ML16293A849: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Appendix E -Project Data Quality Parameter Crosswalk | {{#Wiki_filter:Appendix E - | ||
., Appendix E -Project Data Quality Parameter Crosswalk Field Data Quality Parameters Data Quality Field Activity-Equipment Calibration | Project Data Quality Parameter Crosswalk | ||
* Operability Acceptance Criteri.a | |||
* | ., | ||
* Criteria Criteria Met. Indicator Check Check Identified Y/N (PARCC Parameter) | Appendix E - Project Data Quality Parameter Crosswalk Field Data Quality Parameters Data Quality Field Activity- Equipment Calibration | ||
Precision Soil Samples Duplicate Sample Not Not 10% Relative Quality y applicable applicable Difference (RPD) Assurance between duplicates, Project Plan -1/10 samples and 2 A.6.1, B.5.2.1 duplicates per sub-area Precision No Soil Sample Equipment Not Not Less than Minimum Quality y Cross-Rinsate Blanks applicable applicable Detectable Assurance Contamination Concentration Project Plan -(MDC) on equipment A.6.1, B.4.1, rinsate blanks B.5.2.2 Precision No Sample Deionized Water Not Not Less than Detection Quality y Equipment Blank applicable applicable Limits in DI water Assurance Cross-blanks Project Plan -Contamination A.6.1, B.4.1, B.5.2.2 Accuracy Course Grid Ludlum 2241-2 Annual Daily {3 Within annual Quality y Walkover Scaler/Ratemeter calibration. | * Operability Acceptance Criteri.a * | ||
times/day) calibration, +/-20% Assurance coupled with Daily source source gross cpm Project Plan -2"X2" Nal checks. A.6.1, B.6.1, Gamma Detector B.7.1 and GPS Instrument Accuracy Location Specific Bicron Microrem Annual Daily {3 Within annual Quality y Static Survey Meter calibration. | * Criteria Criteria Met. | ||
times/day) calibration,+/- | Indicator Check Check Identified Y/N (PARCC Parameter) | ||
20% Assurance Daily source source uRem/hr Project Plan -checks. A.6.1, B.6.1, B.7.1 Appendix E -Project Data Quality Parameter Crosswalk Accuracy Location Specific Ludlum 2241-2 Annual Daily (3 Within annual Quality y Static Survey Scaler/Ratemeter calibration. | Precision Soil Samples Duplicate Sample Not Not 10% Relative Quality y applicable applicable Difference (RPD) Assurance between duplicates, Project Plan - | ||
times/day) calibration, +/-20% Assurance coupled with Daily source source Gross cpm Project Plan -2"X2" Nal checks. A.6.1, B.6.1, Gamma Detector B.7.1 Representativeness Walkover Area Global Not Daily. At designated Quality y Location Positioning . applicable. | 1/10 samples and 2 A.6.1, B.5.2.1 duplicates per sub-area Precision No Soil Sample Equipment Not Not Less than Minimum Quality y Cross- Rinsate Blanks applicable applicable Detectable Assurance Contamination Concentration Project Plan - | ||
walkover location. | (MDC) on equipment A.6.1, B.4.1, rinsate blanks B.5.2.2 Precision No Sample Deionized Water Not Not Less than Detection Quality y Equipment Blank applicable applicable Limits in DI water Assurance Cross- blanks Project Plan - | ||
Assurance System (GPS) Commercial Verified with Project Plan -GPS. multiple GPS' and A.6.1 landmarks. | Contamination A.6.1, B.4.1, B.5.2.2 Accuracy Course Grid Ludlum 2241-2 Annual Daily {3 Within annual Quality y Walkover Scaler/Ratemeter calibration. times/day) calibration, +/-20% Assurance coupled with Daily source source gross cpm Project Plan - | ||
Representativeness Sample Area GPS Not Daily. At designated Quality y Location applicable. | 2"X2" Nal checks. A.6.1, B.6.1, Gamma Detector B.7.1 and GPS Instrument Accuracy Location Specific Bicron Microrem Annual Daily {3 Within annual Quality y Static Survey Meter calibration. times/day) calibration,+/- 20% Assurance Daily source source uRem/hr Project Plan - | ||
sample location. | checks. A.6.1, B.6.1, B.7.1 | ||
Assurance Commercial Verified with Project Plan -GPS. multiple GPS' and A.6.1 landmarks. | |||
Representativeness Soil Depth Standard Tape Not Not Samples collected at Quality y Determination Measure/Ruler applicable. | Appendix E - Project Data Quality Parameter Crosswalk Accuracy Location Specific Ludlum 2241-2 Annual Daily (3 Within annual Quality y Static Survey Scaler/Ratemeter calibration. times/day) calibration, +/-20% Assurance coupled with Daily source source Gross cpm Project Plan - | ||
applicable. | 2"X2" Nal checks. A.6.1, B.6.1, Gamma Detector B.7.1 Representativeness Walkover Area Global Not Daily. At designated Quality y Location Positioning . applicable. walkover location. Assurance System (GPS) Commercial Verified with Project Plan - | ||
designated depths, Assurance Standard verified by second Project Plan -measuring technician. | GPS. multiple GPS' and A.6.1 landmarks. | ||
A.6.1 device. Completeness Sampling Not applicable Not Not 95% of samples Quality y applicable | Representativeness Sample Area GPS Not Daily. At designated Quality y Location applicable. sample location. Assurance Commercial Verified with Project Plan - | ||
*applicable targeted for Assurance Collection Project Plan -A.6.1 Completeness Data Usability Not applicable Not Not 90% data usability Quality y applicable applicable Assurance Project Plan -A.6.1 | GPS. multiple GPS' and A.6.1 landmarks. | ||
r | Representativeness Soil Depth Standard Tape Not Not Samples collected at Quality y Determination Measure/Ruler applicable. applicable. designated depths, Assurance Standard verified by second Project Plan - | ||
Precision Relative Percent Difference 10% Quality Assurance Project y (RPO) Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision Relative Error Ratio (RER) < 1.96 Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision Background Data Initial startup calibration Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision Count Time Per GEL analytical method Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy Matrix Spike {MS) or GEL QAP Quality Assurance Project y MS/Matrix Spike Duplicate Plan A.6.1, B.4, B.5.3, {MSD) analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy Tracer Percent Recovery (R) GEL QAP Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy Sample & Standards prep 10% Quality Asswance Project y Appendix E -Project Data Quality Parameter Crosswalk Batch Calculations Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy/Precision Instrument Calibration (Initial 1 per 24 hrs (ICV) 1 per 12 Quality Assurance Project y & Continuing) hrs (CCV) Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy/Precision Frequency of Calibration 1 per 24 hrs (ICV) 1 per 12 Quality Assurance Project hrs (CCV) Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, ' es/er/ms-5 Accuracy/Completeness 10% Sample and Standards NIST traceable standards Quality Assurance Project y Traceability Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Representativeness Field and Method Blanks < MDC and 2s counting Quality Assurance Project y uncertainty Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Completeness Chain-of-Custody (COC) Review Completeness Quality Assurance Project y *Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5}} | measuring technician. A.6.1 device. | ||
Completeness Sampling Not applicable Not Not 95% of samples Quality y applicable *applicable targeted for Assurance Collection Project Plan - | |||
A.6.1 Completeness Data Usability Not applicable Not Not 90% data usability Quality y applicable applicable Assurance Project Plan - | |||
A.6.1 | |||
- | |||
, r Appendix E,.... Project Data Quality Parameter Crosswalk Laboratory Data Quality Parameters Data Quality Indicator Parameter Acceptance Criteria Criteria Identified Criteria Met Y/N (PARCC Parameter) | |||
Precision Relative Percent Difference 10% Quality Assurance Project y (RPO) Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision Relative Error Ratio (RER) < 1.96 Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision Background Data Initial startup calibration Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision Count Time Per GEL analytical method Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy Matrix Spike {MS) or GEL QAP Quality Assurance Project y MS/Matrix Spike Duplicate Plan A.6.1, B.4, B.5.3, | |||
{MSD) analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy Tracer Percent Recovery (R) GEL QAP Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy Sample & Standards prep 10% Quality Asswance Project y | |||
Appendix E - Project Data Quality Parameter Crosswalk Batch Calculations Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy/Precision Instrument Calibration (Initial 1 per 24 hrs (ICV) 1 per 12 Quality Assurance Project y | |||
& Continuing) hrs (CCV) Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy/Precision Frequency of Calibration 1 per 24 hrs (ICV) 1 per 12 Quality Assurance Project hrs (CCV) Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, | |||
' | |||
es/er/ms-5 Accuracy/Completeness 10% Sample and Standards NIST traceable standards Quality Assurance Project y Traceability Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Representativeness Field and Method Blanks < MDC and 2s counting Quality Assurance Project y uncertainty Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Completeness Chain-of-Custody (COC) Review Completeness Quality Assurance Project y | |||
*Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5}} | |||
Revision as of 12:59, 30 October 2019
Text
Appendix E -
Project Data Quality Parameter Crosswalk
.,
Appendix E - Project Data Quality Parameter Crosswalk Field Data Quality Parameters Data Quality Field Activity- Equipment Calibration
- Operability Acceptance Criteri.a *
- Criteria Criteria Met.
Indicator Check Check Identified Y/N (PARCC Parameter)
Precision Soil Samples Duplicate Sample Not Not 10% Relative Quality y applicable applicable Difference (RPD) Assurance between duplicates, Project Plan -
1/10 samples and 2 A.6.1, B.5.2.1 duplicates per sub-area Precision No Soil Sample Equipment Not Not Less than Minimum Quality y Cross- Rinsate Blanks applicable applicable Detectable Assurance Contamination Concentration Project Plan -
(MDC) on equipment A.6.1, B.4.1, rinsate blanks B.5.2.2 Precision No Sample Deionized Water Not Not Less than Detection Quality y Equipment Blank applicable applicable Limits in DI water Assurance Cross- blanks Project Plan -
Contamination A.6.1, B.4.1, B.5.2.2 Accuracy Course Grid Ludlum 2241-2 Annual Daily {3 Within annual Quality y Walkover Scaler/Ratemeter calibration. times/day) calibration, +/-20% Assurance coupled with Daily source source gross cpm Project Plan -
2"X2" Nal checks. A.6.1, B.6.1, Gamma Detector B.7.1 and GPS Instrument Accuracy Location Specific Bicron Microrem Annual Daily {3 Within annual Quality y Static Survey Meter calibration. times/day) calibration,+/- 20% Assurance Daily source source uRem/hr Project Plan -
checks. A.6.1, B.6.1, B.7.1
Appendix E - Project Data Quality Parameter Crosswalk Accuracy Location Specific Ludlum 2241-2 Annual Daily (3 Within annual Quality y Static Survey Scaler/Ratemeter calibration. times/day) calibration, +/-20% Assurance coupled with Daily source source Gross cpm Project Plan -
2"X2" Nal checks. A.6.1, B.6.1, Gamma Detector B.7.1 Representativeness Walkover Area Global Not Daily. At designated Quality y Location Positioning . applicable. walkover location. Assurance System (GPS) Commercial Verified with Project Plan -
GPS. multiple GPS' and A.6.1 landmarks.
Representativeness Sample Area GPS Not Daily. At designated Quality y Location applicable. sample location. Assurance Commercial Verified with Project Plan -
GPS. multiple GPS' and A.6.1 landmarks.
Representativeness Soil Depth Standard Tape Not Not Samples collected at Quality y Determination Measure/Ruler applicable. applicable. designated depths, Assurance Standard verified by second Project Plan -
measuring technician. A.6.1 device.
Completeness Sampling Not applicable Not Not 95% of samples Quality y applicable *applicable targeted for Assurance Collection Project Plan -
A.6.1 Completeness Data Usability Not applicable Not Not 90% data usability Quality y applicable applicable Assurance Project Plan -
A.6.1
-
, r Appendix E,.... Project Data Quality Parameter Crosswalk Laboratory Data Quality Parameters Data Quality Indicator Parameter Acceptance Criteria Criteria Identified Criteria Met Y/N (PARCC Parameter)
Precision Relative Percent Difference 10% Quality Assurance Project y (RPO) Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision Relative Error Ratio (RER) < 1.96 Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision Background Data Initial startup calibration Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Precision Count Time Per GEL analytical method Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy Matrix Spike {MS) or GEL QAP Quality Assurance Project y MS/Matrix Spike Duplicate Plan A.6.1, B.4, B.5.3,
{MSD) analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy Tracer Percent Recovery (R) GEL QAP Quality Assurance Project y Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy Sample & Standards prep 10% Quality Asswance Project y
Appendix E - Project Data Quality Parameter Crosswalk Batch Calculations Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy/Precision Instrument Calibration (Initial 1 per 24 hrs (ICV) 1 per 12 Quality Assurance Project y
& Continuing) hrs (CCV) Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Accuracy/Precision Frequency of Calibration 1 per 24 hrs (ICV) 1 per 12 Quality Assurance Project hrs (CCV) Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan,
'
es/er/ms-5 Accuracy/Completeness 10% Sample and Standards NIST traceable standards Quality Assurance Project y Traceability Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Representativeness Field and Method Blanks < MDC and 2s counting Quality Assurance Project y uncertainty Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5 Completeness Chain-of-Custody (COC) Review Completeness Quality Assurance Project y
- Plan A.6.1, B.4, B.5.3, analytical methods, GEL Quality Assurance Plan, es/er/ms-5