{{#Wiki_filter:'Ci~l stsilllll"'ite)~tz" ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER N.Y.14649.0001 ROBERTC MECREDY Vice President Cinna Nuclear Producrion TELEPHONE AREA CODE 71B 546 2700 GZNNA STATION December 10, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555  
{{#Wiki_filter:'Ci
          ~l stsilllll"'ite)~tz" ROCHESTER GAS AND ELECTRIC CORPORATION             o 89 EAST AVENUE, ROCHESTER N.Y. 14649.0001 ROBERTC MECREDY                                                                     TELEPHONE Vice President                                                               AREA CODE 71B 546 2700 Cinna Nuclear Producrion GZNNA STATION December 10, 1992 US     Nuclear Regulatory Commission Document                 Control Desk Washington,                 DC 20555


==Subject:==
==Subject:==
Monthly Report for November, 1992 Operating Status Xnformation R.E.Ginna Nuclear Power Plant Docket No.50-244  
Monthly Report for November, 1992 Operating Status Xnformation R. E. Ginna Nuclear Power Plant Docket No. 50-244


==Dear Sir:==
==Dear         Sir:==
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of November, 1992.Very truly yours, Robert C.Mecred RCM/Attachments cc:, Mr.Thomas T.Martin NRC (1) ap OPERATING DATA REPORT DOCKET NO.50-244 DATE Dec r 10 1992 COHPLETED BY Robert E.Dodge OPERATING STATUS TELEPHONE 315 524.4446 ext.396 1.2.3.4~5.6.7.8.Unit Name: R.E.GINNA NUCLEAR POWER PLANT Reporting Period: November 1992 Licensed Thermal Power (MWt): Nameplate Rating (Gross HWe): Design Electrical Rating (Net HWe): Haximm Dependable Capacity (Gross HWe): Maxinun Dependable Capacity (Net MWe): If Changes Occur in Capacity Ratings (Items Notes: The unit operated at approx.97/.reactor power level for the report period except for events outlined on page 4.1520 490 470 490 470 Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level to Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Hcnth Yr.-to-Date Cmulat 1 ve 11.12.13~14~15.16~17.18.19.20.21~22.23., Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (HWN)Gross Electrical Energy Generated (HWN)Net Electrical Energy Generated (HWN)Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using HDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate 720 720 720 1 045 291 356 190 338 563 100%100/, 100.05/, 100.05%0/8 040 6 889.71 6 793.75 9 723 083 3 291 724 3 125 312 84.50%84.50%82.71%82.71%2.25%202 146.45 160 220.67 1 687.55 157 499.13 8.5*222 937 596 73 621 331 69 877 859 78.07/.78.07%74.89%74.89%5.89%24.Shutdowns Scheduled Over Next 6 Honths (Type, Date and Duraticn of Each): Refueli and Haintenance
 
-Harch 19 1993 45 da 25'f Shut Down At End Of Report Period, Estimated Date of Startup: 26'nits In Test Status (Prior to Comnerciai Operation):
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of November, 1992.
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION<<CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975<<*CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 t t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-244 UNIT R.E.Ginna Nuclear Power Plant DATE December 0 1992 COMPLETED BY o ert E.Dodge TELEPHONE 1 315 524-4446 ext.396 MONTH November 1992 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)2~3~4~5~6~7~8~9~10.12.13'4'5.16'80 480 481 481 481 481 421 482 481 481 481 481 481 481 481 481 17.18.19.20.21.22.23'4.25.26~27'8.29.30.31.480 481 481 481 481 481 481 481 481 481 481 481 258 431 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole megawatt.
Very truly yours, Robert C. Mecred RCM/
00(:KET NO.SO 244 liNlTNAMl'.
Attachments cc:,         Mr. Thomas T. Martin         NRC (1)
R.E-6INNA NUCLEAtc POWER PLAN'K UNIT SHUTDOWN AND POWER REDUCTIONS
 
(:OMPLI'.TED BY Robert E l)odge 9>>PfiON'f, Bi>-524-4446 ext.396 Ginna Station Ho.Date 0 4~0>T CY 4 0 4 0 Pl cn>>0 4 0 4 0>>O>cc 0 v)c 0 Cl Licensee Event Report 0 Em o 0 VI 4 0 lA O IC)4 0 0 0 4 E 0 O Cause L Corrective Action to Prevent Recurrence 92-08 11-29-92 7.67 A Gasket failure on 2B MSR 2nd pass drain LCV-3334B to feedwater heater 5B,replaced gasket.1 F: Forced S: Scheduled RKV.445 4949 Reason: A-Equipment Failure (Explain)B-Maintenance.
ap OPERATING DATA REPORT DOCKET NO.       50-244 DATE     Dec     r 10   1992 COHPLETED BY Robert E. Dodge TELEPHONE       315   524.4446 ext. 396 OPERATING STATUS
or Test C-Refueling D-Regulatory Restriction'peracor Training 8c License Examinacion F-Administrative
: 1.     Unit Name: R.E. GINNA NUCLEAR POWER PLANT                               Notes: The unit operated at approx.
&Operational Error (Explain)Hither (Explain)3 Method: 14lanual 2-Manual Scram.3-Aucomacic Scram.4-Other (Explain)Exhibic G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-O161)Exhibit I-Same Source  
: 2.      Reporting Period:         November 1992                                             97/. reactor power level for
~w H'I NARRATIVE  
: 3.      Licensed Thermal Power (MWt):                 1520                                  the report period except for 4~      Nameplate Rating (Gross HWe):                 490                                  events outlined on page 4.
: 5.      Design Electrical Rating (Net HWe):           470
: 6.      Haximm Dependable Capacity (Gross HWe):       490
: 7.      Maxinun Dependable Capacity (Net MWe):         470
: 8.      If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9.       Power Level to Which Restricted, If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Hcnth         Yr.-to-Date             Cmulat 1 ve
: 11.     Hours In Report Period                                   720                  8 040                  202 146.45
: 12.      Nunber of Hours Reactor Was Critical                     720                  6 889.71                160 220.67 13 ~    Reactor Reserve Shutdown Hours                                                                         1  687.55 14 ~    Hours Generator On-Line                                 720                  6 793.75                157 499.13
: 15. Unit Reserve Shutdown Hours                                                                                   8.5
* 16 ~    Gross Thermal Energy Generated (HWN)               1 045 291            9 723 083              222 937 596
: 17.      Gross Electrical Energy Generated (HWN)             356 190            3 291 724                73 621 331
: 18.      Net Electrical Energy Generated (HWN)               338 563            3 125 312                69 877 859
: 19. Unit Service Factor                                     100%                    84.50%                    78.07/.
: 20. Unit Availability Factor                                 100/,                  84.50%                    78.07%
21  ~  Unit Capacity Factor (Using   HDC Net)                   100.05/,                82.71%                    74.89%
: 22. Unit Capacity Factor (Using   DER Net)                   100.05%                 82.71%                     74.89%
23.,    Unit  Forced Outage Rate                                    0/                    2.25%                     5.89%
: 24. Shutdowns Scheduled Over Next 6 Honths (Type, Date and Duraticn   of Each):
    'f Refueli   and Haintenance - Harch 19 1993 45 da 25         Shut Down At End Of Report Period, Estimated Date of Startup:
26 'nits In     Test Status (Prior to Comnerciai Operation):                       Forecast                 Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
  <<CUMULATIVE TOTAL COMMENCING JANUARY   1, 1975
<<*CUMULATIVE TOTAL COMMENCING NOVEMBER     8, 1969
 
t AVERAGE DAILY UNIT POWER LEVEL t
DOCKET NO.     50-244 UNIT R.E. Ginna Nuclear Power       Plant DATE December       0   1992 COMPLETED BY o ert E. Dodge TELEPHONE 1 315       524-4446   ext. 396 MONTH           November   1992 DAY AVERAGE DAILY POWER LEVEL              DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                               (MWe-Net)
: 17.              480 2 ~             480                      18.              481 3 ~             481                      19.              481 4               481                      20.              481
    '80
  ~
5 ~             481                      21.              481 6 ~             481                      22.              481 7 ~             421                      23                481 482
                                                '4.
8 ~                                                         481 9 ~             481                      25.              481
: 10.               481                       26  ~            481 481                       27                481
: 12.              481
                                              '8.
481 13                481                       29.               258
    '4 481                      30.               431
    '5.
481                      31.
16                481 INSTRUCTIONS On       this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
 
00(:KET NO.         SO 244 liNlTNAMl'.R.E- 6INNA NUCLEAtc POWER PLAN'K UNIT SHUTDOWN AND POWER REDUCTIONS
(:OMPLI'.TED BY Robert E l)odge 9>>             PfiON'f,   Bi>-524-4446 ext. 396 Ginna   Station Pl CY      cn>>0 0                        4      4 0  Licensee        Em        O IC) 4 0                Cause  L Corrective Ho.           Date           4 0 0
4 0>>> cc4O  Event          o 0 VI 4 0 4 0   0 Action to
                                >T
                                ~
0 v) c   Report 0       lA 0       E                   Prevent Recurrence 0
O Cl 92-08     11-29-92         7. 67                       A                                           Gasket   failure   on 2B   MSR   2nd pass drain LCV-3334B     to feedwater heater 5B,replaced gasket.
1                                                                             3 F: Forced           Reason:                                                    Method:                            Exhibic G - Instructions S: Scheduled       A-Equipment Failure (Explain)                             14lanual                            for Preparation of Data B-Maintenance. or Test                                     2-Manual Scram.                    Entry Sheets for Licensee C-Refueling                                               3-Aucomacic Scram.                  Event Report (LER) File (NUREG-D-Regulatory Restriction'peracor 4-Other (Explain)                  O161)
Training 8c License Examinacion F-Administrative
                      &Operational Error (Explain)
RKV. 445 4949          Hither (Explain)                                                                               Exhibit I - Same Source
 
    ~w H
'I
 
NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-244 UNIT R.E.Ginna Nuclear Power Plant DATE Decem r 10 1992 COMPLETED BY Robert E.Dodge TELEPHONE 1 315 524-4446 ext.396 MONTH November 1992 The reactor power level averaged 974 for the majority of the report, with the following exception:
OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Decem   r 10 1992 COMPLETED BY Robert E. Dodge TELEPHONE 1 315   524-4446 ext. 396 MONTH   November 1992 The reactor power level averaged 974 for the majority of the report, with the following exception:
On November 29, 1992 power level was reduced to 32%to repair a gasket on MSR 2B steam drain line to feedwater heater 5B.}}
On November 29, 1992 power level was reduced to 32% to repair a gasket on MSR 2B steam drain line to feedwater heater 5B.}}

Revision as of 08:46, 29 October 2019

Monthly Operating Rept for Nov 1992 for Re Ginna Nuclear Power Plant.W/921210 Ltr
ML17309A503
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/30/1992
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9212150032
Download: ML17309A503 (7)


Text

'Ci

~l stsilllll"'ite)~tz" ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER N.Y. 14649.0001 ROBERTC MECREDY TELEPHONE Vice President AREA CODE 71B 546 2700 Cinna Nuclear Producrion GZNNA STATION December 10, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for November, 1992 Operating Status Xnformation R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of November, 1992.

Very truly yours, Robert C. Mecred RCM/

Attachments cc:, Mr. Thomas T. Martin NRC (1)

ap OPERATING DATA REPORT DOCKET NO. 50-244 DATE Dec r 10 1992 COHPLETED BY Robert E. Dodge TELEPHONE 315 524.4446 ext. 396 OPERATING STATUS

1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes: The unit operated at approx.
2. Reporting Period: November 1992 97/. reactor power level for
3. Licensed Thermal Power (MWt): 1520 the report period except for 4~ Nameplate Rating (Gross HWe): 490 events outlined on page 4.
5. Design Electrical Rating (Net HWe): 470
6. Haximm Dependable Capacity (Gross HWe): 490
7. Maxinun Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Hcnth Yr.-to-Date Cmulat 1 ve

11. Hours In Report Period 720 8 040 202 146.45
12. Nunber of Hours Reactor Was Critical 720 6 889.71 160 220.67 13 ~ Reactor Reserve Shutdown Hours 1 687.55 14 ~ Hours Generator On-Line 720 6 793.75 157 499.13
15. Unit Reserve Shutdown Hours 8.5
  • 16 ~ Gross Thermal Energy Generated (HWN) 1 045 291 9 723 083 222 937 596
17. Gross Electrical Energy Generated (HWN) 356 190 3 291 724 73 621 331
18. Net Electrical Energy Generated (HWN) 338 563 3 125 312 69 877 859
19. Unit Service Factor 100% 84.50% 78.07/.
20. Unit Availability Factor 100/, 84.50% 78.07%

21 ~ Unit Capacity Factor (Using HDC Net) 100.05/, 82.71% 74.89%

22. Unit Capacity Factor (Using DER Net) 100.05% 82.71% 74.89%

23., Unit Forced Outage Rate 0/ 2.25% 5.89%

24. Shutdowns Scheduled Over Next 6 Honths (Type, Date and Duraticn of Each):

'f Refueli and Haintenance - Harch 19 1993 45 da 25 Shut Down At End Of Report Period, Estimated Date of Startup:

26 'nits In Test Status (Prior to Comnerciai Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

<<CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975

<<*CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969

t AVERAGE DAILY UNIT POWER LEVEL t

DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE December 0 1992 COMPLETED BY o ert E. Dodge TELEPHONE 1 315 524-4446 ext. 396 MONTH November 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

17. 480 2 ~ 480 18. 481 3 ~ 481 19. 481 4 481 20. 481

'80

~

5 ~ 481 21. 481 6 ~ 481 22. 481 7 ~ 421 23 481 482

'4.

8 ~ 481 9 ~ 481 25. 481

10. 481 26 ~ 481 481 27 481
12. 481

'8.

481 13 481 29. 258

'4 481 30. 431

'5.

481 31.

16 481 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

00(:KET NO. SO 244 liNlTNAMl'.R.E- 6INNA NUCLEAtc POWER PLAN'K UNIT SHUTDOWN AND POWER REDUCTIONS

(:OMPLI'.TED BY Robert E l)odge 9>> PfiON'f, Bi>-524-4446 ext. 396 Ginna Station Pl CY cn>>0 0 4 4 0 Licensee Em O IC) 4 0 Cause L Corrective Ho. Date 4 0 0

4 0>>> cc4O Event o 0 VI 4 0 4 0 0 Action to

>T

~

0 0 v) c Report 0 lA 0 E Prevent Recurrence 0

O Cl 92-08 11-29-92 7. 67 A Gasket failure on 2B MSR 2nd pass drain LCV-3334B to feedwater heater 5B,replaced gasket.

1 3 F: Forced Reason: Method: Exhibic G - Instructions S: Scheduled A-Equipment Failure (Explain) 14lanual for Preparation of Data B-Maintenance. or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Aucomacic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction'peracor 4-Other (Explain) O161)

Training 8c License Examinacion F-Administrative

&Operational Error (Explain)

RKV. 445 4949 Hither (Explain) Exhibit I - Same Source

~w H

'I

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Decem r 10 1992 COMPLETED BY Robert E. Dodge TELEPHONE 1 315 524-4446 ext. 396 MONTH November 1992 The reactor power level averaged 974 for the majority of the report, with the following exception:

On November 29, 1992 power level was reduced to 32% to repair a gasket on MSR 2B steam drain line to feedwater heater 5B.