{{#Wiki_filter:(Addressee)
{{#Wiki_filter:(Addressee)
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 July 30, 2018 Mr. Peter P. Sena, III President and Chief Nuclear Officer PSEG Nuclear LLC
UNITED STATES NUCLEAR REGULATORY COMMISSION uly 30, 2018
- N09 P. O. Box 236 Hancocks Bridge, NJ 08038 SUBJECT: HOPE CREEK GENERATING STATION UNIT 1
- DESIGN BASES ASSURANCE INSPECTION (TEAM S) REPORT 05000354/201 8 0 10


==Dear Mr. S ena:==
==SUBJECT:==
On June 22, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Hope Creek Generating Station (HCGS). The NRC inspectors discussed the results of this inspection with John Garecht , Hope Creek Maintenance Director
HOPE CREEK GENERATING STATION UNIT 1 - DESIGN BASES ASSURANCE INSPECTION (TEAMS) REPORT 05000354/2018010
, and other members of your staff. The final results of the inspection were presented via telephone on July 6, 2018
, to David Mannai, Senior Director Regulatory Operations, and other members of your staff.


The results of this inspection are documented in the enclosed report.
==Dear Mr. Sena:==
On June 22, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Hope Creek Generating Station (HCGS). The NRC inspectors discussed the results of this inspection with John Garecht, Hope Creek Maintenance Director, and other members of your staff. The final results of the inspection were presented via telephone on July 6, 2018, to David Mannai, Senior Director Regulatory Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.


The NRC inspectors did not identify any findings or more-than-minor violations.
The NRC inspectors did not identify any findings or more-than-minor violations.


This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 2.390, "Public Inspections, Exemptions, Requests for Withholding."
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely,
Sincerely,
/RA/ Mel Gray , Chief Engineering Branch 1 Division of Reactor Safety Docket N o.: 50-354 License No.
/RA/
: NPF-57  
Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety Docket No.: 50-354 License No.: NPF-57


===Enclosure:===
===Enclosure:===
Inspection Report 05000 354/20 18010
Inspection Report 05000354/2018010


==Inspection Report==
==Inspection Report==
Docket Number: 50-3 54 License Number: NPF-57 Report Number: 05000 354/2018010 Enterprise Identifier
Docket Number: 50-354 License Number: NPF-57 Report Number: 05000354/2018010 Enterprise Identifier: I-2018-010-0035 Licensee: PSEG Nuclear LLC (PSEG)
: I-2018-010-0035 Licensee: PSEG Nuclear LLC (PSEG)
Facility: Hope Creek Generating Station (HCGS)
Facility: Hope Creek Generating Station (HCGS)
Location: Hancocks Bridge, NJ 08038 Inspection Dates: April 16 to May 4, 2018 Inspectors:
Location: Hancocks Bridge, NJ 08038 Inspection Dates: April 16 to May 4, 2018 Inspectors: A. Patel, Senior Reactor Inspector (Team Lead), Division of Reactor Safety (DRS)
A. Patel , Senior Reactor Inspector (Team Lead), Division of Reactor Safety (DRS)
K. Mangan, Senior Reactor Inspector, DRS N. Floyd, Senior Reactor Inspector, DRS J. Brand, Reactor Inspector, DRS M. Yeminy, NRC Contractor N. Della Greca, NRC Contractor Approved By: Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety Enclosure
K. Mangan, Senior Reactor Inspector, DRS N. Floyd, Senior Reactor Inspector, DRS J. Brand, Reactor Inspector, DRS M. Yeminy , NRC Contractor N. Della Greca
, NRC Contractor Approved By:
Mel Gray , Chief Engineering Branch 1 Division of Reactor Safety 2


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring PSEGs performance at


PSEG's performance at Hope Creek Generating Station by conducting a team design bases assurance inspection in accordance with the Reactor Oversight Process.
Hope Creek Generating Station by conducting a team design bases assurance inspection in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
 
The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.


No findings or more-than-minor violations were identified.
No findings or more-than-minor violations were identified.


3
=INSPECTION SCOPES=


=INSPECTION SCOPE=
===This inspection was conducted using the appropriate portions of the inspection procedure (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program -
Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.


S  This inspection w as conducted using the appropriate portions of the inspection procedure (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading
==REACTOR SAFETY==
-rm/doc-collections/insp
-manual/inspection
-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, "Light
-Water Reactor Inspection Program
- Operations Phase."


The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
===71111.21M - Design Bases Assurance Inspection (Teams)
The inspectors evaluated the following components, permanent modifications, and operating experience during the weeks of June 4 and June 18, 2018.


==REACTOR SAFETY==
For the components, the team reviewed the attributes listed in IP 71111.21M, Appendix A, Component Review Attributes, such as those listed below. Specifically, the team evaluated these attributes as per 71111.21M, Appendix B, Component Design Review Considerations and 71111.21M, Appendix C, Component Walkdown Considerations. Specific documents reviewed are listed in the Documents reviewed section.
71111.21 M - Design Bas e s Assurance Inspection (Teams)  The inspectors evaluated the following components, permanent modifications, and operating experience during the weeks of June 4 and June 18, 2018. For the components, the team reviewed the attributes listed in IP 71111.21 M, Appendix A, Component Review Attributes , such as those listed below. Specifically, the team evaluated these attributes as per 71111.21M, Appendix B, Component Design Review Considerations and 71111.21M , Appendix C, Component Walkdown Considerations
 
. Specific documents reviewed are listed in the Documents reviewed section.
Components ===
{{IP sample|IP=IP 71111.21|count=5}}
* Station Auxiliary Cooling System to Residual Heat Removal Heat Exchanger Return Isolation Valve, EG-HV-2512A.


Component s (5 SamplesStation Auxiliary Cooling System to Residual Heat Removal Heat Exchanger Return Isolation Valve, EG-HV-2512A.
o  Material condition and installed configuration (e.g., visual inspection during a walkdown)o  Normal, abnormal, and emergency operating procedures o  Consistency between documentation (e.g., procedures)o  Component/system health reports, corrective maintenance effectiveness and records, and corrective action history o  Design calculations o   Surveillance testing and recent test results The team used Appendix B guidance for Valves, Instrumentation, and Electrical Loads.
* Reactor Core Isolation Cooling Turbine.


o Material condition and installed configuration (e.g., visual inspection during a walkdown) o Normal, abnormal, and emergency operating procedures o Consistency between documentation (e.g., procedures)o Component/system health reports, corrective maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results The team used Appendix B guidance for Valves, Instrumentation, and Electrical Loads
o   Material condition and installed configuration (e.g., visual inspection during a walkdown)o   Normal, abnormal, and emergency operating procedures o   Consistency between documentation (e.g., procedures)o   Component/system health reports, corrective maintenance effectiveness and records, and corrective action history o   Design calculations o   Surveillance testing and recent test results The team used Appendix B guidance for Valves, Instrumentation, and Pumps (as applicable to turbine operation).
. Reactor Core Isolation Cooling Turbine.
* A Emergency Diesel Generator mechanical components.


o Material condition and installed configuration (e.g., visual inspection during a walkdown) o Normal, abnormal, and emergency operating procedures o Consistency between documentation (e.g., procedures)o Component/system health reports, corrective maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results The team used Appendix B guidance for Valves , Instrumentation, and Pumps (as applicable to turbine operation)
o   Material condition and installed configuration (e.g., visual inspection during a walkdown)o   Normal, abnormal, and emergency operating procedures o   Consistency between documentation (e.g., procedures)o   Component/system health reports, corrective maintenance effectiveness and records, and corrective action history o   Design calculations o   Surveillance testing and recent test results The team used Appendix B guidance for Electric Loads.
.  'A' Emergency Diesel Generator mechanical components.
* B Emergency Diesel Generator electrical components.


o Material condition and installed configuration (e.g., visual inspection during a walkdown) o Normal, abnormal, and emergency operating procedures o Consistency between documentation (e.g., procedures)o Component/system health reports, corrective maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results The team used Appendix B guidance for Electric Loads
o   Material condition and installed configuration (e.g., visual inspection during a walkdown)o   Normal, abnormal, and emergency operating procedures o   Consistency between documentation (e.g., procedures)o   Component/system health reports, corrective maintenance effectiveness and records, and corrective action history o   Design calculations o   Surveillance testing and recent test results The team used Appendix B guidance for Electric Loads.
.
* A Residual Heat Removal Pump.


'B' Emergency Diesel Generator electrical components.
o  Material condition and installed configuration (e.g., visual inspection during a walkdown)o  Normal, abnormal, and emergency operating procedures o  Consistency between documentation (e.g., procedures)o  Component/system health reports, corrective maintenance effectiveness and records, and corrective action history o  Design calculations o  Surveillance testing and recent test results The team used Appendix B guidance for Pumps, Valves, and Instrumentation.


o Material condition and installed configuration (e.g., visual inspection during a walkdown) o Normal, abnormal, and emergency operating procedures o Consistency between documentation (e.g., procedures)o Component/system health reports, corrective maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results The team used Appendix B guidance for Electric Loads
Component, Large Early Release Frequency (1 Sample)===
.
* RCIC Exhaust Check Valve, H1FC-1-FC-V003.


'A' Residual Heat Removal Pump.
===o  Material condition and installed configuration (e.g., visual inspection during a walkdown)o  Normal, abnormal, and emergency operating procedures o  Consistency between documentation (e.g., procedures)o  Component/system health reports, corrective maintenance effectiveness and records, and corrective action history o  Design calculations o  Surveillance testing and recent test results The team used Appendix B guidance for Valves.


o Material condition and installed configuration (e.g., visual inspection during a walkdown) o Normal, abnormal, and emergency operating procedures o Consistency between documentation (e.g., procedures)o Component/system health reports, corrective maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results The team used Appendix B guidance for P umps, Valves, and Instrumentation
Permanent Modifications (4 Samples)===
. Component, Large Early Release Frequency (1 Sample)  RCIC Exhaust Check Valve, H1FC-1-FC-V003.
* C Emergency Diesel Generator intercooler pump flexible hose support modification


o Material condition and installed configuration (e.g., visual inspection during a walkdown) o Normal, abnormal, and emergency operating procedures o Consistency between documentation (e.g., procedures)o Component/system health reports, corrective maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results The team used Appendix B guidance for Valves. Permanent Modification s (4 Samples)  'C' Emergency Diesel Generator intercooler pump flexible hose support modification Revise emergency operating procedure calculation, H-1-ZZ-MDC-4019, to reflect reactor fuel changes Motor Control Center compartment replacements High Pressure Coolant Injection system battery analysis Operating Experience (3 Samples)   NRC IN 2016
===*  Revise emergency operating procedure calculation, H-1-ZZ-MDC-4019, to reflect reactor fuel changes
-05, Operating Experience Regarding Complications from Loss of Instrument Air, dated April, 27 2016 NRC Regulatory Issue Summary 2011
* Motor Control Center compartment replacements
-12, Adequacy of Station Electric Distribution System Voltages, Revision 1 NRC IN 2009 Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify, dated June, 19 2009
* High Pressure Coolant Injection system battery analysis Operating Experience (3 Samples)===
* NRC IN 2016-05, Operating Experience Regarding Complications from Loss of Instrument Air, dated April, 27 2016
* NRC Regulatory Issue Summary 2011-12, Adequacy of Station Electric Distribution System Voltages, Revision 1
* NRC IN 2009-09 - Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify, dated June, 19 2009


==EXIT MEETING S AND DEBRIEFS==
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.
The inspectors verified no proprietary information was retained or documented in this report.
 
* On June 22, 2018, the team debriefed the Design Bases Assurance Inspection (Teams)preliminary results to Mr. John Garecht, Hope Creek Maintenance Director, and other members of PSEG staff.
On June 22, 2018, the team debriefed the Design Bases Assurance Inspection (Teams) preliminary results to Mr. John Garecht , Hope Creek Maintenance Director, and other members of PSEG staff.
* On July 6, 2018, the team conducted a phone exit presenting the final results of the inspection with Mr. David Mannai, Senior Director Regulatory Operations, and other members of PSEG staff.
 
On July 6, 2018, the team conducted a phone exit presenting the final results of the inspection with Mr. David Mannai , Senior Director Regulatory Operations, and other members of PSEG staff
.


=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


71111.21M  
71111.21M - DESIGN BASES ASSURANCE INSPECTION (TEAMS)
- DESIGN BASES ASSURANCE INSPECTION (TEAM
Calculations
S)  Calculations
1-P-KJ-624-C010, Design Calculation for Emergency Diesel Generator (EDG) Surge/Vent
1-P-KJ-624-C010, Design Calculation for Emergency Diesel Generator (EDG) Surge/Vent
Anchors, Rev. 0
Anchors, Rev. 0
BC-0002(Q), NPSH for RHR Pumps with Suction from the Suppression Pool, Rev. 5
BC-0002(Q), NPSH for RHR Pumps with Suction from the Suppression Pool, Rev. 5
BC-0023(Q), RHR Min Flow Orifice E/1
BC-0023(Q), RHR Min Flow Orifice E/1-D001, Rev. 3
-D001, Rev. 3
BC-11(Q), RHR Minimum Flow Bypass Line Size, Rev. 2
BC-11(Q), RHR Minimum Flow Bypass Line Size, Rev. 2
BC-3(Q), NPSH for RHR Pumps in Shutdown Cooling Mode, Rev. 3
BC-3(Q), NPSH for RHR Pumps in Shutdown Cooling Mode, Rev. 3
Line 126: Line 115:
C-1991, EDG Intercooler Pump Surge Piping, Rev. 0
C-1991, EDG Intercooler Pump Surge Piping, Rev. 0
C-1992, EDG Intercooler Pump Vent Piping, Rev. 0
C-1992, EDG Intercooler Pump Vent Piping, Rev. 0
D EH-09-0141, HPCI Steam Exhaust Piping Water Hammer Analysis, Dated 10/8/09
DEH-09-0141, HPCI Steam Exhaust Piping Water Hammer Analysis, Dated 10/8/09
E-1.3 (Q), Hope Creek Generating Station Short Circuit Study of 480FV Systems, Rev. 3
E-1.3 (Q), Hope Creek Generating Station Short Circuit Study of 480FV Systems, Rev. 3
E-1.4 (Q), HC Class 1E 125 & 250 VDC Systems Short Circuit
E-1.4 (Q), HC Class 1E 125 & 250 VDC Systems Short Circuit and Voltage Drop Studies,
and Voltage Drop Studies, Rev. 7 E-15.1 (Q), Hope Creek Load Flow and Degraded Voltage Analysis, Rev. 7 & Rev. 11
Rev. 7
E-15.1 (Q), Hope Creek Load Flow and Degraded Voltage Analysis, Rev. 7 & Rev. 11
E-18, Selection of Overload Heaters for AC MOVs and Continuous Duty Motors, Rev. 2
E-18, Selection of Overload Heaters for AC MOVs and Continuous Duty Motors, Rev. 2
E-26 (Q), Breaker to Fuse & Fuse to Fuse Coordination for Appendix R, Rev.
E-26 (Q), Breaker to Fuse & Fuse to Fuse Coordination for Appendix R, Rev. 4B
B E-5.1 (Q), HC Class 1E 250 VDC Station Battery and Charger Sizing, Rev. 9
E-5.1 (Q), HC Class 1E 250 VDC Station Battery and Charger Sizing, Rev. 9
E-5.19 (Q), 250 VDC HPCI System Battery Analysis, Rev. 0
E-5.19 (Q), 250 VDC HPCI System Battery Analysis, Rev. 0
E-7.12 (Q), HC AVR Limits and Protection Coordination, Rev. 0
E-7.12 (Q), HC AVR Limits and Protection Coordination, Rev. 0
E-7.13 (Q), Penetration Assembly Protection, Rev.
E-7.13 (Q), Penetration Assembly Protection, Rev. 4B
B E-7.4 (Q), E
E-7.4 (Q), E-7.4(Q) Class 1E 4.16 KV System Protection Relay Settings, Rev. 6
-7.4(Q) Class 1E 4.16 KV System Protection Relay Settings, Rev. 6 E-7.7 (Q), Class
E-7.7 (Q), Class 1E 480 V System Protecting Relaying, Rev. 7C
E 480 V System Protecting Relaying, Rev.
E-9 (Q), Standby Class 1E Diesel Generator Sizing, Revs. 9, 9A, & 9B
C E-9 (Q), Standby Class 1E Diesel Generator Sizing, Revs. 9, 9A, & 9B
GM-0027, Diesel Generator Area HVAC Analysis, Rev. 1
GM-0027, Diesel Generator Area HVAC Analysis, Rev. 1
H-1-EG-MDC-0938, MOV Capability Assessment for 1EG
H-1-EG-MDC-0938, MOV Capability Assessment for 1EG-HV-2512A, Rev. 1
-HV-2512A, Rev.
Hope Creek Load Flow and Degraded Voltage Analysis, Rev. 11
Hope Creek Load Flow and Degraded Voltage Analysis, Rev. 11
MIDAS 2015.226, MIDACALC Results 1BD
MIDAS 2015.226, MIDACALC Results 1BD-HV-F046 DC Motor Operated Valve, Rev. 5
-HV-F046 DC Motor Operated Valve, Rev. 5
NAI-1484-01, Loads on Turbine Exhaust Pipes due to Post LOCA Turbine Trip, Rev. 1
NAI-1484-01, Loads on Turbine Exhaust Pipes due to Post LOCA Turbine Trip, Rev. 1
SC-JE-0059, Diesel Fuel Oil Day Tank Level, Rev. 4
SC-JE-0059, Diesel Fuel Oil Day Tank Level, Rev. 4
Corrective Action Documents (*initiated in response to inspection)
Corrective Action Documents (*initiated in response to inspection)
20411602 20466535 20519905 20529533 20594384 20595967 20601216 20602340 20613232 20613929 20628456 20629808 20633331 20633802 20663859 20665454 20667174 20686017 20686398 2 0689441 20696918 20698578 20701108 20721062 20723443 20725078 20736860 20738706 20738711 20746795 20747160 20750168 20751715 20754048 20754048 20754162 20760634 20761521 20764634 20767192 20769250 20769250 20769459 20771585 20772476 20772476 20780884 20784 381 20784382 20786607 20786624 20787622 20790172 20791131 20791132 20791133 20791142 20791715 20796656  20796705* 20796837* 20796838* 20796847* 20796862* 20796875* 20796917* 20796918* 20796929* 20796941* 20796985*
20411602             20663859            20738711            20769459          20791142
20797040* 20797126* 20797498* 20798740 207 98770* 20798781* 20798784* 20798786* 20798816 20798816 20798937* 20798940* 20798985* 20798986* 20799011* 20798816* 20799124* 20799129* 20799131* 20799402* Design and Licensing Basis
20466535             20665454            20746795            20771585          20791715
Docket No, 50
20519905             20667174            20747160            20772476          20796656
-354, Hope Creek Generating Station, Amendment to Facility Operating License, Amendment No. 144
20529533             20686017             20750168           20772476         20796705*
Drawings 1-P-FC-003, Fab Isometric RCIC Turbine Supply and Exhaust Reactor Building, Rev. 13
20594384            20686398            20751715            20780884          20796837*
20595967            20689441            20754048            20784381          20796838*
20601216            20696918            20754048            20784382          20796847*
20602340            20698578            20754162            20786607          20796862*
20613232            20701108            20760634            20786624          20796875*
20613929            20721062            20761521            20787622          20796917*
20628456            20723443            20764634            20790172          20796918*
20629808            20725078            20767192            20791131          20796929*
20633331            20736860            20769250            20791132          20796941*
20633802            20738706            20769250            20791133          20796985*
20797040*           20798770*            20798816            20798985*         20799124*
20797126*           20798781*           20798816            20798986*         20799129*
20797498*           20798784*           20798937*           20799011*         20799131*
20798740            20798786*           20798940*           20798816*         20799402*
Design and Licensing Basis
Docket No, 50-354, Hope Creek Generating Station, Amendment to Facility Operating License,
Amendment No. 144
Drawings
1-P-FC-003, Fab Isometric RCIC Turbine Supply and Exhaust Reactor Building, Rev. 13
1-P-FC-01, System Isometric Reactor Building RCIC Turbine Supply and Exhaust, Rev. 19
1-P-FC-01, System Isometric Reactor Building RCIC Turbine Supply and Exhaust, Rev. 19
10855-J200 (Q)-595, Logic Diagram, 4.1
10855-J200 (Q)-595, Logic Diagram, 4.16 KV Sys., Diesel Generator Circuit Breaker
KV Sys., Diesel Generator Circuit Breaker  
      (I) 52-40207, Rev. 15
(I) 52-40207, Rev. 15
10855-J200 (Q)-949, Logic Diagram, 862 Sys., Diesel Generator (I) DG800 Control (1 of 3),
10855-J200 (Q)-949, Logic Diagram, 862 Sys., Diesel Generator (I) DG800 Control (1 of 3), Rev. 7 10855-M (Q) 366 (1), Sh. 1 of 30, Elect. Schematic, Engine Control, Rev. 17
Rev. 7
10855-M (Q) 366 (1), Sh. 1 of 30, Elect. Schematic, Engine Control, Rev. 17
10855-M (Q) 366 (2), Sh. 2 of 30, Elect. Schematic, Engine Control, Rev. 12
10855-M (Q) 366 (2), Sh. 2 of 30, Elect. Schematic, Engine Control, Rev. 12
10855-P-0570, Sh. 15, Welding and Non Destructive Testing Requirements for Field Erected
10855-P-0570, Sh. 15, Welding and Non Destructive Testing Requirements for Field Erected
Piping, Rev. 7
Piping, Rev. 7
AM 88-1, Sht. 1, PID Auxiliary Building Diesel Area Control Diagram, Rev.
AM 88-1, Sht. 1, PID Auxiliary Building Diesel Area Control Diagram, Rev. 15
E-0001-0 (Q), Single Line Diagram, Station, Rev. 24
E-0001-0 (Q), Single Line Diagram, Station, Rev. 24
E-0006-1 (Q), Sh. 1 of 2, Single Line Meter & Relay Diagram, 4.16 KV Class 1E Power System, Rev. 13 E-0006-1 (Q), Sh. 2 of 2, Single Line Meter & Relay Diagram, 4.16 KV Class 1E Power System, Rev. 11 E-0008-1 (Q), Sh.
E-0006-1 (Q), Sh. 1 of 2, Single Line Meter & Relay Diagram, 4.16 KV Class 1E Power System,
of 2, Single Line Meter & Relay Diagram, Diesel Generators, Rev. 4
Rev. 13
E-0009-1 (Q), Sh. 1, Single Line Meter & Relay Diagram, 125 VDC System, Channels A & C, Rev. 26 E-0009-1 (Q), Sh. 2, Single Line Meter & Relay Diagram, 125 VDC System, Channels B & D, Rev. 30 E-0009-1 (Q), Sh. 4, Single Line Meter & Relay Diagram, 125 VDC System, Channels C & D, Rev. 13 E-0018-1 (Q), Sh. 1 of 3, Single Line Meter & Relay Diagram, 480 Volt Class 1E Unit Substation
E-0006-1 (Q), Sh. 2 of 2, Single Line Meter & Relay Diagram, 4.16 KV Class 1E Power System,
Rev. 11
E-0008-1 (Q), Sh. 2 of 2, Single Line Meter & Relay Diagram, Diesel Generators, Rev. 4
E-0009-1 (Q), Sh. 1, Single Line Meter & Relay Diagram, 125 VDC System, Channels A & C,
Rev. 26
E-0009-1 (Q), Sh. 2, Single Line Meter & Relay Diagram, 125 VDC System, Channels B & D,
Rev. 30
E-0009-1 (Q), Sh. 4, Single Line Meter & Relay Diagram, 125 VDC System, Channels C & D,
Rev. 13
E-0018-1 (Q), Sh. 1 of 3, Single Line Meter & Relay Diagram, 480 Volt Class 1E Unit Substation
10B410, 10B420, 10B430, 10B440, 10B450, 10B460, 10B470, 10B480, Rev. 36
10B410, 10B420, 10B430, 10B440, 10B450, 10B460, 10B470, 10B480, Rev. 36
E-0018-1 (Q), Sh. 2, Single Line Meter & Relay Diagram, 480 Volt Class 1E Unit Substation
E-0018-1 (Q), Sh. 2, Single Line Meter & Relay Diagram, 480 Volt Class 1E Unit Substation
10B410, 10B420, 10B430, 10B440, 10B450, 10B460, 10B470, 10B480, Rev. 40
10B410, 10B420, 10B430, 10B440, 10B450, 10B460, 10B470, 10B480, Rev. 40
E-0019-1 (Q), 480 Volt MCC Tabulation Class 1E  
E-0019-1 (Q), 480 Volt MCC Tabulation Class 1E - Aux. Bldg. - D/G Area 10B411, 10B421,
- Aux. Bldg.  
10B431, 10B441, Rev. 13
- D/G Area 10B411, 10B421, 10B431, 10B441, Rev. 13
E-0019-1 (Q), Sh. 2, 480 Volt MCC Tabulation Class 1E - Aux. Bldg. - D/G Area 10B411,
E-0019-1 (Q), Sh. 2, 480 Volt MCC Tabulation Class 1E  
10B421, 10B431, 10B441, Rev. 15
- Aux. Bldg.  
E-0020-1 (Q), Sh. 1 of 2, 480 Volt MCC Tabulation Class 1E - Aux. Bldg. - D/G Area 10B451,
- D/G Area 10B411, 10B421, 10B431, 10B441, Rev. 15
10B461, 10B471, 10B481, Rev. 17
E-0020-1 (Q), Sh. 1 of 2, 480 Volt MCC Tabulation Class 1E  
E-0020-1 (Q), Sh. 2, 480 Volt MCC Tabulation Class 1E - Aux. Bldg. - D/G Area 10B451,
- Aux. Bldg.  
10B461, 10B471, 10B481, Rev. 13
- D/G Area 10B451, 10B461, 10B471, 10B481, Rev. 17
E-0021-1 (Q), Sh. 1 of 6, 480 Volt MCC Tabulation, Class 1E MCC - Reactor Area 10B212,
E-0020-1 (Q), Sh. 2, 480 Volt MCC Tabulation Class 1E  
10B222, 10B232 & 10B242, Rev. 55
- Aux. Bldg.  
E-0046-1 (Q), Schematic Meter & Relay Diagram, 4.16 KV Class 1E Station Power System,
- D/G Area 10B451, 10B461, 10B471, 10B481, Rev. 13
Switchgears 10A401 & 10A403, Rev. 8
E-0021-1 (Q), Sh. 1 of 6, 480 Volt MCC Tabulation, Class 1E MCC  
E-0047-1 (Q), Schematic Meter & Relay Diagram, 4.16 KV Class 1E Station Power System,
- Reactor Area 10B212, 10B222, 10B232 & 10B242, Rev. 55
Switchgears 10A401 & 10A403, Rev. 7
E-0 046-1 (Q), Schematic Meter & Relay Diagram, 4.16 KV Class 1E Station Power System, Switchgears 10A401 & 10A403, Rev. 8
E-0047-1 (Q), Schematic Meter & Relay Diagram, 4.16 KV Class 1E Station Power System, Switchgears 10A401 & 10A403, Rev. 7
 
E-0070-0 (Q), Electrical Schematic Diagram, Class 1E 4.16 KV Sta. Pwr. Sys. Swgr., Main
E-0070-0 (Q), Electrical Schematic Diagram, Class 1E 4.16 KV Sta. Pwr. Sys. Swgr., Main
Circuit Breaker (I) 52
Circuit Breaker (I) 52-40201, Rev. 8
-40201, Rev. 8
E-0071-0 (Q), Electrical Schematic Diagram, Class 1E 4.16 KV Sta. Pwr. Sys. Swgr., Main
E-0071-0 (Q), Electrical Schematic Diagram, Class 1E 4.16 KV Sta. Pwr. Sys. Swgr., Main
Circuit Breaker (I) 52
Circuit Breaker (I) 52-40208, Rev. 8
-40208, Rev. 8
E-0081-0 (Q), Electrical Schematic Diagram, Class 1E - 4.16 KV Unit Substa. Xfmr. Feeder,
E-0081-0 (Q), Electrical Schematic Diagram, Class 1E  
Circuit Breaker (I) 52-40203, Rev. 5
- 4.16 KV Unit Substa. Xfmr. Feeder, Circuit Breaker (I) 52
E-0085-0 (Q), Electrical Schematic Diagram, Class 1E - 4.16 KV Sta. Pwr. Sys. Swgr., Diesel
-40203, Rev. 5
Gen. Circuit Brkr. (I) 52-40207, Rev. 11
E-0085-0 (Q), Electrical Schematic Diagram, Class 1E  
E-0208-0 (Q), Sh. 2, Electrical Schematic Diagram, Class 1E - 4.16 KV Circuit Breaker Control
- 4.16 KV Sta. Pwr. Sys. Swgr., Diesel
Gen. Circuit Brkr. (I) 52
-40207, Rev. 11
E-0208-0 (Q), Sh.
2, Electrical Schematic Diagram, Class 1E  
- 4.16 KV Circuit Breaker Control
Station Service Water Pump, Rev. 12
Station Service Water Pump, Rev. 12
E-0223-0, Sh. 1, RHR HX Outlet Valve 1
E-0223-0, Sh. 1, RHR HX Outlet Valve 1-HV-2512A Scheme No. 1C0318, Rev. 5
-HV-2512A Scheme No. 1C0318, Rev. 5
E-3060-0 (Q), Logic Diagram, Class 1E Station Pwr. Swgr. - 4.16 KV System, Main Circuit
E-3060-0 (Q), Logic Diagram, Class 1E Station Pwr. Swgr.  
- 4.16 KV System, Main Circuit
Breaker, Rev. 16
Breaker, Rev. 16
E-3061-0 (Q), Logic Diagram, Class 1E Station Pwr. Swgr.  
E-3061-0 (Q), Logic Diagram, Class 1E Station Pwr. Swgr. - 4.16 KV System Unit Substa.
- 4.16 KV System Unit Substa.
Xfmr. Feeder Circuit Breaker, Rev. 66
Xfmr. Feeder Circuit Breaker, Rev. 66
E-3080-0 (Q), Sh. 1 of 2, Logic Diagram, Class 1E Sta. Pwr. Swgr.  
E-3080-0 (Q), Sh. 1 of 2, Logic Diagram, Class 1E Sta. Pwr. Swgr. - 4.16 KV System, Diesel
- 4.16 KV System, Diesel
Generator Circuit Breaker, Rev. 12
Generator Circuit Breaker, Rev. 12
E-3080-0 (Q), Sh. 2 of 2, Logic Diagram, Class 1E Sta. Pwr. Swgr.  
E-3080-0 (Q), Sh. 2 of 2, Logic Diagram, Class 1E Sta. Pwr. Swgr. - 4.16 KV System, Diesel
- 4.16 KV System, Diesel
Generator Circuit Breaker, Rev. 8
Generator Circuit Breaker, Rev. 8
E-3081-0 (Q), Sh. 1 of 2, Logic Diagram, Diesel Generator Control, Rev. 7
E-3081-0 (Q), Sh. 1 of 2, Logic Diagram, Diesel Generator Control, Rev. 7
E-3081-0 (Q), Sh. 2 of 2, Logic Diagram, Diesel Generator Control, Rev. 10
E-3081-0 (Q), Sh. 2 of 2, Logic Diagram, Diesel Generator Control, Rev. 10
FSK-P-1-KJ-622, Small Piping/Aux Building Diesel Generator C from CG
FSK-P-1-KJ-622, Small Piping/Aux Building Diesel Generator C from CG-400 to Tank C-407,
-400 to Tank C
Rev. 13
-407, Rev. 13 FSK-P-1-KJ-624, Small Piping/Aux Building Diesel Generator C from Tank CT
FSK-P-1-KJ-624, Small Piping/Aux Building Diesel Generator C from Tank CT-407 to CG-400,
-407 to CG-400, Rev. 17 J-10-0 (Q), Sh. 4, Logic Diagram, Station Service Water System, SSWS Pumps BP502 &
Rev. 17
J-10-0 (Q), Sh. 4, Logic Diagram, Station Service Water System, SSWS Pumps BP502 &
DP502 Start, Rev. 15
DP502 Start, Rev. 15
J-10-0 (Q), Sh. 5, Logic Diagram, Station Service Water System, SSWS Pumps BP502 &
J-10-0 (Q), Sh. 5, Logic Diagram, Station Service Water System, SSWS Pumps BP502 &
DP502 Stop, Rev. 12
DP502 Stop, Rev. 12
J-51-0, Sht. 16, Logic Diagram Residual Heat Removal, Rev.
J-51-0, Sht. 16, Logic Diagram Residual Heat Removal, Rev. 7
J-107-0 (Q), Sh. 4, Logic Diagram, Emergency Load Sequencer, Rev. 3
J-107-0 (Q), Sh. 4, Logic Diagram, Emergency Load Sequencer, Rev. 3
J-4049-0. Sh. 2, Reactor Core Isolation Cooling RCIC Pump Turbine Control, Rev. 7
J-4049-0. Sh. 2, Reactor Core Isolation Cooling RCIC Pump Turbine Control, Rev. 7
Line 233: Line 234:
M-11-1, Sh. 1, Safety Auxiliaries Cooling Reactor Building, Rev. 32
M-11-1, Sh. 1, Safety Auxiliaries Cooling Reactor Building, Rev. 32
M-30-1, Sh. 2, Diesel Generator Auxiliary Systems Intercooler and Injector Cooling, Jacket
M-30-1, Sh. 2, Diesel Generator Auxiliary Systems Intercooler and Injector Cooling, Jacket
Water, Crankcase Vacuum Air Intake, Exhaust and Vibration Monitoring Systems, Rev. 27 M-49-1, Reactor Core Isolation Cooling, Rev. 30
Water, Crankcase Vacuum Air Intake, Exhaust and Vibration Monitoring Systems,
Rev. 27
M-49-1, Reactor Core Isolation Cooling, Rev. 30
M-50-1, RCIC Pump Turbine, Rev. 33
M-50-1, RCIC Pump Turbine, Rev. 33
M-51-1, Sht. 1, Residual Heat Removal, Rev. 51
M-51-1, Sht. 1, Residual Heat Removal, Rev. 51
M-51-1, Sht. 2, Residual Hear Removal , Rev. 45
M-51-1, Sht. 2, Residual Hear Removal , Rev. 45
M-85-1, Sht. 1, Auxiliary Building Diesel Area Air Flow Diagram, Rev. 19
M-85-1, Sht. 1, Auxiliary Building Diesel Area Air Flow Diagram, Rev. 19
N-749, RHR Pump Head Capacity Curve, Rev. 0   N-1223, SACS Pump Curve, Rev. 0
N-749, RHR Pump Head Capacity Curve, Rev. 0
N-1223, SACS Pump Curve, Rev. 0
Functional, Surveillance and Modification Acceptance Testing
Functional, Surveillance and Modification Acceptance Testing
280950, 24M PM Calibration 1KJSS
280950, 24M PM Calibration 1KJSS-421B: B EDG Speed Switch, Performed on 2/14/17
-421B: "B" EDG Speed Switch, Performed on 2/14/17
50003496, Emergency Diesel Generator Interdependence Verification Test - 10 Year,
50003496, Emergency Diesel Generator Interdependence Verification Test - 10 Year, Performed on 4/21/09
Performed on 4/21/09
50065569, 60M ST / 10
50065569, 60M ST / 10-D-421, Class 1E, Channel A, 250 Volt Battery Performance Test,
-D-421, Class 1E, Channel A, 250 Volt Battery Performance Test, Performed on 4/19/09
Performed on 4/19/09
 
50123056, 60M ST / 10-D-421, Class 1E, Channel A, 250 Volt Battery Performance Test,
50123056, 60M ST / 10
Performed on 10/24/13
-D-421, Class 1E, Channel A, 250 Volt Battery Performance Test, Performed on 10/24/13
50162739, Integrated Emergency Diesel Generator 1BG400 Test - 18 Months, Performed on
50162739, Integrated Emergency Diesel Generator 1BG400 Test  
4/24/15
- 18 Months, Performed on 4/24/15 50175271, EDG1BG400  
50175271, EDG1BG400 - 24 Hour Operability Run and Hot Restart Test, Performed on 9/9/16
- 24 Hour Operability Run and Hot Restart Test, Performed on 9/9/16
50175692, NUST 18M ST 52-40208, 4KV Swgr. Degraded Voltage Instrumentation Channel
50175692, NUST 18M ST 52
Calibration & Functional Test, Performed on 11/2/16
-40208, 4KV Swgr. Degraded Voltage Instrumentation Channel Calibration & Functional Test, Performed on 11/2/16
50175732, NUST 18M ST 52-40201, 4KV Swgr. Degraded Voltage Instrumentation Channel
50175732, NUST 18M ST 52
Calibration & Functional Test, Performed on 10/31/16
-40201, 4KV Swgr. Degraded Voltage Instrumentation Channel Calibration & Functional Test, Performed on 10/31/16
50175793, 4.16 KV Bus 10A402 Undervoltage Test and Return to Service - B Channel,
50175793, 4.16 KV Bus 10A402 Undervoltage Test and Return to Service - B Channel, Performed on 4/18/18
Performed on 4/18/18
50176377, NUST ST 18M Test, 10
50176377, NUST ST 18M Test, 10-D-421 Class 1E, Channel A, 250V Battery Service Test,
-D-421 Class 1E, Channel A, 250V Battery Service Test, Performed 10/31/16
Performed 10/31/16
50188845, EDG1BG400  
50188845, EDG1BG400 - 24 Hour Operability Run and Hot Restart Test, Performed on 3/13/18
- 24 Hour Operability Run and Hot Restart Test, Performed on 3/13/18
50190557, NUST Perform IC-FT.PE-0006 on Load Sequencer Div-2, Performed on 4/15/18
50190557, NUST Perform I
50190581, NUST ST 18M Test, 10-D-421 Class 1E, Channel A, 250V Battery Service Test,
C-FT.PE-0006 on Load Sequencer Div
Performed on 5/3/18
-2, Performed on 4/15/18
50199618, ST / 10-D-421, 250 Volt Battery Quarterly Surveillance, Performed on 2/25/18
50190581, NUST ST 18M Test, 10
50199857, NUST 3M ST 10-A-402-01 / 4.16 KV Swgr Degraded Voltage, Performed on 2/17/18
-D-421 Class 1E, Channel A, 250V Battery Service Test, Performed on 5/3/18
50199858, NUST 3M ST 10-A-402-08 / 4.16 KV Swgr Degraded Voltage, Performed on 2/17/18
50199618, ST / 10
202110, NUST ST / 10-D-421, 250 Volt Battery Quarterly Surveillance, Performed on 4/1/18
-D-421, 250 Volt Battery Quarterly Surveillance, Performed on 2/25/18
202136, Emergency Diesel Generator 1BG400 Operability Test - Monthly, Performed on
50199857, NUST 3M ST 10
4/30/18
-A-402-01 / 4.16 KV Swgr Degraded Voltage, Performed on 2/17/18
203057, Emergency Diesel Generator 1BG400 Operability Test - Monthly, Performed on
50199858, NUST 3M ST 10
5/16/18
-A-402-08 / 4.16 KV Swgr Degraded Voltage, Performed on 2/17/18
203499, NUST 31D ST 10-D-421 Class 1E, Channel A, 250V Battery Test, Performed on
202110, NUST ST / 10
5/27/18
-D-421, 250 Volt Battery Quarterly Surveillance, Performed on 4/1/18 50202136, Emergency Diesel Generator 1BG400 Operability Test  
203541, Perform IC-FT.PE-0002 on Load Sequencer Div-2, Performed on 5/14/18
- Monthly, Performed on 4/30/18 50203057, Emergency Diesel Generator 1BG400 Operability Test  
HC.MD-PM.FC-0001, Reactor Core Isolation Cooling Steam Turbine Inspection and PM,
- Monthly, Performed on 5/16/18 50203499, NUST 31D ST 10
performed 5/16/18
-D-421 Class 1E, Channel A, 250V Battery Test, Performed on 5/27/18 50203541, Perform IC
HC.MD-PM.FC-0003(Q), Reactor Core Isolation Cooling Turbine Exhaust Check Valve
-FT.PE-0002 on Load Sequencer Div
Inspection & PM, performed 12/14/12
-2, Performed on 5/14/18
HC.OP-FT.KJ-0001 (Q), Emergency Diesel Generator 1AG400-Functional Test, performed
HC.MD-PM.FC-0001, Reactor Core Isolation Cooling Steam Turbine Inspection and PM, performed 5/16/18
4/3/18
HC.MD-PM.FC-0003(Q), Reactor Core Isolation Cooling
HC.OP-IS.BC-0001(Q), AP202 A Residual Heat Removal Pump In-Service Test, Rev. 50 -
Turbine Exhaust Check Valve
Performed 4/9/18
Inspection & PM, performed
HC.OP-IS.BD-0001, Reactor Core Isolation Cooling Pump-OP203-Inservice Test, peformed
2/14/12 HC.OP-FT.KJ-0001 (Q), Emergency Diesel Generator
2/23/18
AG 400-Functional Test, performed
HC.OP-IS.BD-0101(Q), Reactor Core Isolation Cooling System Valves - Inservice Test,
4/3/18 HC.OP-IS.BC-0001(Q), AP202 A Residual Heat Removal Pump In-Service Test, Rev. 50  
performed 3/6/17
Performed 4/9/1
HC.OP-IS.BD-0101(Q), Reactor Core Isolation Cooling System Valves - Inservice Test,
HC.OP-IS.BD-0001, Reactor Core Isolation Cooling Pump
performed 3/20/18
-OP203-Inservice Test, peformed
HC.OP-IS.EG-0101, Safety Auxiliaries Cooling System - Subsystem A Valves - Inservice Test,
2/23/18 HC.OP-IS.BD-0101(Q), Reactor Core Isolation Cooling System Valves - Inservice Test, performed 3/6/17
Performed 01/05/18
HC.OP-IS.BD-0101(Q), Reactor Core Isolation Cooling System
HC.OP-IS.EG-0102 (Q), Safety Auxiliary Cooling System-Subsystem B Valves-IST, performed
Valves - Inservice Test, performed 3/20/18
1/27/14
HC.OP-IS.EG-0101, Safety Auxiliaries Cooling System  
HC.OP-ST.BD-0003, RCIC Functional Verification-18 Months, performed 2/28/17
- Subsystem A Valves  
HC.OP-ST.EG-0001, SACS Flow Path Verification - Monthly, Performed 04/30/18
- Inservice Test, Performed 01/05/18
HC.OP-ST.KJ-0001 (Q), Emergency Diesel Generator 1AG400-Operability Test-Monthly,
HC.OP-IS.EG-0102 (Q), Safety Auxiliary Cooling System
performed 5/8/18
-Subsystem B Valves
Miscellaneous
-IST, performed
10866-J610-65-1, Self-Acting Pressure Regulator, dated 5/2/83
1/27/14 HC.OP-ST.BD-0003, RCIC Functional Verification
-18 Months, performed 2/28/17
HC.OP-ST.EG-0001, SACS Flow Path Verification  
- Monthly, Performed 04/30/18
HC.OP-ST.KJ-0001 (Q), Emergency Diesel Generator
AG 400-Operability Test
-Monthly, performed 5/8/18
Miscellaneous 10866-J610-65-1, Self-Acting Pressure Regulator, dated 5/2/83
160607BP-01, Machinery Analysis Report for C EDG Jacket Water Piping, dated 06/07/16
160607BP-01, Machinery Analysis Report for C EDG Jacket Water Piping, dated 06/07/16
70105083, Technical Evaluation for Hope Creek 4.16kV 1E Undervoltage Relay Scheme, dated
70105083, Technical Evaluation for Hope Creek 4.16kV 1E Undervoltage Relay Scheme, dated
2/23/09 70183330, Apparent Cause Evaluation for C EDG Jacket Water Braided Hose Leak, Rev. 3
2/23/09
70183330, Apparent Cause Evaluation for C EDG Jacket Water Braided Hose Leak, Rev. 3
BWROG-TP-14-018, Beyond Design Basis RCIC Elevated Temperature Functionality
BWROG-TP-14-018, Beyond Design Basis RCIC Elevated Temperature Functionality
Assessment, Rev. 0
Assessment, Rev. 0
Instrument Calibration Data Report, RCIC Flow Control H1FC
Instrument Calibration Data Report, RCIC Flow Control H1FC-FC-4158, dated 6/8/18
-FC-4158, dated 6/8/18 Program Health Report for Inservice Testing (IST), Q4  
Program Health Report for Inservice Testing (IST), Q4 - 2017
- 2017 Program Health Report for Motor Operated Valves (MOV), Q2  
Program Health Report for Motor Operated Valves (MOV), Q2 - 2017
- 2017 System Health Report for Diesel Generator, Q2  
System Health Report for Diesel Generator, Q2 - 2018
- 2018 System Health Report for SACS & TACS, Q2  
System Health Report for SACS & TACS, Q2 - 2018
- 2018 Modifications and Design Changes DCP 80090368, Modify EG
Modifications and Design Changes
-HV-2512A logic to allow valve to be throttled, Rev. 1
DCP 80090368, Modify EG-HV-2512A logic to allow valve to be throttled, Rev. 1
DCP 80095620, Motor Control Center (MCC) Compartment Replacements, Rev.
DCP 80095620, Motor Control Center (MCC) Compartment Replacements, Rev. 4
DCP 80114476, "C" Emergency Diesel Generator Governor Control System Replacement,   Rev. 0 DCP 80117790, Revise EOP Calculation H
DCP 80114476, C Emergency Diesel Generator Governor Control System Replacement,
-1-ZZ-MDC-4019, Rev. 0
Rev. 0
DCP 80119727, Emergency Diesel Generator Vibrations Piping and Support Adjustments, Rev. 0 DCP 80120892, 250 VDC HPCI System Battery Analysis, Rev. 0 DCP 80121930, VAVF
DCP 80117790, Revise EOP Calculation H-1-ZZ-MDC-4019, Rev. 0
-0032, Diaphragm Valve Replacement, Rev.
DCP 80119727, Emergency Diesel Generator Vibrations Piping and Support Adjustments,
Rev. 0
DCP 80120892, 250 VDC HPCI System Battery Analysis, Rev. 0
DCP 80121930, VAVF-0032, Diaphragm Valve Replacement, Rev. 0
Procedures
Procedures
EP-HC-111-223, HCGS ECG  
EP-HC-111-223, HCGS ECG - EAL Technical Basis, Rev. 2
- EAL Technical Basis, Rev. 2
EP-HC-111-222, HCGS ECG - EAL Technical Basis, Rev. 0
EP-HC-111-22 2, HCGS ECG  
- EAL Technical Basis, Rev.
ER-AA-302-1007, MOV Limitorque Actuator Capability Determination Methodology, Rev. 7
ER-AA-302-1007, MOV Limitorque Actuator Capability Determination Methodology, Rev. 7
HC.IC-DB.BD-0002, EG-M Control Box and Ramp Generator Signal Converter (RCIC), Rev. 1
HC.IC-DB.BD-0002, EG-M Control Box and Ramp Generator Signal Converter (RCIC), Rev. 1
HC.IC-DC.ZZ-0358(Q), Dynalco Controls Universal Speed Switch & Speed Transmitter
HC.IC-DC.ZZ-0358(Q), Dynalco Controls Universal Speed Switch & Speed Transmitter
SST-2000 Series, Rev 0
SST-2000 Series, Rev 0
HC.IC-FT.PE-0002(Q), Emergency Load Sequencer System, Diesel Generator B, 1BC428, Rev. 9 HC.IC-FT.PE-0006(Q), Time Interval Test. Emergency Load Sequencer System, Diesel Generator B, 1BC428, Rev.10
HC.IC-FT.PE-0002(Q), Emergency Load Sequencer System, Diesel Generator B, 1BC428,
Rev. 9
HC.IC-FT.PE-0006(Q), Time Interval Test. Emergency Load Sequencer System, Diesel
Generator B, 1BC428, Rev.10
HC.IC-LC.FC-001, RCIC Turbine Speed Control System, Rev. 11
HC.IC-LC.FC-001, RCIC Turbine Speed Control System, Rev. 11
HC.MD-GP.ZZ-0015(Q), Battery Equalizing Charge, Rev 21, Rev. 22 and Rev. 23
HC.MD-GP.ZZ-0015(Q), Battery Equalizing Charge, Rev 21, Rev. 22 and Rev. 23
HC.MD-ST.KJ-0001, Diesel Generator Technical Specification Surveillance and Preventative
HC.MD-ST.KJ-0001, Diesel Generator Technical Specification Surveillance and Preventative
Maintenance, Rev. 46
Maintenance, Rev. 46
HC.MD-ST.PB-0003(Q), Class 1E 4.16 KV Degraded Voltage Monthly Instrumentation Channel Functional Test, Rev. 28
HC.MD-ST.PB-0003(Q), Class 1E 4.16 KV Degraded Voltage Monthly Instrumentation Channel
HC.MD-ST.PB-0016(Q), Class 1E 4.16 KV Feeder Degraded Voltage 18 Month Instrumentation Channel Calibration & Functional Test 10
Functional Test, Rev. 28
-A-40201, Rev. 6
HC.MD-ST.PB-0016(Q), Class 1E 4.16 KV Feeder Degraded Voltage 18 Month Instrumentation
HC.MD-ST.PB-0017(Q), Class 1E 4.16 KV Feeder Degraded Voltage 18 Month Instrumentation Channel Calibration & Functional Test 10
Channel Calibration & Functional Test 10-A-40201, Rev. 6
-A-40208, Rev. 7
HC.MD-ST.PB-0017(Q), Class 1E 4.16 KV Feeder Degraded Voltage 18 Month Instrumentation
Channel Calibration & Functional Test 10-A-40208, Rev. 7
HC.MD-ST.PJ-0001(Q), 250 Volt Weekly Battery Surveillance, Rev. 24
HC.MD-ST.PJ-0001(Q), 250 Volt Weekly Battery Surveillance, Rev. 24
HC.MD-ST.PJ-0002(Q), 250 Volt Quarterly Battery Surveillance , Rev. 34 & Rev. 35
HC.MD-ST.PJ-0002(Q), 250 Volt Quarterly Battery Surveillance , Rev. 34 & Rev. 35
HC.MD-ST.PJ-0007(Q), 250 Volt Station Batteries Performance Discharge Test Using BCT
HC.MD-ST.PJ-0007(Q), 250 Volt Station Batteries Performance Discharge Test Using BCT-
-2000 with Windows Software and Associated Surveillance Testing, Rev. 0 & Rev. 3
2000 with Windows Software and Associated Surveillance Testing, Rev. 0 & Rev. 3
 
HC.MD-ST.PJ-0008(Q), 250 Volt Station Batteries 18 Month Service Test Using BCT-2000 with
HC.MD-ST.PJ-0008(Q), 250 Volt Station Batteries 18 Month Service Test Using BCT
Windows Software and Associated Surveillance Testing, Rev. 5
-2000 with Windows Software and Associated Surveillance Testing, Rev. 5
HC.MD-ST.ZZ-0009, Motor Operated Valve Thermal Overload Protection Surveillance, Rev. 21
HC.MD-ST.ZZ-0009, Motor Operated Valve Thermal Overload Protection Surveillance, Rev. 21
HC.OP-AB.COOL-0002, Safety/Turbine Auxiliaries Cooling System, Rev. 9
HC.OP-AB.COOL-0002, Safety/Turbine Auxiliaries Cooling System, Rev. 9
HC.OP-AB.ZZ-0135, Station Blackout//Loss of Offsite Power//Diesel Generator Malfunction, Rev. 43 HC.OP-AR.ZZ-0006 , Overhead Annunciator
HC.OP-AB.ZZ-0135, Station Blackout//Loss of Offsite Power//Diesel Generator Malfunction,
Window B ox B1, Rev. 26 HC.OP-EO-ZZ-0103/4-FC, Reactor Building & Rad Release Control, Rev. 11
Rev. 43
HC.OP-AR.ZZ-0006, Overhead Annunciator Window Box B1, Rev. 26
HC.OP-EO-ZZ-0103/4-FC, Reactor Building & Rad Release Control, Rev. 11
HC.OP-EO-ZZ-0106-FC, Primary Containment Control HPCI/RCIC Only, Rev. 0
HC.OP-EO-ZZ-0106-FC, Primary Containment Control HPCI/RCIC Only, Rev. 0
HC.OP-EO-ZZ-0102-FC, Primary Containment Control, Rev. 13
HC.OP-EO-ZZ-0102-FC, Primary Containment Control, Rev. 13
HC.OP-IS.EG-0101, Safety Auxiliaries Cooling System  
HC.OP-IS.EG-0101, Safety Auxiliaries Cooling System - Subsystem A Valves - Inservice Test,
- Subsystem A Valves  
Rev. 56
- Inservice Test, Rev. 56 HC.OP-SO.BC-0001, Residual Heat Removal System Operation, Rev. 54
HC.OP-SO.BC-0001, Residual Heat Removal System Operation, Rev. 54
HC.OP-SO-BD-0001, Reactor Core Isolation Cooling System Operation, Rev. 44
HC.OP-SO-BD-0001, Reactor Core Isolation Cooling System Operation, Rev. 44
HC.OP-SO.EG-0001, Safety and Turbine Auxiliaries Cooling Water System Operation, Rev. 56
HC.OP-SO.EG-0001, Safety and Turbine Auxiliaries Cooling Water System Operation, Rev. 56
HC.OP-SO.GM-0001(Q), Diesel Area Ventilation System Operation, Rev. 21 HC.OP-SO.KJ-0001 (Q), Emergency Diesel Generator Operation, Rev.
HC.OP-SO.GM-0001(Q), Diesel Area Ventilation System Operation, Rev. 21
HC.OP-ST.BD-0004, RCIC System Response Time and Flow Test  
HC.OP-SO.KJ-0001 (Q), Emergency Diesel Generator Operation, Rev. 74
- 18 Month, Rev. 9
HC.OP-ST.BD-0004, RCIC System Response Time and Flow Test - 18 Month, Rev. 9
HC.OP-ST.KJ-0002(Q), Emergency Diesel Generator 1BG400 Operability Test  
HC.OP-ST.KJ-0002(Q), Emergency Diesel Generator 1BG400 Operability Test - Monthly,
- Monthly,   Rev. 78 HC.OP-ST.KJ-0006(Q), Integrated Emergency Diesel Generator 1BG400 Test  
Rev. 78
- 18 Months,   Rev. 47 HC.OP-ST.KJ-0009(Q), Emergency Diesel Generator Interdependence Verification Test  
HC.OP-ST.KJ-0006(Q), Integrated Emergency Diesel Generator 1BG400 Test - 18 Months,
- 10 Year, Rev. 9 HC.OP-ST.KJ-0015(Q), EDG1BG400  
Rev. 47
- 24 Hour Operability Run and Hot Restart Test, Rev. 36
HC.OP-ST.KJ-0009(Q), Emergency Diesel Generator Interdependence Verification Test - 10
HC.OP-ST.PB-0006(Q), 4.16 KV Bus 10A402 Undervoltage Test & Return to Service  
Year, Rev. 9
- B Channel, Rev. 20
HC.OP-ST.KJ-0015(Q), EDG1BG400 - 24 Hour Operability Run and Hot Restart Test, Rev. 36
HC.OP-ST.PB-0016(Q), 4.16 KV Bus 10A402 Undervoltage Test  
HC.OP-ST.PB-0006(Q), 4.16 KV Bus 10A402 Undervoltage Test & Return to Service - B
- B Channel, Rev. 3
Channel, Rev. 20
HC.OP-ST.PB-0016(Q), 4.16 KV Bus 10A402 Undervoltage Test - B Channel, Rev. 3
HC.OP-ST.SM-0006, PCIS/RCIC Isolation Functional Test, Rev. 15
HC.OP-ST.SM-0006, PCIS/RCIC Isolation Functional Test, Rev. 15
MA-AA-723-300, Diagnostic Testing and Inspection of Motor Operated Valves, Rev. 9
MA-AA-723-300, Diagnostic Testing and Inspection of Motor Operated Valves, Rev. 9
Line 378: Line 382:
Dampers, Rev. A
Dampers, Rev. A
G300E, Ventilating and Industrial Axial Fan by Buffalo Forge, Rev. A
G300E, Ventilating and Industrial Axial Fan by Buffalo Forge, Rev. A
GEH-1768G, Instructions, Undervoltage Relays, Types IAV54E, IAV54F, IAV54H, IAV55C, IAV55F, IAV55H and IAV55J, dated 11/94 PNO-E11-4010-0362, Design Spec data Sheet, Rev. 13
GEH-1768G, Instructions, Undervoltage Relays, Types IAV54E, IAV54F, IAV54H, IAV55C,
PN1-ES1-C00 1-0055(I), Reactor Core Isolation Cooling Pump, Rev. 3
IAV55F, IAV55H and IAV55J, dated 11/94
PNO-E11-4010-0362, Design Spec data Sheet, Rev. 13
PN1-ES1-C001-0055(I), Reactor Core Isolation Cooling Pump, Rev. 3
PN1-E11-C002-0051, Residual Heat Removal Pumps by Ingersol Rand, Rev. 4
PN1-E11-C002-0051, Residual Heat Removal Pumps by Ingersol Rand, Rev. 4
VTD 324925, Crane Nuclear Butterfly Valve General Assembly, dated 08/09/01
VTD 324925, Crane Nuclear Butterfly Valve General Assembly, dated 08/09/01
VTD 324927, Design/Seismic Report for Crane Nuclear Butterfly Valve, dated 08/31/01
VTD 324927, Design/Seismic Report for Crane Nuclear Butterfly Valve, dated 08/31/01
VTD 327450, Reactor Core Cooling Isolation System (RCIC) Turbine Speed Increase, Rev. 1
VTD 327450, Reactor Core Cooling Isolation System (RCIC) Turbine Speed Increase, Rev. 1
VTD 431207 (001), Nutherm International, Inc., JE/Diesel Fuel Oil Storage N41 Level Switches, 4/2/09 VTD 431259, Turbine Auxiliary Cooling System (TACS) Flow Balancing, dated 07/21/09
VTD 431207 (001), Nutherm International, Inc., JE/Diesel Fuel Oil Storage N41 Level Switches,
VTD 431640, MCC vendor Manual, Rev.
4/2/09
VTD 431259, Turbine Auxiliary Cooling System (TACS) Flow Balancing, dated 07/21/09
VTD 431640, MCC vendor Manual, Rev. 0
VTD 431990, Cutler Hammer Harsh Environment Qualification of Lights, Switches, Fuse and
VTD 431990, Cutler Hammer Harsh Environment Qualification of Lights, Switches, Fuse and
Terminal Blocks, Rev. 0
Terminal Blocks, Rev. 0
VTD 431992, Cutler Hummer Harsh Environment Qualification of Molded Case Circuit
VTD 431992, Cutler Hummer Harsh Environment Qualification of Molded Case Circuit
Breakers, Rev.
Breakers, Rev. 0
VTD 431993, Seismic Qualification Report on 480 VAC 5 Section Motor Control
VTD 431993, Seismic Qualification Report on 480 VAC 5 Section Motor Control Center for Hope
Center for Hope
Creek Generating Station, Rev. 1
Creek Generating Station, Rev. 1
VTD PN1-ES1-C002-0054, Terry Steam Turbine Company RCIC, Rev. 13
VTD PN1-ES1-C002-0054, Terry Steam Turbine Company RCIC, Rev. 13
VTD PN1-ES1-C001-0055, Reactor Core Isolation Pump, Rev. 4
VTD PN1-ES1-C001-0055, Reactor Core Isolation Pump, Rev. 4
VTD PJ610Q
VTD PJ610Q-0067, Technical Manual Operation, Maintenance, Trouble-Shooting, Repair and
-0067, Technical Manual Operation, Maintenance, Trouble
-Shooting, Repair and
Installation Pressure Reducer Valve, Rev. 0
Installation Pressure Reducer Valve, Rev. 0
Work Orders
Work Orders
30081231 30083447 30118628 30130913 30130913 30212868 30212868 30227753 30227753 30228946 30229391 30229391 30250278 30250278 30250278 30252044 30252044 30256212 30256212 30263676 30263676 30274497 30274497 30283608 30283608 30285865 30303955 30303955 3030 4683 30309933 30309933 30312618 30312618 30315344 30315344 30317617 30317617 30317971 30318678 40001389 40018980 50003496 50123216 50136863 50176495 50179558 50180978 50183935 50185321 50189380 50190087 50199683 50200078 50200337 50200343 50200349 50200694 50200704 50200930 50201143 50201416 50201469 50201806 50201953 60077115 60132106 60134059 70148911 70187504 80115269
30081231           30250278          30304683          50123216            50200694
30083447           30252044          30309933          50136863            50200704
30118628           30252044          30309933          50176495            50200930
30130913           30256212          30312618          50179558            50201143
30130913           30256212           30312618          50180978            50201416
212868            30263676           30315344          50183935            50201469
212868            30263676           30315344          50185321            50201806
227753            30274497           30317617          50189380            50201953
227753            30274497           30317617          50190087            60077115
228946            30283608           30317971          50199683            60132106
229391            30283608           30318678          50200078            60134059
229391            30285865           40001389          50200337            70148911
250278            30303955           40018980          50200343            70187504
250278            30303955           50003496           50200349           80115269
}}
}}

Revision as of 19:25, 20 October 2019

Design Bases Assurance Inspection (Teams) Report 05000354/2018010
ML18212A283
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 07/30/2018
From: Mel Gray
Engineering Region 1 Branch 1
To: Sena P
Public Service Enterprise Group
References
IR 2018010
Download: ML18212A283 (14)


Text

(Addressee)

UNITED STATES NUCLEAR REGULATORY COMMISSION uly 30, 2018

SUBJECT:

HOPE CREEK GENERATING STATION UNIT 1 - DESIGN BASES ASSURANCE INSPECTION (TEAMS) REPORT 05000354/2018010

Dear Mr. Sena:

On June 22, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Hope Creek Generating Station (HCGS). The NRC inspectors discussed the results of this inspection with John Garecht, Hope Creek Maintenance Director, and other members of your staff. The final results of the inspection were presented via telephone on July 6, 2018, to David Mannai, Senior Director Regulatory Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any findings or more-than-minor violations.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety Docket No.: 50-354 License No.: NPF-57

Enclosure:

Inspection Report 05000354/2018010

Inspection Report

Docket Number: 50-354 License Number: NPF-57 Report Number: 05000354/2018010 Enterprise Identifier: I-2018-010-0035 Licensee: PSEG Nuclear LLC (PSEG)

Facility: Hope Creek Generating Station (HCGS)

Location: Hancocks Bridge, NJ 08038 Inspection Dates: April 16 to May 4, 2018 Inspectors: A. Patel, Senior Reactor Inspector (Team Lead), Division of Reactor Safety (DRS)

K. Mangan, Senior Reactor Inspector, DRS N. Floyd, Senior Reactor Inspector, DRS J. Brand, Reactor Inspector, DRS M. Yeminy, NRC Contractor N. Della Greca, NRC Contractor Approved By: Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring PSEGs performance at

Hope Creek Generating Station by conducting a team design bases assurance inspection in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

No findings or more-than-minor violations were identified.

INSPECTION SCOPES

===This inspection was conducted using the appropriate portions of the inspection procedure (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program -

Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.21M - Design Bases Assurance Inspection (Teams)

The inspectors evaluated the following components, permanent modifications, and operating experience during the weeks of June 4 and June 18, 2018.

For the components, the team reviewed the attributes listed in IP 71111.21M, Appendix A, Component Review Attributes, such as those listed below. Specifically, the team evaluated these attributes as per 71111.21M, Appendix B, Component Design Review Considerations and 71111.21M, Appendix C, Component Walkdown Considerations. Specific documents reviewed are listed in the Documents reviewed section.

Components ===

  • Station Auxiliary Cooling System to Residual Heat Removal Heat Exchanger Return Isolation Valve, EG-HV-2512A.

o Material condition and installed configuration (e.g., visual inspection during a walkdown)o Normal, abnormal, and emergency operating procedures o Consistency between documentation (e.g., procedures)o Component/system health reports, corrective maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results The team used Appendix B guidance for Valves, Instrumentation, and Electrical Loads.

o Material condition and installed configuration (e.g., visual inspection during a walkdown)o Normal, abnormal, and emergency operating procedures o Consistency between documentation (e.g., procedures)o Component/system health reports, corrective maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results The team used Appendix B guidance for Valves, Instrumentation, and Pumps (as applicable to turbine operation).

o Material condition and installed configuration (e.g., visual inspection during a walkdown)o Normal, abnormal, and emergency operating procedures o Consistency between documentation (e.g., procedures)o Component/system health reports, corrective maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results The team used Appendix B guidance for Electric Loads.

o Material condition and installed configuration (e.g., visual inspection during a walkdown)o Normal, abnormal, and emergency operating procedures o Consistency between documentation (e.g., procedures)o Component/system health reports, corrective maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results The team used Appendix B guidance for Electric Loads.

o Material condition and installed configuration (e.g., visual inspection during a walkdown)o Normal, abnormal, and emergency operating procedures o Consistency between documentation (e.g., procedures)o Component/system health reports, corrective maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results The team used Appendix B guidance for Pumps, Valves, and Instrumentation.

Component, Large Early Release Frequency (1 Sample)===

===o Material condition and installed configuration (e.g., visual inspection during a walkdown)o Normal, abnormal, and emergency operating procedures o Consistency between documentation (e.g., procedures)o Component/system health reports, corrective maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results The team used Appendix B guidance for Valves.

Permanent Modifications (4 Samples)===

===* Revise emergency operating procedure calculation, H-1-ZZ-MDC-4019, to reflect reactor fuel changes

  • Motor Control Center compartment replacements
  • NRC IN 2016-05, Operating Experience Regarding Complications from Loss of Instrument Air, dated April, 27 2016
  • NRC IN 2009-09 - Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify, dated June, 19 2009

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On June 22, 2018, the team debriefed the Design Bases Assurance Inspection (Teams)preliminary results to Mr. John Garecht, Hope Creek Maintenance Director, and other members of PSEG staff.
  • On July 6, 2018, the team conducted a phone exit presenting the final results of the inspection with Mr. David Mannai, Senior Director Regulatory Operations, and other members of PSEG staff.

DOCUMENTS REVIEWED

71111.21M - DESIGN BASES ASSURANCE INSPECTION (TEAMS)

Calculations

1-P-KJ-624-C010, Design Calculation for Emergency Diesel Generator (EDG) Surge/Vent

Anchors, Rev. 0

BC-0002(Q), NPSH for RHR Pumps with Suction from the Suppression Pool, Rev. 5

BC-0023(Q), RHR Min Flow Orifice E/1-D001, Rev. 3

BC-11(Q), RHR Minimum Flow Bypass Line Size, Rev. 2

BC-3(Q), NPSH for RHR Pumps in Shutdown Cooling Mode, Rev. 3

BD-0001, NPSH for RCIC System Pump, Rev. 4

BD-0003, RCIC Hydraulic Analysis, Rev. 6

C-1991, EDG Intercooler Pump Surge Piping, Rev. 0

C-1992, EDG Intercooler Pump Vent Piping, Rev. 0

DEH-09-0141, HPCI Steam Exhaust Piping Water Hammer Analysis, Dated 10/8/09

E-1.3 (Q), Hope Creek Generating Station Short Circuit Study of 480FV Systems, Rev. 3

E-1.4 (Q), HC Class 1E 125 & 250 VDC Systems Short Circuit and Voltage Drop Studies,

Rev. 7

E-15.1 (Q), Hope Creek Load Flow and Degraded Voltage Analysis, Rev. 7 & Rev. 11

E-18, Selection of Overload Heaters for AC MOVs and Continuous Duty Motors, Rev. 2

E-26 (Q), Breaker to Fuse & Fuse to Fuse Coordination for Appendix R, Rev. 4B

E-5.1 (Q), HC Class 1E 250 VDC Station Battery and Charger Sizing, Rev. 9

E-5.19 (Q), 250 VDC HPCI System Battery Analysis, Rev. 0

E-7.12 (Q), HC AVR Limits and Protection Coordination, Rev. 0

E-7.13 (Q), Penetration Assembly Protection, Rev. 4B

E-7.4 (Q), E-7.4(Q) Class 1E 4.16 KV System Protection Relay Settings, Rev. 6

E-7.7 (Q), Class 1E 480 V System Protecting Relaying, Rev. 7C

E-9 (Q), Standby Class 1E Diesel Generator Sizing, Revs. 9, 9A, & 9B

GM-0027, Diesel Generator Area HVAC Analysis, Rev. 1

H-1-EG-MDC-0938, MOV Capability Assessment for 1EG-HV-2512A, Rev. 1

Hope Creek Load Flow and Degraded Voltage Analysis, Rev. 11

MIDAS 2015.226, MIDACALC Results 1BD-HV-F046 DC Motor Operated Valve, Rev. 5

NAI-1484-01, Loads on Turbine Exhaust Pipes due to Post LOCA Turbine Trip, Rev. 1

SC-JE-0059, Diesel Fuel Oil Day Tank Level, Rev. 4

Corrective Action Documents (*initiated in response to inspection)

20411602 20663859 20738711 20769459 20791142

20466535 20665454 20746795 20771585 20791715

20519905 20667174 20747160 20772476 20796656

20529533 20686017 20750168 20772476 20796705*

20594384 20686398 20751715 20780884 20796837*

20595967 20689441 20754048 20784381 20796838*

20601216 20696918 20754048 20784382 20796847*

20602340 20698578 20754162 20786607 20796862*

20613232 20701108 20760634 20786624 20796875*

20613929 20721062 20761521 20787622 20796917*

20628456 20723443 20764634 20790172 20796918*

20629808 20725078 20767192 20791131 20796929*

20633331 20736860 20769250 20791132 20796941*

20633802 20738706 20769250 20791133 20796985*

20797040* 20798770* 20798816 20798985* 20799124*

20797126* 20798781* 20798816 20798986* 20799129*

20797498* 20798784* 20798937* 20799011* 20799131*

20798740 20798786* 20798940* 20798816* 20799402*

Design and Licensing Basis

Docket No, 50-354, Hope Creek Generating Station, Amendment to Facility Operating License,

Amendment No. 144

Drawings

1-P-FC-003, Fab Isometric RCIC Turbine Supply and Exhaust Reactor Building, Rev. 13

1-P-FC-01, System Isometric Reactor Building RCIC Turbine Supply and Exhaust, Rev. 19

10855-J200 (Q)-595, Logic Diagram, 4.16 KV Sys., Diesel Generator Circuit Breaker

(I) 52-40207, Rev. 15

10855-J200 (Q)-949, Logic Diagram, 862 Sys., Diesel Generator (I) DG800 Control (1 of 3),

Rev. 7

10855-M (Q) 366 (1), Sh. 1 of 30, Elect. Schematic, Engine Control, Rev. 17

10855-M (Q) 366 (2), Sh. 2 of 30, Elect. Schematic, Engine Control, Rev. 12

10855-P-0570, Sh. 15, Welding and Non Destructive Testing Requirements for Field Erected

Piping, Rev. 7

AM 88-1, Sht. 1, PID Auxiliary Building Diesel Area Control Diagram, Rev. 15

E-0001-0 (Q), Single Line Diagram, Station, Rev. 24

E-0006-1 (Q), Sh. 1 of 2, Single Line Meter & Relay Diagram, 4.16 KV Class 1E Power System,

Rev. 13

E-0006-1 (Q), Sh. 2 of 2, Single Line Meter & Relay Diagram, 4.16 KV Class 1E Power System,

Rev. 11

E-0008-1 (Q), Sh. 2 of 2, Single Line Meter & Relay Diagram, Diesel Generators, Rev. 4

E-0009-1 (Q), Sh. 1, Single Line Meter & Relay Diagram, 125 VDC System, Channels A & C,

Rev. 26

E-0009-1 (Q), Sh. 2, Single Line Meter & Relay Diagram, 125 VDC System, Channels B & D,

Rev. 30

E-0009-1 (Q), Sh. 4, Single Line Meter & Relay Diagram, 125 VDC System, Channels C & D,

Rev. 13

E-0018-1 (Q), Sh. 1 of 3, Single Line Meter & Relay Diagram, 480 Volt Class 1E Unit Substation

10B410, 10B420, 10B430, 10B440, 10B450, 10B460, 10B470, 10B480, Rev. 36

E-0018-1 (Q), Sh. 2, Single Line Meter & Relay Diagram, 480 Volt Class 1E Unit Substation

10B410, 10B420, 10B430, 10B440, 10B450, 10B460, 10B470, 10B480, Rev. 40

E-0019-1 (Q), 480 Volt MCC Tabulation Class 1E - Aux. Bldg. - D/G Area 10B411, 10B421,

10B431, 10B441, Rev. 13

E-0019-1 (Q), Sh. 2, 480 Volt MCC Tabulation Class 1E - Aux. Bldg. - D/G Area 10B411,

10B421, 10B431, 10B441, Rev. 15

E-0020-1 (Q), Sh. 1 of 2, 480 Volt MCC Tabulation Class 1E - Aux. Bldg. - D/G Area 10B451,

10B461, 10B471, 10B481, Rev. 17

E-0020-1 (Q), Sh. 2, 480 Volt MCC Tabulation Class 1E - Aux. Bldg. - D/G Area 10B451,

10B461, 10B471, 10B481, Rev. 13

E-0021-1 (Q), Sh. 1 of 6, 480 Volt MCC Tabulation, Class 1E MCC - Reactor Area 10B212,

10B222, 10B232 & 10B242, Rev. 55

E-0046-1 (Q), Schematic Meter & Relay Diagram, 4.16 KV Class 1E Station Power System,

Switchgears 10A401 & 10A403, Rev. 8

E-0047-1 (Q), Schematic Meter & Relay Diagram, 4.16 KV Class 1E Station Power System,

Switchgears 10A401 & 10A403, Rev. 7

E-0070-0 (Q), Electrical Schematic Diagram, Class 1E 4.16 KV Sta. Pwr. Sys. Swgr., Main

Circuit Breaker (I) 52-40201, Rev. 8

E-0071-0 (Q), Electrical Schematic Diagram, Class 1E 4.16 KV Sta. Pwr. Sys. Swgr., Main

Circuit Breaker (I) 52-40208, Rev. 8

E-0081-0 (Q), Electrical Schematic Diagram, Class 1E - 4.16 KV Unit Substa. Xfmr. Feeder,

Circuit Breaker (I) 52-40203, Rev. 5

E-0085-0 (Q), Electrical Schematic Diagram, Class 1E - 4.16 KV Sta. Pwr. Sys. Swgr., Diesel

Gen. Circuit Brkr. (I) 52-40207, Rev. 11

E-0208-0 (Q), Sh. 2, Electrical Schematic Diagram, Class 1E - 4.16 KV Circuit Breaker Control

Station Service Water Pump, Rev. 12

E-0223-0, Sh. 1, RHR HX Outlet Valve 1-HV-2512A Scheme No. 1C0318, Rev. 5

E-3060-0 (Q), Logic Diagram, Class 1E Station Pwr. Swgr. - 4.16 KV System, Main Circuit

Breaker, Rev. 16

E-3061-0 (Q), Logic Diagram, Class 1E Station Pwr. Swgr. - 4.16 KV System Unit Substa.

Xfmr. Feeder Circuit Breaker, Rev. 66

E-3080-0 (Q), Sh. 1 of 2, Logic Diagram, Class 1E Sta. Pwr. Swgr. - 4.16 KV System, Diesel

Generator Circuit Breaker, Rev. 12

E-3080-0 (Q), Sh. 2 of 2, Logic Diagram, Class 1E Sta. Pwr. Swgr. - 4.16 KV System, Diesel

Generator Circuit Breaker, Rev. 8

E-3081-0 (Q), Sh. 1 of 2, Logic Diagram, Diesel Generator Control, Rev. 7

E-3081-0 (Q), Sh. 2 of 2, Logic Diagram, Diesel Generator Control, Rev. 10

FSK-P-1-KJ-622, Small Piping/Aux Building Diesel Generator C from CG-400 to Tank C-407,

Rev. 13

FSK-P-1-KJ-624, Small Piping/Aux Building Diesel Generator C from Tank CT-407 to CG-400,

Rev. 17

J-10-0 (Q), Sh. 4, Logic Diagram, Station Service Water System, SSWS Pumps BP502 &

DP502 Start, Rev. 15

J-10-0 (Q), Sh. 5, Logic Diagram, Station Service Water System, SSWS Pumps BP502 &

DP502 Stop, Rev. 12

J-51-0, Sht. 16, Logic Diagram Residual Heat Removal, Rev. 7

J-107-0 (Q), Sh. 4, Logic Diagram, Emergency Load Sequencer, Rev. 3

J-4049-0. Sh. 2, Reactor Core Isolation Cooling RCIC Pump Turbine Control, Rev. 7

M-0910-0, Sh. 1, Process Flow Diagram Safety & Turbine Auxiliaries Cooling, Rev. 2

M-11-1, Sh. 1, Safety Auxiliaries Cooling Reactor Building, Rev. 32

M-30-1, Sh. 2, Diesel Generator Auxiliary Systems Intercooler and Injector Cooling, Jacket

Water, Crankcase Vacuum Air Intake, Exhaust and Vibration Monitoring Systems,

Rev. 27

M-49-1, Reactor Core Isolation Cooling, Rev. 30

M-50-1, RCIC Pump Turbine, Rev. 33

M-51-1, Sht. 1, Residual Heat Removal, Rev. 51

M-51-1, Sht. 2, Residual Hear Removal , Rev. 45

M-85-1, Sht. 1, Auxiliary Building Diesel Area Air Flow Diagram, Rev. 19

N-749, RHR Pump Head Capacity Curve, Rev. 0

N-1223, SACS Pump Curve, Rev. 0

Functional, Surveillance and Modification Acceptance Testing

280950, 24M PM Calibration 1KJSS-421B: B EDG Speed Switch, Performed on 2/14/17

50003496, Emergency Diesel Generator Interdependence Verification Test - 10 Year,

Performed on 4/21/09

50065569, 60M ST / 10-D-421, Class 1E, Channel A, 250 Volt Battery Performance Test,

Performed on 4/19/09

50123056, 60M ST / 10-D-421, Class 1E, Channel A, 250 Volt Battery Performance Test,

Performed on 10/24/13

50162739, Integrated Emergency Diesel Generator 1BG400 Test - 18 Months, Performed on

4/24/15

50175271, EDG1BG400 - 24 Hour Operability Run and Hot Restart Test, Performed on 9/9/16

50175692, NUST 18M ST 52-40208, 4KV Swgr. Degraded Voltage Instrumentation Channel

Calibration & Functional Test, Performed on 11/2/16

50175732, NUST 18M ST 52-40201, 4KV Swgr. Degraded Voltage Instrumentation Channel

Calibration & Functional Test, Performed on 10/31/16

50175793, 4.16 KV Bus 10A402 Undervoltage Test and Return to Service - B Channel,

Performed on 4/18/18

50176377, NUST ST 18M Test, 10-D-421 Class 1E, Channel A, 250V Battery Service Test,

Performed 10/31/16

50188845, EDG1BG400 - 24 Hour Operability Run and Hot Restart Test, Performed on 3/13/18

50190557, NUST Perform IC-FT.PE-0006 on Load Sequencer Div-2, Performed on 4/15/18

50190581, NUST ST 18M Test, 10-D-421 Class 1E, Channel A, 250V Battery Service Test,

Performed on 5/3/18

50199618, ST / 10-D-421, 250 Volt Battery Quarterly Surveillance, Performed on 2/25/18

50199857, NUST 3M ST 10-A-402-01 / 4.16 KV Swgr Degraded Voltage, Performed on 2/17/18

50199858, NUST 3M ST 10-A-402-08 / 4.16 KV Swgr Degraded Voltage, Performed on 2/17/18

202110, NUST ST / 10-D-421, 250 Volt Battery Quarterly Surveillance, Performed on 4/1/18

202136, Emergency Diesel Generator 1BG400 Operability Test - Monthly, Performed on

4/30/18

203057, Emergency Diesel Generator 1BG400 Operability Test - Monthly, Performed on

5/16/18

203499, NUST 31D ST 10-D-421 Class 1E, Channel A, 250V Battery Test, Performed on

5/27/18

203541, Perform IC-FT.PE-0002 on Load Sequencer Div-2, Performed on 5/14/18

HC.MD-PM.FC-0001, Reactor Core Isolation Cooling Steam Turbine Inspection and PM,

performed 5/16/18

HC.MD-PM.FC-0003(Q), Reactor Core Isolation Cooling Turbine Exhaust Check Valve

Inspection & PM, performed 12/14/12

HC.OP-FT.KJ-0001 (Q), Emergency Diesel Generator 1AG400-Functional Test, performed

4/3/18

HC.OP-IS.BC-0001(Q), AP202 A Residual Heat Removal Pump In-Service Test, Rev. 50 -

Performed 4/9/18

HC.OP-IS.BD-0001, Reactor Core Isolation Cooling Pump-OP203-Inservice Test, peformed

2/23/18

HC.OP-IS.BD-0101(Q), Reactor Core Isolation Cooling System Valves - Inservice Test,

performed 3/6/17

HC.OP-IS.BD-0101(Q), Reactor Core Isolation Cooling System Valves - Inservice Test,

performed 3/20/18

HC.OP-IS.EG-0101, Safety Auxiliaries Cooling System - Subsystem A Valves - Inservice Test,

Performed 01/05/18

HC.OP-IS.EG-0102 (Q), Safety Auxiliary Cooling System-Subsystem B Valves-IST, performed

1/27/14

HC.OP-ST.BD-0003, RCIC Functional Verification-18 Months, performed 2/28/17

HC.OP-ST.EG-0001, SACS Flow Path Verification - Monthly, Performed 04/30/18

HC.OP-ST.KJ-0001 (Q), Emergency Diesel Generator 1AG400-Operability Test-Monthly,

performed 5/8/18

Miscellaneous

10866-J610-65-1, Self-Acting Pressure Regulator, dated 5/2/83

160607BP-01, Machinery Analysis Report for C EDG Jacket Water Piping, dated 06/07/16

70105083, Technical Evaluation for Hope Creek 4.16kV 1E Undervoltage Relay Scheme, dated

2/23/09

70183330, Apparent Cause Evaluation for C EDG Jacket Water Braided Hose Leak, Rev. 3

BWROG-TP-14-018, Beyond Design Basis RCIC Elevated Temperature Functionality

Assessment, Rev. 0

Instrument Calibration Data Report, RCIC Flow Control H1FC-FC-4158, dated 6/8/18

Program Health Report for Inservice Testing (IST), Q4 - 2017

Program Health Report for Motor Operated Valves (MOV), Q2 - 2017

System Health Report for Diesel Generator, Q2 - 2018

System Health Report for SACS & TACS, Q2 - 2018

Modifications and Design Changes

DCP 80090368, Modify EG-HV-2512A logic to allow valve to be throttled, Rev. 1

DCP 80095620, Motor Control Center (MCC) Compartment Replacements, Rev. 4

DCP 80114476, C Emergency Diesel Generator Governor Control System Replacement,

Rev. 0

DCP 80117790, Revise EOP Calculation H-1-ZZ-MDC-4019, Rev. 0

DCP 80119727, Emergency Diesel Generator Vibrations Piping and Support Adjustments,

Rev. 0

DCP 80120892, 250 VDC HPCI System Battery Analysis, Rev. 0

DCP 80121930, VAVF-0032, Diaphragm Valve Replacement, Rev. 0

Procedures

EP-HC-111-223, HCGS ECG - EAL Technical Basis, Rev. 2

EP-HC-111-222, HCGS ECG - EAL Technical Basis, Rev. 0

ER-AA-302-1007, MOV Limitorque Actuator Capability Determination Methodology, Rev. 7

HC.IC-DB.BD-0002, EG-M Control Box and Ramp Generator Signal Converter (RCIC), Rev. 1

HC.IC-DC.ZZ-0358(Q), Dynalco Controls Universal Speed Switch & Speed Transmitter

SST-2000 Series, Rev 0

HC.IC-FT.PE-0002(Q), Emergency Load Sequencer System, Diesel Generator B, 1BC428,

Rev. 9

HC.IC-FT.PE-0006(Q), Time Interval Test. Emergency Load Sequencer System, Diesel

Generator B, 1BC428, Rev.10

HC.IC-LC.FC-001, RCIC Turbine Speed Control System, Rev. 11

HC.MD-GP.ZZ-0015(Q), Battery Equalizing Charge, Rev 21, Rev. 22 and Rev. 23

HC.MD-ST.KJ-0001, Diesel Generator Technical Specification Surveillance and Preventative

Maintenance, Rev. 46

HC.MD-ST.PB-0003(Q), Class 1E 4.16 KV Degraded Voltage Monthly Instrumentation Channel

Functional Test, Rev. 28

HC.MD-ST.PB-0016(Q), Class 1E 4.16 KV Feeder Degraded Voltage 18 Month Instrumentation

Channel Calibration & Functional Test 10-A-40201, Rev. 6

HC.MD-ST.PB-0017(Q), Class 1E 4.16 KV Feeder Degraded Voltage 18 Month Instrumentation

Channel Calibration & Functional Test 10-A-40208, Rev. 7

HC.MD-ST.PJ-0001(Q), 250 Volt Weekly Battery Surveillance, Rev. 24

HC.MD-ST.PJ-0002(Q), 250 Volt Quarterly Battery Surveillance , Rev. 34 & Rev. 35

HC.MD-ST.PJ-0007(Q), 250 Volt Station Batteries Performance Discharge Test Using BCT-

2000 with Windows Software and Associated Surveillance Testing, Rev. 0 & Rev. 3

HC.MD-ST.PJ-0008(Q), 250 Volt Station Batteries 18 Month Service Test Using BCT-2000 with

Windows Software and Associated Surveillance Testing, Rev. 5

HC.MD-ST.ZZ-0009, Motor Operated Valve Thermal Overload Protection Surveillance, Rev. 21

HC.OP-AB.COOL-0002, Safety/Turbine Auxiliaries Cooling System, Rev. 9

HC.OP-AB.ZZ-0135, Station Blackout//Loss of Offsite Power//Diesel Generator Malfunction,

Rev. 43

HC.OP-AR.ZZ-0006, Overhead Annunciator Window Box B1, Rev. 26

HC.OP-EO-ZZ-0103/4-FC, Reactor Building & Rad Release Control, Rev. 11

HC.OP-EO-ZZ-0106-FC, Primary Containment Control HPCI/RCIC Only, Rev. 0

HC.OP-EO-ZZ-0102-FC, Primary Containment Control, Rev. 13

HC.OP-IS.EG-0101, Safety Auxiliaries Cooling System - Subsystem A Valves - Inservice Test,

Rev. 56

HC.OP-SO.BC-0001, Residual Heat Removal System Operation, Rev. 54

HC.OP-SO-BD-0001, Reactor Core Isolation Cooling System Operation, Rev. 44

HC.OP-SO.EG-0001, Safety and Turbine Auxiliaries Cooling Water System Operation, Rev. 56

HC.OP-SO.GM-0001(Q), Diesel Area Ventilation System Operation, Rev. 21

HC.OP-SO.KJ-0001 (Q), Emergency Diesel Generator Operation, Rev. 74

HC.OP-ST.BD-0004, RCIC System Response Time and Flow Test - 18 Month, Rev. 9

HC.OP-ST.KJ-0002(Q), Emergency Diesel Generator 1BG400 Operability Test - Monthly,

Rev. 78

HC.OP-ST.KJ-0006(Q), Integrated Emergency Diesel Generator 1BG400 Test - 18 Months,

Rev. 47

HC.OP-ST.KJ-0009(Q), Emergency Diesel Generator Interdependence Verification Test - 10

Year, Rev. 9

HC.OP-ST.KJ-0015(Q), EDG1BG400 - 24 Hour Operability Run and Hot Restart Test, Rev. 36

HC.OP-ST.PB-0006(Q), 4.16 KV Bus 10A402 Undervoltage Test & Return to Service - B

Channel, Rev. 20

HC.OP-ST.PB-0016(Q), 4.16 KV Bus 10A402 Undervoltage Test - B Channel, Rev. 3

HC.OP-ST.SM-0006, PCIS/RCIC Isolation Functional Test, Rev. 15

MA-AA-723-300, Diagnostic Testing and Inspection of Motor Operated Valves, Rev. 9

Vendor Manuals

76J-10700-15, Aux. Building Diesel Area HVAC, Rev. 2

90192-802, Installation Operating and Maintenance Manual for Model 3472 Back Pressure

Dampers, Rev. A

G300E, Ventilating and Industrial Axial Fan by Buffalo Forge, Rev. A

GEH-1768G, Instructions, Undervoltage Relays, Types IAV54E, IAV54F, IAV54H, IAV55C,

IAV55F, IAV55H and IAV55J, dated 11/94

PNO-E11-4010-0362, Design Spec data Sheet, Rev. 13

PN1-ES1-C001-0055(I), Reactor Core Isolation Cooling Pump, Rev. 3

PN1-E11-C002-0051, Residual Heat Removal Pumps by Ingersol Rand, Rev. 4

VTD 324925, Crane Nuclear Butterfly Valve General Assembly, dated 08/09/01

VTD 324927, Design/Seismic Report for Crane Nuclear Butterfly Valve, dated 08/31/01

VTD 327450, Reactor Core Cooling Isolation System (RCIC) Turbine Speed Increase, Rev. 1

VTD 431207 (001), Nutherm International, Inc., JE/Diesel Fuel Oil Storage N41 Level Switches,

4/2/09

VTD 431259, Turbine Auxiliary Cooling System (TACS) Flow Balancing, dated 07/21/09

VTD 431640, MCC vendor Manual, Rev. 0

VTD 431990, Cutler Hammer Harsh Environment Qualification of Lights, Switches, Fuse and

Terminal Blocks, Rev. 0

VTD 431992, Cutler Hummer Harsh Environment Qualification of Molded Case Circuit

Breakers, Rev. 0

VTD 431993, Seismic Qualification Report on 480 VAC 5 Section Motor Control Center for Hope

Creek Generating Station, Rev. 1

VTD PN1-ES1-C002-0054, Terry Steam Turbine Company RCIC, Rev. 13

VTD PN1-ES1-C001-0055, Reactor Core Isolation Pump, Rev. 4

VTD PJ610Q-0067, Technical Manual Operation, Maintenance, Trouble-Shooting, Repair and

Installation Pressure Reducer Valve, Rev. 0

Work Orders

30081231 30250278 30304683 50123216 50200694

30083447 30252044 30309933 50136863 50200704

30118628 30252044 30309933 50176495 50200930

30130913 30256212 30312618 50179558 50201143

30130913 30256212 30312618 50180978 50201416

212868 30263676 30315344 50183935 50201469

212868 30263676 30315344 50185321 50201806

227753 30274497 30317617 50189380 50201953

227753 30274497 30317617 50190087 60077115

228946 30283608 30317971 50199683 60132106

229391 30283608 30318678 50200078 60134059

229391 30285865 40001389 50200337 70148911

250278 30303955 40018980 50200343 70187504

250278 30303955 50003496 50200349 80115269