ML16237A073: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
  NUCLEAR REGULATORY COMMISSION
  NUCLEAR REGULATORY COMMISSION
  REGION IV
  REGION IV 1600 E LAMAR BLVD
1600 E LAMAR BLVD
  ARLINGTON, TX 76011
  ARLINGTON, TX 76011
-4511 August 31, 2016
-4511 August 31, 2016
Line 29: Line 28:
  Burlington, KS 66839  SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR
  Burlington, KS 66839  SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR
  WOLF CREEK GENERATING STATION (REPORT 05000482/2016005)
  WOLF CREEK GENERATING STATION (REPORT 05000482/2016005)
  Dear Mr. Heflin: On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC)
  Dear Mr. Heflin: O n August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC)
  completed its mid-cycle performance review of Wolf Creek
  completed its mid-cycle performance review of Wolf Creek
  Generating Station
  Generating Station.  The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions  
.  The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions  
from July 1, 2015, through June
from July
1, 2015, through June
  30, 2016.  This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.    The NRC determined that overall, Wolf Creek Generating Station operated in a manner that preserved public health and safety and met all cornerstone objectives.  The NRC determined  
  30, 2016.  This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.    The NRC determined that overall, Wolf Creek Generating Station operated in a manner that preserved public health and safety and met all cornerstone objectives.  The NRC determined  
the performance at Wolf Creek
the performance at Wolf Creek
  Generating Station during the most recent quarter was within the Licensee Response Column of the NRC
  Generating Station during the most recent quarter was within the Licensee Response Column of the NRC
's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e.,  
's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green).  Therefore, the NRC plans to conduct ROP baseline inspections at your facility.  Although plant performance was within the Licensee Response
Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e.,  
Green).  Therefore, the NRC plans to conduct ROP baseline inspections at your facility.  Although plant performance was within the Licensee Response
  Column, the NRC has not yet finalized the significance of Apparent Violation 05000482/2016008
  Column, the NRC has not yet finalized the significance of Apparent Violation 05000482/2016008
-01, "Failure to Adequately Establish and Adjust Preventive Maintenance for Emergency Diesel Generator Excitation  
-01 , "Failure to Adequately Establish and Adjust Preventive Maintenance for Emergency Diesel Generator Excitation  
System Diodes
System Diodes
."  This apparent violation is described in Inspection Report 05000482/2016008 (ML16235A132), issued in August 19, 2016.  The final safety significance determination may affect the NRC's assessment of plant performance and the enclosed inspection plan.  
."  This apparent violation is described in Inspection Report 05000482/2016008 (ML16235A132), issued in August 19, 2016.  The final safety significance determination may affect the NRC's assessment of plant performance and the enclosed inspection plan.  
  The enclosed inspection plan lists the inspections scheduled through June 30, 2018.  Routine inspections performed by resident inspectors are not included in the inspection plan.
  The enclosed inspection plan lists the inspections scheduled through June 30 , 2018.  Routine inspections performed by resident inspectors are not included in the inspection plan.
   The inspections listed during the second half
   The inspections listed during the second half
  of the inspection plan are tentative and may be revised at the end
  of the inspection plan are tentative and may be revised at the end
Line 52: Line 47:
-publicly available correspondence.   
-publicly available correspondence.   
    
    
A. Heflin
A. Heflin - 2 - In response to the accident at Fukushima, the Commission issued Order EA
- 2 - In response to the accident at Fukushima, the Commission issued Order EA
-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
-Design-Basis External Events
-Design-Basis External Events
," and Order EA
," and Order EA
-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation."  The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site.  After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued.  Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191,  
-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation."  The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site.  After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued.  Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
"Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
-Unit Dose Assessment Plans."  In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re
-Unit Dose Assessment Plans."  In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re
-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid
-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid
Line 70: Line 63:
  Please contact  
  Please contact  
me at 817-200-1141 with any questions you have regarding this letter.
me at 817-200-1141 with any questions you have regarding this letter.
  Sincerely,
  Sincerely, /RA/ Nicholas H. Taylor, Chief
/RA/ Nicholas H. Taylor, Chief
  Projects Branch B
  Projects Branch B
  Division of Reactor Projects
  Division of Reactor Projects
  Docket No.: 50
  Docket No.: 50
-482 License No.: NPF
-482 License No.: NPF
-42 Enclosure:
-42 Enclosure:   Wolf Creek Generating Station
  Wolf Creek Generating Station
  Inspection/Activity Plan   
  Inspection/Activity
Plan   
Page 1 of 2
Page 1 of 2
08/30/2016
08/30/2016
09:37:18Report 22
09:37:18 Report 22 Unit NumberPlanned Dates
UnitNumberPlanned Dates
Start          EndInspection ActivityTitle No. of Staff
Start          EndInspection ActivityTitleNo. of Staff
on SiteWolf CreekInspection / Activity Plan
on SiteWolf CreekInspection / Activity Plan
07/01/2016
07/01/2016
-06/30/2018TSB 52B-BIENNIAL PI&R INSPECTION
-06/30/2018TSB 52B-BIENNIAL PI&R INSPECTION
41 IPProblem Identification and Resolution71152B06/27/2016
4 1 IP Problem Identification and Resolution71152B 06/27/2016
07/01/2016
07/01/2016
INSP-BIENNIAL REQUAL INSPECTION
INSP-BIENNIAL REQUAL INSPECTION
21 IPLicensed Operator Requalification Program7111111B06/27/2016
2 1 IP Licensed Operator Requalification Program7111111B 06/27/2016
07/01/2016
07/01/2016
EP-1-EP PERFORMANCE INDICATORS
EP-1-EP PERFORMANCE INDICATORS
11 IPERO Readiness71151-EP02
1 1 IP ERO Readiness71151-EP02
08/01/2016
08/01/2016
08/05/2016
08/05/2016
1 IPAlert & Notification System Reliability71151-EP03
1 IP A lert & Notification System Reliability71151-EP03
08/01/2016
08/01/2016
08/05/2016
08/05/2016
1 IPUnplanned Scrams per 7000 Critical Hrs71151-IE01
1 IP Unplanned Scrams per 7000 Critical Hrs71151-IE01
08/01/2016
08/01/2016
08/05/2016
08/05/2016
EP-2-BIENNIAL EP PROGRAM INSPECTION
EP-2-BIENNIAL EP PROGRAM INSPECTION
11 IPAlert and Notification System Testing711140208/01/2016
1 1 IP A lert and Notification System Testing7111402 08/01/2016
08/05/2016
08/05/2016
1 IPEmergency Preparedness Organization Staffing and Augmentation System711140308/01/2016
1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 08/01/2016
08/05/2016
08/05/2016
1 IPEmergency Action Level and Emergency Plan Changes711140408/01/2016
1 IP Emergency Action Level and Emergency Plan Changes7111404 08/01/2016
08/05/2016
08/05/2016
1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140508/01/2016
1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 08/01/2016
08/05/201671111.08-INSERVICE INSPECTION
08/05/201671111.08-INSERVICE INSPECTION
11 IPInservice Inspection Activities - PWR7111108P10/03/2016
1 1 IP Inservice Inspection Activities - PWR7111108P 10/03/2016
10/14/2016
10/14/2016
RS 12 PI-RADIATION SAFETY
RS 12 PI-RADIATION SAFETY
31 IPRadiological Hazard Assessment and Exposure Controls71124.0110/17/2016
3 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/17/2016
10/21/2016
10/21/2016
1 IPOccupational ALARA Planning and Controls71124.0210/17/2016
1 IP Occupational ALARA Planning and Controls71124.02 10/17/2016
10/21/2016
10/21/2016
1 IPOccupational Exposure Control Effectiveness71151-OR01
1 IP Occupational Exposure Control Effectiveness71151-OR01
10/17/2016
10/17/2016
10/21/2016
10/21/2016
1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01
1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01
10/17/2016
10/17/2016
10/21/2016
10/21/2016
INIT EXA-INITIAL EXAM
INIT EXA-INITIAL EXAM
51 INITIAL EXAM WOLF CREEK (11/2017)
5 1 INITIAL EXAM WOLF CREEK (11/2017)
X0259710/16/2017
X02597 10/16/2017
10/20/2017
10/20/2017
1 INITIAL EXAM WOLF CREEK (11/2017)
1 INITIAL EXAM WOLF CREEK (11/2017)
X0259711/13/201711/24/2017
X0259711/13/201711/24/2017
RS 13 PI-RADIATION SAFETY
RS 13 PI-RADIATION SAFETY
21 IPRadiological Hazard Assessment and Exposure Controls71124.0105/08/2017
2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/08/2017
05/12/2017
05/12/2017
1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/08/2017
1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 05/08/2017
05/12/2017
05/12/2017
1 IPOccupational Exposure Control Effectiveness71151-OR01
1 IP Occupational Exposure Control Effectiveness71151-OR01
05/08/2017
05/08/2017
05/12/2017
05/12/2017
1 IPRETS/ODCM Radiological Effluent Occurrences71151-PR01
1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01
05/08/2017
05/08/2017
05/12/2017
05/12/2017
RS 24-RADIATION SAFETY
RS 24-RADIATION SAFETY
21 IPOccupational ALARA Planning and Controls71124.0206/12/2017
2 1 IP Occupational ALARA Planning and Controls71124.02 06/12/2017
06/16/2017
06/16/2017
1 IPOccupational Dose Assessment71124.0406/12/2017
1 IP Occupational Dose Assessment71124.04 06/12/2017
06/16/2017
06/16/2017
EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION
EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION
41 IPFire Protection [Triennial]7111105T10/02/2017
4 1 IP Fire Protection [Triennial]7111105T 10/02/2017
10/06/2017
10/06/2017
1 IPFire Protection [Triennial]7111105T10/16/2017
1 IP Fire Protection [Triennial]7111105T 10/16/2017
10/20/2017
10/20/2017
This report does not include INPO and OUTAGE activities. This report shows only on-site
This report does not include INPO and OUTAGE activities. This report shows only on-site
Line 156: Line 145:
Page 2 of 2
Page 2 of 2
08/30/2016
08/30/2016
09:37:18Report 22
09:37:18 Report 22 Unit NumberPlanned Dates
UnitNumberPlanned Dates
Start          EndInspection ActivityTitle No. of Staff
Start          EndInspection ActivityTitleNo. of Staff
on SiteWolf CreekInspection / Activity Plan
on SiteWolf CreekInspection / Activity Plan
07/01/2016
07/01/2016
-06/30/2018
-06/30/2018
EP-2-BIENNIAL EP EXERCISE INSPECTION
EP-2-BIENNIAL EP EXERCISE INSPECTION
41 IPExercise Evaluation711140111/13/201711/17/2017
4 1 IP Exercise Evaluation711140111/13/201711/17/2017
1 IPEmergency Action Level and Emergency Plan Changes711140411/13/201711/17/2017
1 IP Emergency Action Level and Emergency Plan Changes711140411/13/201711/17/2017
EP-3-EP PERFORMANCE INDICATOR VERIFICATION
EP-3-EP PERFORMANCE INDICATOR VERIFICATION
11 IPDrill/Exercise Performance71151-EP0111/13/201711/17/2017
1 1 IP Drill/Exercise Performance71151-EP0111/13/201711/17/2017
1 IPERO Readiness71151-EP0211/13/201711/17/2017
1 IP ERO Readiness71151-EP0211/13/201711/17/2017
1 IPAlert & Notification System Reliability71151-EP0311/13/201711/17/20177111108-INSERVICE INSPECTION
1 IP A lert & Notification System Reliability71151-EP0311/13/201711/17/20177111108-INSERVICE INSPECTION
11 IPInservice Inspection Activities - PWR7111108P04/02/2018
1 1 IP Inservice Inspection Activities - PWR7111108P 04/02/2018
04/13/2018
04/13/2018
This report does not include INPO and OUTAGE activities. This report shows only on-site
This report does not include INPO and OUTAGE activities. This report shows only on-site
Line 176: Line 164:
   ML16237A073
   ML16237A073
  SUNSI ReviewBy: NHT ADAMS Yes    NoPublicly Available Non-Publicly Available
  SUNSI ReviewBy: NHT ADAMS Yes    NoPublicly Available Non-Publicly Available
  Non-Sensitive Sensitive
  Non-Sensitive Sensitive Keyword: NRC-002 OFFICE: RIV SPE:DRP/B D: DRS D: DRP C: DRP/B NAME DProulx AVegel TWPruett NTaylor SIGNATURE /RA/ /RA Jeff Clark for/
Keyword: NRC-002 OFFICE: RIV SPE:DRP/B
D: DRS D: DRP C: DRP/B NAME DProulx AVegel TWPruett NTaylor SIGNATURE
/RA/ /RA Jeff Clark for/
  /RA/ /RA/ DATE 8/22/16 8/22/16 8/23/16 8/24/16   
  /RA/ /RA/ DATE 8/22/16 8/22/16 8/23/16 8/24/16   
Letter to Adam C. Heflin
Letter to Adam C. Heflin

Revision as of 05:34, 8 July 2018

Mid-Cycle Assessment Letter for Wolf Creek Generating Station (Report 05000482/2016005)
ML16237A073
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/31/2016
From: Taylor N H
NRC/RGN-IV/DRP/RPB-B
To: Heflin A C
Wolf Creek
Taylor N H
References
IR 2016005
Download: ML16237A073 (6)


See also: IR 05000482/2016005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV 1600 E LAMAR BLVD

ARLINGTON, TX 76011

-4511 August 31, 2016

Adam C. Heflin, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR

WOLF CREEK GENERATING STATION (REPORT 05000482/2016005)

Dear Mr. Heflin: O n August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC)

completed its mid-cycle performance review of Wolf Creek

Generating Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions

from July 1, 2015, through June

30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Wolf Creek Generating Station operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined

the performance at Wolf Creek

Generating Station during the most recent quarter was within the Licensee Response Column of the NRC

's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. Although plant performance was within the Licensee Response

Column, the NRC has not yet finalized the significance of Apparent Violation 05000482/2016008

-01 , "Failure to Adequately Establish and Adjust Preventive Maintenance for Emergency Diesel Generator Excitation

System Diodes

." This apparent violation is described in Inspection Report 05000482/2016008 (ML16235A132), issued in August 19, 2016. The final safety significance determination may affect the NRC's assessment of plant performance and the enclosed inspection plan.

The enclosed inspection plan lists the inspections scheduled through June 30 , 2018. Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the second half

of the inspection plan are tentative and may be revised at the end

-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which

will be sent via separate, non

-publicly available correspondence.

A. Heflin - 2 - In response to the accident at Fukushima, the Commission issued Order EA

-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond

-Design-Basis External Events

," and Order EA

-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi

-Unit Dose Assessment Plans." In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re

-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid

-cycle assessment process beginning in calendar year 2017. This will be the final mid

-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of

licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html

(the Public Electronic Reading Room).

Please contact

me at 817-200-1141 with any questions you have regarding this letter.

Sincerely, /RA/ Nicholas H. Taylor, Chief

Projects Branch B

Division of Reactor Projects

Docket No.: 50

-482 License No.: NPF

-42 Enclosure: Wolf Creek Generating Station

Inspection/Activity Plan

Page 1 of 2

08/30/2016

09:37:18 Report 22 Unit NumberPlanned Dates

Start EndInspection ActivityTitle No. of Staff

on SiteWolf CreekInspection / Activity Plan

07/01/2016

-06/30/2018TSB 52B-BIENNIAL PI&R INSPECTION

4 1 IP Problem Identification and Resolution71152B 06/27/2016

07/01/2016

INSP-BIENNIAL REQUAL INSPECTION

2 1 IP Licensed Operator Requalification Program7111111B 06/27/2016

07/01/2016

EP-1-EP PERFORMANCE INDICATORS

1 1 IP ERO Readiness71151-EP02

08/01/2016

08/05/2016

1 IP A lert & Notification System Reliability71151-EP03

08/01/2016

08/05/2016

1 IP Unplanned Scrams per 7000 Critical Hrs71151-IE01

08/01/2016

08/05/2016

EP-2-BIENNIAL EP PROGRAM INSPECTION

1 1 IP A lert and Notification System Testing7111402 08/01/2016

08/05/2016

1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 08/01/2016

08/05/2016

1 IP Emergency Action Level and Emergency Plan Changes7111404 08/01/2016

08/05/2016

1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 08/01/2016

08/05/201671111.08-INSERVICE INSPECTION

1 1 IP Inservice Inspection Activities - PWR7111108P 10/03/2016

10/14/2016

RS 12 PI-RADIATION SAFETY

3 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/17/2016

10/21/2016

1 IP Occupational ALARA Planning and Controls71124.02 10/17/2016

10/21/2016

1 IP Occupational Exposure Control Effectiveness71151-OR01

10/17/2016

10/21/2016

1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01

10/17/2016

10/21/2016

INIT EXA-INITIAL EXAM

5 1 INITIAL EXAM WOLF CREEK (11/2017)

X02597 10/16/2017

10/20/2017

1 INITIAL EXAM WOLF CREEK (11/2017)

X0259711/13/201711/24/2017

RS 13 PI-RADIATION SAFETY

2 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/08/2017

05/12/2017

1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 05/08/2017

05/12/2017

1 IP Occupational Exposure Control Effectiveness71151-OR01

05/08/2017

05/12/2017

1 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01

05/08/2017

05/12/2017

RS 24-RADIATION SAFETY

2 1 IP Occupational ALARA Planning and Controls71124.02 06/12/2017

06/16/2017

1 IP Occupational Dose Assessment71124.04 06/12/2017

06/16/2017

EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION

4 1 IP Fire Protection [Triennial]7111105T 10/02/2017

10/06/2017

1 IP Fire Protection [Triennial]7111105T 10/16/2017

10/20/2017

This report does not include INPO and OUTAGE activities. This report shows only on-site

and announced inspection procedures.

Page 2 of 2

08/30/2016

09:37:18 Report 22 Unit NumberPlanned Dates

Start EndInspection ActivityTitle No. of Staff

on SiteWolf CreekInspection / Activity Plan

07/01/2016

-06/30/2018

EP-2-BIENNIAL EP EXERCISE INSPECTION

4 1 IP Exercise Evaluation711140111/13/201711/17/2017

1 IP Emergency Action Level and Emergency Plan Changes711140411/13/201711/17/2017

EP-3-EP PERFORMANCE INDICATOR VERIFICATION

1 1 IP Drill/Exercise Performance71151-EP0111/13/201711/17/2017

1 IP ERO Readiness71151-EP0211/13/201711/17/2017

1 IP A lert & Notification System Reliability71151-EP0311/13/201711/17/20177111108-INSERVICE INSPECTION

1 1 IP Inservice Inspection Activities - PWR7111108P 04/02/2018

04/13/2018

This report does not include INPO and OUTAGE activities. This report shows only on-site

and announced inspection procedures.

ML16237A073

SUNSI ReviewBy: NHT ADAMS Yes NoPublicly Available Non-Publicly Available

Non-Sensitive Sensitive Keyword: NRC-002 OFFICE: RIV SPE:DRP/B D: DRS D: DRP C: DRP/B NAME DProulx AVegel TWPruett NTaylor SIGNATURE /RA/ /RA Jeff Clark for/

/RA/ /RA/ DATE 8/22/16 8/22/16 8/23/16 8/24/16

Letter to Adam C. Heflin

from Nicholas H. Taylor dated August 31, 2016

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION (REPORT 05000482/2016005)

DISTRIBUTION

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Douglas.Dodson@nrc.gov)

Resident Inspector (Fabian.Thomas@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

Wolf Creek Administrative Assistant (Susan.Galemore@nrc.gov

) Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Fred.Lyon@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer

(Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.g

ov ROPassessment.Resource@nrc.gov