Changes The surveillances being revised by the licensee have different surveillance identification numbers as compared to the surveillances found in TSTF-425. These differences have no impact on the technical content of the amendment, and the amendment changes are consistent with the current formatting and content of the Columbia TSs. These differences are administrative in nature and are, therefore, acceptable and consistent with the intent of the NRG-approved TSTF-425.

There are surveillances included in TSTF-425 that are not included in the Columbia TSs.

TSTF-425 transfers control of frequencies for existing surveillances to the SFCP, but it does not add, delete, or modify the content of the surveillance actions themselves. Based on this, the amendment, which represents a plant-specific adoption of TSTF-425, only changes frequencies for existing surveillances in the Columbia TSs. Therefore, these differences between the amendment and TSTF-425 are administrative in nature and are, therefore, acceptable and consistent with the intent of the NRG-approved TSTF-425.

This amendment transfers control of frequencies for plant specific surveillances (i.e.,

surveillances not included in TSTF-425 or surveillances with modified wording as compared to TSTF-425) to the SFCP. Although these changes are not included in the marked-up TS pages for TSTF-425, the TSTF states, in part, that 'The proposed change relocates all periodic Surveillance Frequencies from the Technical Specifications and places the Frequencies under licensee control in accordance with a new program," and "All surveillances are relocated except. .. [4 exclusion criteria for the surveillance frequencies are listed]." These statements denote that TSTF-425 applies to all surveillances, including the Columbia plant specific surveillances, that are periodic and do not meet one of the exclusion criteria. The NRC staff has determined that all of the surveillance frequencies being changed by this amendment are periodic and do not meet the exclusion criteria; therefore, it is acceptable to relocate them to the SFCP. These differences between the amendment and TSTF-425 are consistent with the intent of the NRG-approved TSTF-425.

In accordance with TSTF-425, this amendment relocated surveillance frequencies to the SFCP that were being performed at a given periodicity on a STAGGERED TEST BASIS. Since these specific surveillance frequencies are being relocated, TSTF-425 deletes the STAGGERED TEST BASIS definition from TS. In contrast, the licensee will relocate the same frequencies but retain the definition because the term STAGGERED TEST BASIS is referenced in administrative section 5.5.14, "Control Room Envelope Habitability Program," of the Columbia TSs. Since 5.5.14 is outside the scope of this TSTF, this difference is considered acceptable and consistent with the intent of the NRG-approved TSTF-425.

3.4 Summary and Conclusions The NRC staff has reviewed the licensee's proposed relocation of specific surveillance frequencies to a licensee-controlled document, and controlling changes to these surveillance frequencies in accordance with a new program, the SFCP, identified in the Administrative Controls of TSs. The SFCP and TSs Section 5.0, Subsection 5.5.15 references NEI 04-10, Revision 1, which provides a risk-informed methodology using plant-specific risk insights and performance data to revise surveillance frequencies within the SFCP. This methodology

supports relocating surveillance frequencies from TSs to a licensee-controlled document, provided those frequencies are changed in accordance with the NEI 04-10, Revision 1, which is specified in the Administrative Controls section of the TSs.

The proposed licensee adoption of TSTF-425, Revision 3, and risk-informed methodology of NRG-approved NEI 04-10, Revision 1, as referenced in the Administrative Controls section of TSs, satisfies the key principles of risk-informed decision making applied to changes to TSs as delineated in RG 1.177 and RG 1.174, in that:

  • The proposed change meets current regulations;
  • The proposed change is consistent with defense-in-depth philosophy;
  • The proposed change maintains sufficient safety margins;
  • Increases in risk resulting from the proposed change are small and consistent with the Commission's Safety Goal Policy Statement; and
  • The impact of the proposed change is monitored with performance measurement strategies.

Paragraph 50.36(c) of 10 CFR discusses the categories that will be included in TSs.

Paragraph 50.36(c)(3) of 10 CFR discusses the specific category of SRs and states, "Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met." Based on the above evaluation, the NRC staff concludes that, with the proposed relocation of surveillance frequencies to a licensee-controlled document and administratively controlled in accordance with the TS SFCP, the licensee continues to meet the requirements in 10 CFR 50.36.

4.0 STATE CONSULTATION

In accordance with the Commission's regulations, the Washington State official was notified of the proposed issuance of the amendment. The State official had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 1O CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding published in the Federal Register on May 26, 2015 (80 FR 30100). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).

Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributors: W. Satterfield, P. Snyder, and D. O'Neal Date: November 3 , 201 6

ML16253A025 *via email **SE input dated OFFICE NRR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1 /LA NRR/DSS/STSB/BC(A)** NRR/DRA/APLA/BC**

NAME JKlos JBurkhardt SAnderson SRosenberg DATE 10/18/16 10/14/16 3/21/16 7/18/16 OFFICE NRR/DSS/SBPB/BC* NRR/DE/EICB/BC* NRR/DE/EEEB NRR/DE/EEEB NAME RDennig MWaters TMartinez-Navedo (non-concur) SSom (non-concur)

DATE 10/12/16 9/30/16 10/19/16 10/19/16 OFFICE NRR/DE/EEEB NRR/DE/EEEB NRR/DE/EEEB NRR/DE/EEEB/BC NAME SRay (non-concur) GMatharu (non-concur) RMathew (non-concur) JZimmerman (non-concur)

DATE 10/19/16 10/19/16 10/19/16 10/24/16 OFFICE OGC-NLO NRR/DORL/LPL4-1 /BC NRR/DORL/LPL4-1 /PM NAME VHoang RPascarelli JKlos DATE 10/28/16 11/3/16 11/3/16