{{#Wiki_filter: Mr. Richard Bologna Site Vice President First Energy Nuclear Operating Company Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077-0004 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406 | ||
-2713 Mr. Richard Bologna Site Vice President First Energy Nuclear Operating Company Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077-0004 | |||
SUBJECT: ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION UNITS 1 AND 2 (REPORTS 05000334/2017006 AND 0500412/2017006 05000334/2017402 AND 05000412/2017402 AND 05000334/2017501 AND 05000412/2017501) | SUBJECT: ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION UNITS 1 AND 2 (REPORTS 05000334/2017006 AND 0500412/2017006 05000334/2017402 AND 05000412/2017402 AND 05000334/2017501 AND 05000412/2017501) | ||
==Dear Mr. Bologna:== | ==Dear Mr. Bologna:== | ||
The NRC has completed its end-of-cycle performance assessment of Beaver Valley Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017, through December 31, 2017. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and | The NRC has completed its end-of-cycle performance assessment of Beaver Valley Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results | ||
, and enforcement actions from January 1, 2017, through December 31, 2017. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safet y. The NRC determined the performance at Beaver Valley Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRC's Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program," because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected rang e (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspecti on plan lists the inspections scheduled through December 31, 2019. This updated inspecti on plan now includes planned security inspections which were formerly transmitted under separate correspondence. | |||
Sincerely,/RA/ Matthew R. Young, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos. 50-334 and 50-412 License Nos. DPR-66 and NPF-73 | The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. | ||
The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. The NRC will also be performi ng TI-191, "Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 and EP Info Request March 12, 2012in the first quarter of 2018. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC's Website at http://ww w.nrc.gov/reading | |||
-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5205 with any questions you may have regarding this letter. | |||
Sincerely,/RA/ Matthew R. Young, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos. | |||
50-334 and 50 | |||
-412 License Nos. DPR-66 and NPF | |||
-73 | |||
===Enclosure:=== | ===Enclosure:=== | ||
Inspection/Activity Plan | Inspection/Activity Plan | ||
ML180047A001 SUNSI ReviewNon-SensitiveSensitivePublicly AvailableNon-Publicly AvailableOFFICE RI/DRP RI/DRP NAME SShaffer MYoung DATE 2/28/18 /2/18 Beaver Valley | |||
01/01/2018 - 12/31/2019 | |||
Unit Start End Activity CAC Title Staff Count | |||
BV1 REQUAL INSP W/ P/F RESULTS | |||
2 1 | |||
01/22/2018 | |||
01/26/2018 | |||
IP 71111.11A | |||
000703 Licensed Operator Requalification Program and Licensed Operator Performance - | |||
Annual 1 | Annual 1 | ||
01/22/2018 01/26/2018 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance - | 01/22/2018 | ||
Biennial RAD SAFETY INSP 1 | |||
1, 2 01/22/2018 01/26/2018 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 01/22/2018 01/26/2018 IP 71151 000746 Performance Indicator Verification CYBER FULL IMP 4 | 01/26/2018 | ||
1, 2 01/29/2018 02/02/2018 IP 71130.10P 000741 Cyber Security 1, 2 02/12/2018 02/16/2018 IP 71130.10P 000741 Cyber Security FUKUSHIMA LESSONS LEARNED TI-191 1 | |||
1, 2 02/19/2018 02/23/2018 TI 2515/191 000509 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 UNIT 1 INSERVICE INSPECTION 1 | IP 71111.11B | ||
1, 2 04/23/2018 04/27/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/23/2018 04/27/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 04/23/2018 04/27/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/23/2018 04/27/2018 IP 71124.04 000729 Occupational Dose Assessment ACCESS CONTROL, PROTECTIVE STRATEGY, TSR 4 | 000704 Licensed Operator Requalification Program and Licensed Operator Performance - | ||
1, 2 06/04/2018 06/08/2018 IP 71130.02 000734 Access Control 1, 2 06/04/2018 06/08/2018 IP 71130.05 000737 Protective Strategy Evaluation 1, 2 06/04/2018 06/08/2018 IP 71130.14 000743 Review of Power Reactor Target Sets 1, 2 06/04/2018 06/08/2018 IP 71151 001338 Performance Indicator Verification EP EXERCISE INSPECTION 5 | |||
1, 2 06/11/2018 06/15/2018 IP 71114.01 000716 Exercise Evaluation 1, 2 06/11/2018 06/15/2018 IP 71151 001397 Performance Indicator Verification 1/4/2018 10:49:52 AM Page 1 | Biennial RAD SAFETY INSP | ||
1 1, 2 01/22/2018 | |||
01/26/2018 | |||
IP 71124.06 | |||
000730 Radioactive Gaseous and Liquid Effluent Treatment | |||
1, 2 01/22/2018 | |||
01/26/2018 | |||
IP 71151 000746 Performance Indicator Verification | |||
CYBER FULL IMP | |||
4 1, 2 01/29/2018 | |||
02/02/2018 | |||
IP 71130.10P | |||
000741 Cyber Security | |||
1, 2 02/12/2018 | |||
02/16/2018 | |||
IP 71130.10P | |||
000741 Cyber Security | |||
FUKUSHIMA LESSONS LEARNED TI-191 | |||
1 1, 2 02/19/2018 | |||
02/23/2018 | |||
TI 2515/191 | |||
000509 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request | |||
March 12, 2012 | |||
UNIT 1 INSERVICE INSPECTION | |||
1 1 | |||
04/23/2018 | |||
05/04/2018 | |||
IP 71111.08P | |||
000702 Inservice Inspection Activities - PWR | |||
RAD SAFETY INSP | |||
1 1, 2 04/23/2018 | |||
04/27/2018 | |||
IP 71124.01 | |||
000725 Radiological Hazard Assessment and Exposure Controls | |||
1, 2 04/23/2018 | |||
04/27/2018 | |||
IP 71124.02 | |||
000726 Occupational ALARA Planning and Controls | |||
1, 2 04/23/2018 | |||
04/27/2018 | |||
IP 71124.03 | |||
000727 In-Plant Airborne Radioactivity Control and Mitigation | |||
1, 2 04/23/2018 | |||
04/27/2018 | |||
IP 71124.04 | |||
000729 Occupational Dose Assessment | |||
ACCESS CONTROL, PROTECTIVE STRATEGY, TSR | |||
4 1, 2 06/04/2018 | |||
06/08/2018 | |||
IP 71130.02 | |||
000734 Access Control | |||
1, 2 06/04/2018 | |||
06/08/2018 | |||
IP 71130.05 | |||
000737 Protective Strategy Evaluation | |||
1, 2 06/04/2018 | |||
06/08/2018 | |||
IP 71130.14 | |||
000743 Review of Power Reactor Target Sets | |||
1, 2 06/04/2018 | |||
06/08/2018 | |||
IP 71151 001338 Performance Indicator Verification | |||
EP EXERCISE INSPECTION | |||
5 1, 2 06/11/2018 | |||
06/15/2018 | |||
IP 71114.01 | |||
000716 Exercise Evaluation | |||
1, 2 06/11/2018 | |||
06/15/2018 | |||
IP 71151 001397 Performance Indicator Verification | |||
1/4/2018 10:49:52 AM | |||
Page 1 | |||
of 4 | of 4 | ||
This report does not include INPO and OUTAGE activities. | This report does not include INPO and OUTAGE activities. | ||
| Line 50: | Line 217: | ||
IP 22 Inspection Activity Plan Report | IP 22 Inspection Activity Plan Report | ||
Beaver Valley 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count MC&A 1 | Beaver Valley | ||
1, 2 06/11/2018 06/15/2018 IP 71130.11 000742 Material Control and Accounting (MC&A) | |||
TRIENNIAL FIRE PROTECTION 4 | 01/01/2018 - 12/31/2019 | ||
1, 2 07/23/2018 07/27/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial) | |||
1, 2 08/06/2018 08/10/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial) | Unit Start End Activity CAC Title Staff Count | ||
BEAVER VALLEY 1 INITIAL OL EXAM 4 | |||
MC&A 1 | |||
1, 2 09/17/2018 09/28/2018 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD) | 1, 2 06/11/2018 | ||
RAD INSTRUMENTATION 1 | |||
1, 2 09/10/2018 09/14/2018 IP 71124.05 000729 Radiation Monitoring Instrumentation Unit 2 Inservice Inspection 1 | 06/15/2018 | ||
1, 2 10/29/2018 11/02/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/29/2018 11/02/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 10/29/2018 11/02/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/29/2018 11/02/2018 IP 71124.04 000729 Occupational Dose Assessment RADWASTE 1 | IP 71130.11 | ||
1, 2 11/05/2018 11/09/2018 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation RAD SAFETY INSPECTION 1 | |||
1, 2 12/10/2018 12/14/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 12/10/2018 12/14/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 12/10/2018 12/14/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 12/10/2018 12/14/2018 IP 71124.04 000729 Occupational Dose Assessment 1, 2 12/10/2018 12/14/2018 IP 71151 000746 Performance Indicator Verification PI&R BIENNIAL 1 | 000742 Material Control and Accounting (MC&A) | ||
1, 2 03/04/2019 03/08/2019 IP 71152B 000747 Problem Identification and Resolution 1, 2 03/18/2019 03/22/2019 IP 71152B 000747 Problem Identification and Resolution 1/4/2018 10:49:52 AM Page 2 | |||
TRIENNIAL FIRE PROTECTION | |||
4 1, 2 07/23/2018 | |||
07/27/2018 | |||
IP 71111.05XT | |||
000697 Fire Protection - NFPA 805 (Triennial) | |||
1, 2 08/06/2018 | |||
08/10/2018 | |||
IP 71111.05XT | |||
000697 Fire Protection - NFPA 805 (Triennial) | |||
BEAVER VALLEY 1 INITIAL OL EXAM | |||
4 1 | |||
08/20/2018 | |||
08/24/2018 | |||
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV) | |||
1, 2 09/17/2018 | |||
09/28/2018 | |||
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD) | |||
RAD INSTRUMENTATION | |||
1 1, 2 09/10/2018 | |||
09/14/2018 | |||
IP 71124.05 | |||
000729 Radiation Monitoring Instrumentation | |||
Unit 2 Inservice Inspection | |||
1 2 | |||
10/29/2018 | |||
11/09/2018 | |||
IP 71111.08P | |||
000702 Inservice Inspection Activities - PWR | |||
Rad Safety Inspection | |||
1 1, 2 10/29/2018 | |||
11/02/2018 | |||
IP 71124.01 | |||
000725 Radiological Hazard Assessment and Exposure Controls | |||
1, 2 10/29/2018 | |||
11/02/2018 | |||
IP 71124.02 | |||
000726 Occupational ALARA Planning and Controls | |||
1, 2 10/29/2018 | |||
11/02/2018 | |||
IP 71124.03 | |||
000727 In-Plant Airborne Radioactivity Control and Mitigation | |||
1, 2 10/29/2018 | |||
11/02/2018 | |||
IP 71124.04 | |||
000729 Occupational Dose Assessment | |||
RADWASTE 1 | |||
1, 2 11/05/2018 | |||
11/09/2018 | |||
IP 71124.08 | |||
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and | |||
Transportation | |||
RAD SAFETY INSPECTION | |||
1 1, 2 12/10/2018 | |||
12/14/2018 | |||
IP 71124.01 | |||
000725 Radiological Hazard Assessment and Exposure Controls | |||
1, 2 12/10/2018 | |||
12/14/2018 | |||
IP 71124.02 | |||
000726 Occupational ALARA Planning and Controls | |||
1, 2 12/10/2018 | |||
12/14/2018 | |||
IP 71124.03 | |||
000727 In-Plant Airborne Radioactivity Control and Mitigation | |||
1, 2 12/10/2018 | |||
12/14/2018 | |||
IP 71124.04 | |||
000729 Occupational Dose Assessment | |||
1, 2 12/10/2018 | |||
12/14/2018 | |||
IP 71151 000746 Performance Indicator Verification | |||
PI&R BIENNIAL | |||
1 1, 2 03/04/2019 | |||
03/08/2019 | |||
IP 71152B | |||
000747 Problem Identification and Resolution | |||
1, 2 03/18/2019 | |||
03/22/2019 | |||
IP 71152B | |||
000747 Problem Identification and Resolution | |||
1/4/2018 10:49:52 AM | |||
Page 2 | |||
of 4 | of 4 | ||
This report does not include INPO and OUTAGE activities. | This report does not include INPO and OUTAGE activities. | ||
| Line 72: | Line 399: | ||
IP 22 Inspection Activity Plan Report | IP 22 Inspection Activity Plan Report | ||
Beaver Valley 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count RAD SAFETY 01,02,03,04 1 | Beaver Valley | ||
1, 2 03/18/2019 03/22/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 03/18/2019 03/22/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 03/18/2019 03/22/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/18/2019 03/22/2019 IP 71124.04 000729 Occupational Dose Assessment FORCE-ON-FORCE PLANNING AND EXERCISES 8 | |||
1, 2 03/25/2019 03/29/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 04/15/2019 04/19/2019 IP 71130.03 000735 Contingency Response - Force-On-Force Testing EQ PROGRAM 3 | 01/01/2018 - 12/31/2019 | ||
1, 2 06/10/2019 06/14/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs) | |||
1, 2 06/24/2019 06/28/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs) | Unit Start End Activity CAC Title Staff Count | ||
EP PROGRAM INSPECTION 2 | |||
1, 2 06/10/2019 06/14/2019 IP 71114.02 000717 Alert and Notification System Testing 1, 2 06/10/2019 06/14/2019 IP 71114.03 000718 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 06/10/2019 06/14/2019 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 06/10/2019 06/14/2019 IP 71151 001397 Performance Indicator Verification RAD SAFETY REMP 1 | RAD SAFETY 01,02,03,04 | ||
1, 2 07/08/2019 07/12/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 07/08/2019 07/12/2019 IP 71151 000746 Performance Indicator Verification Triennial Heat Sink 1 | |||
1, 2 07/15/2019 07/19/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial ACCESS CONTROL, EQUIP PERF, TRAINING 3 | 1 1, 2 03/18/2019 | ||
1, 2 07/22/2019 07/26/2019 IP 71130.02 000734 Access Control 1, 2 07/22/2019 07/26/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 07/22/2019 07/26/2019 IP 71130.07 000739 Security Training 1, 2 07/22/2019 07/26/2019 IP 71151 001338 Performance Indicator Verification 50.59 Process 3 | |||
1, 2 08/12/2019 08/16/2019 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments 1/4/2018 10:49:52 AM Page 3 | 03/22/2019 | ||
IP 71124.01 | |||
000725 Radiological Hazard Assessment and Exposure Controls | |||
1, 2 03/18/2019 | |||
03/22/2019 | |||
IP 71124.02 | |||
000726 Occupational ALARA Planning and Controls | |||
1, 2 03/18/2019 | |||
03/22/2019 | |||
IP 71124.03 | |||
000727 In-Plant Airborne Radioactivity Control and Mitigation | |||
1, 2 03/18/2019 | |||
03/22/2019 | |||
IP 71124.04 | |||
000729 Occupational Dose Assessment | |||
FORCE-ON-FORCE PLANNING AND EXERCISES | |||
8 1, 2 03/25/2019 | |||
03/29/2019 | |||
IP 71130.03 | |||
000735 Contingency Response - Force-On-Force Testing | |||
1, 2 04/15/2019 | |||
04/19/2019 | |||
IP 71130.03 | |||
000735 Contingency Response - Force-On-Force Testing | |||
EQ PROGRAM | |||
3 1, 2 06/10/2019 | |||
06/14/2019 | |||
IP 71111.21N | |||
000714 Design Bases Assurance Inspection (Programs) | |||
1, 2 06/24/2019 | |||
06/28/2019 | |||
IP 71111.21N | |||
000714 Design Bases Assurance Inspection (Programs) | |||
EP PROGRAM INSPECTION | |||
2 1, 2 06/10/2019 | |||
06/14/2019 | |||
IP 71114.02 | |||
000717 Alert and Notification System Testing | |||
1, 2 06/10/2019 | |||
06/14/2019 | |||
IP 71114.03 | |||
000718 Emergency Preparedness Organization Staffing and Augmentation System | |||
1, 2 06/10/2019 | |||
06/14/2019 | |||
IP 71114.05 | |||
000720 Correction of Emergency Preparedness Weaknesses and Deficiencies | |||
1, 2 06/10/2019 | |||
06/14/2019 | |||
IP 71151 001397 Performance Indicator Verification | |||
RAD SAFETY REMP | |||
1 1, 2 07/08/2019 | |||
07/12/2019 | |||
IP 71124.07 | |||
000731 Radiological Environmental Monitoring Program | |||
1, 2 07/08/2019 | |||
07/12/2019 | |||
IP 71151 000746 Performance Indicator Verification | |||
Triennial Heat Sink | |||
1 1, 2 07/15/2019 | |||
07/19/2019 | |||
IP 71111.07T | |||
000700 Heat Sink Performance -Triennial | |||
ACCESS CONTROL, EQUIP PERF, TRAINING | |||
3 1, 2 07/22/2019 | |||
07/26/2019 | |||
IP 71130.02 | |||
000734 Access Control | |||
1, 2 07/22/2019 | |||
07/26/2019 | |||
IP 71130.04 | |||
000736 Equipment Performance, Testing, and Maintenance | |||
1, 2 07/22/2019 | |||
07/26/2019 | |||
IP 71130.07 | |||
000739 Security Training | |||
1, 2 07/22/2019 | |||
07/26/2019 | |||
IP 71151 001338 Performance Indicator Verification | |||
50.59 Process | |||
3 1, 2 08/12/2019 | |||
08/16/2019 | |||
IP 71111.17T | |||
000709 Evaluations of Changes, Tests, and Experiments | |||
1/4/2018 10:49:52 AM | |||
Page 3 | |||
of 4 | of 4 | ||
This report does not include INPO and OUTAGE activities. | This report does not include INPO and OUTAGE activities. | ||
| Line 90: | Line 585: | ||
IP 22 Inspection Activity Plan Report | IP 22 Inspection Activity Plan Report | ||
Beaver Valley 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count RAD SAFETY 01,02,03,04 1 | Beaver Valley | ||
1, 2 08/12/2019 08/16/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 08/12/2019 08/16/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 08/12/2019 08/16/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 08/12/2019 08/16/2019 IP 71124.04 000729 Occupational Dose Assessment BV2 REQUAL INSP WITH P/F RESULTS 2 | |||
01/01/2018 - 12/31/2019 | |||
Unit Start End Activity CAC Title Staff Count | |||
RAD SAFETY 01,02,03,04 | |||
1 1, 2 08/12/2019 | |||
08/16/2019 | |||
IP 71124.01 | |||
000725 Radiological Hazard Assessment and Exposure Controls | |||
1, 2 08/12/2019 | |||
08/16/2019 | |||
IP 71124.02 | |||
000726 Occupational ALARA Planning and Controls | |||
1, 2 08/12/2019 | |||
08/16/2019 | |||
IP 71124.03 | |||
000727 In-Plant Airborne Radioactivity Control and Mitigation | |||
1, 2 08/12/2019 | |||
08/16/2019 | |||
IP 71124.04 | |||
000729 Occupational Dose Assessment | |||
BV2 REQUAL INSP WITH P/F RESULTS | |||
2 2 | |||
08/26/2019 | |||
08/30/2019 | |||
IP 71111.11A | |||
000703 Licensed Operator Requalification Program and Licensed Operator Performance - | |||
Annual 2 | Annual 2 | ||
08/26/2019 08/30/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance - | 08/26/2019 | ||
Biennial BEAVER VALLEY 2 INITIAL OL EXAM 4 | |||
08/30/2019 | |||
2 09/23/2019 10/04/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD) | |||
RAD SAFETY OUT 1 | IP 71111.11B | ||
1, 2 09/23/2019 09/27/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 09/23/2019 09/27/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 09/23/2019 09/27/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/23/2019 09/27/2019 IP 71124.04 000729 Occupational Dose Assessment 1, 2 09/23/2019 09/27/2019 IP 71151 000746 Performance Indicator Verification INSERVICE INSPECTION - UNIT 1 1 | |||
000704 Licensed Operator Requalification Program and Licensed Operator Performance - | |||
Biennial BEAVER VALLEY 2 INITIAL OL EXAM | |||
4 2 | |||
08/26/2019 | |||
08/30/2019 | |||
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV) | |||
2 09/23/2019 | |||
10/04/2019 | |||
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD) | |||
RAD SAFETY OUT | |||
1 1, 2 09/23/2019 | |||
09/27/2019 | |||
IP 71124.01 | |||
000725 Radiological Hazard Assessment and Exposure Controls | |||
1, 2 09/23/2019 | |||
09/27/2019 | |||
IP 71124.02 | |||
000726 Occupational ALARA Planning and Controls | |||
1, 2 09/23/2019 | |||
09/27/2019 | |||
IP 71124.03 | |||
000727 In-Plant Airborne Radioactivity Control and Mitigation | |||
1, 2 09/23/2019 | |||
09/27/2019 | |||
IP 71124.04 | |||
000729 Occupational Dose Assessment | |||
1, 2 09/23/2019 | |||
09/27/2019 | |||
IP 71151 000746 Performance Indicator Verification | |||
INSERVICE INSPECTION - UNIT 1 | |||
1 1 | |||
10/07/2019 | |||
10/18/2019 | |||
IP 71111.08P | |||
000702 Inservice Inspection Activities - PWR | |||
1/4/2018 10:49:52 AM | |||
Page 4 | |||
of 4 | of 4 | ||
This report does not include INPO and OUTAGE activities. | This report does not include INPO and OUTAGE activities. | ||
Revision as of 01:54, 29 June 2018
| ML18047A001 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 02/28/2018 |
| From: | Young M R NRC/RGN-I/DRP/PB6 |
| To: | Bologna R FirstEnergy Nuclear Operating Co |
| Young M | |
| Shared Package | |
| ML18046A504 | List: |
| References | |
| IR 2017006, IR 2017402, IR 2017501 | |
| Download: ML18047A001 (7) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406
-2713 Mr. Richard Bologna Site Vice President First Energy Nuclear Operating Company Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077-0004
SUBJECT: ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION UNITS 1 AND 2 (REPORTS 05000334/2017006 AND 0500412/2017006 05000334/2017402 AND 05000412/2017402 AND 05000334/2017501 AND 05000412/2017501)
Dear Mr. Bologna:
The NRC has completed its end-of-cycle performance assessment of Beaver Valley Power Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results
, and enforcement actions from January 1, 2017, through December 31, 2017. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safet y. The NRC determined the performance at Beaver Valley Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRC's Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program," because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected rang e (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspecti on plan lists the inspections scheduled through December 31, 2019. This updated inspecti on plan now includes planned security inspections which were formerly transmitted under separate correspondence.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised.
The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. The NRC will also be performi ng TI-191, "Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 and EP Info Request March 12, 2012in the first quarter of 2018. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC's Website at http://ww w.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5205 with any questions you may have regarding this letter.
Sincerely,/RA/ Matthew R. Young, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.
50-334 and 50
-412 License Nos. DPR-66 and NPF
-73
Enclosure:
Inspection/Activity Plan
ML180047A001 SUNSI ReviewNon-SensitiveSensitivePublicly AvailableNon-Publicly AvailableOFFICE RI/DRP RI/DRP NAME SShaffer MYoung DATE 2/28/18 /2/18 Beaver Valley
01/01/2018 - 12/31/2019
Unit Start End Activity CAC Title Staff Count
BV1 REQUAL INSP W/ P/F RESULTS
2 1
01/22/2018
01/26/2018
000703 Licensed Operator Requalification Program and Licensed Operator Performance -
Annual 1
01/22/2018
01/26/2018
000704 Licensed Operator Requalification Program and Licensed Operator Performance -
Biennial RAD SAFETY INSP
1 1, 2 01/22/2018
01/26/2018
000730 Radioactive Gaseous and Liquid Effluent Treatment
1, 2 01/22/2018
01/26/2018
IP 71151 000746 Performance Indicator Verification
CYBER FULL IMP
4 1, 2 01/29/2018
02/02/2018
000741 Cyber Security
1, 2 02/12/2018
02/16/2018
000741 Cyber Security
FUKUSHIMA LESSONS LEARNED TI-191
1 1, 2 02/19/2018
02/23/2018
000509 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request
March 12, 2012
UNIT 1 INSERVICE INSPECTION
1 1
04/23/2018
05/04/2018
000702 Inservice Inspection Activities - PWR
RAD SAFETY INSP
1 1, 2 04/23/2018
04/27/2018
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 04/23/2018
04/27/2018
000726 Occupational ALARA Planning and Controls
1, 2 04/23/2018
04/27/2018
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 04/23/2018
04/27/2018
000729 Occupational Dose Assessment
ACCESS CONTROL, PROTECTIVE STRATEGY, TSR
4 1, 2 06/04/2018
06/08/2018
000734 Access Control
1, 2 06/04/2018
06/08/2018
000737 Protective Strategy Evaluation
1, 2 06/04/2018
06/08/2018
000743 Review of Power Reactor Target Sets
1, 2 06/04/2018
06/08/2018
IP 71151 001338 Performance Indicator Verification
EP EXERCISE INSPECTION
5 1, 2 06/11/2018
06/15/2018
000716 Exercise Evaluation
1, 2 06/11/2018
06/15/2018
IP 71151 001397 Performance Indicator Verification
1/4/2018 10:49:52 AM
Page 1
of 4
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Beaver Valley
01/01/2018 - 12/31/2019
Unit Start End Activity CAC Title Staff Count
MC&A 1
1, 2 06/11/2018
06/15/2018
000742 Material Control and Accounting (MC&A)
TRIENNIAL FIRE PROTECTION
4 1, 2 07/23/2018
07/27/2018
000697 Fire Protection - NFPA 805 (Triennial)
1, 2 08/06/2018
08/10/2018
000697 Fire Protection - NFPA 805 (Triennial)
BEAVER VALLEY 1 INITIAL OL EXAM
4 1
08/20/2018
08/24/2018
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1, 2 09/17/2018
09/28/2018
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
RAD INSTRUMENTATION
1 1, 2 09/10/2018
09/14/2018
000729 Radiation Monitoring Instrumentation
Unit 2 Inservice Inspection
1 2
10/29/2018
11/09/2018
000702 Inservice Inspection Activities - PWR
Rad Safety Inspection
1 1, 2 10/29/2018
11/02/2018
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 10/29/2018
11/02/2018
000726 Occupational ALARA Planning and Controls
1, 2 10/29/2018
11/02/2018
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 10/29/2018
11/02/2018
000729 Occupational Dose Assessment
RADWASTE 1
1, 2 11/05/2018
11/09/2018
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
Transportation
RAD SAFETY INSPECTION
1 1, 2 12/10/2018
12/14/2018
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 12/10/2018
12/14/2018
000726 Occupational ALARA Planning and Controls
1, 2 12/10/2018
12/14/2018
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 12/10/2018
12/14/2018
000729 Occupational Dose Assessment
1, 2 12/10/2018
12/14/2018
IP 71151 000746 Performance Indicator Verification
PI&R BIENNIAL
1 1, 2 03/04/2019
03/08/2019
IP 71152B
000747 Problem Identification and Resolution
1, 2 03/18/2019
03/22/2019
IP 71152B
000747 Problem Identification and Resolution
1/4/2018 10:49:52 AM
Page 2
of 4
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Beaver Valley
01/01/2018 - 12/31/2019
Unit Start End Activity CAC Title Staff Count
RAD SAFETY 01,02,03,04
1 1, 2 03/18/2019
03/22/2019
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 03/18/2019
03/22/2019
000726 Occupational ALARA Planning and Controls
1, 2 03/18/2019
03/22/2019
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 03/18/2019
03/22/2019
000729 Occupational Dose Assessment
FORCE-ON-FORCE PLANNING AND EXERCISES
8 1, 2 03/25/2019
03/29/2019
000735 Contingency Response - Force-On-Force Testing
1, 2 04/15/2019
04/19/2019
000735 Contingency Response - Force-On-Force Testing
EQ PROGRAM
3 1, 2 06/10/2019
06/14/2019
000714 Design Bases Assurance Inspection (Programs)
1, 2 06/24/2019
06/28/2019
000714 Design Bases Assurance Inspection (Programs)
EP PROGRAM INSPECTION
2 1, 2 06/10/2019
06/14/2019
000717 Alert and Notification System Testing
1, 2 06/10/2019
06/14/2019
000718 Emergency Preparedness Organization Staffing and Augmentation System
1, 2 06/10/2019
06/14/2019
000720 Correction of Emergency Preparedness Weaknesses and Deficiencies
1, 2 06/10/2019
06/14/2019
IP 71151 001397 Performance Indicator Verification
RAD SAFETY REMP
1 1, 2 07/08/2019
07/12/2019
000731 Radiological Environmental Monitoring Program
1, 2 07/08/2019
07/12/2019
IP 71151 000746 Performance Indicator Verification
Triennial Heat Sink
1 1, 2 07/15/2019
07/19/2019
000700 Heat Sink Performance -Triennial
ACCESS CONTROL, EQUIP PERF, TRAINING
3 1, 2 07/22/2019
07/26/2019
000734 Access Control
1, 2 07/22/2019
07/26/2019
000736 Equipment Performance, Testing, and Maintenance
1, 2 07/22/2019
07/26/2019
000739 Security Training
1, 2 07/22/2019
07/26/2019
IP 71151 001338 Performance Indicator Verification
50.59 Process
3 1, 2 08/12/2019
08/16/2019
000709 Evaluations of Changes, Tests, and Experiments
1/4/2018 10:49:52 AM
Page 3
of 4
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Beaver Valley
01/01/2018 - 12/31/2019
Unit Start End Activity CAC Title Staff Count
RAD SAFETY 01,02,03,04
1 1, 2 08/12/2019
08/16/2019
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 08/12/2019
08/16/2019
000726 Occupational ALARA Planning and Controls
1, 2 08/12/2019
08/16/2019
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 08/12/2019
08/16/2019
000729 Occupational Dose Assessment
BV2 REQUAL INSP WITH P/F RESULTS
2 2
08/26/2019
08/30/2019
000703 Licensed Operator Requalification Program and Licensed Operator Performance -
Annual 2
08/26/2019
08/30/2019
000704 Licensed Operator Requalification Program and Licensed Operator Performance -
Biennial BEAVER VALLEY 2 INITIAL OL EXAM
4 2
08/26/2019
08/30/2019
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
2 09/23/2019
10/04/2019
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
RAD SAFETY OUT
1 1, 2 09/23/2019
09/27/2019
000725 Radiological Hazard Assessment and Exposure Controls
1, 2 09/23/2019
09/27/2019
000726 Occupational ALARA Planning and Controls
1, 2 09/23/2019
09/27/2019
000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 09/23/2019
09/27/2019
000729 Occupational Dose Assessment
1, 2 09/23/2019
09/27/2019
IP 71151 000746 Performance Indicator Verification
INSERVICE INSPECTION - UNIT 1
1 1
10/07/2019
10/18/2019
000702 Inservice Inspection Activities - PWR
1/4/2018 10:49:52 AM
Page 4
of 4
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report