IR 05000400/2015005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
[[Issue date::September 1, 2015]]
-1257 September 1, 2015 Benjamin Site Vice President Duke Energy Progress, Inc.


Benjamin Site Vice President Duke Energy Progress, Inc. Shearon Harris Nuclear Power Plant 5413 Shearon Harris Rd New Hill, NC 27562-0165
Shearon Harris Nuclear Power Plant 5413 Shearon Harris Rd New Hill, NC 27562
-0165


SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2015005
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT  
- NRC INSPECTION REPORT 05000400/2015005


==Dear Mr. Waldrep:==
==Dear Mr. Waldrep:==
On August 12, 2015, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Shearon Harris Nuclear Power Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014, through June 30, 2015. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
On August 12, 2015, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Shearon Harris Nuclear Power Plant
. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014, through June 30, 2015. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.


This performance review and enclosed inspection plan do not include security information. The NRC determined that overall, Shearon Harris Nuclear Power Plant operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Shearon Harris Nuclear Power Plant, during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. We also plan on conducting the following infrequently performed inspection: Operator Licensing Initial Exams. Additionally, the triennial commitment management program audit is scheduled for October 2015. In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events." This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for the Shearon Harris Nuclear Power Plant, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above performing TI 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans." In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact George Hopper at (404) 997-4645 with any questions you may have regarding this letter.
This performance review and enclosed inspection plan do not include security information.


Sincerely,/RA/ George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-400 License Nos.: NPF-63  
The NRC determined that overall, Shearon Harris Nuclear Power Plant operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Shearon Harris Nuclear Power Plant, during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
 
The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end
-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security
-related inspections, which will be sent via separate, non
-publicly available correspondence.
 
We also plan on conducting the following infrequently performed inspection:
Operator Licensing Initial Exams.
 
Additionally, the triennial commitment management program audit is scheduled for October 2015. In response to the accident at Fukushima, the Commission issued Order EA
-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyo nd-Design-Basis External Events.
 
" This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond
-design-basis external event.
 
Additionally, the Commission issued Order EA
-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation
." This Order requires licensees to have a reliable means of remotely monitoring wide
-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond
-design-basis external event.
 
The NRC is conducting audits of licensee efforts towards compliance with these Orders.
 
The audit was completed for the Shearon Harris Nuclear Power Plant, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site.
 
After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued.
 
Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above performing TI 191,
"Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
-Unit Dose Assessment Plans
." In accordance with Title 10 of the Code of Federal Regulation s (10 CFR) 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
 
Please contact George Hopper at (404) 997-4645 with any questions you may have regarding this letter.
 
Sincerely,/RA/ George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.:
50-400 License Nos.:
NPF-63  


===Enclosure:===
===Enclosure:===
Harris Inspection/Activity Plan (09/01/2015 - 06/30/2017) cc: Distribution via ListServ  
Harris Inspection/Activity Plan (09/01/2015 - 06/30/2017) cc: Distribution via ListServ
 
______________
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE DXW4 JSD GTH NAME DJackson JDodson GHopper DATE 8/28/2015 8/21/2015 8/31/2015 E-MAIL COPY?
YES NO YES NO YES NO Letter to Benjamin from George T. Hopper dated September 1, 2015.


______________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE DXW4 JSD GTH NAME DJackson JDodson GHopper DATE 8/28/2015 8/21/2015 8/31/2015 E-MAIL COPY? YES NO YES NO YES NO Letter to Benjamin from George T. Hopper dated September 1, 2015.
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT
- NRC INSPECTION REPORT 05000400/2015005 DISTRIBUTION
: D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS RidsNrrPMShearonHarris Resource ROP Assessments ROP Reports Institute of Nuclear Power Operations (INPO)


SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2015005 DISTRIBUTION: D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS RidsNrrPMShearonHarris Resource ROP Assessments ROP Reports Institute of Nuclear Power Operations (INPO)
Page 1 of 2 09/01/2015 10:20:42Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteHarrisInspection / Activity Plan 09/01/2015
Page 1 of 209/01/201510:20:42Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteHarrisInspection / Activity Plan09/01/2015-06/30/2017ASM EP-2015 EP ASM & RES BASELINE31 IPDrill Evaluation711140601/01/201512/31/2015PI&R-PROBLEM IDENTIFICATION AND RESOLUTION51 IPProblem Identification and Resolution71152B09/14/201509/18/20151 IPProblem Identification and Resolution71152B09/28/201510/02/2015EP-EP EXERCISE81 IPEmergency Action Level and Emergency Plan Changes711140410/26/201510/30/20151 IPExercise Evaluation - Hostile Action (HA) Event711140710/26/201510/30/20151 IPPerformance Indicator Verification7115110/26/201510/30/2015MODS-PLANT MODIFICATIONS INSPECTION41 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T11/16/201511/20/20151 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T12/07/201512/11/2015ASM EP-2016 EP ASM & RES BASELINE31 IPDrill Evaluation711140601/01/201612/31/2016EP-EP PROGRAM INSPECTION21 IPExercise Evaluation711140105/23/201605/27/20161 IPAlert and Notification System Testing711140205/23/201605/27/20161 IPEmergency Preparedness Organization Staffing and Augmentation System711140305/23/201605/27/20161 IPEmergency Action Level and Emergency Plan Changes711140405/23/201605/27/20161 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140505/23/201605/27/20161 IPPerformance Indicator Verification7115105/23/201605/27/2016HS-TRIENNIAL HEAT SINK PERFORMANCE11 IPHeat Sink Performance7111107T06/13/201606/17/2016OL EXAM-INITIAL LICENSE EXAM PREP31 HARRIS JULY 2016 INITIAL EXAM AT POWER FACILITIESSV2347406/13/201606/17/2016OL EXAM-INITIAL LICENSE EXAM31 HARRIS JULY 2016 INITIAL EXAM AT POWER FACILITIESSV2347407/11/201607/22/2016ISI-UNIT 1 IN-SERVICE INSPECTION & RVH EXAM21 IPInservice Inspection Activities - PWR7111108P10/17/201610/21/2016RP-RP OCCUPATIONAL INSPECTION WEEK 131 IPRadiological Hazard Assessment and Exposure Controls71124.0110/17/201610/21/20161 IPOccupational ALARA Planning and Controls71124.0210/17/201610/21/20161 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/17/201610/21/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
-06/30/2017ASM EP-2015 EP ASM & RES BASELINE 31 IPDrill Evaluation711140601/01/2015 12/31/2015 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 51 IPProblem Identification and Resolution71152B09/14/2015 09/18/2015 1 IPProblem Identification and Resolution71152B09/28/2015 10/02/2015 EP-EP EXERCISE 81 IPEmergency Action Level and Emergency Plan Changes711140410/26/2015 10/30/2015 1 IPExercise Evaluation - Hostile Action (HA) Event711140710/26/2015 10/30/2015 1 IPPerformance Indicator Verification7115110/26/2015 10/30/2015 MODS-PLANT MODIFICATIONS INSPECTION 41 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T11/16/201511/20/2015 1 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T12/07/201512/11/2015ASM EP-2016 EP ASM & RES BASELINE 31 IPDrill Evaluation711140601/01/2016 12/31/2016 EP-EP PROGRAM INSPECTION 21 IPExercise Evaluation711140105/23/2016 05/27/2016 1 IPAlert and Notification System Testing711140205/23/2016 05/27/2016 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140305/23/2016 05/27/2016 1 IPEmergency Action Level and Emergency Plan Changes711140405/23/2016 05/27/2016 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140505/23/2016 05/27/2016 1 IPPerformance Indicator Verification7115105/23/2016 05/27/2016 HS-TRIENNIAL HEAT SINK PERFORMANCE 11 IPHeat Sink Performance7111107T06/13/2016 06/17/2016OL EXAM-INITIAL LICENSE EXAM PREP 31 HARRIS JULY 2016 INITIAL EXAM AT POWER FACILITIESS V2347406/13/2016 06/17/2016OL EXAM-INITIAL LICENSE EXAM 31 HARRIS JULY 2016 INITIAL EXAM AT POWER FACILITIESS V2347407/11/2016 07/22/2016 ISI-UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 21 IPInservice Inspection Activities - PWR7111108P10/17/2016 10/21/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 1 31 IPRadiological Hazard Assessment and Exposure Controls71124.0110/17/2016 10/21/2016 1 IPOccupational ALARA Planning and Controls71124.0210/17/2016 10/21/2016 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/17/2016 10/21/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Page 2 of 209/01/201510:20:42Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteHarrisInspection / Activity Plan09/01/2015-06/30/2017RP-RP OCCUPATIONAL INSPECTION WEEK 131 IPOccupational Dose Assessment71124.0410/17/201610/21/20161 IPRadiation Monitoring Instrumentation71124.0510/17/201610/21/20161 IPPerformance Indicator Verification7115110/17/201610/21/2016RP-RP OCCUPATIONAL INSPECTION WEEK 221 IPRadiological Hazard Assessment and Exposure Controls71124.0110/31/201611/04/20161 IPOccupational ALARA Planning and Controls71124.0210/31/201611/04/20161 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/31/201611/04/20161 IPOccupational Dose Assessment71124.0410/31/201611/04/20161 IPRadiation Monitoring Instrumentation71124.0510/31/201611/04/20161 IPPerformance Indicator Verification7115110/31/201611/04/2016CDBI-COMPONENT DESIGN BASIS INSPECTION71 IPComponent Design Bases Inspection711112101/30/201702/03/20171 IPComponent Design Bases Inspection711112102/27/201703/03/20171 IPComponent Design Bases Inspection711112103/13/201703/17/20171 IPComponent Design Bases Inspection711112103/27/201703/31/2017EP-EP EXERCISE61 IPExercise Evaluation711140104/24/201704/28/20171 IPEmergency Action Level and Emergency Plan Changes711140404/24/201704/28/20171 IPExercise Evaluation - Scenario Review711140804/24/201704/28/20171 IPPerformance Indicator Verification7115104/24/201704/28/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 2 09/01/2015 10:20:42Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteHarrisInspection / Activity Plan 09/01/2015
-06/30/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 31 IPOccupational Dose Assessment71124.0410/17/2016 10/21/2016 1 IPRadiation Monitoring Instrumentation71124.0510/17/2016 10/21/2016 1 IPPerformance Indicator Verification7115110/17/2016 10/21/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 2 21 IPRadiological Hazard Assessment and Exposure Controls71124.0110/31/201611/04/2016 1 IPOccupational ALARA Planning and Controls71124.0210/31/201611/04/2016 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/31/201611/04/2016 1 IPOccupational Dose Assessment71124.0410/31/201611/04/2016 1 IPRadiation Monitoring Instrumentation71124.0510/31/201611/04/2016 1 IPPerformance Indicator Verification7115110/31/201611/04/2016 CDBI-COMPONENT DESIGN BASIS INSPECTION 71 IPComponent Design Bases Inspection711112101/30/2017 02/03/2017 1 IPComponent Design Bases Inspection711112102/27/2017 03/03/2017 1 IPComponent Design Bases Inspection711112103/13/2017 03/17/2017 1 IPComponent Design Bases Inspection711112103/27/2017 03/31/2017 EP-EP EXERCISE 61 IPExercise Evaluation711140104/24/2017 04/28/2017 1 IPEmergency Action Level and Emergency Plan Changes711140404/24/2017 04/28/2017 1 IPExercise Evaluation - Scenario Review711140804/24/2017 04/28/2017 1 IPPerformance Indicator Verification7115104/24/2017 04/28/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 20:41, 30 June 2018

Mid-Cycle Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2015005
ML15244B075
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/01/2015
From: Hopper G T
NRC/RGN-II/DRP/RPB4
To: Waldrep B C
Duke Energy Progress
References
IR 2015005
Download: ML15244B075 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 September 1, 2015 Benjamin Site Vice President Duke Energy Progress, Inc.

Shearon Harris Nuclear Power Plant 5413 Shearon Harris Rd New Hill, NC 27562

-0165

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT

- NRC INSPECTION REPORT 05000400/2015005

Dear Mr. Waldrep:

On August 12, 2015, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Shearon Harris Nuclear Power Plant

. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014, through June 30, 2015. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information.

The NRC determined that overall, Shearon Harris Nuclear Power Plant operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Shearon Harris Nuclear Power Plant, during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end

-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security

-related inspections, which will be sent via separate, non

-publicly available correspondence.

We also plan on conducting the following infrequently performed inspection:

Operator Licensing Initial Exams.

Additionally, the triennial commitment management program audit is scheduled for October 2015. In response to the accident at Fukushima, the Commission issued Order EA

-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyo nd-Design-Basis External Events.

" This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond

-design-basis external event.

Additionally, the Commission issued Order EA

-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation

." This Order requires licensees to have a reliable means of remotely monitoring wide

-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond

-design-basis external event.

The NRC is conducting audits of licensee efforts towards compliance with these Orders.

The audit was completed for the Shearon Harris Nuclear Power Plant, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site.

After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued.

Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above performing TI 191,

"Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi

-Unit Dose Assessment Plans

." In accordance with Title 10 of the Code of Federal Regulation s (10 CFR) 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact George Hopper at (404) 997-4645 with any questions you may have regarding this letter.

Sincerely,/RA/ George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.:

50-400 License Nos.:

NPF-63

Enclosure:

Harris Inspection/Activity Plan (09/01/2015 - 06/30/2017) cc: Distribution via ListServ

______________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE DXW4 JSD GTH NAME DJackson JDodson GHopper DATE 8/28/2015 8/21/2015 8/31/2015 E-MAIL COPY?

YES NO YES NO YES NO Letter to Benjamin from George T. Hopper dated September 1, 2015.

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT

- NRC INSPECTION REPORT 05000400/2015005 DISTRIBUTION

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS RidsNrrPMShearonHarris Resource ROP Assessments ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 09/01/2015 10:20:42Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteHarrisInspection / Activity Plan 09/01/2015

-06/30/2017ASM EP-2015 EP ASM & RES BASELINE 31 IPDrill Evaluation711140601/01/2015 12/31/2015 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 51 IPProblem Identification and Resolution71152B09/14/2015 09/18/2015 1 IPProblem Identification and Resolution71152B09/28/2015 10/02/2015 EP-EP EXERCISE 81 IPEmergency Action Level and Emergency Plan Changes711140410/26/2015 10/30/2015 1 IPExercise Evaluation - Hostile Action (HA) Event711140710/26/2015 10/30/2015 1 IPPerformance Indicator Verification7115110/26/2015 10/30/2015 MODS-PLANT MODIFICATIONS INSPECTION 41 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T11/16/201511/20/2015 1 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T12/07/201512/11/2015ASM EP-2016 EP ASM & RES BASELINE 31 IPDrill Evaluation711140601/01/2016 12/31/2016 EP-EP PROGRAM INSPECTION 21 IPExercise Evaluation711140105/23/2016 05/27/2016 1 IPAlert and Notification System Testing711140205/23/2016 05/27/2016 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140305/23/2016 05/27/2016 1 IPEmergency Action Level and Emergency Plan Changes711140405/23/2016 05/27/2016 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140505/23/2016 05/27/2016 1 IPPerformance Indicator Verification7115105/23/2016 05/27/2016 HS-TRIENNIAL HEAT SINK PERFORMANCE 11 IPHeat Sink Performance7111107T06/13/2016 06/17/2016OL EXAM-INITIAL LICENSE EXAM PREP 31 HARRIS JULY 2016 INITIAL EXAM AT POWER FACILITIESS V2347406/13/2016 06/17/2016OL EXAM-INITIAL LICENSE EXAM 31 HARRIS JULY 2016 INITIAL EXAM AT POWER FACILITIESS V2347407/11/2016 07/22/2016 ISI-UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 21 IPInservice Inspection Activities - PWR7111108P10/17/2016 10/21/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 1 31 IPRadiological Hazard Assessment and Exposure Controls71124.0110/17/2016 10/21/2016 1 IPOccupational ALARA Planning and Controls71124.0210/17/2016 10/21/2016 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/17/2016 10/21/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 09/01/2015 10:20:42Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteHarrisInspection / Activity Plan 09/01/2015

-06/30/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 31 IPOccupational Dose Assessment71124.0410/17/2016 10/21/2016 1 IPRadiation Monitoring Instrumentation71124.0510/17/2016 10/21/2016 1 IPPerformance Indicator Verification7115110/17/2016 10/21/2016 RP-RP OCCUPATIONAL INSPECTION WEEK 2 21 IPRadiological Hazard Assessment and Exposure Controls71124.0110/31/201611/04/2016 1 IPOccupational ALARA Planning and Controls71124.0210/31/201611/04/2016 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/31/201611/04/2016 1 IPOccupational Dose Assessment71124.0410/31/201611/04/2016 1 IPRadiation Monitoring Instrumentation71124.0510/31/201611/04/2016 1 IPPerformance Indicator Verification7115110/31/201611/04/2016 CDBI-COMPONENT DESIGN BASIS INSPECTION 71 IPComponent Design Bases Inspection711112101/30/2017 02/03/2017 1 IPComponent Design Bases Inspection711112102/27/2017 03/03/2017 1 IPComponent Design Bases Inspection711112103/13/2017 03/17/2017 1 IPComponent Design Bases Inspection711112103/27/2017 03/31/2017 EP-EP EXERCISE 61 IPExercise Evaluation711140104/24/2017 04/28/2017 1 IPEmergency Action Level and Emergency Plan Changes711140404/24/2017 04/28/2017 1 IPExercise Evaluation - Scenario Review711140804/24/2017 04/28/2017 1 IPPerformance Indicator Verification7115104/24/2017 04/28/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.