| issue date = 08/02/2012
| issue date = 08/02/2012
| title = IR 05000397-12-007, 6/11/12 - 7/27/12, Energy Northwest, Columbia Generating Station Triennial Fire Protection Team Inspection
| title = IR 05000397-12-007, 6/11/12 - 7/27/12, Energy Northwest, Columbia Generating Station Triennial Fire Protection Team Inspection
| author name = Miller G B
| author name = Miller G
| author affiliation = NRC/RGN-IV/DRS/EB-2
| author affiliation = NRC/RGN-IV/DRS/EB-2
| addressee name = Reddemann M E
| addressee name = Reddemann M
| addressee affiliation = Energy Northwest
| addressee affiliation = Energy Northwest
| docket = 05000397
| docket = 05000397
| license number = NPF-021
| license number = NPF-021
| contact person = Miller G B
| contact person = Miller G
| document report number = IR-12-007
| document report number = IR-12-007
| document type = Inspection Report, Letter
| document type = Inspection Report, Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:August 2, 2012
[[Issue date::August 2, 2012]]


Mr. Mark Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023) Richland, WA 99352-0968
==SUBJECT:==
 
COLUMBIA GENERATING STATION - NRC TRIENNIAL FIRE INSPECTION REPORT 05000397/2012007
SUBJECT: COLUMBIA GENERATING STATION - NRC TRIENNIAL FIRE INSPECTION REPORT 05000397/2012007


==Dear Mr. Reddemann:==
==Dear Mr. Reddemann:==
On June 28, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Columbia Generating Station. The enclosed inspection report documents the inspection results, which were discussed in a debrief meeting on June 28, 2012, with Mr. A. Javorik, Vice-
On June 28, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Columbia Generating Station. The enclosed inspection report documents the inspection results, which were discussed in a debrief meeting on June 28, 2012, with Mr. A. Javorik, Vice-President Engineering, and other members of your staff. Following additional in-office review, an exit meeting was conducted on July 27, 2012, with Mr. A. Javorik, Vice-President Engineering, and other members of your staff.
President Engineering, and other members of your staff. Following additional in-office review, an exit meeting was conducted on July 27, 2012, with Mr. A. Javorik, Vice-President Engineering, and other members of your staff.


The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


Based on the results of this inspection, the NRC has identified one finding that was evaluated under the risk significance determination process. A violation was associated with the finding. The finding was found to have very low safety significance (Green) and the violation associated with this finding is being treated as a non-cited violation, consistent with Section 2.3.2 of the NRC Enforcement Policy. If you contest the NCV in this report, you should provide a written response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington, D.C. 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Senior Resident Inspector at the Columbia Generating Station. In addition, if you disagree with the characterization of the finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV, and the NRC Senior Resident Inspector at Columbia Generating Station. The information you provide will be considered in accordance with Inspection Manual Chapter 0305. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Based on the results of this inspection, the NRC has identified one finding that was evaluated under the risk significance determination process. A violation was associated with the finding. The finding was found to have very low safety significance (Green) and the violation associated with this finding is being treated as a non-cited violation, consistent with Section 2.3.2 of the NRC Enforcement Policy. If you contest the NCV in this report, you should provide a written response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington, D.C. 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Senior Resident Inspector at the Columbia Generating Station. In addition, if you disagree with the characterization of the finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV, and the NRC Senior Resident Inspector at Columbia Generating Station. The information you provide will be considered in accordance with Inspection Manual Chapter 0305. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,/RA/
Geoffrey B. Miller, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-397 License No. NPF-21
 
===Enclosure:===
1. Inspection Report No. 05000397/2012007


===Attachment:===
Sincerely,
1. Supplemental Information  
/RA/
Geoffrey B. Miller, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-397 License No. NPF-21 Enclosure:
1. Inspection Report No. 05000397/2012007 Attachment: 1. Supplemental Information  


Electronic Distribution: Columbia Generating Station  
Electronic Distribution: Columbia Generating Station  


ML12215A497 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: GBM Publicly Available Non-Sensitive Non-publicly Available Sensitive RIV: DRS/EB2/SRI DRS/EB2/RI DRS/EB2/RI DRS/EB2/RI DRS/EB2/BC JMateychick SAchen EUribe JWatkins GMiller /RA/ /RA/per e-mail /RA/ /RA/per e-mail /RA/ 7/27/2012 7/25/2012 7/24/2012 7/25/2012 8/02/2012 Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION IV  
ML12215A497 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: GBM Publicly Available Non-Sensitive Non-publicly Available Sensitive RIV: DRS/EB2/SRI DRS/EB2/RI DRS/EB2/RI DRS/EB2/RI DRS/EB2/BC JMateychick SAchen EUribe JWatkins GMiller /RA/ /RA/per e-mail /RA/ /RA/per e-mail /RA/ 7/27/2012 7/25/2012 7/24/2012 7/25/2012 8/02/2012  
- 1 - Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION IV  


Docket: 50-397 License: NPF-21 Report Nos.: 05000397/2012007 Licensee: Energy Northwest Facility: Columbia Generating Station Location: P.O. Box 968 (Mail Drop 1023) Richland, WA 99352-0968 Dates: June 11, 2012 thru July 27, 2012 Team Leader: J. Mateychick, Senior Reactor Inspector, Engineering Branch 2 Inspectors: S. Achen, Reactor Inspector, Engineering Branch 2 E. Uribe, Reactor Inspector, Engineering Branch 2 J. Watkins, Reactor Inspector, Engineering Branch 2 Approved By: Geoffrey B. Miller, Chief Engineering Branch 2 Division of Reactor Safety Enclosure  
Docket: 50-397 License: NPF-21 Report Nos.: 05000397/2012007 Licensee: Energy Northwest Facility: Columbia Generating Station Location: P.O. Box 968 (Mail Drop 1023) Richland, WA 99352-0968 Dates: June 11, 2012 thru July 27, 2012 Team Leader: J. Mateychick, Senior Reactor Inspector, Engineering Branch 2 Inspectors: S. Achen, Reactor Inspector, Engineering Branch 2 E. Uribe, Reactor Inspector, Engineering Branch 2 J. Watkins, Reactor Inspector, Engineering Branch 2 Approved By: Geoffrey B. Miller, Chief Engineering Branch 2 Division of Reactor Safety  
- 2 - Enclosure  


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
Line 317: Line 312:


===Closed===
===Closed===
: None  LIST OF ACRONYMS  
None  LIST OF ACRONYMS
: ADAMS Agencywide Documents Access and Management System AR  action Request CFR  Code of Federal Regulations  
ADAMS Agencywide Documents Access and Management System AR  action Request CFR  Code of Federal Regulations
: DRS  Division of Reactor Safety FPIP  Fire Protection Impairment Permits FSAR  Final Safety Analysis Report  NCV  Non-cited Violation NFPA  National Fire Protection Association  
DRS  Division of Reactor Safety FPIP  Fire Protection Impairment Permits FSAR  Final Safety Analysis Report  NCV  Non-cited Violation NFPA  National Fire Protection Association
: NRC  Nuclear Regulatory Commission PAR  Publicly Available Records SDP  Significance Determination Process  
NRC  Nuclear Regulatory Commission PAR  Publicly Available Records SDP  Significance Determination Process  


==LIST OF DOCUMENTS REVIEWED==
==LIST OF DOCUMENTS REVIEWED==
CALCULATIONS
: Number Title Revision
: ENW-CALC-023 RCIC Black Start Room Flooding Evaluation 0
: ENW-CALC-024 RCIC Black Start Oil Cooler Evaluation 0
: MSE-EJJ-10-01 Columbia Generating Station Expert Panel Identification and Review of Multiple Spurious Operation Scenarios 4/23/10
: NE-02-85-19 Calculation for Post Fire Safe Shutdown (PFSS) Analysis 6
: NE 02-85-19 Spurious Cable Analysis (lllc)
: 4
: NE-02-85-19 Spurious Cable Analysis (lllc) 5
: NE-02-85-19 Control Cable Voltage Drop Calc (Io2) 4
: NE-02-85-19 Voltage Drop Calculations During a DBF for Power Whittaker Cables (Io3)
: NE-02-85-19 Electrical Component Analysis (Ia1)
: NE-02-85-19 Voltage Drop and Ampacity Calc. Text (Io1)
: NE-02-94-19 Hi/Lo Analysis (Id1) 5
: NE-02-94-19 2 Series MOVs (If1) 5
: NE-02-94-19 MSIVs 2 Series MSIV Anai (If2) 5
: NE-02-94-35 System Impacts on Post Fire Safe Shutdown 2
: DRAWINGS
: Number Title Revision D00292, Sheet 31 Fire Detection and Alarm System Installation Diagram - Diesel Generator Building Elevation 441' and 455'
: J D00292, Sheet 35 Fire Detection and Alarm System Installation Diagram - Radwaste and Control Building Elevation 437'
: H E502-2 Main One Line Diagram 54 E502-2 Main One Line Diagram 55
: E 596 Communication System Turbine Generator Building Elevation 441'-0" And 471'-0"
: Number Title Revision E 691, Sheet 1 Reactor Building Communication System 20 E 692, Sheet 2 Reactor Building Communication System 14
: E 727, Sheet 1 Radwaste And Control Building Ground Floor Elevation 437'-0" Lighting Plan
: E 730, Sheet 2 Radwaste And Control Building Floor Elevation 467'-0" Lighting Plan
: E 731-1 Radwaste And Control Building Floor Plan Elevation 487'-0" Lighting Plan
: E 733 Radwaste And Control Building Elevation 501'-0" And 507'-0" Lighting Plan
: E 735 Radwaste And Control Building Elevation 525'-0" And Miscellaneous Elevations Lighting Plan
: E 736 Radwaste And Control Building Stairwell Lighting And Miscellaneous Details
: E 756-1 Radwaste And Control Building Communication System 24 E 757-2 Communication System Radwaste And Control Building Elevation 487'-0", 501'-0", 507'-0", 531'-0", And 525'-0"
: E 757-2A Radwaste And Control Building Elevation 525'-0" Communication Room Layout
: E 758-3 Radwaste And Control Building Communication System 37 E775-5 Main Control Room PGCC Lateral And Transitional Duct Layout (Lower Floor Section)
: E775-4 Main Control Room PGCC Longitudinal Duct Layout (Upper Floor Section)
: E 833 Plot Plan Communication System 13 E841, Sheet 1 Communication System Miscellaneous Details 7
: E 787 Diesel Generator Building Communication System 9
: E948-1 Appendix R Post Fire Safe Shutdown (PFSS) Protected Raceways General Notes, Legend and Drawing Index
: E948-2 Appendix R Post Fire Safe Shutdown (PFSS) Protected Raceways Reactor Building and Diesel Generator/Radwaste Corridor Elevations 441'-0" and 471'-0" 16 
: Number Title Revision E948-3 Appendix R Post Fire Safe Shutdown (PFSS) Protected Raceways Radwaste Building - Elevations 467'-0",
: 484'-0" & 525'-0"
: EWD-1E-048 Nuclear Boiler Systems Valve
: MS-V22A (B22-F022A) 16
: EWD-1E-052 Nuclear Boiler Systems Valve
: MS-V28A (B22-F028A) 15
: EWD-1E-056 Nuclear Boiler Systems Main Steam Line Valve Trip Circuit 14
: EWD-1E-043, Sheet 2 Nuclear Boiler Systems Steam Supply Shutoff System 14
: EWD-9E-003 Residual Heat Removal System Pump
: RHR-P-2B 19
: EWD-9E-004 Residual Heat Removal System Pump
: RHR-P-2B 019
: EWD-46E-049 4.16kV & 6.9kV Switchgear Circuit Breaker Details 006
: EWD-9E-055 Residual Heat Removal System MOV
: RHR-V-53B 15
: EWD-9E-057 Residual Heat Removal System MOV
: RHR-FCV-64B 018
: EWD-9E-071 Residual Heat Removal System MOV
: RHR-V-123B (E12-F099B)
: EWD-9E-099 Residual Heat Removal System Miscellaneous Relay Circuits (Div 2)
: EWD-15E-047 Reactor Protection System Power Panel
: RPS-PP-C72/P001 8
: EWD-46E-094 AC Electrical Distribution Systems Aux Power XFMR E-TR-B BRKR E-CB-B/8 Sheet 1
: EWD-46E-240A AC Electrical Distribution System Power Panel E-PP-7AF Circuit Details
: EWD-9E-093 Miscellaneous Relay Circuits (DIV 1) 19
: EWD-9E-064 Residual Heat Removal System MOV
: RHR-V-74B (E12-F074B)
: EWD-50E-008A DC Electrical Distribution System Distribution Panel E-DP-S1/2A Circuit Details
: EWD-9E-069 Residual Heat Removal System MOV
: RHR-V-115 (E12-F094) & Valve
: RHR-V-182 (E12-F097)
: EWD-46E-419 Electrical Wiring Diagram AC Electrical Distribution System Radwaste Building Lighting Elevation 437' Lighting Panel E-LP-5DA
: Number Title Revision
: EWD-46E-420 Electrical Wiring Diagram AC Electrical Distribution System Radwaste Building Lighting Elevation 437' Lighting Panel E-LP-5DB
: EWD-47E-007 Standby AC Power System Diesel Generator 2 Breaker E-CB-DG2/8
: EWD-47E-008B Standby AC Power System Diesel Generator 2 Breaker E-CB-DG/8
: EWD-58E-003 Standby Service Water System
: SW-P-1B 20
: EWD-58E-004 Electrical Wiring Diagram Standby Service Water System
: SW-P-1B Breaker
: SW-CB-P1B
: EWD-58E-004B Electrical Wiring Diagram Standby Service Water System
: SW-P-1B Breaker
: SW-CB-P1B
: EWD-58E-014 Electrical Wiring Diagram Standby Service Water System MOV
: SW-V-2B
: EWD-58E-021 Electrical Wiring Diagram Standby Service Water System MOV
: SW-V-12B
: FM892-7 Sprinkler and Hose Station Plan Elevation 437'-0", 441'-0" and Miscellaneous Floors
: FM892-12 Access-Egress For PFSS Activities Elevation 437'-0", 441'-0', 471'-0" And Miscellaneous Floors
: FM892-13 Access-Egress For PFSS Activities Operating Floor Plan At Elevation 501'-0" And 525'-0"
: FM892-14 Access-Egress For PFSS Activities Reactor Building Miscellaneous Plans
: M519 Flow Diagram Reactor Core Isolation Cooling System 92 M521-2 Residual Heat Removal Loop "B" 111
: PFSS-1 Appendix R - Post Fire Safe Shutdown (PFSS) Division 1 Boundaries
: 009
: PFSS-2 Appendix R - Post Fire Safe Shutdown (PFSS) Division 2 Boundaries 
: 010
: PFSS-3 Appendix R - Post Fire Safe Shutdown (PFSS) Remote Shutdown Boundaries 
: 009 
: Number Title Revision
: PFSS-4 Appendix R - Post Fire Safe Shutdown (PFSS) RHR & ADS System Alternate Shutdown Cooling Piping and Instrument Diagram
: 003
: PFSS-6 Appendix R - Post Fire Safe Shutdown (PFSS) Standby Service Water System Piping and Instrument Diagram 002 217A-00, Sheet
: 28 Cable Chase - Zone 2 System #66 (Preaction) 10 217A-00, Sheet
: 29 Cable Chase - Zone 2 System #66 (Preaction) 4
: ENGINEERING EVALUATIONS
: Number Title Revision 95-048 10
: CFR 50.59 Safety Evaluation Control Room Evacuation and Remote Cooldown May 1995 95-058 10CFR50.59 Safety Evaluation Control Room Evacuation and Remote Cooldown May 1995
: FIRE IMPAIRMENTS
: 09-0356 11-0235 11-0279 12-0073 12-0177 12-0183 10-0232 10-0362 11-0014 11-0146 11-0272 
: PREVENTIVE MAINTENANCE TASKS
: 01174145
: 01176270   
: PROBLEM IDENTIFICATION REPORTS (Action Requests ARs)
: 216894
: 00215102
: 00228113
: 00258333
: 00256220
: 216882
: 00216841
: 00216872
: 00216883
: 00216887
: 226804
: 00226807
: 00221950
: 00222306
: 00236202
: 229278
: 00224299
: 00262993
: 00244786
: 00247759
: 266011*
: 00265861*
: 00264160*
: 00265322*
: 00265305*
: 00265306*
: 00265924*
: 00265205*
: 00265934*
: 00265870*
: 00265271*
: 00265267*
: 00265269*
: 00265270*
: 00265854*
: 265861*
: 00265956*
: 002266020*
: 00266019*
: 00266011*
: 265061*
: 00265204*
: 00265206*
: 00265207*
: 00265208*
: 00265211*
: 00265212*
: 00265267*
: 00265212*
: 00265964* *Issued as a result of inspection activities.
: PROCEDURES
: Number Title Revision
: AB-EDMG Extensive Damage Mitigation Guidelines 5/23/12
: ABN-CR-EVAC Control Room Evacuation and Remote Cooldown 22
: ABN-FIRE Fire 025
: ABN-FIRE-CR Control Room Fire 005
: ABN-FIRE-OG Offgas Charcoal Adsorber Fire 003
: ABN-LIGHTING-CR Loss Of Control Room AC Lighting 001
: ABN-RCIC-START RCIC Start Without Ac And Dc Power 005
: ABN-TSG-001 Spent Fuel Pool Makeup From Stairwell Fire Header 004
: DES-2-1 Plant Design Changes 045
: DES-3-2 Special Design Verification Analysis 3
: FPP 15.1.8 Plant Fire Hose Station Operability Demonstration 7
: FPP 15.2.2 Function and Sensitivity Check of Ionization Detectors 16
: FPP 15.2.5 Zone 66 Ionization detector Visual Inspections, Function and Sensitivity Tests
: 005
: FPP 15.2.14 Functional Check, Sensitivity Check and Cleaning of Photoelectric Detectors
: 008
: FPP 15.2.36 PGCC Halon System U679 Through U894 -Sensitivity Check, Actuation Test and CFT
: 007
: FPP 15.2.39 Emergency Lighting 8-Hour EBU And Essential Fluorescent Lighting Inspection - Monthly
: 003
: FPP 15.2.40 Emergency Lighting 8 - Hour EBU Discharge - Annual 003
: FPP 15.2.40 Emergency Lighting 8 - Hour EBU Discharge 
: 004
: FPP 15.2.40 Emergency Lighting 8 - Hour EBU Discharge 
: 005
: FPP 15.2.41 Annual Surveillance Of 8-Hour Portable Lanterns 005
: FPP 15.2.42 24 Month Operability Test Of Lighting Transfer Switches, E-RMS-7FDA And E-RMS-8FDA
: 000
: FPP 15.2.43 PBX Battery E-BO-PBX Monthly Testing 003
: FPP 15.2.44 PBX Battery E-BO-PBX Quarterly Testing 002 
: Number Title Revision
: FPP 15.3.6 Control Room Halon Pressure Check, Weight Check, Flow Test and PGCC Barrier Inspection
: 005
: FPP 15.4.2 Fire Main Hydraulic Data Acquisition 8
: FPP 15.4.8 Fire Protection System Annual Functional Test 014
: FPP 15.5.9 Essential PBX Phone Functional Test 003
: OPS-INST-M101 Remote and Alt Remote Shutdown Panel Channel Check 10
: OPS-INST-B704 ADS Solenoid Remote Shutdown System Transfer Switch Check
: OPS-INST-B703 Fire Remote Transfer Switch Operability 9
: OPS-INST-B701 Remote Shutdown Panel Operability 14
: PFP-RB-422 Reactor 422 4
: PFP-RW-467 Radwaste 467 4
: PFP-RW-467 Pre-Fire Plan Radwaste 467 004
: PFP-RW-501-507 Pre-Fire Plan Radwaste 501-507 004 PPM 1.3.10 Plant Fire Protection Program Implementation 031
: PPM 1.3.10A Control of Ignition Sources 015
: PPM 1.3.10B Active Fire System Operability and Impairment Control 014
: PPM 1.3.10C Control of Transient Combustibles 014
: PPM 1.3.57 Barrier Impairment 027
: PPM 1.3.68 Work Management Process 025 PPM 1.5.13 Preventive Maintenance Optimization Living Program 025
: PPM 15.1.1 Fire Suppression Sprinkler System Inspection 017
: PPM 15.1.8 Plant Fire Hose Station Operability Demonstration 011
: PPM 15.1.15 Wet Pipe Sprinkler Flow Switch Functional Test 021
: PPM 15.1.18 Fire Suppression Systems Valve Alignment 017
: PPM 15.1.22 Plant Fire Extinguisher and Foam Cart Inspections 036
: PPM 15.1.27 Smoke Removal Fan Operability Surveillance 004
: PPM 15.3.15 Fire Protection Sprinkler System Internal Inspection 019 
  - 10 - Attachment Number Title Revision
: SWP-CAP-01 Corrective Action Program 024
: SWP-DES-01 Plant Modifications and Configuration Control 015
: SWP-FPP-01 Nuclear Fire Protection Program 007
: SWP-LIC-02 Licensing Basis Impact Determinations 011
: MISCELLANEOUS DOCUMENTS
: Number Title Revision
: BWROG-TP-11-011 BWROG Assessments of Generic Multiple Spurious Operations (MSOs) in Post-Fire Safe Shutdown Circuit Analysis for the Operating BWR Plants
: C11-0005 Component Classification Evaluation Record (SW-ATD-P1B,
: RHR-ATD-P2B, E-ATD-TRB/SM8)
: CVI 999-00,76 Dual-Lite Instruction Manual For Self Contained Emergency Lighting Units 
: 2 Design Basis Document B 1.10.7 Essential Lighting 58 Design Basis Document B 1.10.8 Essential Communication 62 Design Specification For Division 200 Section 209 Post Fire Safe shutdown (PFSS) Analysis Requirements Design Specification For Division 300 Section 307 Main Steam System 6 D104-C1-001 PFSS Fire Wrap Commodity Data 10/09/1999 D104-C1-001.01 PFSS Fire Wrap Commodity Data 10/09/1999
: D104-C1-001.03 PFSS Fire Wrap Commodity Data 10/09/1999
: D207-5003 Penetration Seal Data Form 10/06/1999
: ERIN Letter C106110003-9696 Resolution of CGS MSO Issues Using MAAP (Final Draft) 1/27/11 FPF 1.1, Item No. 13 Penetration Seal Limiting Design Parameters 3 FPF 1.1, Item No. 59 Technical Justification For Minor Deviations From Limiting Design Parameters


  - 11 - Attachment Number Title Revision FPF 1.11, Item No. 2 Qualification of Whittaker MI Cable as a 3-Hour Raceway Fire Barrier
: FPF 2.1, Item No. 34 Compliance With NFPA 72E-1974 Smoke Detector Placement
: FPF 2.10, Item No. 7 Columbia Smoke Removal Analysis 0 FPF 2.10, Item No.
: Control Room Habitability Smoke Intrusion Analysis 0 FPF 2.12, Item No.
: Availability of Fire Brigade Communications by Fire Area 0 FPF 3.18, Item No. 6 NFPA 20 Code Conformance Review 0 FPF 3.18, Item No. 7 NFPA 14 Code Conformance Evaluation 0
: FPF 4.1 Item 2 Normal Shutdown Manual Action Feasibility Review 0
: FPSA-1-RE-0001 Fire Probabilistic Safety Results - Quantification and Results 2 FSAR, Amendment 60, Section F.2.2.2 Raceway Fire Barriers December
: 2009 FSAR, Amendment 61, Section F.4 Fire Hazards Analysis December
: 2011 FTCR/94/0060 Test Report for a 1 Hour Fire Hose Stream Tests on Darmatt KM1 Fire Protection System for Electrical Circuits Systems to ASTM E119 NRC
: GL 86/10
: Supplement 1
: B FTCR/94/0130 Test Report for a 1 Hour Fire Hose Stream Tests on Darmatt KM1 Fire Protection System for End Penetration Seals at Braidwood and Byron NPS - Repeat Test
: A FTCR/95/0025 Report on the One Hour fire test/Five Minute Water Hose Test on Darmatt KM1 Board and Pre-Moulded Systems for Intervening Thermal Shorts Test Date 7 March 1995
: B
: GEF-3481C General Electric Control Switches
: GO2-95-013
: WNP-2, Operating License
: NPF-21 Revision To Procedures For Control Room Fires 1/25/95 
  - 12 - Attachment Number Title Revision
: LE-06-005 Licensing Basis Impact Evaluation For
: LCDN-FSAR-06-012 Regarding 8-Hour Portable Lanterns Used For Post Fire Safe Shutdown Manual Actions Licensee Controlled Specification 1.10 Fire Protection 67
: Memorandum From J. Harmon, Maintenance Manager To R. Webring, Plant Technical Manager-WPSS Self Contained Battery Powered Emergency Lighting Periodic Test Requirements 4/29/92
: Memorandum From A. Hosler, Manager,
: WNP-2 Licensing To Distribution Record Of Telecon - Proposed Use Of Portable Lighting For Fire Protection 5/15/92
: NEDO-10466-A Licensing Topical Report, Power Generation Control Complex, Design Criteria and Safety Evaluation February 1979
: NEDO-33638 BWROG Assessments of Generic Multiple spurious Operations (MSOs) in Post-Fire Safe Shutdown Circuit Analysis for the Operating BWR Plants
: NRC Letter
: LI2-87-025
: WNP-2 FSAR Amendment 37  (TAC No. 63528) 11/11/87 NRC Letter
: GI2-89-048 Approved Fire Protection Program at
: WNP-2 (TAC 63528) 5/22/89
: PER 292-287 Problem Evaluation Request For Potential Deficiencies In Appendix R
: Calculation
: NE-02-85-19 4/6/1992
: PFP-TG-441-456 Pre-Fire Plan Turbine Generator 441-456 006
: PFP-RW-467 Pre-Fire Plan Radwaste 467 004
: PFP-RW-484-487 Power Block Pre-Fire Plan: Radwaste 484-487 004
: PFP-RW-501-507 Pre-Fire Plan Radwaste 501-507 004
: SD000177 System Description, Fire Protection 15
: SD000204 System Description, Standby Service Water 17
: SD000210 System Description, Remote Shutdown 8
: SPEC 209 Post Fire Safe Shutdown Analysis Spec 209 
  - 13 - Attachment Number Title Revision SPEC 307 Design Specification for Division 300 Section 307 Main Steam System Technical
: Memorandum
: TM-2160 B.5.b Implementation 2 Technical
: Memorandum
: TM-2181 BWROG Position Paper on fire-Induced Water Hammer 0
: TPD-22 Fire Brigade Training Program Description 000 23A1900 Residual Heat Removal System 004
: Emergency Plan 57
: Scientific Columbus Exceltronic AC Current or Voltage Transducers
: MODIFICATIONS
: Number Title Revision
: EC 10365 Appendix R Mod for RHR Valves 1
: EC 9123
: SM-8 CT Shorting Switches Isolate Overcurrent Relay CKT for CR Ammeter CKT
: SW-P-1B,
: RHR-P-2B AND E-CB-B/8 Breaker Cubicles
: EC 4558 RHR PFSS Valve Protection From Multiple Spurious Hot Shorts
: EC-6583 Install B5b Cabinets In Reactor Building Stairways To Support New
: ABN-TSG Procedures 5/6/2009
: WORK ORDERS
: 01135538
: 01200249
: 02008609
: 02008616
: 01138150
: 2000723
: 01185703
: 02000176
: 01126331
: 02004430
: 01194863
: 02012584
: 01175543
: 01194865
: 01135538
: 200249
: 01126939
: 01189016
: 01169277
: 01196157
: 2002569
: 02010793
: 02009843
: 02005239
: 01169277
: 2012888
: 02012919
: 02013524
: 01166302
: 011837786
: 01183267
: 01198372
: 02002660
: 01188504
: 02007545
: 01191924
: 01189394
: 0223960
: 1176830
: 01166429
: 01183786
: 29083270
: 02012864
: 02008509
: 02012293 
  - 14 - Attachment
: 01180383
: 02013094
: 02014565
: 02014567
: 02012425
: 2012930
: 02014571
: 02014572
: 02014575
: 02014576
: 0118758 02001957
}}
}}

Revision as of 15:51, 23 June 2019

IR 05000397-12-007, 6/11/12 - 7/27/12, Energy Northwest, Columbia Generating Station Triennial Fire Protection Team Inspection
ML12215A497
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/02/2012
From: Geoffrey Miller
NRC/RGN-IV/DRS/EB-2
To: Reddemann M
Energy Northwest
Miller G
References
IR-12-007
Download: ML12215A497 (30)


Text

August 2, 2012

SUBJECT:

COLUMBIA GENERATING STATION - NRC TRIENNIAL FIRE INSPECTION REPORT 05000397/2012007

Dear Mr. Reddemann:

On June 28, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Columbia Generating Station. The enclosed inspection report documents the inspection results, which were discussed in a debrief meeting on June 28, 2012, with Mr. A. Javorik, Vice-President Engineering, and other members of your staff. Following additional in-office review, an exit meeting was conducted on July 27, 2012, with Mr. A. Javorik, Vice-President Engineering, and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, the NRC has identified one finding that was evaluated under the risk significance determination process. A violation was associated with the finding. The finding was found to have very low safety significance (Green) and the violation associated with this finding is being treated as a non-cited violation, consistent with Section 2.3.2 of the NRC Enforcement Policy. If you contest the NCV in this report, you should provide a written response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington, D.C. 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Senior Resident Inspector at the Columbia Generating Station. In addition, if you disagree with the characterization of the finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV, and the NRC Senior Resident Inspector at Columbia Generating Station. The information you provide will be considered in accordance with Inspection Manual Chapter 0305. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Geoffrey B. Miller, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-397 License No. NPF-21 Enclosure:

1. Inspection Report No. 05000397/2012007 Attachment: 1. Supplemental Information

Electronic Distribution: Columbia Generating Station

ML12215A497 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: GBM Publicly Available Non-Sensitive Non-publicly Available Sensitive RIV: DRS/EB2/SRI DRS/EB2/RI DRS/EB2/RI DRS/EB2/RI DRS/EB2/BC JMateychick SAchen EUribe JWatkins GMiller /RA/ /RA/per e-mail /RA/ /RA/per e-mail /RA/ 7/27/2012 7/25/2012 7/24/2012 7/25/2012 8/02/2012

- 1 - Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION IV

Docket: 50-397 License: NPF-21 Report Nos.: 05000397/2012007 Licensee: Energy Northwest Facility: Columbia Generating Station Location: P.O. Box 968 (Mail Drop 1023) Richland, WA 99352-0968 Dates: June 11, 2012 thru July 27, 2012 Team Leader: J. Mateychick, Senior Reactor Inspector, Engineering Branch 2 Inspectors: S. Achen, Reactor Inspector, Engineering Branch 2 E. Uribe, Reactor Inspector, Engineering Branch 2 J. Watkins, Reactor Inspector, Engineering Branch 2 Approved By: Geoffrey B. Miller, Chief Engineering Branch 2 Division of Reactor Safety

- 2 - Enclosure

SUMMARY OF FINDINGS

IR 05000397/2012007; 6/11/12 - 7/27/12; Energy Northwest; Columbia Generating Station; Triennial Fire Protection Team Inspection.

The report covered a two-week on-site triennial fire protection team inspection by specialist inspectors from Region IV. One Green finding, which was a non-cited violation (NCV), was identified. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter 0609, "Significance Determination Process." Findings for which the significance determination process (SDP) does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.

A. NRC-Identified and Self-Revealing Findings

Cornerstone: Mitigating Systems

Green.

The inspectors identified a non-cited violation for the failure to ensure that material, parts, and equipment specified met or exceeded the design criteria as required by License Condition 2.C.14, "Fire protection Program (Generic Letter 86-10)." Specifically, prior to implementing engineering change EC 9123, the licensee failed to analyze for all possible failure modes of fire induced circuit failures for transducers installed for ensuring electrical isolation in the event of a fire in the control room for post fire safe shutdown standby service water pump SW-P-1B, residual heat removal pump RHR-P-2B, and circuit breaker E-CB-B/8 as required by FSAR Appendix F, Table F.3-1.

The failure to analyze a modification to post fire safe shutdown circuitry for all possible modes of fire induced circuit failures was a performance deficiency. The performance deficiency was more than minor because it was associated with the protection against external events (fire) attribute of the Mitigating Systems Cornerstone and it adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The inspectors evaluated this deficiency using Inspection Manual Chapter 0609, Appendix F, "Fire Protection Significance Determination Process." The performance deficiency affected the fire protection defense-in depth strategies involving post-fire safe shutdown systems.

This finding was evaluated using the process in Inspection Manual Chapter 0609, Appendix F, "Fire Protection Significance Determination Process," Attachment 2, "Degradation Rating Guidance Specific to Various Fire Protection Program Elements," and was determined to be of very low safety significance. The finding was assigned a low degradation rating because the capability to achieve safe shutdown in the event of a control room fire would be minimally impacted by the failure to analyze the control circuitry for equipment required for post fire safe shutdown. This was based on the licensee verifying through bench testing that the component in question does provide adequate electrical isolation. Because this finding had a low degradation rating, it screened as having very low safety significance (Green). The performance deficiency had a cross-cutting aspect in the area of human performance associated with decision making because the licensee did not make risk-significant decisions using a systematic process, especially when faced with uncertain or unexpected plant conditions, to ensure safety was maintained and failed to implement the roles and authorities as designed for risk-significant decisions H.1(a). (Section 1R05.06.b)

B. Licensee-Identified Violations

None.

REPORT DETAILS

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity

1R05 Fire Protection

This report presents the results of a triennial fire protection inspection conducted in accordance with NRC Inspection Procedure 71111.05T, "Fire Protection (Triennial)," at the Columbia Generating Station. The inspection team evaluated the implementation of the approved fire protection program in selected risk-significant areas, with an emphasis on the procedures, equipment, fire barriers, and systems that ensure the post-fire capability to safely shutdown the plant.

Inspection Procedure 71111.05T requires the selection of three to five fire areas for review. The inspection team used the fire hazards analysis section of the Columbia Generating Station Fire Probabilistic Safety Assessment to select the following five risk-significant fire areas (inspection samples) for review:

  • Fire Area RC-10 Control Room
  • Fire Area RC-14 Division 1 Switchgear Room
  • Fire Area TG-1, Fire Zone 12 Turbine Building South Corridors The inspection team evaluated the licensee's fire protection program using the applicable requirements, which included plant Technical Specifications, Operating License Condition 2.C.14, NRC safety evaluations, 10 CFR 50.48, and Branch Technical Position 9.5-1. The team also reviewed related documents that included the Final Safety Analysis Report (FSAR), Section 9.5; the fire hazards analysis; and the post-fire safe shutdown analysis.

Specific documents reviewed by the team are listed in the attachment. Three inspection samples were completed.

.01 Protection of Safe Shutdown Capabilities

a. Inspection Scope

The team reviewed piping and instrumentation diagrams, safe shutdown equipment list, safe shutdown design basis documents, and the post-fire safe shutdown analysis to verify that the licensee properly identified the components and systems necessary to achieve and maintain safe shutdown conditions for fires in the selected fire areas. The team observed walk-downs of the procedures used for achieving and maintaining safe shutdown in the event of a fire to verify that the procedures properly implemented the safe shutdown analysis provisions.

For each of the selected fire areas, the team reviewed the separation of redundant safe shutdown cables, equipment, and components located within the same fire area. The team also reviewed the licensee's method for meeting the requirements of 10 CFR 50.48; Branch Technical Position 9.5-1, Appendix A; and 10 CFR Part 50, Appendix R, Section III.G. Specifically, the team evaluated whether at least one post-fire safe shutdown success path remained free of fire damage in the event of a fire. In addition, the team verified that the licensee met applicable license commitments.

b. Findings

No findings were identified.

.02 Passive Fire Protection

a. Inspection Scope

The team walked down accessible portions of the selected fire areas to observe the material condition and configuration of the installed fire area boundaries (including walls, fire doors, and fire dampers) and verify that the electrical raceway fire barriers were appropriate for the fire hazards in the area. The team compared the installed configurations to the approved construction details, supporting fire tests, and applicable license commitments.

The team reviewed installation, repair, and qualification records for a sample of penetration seals to ensure the fill material possessed an appropriate fire rating and that the installation met the engineering design. The team also reviewed similar records for the rated fire wraps to ensure the material possessed an appropriate fire rating and that the installation met the engineering design.

b. Findings

No findings were identified.

.03 Active Fire Protection

a. Inspection Scope

The team reviewed the design, maintenance, testing, and operation of the fire detection and suppression systems in the selected fire areas. The team verified the automatic detection systems and the manual and automatic suppression systems were installed, tested, and maintained in accordance with the National Fire Protection Association code of record or approved deviations, and that each suppression system was appropriate for the hazards in the selected fire areas.

The team performed a walkdown of accessible portions of the detection and suppression systems in the selected fire areas. The team also performed a walkdown of major system support equipment in other areas (e.g., fire pumps and Halon supply systems) to assess the material condition of these systems and components.

The team reviewed the electric and diesel fire pump flow and pressure tests to verify that the pumps met their design requirements. The team also reviewed the halon suppression functional tests to verify that the system capability met the design requirements.

The team assessed the fire brigade capabilities by reviewing training, qualification, and drill critique records. The team also reviewed pre-fire plans and smoke removal plans for the selected fire areas to determine if appropriate information was provided to fire brigade members and plant operators to identify safe shutdown equipment and instrumentation, and to facilitate suppression of a fire that could impact post-fire safe shutdown capability. In addition, the team inspected fire brigade equipment to determine operational readiness for fire fighting.

The team observed an unannounced fire drill, conducted on June 27, 2012, in the Radwaste Building 487' Elevation General Area and the subsequent drill critique using the guidance contained in Inspection Procedure 71111.05AQ, "Fire Protection Annual/Quarterly." The team observed fire brigade members fight a simulated fire in the Radwaste Building, located in the radiological controlled area. The team verified that the licensee identified problems, openly discussed them in a self-critical manner at the drill debrief, and identified appropriate corrective actions. Specific attributes evaluated were:

(1) proper wearing of turnout gear and self-contained breathing apparatus;
(2) proper use and layout of fire hoses;
(3) employment of appropriate fire fighting techniques; (4)sufficient fire fighting equipment was brought to the scene;
(5) effectiveness of fire brigade leader communications, command, and control;
(6) search for victims and propagation of the fire into other areas;
(7) smoke removal operations;
(8) utilization of pre-planned strategies;
(9) adherence to the pre-planned drill scenario; and
(10) drill objectives.

b. Findings

No findings were identified.

.04 Protection From Damage From Fire Suppression Activities

a. Inspection Scope

The team performed plant walkdowns and document reviews to verify that redundant trains of systems required for safe shutdown, which are located in the same fire area, would not be subject to damage from fire suppression activities or from the rupture or inadvertent operation of fire suppression systems. Specifically, the team verified that:

  • A fire in one of the selected fire areas would not directly, through production of smoke, heat, or hot gases, cause activation of suppression systems that could potentially damage all redundant safe shutdown trains.
  • A fire in one of the selected fire areas or the inadvertent actuation or rupture of a fire suppression system would not directly cause damage to all redundant trains (e.g., sprinkler-caused flooding of other than the locally affected train).

Adequate drainage is provided in areas protected by water suppression systems.

b. Findings

No findings were identified.

.05 Alternative Shutdown Capability

a. Inspection Scope

Review of Methodology The team reviewed the safe shutdown analysis, operating procedures, piping and instrumentation drawings, electrical drawings, the Final Safety Analysis Report, and other supporting documents to verify that safe shutdown could be achieved and maintained from outside the control room for fires that require evacuation of the control room, with or without offsite power available.

Plant walkdowns were conducted to verify that the plant configuration was consistent with the description contained in the safe shutdown and fire hazards analysis. The team focused on ensuring the adequacy of systems selected for reactivity control, reactor coolant makeup, reactor decay heat removal, process monitoring instrumentation, and support system functions.

The team also verified that the systems and components credited for safe shutdown would remain free from fire damage. Finally, the team verified that the transfer of control from the control room to the alternative shutdown location would not be affected by fire induced circuit failures (e.g., by the provision of separate fuses and power supplies for alternative shutdown control circuits).

Review of Operational Implementation

The team verified that the licensed and non licensed operators received training on alternative shutdown procedures. The team also verified that sufficient personnel to perform a safe shutdown are trained and available onsite at all times, exclusive of those assigned as fire brigade members.

A simulated walkdown of the post-fire safe shutdown procedure with licensed and non licensed operators was performed to determine the adequacy of the procedure. The team observed that the procedure, as written, does ensure a safe shutdown condition of the plant and does implement the required actions within the time limits specified by analysis. Time critical actions that were observed include a reactor trip, closure of main steam isolation valves, isolating unprotected circuits, restoring electrical power, establishing control at the remote shutdown and local control panels, performing an emergency depressurization, establishing reactor coolant makeup at desired pressure, and establishing decay heat removal.

The team reviewed operator manual actions to ensure that they could be implemented in accordance with plant procedures in the time necessary to support safe shutdown for a fire in the control room. The team concluded that the licensee procedure does ensure safe shutdown of the plant.

The team also reviewed the periodic testing of the alternative shutdown transfer capability as well as instrumentation and control functions to verify that the tests are adequate to demonstrate the functionality of the alternative shutdown capability.

b. Findings

No findings were identified.

.06 Circuit Analysis

a. Inspection Scope

The team reviewed the post-fire safe shutdown analysis to verify that the licensee identified the circuits that may impact the ability to achieve and maintain safe shutdown.

The team verified, on a sample basis, that the licensee properly identified the cables for equipment required to achieve and maintain hot shutdown conditions in the event of a fire in the selected fire areas. The team verified that these cables were either adequately protected from the potentially adverse effects of fire damage or were analyzed to show that fire induced circuit faults (e.g., hot shorts, open circuits, and shorts to ground) would not prevent safe shutdown. The team reviewed the circuits associated with the following components:

  • E-CB-B/8, RHR-CB-P2B, SW-CB-P1B, CT Shorting Switch Modification
  • Whittaker Mineral Insulated Cables for Instrumentation and Control associated with Post Fire Safe Shutdown

For this sample, the team reviewed electrical elementary and block diagrams and identified power, control, and instrument cables necessary to support their operation. In addition, the team reviewed cable routing information to verify that fire protection features were in place as needed to satisfy the separation requirements specified in the fire protection license basis.

b. Findings

Introduction.

The team identified a violation of License Condition 2.C.14, "Fire protection Program (Generic Letter 86-10)" of very low safety significance (Green) for the failure to analyze for all possible modes of fire induced circuit failures introduced by a modification made to post fire safe shutdown circuitry. Specifically, the licensee failed to analyze for all possible failure modes for transducers required for ensuring electrical isolation in the event of a fire in the control room for standby service water pump SW-P-1B, residual heat removal pump RHR-P-2B, and circuit breaker E-CB-B/8. As a result, the licensee failed to ensure that the local control circuitry would be isolated from the effects of fire damage caused by a control room fire.

Description.

In the event of a fire in the control room, the licensee must ensure control circuitry for equipment credited for post fire safe shutdown is electrically isolated to ensure that fire damage would not prevent operation of equipment needed to achieve and maintain safe shutdown conditions. In June 2012, the licensee implemented engineering change EC 9123 to replace the isolation function of current transformer (CT) shorting switches. The shorting switches were replaced with current transducers to isolate control room ammeter circuitry from the control circuitry for service water pump 1B, residual heat removal pump 2B, and circuit breaker B/8 which connects offsite power to the credited class 1E 4160V SM8 bus.

The team reviewed the licensee's engineering change package and evaluations for the modification. The team identified that the evaluation did not contain any analysis of potential circuit failure modes for response of the transducers. The licensee failed to establish the criteria for determining if the component could be impacted by fire induced circuit failures prior to implementing the modification in the plant and issuing a new revision of procedure ABN-CR-EVAC "Control Room Evacuation and Remote Cooldown," Revision 023, which omitted using the manual switching of the CT shorting switches for isolation. In response to the identified deficiency, the licensee was able to implement compensatory measures to reinstate the use of the CT shorting switches which had been left in place, until bench testing on the component could be performed. The licensee entered this deficiency in their corrective action program as Condition Report 00266019.

Analysis.

The failure to analyze a modification to post fire safe shutdown circuitry for all possible modes of fire induced circuit failures was a performance deficiency. Specifically, the licensee failed to ensure that control circuitry for equipment required for post fire safe shutdown would be isolated from the control room in the event of a fire. The performance deficiency was more than minor because it was associated with the protection of external events attribute (fire) of the Mitigating Systems cornerstone and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The team evaluated the finding using Inspection Manual Chapter 0609, Appendix F, "Fire Protection Significance Determination Process," because it affected fire protection defense in depth strategies involving post fire safe shutdown. Using Appendix F, Attachment 2, "Degradation Rating Guidance Specific to Various Fire Protection Program Elements," the team assigned a low degradation rating to the finding because the capability to achieve safe shutdown in the event of a control room fire would be minimally impacted by the failure to analyze the control circuitry for equipment required for post fire safe shutdown. This was based on the licensee verifying through bench testing that the component in question does provide adequate electrical isolation. Because this finding had a low degradation rating, it screened as having very low safety significance (Green). The performance deficiency had a cross-cutting aspect in the area of human performance associated with decision making because the licensee did not make risk-significant decisions using a systematic process, especially when faced with uncertain or unexpected plant conditions, to ensure safety was maintained and failed to implement the roles and authorities as designed for risk-significant decisions H.1(a).

Enforcement.

Fire Protection License Condition 2.C.14, "Fire protection Program (Generic Letter 86-10)," specifies that the licensee shall implement and maintain in effect all provisions of the approved Fire Protection Program. Final Safety Analysis Report, Table F.3-1, "Comparison with BTP 9.5-1 Appendix A," Section C, "Quality Assurance Program," requires in part, that "the established engineering procedures require the design changes to be reviewed by cognizant personnel to ensure material, parts, and equipment specified will meet or exceed the design criteria."

Contrary to the above, during a plant modification in June 2012, the licensee failed to review design changes to ensure material, parts, and equipment specified met or exceeded the design criteria. Specifically, the licensee failed to analyze all circuit failure modes for transducers installed in post fire safe shutdown circuitry to ensure electrical isolation for a control room fire. Because this finding is of very low safety significance and has been entered into the licensee's corrective action program (Condition Report 00266019), this violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the NRC Enforcement Policy: NCV 05000397/2012007-001, Failure to Analyze Post Fire Safe Shutdown Circuitry for Isolation for a Control Room Fire.

.07 Communications

a. Inspection Scope

The inspectors reviewed the adequacy of the communication system to support plant personnel in the performance of alternative post-fire safe shutdown functions and fire brigade duties. The review verified that the licensee established and maintained in working order primary and backup communications. Further, the inspectors evaluated the environmental impacts such as ambient noise levels, coverage patterns, and clarity of reception. The inspectors reviewed that the electrical power supplies, PBX battery system, PBX phones, sound powered phones and cable routing for the phone system would allow them to remain functional following a fire in the control room and other fire areas.

b. Findings

No findings were identified.

.08 Emergency Lighting

a. Inspection Scope

The inspectors reviewed the emergency lighting system required to support plant personnel in the performance of post-fire safe shutdown functions to verify it was adequate to support the performance of manual actions required to achieve and maintain safe shutdown conditions, and for illuminating access and egress routes to the areas where manual actions are required. The review verified that the licensee relied on fixed emergency lights with an 8-hour battery capacity, diesel backed fluorescent lights, and 8-hour portable lanterns for selected post-fire safe shutdown manual actions. The licensee maintained the emergency light batteries in accordance with manufacturer recommendations, and tested and performed maintenance in accordance with plant procedures and industry practices. The inspectors evaluated the locations and positioning of fixed emergency lights and the four pre-staged locations for the storage of the 8-hour portable lanterns (five 8-hour portable lanterns at each location) during a walkthrough of the control room evacuation procedure and during review of manual actions performed for fires in areas outside of the control room. The approved 8-hour portable lanterns are used exclusively for selected post-fire safe shutdown manual actions and there are adequate lanterns pre-staged at each of the four locations to supply the control room staff of five. The portable 8-hour lanterns are maintained and tested annually.

b. Findings

No findings were identified.

.09 Cold Shutdown Repairs

a. Inspection Scope

The team verified that the licensee does not perform or credit any repairs to achieve post-fire safe shutdown.

b. Findings

No findings were identified.

.10 Compensatory Measures

a. Inspection Scope

The team verified that compensatory measures were implemented for out-of-service, degraded, or inoperable fire protection and post-fire safe shutdown equipment, systems, or features (e.g., detection and suppression systems and equipment; passive fire barriers; or pumps, valves, or electrical devices providing safe shutdown functions). The team also verified that the short-term compensatory measures compensated for the degraded function or feature until appropriate corrective action could be taken and that the licensee was effective in returning the equipment to service in a reasonable period of time.

b. Findings

No findings were identified.

.11 B.5.b Inspection Activities

a. Inspection Scope

The inspectors reviewed the licensee's implementation of guidance and strategies intended to maintain or restore core, containment, and spent fuel pool cooling capabilities under the circumstances associated with loss of large areas of the plant due to explosions or fire as required by Section B.5.b of the Interim Compensatory Measures Order, EA-02-026, dated February 25, 2002, and 10 CFR 50.54(hh)(2).

The inspectors reviewed the strategies to verify that they continued to maintain and implement procedures, maintain and test equipment necessary to properly implement the strategies, and ensure station personnel are knowledgeable, trained, and capable of implementing the procedures. The inspectors visually inspected the fire truck with remote controlled extension ladder mounted spray nozzle, B.5.b equipment storage trailer, storage lockers strategically located within the plant that contained materials and equipment necessary to implement B.5.b strategies, and other equipment used to implement the strategies to ensure the availability and material readiness of the equipment. The inspectors evaluated the adequacy of the trailer hitch attachments and verified the availability of on-site vehicles capable of towing the B.5.b equipment storage trailer. The licensee implemented their strategies in accordance with Procedure OCAG-1, "Operational Contingency Action Guideline," Revision 20. The inspectors selected the following two specific strategies for this inspection sample:

  • Spent Fuel Pool Makeup From Stairwell Fire Header The inspectors completed two samples.

b. Findings

No findings were identified.

OTHER ACTIVITIES

[OA]

4OA2 Identification and Resolution of Problems

Corrective Actions for Fire Protection Deficiencies

a. Inspection Scope

The team selected a sample of condition reports associated with the licensee's fire protection program to verify that the licensee had an appropriate threshold for identifying deficiencies. The team reviewed the corrective actions proposed and implemented to verify that they were effective in correcting identified deficiencies. The team evaluated the quality of recent engineering evaluations through a review of condition reports, calculations, and other documents during the inspection.

b. Findings

No findings were identified.

0A6 Meetings, Including Exit The team presented the inspection results to Mr. A. Javorik, Vice-President Engineering, and other members of the licensee staff at debrief meeting on June 28, 2012.

Following additional in-office review, an exit meeting was conducted on July 27, 2012, with Mr. A. Javorik, Vice-President Engineering, and other members of your staff. The licensee acknowledged the findings presented. The inspectors asked whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.

4OA7 Licensee-Identified Violations

None ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

B. Adami, Technical Services Engineering Manager
M. Baird, Shift Manager
C. Blake, System Engineer
M. Boddy, Security Supervisor
D. Brown, Operations Manager
B. Burke, Design Archirect
S. Clizbe, Safeguards and Compliance
M. Da Re, Quality Assessor
M. Davis, Radiological Services Manger
E. Dumlao, System Engineer
Z. Dunham, Licensing Supervisor
C. England, Organizational Effectiveness Manager
E. Gilmour, Information Services Manager
G. Gordon, Equipment Operator Don Gregoire, Regulatory Affairs Manager
W. Harper, Fire Protection Engineer
R. Hermann, System Engineer
W. Hettel, Vice-President Operations
A. Javorik, Vice-President Engineering
M. Kellett, Document and Data Services Manager
C. King, Assistant Plant General Manger
J. Lomax, Electrical Designer
R. Olson, Fire Protection System Engineer
B. Mackissock, Plant General Manager
D. Mand, Design Engineering Manger
C. Moon, Training Manager
T. Morales, Mechanical Design Authority
J. Noah, Fire Marshall
C. Noedhaus, Operations Work Control Shift Manager
R. Olson, Fire Protection Systems Engineer
T. Parmelee, Post-Fire Safe Shutdown Engineer
J. Peterson, Fire Protection Engineer
J. Rhoads, Senior Engineer
J. Sims, Long Range Planning Manager
I. Singh, Systems Engineer
C. Sonoda, Licensing Engineer
G. Strong, Electrical/I&C Design Engineering Supervisor
J. Twomey, Acting Regulatory Affairs Manager
L. Williams, Licensing Engineer
R. Wolfgramm, Plant Programs Supervisor

NRC personnel

M. Hayes, Resident Inspector

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened

None

Opened and Closed

05000397/2012007-001 NCV Failure to Analyze Post Fire Safe Shutdown Circuitry for Isolation for a Control Room Fire

Closed

None LIST OF ACRONYMS

ADAMS Agencywide Documents Access and Management System AR action Request CFR Code of Federal Regulations

DRS Division of Reactor Safety FPIP Fire Protection Impairment Permits FSAR Final Safety Analysis Report NCV Non-cited Violation NFPA National Fire Protection Association

NRC Nuclear Regulatory Commission PAR Publicly Available Records SDP Significance Determination Process

LIST OF DOCUMENTS REVIEWED