IR 05000247/2015006: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:rch 2, 2016 | ||
==SUBJECT:== | ==SUBJECT:== | ||
Revision as of 02:09, 14 July 2019
| ML16060A077 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 03/02/2016 |
| From: | Michael Scott Division Reactor Projects I |
| To: | Coyle L Entergy Nuclear Operations |
| Dentel G | |
| References | |
| IR 2015006 | |
| Download: ML16060A077 (7) | |
Text
rch 2, 2016
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING, UNITS 2 AND 3 (REPORT 05000247/2015006 AND
Dear Mr. Coyle:
On February 10, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Indian Point Nuclear Generating (Indian Point), Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015, through December 31, 2015. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at Indian Point Unit 2 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action
Matrix in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program," because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). The NRC determined the performance at Indian Point Unit 3 during the most recent quarter was within the Regulatory
Response Column of the NRC's ROP Action Ma trix, because all inspection findings had very low safety significance (i.e., Green), and one PI was of low to moderate safety significance (i.e.,
White) in the Initiating Events cornerstone. Specifically, the "Unplanned Scrams per 7000 Critical Hours" PI exceeded the Green/White threshold in the fourth quarter of the assessment period. Therefore, in addition to ROP baseline inspections, the NRC plans to schedule and conduct a supplemental inspection in accordance with Inspection Procedure (IP) 95001,
"Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," upon notification of your readiness. The inspection will be focused on ensuring that the root causes and contributing causes of the performance issue are understood, the extent of condition and cause are identified, and the corrective actions are sufficient to prevent recurrence.
The enclosed inspection plan lists the inspections scheduled through December 31, 2017.
Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will conduct IP 60845, "Operation of Inter-Unit Fuel Transfer Canister and Cask System," and IP 60855.1, "Operation of an Independent Spent Fuel Storage Installation at Operating Plants." The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and person nel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events." This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." This Order requires licensees to have a reliable means of remotely monitoring wide-range spent fuel pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audits were conducted during the weeks of November 30, 2015, and October 27, 2014, for Indian Point Units 2 and 3, respectively, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, "Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Pr eparedness Communications/Staffing/Multi-Unit Dose Assessment Plans." The schedule for this inspection at Indian Point is shown in the Enclosure.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Mr. Glenn Dentel at 610-337-5233 with any questions you have regarding this
letter.
Sincerely,
/RA/ Michael L. Scott, Director Division of Reactor Projects Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64
Enclosure: Indian Point Inspection/Activity Plan
cc w/encl: Distribution via ListServ
ML16060A077 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME ADeFrancisco/AED GDentel/GTD MScott/MLS DATE 2/23/16 2/23/16 2
/29/16 Letter to Mr. Larry Coyle from Michael L. Scott dated March 2, 2016
SUBJECT: ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING, UNITS 2 AND 3 (REPORT 05000247/2015006 AND 05000286/2015006)
DISTRIBUTION: (via email) DDorman, RA DLew, DRA MScott, DRP JColaccino, DRP RLorson, DRS BSmith, DRS GDentel, DRP ADeFrancisco, DRP JSchussler, DRP BPinson, DRP BHaagensen, DRP, SRI GNewman, DRP, RI SRich, DRP, RI DHochmuth, DRP, AA
TClark, RI OEDO RidsNrrPMIndianPoint Resource
RidsNrrDorlLpl1-1 Resource ROPReports Resource DRS Branch Chiefs (6)
DScrenci, PAO,
NSheehan, PAO NMcNamara, SLO
DTifft, SLO ROPassessment Resource RidsNrrDirslpab Resource
Page 1 of 3 02/23/2016 09:39:26 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Indian PointInspection / Activity Plan 01/01/2016-12/31/201771124-HP 1 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/07/201603/11/2016 2 IP Occupational ALARA Planning and Controls71124.02 03/07/201603/11/2016 ISI-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 03/14/2016 03/25/2016 EP-EP EXERCISE EVALUATION 4 2, 3 IP Exercise Evaluation7111401 06/27/2016 07/01/2016 TRI FI-TRIENNIAL FIRE PROTECTION 4 2 IP Fire Protection [Triennial]7111105T 05/23/2016 05/27/2016 2 IP Fire Protection [Triennial]7111105T 06/06/2016 06/10/201671124.07-REMP 1 2, 3 IP Radiological Environmental Monitoring Program71124.07 06/13/2016 06/17/2016 EXM10/31-INDIAN POINT 2 INITIAL EXAMINATION 3 2 FY17-IP2 INITIAL OPERATOR LICENSING EXAM U01926 10/03/2016 10/07/2016 2 FY17-IP2 INITIAL OPERATOR LICENSING EXAM U01926 10/31/201611/04/2016 ISFSI-ISFSI WET TRANSFER INSPECTION 1 2, 3 IP Operation of Inter-Unit Fuel Transfer Canister and Cask System 60845 07/25/2016 07/29/20167111111B-IP2 REQUAL INSP WITH P/F RESULTS 2 2 IP Licensed Operator Requalification Program7111111B 09/19/2016 09/23/201671124-HP INSPECTION 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/19/2016 09/23/2016 2, 3 IP Occupational ALARA Planning and Controls71124.02 09/19/2016 09/23/2016 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/19/2016 09/23/201671124-HP & PI&R VERIFICATION 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.0111/14/201611/18/2016 2, 3 IP Radiation Monitoring Instrumentation71124.0511/14/201611/18/2016 2, 3 IP Occupational Exposure Control Effectiveness71151-OR0111/14/201611/18/2016 2, 3 IP RETS/ODCM Radiological Effluent Occurrences71151-PR0111/14/201611/18/201671124-RETS INSPECTION 1 2, 3 IP Radiation Monitoring Instrumentation71124.05 01/23/2017 01/27/2017 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 01/23/2017 01/27/201771124-HP INSPECTION 1 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/13/2017 03/17/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 3 02/23/2016 09:39:26 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Indian PointInspection / Activity Plan 01/01/2016-12/31/201771124-HP INSPECTION 1 3 IP Occupational ALARA Planning and Controls71124.02 03/13/2017 03/17/20177111108P-U3 INSERVICE INSPECTION 1 3 IP Inservice Inspection Activities - PWR7111108P 03/13/2017 03/24/20177111105T-TRIENNIAL FIRE PROTECTION 7 2, 3 IP Fire Protection [Triennial]7111105T 05/01/2017 05/05/2017 2, 3 IP Fire Protection [Triennial]7111105T 05/15/2017 05/19/201771124-HP INSPECTION 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/08/2017 05/12/2017 2, 3 IP Occupational ALARA Planning and Controls71124.02 05/08/2017 05/12/2017TI-191-FUKUSHIMA LESSONS-LEARNED 1 2, 3 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 05/08/2017 05/12/2017 10/30EXM-INDIAN POINT 3 INITIAL EXAM 4 3 FY18-IP3 INITIAL OPERATOR LICENSING EXAM U01947 10/02/2017 10/06/2017 3 FY18-IP3 INITIAL OPERATOR LICENSING EXAM U01947 10/30/201711/03/2017 MODS-PERMANENT PLANT MODIFICATIONS 4 2, 3 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 06/05/2017 06/09/2017 2, 3 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 06/19/2017 06/23/2017 EP-EP PROGRAM INSPECTION 1 2, 3 IP A lert and Notification System Testing7111402 07/10/2017 07/14/2017 2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 07/10/2017 07/14/2017 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 07/10/2017 07/14/2017 2, 3 IP Performance Indicator Verification71151 07/10/2017 07/14/20177111111B-IP3 REQUAL INSP WITH P/F RESULTS 2 3 IP Licensed Operator Requalification Program7111111B 09/18/2017 09/22/201771124-HP & PI&R 1 2, 3 IP Occupational Dose Assessment71124.04 08/14/2017 08/18/2017 2, 3 IP Occupational Exposure Control Effectiveness71151-OR01 08/14/2017 08/18/2017 2, 3 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 08/14/2017 08/18/2017 ISFSI-ISFSI LOADING CAMPAIGN INSPECTION 1 2, 3 IP Operation Of An ISFSI 60855 09/04/2017 09/08/2017 2, 3 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 09/04/2017 09/08/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 3 of 3 02/23/2016 09:39:26 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Indian PointInspection / Activity Plan 01/01/2016-12/31/201771152B-PI&R BIENNIAL TEAM INSPECTION 5 2, 3 IP Problem Identification and Resolution71152B11/27/2017 12/01/2017 2, 3 IP Problem Identification and Resolution71152B12/11/2017 12/15/201771124.08-RADWASTE 1 2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/13/201711/17/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.