| issue date = 08/31/2016
| issue date = 08/31/2016
| title = Mid-Cycle Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Report 05000280,281/2016005
| title = Mid-Cycle Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Report 05000280,281/2016005
| author name = Rose S D
| author name = Rose S
| author affiliation = NRC/RGN-II/DRP
| author affiliation = NRC/RGN-II/DRP
| addressee name = Heacock D A
| addressee name = Heacock D
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| docket = 05000280, 05000281
| docket = 05000280, 05000281

Revision as of 22:58, 19 June 2019

Mid-Cycle Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Report 05000280,281/2016005
ML16244A126
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/31/2016
From: Steven Rose
Division Reactor Projects II
To: Heacock D
Virginia Electric & Power Co (VEPCO)
References
IR 2016005
Download: ML16244A126 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 August 31, 2016 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Dominion Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060

-6711

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR SURRY POWER STATION , UNITS 1 AND 2 - NRC INSPECTION REPORT 05000280, 281/201 6005 Dear Mr. Heacock

On August 10, 2016, the Nuclear Regulatory Commission (NRC) completed its mid

-cycle performance review of Surry Power Station

, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 20 15, through June 30, 20 16. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Surry Power Station, Units 1 and 2, were operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined that the performance at Surry Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRC

's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection schedule of the inspection plan are tentative and may be revised at the end

-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non

-publicly available correspondence

. A dd i t i ona l l y , t he NR C p l a ns on conducting non-ROP baseline inspections which include two Operating License Initial Examinations and Temporary Instruction 2515/191, Revision 1, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi

-Unit Dose Assessment Plans."

D. Heacock 2 The NRC staff received the Surry Power Station, Unit s 1 and 2, Final Compliance letter for Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond

-Design-Basis External Events," and Order EA 051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation."

The NRC staff issued the Surry Power Station, Unit s 1 and 2 , Safety Evaluation on August 4, 2016, and will confirm full implementation of the orders mentioned above by performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi

-Unit Dose Assessment Plans." In Staff Requirements Memorandum

- SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re

-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid

-cycle assessment process beginning in calendar year 2017. This will be the final mid

-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4609 with any questions you may have regarding this letter.

Sincerely, /RA/ Steven D. Rose, Chief Reactor Projects Branch 5

Division of Reactor Projects

Docket Nos.

50-280, 50-281 License Nos

.: DPR-32, DPR-37

Enclosure:

Sur ry Inspection

/ Activity Plan (0 9/01/20 1 6 - 06/30/201 8) cc Distribution via List Serv

___________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB2 SON via email SDR2 NAME BBishop SNinh SRose DATE 8/30/2016 8/30/2016 8/30/2016 E-MAIL COPY?

YES NO YES NO YES NO D. Heacock 2 Letter to David A Heacock from Steven D. Rose dated August 31, 201 6

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000280, 281/201 6005 DISTRIBUTION

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 3 08/31/2016 07:01:09 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site SurryInspection / Activity Plan 09/01/2016

-06/30/2018OL EXAM-INITIAL LICENSE EXAM 3 1 SURRY SEPTEMBER 2016 INITIAL EXAM AT POWER FACILITIES V23477 09/19/2016 09/30/2016 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 10/24/2016 10/28/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 1 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/31/201611/04/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 10/31/201611/04/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/31/201611/04/2016 1, 2 IP Occupational Dose Assessment71124.04 10/31/201611/04/2016 1, 2 IP Radiation Monitoring Instrumentation71124.05 10/31/201611/04/2016 1, 2 IP Performance Indicator Verification71151 10/31/201611/04/2016 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 10/31/201611/04/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 2 3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.0111/28/2016 12/02/2016 1, 2 IP Occupational ALARA Planning and Controls71124.0211/28/2016 12/02/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.0311/28/2016 12/02/2016 1, 2 IP Occupational Dose Assessment71124.0411/28/2016 12/02/2016 1, 2 IP Radiation Monitoring Instrumentation71124.0511/28/2016 12/02/2016 1, 2 IP Performance Indicator Verification7115111/28/2016 12/02/2016OL RQ-REQUAL INSPECTION 2 1, 2 IP Licensed Operator Requalification Program7111111B 01/23/2017 01/27/2017 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 IP Problem Identification and Resolution71152B 01/30/2017 02/03/2017 1, 2 IP Problem Identification and Resolution71152B 02/13/2017 02/17/2017TI-191-MITIGATING STRATEGIES 4 1, 2 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 03/13/2017 03/17/2017 ISI-UNIT 2 IN-SERVICE INSPECTION & RVH EXAM 1 2 IP Inservice Inspection Activities - PWR7111108P 05/15/2017 05/19/2017 RP-RAD HAZARDS AND TRANSPORTATION 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/15/2017 05/19/2017 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 05/15/2017 05/19/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 3 08/31/2016 07:01:09 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site SurryInspection / Activity Plan 09/01/2016

-06/30/2018 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 05/22/2017 05/26/2017 EP-EXERCISE INSPECTION 3 1, 2 IP Exercise Evaluation7111401 07/24/2017 07/28/2017 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 07/24/2017 07/28/2017 1, 2 IP Exercise Evaluation - Scenario Review7111408 07/24/2017 07/28/2017 1, 2 IP Performance Indicator Verification71151 07/24/2017 07/28/2017 CDBI-COMPONENT DESIGN BASIS INSPECTION 7 1, 2 IP Component Design Bases Inspection7111121 07/24/2017 07/28/2017 1, 2 IP Component Design Bases Inspection7111121 08/14/2017 08/18/2017 1, 2 IP Component Design Bases Inspection7111121 08/28/2017 09/01/2017 1, 2 IP Component Design Bases Inspection7111121 09/18/2017 09/22/2017 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 IP Heat Sink Performance7111107T 08/07/201708/11/2017OL EXAM-INITIAL LICENSE EXAM PREP 3 1 SURRY OCTOBER 2017 INITIAL EXAM AT POWER FACILITIES V23502 10/02/2017 10/06/2017OL EXAM-INITIAL LICENSE EXAM 3 1 SURRY OCTOBER 2017 INITIAL EXAM AT POWER FACILITIES V23502 10/30/201711/17/2017 RP-RP PUBLIC BASELINE INSPECTION 2 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.0611/27/2017 12/01/2017 1, 2 IP Radiological Environmental Monitoring Program71124.0711/27/2017 12/01/2017 1, 2 IP Performance Indicator Verification7115111/27/2017 12/01/2017 TFPI-TRIENNIAL FIRE PROTECTION INSPECTION 5 1, 2 IP Fire Protection [Triennial]7111105T 02/26/2018 03/01/2018 1, 2 IP Fire Protection [Triennial]7111105T 03/12/2018 03/16/2018 EP-EP PROGRAM INSPECTION 3 1, 2 IP A lert and Notification System Testing7111402 04/09/2018 04/13/2018 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 04/09/2018 04/13/2018 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 04/09/2018 04/13/2018 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 04/09/2018 04/13/2018 1, 2 IP Performance Indicator Verification71151 04/09/2018 04/13/2018 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/30/2018 05/04/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 3 of 3 08/31/2016 07:01:09 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site SurryInspection / Activity Plan 09/01/2016

-06/30/2018 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 05/07/201805/11/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.