ML24057A306: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:RM     DOCUMENTATION                               NO. BW-SDP-006,                     Rev.       0                                                                                                                                                   PAGE     NO.1
{{#Wiki_filter:RM DOCUMENTATION NO. BW-SDP-006, Rev. 0 PAGE NO.1


STATION:           Braidwood UNIT(S)                 AFFECTED:                                       UNIT2
STATION: Braidwood UNIT(S) AFFECTED: UNIT2


TITLE:         Braidwood                                   28 AF     Pump                           Fuel     Oil Leak             SDP   Sensitivities
TITLE: Braidwood 28 AF Pump Fuel Oil Leak SDP Sensitivities


==SUMMARY==
==SUMMARY==
This document describes the FPIE and FPRA modeling, associated results, and sensitivities discussed in reference to the 2B AF pump fuel oil leak at Braidwood.


This document                                          describes the FPIE  and                      FPRA      modeling,           associated                  results, and                      sensitivities discussed        in reference to  the 2B  AF    pump                      fuel oil leak at  Braidwood.
URE(s) Impacted: None Number of pages: 32 gages, including this gage.
RM Document Level: Level 1, ger ER-AA-600-1012 [1].


URE(s)                    Impacted:                                                                                                                    None Number                      of pages:                                                                                                                          32    gages,            including    this gage.
Internal RM Documentation Electronic Calculation Data Files: BW-SDP-006_R0_Attachment.zip, 83,176 KB, 2/24/2024, 9:45 AM
RM     Document                                              Level:                                   Level 1,      ger ER-AA-600-1012              [1].


Internal                RM      Documentation Electronic              Calculation                                  Data              Files: BW-SDP-006_R0_Attachment.zip,                                              83,176      KB,    2/24/2024,        9:45    AM
Co-Prepared by: Andrew Christensen / Signed Via Email /2/24/2024 Print Sign Date


Co-Prepared                             by:                                           Andrew                Christensen                                                                                                        /   Signed Via               Email                                                                                                                                                                                                                                 /2/24/2024 Print                                                                                                                                                                                                                                                                                                                                                                                                                                             Sign                                                                                                                                                                                                                                                                                                                                                                                                                   Date
Co-Prepared by: Ethan Graven / Signed Via Email /2/24/2024 Print Sign Date


Co-Prepared                             by:                                                   Ethan            Graven                                                                                                                                                                                                                                    / Signed Via               Email                                                                                                                                                                                                                               /2/24/2024 Print                                                                                                                                                                                                                                                                                                                                                                                                                               Sign                                                                                                                                                                                                                                                                                                                                                                                                                               Date
Co-Prepared by: Usama Farradj / Signed Via Email /2/24/2024 Print Sign Date


Co-Prepared                               by:                                               Usama                                              Farradj                                                                                                                                                                                        / Signed Via               Email                                                                                                                                                                                                                                           /2/24/2024 Print                                                                                                                                                                                                                                                                                                                                                                                                                                             Sign                                                                                                                                                                                                                                                                                                                                                                                                                   Date
Co-Prepared by: Lynn Kolonauski / Signed Via Email /2/24/2024 Print Sign Date


Co-Prepared                            by:                                                 Lynn                                Kolonauski                                                                                                                                                                                          / Signed Via               Email                                                                                                                                                                                                                                         /2/24/2024 Print                                                                                                                                                                                                                                                                                                                                                                                                                                             Sign                                                                                                                                                                                                                                                                                                                                                                                                                   Date
Reviewed by: Adam Harden / Signed Via Email /2/24/2024 Print Sign Date


Reviewed             by:                                             Adam                        Harden                                                                                                                                                                                                                                                                          / Signed Via               Email                                                                                                                                                                                                                                         /2/24/2024 Print                                                                                                                                                                                                                                                                                                                                                                                                                                             Sign                                                                                                                                                                                                                                                                                                                                                                                                                               Date
Reviewed by: Donald Vanover / Signed Via Email /2/24/2024 Print Sign Date


Reviewed              by:                                                   Donald                  Vanover                                                                                                                                                                                                                                                              / Signed Via               Email                                                                                                                                                                                                                                           /2/24/2024 Print                                                                                                                                                                                                                                                                                                                                                                                                                               Sign                                                                                                                                                                                                                                                                                                                                                                                                                   Date
Approved by: Roy Linthicum / Signed Via Email /2/24/2024 Print Sign Date


Approved                            by:                                                   Roy                        Linthicum                                                                                                                                                                                                                                                          /  Signed  Via                Email                                                                                                                                                                                                                                        /2/24/2024 Print                                                                                                                                                                                                                                                                                                                                                                                                                                            Sign                                                                                                                                                                                                                                                                                                                                                                                                                                Date
Method of Review: [ X] Detailed [] Alternate This RM documentation supersedes: N/A in its entirety.


Method          of    Review:                     [ X] Detailed [] Alternate This RM    documentation                                                                      supersedes:                                                                                                                                                                 N/A                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              in        its entirety.
External RM Documentation Prepared by: N/A I I
- Print Sign Date Approved by: N/A I I
- Print Sign Date Do any ASSUMPTIONS I ENGINEER/NG JUDGEMENTS require later verification? [] Yes [ X] No Tracked By: AT#, URE# etc.)
Braidwood Unit 2


External                  RM      Documentation Prepared            by:                                      N/A                                                                                                                                                                                                                                                                                                                                                                                                                                                          I                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        I
2B AF Pump Fuel Oil Leak SDP Sensitivities
-                                                                                                                                                                                                                                                                                                                                                                                                                    Print                                                                                                                                                                                                                                                                                                                                                                                                                                              Sign                                                                                                                                                                                                                                                                                                                                                                                                                                Date Approved                            by:                            N/A                                                                                                                                                                                                                                                                                                                                                                                                                                                        I                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        I
-                                                                                                                                                                                                                                                                                                                                                                                                                              Print                                                                                                                                                                                                                                                                                                                                                                                                                                Sign                                                                                                                                                                                                                                                                                                                                                                                                                    Date Do          any                              ASSUMPTIONS                              I ENGINEER/NG        JUDGEMENTS                        require later verification?                [] Yes        [ X] No            Tracked By:            AT#,      URE#                    etc.)
Braidwood                                                                          Unit                2


2B      AF            Pump                                                                Fuel              Oil Leak                            SDP Sensitivities
CONTACTS Braidwood


CONTACTS                                                                                                                                                                                                                                                                                                                                                                                                                                                                            Braidwood
Site Risk Mgmt Engineer Andrew Christensen (773) 718-6601


Site Risk Mgmt   Engineer                                                                                                                                                             Andrew                  Christensen (773)     718-6601
Fleet. Risk Mgmt Engineer Ethan Graven (224) 422-9458


Fleet. Risk Mgmt    Engineer                                                                                                                                                                                                                        Ethan            Graven                  (224)  422-9458
Internal Events Model Owner Adam Harden


Internal      Events  Model Owner                                                                                                                                                                                                                                                                                                             Adam                      Harden
Fire PRA Model Owner Usama Farradj


Fire PRA    Model  Owner                                                                                                                                                                                                                                                                                                                                                      Usama                                            Farradj
2 Table of Contents


2 Table            of    Contents
1.0 EVENT OVERVIEW....................................................................................................................................................4


1.0 EVENT          OVERVIEW                            ...................................................................................................................................................                                 .4
2.0 MAJOR PRA MODEL REFINEMENTS FOR THE SDP.................................................................................................... 4 2.1 FPIE.................................................................................................................................................... 4 2.2 FPRA.................................................................................................................................................. 5


2.0 MAJOR  PRA    MODEL REFINEMENTS FOR  THE SDP ....................................................................................................                 4 2.1        FPIE ....................................................................................................................................................                            4 2.2  FPRA      ..................................................................................................................................................                            5
3.0 RESULTS................................................................................................................................................................... 5


3.0 RESULTS            ...................................................................................................................................................................                                  5
4.0 SENSITIVITIES........................................................................................................................................................... 5 4.1 FLEX HEP Sensitivity......................................................................................................................... 5 4.2 28 AF Pump Failure Probability Sensitivity........................................................................................ 9 4.3 Sensitivity Results............................................................................................................................... 9 4.4 Impact from External Events............................................................................................................. 11 4.5 Additional Sensitivity......................................................................................................................... 11 4.6 Key Conservatisms........................................................................................................................... 12
 
4.0 SENSITIVITIES ...........................................................................................................................................................                               5 4.1       FLEX       HEP   Sensitivity .........................................................................................................................                     5 4.2 28 AF   Pump                         Failure Probability   Sensitivity ........................................................................................               9 4.3   Sensitivity Results ...............................................................................................................................                     9 4.4   Impact                   from         External     Events .............................................................................................................                       11 4.5 Additional Sensitivity .........................................................................................................................                         11 4.6     Key           Conservatisms       ...........................................................................................................................                         12


==5.0 CONCLUSION==
==5.0 CONCLUSION==
S ........................................................................................................................................................                               12
S........................................................................................................................................................ 12


==6.0 REFERENCES==
==6.0 REFERENCES==
...........................................................................................................................................................                                 13
........................................................................................................................................................... 13


APPENDIX A FPIE AND FPRA   HEP CHANGES .................................................................................................................                   14
APPENDIX A FPIE AND FPRA HEP CHANGES................................................................................................................. 14


APPENDIX B ADDITIONAL MODEL CONSERVATISMS ....................................................................................................                 26
APPENDIX B ADDITIONAL MODEL CONSERVATISMS.................................................................................................... 26


APPENDIX C SENSITIVITY       CALCULATIONS     AND   EXTERNAL HAZARDS   EXTRAPOLATION ................................................ 30
APPENDIX C SENSITIVITY CALCULATIONS AND EXTERNAL HAZARDS EXTRAPOLATION................................................ 30


3 BW-SDP-006,                   Rev.     0
3 BW-SDP-006, Rev. 0


1.0   Event       Overview Elevated fuel content                   was                   identified in the 2B Auxiliary   Feedwater       (AF)   diesel engine           lube         oil sample during     quarterly sampling.         A confirmatory                         sample         determined the fuel content                   was                   above                                 fault limits and could                 not             be           evaluated               to   be           acceptable.                           An             emergent       72-hour LCO                                                                                                                                       entry     was                   made                         to     perform repairs which     found                     fuel leaks at compression                           fittings on                       2 fuel injector return lines and                     exited on                       9/23/2023. The fuel lines and                   fittings were     originally replaced during     preventative maintenance                                                 during     A2R23     (spring 2023). The   last previous     in-range               oil sample       was                 taken             on                       5/19/2023.     Fuel   leaks were     identified on                       fuel injectors that had               been                       refurbished at Paragon,                                           Inc.                 The     16   units were     returned to   stock at                                                                                                   Byron                         Station on                       March             27,   2023,         PO     1390618 was                   issued to     Paragon                                     March             29,   2023,     and                       repair units were     received back                         onsite at   Braidwood                           Station from       Paragon                                           on                       April 17, 2023. Material condition               deficiencies with refurbished fuel injectors, including fuel injector cap                   sealing surface           defects and                                                                                                                                                 degraded       O-ring, resulted in diesel fuel leaking into the diesel engine             oil.
1.0 Event Overview Elevated fuel content was identified in the 2B Auxiliary Feedwater (AF) diesel engine lube oil sample during quarterly sampling. A confirmatory sample determined the fuel content was above fault limits and could not be evaluated to be acceptable. An emergent 72-hour LCO entry was made to perform repairs which found fuel leaks at compression fittings on 2 fuel injector return lines and exited on 9/23/2023. The fuel lines and fittings were originally replaced during preventative maintenance during A2R23 (spring 2023). The last previous in-range oil sample was taken on 5/19/2023. Fuel leaks were identified on fuel injectors that had been refurbished at Paragon, Inc. The 16 units were returned to stock at Byron Station on March 27, 2023, PO 1390618 was issued to Paragon March 29, 2023, and repair units were received back onsite at Braidwood Station from Paragon on April 17, 2023. Material condition deficiencies with refurbished fuel injectors, including fuel injector cap sealing surface defects and degraded O-ring, resulted in diesel fuel leaking into the diesel engine oil.


Testing was                 performed     on                       a           Detroit Diesel Series 149 diesel engine           to determine if the 2B AF   diesel engine           could               have             performed   its safety function                 of driving the 2B AF   pump                         and                     other connected equipment           for a             period of at least 24   hours.             The   engine           started with fuel oil diluted lubricating oil representative of the 2B   AF   engine         conditions               and                       operated           in this condition                 for over     24   hours,             with additional fuel oil being           added             to   the lube           oil during     the test to   represent the September       2023   as-found condition.               Based             on                       the successful         performance                           of the test engine           with the fuel oil diluted lube         oil and MPR's   evaluation                   determining the test addressed       all of the likely engine           failure modes,                     MPR   concluded that there is reasonable                                   assurance                                       the Braidwood                           2B   AF     Pump                       Diesel Drive would                     have           performed   its safety function             of driving the 2B AF     pump                     and                     other connected                                 equipment           for at least 24   hours                 [1]
Testing was performed on a Detroit Diesel Series 149 diesel engine to determine if the 2B AF diesel engine could have performed its safety function of driving the 2B AF pump and other connected equipment for a period of at least 24 hours. The engine started with fuel oil diluted lubricating oil representative of the 2B AF engine conditions and operated in this condition for over 24 hours, with additional fuel oil being added to the lube oil during the test to represent the September 2023 as-found condition. Based on the successful performance of the test engine with the fuel oil diluted lube oil and MPR's evaluation determining the test addressed all of the likely engine failure modes, MPR concluded that there is reasonable assurance the Braidwood 2B AF Pump Diesel Drive would have performed its safety function of driving the 2B AF pump and other connected equipment for at least 24 hours [1]


Based           on                       this testing, the 2B AF   pump                     would                     have             met   its PRA   success                   criteria and                       PRA   mission     time.
Based on this testing, the 2B AF pump would have met its PRA success criteria and PRA mission time.
Therefore, the 2B AF     pump                       would                     be           considered           available       for the duration               of the SOP exposure                           period.
Therefore, the 2B AF pump would be considered available for the duration of the SOP exposure period.
Following       IMC 0609   Appendix             A   Exhibit 2,       the 2B AF   pump                   would                     have           maintained                     its PRA   functionality and                     would                 screen           as         Green         [2]. The   following PRA   model           refinements, results, and                       sensitivities are provided under             the assumption                           that the pump                     would                   not           have             met   its mission     time, in the event the NRC does         not           agree     that PRA     success                   criteria and                       PRA   mission     time are       met.
Following IMC 0609 Appendix A Exhibit 2, the 2B AF pump would have maintained its PRA functionality and would screen as Green [2]. The following PRA model refinements, results, and sensitivities are provided under the assumption that the pump would not have met its mission time, in the event the NRC does not agree that PRA success criteria and PRA mission time are met.


2.0   Major           PRA         Model           Refinements                     for   the SDP 2.1       FPIE The   major             model           refinements made                       to   the FPIE   model         are       as         follows:
2.0 Major PRA Model Refinements for the SDP 2.1 FPIE The major model refinements made to the FPIE model are as follows:
* Refined support       system         initiating event   (SSIE)   fault trees to   improve       quantification     times
* Refined support system initiating event (SSIE) fault trees to improve quantification times
* Included                 loss of ESF AC     bus                   initiators as           general   transients o                                           Controlled shutdown                           following loss of ESF AC     bus                   would                   not             need             to   recognize           loss of secondary                                             cooling                 as         FW             is available         during     shutdown.
* Included loss of ESF AC bus initiators as general transients o Controlled shutdown following loss of ESF AC bus would not need to recognize loss of secondary cooling as FW is available during shutdown.
* Incorporated                             more               credit to   the DC   crosstie to   opposite unit DC     bus,                   specifically adding         credit for DC   crosstie (train A;     train B already               credited) within 1 hour             of associated               battery     charger       not being       energized.
* Incorporated more credit to the DC crosstie to opposite unit DC bus, specifically adding credit for DC crosstie (train A; train B already credited) within 1 hour of associated battery charger not being energized.
o                                           Credited the DC   bus                         111     to   211         DC   crosstie   (for controlled shutdown                             following loss of ESF AC     bus                   initiating events only).
o Credited the DC bus 111 to 211 DC crosstie (for controlled shutdown following loss of ESF AC bus initiating events only).
* Medium           Head             (MH)   FLEX       pump                     credit to supply         flow to   Steam             Generators           (SGs) from     the RWST,                 including     credit to   the N+1       FLEX       pump                     after 4   successful           hours             of the first FLEX     pump.
* Medium Head (MH) FLEX pump credit to supply flow to Steam Generators (SGs) from the RWST, including credit to the N+1 FLEX pump after 4 successful hours of the first FLEX pump.
* Updated                   loss of AC     power             recovery                 values         for SOP   Exposure                         Period 1 due             to credit from       ~2     hour 2B AF     pump                     demonstrated                       run               time during       Exposure                           Period 1
* Updated loss of AC power recovery values for SOP Exposure Period 1 due to credit from ~2 hour 2B AF pump demonstrated run time during Exposure Period 1
* Updated                 various               HEPs due             to credit for ~2     hour               2B AF     pump                     demonstrated                     run                 time during Exposure                         Period 1.     Refer to Appendix             A   for additional details.
* Updated various HEPs due to credit for ~2 hour 2B AF pump demonstrated run time during Exposure Period 1. Refer to Appendix A for additional details.
* Updated                 various               HEPs due             to   applying           a             10% probability that operators           fail to   manually                                     trip the unit within 30   seconds                       of a           total loss of Main           Feedwater,       as         opposed                         to allowing       the unit to automatically                         trip on                         low       SG   level.
* Updated various HEPs due to applying a 10% probability that operators fail to manually trip the unit within 30 seconds of a total loss of Main Feedwater, as opposed to allowing the unit to automatically trip on low SG level.
o                                           Applied to   both           the base                   case                 and                       Exposure                           Period 2
o Applied to both the base case and Exposure Period 2


4 BW-SDP-006,                               Rev.       0
4 BW-SDP-006, Rev. 0


o                                     Refer to Appendix                   A   for additional     details 2.2   FPRA The   major               model             refinements     made                       to   the FPRA       model             are       as         follows:
o Refer to Appendix A for additional details 2.2 FPRA The major model refinements made to the FPRA model are as follows:
* Scenarios                     where         no                   reactor           trip was                 anticipated,     for U1                     (relative to   the availability of the U1                   cross tie to   support           U2)                 and                     for U2                 received a         conservative                         0.1       unit trip probability.
* Scenarios where no reactor trip was anticipated, for U1 (relative to the availability of the U1 cross tie to support U2) and for U2 received a conservative 0.1 unit trip probability.
* 11.4C-0       Rad             Waste               Control           Room                                 fire modeling               refinements,     specifically the size and                     spread         of fires in   this zone                     and                     how                 they       impact         the Unit         1 cables                       in the zone
* 11.4C-0 Rad Waste Control Room fire modeling refinements, specifically the size and spread of fires in this zone and how they impact the Unit 1 cables in the zone
* MH     FLEX         pump                     credit to   supply flow                                                                                                             to   SGs from         the Refueling Water           Storage           Tank                     (RWST),
* MH FLEX pump credit to supply flow to SGs from the Refueling Water Storage Tank (RWST),
including         credit to   the N+1     FLEX         pump                     after 4   successful               hours               of the first FLEX         pump.
including credit to the N+1 FLEX pump after 4 successful hours of the first FLEX pump.
* Updated                   various                 HEPs   due             to   credit from         ~2     hour             2B AF     pump                     demonstrated                               run               time during Exposure                             Period 1.     Refer to Appendix                 A   for additional     details.
* Updated various HEPs due to credit from ~2 hour 2B AF pump demonstrated run time during Exposure Period 1. Refer to Appendix A for additional details.
* Updated                     various                 HEPs   due             to   applying               a           10%   probability         that operators               fail to     manually                                       trip the unit within 30   seconds                           of a           total loss of Main             Feedwater,             as         opposed                       to   allowing           the unit to automatically trip                                                                                                                                                                                 on                     low         SG     level.
* Updated various HEPs due to applying a 10% probability that operators fail to manually trip the unit within 30 seconds of a total loss of Main Feedwater, as opposed to allowing the unit to automatically trip on low SG level.
o                                   Applied to   both             the base                   case                 and                     Exposure                             Period 2 o                                     Refer to Appendix                   A   for additional     details.
o Applied to both the base case and Exposure Period 2 o Refer to Appendix A for additional details.
3.0       Results Table                 3.0-1       below                 shows                 the results of Braidwood's                             FPIE     and                   FPRA       models           following     the refinements discussed             in   Section             2. These       models         were       quantified with average                   maintenance and                                                                                                                                                                                                                         with the 2B AF pump                       Fail to     Run                     event       set to   TRUE.                     The     exposure                             period is split up           into 2   different periods: Exposure Period 1   is the time before           September                   1 and                     Exposure                               Period 2     is the time after September                     1. There are different PRA     results before         and                   after September                 1 because                                     the 2B   AF   pump                       ran               for approximately                                   2 hours                 on                     September                   1.     Exposure                             Period 1 credits this proven                     run               time while Exposure                               Period 2   does             not.
3.0 Results Table 3.0-1 below shows the results of Braidwood's FPIE and FPRA models following the refinements discussed in Section 2. These models were quantified with average maintenance and with the 2B AF pump Fail to Run event set to TRUE. The exposure period is split up into 2 different periods: Exposure Period 1 is the time before September 1 and Exposure Period 2 is the time after September 1. There are different PRA results before and after September 1 because the 2B AF pump ran for approximately 2 hours on September 1. Exposure Period 1 credits this proven run time while Exposure Period 2 does not.


Table               3.0-1:       SOP   Results End                                                                                                                                   FPIE                                                                                                                           FPRA                                                                                                                               FPIE                                                                                                                     FPRA                                                                             Exposure                                                                                                                       Total State                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     Delta                                                                                                                           Delta                                                                                                   Time (Days)
Table 3.0-1: SOP Results End FPIE FPRA FPIE FPRA Exposure Total State Delta Delta Time (Days)
Base                                                                                                                                                                 CDF                                                                                                       7.1 E-06                                                                           2.7E-05                                                                                                             N/A                                                                                                                               N/A                                                                                                                                   N/A                                                                                                                                 N/A Case                                                                                                                                                     LERF                                                                             1.2E-07                                                                               3.3E-06                                                                                                                 N/A                                                                                                                                   N/A                                                                                                                               N/A                                                                                                                                         N/A
Base CDF 7.1 E-06 2.7E-05 N/A N/A N/A N/A Case LERF 1.2E-07 3.3E-06 N/A N/A N/A N/A


Exposure                                                                                                           CDF                                                                               1.6E-05                                                                                 3.7E-05                                                                               8.5E-06                                                                                 1.0E-05                                                                                                             105                                                                                                         5.4E-06 Period     1                                                                                 LERF                                                                           3.6E-07                                                                               4.4E-06                                                                               2.5E-07                                                                                                         1.1 E-06                                                                                                           105                                                                                                           3.9E-07
Exposure CDF 1.6E-05 3.7E-05 8.5E-06 1.0E-05 105 5.4E-06 Period 1 LERF 3.6E-07 4.4E-06 2.5E-07 1.1 E-06 105 3.9E-07


Exposure                                                                                                           CDF                                                                                 1.9E-05                                                                               5.6E-05                                                                                 1.2E-05                                                                             2.9E-05                                                                                                               22                                                                                                               2.5E-06 Period     2                                                                                   LERF                                                                         4.6E-07                                                                                 6.5E-06                                                                               3.4E-07                                                                               3.2E-06                                                                                                               22                                                                                                                                               2.1 E-07
Exposure CDF 1.9E-05 5.6E-05 1.2E-05 2.9E-05 22 2.5E-06 Period 2 LERF 4.6E-07 6.5E-06 3.4E-07 3.2E-06 22 2.1 E-07


Total                                                                                                                                                           CDF                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 127                                                                                                       7.9E-06 Exposure                                                                                                   LERF                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               127                                                                                                         6.0E-07 Period
Total CDF 127 7.9E-06 Exposure LERF 127 6.0E-07 Period


4.0     Sensitivities 4.1       FLEX           HEP Sensitivity After detailed discussions               and                     walkdowns,                                       the NRC       has           challenged             the acceptability           of deploying             the MH FLEX         pump                       to   pull suction                 from         the RWST                   to   supply           the SGs. While a           detailed human                                         error probability (HEP)       calculation                         for failing to   deploy             the MH     FLEX       pump                       has         been                     completed,               the challenge             that the NRC       has           presented   is understood.                               Therefore, the sensitivity increased               the execution                               timing for the HEP calculation.                         These     adjusted       HEPs   were       then     used             to   quantify             the FPIE     and                     FPRA       models           associated                   with Exposure                               Period 1. These       results are       summarized                                     in   Section           4.3.
4.0 Sensitivities 4.1 FLEX HEP Sensitivity After detailed discussions and walkdowns, the NRC has challenged the acceptability of deploying the MH FLEX pump to pull suction from the RWST to supply the SGs. While a detailed human error probability (HEP) calculation for failing to deploy the MH FLEX pump has been completed, the challenge that the NRC has presented is understood. Therefore, the sensitivity increased the execution timing for the HEP calculation. These adjusted HEPs were then used to quantify the FPIE and FPRA models associated with Exposure Period 1. These results are summarized in Section 4.3.


5 BW-SDP-006,                           Rev. 0
5 BW-SDP-006, Rev. 0


The   timing used         to calculate           the probability     that the operators           fail to   align the MH     FLEX       pump                     includes     5 parts:
The timing used to calculate the probability that the operators fail to align the MH FLEX pump includes 5 parts:
: 1.                                   The   length of time for operators           to   decide to     use         FLEX     per 2BwFR-H.1                 -                     19 minutes
: 1. The length of time for operators to decide to use FLEX per 2BwFR-H.1 - 19 minutes
: 2.                                   The   time to set up           the high head             FLEX       pump                   -                       132 minutes
: 2. The time to set up the high head FLEX pump - 132 minutes
: 3.                                   The   amount                                       of extra       time required to   establish procedure                 steps to   align the MH     FLEX       pump.                           Base case                 assumes                                 an                     additional 20   minutes         for this part of                                                                       the action                     and                     this is included       in the execution time.
: 3. The amount of extra time required to establish procedure steps to align the MH FLEX pump. Base case assumes an additional 20 minutes for this part of the action and this is included in the execution time.
: 4.                                   The   additional time required to   set up         the MH     FLEX       pump                   discharge   hoses       -                 23   minutes
: 4. The additional time required to set up the MH FLEX pump discharge hoses - 23 minutes
: 5.                                   The   amount                                       of time required to   depressurize the SG that will be               fed with the MH     FLEX       pump                     -                   20 minutes
: 5. The amount of time required to depressurize the SG that will be fed with the MH FLEX pump - 20 minutes


Interval 1 -           Before Operations     decides to   use           FLEX,       they   must rule                                                                               out           the use         of the AF   crosstie. This, along                   with making                   the decision   to   use           FLEX,     was                 simulated by                       the Operations     day                     shift on                       12/10/23     and was                 determined to   be               19 minutes.         This time is included       in Tcielay depicted in Table           4.1-1     as           a           20     minute value.
Interval 1 - Before Operations decides to use FLEX, they must rule out the use of the AF crosstie. This, along with making the decision to use FLEX, was simulated by the Operations day shift on 12/10/23 and was determined to be 19 minutes. This time is included in Tcielay depicted in Table 4.1-1 as a 20 minute value.


Intervals 2-4   cover             the MH     FLEX       pump                     alignment.           The     reason                       the high head             FLEX       pump                     execution timing is used               in Interval 1 is because                                   that action               was                   validated as           part of the ELAP   FLEX     strategy.
Intervals 2-4 cover the MH FLEX pump alignment. The reason the high head FLEX pump execution timing is used in Interval 1 is because that action was validated as part of the ELAP FLEX strategy.
OP-BR-102-106               Rev     015   reports this timing under               FTSA#8   as             132   minutes.         This timing reflects the high head             FLEX         pump                       pulling suction               from       the RWST.                   Interval 3 reflects the extra       time required to establish procedure                   steps to   align the MH     FLEX pump                                                                                                                                       to   the RWST.                 Sensitivity to   this assumption                                   is explored         in Table         4.1-1.       Finally, when                     aligning the MH     FLEX       pump                       to   pull suction                 from       the RWST,                 additional discharge     hose           staging is required for the pump                     to discharge into the SGs. Therefore, an                     additional 23 minutes             is included       as           Interval 4. This time was                   simulated by                     the day                       shift on                         12/10/23.
OP-BR-102-106 Rev 015 reports this timing under FTSA#8 as 132 minutes. This timing reflects the high head FLEX pump pulling suction from the RWST. Interval 3 reflects the extra time required to establish procedure steps to align the MH FLEX pump to the RWST. Sensitivity to this assumption is explored in Table 4.1-1. Finally, when aligning the MH FLEX pump to pull suction from the RWST, additional discharge hose staging is required for the pump to discharge into the SGs. Therefore, an additional 23 minutes is included as Interval 4. This time was simulated by the day shift on 12/10/23.


Interval 5 -           The     length of time to   depressurize the SGs sufficiently such               that the MH     FLEX       pump                         can inject flow                                                                                                           is accounted                                         for and                   takes 20   minutes.
Interval 5 - The length of time to depressurize the SGs sufficiently such that the MH FLEX pump can inject flow is accounted for and takes 20 minutes.


Table             4.1-1:         Differing Additional       Time     Applied Due             to     Procedural                               Complexity                             and                           AF     Pump                                 Run Times,   with Resulting   Action                   Timing           and                           HEPs In                             ut     Parameters                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               HEP Values Case                                                                                                                                                                                                   Available         Times                                                                                                                                                                                         Time     Required       to       Establish Procedure                             Steps to Ali n             Medium                     Head             FLEX           Pum AFW                                                                                                                   Tsw                                                             Tdelay                                                                             Tsw-                                                                                                                                                                       20     Min                                                                                                           30     Min                                                                                                             40     Min                                                                                                                                                         50     Min Pump                             Run                                                                         (Min)                                                             (Min)                                                                                     Tdelay Time                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Min 1.88 Hours                                                                                                 350                                                                                                                 132                                                                                                                                       218                                                                                                                                   6.3E-02 2.0   Hours                                                                                                                               365                                                                                                                 140                                                                                                                                           225                                                                                                                                 6.3E-02 3.0   Hours                                                                                                               440                                                                                                       200                                                                                                                                             240                                                                                                                                   4.7E-02 4.0   Hours                                                                                                                                 520                                                                                                     260                                                                                                                                             260                                                                                                                                       3.9E-02                                                                                                                                                                                                                                                                                           4.?E-02
Table 4.1-1: Differing Additional Time Applied Due to Procedural Complexity and AF Pump Run Times, with Resulting Action Timing and HEPs In ut Parameters HEP Values Case Available Times Time Required to Establish Procedure Steps to Ali n Medium Head FLEX Pum AFW Tsw Tdelay Tsw-20 Min 30 Min 40 Min 50 Min Pump Run (Min) (Min) Tdelay Time Min 1.88 Hours 350 132 218 6.3E-02 2.0 Hours 365 140 225 6.3E-02 3.0 Hours 440 200 240 4.7E-02 4.0 Hours 520 260 260 3.9E-02 4.?E-02
*Tree=   0;   2.2E-1     is the HEP   value         with no                   recovery.                 Tree=   0 if Tsw     is 365 minutes       and                     an                   additional 50 minutes         are used           to   determine the alignment       procedure                 implementation           steps. Note   that the MAAP runs           quoted             in   Table         4.1-3 indicate Tsw       for 2.0 hours           of AF run               time could               be           as         large as         370 minutes         and                       Tsw     for 3.0 hours           of AF run               time could                 be         as       high as         445 minutes.             The     Tsw       values       quoted             in Table         4. 1-1     are     slightly conservative.
* Tree= 0; 2.2E-1 is the HEP value with no recovery. Tree= 0 if Tsw is 365 minutes and an additional 50 minutes are used to determine the alignment procedure implementation steps. Note that the MAAP runs quoted in Table 4.1-3 indicate Tsw for 2.0 hours of AF run time could be as large as 370 minutes and Tsw for 3.0 hours of AF run time could be as high as 445 minutes. The Tsw values quoted in Table 4. 1-1 are slightly conservative.


The   sensitivity in   Table           4.1-1     adds           additional time for the assumed                               extra       time needed               to   establish procedure                     steps to   align the MH     FLEX pump                                                                                                                                 and                     shows                 the change                                     in   HEP when                     the recovery                   time is reduced.             The     HEP   naturally               increases         as         execution                             time increases         because                                     the recovery                 time is shorter, which       increases the                                                                                                                                                     dependency                                           factor. The   HEPs   based                       on                     recovery                   time available         and                     associated dependency                                           factor   are       summarized                             in Table           4.1-2.
The sensitivity in Table 4.1-1 adds additional time for the assumed extra time needed to establish procedure steps to align the MH FLEX pump and shows the change in HEP when the recovery time is reduced. The HEP naturally increases as execution time increases because the recovery time is shorter, which increases the dependency factor. The HEPs based on recovery time available and associated dependency factor are summarized in Table 4.1-2.


6 BW-SDP-006,                           Rev.       0
6 BW-SDP-006, Rev. 0


Table             4.1-2:       HEP   Based                 on                           Recovery                               Time     Available         and                         Associated                     Dependency                                                 Factor
Table 4.1-2: HEP Based on Recovery Time Available and Associated Dependency Factor


Tree (min)                                                                                                                                                                                                                                                                                                                                           Dependency                                                   Factor                                                                                                                                                                                                                                                         FLEX       HEP
Tree (min) Dependency Factor FLEX HEP
                                                                                                          > 60                                                                                                                                                                                                                                                                                                                                                                                 Zero           Dependence                                                                                                                                                                                                                                                                                                     3.9E-02
> 60 Zero Dependence 3.9E-02
                                                                      >   30   and                         up             to   60                                                                                                                                                                                                                                                                                             Low                 Dependence                                                                                                                                                                                                                                                                                                     4.7E-02
> 30 and up to 60 Low Dependence 4.7E-02
                                                                      >     15 and                       up           to   30                                                                                                                                                                                                                                                   Medium               Dependence                                                                                                                                                                                                                                                                       6.3E-02
> 15 and up to 30 Medium Dependence 6.3E-02
                                                                        >   0 and                       up             to     15                                                                                                                                                                                                                                                                                                                 High Dependence                                                                                                                                                                                                                                                                                                                         1.2E-01 0                                                                                                                                                                                                                                                                                                                                                       Complete       Dependence                                                                                                                                                                                                                                                                               2.2E-01 NeQative                                                                                                                                                                                                                                                                                                                                                                                                                                                       N/A                                                                                                                                                                                                                                                                                                                                                                                                                                                     1.0
> 0 and up to 15 High Dependence 1.2E-01 0 Complete Dependence 2.2E-01 NeQative N/A 1.0


Table             4.1-1       also         varies the amount                                     of time the 28 AF   pump                       ran.                     By             increasing           this run               time, the core           will produce                         less decay                               heat   when                     the 28 AF   pump                       fails to   run.               This lengthens   the time to   core             damage,                                     and thus   lengthens     the system         window                           time as         well as         the time available             to   deploy             the MH     FLEX         pump.
Table 4.1-1 also varies the amount of time the 28 AF pump ran. By increasing this run time, the core will produce less decay heat when the 28 AF pump fails to run. This lengthens the time to core damage, and thus lengthens the system window time as well as the time available to deploy the MH FLEX pump.
Additional recovery                   time yields lower   dependence                                 and                     lower     HEPs. System           window                           times are       determined by                   the thermal hydraulic             analysis                     in   Table           4.1-3,     which         uses         MAAP.
Additional recovery time yields lower dependence and lower HEPs. System window times are determined by the thermal hydraulic analysis in Table 4.1-3, which uses MAAP.


Table             4.1-3:       MAAP     Quantifications                   Corresponding                                       to         Differing AF       Pump                               Run                             Time
Table 4.1-3: MAAP Quantifications Corresponding to Differing AF Pump Run Time


Case                                                                                                                                                                                                 BB_506_OSG                 -                                                                                                                   BB_506_OSG                 -                                                                                                                   BB_506_OSG                 -                                                                                                                   BB_506_OSG                 -
Case BB_506_OSG - BB_506_OSG - BB_506_OSG - BB_506_OSG -
DD188               FLEX1                                                                                                                 DD200               FLEX1                                                                                                                             DD300             FLEX1                                                                                                                     DD400               FLEX1 DDAFW                                                                                                                                                                                     1.88   hours                                                                                                                                                                                                                         2   hours                                                                                                                                                                                                                                                       3 hours                                                                                                                                                                                                                                                     4   hours operation time SG   dryout                                                                                                                                                             241.4     min                                                                                                                                                                                                       250.1         min                                                                                                                                                                                                       321.3     min                                                                                                                                                                                                                   390.1       min
DD188 FLEX1 DD200 FLEX1 DD300 FLEX1 DD400 FLEX1 DDAFW 1.88 hours 2 hours 3 hours 4 hours operation time SG dryout 241.4 min 250.1 min 321.3 min 390.1 min


Core                                                                                                                                                                                                                                     309.6     min                                                                                                                                                                                       318.3       min                                                                                                                                                                                                                                 396.1     min                                                                                                                                                                                       466.9       min uncovery FLEX       start                                                                                                                             349.6     min                                                                                                                                                                                                                 370     min                                                                                                                                                                                                                           445     min                                                                                                                                                                                                                                   520   min time Peak         core                                                                                                                                                                                                                 1211     °F                                                                                                                                                                                                         1306     °F                                                                                                                                                                                                                             1255   °F                                                                                                                                                                                                                       1243   °F temperature
Core 309.6 min 318.3 min 396.1 min 466.9 min uncovery FLEX start 349.6 min 370 min 445 min 520 min time Peak core 1211 °F 1306 °F 1255 °F 1243 °F temperature


The   total system           window,                                     Tsw,         corresponds                           to   the FLEX       start time needed               to   avoid           core             damage.                                   Delay time, Tdelay,         is the 28 AF     pump                         run               time plus the time it takes operators               to   decide to   use           FLEX.         The difference between                           Tsw       and                           Tdelay         is the total amount                                       of time available         for operators                 to   complete             an                     action, or   Time     Required,   Tr. The   difference between                     total available         time and                     the time required to   execute                         is Tree, or   amount                                     of time available             for recovery.                   Figure 4.1-1         illustrates the timing definitions.
The total system window, Tsw, corresponds to the FLEX start time needed to avoid core damage. Delay time, Tdelay, is the 28 AF pump run time plus the time it takes operators to decide to use FLEX. The difference between Tsw and Tdelay is the total amount of time available for operators to complete an action, or Time Required, Tr. The difference between total available time and the time required to execute is Tree, or amount of time available for recovery. Figure 4.1-1 illustrates the timing definitions.


7 BW-SDP-006,                               Rev.         0
7 BW-SDP-006, Rev. 0


I System             Window,                                       T~w
I System Window, T~w
                                                                                                                                                                    ! Time   Required,       TR
! Time Required, TR


L R~o~ry                       time, ~]I Expected                 Performance                                   Time, ET I                                                                                                                                                                                                                                                                                                                               *'                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         i
L R~o~ry time, ~]I Expected Performance Time, ET I *' i


          ---------.....,                               1.-I ..   ----------.-                             .... -.**f----------....... -                 ... ,-                 time
---------....., 1.-I.. ----------.-.... -.**f----------....... -...,- time


t\\:c O                                                                                                                                                                                                                                                                                                                               ~\\_[~--------
t\\:c O ~\\_[~--------
Qpef.1',l,)!f' is cl.HHJ to perform action
Qpef.1',l,)!f' is cl.HHJ to perform action


                              \\ _________                                                       ,----1 -~
\\ _________,----1 -~
loitiatin~ Event Occurs                                                                                                                                                                                                                                                                           lrre(:ovenble eod             state
loitiatin~ Event Occurs lrre(:ovenble eod state


Figure 4.1-1   Timing         Criteria
Figure 4.1-1 Timing Criteria


Credit for the ~2     hour             2B   AF     pump                         run               time provides enough                                 margin                     to   credit the MH     FLEX         pump deployment.                             Additionally,   earlier in   the total exposure                               period,   the 2B   AF   pump                     demonstrated                           at   least 3.5 hours               of run               time, incrementally                     decreasing                   as         monthly                       test runs             were       completed.                 Table             4.1-4       shows                 this demonstrated                               run                 time.
Credit for the ~2 hour 2B AF pump run time provides enough margin to credit the MH FLEX pump deployment. Additionally, earlier in the total exposure period, the 2B AF pump demonstrated at least 3.5 hours of run time, incrementally decreasing as monthly test runs were completed. Table 4.1-4 shows this demonstrated run time.


Table               4.1-4:     28   AF     Pump                           Demonstrated                                   Runtime Date                                                                                                                                                                                                                                                                   Run                           Time     (Hours) 6/8/2023                                                                                                                                                                                                                                                                                                                                             0.61 7/14/2023                                                                                                                                                                                                                                                                                         0.57 8/10/2023                                                                                                                                                                                                                                                                                                 0.52 9/1/2023                                                                                                                                                                                                                                                                                                       1.88 Total                                                                                                                                                                                                                                                                                                                     3.58
Table 4.1-4: 28 AF Pump Demonstrated Runtime Date Run Time (Hours) 6/8/2023 0.61 7/14/2023 0.57 8/10/2023 0.52 9/1/2023 1.88 Total 3.58


Along             with the greater than             24   hour                   run               time from         the Detroit Diesel test, the 2B   AF     pump                       run               times currently             credited in   the analysis                   are         bounding.                                         Credit for additional           run               time could                   substantially                 influence the assumed                               boundary                                                     conditions                               in this analysis.
Along with the greater than 24 hour run time from the Detroit Diesel test, the 2B AF pump run times currently credited in the analysis are bounding. Credit for additional run time could substantially influence the assumed boundary conditions in this analysis.


On             12/10/23,         the day                   shift on                   Braidwood                             Unit       2 walked             through               a           simulated       operator               response                   of what they     would                   do           after the 2B AF     pump                     tripped after a           unit   trip, and                     the 2A AF   pump,                       FW           restoration,         and                   the AF   crosstie were         all unavailable.                                 They             recognized                   the need               to   restore SG   feed in time to   prevent   core damage                               would                     be         the major               objective     and                   the MH     FLEX       pump                       pulling suction                 from         the RWST               would                     be faster than           the using           the low         head               FLEX         pump                       pulling suction                   from         the lake to   supply             the MH     FLEX pump.                       The   crew             identified they     would                     use         the MH     FLEX         pump                       but           noted             concerns                                     due             to   supplying               the SGs with contaminated                                           RWST                 water.         They             recognized                   the Shift Manager                         would                     have             implemented                 1 O CFR       50.54(x)               which           allows         Operations             to   make                   decisions         outside       of procedures                               in   order   to   protect the health and                   safety       of the public.           One             identified strategy   was                 to   supply             the MH     FLEX         pump                     via   the fire protection           system,                 if it were       available,               which         would                       be           substantially                 quicker   than             connecting                                       the FLEX pump                     to   the RWST                 and                   would                     alleviate contamination                                                   concerns.                                       This would                     also         alleviate the need             to connect                                   the 3400'       of 5"   hose             required to   connect                                 the low       head               FLEX         pump                     drafting off of the cooling                   lake to   supply             the MH     FLEX         pump,                         should             this suction                   supply             option                 be           selected as         described               in   the
On 12/10/23, the day shift on Braidwood Unit 2 walked through a simulated operator response of what they would do after the 2B AF pump tripped after a unit trip, and the 2A AF pump, FW restoration, and the AF crosstie were all unavailable. They recognized the need to restore SG feed in time to prevent core damage would be the major objective and the MH FLEX pump pulling suction from the RWST would be faster than the using the low head FLEX pump pulling suction from the lake to supply the MH FLEX pump. The crew identified they would use the MH FLEX pump but noted concerns due to supplying the SGs with contaminated RWST water. They recognized the Shift Manager would have implemented 1 O CFR 50.54(x) which allows Operations to make decisions outside of procedures in order to protect the health and safety of the public. One identified strategy was to supply the MH FLEX pump via the fire protection system, if it were available, which would be substantially quicker than connecting the FLEX pump to the RWST and would alleviate contamination concerns. This would also alleviate the need to connect the 3400' of 5" hose required to connect the low head FLEX pump drafting off of the cooling lake to supply the MH FLEX pump, should this suction supply option be selected as described in the


8 BW-SDP-006,                       Rev. 0
8 BW-SDP-006, Rev. 0


procedure.                     However,               the crew         would                   pursue               alternate success                   paths in   parallel provided the operator resources             were     available.
procedure. However, the crew would pursue alternate success paths in parallel provided the operator resources were available.


The operations                 crews       are       made                         up           of highly trained individuals dedicated to   protecting the health and safety of the public. If the crew           lost AF,     FW             restoration, and                       the AF crosstie, they would                   not           stop attempting alternative strategies to   restore secondary                                           cooling.               While these additional operator           actions were     not           quantified in   the FPIE   and                     FPRA       models,       these operator           actions                 should           be           qualitatively considered               in tandem                       with the modeled           operator           actions.
The operations crews are made up of highly trained individuals dedicated to protecting the health and safety of the public. If the crew lost AF, FW restoration, and the AF crosstie, they would not stop attempting alternative strategies to restore secondary cooling. While these additional operator actions were not quantified in the FPIE and FPRA models, these operator actions should be qualitatively considered in tandem with the modeled operator actions.


The discussion           above                               demonstrates                 a           realistic pathway                             towards             cooling               the core               in the understood scenario.                   Operations       has         stated that by                       implementing 10 CFR   50.54(x),               they   would                   implement non proceduralized     actions               to   protect the health and                     safety of the public.     This includes   different suction sources                 for the MH     FLEX     pump,                         like the Fire Protection   header.       While the implementation       of 10 CFR 50.54(x)             does           introduce           some                     level of unpredictability in operator             response,               operators           are     trained to cool the core               in   any                             way                               possible. While they may                                 not           take the exact                 actions               discussed   in the HEP development             above,                                 they would                   take action.                 The   purpose           of this HEP sensitivity is to   bound                                         this uncertainty.                     The   sensitivity results, included         in   Section       4.3,   considers         3   HEPs for the MH     FLEX       pump HFE: 0.063     (nominal                           or     medium                   dependence,                                   as         shown                                 in Table           4.1-2),       0.3,   and                           1.0 (no                     flex credit).
The discussion above demonstrates a realistic pathway towards cooling the core in the understood scenario. Operations has stated that by implementing 10 CFR 50.54(x), they would implement non proceduralized actions to protect the health and safety of the public. This includes different suction sources for the MH FLEX pump, like the Fire Protection header. While the implementation of 10 CFR 50.54(x) does introduce some level of unpredictability in operator response, operators are trained to cool the core in any way possible. While they may not take the exact actions discussed in the HEP development above, they would take action. The purpose of this HEP sensitivity is to bound this uncertainty. The sensitivity results, included in Section 4.3, considers 3 HEPs for the MH FLEX pump HFE: 0.063 (nominal or medium dependence, as shown in Table 4.1-2), 0.3, and 1.0 (no flex credit).


4.2   28 AF     Pump                                 Failure Probability                         Sensitivity The example                       Detroit Diesel testing report shows               that the 2B   AF     pump                   would                     have           met   its PRA     mission time and                   would                     have             been                     considered           available       for the duration           of the SOP exposure                         period. However, an                     additional sensitivity, modifying   the 2B AF   pump                     failure rate, is included       to address   any                                 proposed uncertainty                       regarding the Detroit Diesel engine           testing. The   results of this sensitivity are       included       in Tables         4.3-1     through         4.3-6.
4.2 28 AF Pump Failure Probability Sensitivity The example Detroit Diesel testing report shows that the 2B AF pump would have met its PRA mission time and would have been considered available for the duration of the SOP exposure period. However, an additional sensitivity, modifying the 2B AF pump failure rate, is included to address any proposed uncertainty regarding the Detroit Diesel engine testing. The results of this sensitivity are included in Tables 4.3-1 through 4.3-6.


4.3   Sensitivity Results The tables below                 contain                         the results of several sensitivity studies. The   FLEX         HEP described in   Section 4.1       is varied from         its nominal                         value         of 0.063   to   0.3 to     1.0 (True).     Additionally, the 2B AF     pump                         FTR   value is varied from         0.1     to   0.5 to       1.0 (True).       Tables           4.3-1   and                     4.3-2   show                 the ~CDF       and                 ~LERF         values         for the FPIE   model           sensitivity results, respectively. Similarly, Tables       4.3-3   and                     4.3-4   show                 the ~CDF       and                 ~LERF values       for the FPRA     model           sensitivity results, respectively. Finally, the FPIE   and                       FPRA   results are combined                                           in Tables         4.3-5   and                     4.3-6   for ~CDF       and                   ~LERF,             respectively.
4.3 Sensitivity Results The tables below contain the results of several sensitivity studies. The FLEX HEP described in Section 4.1 is varied from its nominal value of 0.063 to 0.3 to 1.0 (True). Additionally, the 2B AF pump FTR value is varied from 0.1 to 0.5 to 1.0 (True). Tables 4.3-1 and 4.3-2 show the ~CDF and ~LERF values for the FPIE model sensitivity results, respectively. Similarly, Tables 4.3-3 and 4.3-4 show the ~CDF and ~LERF values for the FPRA model sensitivity results, respectively. Finally, the FPIE and FPRA results are combined in Tables 4.3-5 and 4.3-6 for ~CDF and ~LERF, respectively.


Due             to   the Detroit Diesel test running                       for greater than             24   hours,               the pump                           is assumed                             to   run                 for at   least 2 hours             for the duration               of the exposure                           period. Therefore, the values             in   these tables use         the Exposure Period 1 refinements for the entire 127-day                       duration.                 This is different from         the SOP calculation                         in   Table 3.0-1, which       uses         the Exposure                           Period 2   base                   over     the entire exposure                           period. The   base                   from         Exposure Period 1 was                   used           because                                       it credits the MH     FLEX       pump                     strategy and                       the demonstrated                 2B AF pump/engine                                       run                 time. This yields a           lower   base                     metric and                     therefore larger and                         more               conservative difference between                       the base                     and                       sensitivity CDF   and                         LERF.
Due to the Detroit Diesel test running for greater than 24 hours, the pump is assumed to run for at least 2 hours for the duration of the exposure period. Therefore, the values in these tables use the Exposure Period 1 refinements for the entire 127-day duration. This is different from the SOP calculation in Table 3.0-1, which uses the Exposure Period 2 base over the entire exposure period. The base from Exposure Period 1 was used because it credits the MH FLEX pump strategy and the demonstrated 2B AF pump/engine run time. This yields a lower base metric and therefore larger and more conservative difference between the base and sensitivity CDF and LERF.


Appendix             C   provides   additional detail for the sensitivity calculations.
Appendix C provides additional detail for the sensitivity calculations.


9 BW-SDP-006,                         Rev. 0
9 BW-SDP-006, Rev. 0


Table             4.3-1       FPIE   LiCDF Sensitivities FLEX       HEP 0.063                                                                                                                           0.3                                                                                                                                                                     TRUE 2BAF                                                                                                                         0.1                                                                                   2.?E-07                                                                             3.6E-07                                                                                       4.8E-07 Pump                                                                                                                                   0.5                                                                                 1.6E-06                                                                             1.8E-06                                                                                       2.0E-06 Failure                                                                               TRUE Probability                                                                                                                                                                         3.2E-06                                                                             3.5E-06                                                                                         4.0E-06
Table 4.3-1 FPIE LiCDF Sensitivities FLEX HEP 0.063 0.3 TRUE 2BAF 0.1 2.?E-07 3.6E-07 4.8E-07 Pump 0.5 1.6E-06 1.8E-06 2.0E-06 Failure TRUE Probability 3.2E-06 3.5E-06 4.0E-06


Table           4.3-2     FPIE LiLERF Sensitivities FLEX       HEP 0.063                                                                                                                           0.3                                                                                                                                                                     TRUE 2BAF                                                                                                                               0.1                                                                                 7.?E-09                                                                             9.9E-09                                                                                             1.3E-08 Pump                                                                                                                                       0.5                                                                             4.6E-08                                                                                 5.1E-08                                                                                           5.8E-08 Failure                                                                                   TRUE Probability                                                                                                                                                                           9.3E-08                                                                                 1.0E-07                                                                                                               1.1 E-07
Table 4.3-2 FPIE LiLERF Sensitivities FLEX HEP 0.063 0.3 TRUE 2BAF 0.1 7.?E-09 9.9E-09 1.3E-08 Pump 0.5 4.6E-08 5.1E-08 5.8E-08 Failure TRUE Probability 9.3E-08 1.0E-07 1.1 E-07


Table           4.3-3     FIRE   LiCDF Sensitivities FLEX       HEP 0.063                                                                                                                             0.3                                                                                                                                                                     TRUE 2BAF                                                                                                                           0.1                                                                                   4.2E-07                                                                                 7.3E-07                                                                                             1.3E-06 Pump                                                                                                                             0.5                                                                                 2.2E-06                                                                               3.3E-06                                                                                           5.2E-06 Failure                                                                               TRUE Probability                                                                                                                                                                     4.0E-06                                                                                 6.2E-06                                                                                         9.6E-06
Table 4.3-3 FIRE LiCDF Sensitivities FLEX HEP 0.063 0.3 TRUE 2BAF 0.1 4.2E-07 7.3E-07 1.3E-06 Pump 0.5 2.2E-06 3.3E-06 5.2E-06 Failure TRUE Probability 4.0E-06 6.2E-06 9.6E-06


Table           4.3-4       FIRE   b.LERF               Sensitivities FLEX         HEP 0.063                                                                                                                             0.3                                                                                                                                                                     TRUE 2BAF                                                                                                                           0.1                                                                                 4.5E-08                                                                                 7.3E-08                                                                                               1.3E-07 Pump                                                                                                                                   0.5                                                                               2.3E-07                                                                                 3.2E-07                                                                                           5.0E-07 Failure                                                                             TRUE Probability                                                                                                                                                                     4.3E-07                                                                                 6.3E-07                                                                                             9.3E-07
Table 4.3-4 FIRE b.LERF Sensitivities FLEX HEP 0.063 0.3 TRUE 2BAF 0.1 4.5E-08 7.3E-08 1.3E-07 Pump 0.5 2.3E-07 3.2E-07 5.0E-07 Failure TRUE Probability 4.3E-07 6.3E-07 9.3E-07


10 BW-SDP-006,                         Rev. 0
10 BW-SDP-006, Rev. 0


Table             4.3-5   TOTAL   LiCDF Sensitivities FLEX         HEP 0.063                                                                                                   0.3                                                                                                                                                                           TRUE 28AF                                                                                                                               0.1                                                                                               6.9E-07                                                                               1.1 E-06                                                                                                 1.SE-06 Pump                                                                                                                                       0.5                                                                                             3.?E-06                                                             5.0E-06                                                                                               7.2E-06 Failure                                                                                 TRUE Probability                                                                                                                                                                                           7.2E-06                                                             9.?E-06                                                                                             1.4E-05
Table 4.3-5 TOTAL LiCDF Sensitivities FLEX HEP 0.063 0.3 TRUE 28AF 0.1 6.9E-07 1.1 E-06 1.SE-06 Pump 0.5 3.?E-06 5.0E-06 7.2E-06 Failure TRUE Probability 7.2E-06 9.?E-06 1.4E-05


Table           4.3-6     TOTAL   LiLERF Sensitivities FLEX         HEP 0.063                                                                                                   0.3                                                                                                                                                                           TRUE 28AF                                                                                                                                 0.1                                                                                                 5.3E-08                                                             8.3E-08                                                                                                 1.5E-07 Pump                                                                                                                                       0.5                                                                                             2.?E-07                                                             3.?E-07                                                                                               5.6E-07 Failure                                                                                   TRUE Probability                                                                                                                                                                                           5.3E-07                                                             7.3E-07                                                                                                 1.0E-06
Table 4.3-6 TOTAL LiLERF Sensitivities FLEX HEP 0.063 0.3 TRUE 28AF 0.1 5.3E-08 8.3E-08 1.5E-07 Pump 0.5 2.?E-07 3.?E-07 5.6E-07 Failure TRUE Probability 5.3E-07 7.3E-07 1.0E-06


4.4   Impact                                 from                   External                   Events The   NRC     provided 3 tiCDF data             points for their external,       high winds       and                     seismic contributions                       to   the SDP determination:         9.5E-7,   6.5E-7,     and                         5E-7. These values         are       highlighted in Table         4.4-1. 9.5E-7     is the base case,                   and                       then   the NRC     provided a           sensitivity with the FLEX       HEP set to   0.063   and                       0.5   for the 2B AF pump                         FTR     value.               In               lieu of trying to   reproduce                 the modifications   that were     made                       to   the SPAR     model,             an extrapolation                     is performed. The   first step was                   to extrapolate         to   the   top right value           first. Then,             the other values           are     derived after assigning     their FLEX     sensitivity to   the bottom                       left as           an                     anchor                                   point.
4.4 Impact from External Events The NRC provided 3 tiCDF data points for their external, high winds and seismic contributions to the SDP determination: 9.5E-7, 6.5E-7, and 5E-7. These values are highlighted in Table 4.4-1. 9.5E-7 is the base case, and then the NRC provided a sensitivity with the FLEX HEP set to 0.063 and 0.5 for the 2B AF pump FTR value. In lieu of trying to reproduce the modifications that were made to the SPAR model, an extrapolation is performed. The first step was to extrapolate to the top right value first. Then, the other values are derived after assigning their FLEX sensitivity to the bottom left as an anchor point.


T               bl                       4 4       1 LiCDF a                     e                                                                           -                                                                                                                                                                                                     ue                         o                                       eIsmIc,                                                     IQ                                                                     In                             s,     an           dT                                                                         d d                                           t                         S   .                                         .                                   H.               h w*           d orna                                     oes FLEX         HEP 0.063                                                                                                       0.3                                                                                                                                                       TRUE 28 AF   Pump                                                                                                                                                                       0.1                                                                                               2.2E-07                                                               2.?E-07                                                                                           4.1 E-07 Failure Probability                                   0.5                                                                                             3.4E-07                                                               4.3E-07                                                                           6.5E-07 TRUE                                                             5.0E-07                                                               6.3E-07                                                                             9.5E-07
T bl 4 4 1 LiCDF a e - ue o eIsmIc, IQ In s, an dT d d t S.. H. h w* d orna oes FLEX HEP 0.063 0.3 TRUE 28 AF Pump 0.1 2.2E-07 2.?E-07 4.1 E-07 Failure Probability 0.5 3.4E-07 4.3E-07 6.5E-07 TRUE 5.0E-07 6.3E-07 9.5E-07


Adding     these extrapolated         results to   Table         4.3-5     leads to the following:
Adding these extrapolated results to Table 4.3-5 leads to the following:


T                 bl                       4 4     2 T           t   I LiCDF .                             I         d.                                                 S             . a                       e                                                                           -                                             oa                                                                                                                                               , inc     u                           InQ                                   eIsmIc,                                                       IQ                                                                       In                           s,       an H.               hW.                             d                                                                 dT                                                                           d orna                                         oes FLEX       HEP 0.063                                                                                                             0.3                                                                                                                                                                       TRUE 28 AF   Pump                       Failure                                                                                                               0.1                                                                                                                                                                             9.1 E-7                                                                                     1.4E-6                                                                                                           2.2E-6 Probability                                                                                                                                                                                                                                                                                   0.5                                                                                                                                                                       4.1 E-6                                                                                 5.5E-6                                                                                                               7.9E-6 TRUE                                                                                                           7.7E-6                                                                                       1.0E-5                                                                                                                 1.5E-5
T bl 4 4 2 T t I LiCDF. I d. S. a e - oa, inc u InQ eIsmIc, IQ In s, an H. hW. d dT d orna oes FLEX HEP 0.063 0.3 TRUE 28 AF Pump Failure 0.1 9.1 E-7 1.4E-6 2.2E-6 Probability 0.5 4.1 E-6 5.5E-6 7.9E-6 TRUE 7.7E-6 1.0E-5 1.5E-5


4.5   Additional         Sensitivity An             additional sensitivity is included       in   Table           4.5-1   that shows                 the LiCDF and                     LiLERF representing the 2B AF     pump                       FTR     probability   set to   0.053   (twice the nominal                             failure probability) and                           no                         MH     FLEX       pump credit. Since     there is no                         MH     FLEX       pump                       credit, the Exposure                           Period 2 base                       is used             in   the LiCDF and LiLERF calculations,                     which       is more               appropriate for this sensitivity case.                 Only         the case                   in which     FLEX       is not           credited is performed,   because                                     these results bound                                         any                                 case               that credits FLEX.       The LiCDF for Seismic, High Winds,             and                     Tornadoes                                       uses       the same                   extrapolation                 methodology                               described   in   Section     4.4.
4.5 Additional Sensitivity An additional sensitivity is included in Table 4.5-1 that shows the LiCDF and LiLERF representing the 2B AF pump FTR probability set to 0.053 (twice the nominal failure probability) and no MH FLEX pump credit. Since there is no MH FLEX pump credit, the Exposure Period 2 base is used in the LiCDF and LiLERF calculations, which is more appropriate for this sensitivity case. Only the case in which FLEX is not credited is performed, because these results bound any case that credits FLEX. The LiCDF for Seismic, High Winds, and Tornadoes uses the same extrapolation methodology described in Section 4.4.
yielding a         conservative             addition of 3.SE-07 to   the total shown                                   in Table           4.5-1.
yielding a conservative addition of 3.SE-07 to the total shown in Table 4.5-1.


11 BW-SDP-006,                       Rev. 0
11 BW-SDP-006, Rev. 0


Appendix             C provides additional detail for the sensitivity calculations.
Appendix C provides additional detail for the sensitivity calculations.


T               bl                       4   5     1 AddT                                                     IS                                                       T                 *t     R a                     e                                                                   -                                                                                                                   11ona ens1                 IVl[Y                                                                                                                   It esu                     s FPIE                                                                                                                     FIRE                                                                                                               Seismic, High Winds,                                                 Total and                       Tornadoes LlCDF                                                           9.0E-08                                                                       3.SE-07                                                           3.8E-07                                                                                                                                                                                                                                                                           8.2E-07 LlLERF                                           2.0E-09                                                                 3.8E-08                                                               N/A                                                                                                                                                                                                                                                                                                                                       4.0E-08
T bl 4 5 1 AddT IS T *t R a e - 11ona ens1 IVl[Y It esu s FPIE FIRE Seismic, High Winds, Total and Tornadoes LlCDF 9.0E-08 3.SE-07 3.8E-07 8.2E-07 LlLERF 2.0E-09 3.8E-08 N/A 4.0E-08


4.6     Key                   Conservatisms There are     conservatisms                     included       in this analysis               that should           be           considered           for impacts     on                         results. On 2/8/24,   an                       Operations       crew         was                   put   in   a             loss of feedwater scenario                       in the control             room                       simulator   to validate the timing used           in the FLEX       HEP calculation.                       The   scenario                   consisted     of a           total loss of feedwater and                     failure of AF     pumps                     to   start. Operations     responded                   to   the loss of feedwater by                       tripping the unit and entering the Loss       of Heat Sink procedure                 after failing to   restart the AF     pumps.                   They             simulated sending           an equipment           operator               to   open                     the AF   crosstie valves, and                       then   attempted to   restart Feedwater     and Condensate/Condensate                                                                 Booster     pumps.                   After those strategies failed, the simulated equipment           operator reported back                       that the AF crosstie valves could                 not             be             opened.                     The   control           room                         responded                   by                     entering FSG-3 and                     directing equipment           operators           to   begin         aligning the MH     FLEX       pump.
4.6 Key Conservatisms There are conservatisms included in this analysis that should be considered for impacts on results. On 2/8/24, an Operations crew was put in a loss of feedwater scenario in the control room simulator to validate the timing used in the FLEX HEP calculation. The scenario consisted of a total loss of feedwater and failure of AF pumps to start. Operations responded to the loss of feedwater by tripping the unit and entering the Loss of Heat Sink procedure after failing to restart the AF pumps. They simulated sending an equipment operator to open the AF crosstie valves, and then attempted to restart Feedwater and Condensate/Condensate Booster pumps. After those strategies failed, the simulated equipment operator reported back that the AF crosstie valves could not be opened. The control room responded by entering FSG-3 and directing equipment operators to begin aligning the MH FLEX pump.


In           summary,                                           the operators         took             13   minutes         from     the LOFW               to   trip the unit, navigate           emergency                                 operating procedures,                 and                       finally, direct equipment             operators           to   align the MH     FLEX       pump                     for SG   feed flow. The fully developed     HEP   assumes                           the operators         take 20   minutes         to   arrive at this decision,   which       is conservative.
In summary, the operators took 13 minutes from the LOFW to trip the unit, navigate emergency operating procedures, and finally, direct equipment operators to align the MH FLEX pump for SG feed flow. The fully developed HEP assumes the operators take 20 minutes to arrive at this decision, which is conservative.


Additionally, operators             in the control             room                         simulator   had             to   execute                   post-trip actions                   in   parallel with the AF   failure and                         had             the added             stress of using         multiple procedures               simultaneously.                               In             the modeled scenario,                   the 2B   AF   pump                       provides SG   feed flow for approximately                         2   hours             after the unit trip. In             those 2 hours,             operators           would                   have           completed         the post-trip actions               and                     stabilized the unit. This is an                       additional conservatism                   because                                           in   the control             room                         simulator,   the operators             had             to   respond                 to   the unit trip and                       the loss of heat sink simultaneously.
Additionally, operators in the control room simulator had to execute post-trip actions in parallel with the AF failure and had the added stress of using multiple procedures simultaneously. In the modeled scenario, the 2B AF pump provides SG feed flow for approximately 2 hours after the unit trip. In those 2 hours, operators would have completed the post-trip actions and stabilized the unit. This is an additional conservatism because in the control room simulator, the operators had to respond to the unit trip and the loss of heat sink simultaneously.


Finally, by                     the time the 2B AF   pump                         is assumed                                 to   trip at ~2     hours             after the unit trip, additional Operations personnel           would                     have             reported to   the station per administrative procedures                     in   response             to   the plant trip.
Finally, by the time the 2B AF pump is assumed to trip at ~2 hours after the unit trip, additional Operations personnel would have reported to the station per administrative procedures in response to the plant trip.
These personnel,             who                       are       not           credited in the FLEX       HEP calculation,                     would                       be           available       to assist in   the decision   making                   or   execution   tasks                       for the MH     FLEX       pump                     alignment.
These personnel, who are not credited in the FLEX HEP calculation, would be available to assist in the decision making or execution tasks for the MH FLEX pump alignment.


5.0   Conclusions The   results of this analysis                 provide an                     overview   of the impact     of crediting FLEX       and                       the Detroit Diesel testing for the SOP evaluation.
5.0 Conclusions The results of this analysis provide an overview of the impact of crediting FLEX and the Detroit Diesel testing for the SOP evaluation.


The sensitivity results show                 that a           FLEX       HEP of 0.3   or     setting the 2B AF   pump                       fail to   run                 probability to   0.5 would                 yield no                   greater than             a         White finding. Considering   the Detroit Diesel test ran                 for over     24   hours,                 it is reasonable                                 to conclude                                 that the 2B AF   pump                     would                     have               run               for longer     than             the assumed                             ~2hours.
The sensitivity results show that a FLEX HEP of 0.3 or setting the 2B AF pump fail to run probability to 0.5 would yield no greater than a White finding. Considering the Detroit Diesel test ran for over 24 hours, it is reasonable to conclude that the 2B AF pump would have run for longer than the assumed ~2hours.
Additionally, the operator           simulation       discussed     in   Section       4.6   provides high confidence                       that the FLEX strategy can                               be             implemented.
Additionally, the operator simulation discussed in Section 4.6 provides high confidence that the FLEX strategy can be implemented.


Additional model         conservatisms                   have           also           been                       identified that could                   lead to additional reductions             in   the calculated             risk for the Detailed Risk Evaluation,                   which       are     detailed in Appendix               B.
Additional model conservatisms have also been identified that could lead to additional reductions in the calculated risk for the Detailed Risk Evaluation, which are detailed in Appendix B.


12 BW-SDP-006,                   Rev. 0
12 BW-SDP-006, Rev. 0


6.0   References
6.0 References
: 1.                             4101-0031-RPT-001           Revision 0,       "Test Report and                         Past Operability Evaluation                     Braidwood                         AF Diesel Drive Test with Lube                         Oil Diluted by                       Fuel Oil". January                                             2024
: 1. 4101-0031-RPT-001 Revision 0, "Test Report and Past Operability Evaluation Braidwood AF Diesel Drive Test with Lube Oil Diluted by Fuel Oil". January 2024
: 2.                                   NRC   Inspection               Manual                             Chapter 0609 Appendix               A,     "The   Significance   Determination       Process       for Findings At-Power".       January                                                 2021.
: 2. NRC Inspection Manual Chapter 0609 Appendix A, "The Significance Determination Process for Findings At-Power". January 2021.


13 d   FPRA       HEP   Changes
13 d FPRA HEP Changes
  )   edits made                     to   the FPIE   and                       FPRA     models         for SOP   quantifications.       HFEs ending               in   "-F" signify FPRA     HFEs, which       have
  ) edits made to the FPIE and FPRA models for SOP quantifications. HFEs ending in "-F" signify FPRA HFEs, which have
:p1E version.
:p1E version.


HEP   EDITS   MADE   SINCE   2022   BBW                   FPIE   UPDATE
HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE


HFE   Description                                                                                                                                                                                 HEPs                                                                                     Update 1.30.2024                                                                           2022 Edits HEPs OPERATORS             FAIL TO   CLOSE                                                                                                           2.8E-02                                                                             3.8E-02 The   execution                           time for the AF   crosstie (13   minutes)         was OPPOSITE           UNIT           AF0005       VALVES                                                                                                   entered   by                   mistake. The   applicable         execution                         time is 6 LOCALLY           (LOFW)                                                                                                                                   minutes.           This is the time to   close     the AF005s       locally   per operator               interviews conducted                                 at   Byron                             in May                 2009.
HFE Description HEPs Update 1.30.2024 2022 Edits HEPs OPERATORS FAIL TO CLOSE 2.8E-02 3.8E-02 The execution time for the AF crosstie (13 minutes) was OPPOSITE UNIT AF0005 VALVES entered by mistake. The applicable execution time is 6 LOCALLY (LOFW) minutes. This is the time to close the AF005s locally per operator interviews conducted at Byron in May 2009.
OPERATOR             FAILS   TO XTIE                                                                                                                                                 3.5E-03                                                                                           #N/A This is a         new               action               developed       to   replace     the original TRAIN     A or     B   DC   BUS               POWER                                                                                                   action                 0DC-12-XTIE-HDCOA,                     OPERATOR             FAILS TO FROM     OPPOSITE           UNIT               (NON-                                                                                                     XTIE     TRAIN           B DC     BUS               POWER                 FROM       OPPOSITE ELAP)                                                                                                                                                     UNIT,               which       was               developed     for ELAP   scenarios.
OPERATOR FAILS TO XTIE 3.5E-03 #N/A This is a new action developed to replace the original TRAIN A or B DC BUS POWER action 0DC-12-XTIE-HDCOA, OPERATOR FAILS TO FROM OPPOSITE UNIT (NON-XTIE TRAIN B DC BUS POWER FROM OPPOSITE ELAP) UNIT, which was developed for ELAP scenarios.
OPERATORS               FAIL TO   RESTORE                                                                           1.3E-03                                                                             1.6E-03 Removed                           an                   execution                         subtask               found                       to   be           non-critical.
OPERATORS FAIL TO RESTORE 1.3E-03 1.6E-03 Removed an execution subtask found to be non-critical.
LEVEL             TO   SX   TOWER                   BASIN                                                                                               The     action                 originally included       BOP   SX-12         Step F.1.c     to (BYRON           ONLY)                                                                                                                                   "VERIFY/OPEN                           0SX158A/B           or     0SX157A/B,                 Essential Service Water           Basin         Inlet Valve."           This subtask                 was removed                   as         the SX     CT System           Notebook                               (BB-PRA-005.018         R3)     states, "The     basin                 makeup                             valves   (0SX157A
LEVEL TO SX TOWER BASIN The action originally included BOP SX-12 Step F.1.c to (BYRON ONLY) "VERIFY/OPEN 0SX158A/B or 0SX157A/B, Essential Service Water Basin Inlet Valve." This subtask was removed as the SX CT System Notebook (BB-PRA-005.018 R3) states, "The basin makeup valves (0SX157A
                                                                                                                                                                                &   B,     0SX158A           &   B)   are     assumed                           to   be           normally                     open,                   do not           need             to   change                           position, and                 therefore are     not modeled.
& B, 0SX158A & B) are assumed to be normally open, do not need to change position, and therefore are not modeled.
OPS   FAILS     TO   TRIP       RCP     TO                                                                                                                                                             2.1 E-02                                                                     2.9E-02       1 Corrected     execution                           time, Texe,         from         an                   overly PROTECT         SD   SEALS       -         NO   SEAL                                                                                                   conservative                   5 minutes           to   2   minutes           based                         on COOLING                                                                                                                                                   Operations           input collected on                 1.2.2024         during     the BW2 AF   SOP   effort.
OPS FAILS TO TRIP RCP TO 2.1 E-02 2.9E-02 1 Corrected execution time, Texe, from an overly PROTECT SD SEALS - NO SEAL conservative 5 minutes to 2 minutes based on COOLING Operations input collected on 1.2.2024 during the BW2 AF SOP effort.
OPS     FAILS   TO   TRIP       RCP     TO                                                                                                                                                             2.1 E-03                                                   2.2E-03     2 Corrected     execution                         time, Texe,           from       an                   overly PROTECT         NON-SD         SEALS     -         NO                                                                                                 conservative                   5 minutes           to   2   minutes           based                         on SEAL   COOLING                                                                                                                                           Operations           input collected on                   1.2.2024       during     the BW2 AF   SOP   effort.
OPS FAILS TO TRIP RCP TO 2.1 E-03 2.2E-03 2 Corrected execution time, Texe, from an overly PROTECT NON-SD SEALS - NO conservative 5 minutes to 2 minutes based on SEAL COOLING Operations input collected on 1.2.2024 during the BW2 AF SOP effort.


node!                     update             HEP   value           was                     used         for the FPIE   SOP quantification.
node! update HEP value was used for the FPIE SOP quantification.
nodel           update             HEP   value           was                     used         for the FPIE   SOP   quantification.
nodel update HEP value was used for the FPIE SOP quantification.


14 HEP   EDITS     MADE     SINCE   2022   BBW                   FPIE   UPDATE
14 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE


HFE   Description                                                                                                                                                                                               HEPs                                                                                   Update                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Edits 1.30.2024                                                                           2022 HEPs OPERATORS       FAIL TO   STOP   RH                                                                                       2.3E-03                                                                             6.0E-03                                                             Edited CBOTM element   Pee, "Skip a           Step in   Procedure",
HFE Description HEPs Update Edits 1.30.2024 2022 HEPs OPERATORS FAIL TO STOP RH 2.3E-03 6.0E-03 Edited CBOTM element Pee, "Skip a Step in Procedure",
PUMPS                 (TRANSIENT)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           to endstate   "h". The   step was               originally treated as 2.6E-03                                                                                                                                                                                                                                                               "hidden"   (i.e., endstate   "i"), which       is considered           overly conservative.
PUMPS (TRANSIENT) to endstate "h". The step was originally treated as 2.6E-03 "hidden" (i.e., endstate "i"), which is considered overly conservative.
Current   Pee entry:
Current Pee entry:
                                                                                                                                                                                                                                -       The   Note located       prior to   Step 25 in   FRH1     specifically states that the RH       pumps                   should         not           be             run             longer     than 2.4   hours           without CC   flow applied to   the RH       HX.       (Not treated as         "hidden".)
- The Note located prior to Step 25 in FRH1 specifically states that the RH pumps should not be run longer than 2.4 hours without CC flow applied to the RH HX. (Not treated as "hidden".)
                                                                                                                                                                                                                              -       The   crew         is possibly       in more             than             one                   procedure, depending             on                   the given scenario.                   ("Multiple" procedures selected.)
- The crew is possibly in more than one procedure, depending on the given scenario. ("Multiple" procedures selected.)
                                                                                                                                                                                                                              -         While the direction is located     within a           Note with a border,         it is not         considered           to   be           graphically distinct.
- While the direction is located within a Note with a border, it is not considered to be graphically distinct.
                                                                                                                                                                                                                              -While the BBW             operators         use       the circle/slash method           of placekeeping     and                   this method           satisfies the requirements of Constellation procedure                 HU-AA-104-101,                     because                                 the 2.4-hour                 direction is located       in a         Note   and                       in   not             in a procedure                 step, no                   credit is taken           for placekeeping     aids.
-While the BBW operators use the circle/slash method of placekeeping and this method satisfies the requirements of Constellation procedure HU-AA-104-101, because the 2.4-hour direction is located in a Note and in not in a procedure step, no credit is taken for placekeeping aids.
OPERATORS       FAIL TO     REFILL                                                                                                                       1.4E-04                                                                           6.9E-04                                                             1 AF01 PB-FO-HXVOA-F                         is for refilling the OOAF fuel oil OOAFP FUEL               OIL DAY   TANK                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     supply       for the non-SOP                             unit (Unit       1). While there is FROM   STORAGE     TANK                                                                                                                                                                                                     5.7E-04   3                                                                           5.7E-03                                                           sufficient time to   support     the feasibility for TSC   activation
OPERATORS FAIL TO REFILL 1.4E-04 6.9E-04 1 AF01 PB-FO-HXVOA-F is for refilling the OOAF fuel oil OOAFP FUEL OIL DAY TANK supply for the non-SOP unit (Unit 1). While there is FROM STORAGE TANK 5.7E-04 3 5.7E-03 sufficient time to support the feasibility for TSC activation
("ERF     Review" in the HRAC),   TSC   recovery               credit was not         applied in the baseline       HEP calc           as           an                 Alert was                 not assured           for every       scenario                     in which     this action                 is credited. TSC   activation         is justified and                   applied in the SOP scenario.
("ERF Review" in the HRAC), TSC recovery credit was not applied in the baseline HEP calc as an Alert was not assured for every scenario in which this action is credited. TSC activation is justified and applied in the SOP scenario.


,.5E-04 was                     used             in   FPRA       quantification.
,.5E-04 was used in FPRA quantification.


15 HEP EDITS     MADE     SINCE   2022   BBW                 FPIE   UPDATE
15 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE


HFE   Description                                                                                                                                                                                         HEPs                                                                                   Update                                                                                                                                                                                                                                                                                                                                                                                                                                                     Edits 1.30.2024                                                                           2022 HEPs SOP   INTERVAL                     1   HEP   EDITS p                                                                                                     OPERATORS         FAIL TO ALIGN                                                                                                                                 6.3E-02                                                                                                                       N/A                                                                               This action               was               developed     to   reflect use       of the MH   FLEX FLEX       PUMP                 FOR   SG                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   pump                   taking suction                 on                   the RWST             for the SDP-1 INVENTORY                     MAKEUP                 (GIVEN                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     exposure                         period. This baseline       version   adds           an 1.88   HR AF   SUCCESS,                   EXEC                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     additional 20   minutes         to the execution                         time for ONLY)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 communication                                                         between                   the operators           executing                 the alignment           and                   shift Operations     management                                                   as       the execution                           procedures                 do           not         exactly                 match               the non-ELAP     scenario                   and                     step omissions will                                                                                                                                               be           needed.
HFE Description HEPs Update Edits 1.30.2024 2022 HEPs SOP INTERVAL 1 HEP EDITS p OPERATORS FAIL TO ALIGN 6.3E-02 N/A This action was developed to reflect use of the MH FLEX FLEX PUMP FOR SG pump taking suction on the RWST for the SDP-1 INVENTORY MAKEUP (GIVEN exposure period. This baseline version adds an 1.88 HR AF SUCCESS, EXEC additional 20 minutes to the execution time for ONLY) communication between the operators executing the alignment and shift Operations management as the execution procedures do not exactly match the non-ELAP scenario and step omissions will be needed.
Given the cue               timing, the same                   HEP   applies for FPIE   and Fire.
Given the cue timing, the same HEP applies for FPIE and Fire.
OPERATORS         FAIL TO   CLOSE                                                                                                                     1.4E-03                                                                                                               N/A                                                                                                 Tsw:       With AF   success               for 1.88   hours,             reestablishing SG OPPOSITE       UNIT           AF0005     VALVES                                                                                                                                                                                                                                                                                                                                                                                                                                                                     feed by                   the 349.6   minute         (5.83   hours)             point allows LOCALLY         (1.88   HR AF                                                                                                                                                                                                                             2.2E-03                                                                                                                                                                                                                                                 avoidance                               of core           damage                           per MAAP   run credit)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 BB_506_OSG_DD188_FLEXh.                                                     This is past SG   dryout                 as allowed           by                 2BwFR-H         .1     Attachment             B and                   supported         by multiple operator           interviews.
OPERATORS FAIL TO CLOSE 1.4E-03 N/A Tsw: With AF success for 1.88 hours, reestablishing SG OPPOSITE UNIT AF0005 VALVES feed by the 349.6 minute (5.83 hours) point allows LOCALLY (1.88 HR AF 2.2E-03 avoidance of core damage per MAAP run credit)_SDP BB_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
OPERATORS         FAIL TO   EXECUTE                                                                                           2.5E-03                                                                                                                 N/A                                                                                                 Tsw:       With AF   success                 for 1.88   hours,             reestablishing SG AF   CROSSTIE         FROM     OPPOSITE                                                                                                                                                                                                                                                                                                                                                                                                                                                       feed by                 the 349.6   minute         (5.83   hours)             point allows UNIT               (EXE       ONLY;     1.88   HR AF                                                                                                                         2.?E-03                                                                                                                                                                                                                                               avoidance                               of core           damage                           per MAAP   run credit)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   BB_506_OSG_DD188_FLEXh.                                                   This is past SG   dryout                 as allowed           by                 2BwFR-H.1             Attachment           Band                       supported         by multiple operator           interviews.
OPERATORS FAIL TO EXECUTE 2.5E-03 N/A Tsw: With AF success for 1.88 hours, reestablishing SG AF CROSSTIE FROM OPPOSITE feed by the 349.6 minute (5.83 hours) point allows UNIT (EXE ONLY; 1.88 HR AF 2.?E-03 avoidance of core damage per MAAP run credit)_SDP BB_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 2BwFR-H.1 Attachment Band supported by multiple operator interviews.
FIRE     -         OPERATORS         FAIL TO                                                                                                                               6.?E-03                                                                                                         N/A                                                                                                 Tsw:       With AF   success               for 1.88   hours,               reestablishing SG OPEN AF005     VALVES                         (LOCALLY                                                                                                                                                                                                                                                                                                                                                                                                                                                               feed by                   the 349.6   minute           (5.83   hours)               point allows FAIL AIR;     LOFW             w         1.88   HR AF                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   avoidance                               of core           damage                           per MAAP   run credit)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   BB_506_OSG_DD188_FLEXh.                                                     This is past SG   dryout                 as allowed           by                 2BwFR-H.1             Attachment             B and                   supported         by multiple operator           interviews.
FIRE - OPERATORS FAIL TO 6.?E-03 N/A Tsw: With AF success for 1.88 hours, reestablishing SG OPEN AF005 VALVES (LOCALLY feed by the 349.6 minute (5.83 hours) point allows FAIL AIR; LOFW w 1.88 HR AF avoidance of core damage per MAAP run credit)_SDP BB_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
OPERATOR           FAILS TO   START                                                                                                                         1.8E-03                                                                                                         N/A                                                                                                 Tsw:       With AF   success               for 1.88   hours,               reestablishing SG MOTOR-DRIVEN                   AFW             PUMP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           feed by                 the 349.6   minute         (5.83   hours)             point allows AFTER       FAILURE                       OF     DC     (1.88     HR                                                                   5.2E-02                                                                                                                                                                                                                                                 avoidance                               of core           damage                             per MAAP   run AF   credit)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             BB_506_OSG_DD188_FLEXh. This                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   is past SG   dryout                 as allowed           by                 2BwFR-H         .1       Attachment             B and                   supported       by multiple operator           interviews.
OPERATOR FAILS TO START 1.8E-03 N/A Tsw: With AF success for 1.88 hours, reestablishing SG MOTOR-DRIVEN AFW PUMP feed by the 349.6 minute (5.83 hours) point allows AFTER FAILURE OF DC (1.88 HR 5.2E-02 avoidance of core damage per MAAP run AF credit)_SDP BB_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.


16 HEP   EDITS   MADE     SINCE     2022   BBW                   FPIE   UPDATE
16 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE


HFE     Description                                                                                                                                                                             HEPs                                                                                     Update                                                                                                                                                                                                                                                                                                                                                                                                                                                               Edits 1.30.2024                                                                             2022 HEPs OPERATORS         FAIL TO   LOCALLY                                                                                   2.3E-03                                                                                                               N/A                                                                                                 Tsw:     With AF   success               for 1.88 hours,             reestablishing SG START   8 AUXILIARY                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       feed by                 the 349.6   minute         (5.83 hours)             point allows FEEDWATER                   PUMP                 (1.88   HR AF                                                                                                                                                                                                                                                                                                                                                                                                                                                 avoidance                               of core           damage                             per MAAP   run credit)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           88_506_OSG_DD188_FLEXh.                                                     This is past SG   dryout               as allowed         by                   28wFR-H.1               Attachment           8   and                   supported       by multiple operator           interviews.
HFE Description HEPs Update Edits 1.30.2024 2022 HEPs OPERATORS FAIL TO LOCALLY 2.3E-03 N/A Tsw: With AF success for 1.88 hours, reestablishing SG START 8 AUXILIARY feed by the 349.6 minute (5.83 hours) point allows FEEDWATER PUMP (1.88 HR AF avoidance of core damage per MAAP run credit)_SDP 88_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 28wFR-H.1 Attachment 8 and supported by multiple operator interviews.
OPERATORS         FAIL TO   MANUALLY                                                                       5.4E-04                                                                                                               N/A                                                                                                 Tsw:     With AF   success               for 1.88 hours,             reestablishing SG START AF     PUMPS                   FROM     CR                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             feed by                 the 349.6   minute           (5.83 hours)             point allows (1.88   HR AF   credit)_SDP                                                                                                                                                                                                                                   1.1 E-03                                                                                                                                                                                                                                                   avoidance                               of core           damage                             per MAAP   run 88_506_OSG_DD188_FLEXh.                                                       This is past SG   dryout                 as allowed       by                   28wFR-H.1             Attachment           8   and                   supported       by multiple operator           interviews.
OPERATORS FAIL TO MANUALLY 5.4E-04 N/A Tsw: With AF success for 1.88 hours, reestablishing SG START AF PUMPS FROM CR feed by the 349.6 minute (5.83 hours) point allows (1.88 HR AF credit)_SDP 1.1 E-03 avoidance of core damage per MAAP run 88_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 28wFR-H.1 Attachment 8 and supported by multiple operator interviews.
OPERATORS         FAIL TO                                                                                                                                                                                                                                                                                 8.1 E-04                                                                                                             N/A                                                                                                 Tsw:       With AF   success                 for 1.88 hours,             reestablishing SG RECOGNIZE         THE   LOSS   OF                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               feed by                 the 349.6   minute         (5.83   hours)             point allows SECONDARY             COOLING                                                                                                                                                                                               7.0E-04                                                                                                                                                                                                                                                     avoidance                               of core           damage                             per MAAP   run (COGNITIVE                     ONLY;     1.88   HR                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       88_506_OSG_DD188_FLEXh.                                                       This is past SG   dryout               as AF)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           allowed         by                   28wFR-H.1               Attachment           8   and                     supported       by multiple operator           interviews.
OPERATORS FAIL TO 8.1 E-04 N/A Tsw: With AF success for 1.88 hours, reestablishing SG RECOGNIZE THE LOSS OF feed by the 349.6 minute (5.83 hours) point allows SECONDARY COOLING 7.0E-04 avoidance of core damage per MAAP run (COGNITIVE ONLY; 1.88 HR 88_506_OSG_DD188_FLEXh. This is past SG dryout as AF)_SDP allowed by 28wFR-H.1 Attachment 8 and supported by multiple operator interviews.
OPERATORS         FAIL TO   RESTORE                                                                           1.0E-03                                                                                                             N/A                                                                                                 Tsw:     With AF   success               for 1.88 hours,             reestablishing SG ALTERNATE       FEEDWATER               (EXE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 feed by                 the 349.6   minute         (5.83 hours)               point allows ONLY;     1.88   HRAF       credit)_SDP                                                                                                     1.4E-02                                                                                                                                                                                                                                                       avoidance                               of core           damage                             per MAAP   run 88_506_OSG_DD188_FLEXh.                                                       This is past SG   dryout                 as allowed         by                   28wFR-H.1               Attachment           8   and                     supported       by multiple operator           interviews.
OPERATORS FAIL TO RESTORE 1.0E-03 N/A Tsw: With AF success for 1.88 hours, reestablishing SG ALTERNATE FEEDWATER (EXE feed by the 349.6 minute (5.83 hours) point allows ONLY; 1.88 HRAF credit)_SDP 1.4E-02 avoidance of core damage per MAAP run 88_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 28wFR-H.1 Attachment 8 and supported by multiple operator interviews.
OPERATORS         FAIL TO   EXECUTE                                                                                       2.4E-04                                                                                                               N/A                                                                                                 Tsw:         For   the 8&F   action               for the SDP-1     interval (AF TO   OPEN     PZR         PORVS                 FOR     8/F                                                                                                                                                                                                                                                                                                                                                                                                                                                                         success                 for 1.88 hours),             MAAP   run COOLING     (EXE         ONLY;     1.88   HR                                                                                                 2.8E-02                                                                                                                                                                                                                             88506_         1 PORV     _   1SI_DDAFW188d indicates                                                                                                                                                                                                                                                                             core AF   credit)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             damage                             can                             be           avoided         if 8&F   is initiated within 204.0 minutes.       This is NOT prior to   SG   dryout.
OPERATORS FAIL TO EXECUTE 2.4E-04 N/A Tsw: For the 8&F action for the SDP-1 interval (AF TO OPEN PZR PORVS FOR 8/F success for 1.88 hours), MAAP run COOLING (EXE ONLY; 1.88 HR 2.8E-02 88506_ 1 PORV _ 1SI_DDAFW188d indicates core AF credit)_SDP damage can be avoided if 8&F is initiated within 204.0 minutes. This is NOT prior to SG dryout.
FIRE   -         OPS     FAILS TO   OPEN   PZR                                                                     2.4E-04                                                                                                                       N/A                                                                                                 Tsw:       For   the 8&F     action               for the SDP-1     interval (AF PORVS                 FOR     8/F     COOLING   (EXE                                                                                                                                                                                                                                                                                                                                                                                                                                                             success                 for 1.88 hours),               MAAP   run ONLY,     LOFW             w         1.88   HR   AF   credit,                                                                                                                                                                                                                                                                                                                                                                           88506_         1 PORV     _   1SI_DDAFW188d                         indicates core Pe   Recovery)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             damage                             can                         be           avoided         if 8&F   is initiated within 204.0 minutes.       This is NOT prior to   SG   dryout.
FIRE - OPS FAILS TO OPEN PZR 2.4E-04 N/A Tsw: For the 8&F action for the SDP-1 interval (AF PORVS FOR 8/F COOLING (EXE success for 1.88 hours), MAAP run ONLY, LOFW w 1.88 HR AF credit, 88506_ 1 PORV _ 1SI_DDAFW188d indicates core Pe Recovery)_SDP damage can be avoided if 8&F is initiated within 204.0 minutes. This is NOT prior to SG dryout.


17 HEP   EDITS     MADE   SINCE   2022   BBW                   FPIE   UPDATE
17 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE


HFE   Description                                                                                                                                                                                       HEPs                                                                                       Update                                                                                                                                                                                                                                                                                                                                                                                                                                                             Edits 1.30.2024                                                                               2022 HEPs OPERATORS       FAIL TO     INITIATE SI                                                           1.5E-04                                                                                                               N/A                                                                                                 Tsw:         For   the B&F   action             for the SDP-1     interval (AF FOR     BLEED AND                                                                                                             FEED                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               success                 for 1.88 hours),           MMP   run COOLING     (EXE       ONLY;       1.88   HR                                                                                                       1.0E-02                                                                                                                                                                                                                                                     BB506_   1 PORV     _   1SI_DDAFW188d                           indicates core AF   credit)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 damage                               can                             be           avoided         if B&F   is initiated within 204.0 minutes.       This is NOT prior to   SG   dryout.
HFE Description HEPs Update Edits 1.30.2024 2022 HEPs OPERATORS FAIL TO INITIATE SI 1.5E-04 N/A Tsw: For the B&F action for the SDP-1 interval (AF FOR BLEED AND FEED success for 1.88 hours), MMP run COOLING (EXE ONLY; 1.88 HR 1.0E-02 BB506_ 1 PORV _ 1SI_DDAFW188d indicates core AF credit)_SDP damage can be avoided if B&F is initiated within 204.0 minutes. This is NOT prior to SG dryout.
FIRE   -         OPERATORS           FAIL TO                                                                                                                                   1.5E-04                                                                                                               N/A                                                                                                 Tsw:         For   the B&F   action             for the SDP-1     interval (AF INITIATE   SI     FOR   BLEED   AND                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             success                 for 1.88 hours),           MMP   run FEED   COOLING     (EXE         ONLY,                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       BB506_   1 PORV     _   1SI_DDAFW188d                           indicates core LOFW           w           1.88 HR AF credit,                                           Pe                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   damage                                 can                             be           avoided         if B&F   is initiated within 204.0 Recovery)                                       SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 minutes.       This is NOT prior to   SG   dryout.
FIRE - OPERATORS FAIL TO 1.5E-04 N/A Tsw: For the B&F action for the SDP-1 interval (AF INITIATE SI FOR BLEED AND success for 1.88 hours), MMP run FEED COOLING (EXE ONLY, BB506_ 1 PORV _ 1SI_DDAFW188d indicates core LOFW w 1.88 HR AF credit, Pe damage can be avoided if B&F is initiated within 204.0 Recovery) SOP minutes. This is NOT prior to SG dryout.
BASE       CASE   AND     SOP INTERVAL                     2   HEP EDITS
BASE CASE AND SOP INTERVAL 2 HEP EDITS
;cenarios,                     the original baseline         actions           for SG   feed restoration and                     Bleed and                     Feed   (B&F)   used       a         system       window                       that reflected N       SG   level at -45   seconds.                       Operator     interviews and                   observed               simulator scenarios                 identified that the                                                 BBW             crews         are     trained to   insert
;cenarios, the original baseline actions for SG feed restoration and Bleed and Feed (B&F) used a system window that reflected N SG level at -45 seconds. Operator interviews and observed simulator scenarios identified that the BBW crews are trained to insert
:Jiately upon                           the recognition         of the total loss of feed condition.             The   SG   Feed   restoration and                     B&F actions             were     revised to   reflect a           split reactor       trip at 30 seconds                     with a       failure rate of 10%. That   is, the HEPs for total LOFW             initiators and                     failure of AF   were   numerically
:Jiately upon the recognition of the total loss of feed condition. The SG Feed restoration and B&F actions were revised to reflect a split reactor trip at 30 seconds with a failure rate of 10%. That is, the HEPs for total LOFW initiators and failure of AF were numerically


[0.1 *(HEPsase) + 0.9*(HEPsoP-2)]
[0.1 *(HEPsase) + 0.9*(HEPsoP-2)]
1e baseline         HEPs associated               with the common                                                   cognitive action,                 1 FW-FRH1-FHSGOA,                                       all used         the time to   optimized B&F as         a zed B&F time is 30   minutes       for scenarios               that only                   credit the automatic                         plant trip on                     low       SG     level. This is conservative         for SG feed
1e baseline HEPs associated with the common cognitive action, 1 FW-FRH1-FHSGOA, all used the time to optimized B&F as a zed B&F time is 30 minutes for scenarios that only credit the automatic plant trip on low SG level. This is conservative for SG feed
~un                     BB_NoBF           _Scram_AutoC                                                 (LOFW             with no               AFW           and                   automatic                           plant trip on                   low         SG   level) indicates that the SGs will retain
~un BB_NoBF _Scram_AutoC (LOFW with no AFW and automatic plant trip on low SG level) indicates that the SGs will retain
>red by                   39.9   minutes.
>red by 39.9 minutes.
OPERATORS         FAIL TO   CLOSE                                                                                                                     1.4E-03                                                                                                               N/A                                                                                                 Tsw:       BB_NoBF         _Scram30E                               includes     credit for a         manual OPPOSITE       UNIT           AF0005       VALVES                                                                                                                                                                                                                                                                                                                                                                                                                                                               reactor     trip upon                             recognition         of the LOFW.           If AFW               is LOCALLY     (LOFW             w         30s trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                         initiated by                   2.46   hours             (147.6 minutes)         core           damage                                   is avoided.           (Max                   core           temperature   node                 of 1796F). This is past SG   dryout               as         allowed       by                   2BwFR-H.1           Attachment             B and                   supported       by                   multiple operator           interviews.
OPERATORS FAIL TO CLOSE 1.4E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual OPPOSITE UNIT AF0005 VALVES reactor trip upon recognition of the LOFW. If AFW is LOCALLY (LOFW w 30s trip)_SDP initiated by 2.46 hours (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
G                                                                                           OPERATORS         FAIL TO   CLOSE                                                                                                                 6.6E-03                                                                                 3.8E-02                                                                   Tsw:       MMP   Run                     BB_NoBF           _Scram_AutoC                                                 (LOFW             with OPPOSITE     UNIT           AF0005       VALVES                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               no               AFW           and                   automatic                         plant trip on                   low       SG   level)
G OPERATORS FAIL TO CLOSE 6.6E-03 3.8E-02 Tsw: MMP Run BB_NoBF _Scram_AutoC (LOFW with OPPOSITE UNIT AF0005 VALVES no AFW and automatic plant trip on low SG level)
LOCALLY     (LOFW)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         indicates that the SGs will retain inventory             if SG feed is restored by                   the 39.9   minute           point. (Note the 2022   HEP value           includes the higher Texe         value         which     was               corrected in the SOP effort and                       in the working           copy                     of the HRAC.)
LOCALLY (LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point. (Note the 2022 HEP value includes the higher Texe value which was corrected in the SOP effort and in the working copy of the HRAC.)


18 HEP   EDITS     MADE     SINCE     2022   BBW                   FPIE     UPDATE
18 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE


HFE   Description                                                                                                                                                                                   HEPs                                                                                   Update                                                                                                                                                                                                                                                                                                                                                                                                                                                       Edits 1.30.2024                                                                           2022 HEPs OPERATORS           FAIL TO   EXECUTE                                                                                         2.5E-03                                                                                                               N/A                                                                                               Tsw:       BB_NoBF           _Scram30E                                 includes     credit for a           manual AF   CROSSTIE           FROM     OPPOSITE                                                                                                                                                                                                                                                                                                                                                                                                                                   reactor       trip upon                             recognition           of the LOFW.             If AFW               is UNIT               (EXE       ONLY;     LOFWw                       30s                                                                                                                                                                                                                                                                                                                                                                                                                                                                             initiated by                 2.46   hours             (147.6     minutes)           core           damage                                   is trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 avoided.             (Max                 core           temperature       node                 of 1796F). This is past SG   dryout                 as         allowed         by                 2BwFR-H.1               Attachment               B and                   supported         by                 multiple operator             interviews.
HFE Description HEPs Update Edits 1.30.2024 2022 HEPs OPERATORS FAIL TO EXECUTE 2.5E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual AF CROSSTIE FROM OPPOSITE reactor trip upon recognition of the LOFW. If AFW is UNIT (EXE ONLY; LOFWw 30s initiated by 2.46 hours (147.6 minutes) core damage is trip)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
3                                                                                                   OPERATORS           FAIL TO   EXECUTE                                                                                                                 2.1 E-02                                                                             7.0E-02                                                                     Tsw:       MAAP     Run                   BB_NoBF           _Scram_AutoC                                                 (LOFWwith AF   CROSSTIE         FROM       OPPOSITE                                                                                                                                                                                                                                                                                                                                                                                                                             no             AFW           and                 automatic                         plant trip on                   low         SG     level)
3 OPERATORS FAIL TO EXECUTE 2.1 E-02 7.0E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFWwith AF CROSSTIE FROM OPPOSITE no AFW and automatic plant trip on low SG level)
UNIT               (EXE         ONLY;     LOFW)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               indicates that the SGs will retain inventory               if SG   feed is restored by                 the 39.9   minute           point.
UNIT (EXE ONLY; LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.
OPERATORS           FAIL TO   OPEN                                                                                                                             4.0E-02                                                                                                         N/A                                                                                               Tsw:       BB_NoBF           _Scram30E                                 includes     credit for a         manual AF005     VALVES                         (LOCALLY           FAIL                                                                                                                                                                                                                                                                                                                                                                                                                                                         reactor       trip upon                           recognition           of the LOFW.             If AFW               is AIR;       LOFW             w         30s trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   initiated by                 2.46     hours             (147.6     minutes)           core           damage                               is avoided.             (Max                   core         temperature         node                 of 1796F). This is past   SG   dryout                 as         allowed         by                 2BwFR-H.1               Attachment             B and                   supported         by                   multiple operator             interviews.
OPERATORS FAIL TO OPEN 4.0E-02 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual AF005 VALVES (LOCALLY FAIL reactor trip upon recognition of the LOFW. If AFW is AIR; LOFW w 30s trip)_SDP initiated by 2.46 hours (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.


~                                                                                                           OPERATORS           FAIL TO   OPEN                                                                                                                                                               4.1 E-02                                                                           9.7E-02                                                                   Tsw:       MAAP   Run                     BB_NoBF           _Scram_AutoC                                                 (LOFW             with J
~ OPERATORS FAIL TO OPEN 4.1 E-02 9.7E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with J
AF005     VALVES                         (LOCALLY         FAIL                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               no             AFW           and                   automatic                         plant trip on                 low       SG   level)
AF005 VALVES (LOCALLY FAIL no AFW and automatic plant trip on low SG level)
AIR;       LOFW)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         indicates that the SGs will retain inventory               if SG feed is restored by                 the 39.9   minute             point.
AIR; LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.
OPERATOR           FAILS   TO   START                                                                                                                           1.SE-03                                                                                                           N/A                                                                                                   Tsw:       BB_NoBF           _Scram30E                                   includes     credit for a         manual MOTOR-DRIVEN                     AFW             PUMP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   reactor       trip upon                           recognition           of the LOFW.             If AFW               is AFTER         FAILURE                   OF   DC   (LOFW               w                                                                                                                                                                                                                                                                                                                                                                                                                                       initiated by                 2.46   hours             (147.6     minutes)           core           damage                                   is 30s trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         avoided.             (Max                 core           temperature       node                 of 1796F). This is past   SG   dryout                 as         allowed         by                 2BwFR-H.1               Attachment               B and                   supported         by                 multiple operator             interviews.
OPERATOR FAILS TO START 1.SE-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual MOTOR-DRIVEN AFW PUMP reactor trip upon recognition of the LOFW. If AFW is AFTER FAILURE OF DC (LOFW w initiated by 2.46 hours (147.6 minutes) core damage is 30s trip)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
RIG                                                               OPERATOR           FAILS   TO   START                                                                                                                             7.SE-03                                                                             2.SE-02                                                                   Tsw:       MAAP     Run                   BB_NoBF             _Scram_AutoC                                                 (LOFW             with MOTOR-DRIVEN                       AFW             PUMP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             no             AFW           and                 automatic                         plant trip on                   low       SG   level)
RIG OPERATOR FAILS TO START 7.SE-03 2.SE-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with MOTOR-DRIVEN AFW PUMP no AFW and automatic plant trip on low SG level)
AFTER         FAILURE                   OF   DC                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     indicates that the SGs will retain inventory               if SG   feed is (LOFW)                         SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       restored by                   the 39.9   minute             point.
AFTER FAILURE OF DC indicates that the SGs will retain inventory if SG feed is (LOFW) SOP restored by the 39.9 minute point.


19 HEP   EDITS     MADE     SINCE     2022   BBW                   FPIE   UPDATE
19 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE


HFE   Description                                                                                                                                                                                   HEPs                                                                                     Update                                                                                                                                                                                                                                                                                                                                                                                                                                                               Edits 1.30.2024                                                                               2022 HEPs OPERATORS           FAIL TO   LOCALLY                                                                                   2.3E-03                                                                                                               N/A                                                                                             Tsw:       BB_NoBF             _Scram30E                                 includes     credit for a         manual START   B AUXILIARY                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         reactor         trip upon                           recognition           of the LOFW.             If AFW             is FEEDWATER                   PUMP               (LOFW             w         30s                                                                                                                                                                                                                                                                                                                                                                                                                   initiated by                 2.46   hours             (147.6     minutes)         core           damage                                     is trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             avoided.               (Max                   core           temperature       node                 of 1796F). This is past SG   dryout               as         allowed         by                 2BwFR-H.1             Attachment                 B and                   supported           by                 multiple operator             interviews.
HFE Description HEPs Update Edits 1.30.2024 2022 HEPs OPERATORS FAIL TO LOCALLY 2.3E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual START B AUXILIARY reactor trip upon recognition of the LOFW. If AFW is FEEDWATER PUMP (LOFW w 30s initiated by 2.46 hours (147.6 minutes) core damage is trip)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
  ~IG                                                                         OPERATORS             FAIL TO   LOCALLY                                                                                     9.6E-03                                                                                 1.5E-02                                                               Tsw:       MAAP     Run                   BB_NoBF           _Scram_AutoC                                               (LOFW               with START   B AUXILIARY                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     no               AFW           and                 automatic                         plant trip on                 low       SG   level)
  ~IG OPERATORS FAIL TO LOCALLY 9.6E-03 1.5E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with START B AUXILIARY no AFW and automatic plant trip on low SG level)
FEEDWATER                   PUMP               (LOFW)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                     indicates that the SGs will retain inventory               if SG feed is restored by                 the 39.9   minute           point.
FEEDWATER PUMP (LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.
OPERATORS             FAIL TO   MANUALLY                                                                         5.4E-04                                                                                                         N/A                                                                                                 Tsw:       BB_NoBF             _Scram30E                                 includes     credit for a         manual START AF   PUMPS                   FROM       CR                                                                                                                                                                                                                                                                                                                                                                                                                                                                               reactor         trip upon                             recognition           of the LOFW.             If AFW               is (LOFWw                         30s trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       initiated by                 2.46   hours             (147.6   minutes)           core           damage                                     is avoided.               (Max                   core           temperature       node                 of 1796F). This is past SG   dryout                 as         allowed         by                 2BwFR-H.1             Attachment                 B and                   supported         by                 multiple operator             interviews.
OPERATORS FAIL TO MANUALLY 5.4E-04 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual START AF PUMPS FROM CR reactor trip upon recognition of the LOFW. If AFW is (LOFWw 30s trip)_SDP initiated by 2.46 hours (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
RIG                                                                 OPERATORS           FAIL TO   MANUALLY                                                                         8.7E-04                                                                                 1.7E-03                                                                 Tsw:       MAAP     Run                     BB_NoBF           _Scram_AutoC                                               (LOFW             with START AF   PUMPS                   FROM     CR                                                                                                                                                                                                                                                                                                                                                                                                                                                                               no             AFW             and                   automatic                         plant trip on                   low       SG     level)
RIG OPERATORS FAIL TO MANUALLY 8.7E-04 1.7E-03 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with START AF PUMPS FROM CR no AFW and automatic plant trip on low SG level)
(LOFW)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 indicates that the SGs will retain inventory               if SG feed is restored by                 the 39.9   minute             point.
(LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.
OPERATORS           FAIL RECOGNIZE                                                                                                                       8.1 E-04                                                                                                       N/A                                                                                             Tsw:         BB_NoBF             _Scram30E                               includes     credit for a           manual THE     LOSS     OF SECONDARY                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               reactor         trip upon                           recognition           of the LOFW.             If AFW             is COOLING       (COGNITIVE                     ONLY;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     initiated by                 2.46   hours             (147.6     minutes)         core           damage                                     is LOFW             w         30s trip_no     AF)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               avoided.             (Max                     core           temperature       node                 of 1796F). This is past SG   dryout                 as         allowed         by                 2BwFR-H.1             Attachment               B and                   supported           by                 multiple operator             interviews.
OPERATORS FAIL RECOGNIZE 8.1 E-04 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual THE LOSS OF SECONDARY reactor trip upon recognition of the LOFW. If AFW is COOLING (COGNITIVE ONLY; initiated by 2.46 hours (147.6 minutes) core damage is LOFW w 30s trip_no AF)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
IIG                                                                         OPERATORS             FAIL RECOGNIZE                                                                                           2.2E-03                                                                               3.3E-03                                                                 Tsw:       MAAP     Run                     BB_NoBF             _Scram_AutoC                                               (LOFW             with THE   LOSS     OF   SECONDARY                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               no             AFW           and                 automatic                         plant trip on                 low       SG   level)
IIG OPERATORS FAIL RECOGNIZE 2.2E-03 3.3E-03 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with THE LOSS OF SECONDARY no AFW and automatic plant trip on low SG level)
COOLING       (COGNITIVE                     ONLY;                                                                                                                                                                                                                                                                                                                                                                                                                                                                             indicates that the SGs will retain inventory               if SG feed is LOFW)                         SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           restored by                 the 39.9   minute             point.
COOLING (COGNITIVE ONLY; indicates that the SGs will retain inventory if SG feed is LOFW) SOP restored by the 39.9 minute point.


20 HEP     EDITS   MADE     SINCE     2022   BBW                   FPIE   UPDATE
20 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE


HFE   Description                                                                                                                                                                             HEPs                                                                                   Update                                                                                                                                                                                                                                                                                                                                                                                                                                                               Edits 1.30.2024                                                                           2022 HEPs OPERATORS         FAIL TO   RESTORE                                                                             1.0E-03                                                                                                                   N/A                                                                                                   Tsw:       BB_NoBF         _Scram30E                                 includes   credit for a           manual ALTERNATE     FEEDWATER                 (EXE                                                                                                                                                                                                                                                                                                                                                                                                                                                                         reactor     trip upon                             recognition         of the LOFW.           If AFW               is ONLY;     LOFWw                         30s trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   initiated by                 2.46   hours               (147.6 minutes)         core           damage                                 is avoided.           (Max                 core           temperature     node               of 1796F). This is past SG   dryout               as         allowed         by                   2BwFR-H.1           Attachment             B and                   supported       by                   multiple operator           interviews.
HFE Description HEPs Update Edits 1.30.2024 2022 HEPs OPERATORS FAIL TO RESTORE 1.0E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual ALTERNATE FEEDWATER (EXE reactor trip upon recognition of the LOFW. If AFW is ONLY; LOFWw 30s trip)_SDP initiated by 2.46 hours (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
  ~IG                                                                       OPERATORS       FAIL TO     RESTORE                                                                             1.0E-02                                                                             3.6E-02                                                                   Tsw:       MMP   Run                     BB_NoBF           _Scram_AutoC                                                 (LOFW             with ALTERNATEFEEDWATER(EXE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       no               AFW             and                   automatic                           plant trip on                   low         SG   level)
  ~IG OPERATORS FAIL TO RESTORE 1.0E-02 3.6E-02 Tsw: MMP Run BB_NoBF _Scram_AutoC (LOFW with ALTERNATEFEEDWATER(EXE no AFW and automatic plant trip on low SG level)
ONLY;     LOFW)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 indicates that the                                                       SGs will retain inventory             if SG   feed is restored by                   the 39.9   minute           point.
ONLY; LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.
OPERATORS       FAIL TO   EXECUTE                                                                                         2.4E-04                                                                                                                                                   N/A                                                                                       Tsw:       MMP   run               BB_LatestBF _Scram_30A,                                         indicates that TO   OPEN     PZR       PORVS                 FOR     B/F                                                                                                                                                                                                                                                                                                                                                                                                                                                             the latest time for B&F to   prevent core           damage                             with a COOLING       (EXE       ONLY;   LOFWw                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   manual                                   plant trip at 30 seconds                         and                 without SG   feed is 30s trip) SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         71.4   minutes.
OPERATORS FAIL TO EXECUTE 2.4E-04 N/A Tsw: MMP run BB_LatestBF _Scram_30A, indicates that TO OPEN PZR PORVS FOR B/F the latest time for B&F to prevent core damage with a COOLING (EXE ONLY; LOFWw manual plant trip at 30 seconds and without SG feed is 30s trip) SOP 71.4 minutes.
,                                                                                 OPERATORS       FAIL TO   EXECUTE                                                                                         4.2E-03                                                                             4.2E-03                                                                     Tsw:         In           order to   avoid           core           damage,                             bleed and                   feed TO   OPEN     PZR       PORVS                 FOR     B/F                                                                                                                                                                                                                                                                                                                                                                                                                                                                             would                   have           to   be           initiated by                   30 minutes         (Tsw)     per BBW COOLING       (EXE       ONLY;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       MMP   run               BB0007c         (LOFW             with no               AFW             and                   automatic LOFW)                           SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       plant trip on                   low       SG   level).
, OPERATORS FAIL TO EXECUTE 4.2E-03 4.2E-03 Tsw: In order to avoid core damage, bleed and feed TO OPEN PZR PORVS FOR B/F would have to be initiated by 30 minutes (Tsw) per BBW COOLING (EXE ONLY; MMP run BB0007c (LOFW with no AFW and automatic LOFW) SOP plant trip on low SG level).
OPERATORS       FAIL TO     INITIATE SI                                                           1.5E-04                                                                                                                                                 NIA                                                                                                     Tsw:       MMP   run               BB_LatestBF _Scram_30A,                                         indicates that FOR     BLEED AND   FEED                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 the latest time for B&F to   prevent core           damage                             with a COOLING       (EXE       ONLY;   LOFWw                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   manual                                     plant trip at 30   seconds                         and                 without SG   feed is 30s trip) SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   71.4   minutes.
OPERATORS FAIL TO INITIATE SI 1.5E-04 NIA Tsw: MMP run BB_LatestBF _Scram_30A, indicates that FOR BLEED AND FEED the latest time for B&F to prevent core damage with a COOLING (EXE ONLY; LOFWw manual plant trip at 30 seconds and without SG feed is 30s trip) SOP 71.4 minutes.
OPERATORS       FAIL TO   INITIATE   SI                                                           1.6E-03                                                                           1.6E-03                                                                     Tsw:         In           order to   avoid           core           damage,                               bleed and                   feed FOR     BLEED AND   FEED                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         would                 have         to   be           initiated by                   30   minutes         (Tsw)     per BBW COOLING       (EXE       ONLY;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     MAAP   run               BB0007c         (LOFW             with no               AFW               and                   automatic LOFW)                         SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       plant trip on                     low         SG   level).
OPERATORS FAIL TO INITIATE SI 1.6E-03 1.6E-03 Tsw: In order to avoid core damage, bleed and feed FOR BLEED AND FEED would have to be initiated by 30 minutes (Tsw) per BBW COOLING (EXE ONLY; MAAP run BB0007c (LOFW with no AFW and automatic LOFW) SOP plant trip on low SG level).
FIRE   -         OPERATORS         FAIL TO                                                                                                                                   1.7E-03                                                                                                                                                 N/A                                                                                       Tsw:       BB_NoBF         _Scram30E                                 includes   credit for a           manual CLOSE   OPPOSITE     UNIT           AF005                                                                                                                                                                                                                                                                                                                                                                                                                                                                         reactor     trip upon                             recognition         of the LOFW.             If AFW             is VALVES                           LOCALLY     (LOFWw                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             initiated by                 2.46   hours             (147.6   minutes)         core           damage                               is manual                                   trip at 30s)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     avoided.           (Max                   core           temperature   node                 of 1796F). This is past SG   dryout             as         allowed         by                   2BwFR-H.1           Attachment           B and                   supported       by                   multiple operator           interviews.
FIRE - OPERATORS FAIL TO 1.7E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual CLOSE OPPOSITE UNIT AF005 reactor trip upon recognition of the LOFW. If AFW is VALVES LOCALLY (LOFWw initiated by 2.46 hours (147.6 minutes) core damage is manual trip at 30s)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.


21 HEP   EDITS   MADE     SINCE     2022   BBW                 FPIE   UPDATE
21 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE


HFE   Description                                                                                                                                                                             HEPs                                                                                   Update                                                                                                                                                                                                                                                                                                                                                                                                                                             Edits 1.30.2024                                                                             2022 HEPs
HFE Description HEPs Update Edits 1.30.2024 2022 HEPs
  ~IG                                                                       FIRE       -         OPERATORS           FAIL TO                                                                                                                                 2.SE-02                                                                                                                 1.0                                                                                                     Tsw:       MAAP     Run                   BB_NoBF             _Scram_AutoC                                                 (LOFW             with CLOSE       OPPOSITE         UNIT           AF005                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           no               AFW           and                 automatic                         plant   trip on                   low       SG   level)
  ~IG FIRE - OPERATORS FAIL TO 2.SE-02 1.0 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with CLOSE OPPOSITE UNIT AF005 no AFW and automatic plant trip on low SG level)
VALVES                           LOCALLY       (LOFWTsw                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               indicates that the SGs will retain inventory               if SG   feed is used         for Fire) SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         restored by                 the 39.9   minute             point.
VALVES LOCALLY (LOFWTsw indicates that the SGs will retain inventory if SG feed is used for Fire) SOP restored by the 39.9 minute point.
FIRE       -         OPERATORS           FAIL TO                                                                                                                           2.SE-03   4                                                                                                         N/A                                                                                                   Tsw:       BB_NoBF           _Scram30E                                   includes     credit for a         manual ALIGN     AF XTIE         FROM     OPPOSITE                                                                                                                                                                                                                                                                                                                                                                                                                         reactor       trip upon                           recognition             of the LOFW.             If AFW               is UNIT               (EXE         ONLY;     LOFWw                       30s                                                                                                                                                                                                                                                                                                                                                                                                                                                                             initiated by                 2.46   hours             (147.6     minutes)           core           damage                                   is trip)_SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 avoided.             (Max                   core           temperature         node                 of 1796F). This is past SG   dryout                 as         allowed         by                 2BwFR-H.1             Attachment               B and                   supported         by                 multiple operator             interviews.
FIRE - OPERATORS FAIL TO 2.SE-03 4 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual ALIGN AF XTIE FROM OPPOSITE reactor trip upon recognition of the LOFW. If AFW is UNIT (EXE ONLY; LOFWw 30s initiated by 2.46 hours (147.6 minutes) core damage is trip)_SOP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
~IG                                                                     FIRE       -         OPERATORS           FAIL TO                                                                                                                         6.6E-02                                                                               7.0E-02                                                                     Tsw:       MAAP     Run                     BB_NoBF           _Scram_AutoC                                               (LOFWwith ALIGN     AF   XTIE         FROM     OPPOSITE                                                                                                                                                                                                                                                                                                                                                                                                                                                           no             AFW           and                   automatic                         plant   trip on                   low       SG   level)
~IG FIRE - OPERATORS FAIL TO 6.6E-02 7.0E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFWwith ALIGN AF XTIE FROM OPPOSITE no AFW and automatic plant trip on low SG level)
UNIT               (EXE         ONLY;     LOFWTsw                         used                                                                                                                                                                                                                                                                                                                                                                                                                                     indicates that the SGs will retain inventory               if SG   feed is for Fire) SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     restored by                   the 39.9   minute           point.
UNIT (EXE ONLY; LOFWTsw used indicates that the SGs will retain inventory if SG feed is for Fire) SOP restored by the 39.9 minute point.
FIRE       -         OPERATORS           FAIL TO                                                                                                                         6.7E-03                                                                                                             N/A                                                                                                     Tsw:       BB_NoBF           _Scram30E                                   includes     credit for a         manual OPEN   AF005       VALVES                         (LOCALLY                                                                                                                                                                                                                                                                                                                                                                                                                                           reactor       trip upon                           recognition           of the LOFW.             If AFW               is FAIL AIR;       LOFWw                       30s trip)_SOP                                                                                                                                                                                                                                                                                                                                                                                                                                               initiated by                 2.46   hours             (147.6     minutes)           core           damage                               is avoided.             (Max                   core         temperature         node                 of 1796F). This is I                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 past SG   dryout               as         allowed         by                   2BwFR-H.1             Attachment             B and                   supported         by                 multiple operator             interviews.
FIRE - OPERATORS FAIL TO 6.7E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual OPEN AF005 VALVES (LOCALLY reactor trip upon recognition of the LOFW. If AFW is FAIL AIR; LOFWw 30s trip)_SOP initiated by 2.46 hours (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is I past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.


FIRE       -         OPERATORS             FAIL TO                                                                                                                             1.7E-02                                                                                                         N/A                                                                                                   Tsw:       BB_NoBF           _Scram30E                                 includes       credit for a         manual OPEN   AF005       VALVES                         (LOCALLY                                                                                                                                                                                                                                                                                                                                                                                                                                           reactor       trip upon                           recognition             of the LOFW.             If AFW               is FAIL AIR;       LOFWw                       30s trip)_SOP                                                                                                                                                                                                                                                                                                                                                                                                                                               initiated by                 2.46   hours               (147.6     minutes)           core           damage                                   is avoided.             (Max                   core           temperature         node                 of 1796F). This is 1                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         past SG   dryout                 as         allowed         by                 2BwFR-H.1             Attachment             B and                   supported         by                 multiple operator             interviews.
FIRE - OPERATORS FAIL TO 1.7E-02 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual OPEN AF005 VALVES (LOCALLY reactor trip upon recognition of the LOFW. If AFW is FAIL AIR; LOFWw 30s trip)_SOP initiated by 2.46 hours (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is 1 past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.


'.IG                                                                           FIRE       -         OPERATORS           FAIL TO                                                                                                                             5.2E-02                                                                                   2.8E-01                                                                       Tsw:       MAAP     Run                   BB_NoBF             _Scram_AutoC                                                 (LOFW             with OPEN   AF005       VALVES                         (LOCALLY                                                                                                                                                                                                                                                                                                                                                                                                                                                                             no             AFW           and                 automatic                         plant trip on                 low         SG     level)
'.IG FIRE - OPERATORS FAIL TO 5.2E-02 2.8E-01 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with OPEN AF005 VALVES (LOCALLY no AFW and automatic plant trip on low SG level)
FAIL AIR;       LOFWTsw                         used         for                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               indicates that the SGs will retain inventory               if SG feed is Fire) SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   restored by                 the 39.9   minute             point.
FAIL AIR; LOFWTsw used for indicates that the SGs will retain inventory if SG feed is Fire) SOP restored by the 39.9 minute point.


.7E-03 was                   used               in   FPRA   quantification.
.7E-03 was used in FPRA quantification.


22 HEP   EDITS   MADE   SINCE     2022   BBW                   FPIE   UPDATE
22 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE


HFE   Description                                                                                                                                                                                             HEPs                                                                                     Update                                                                                                                                                                                                                                                                                                                                                                                                                                                             Edits 1.30.2024                                                                           2022 HEPs FIRE   -           OPS     FAILS TO   START   MD                                                               2.2E-03   5                                                                                                           N/A                                                                                                 Tsw:         BB_NoBF         _Scram30E                                 includes     credit for a         manual AFW             PUMP             AFTER         FAILURE                       OF                                                                                                                                                                                                                                                                                                                                                                                                                                         reactor       trip upon                           recognition           of the LOFW.             If AFW               is DC   (LOFW               w         30s trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           initiated by                   2.46   hours             (147.6   minutes)           core           damage                                   is avoided.             (Max                 core           temperature     node                 of 1796F). This is past   SG   dry out           as         allowed         by                 2BwFR-H         .1     Attachment             B and                   supported         by                   multiple operator           interviews.
HFE Description HEPs Update Edits 1.30.2024 2022 HEPs FIRE - OPS FAILS TO START MD 2.2E-03 5 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual AFW PUMP AFTER FAILURE OF reactor trip upon recognition of the LOFW. If AFW is DC (LOFW w 30s trip)_SDP initiated by 2.46 hours (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dry out as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
ORIG                                           FIRE   -         OPS     FAILS TO   START   MD                                                                         1.0E-02                                                                               9.5E-02                                                                   Tsw:       MAAP   Run                     BB_NoBF           _Scram_AutoC                                                   (LOFW             with AFW             PUMP             AFTER         FAILURE                       OF                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 no               AFW             and                   automatic                         plant trip on                   low         SG     level)
ORIG FIRE - OPS FAILS TO START MD 1.0E-02 9.5E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with AFW PUMP AFTER FAILURE OF no AFW and automatic plant trip on low SG level)
DC   (LOFW               Tsw       used           in Fire)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                             indicates that the SGs will retain inventory               if SG   feed is restored by                   the 39.9   minute           point.
DC (LOFW Tsw used in Fire)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.
FIRE   -         OPERATORS             FAIL TO                                                                                                                                   1.1E-03                                                                                                           N/A                                                                                               Tsw:         BB_NoBF           _Scram30E                                 includes     credit for a         manual MANUALLY                       START AF   PUMPS                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 reactor       trip upon                           recognition         of the LOFW.             If AFW               is FROM     CR     (LOFW               w         30s trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                 initiated by                   2.46   hours               (147.6   minutes)           core           damage                                   is avoided.               (Max                 core           temperature     node                 of 1796F). This is past SG   dryout                 as         allowed       by                 2BwFR-H.1               Attachment             B and                   supported         by                   multiple operator           interviews.
FIRE - OPERATORS FAIL TO 1.1E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual MANUALLY START AF PUMPS reactor trip upon recognition of the LOFW. If AFW is FROM CR (LOFW w 30s trip)_SDP initiated by 2.46 hours (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
RIG                                                                       FIRE   -         OPERATORS             FAIL TO                                                                                                                                   1.5E-03                                                                           4.9E-03                                                                   Tsw:       MAAP     Run                     BB_NoBF           _Scram_AutoC                                                 (LOFW             with MANUALLY                       START AF   PUMPS                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           no               AFW             and                 automatic                         plant trip on                   low         SG   level)
RIG FIRE - OPERATORS FAIL TO 1.5E-03 4.9E-03 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with MANUALLY START AF PUMPS no AFW and automatic plant trip on low SG level)
FROM     CR   (LOFW               Tsw       used           in                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   indicates that the SGs will retain inventory               if SG   feed is Fire) SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               restored by                 the 39.9   minute           point.
FROM CR (LOFW Tsw used in indicates that the SGs will retain inventory if SG feed is Fire) SDP restored by the 39.9 minute point.
FIRE   -         OPERATORS             FAIL                                                                                                                                                                                 7.0E-04                                                                                                           NIA                                                                                             Tsw:       MAAP   run               BB_LatestBF _Scram_30A,                                             indicates that RECOGNIZE           THE     CUE                   TO                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               the latest time for B&F to   prevent core           damage                               with a SECONDARY             COOLING       (LOFW             w                                                                                                                                                                                                                                                                                                                                                                                                                                     manual                                       plant trip at 30   seconds                         and                 without   SG   feed is 30s trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             71.4   minutes.       After this time, RCS     injection flow cannot prevent core           damage                           when                     the bleed path     is opened.
FIRE - OPERATORS FAIL 7.0E-04 NIA Tsw: MAAP run BB_LatestBF _Scram_30A, indicates that RECOGNIZE THE CUE TO the latest time for B&F to prevent core damage with a SECONDARY COOLING (LOFW w manual plant trip at 30 seconds and without SG feed is 30s trip)_SDP 71.4 minutes. After this time, RCS injection flow cannot prevent core damage when the bleed path is opened.
RIG                                                                       FIRE   -         OPERATORS             FAIL                                                                                                                                                                                 8.5E-03                                                                           8.3E-03                                                                       Tsw:       MAAP     Run                   BB_NoBF           _Scram_AutoC                                                 (LOFWwith RECOGNIZE           THE     CUE                   TO                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       no             AFW             and                   automatic                         plant trip on                   low         SG   level)
RIG FIRE - OPERATORS FAIL 8.5E-03 8.3E-03 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFWwith RECOGNIZE THE CUE TO no AFW and automatic plant trip on low SG level)
SECONDARY             COOLING       (LOFW                                                                                                                                                                                                                                                                                                                                                                                                                                                                 indicates that the SGs will retain inventory               if SG   feed is Tsw     used         for Fire) SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 restored by                   the 39.9   minute           point.
SECONDARY COOLING (LOFW indicates that the SGs will retain inventory if SG feed is Tsw used for Fire) SDP restored by the 39.9 minute point.


,.2E-02 was                 used               in FPRA       quantification.
,.2E-02 was used in FPRA quantification.


23 HEP     EDITS   MADE     SINCE   2022   BBW                   FPIE   UPDATE
23 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE


HFE Description                                                                                                                                                                                                       HEPs                                                                                   Update                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Edits 1.30.2024                                                                             2022 HEPs FIRE   -         OPERATORS         FAIL TO                                                                                                                               6.7E-03 6                                                                                                                 N/A                                                                                                   Tsw:       BB_NoBF           _Scram30E                                 includes   credit for a           manual RESTORE   ALTERNATE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       reactor       trip upon                             recognition         of the LOFW.             If AFW               is FEEDWATER             (EXE         ONLY;   LOFW                                                                                                                                                                                                                                                                                                                                                                                                                                                                     initiated by                 2.46   hours             (147.6 minutes)         core           damage                                     is w         30s trip)_SDP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           avoided.           (Max                   core           temperature   node                 of 1796F). This is past SG   dryout                 as         allowed       by                   2BwFR-H.1           Attachment               B and                   supported       by                   multiple operator           interviews.
HFE Description HEPs Update Edits 1.30.2024 2022 HEPs FIRE - OPERATORS FAIL TO 6.7E-03 6 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual RESTORE ALTERNATE reactor trip upon recognition of the LOFW. If AFW is FEEDWATER (EXE ONLY; LOFW initiated by 2.46 hours (147.6 minutes) core damage is w 30s trip)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.
HIG                                                               FIRE   -         OPERATORS         FAIL TO                                                                                                                                                 3.SE-02                                                                         4.5E-02                                                                     Tsw:       MMP   Run                     BB_NoBF           _Scram_AutoC                                             (LOFWwith RESTORE   ALTERNATE                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 no               AFW           and                   automatic                         plant trip on                   low       SG   level)
HIG FIRE - OPERATORS FAIL TO 3.SE-02 4.5E-02 Tsw: MMP Run BB_NoBF _Scram_AutoC (LOFWwith RESTORE ALTERNATE no AFW and automatic plant trip on low SG level)
FEEDWATER             (EXE         ONLY;   LOFW                                                                                                                                                                                                                                                                                                                                                                                                                                                                 indicates that the SGs will retain inventory             if SG feed is Tsw       used           in Fire) SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   restored by                   the 39.9   minute         point.
FEEDWATER (EXE ONLY; LOFW indicates that the SGs will retain inventory if SG feed is Tsw used in Fire) SOP restored by the 39.9 minute point.
FIRE   -         OPS   FAILS TO   OPEN     PZR                                                                               2.SE-02                                                                                                                   N/A                                                                                                   Tsw:           In           order to   avoid         core           damage,                               feed and                   bleed PORVS                   FOR     B/F   COOLING     (EXE                                                                                                                                                                                                                                                                                                                                                                                                                                                         would                   have         to   be           initiated by                   71.4 minutes           (Tsw)     per ONLY;   LOFWw                     30s trip; NO   Pe                                                                                                                                                                                                                                                                                                                                                                                                                             BBW           MMP   run               BB_LatestBF _Scram_30A.
FIRE - OPS FAILS TO OPEN PZR 2.SE-02 N/A Tsw: In order to avoid core damage, feed and bleed PORVS FOR B/F COOLING (EXE would have to be initiated by 71.4 minutes (Tsw) per ONLY; LOFWw 30s trip; NO Pe BBW MMP run BB_LatestBF _Scram_30A.
rec)             SOP IG                                                                                               FIRE   -         OPS   FAILS TO   OPEN     PZR                                                                               2.SE-02                                                                                 2.SE-02                                                                 Tsw:         In           order to   avoid         core           damage,                               bleed and                   feed PORVS                   FOR   B/F   COOLING     (EXE                                                                                                                                                                                                                                                                                                                                                                                                                                                         would                   have         to   be           initiated by                       30   minutes           (Tsw)     per BBW ONLY;   LOFWTsw;                             NO   Pe                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           MAAP   run             BB0007c         (LOFW             with no               AFW             and                   automatic recovery)                             SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             plant trip on                   low         SG     level).
rec) SOP IG FIRE - OPS FAILS TO OPEN PZR 2.SE-02 2.SE-02 Tsw: In order to avoid core damage, bleed and feed PORVS FOR B/F COOLING (EXE would have to be initiated by 30 minutes (Tsw) per BBW ONLY; LOFWTsw; NO Pe MAAP run BB0007c (LOFW with no AFW and automatic recovery) SOP plant trip on low SG level).
FIRE   -           OPS FAILS TO   OPEN     PZR                                                                         2.4E-04                                                                                                               N/A                                                                                                 Tsw:         In           order to   avoid         core           damage,                               feed and                     bleed PORVS                   FOR   B/F   COOLING     (EXE                                                                                                                                                                                                                                                                                                                                                                                                                                             would                   have           to   be             initiated by                   71.4 minutes           (Tsw)     per ONLY,   LOFWw                     30s trip, Pe                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               BBW           MMP   run               BB_LatestBF _Scram_30A.
FIRE - OPS FAILS TO OPEN PZR 2.4E-04 N/A Tsw: In order to avoid core damage, feed and bleed PORVS FOR B/F COOLING (EXE would have to be initiated by 71.4 minutes (Tsw) per ONLY, LOFWw 30s trip, Pe BBW MMP run BB_LatestBF _Scram_30A.
Recovery)                                     SOP
Recovery) SOP
:IG                                                                                     FIRE   -           OPS   FAILS TO   OPEN     PZR                                                                       4.2E-03                                                                             4.2E-03                                                                   Tsw:         In           order to   avoid         core           damage,                               bleed and                   feed PORVS                   FOR   B/F   COOLING       (EXE                                                                                                                                                                                                                                                                                                                                                                                                                                             would                   have         to   be           initiated by                   30   minutes         (Tsw)     per BBW ONLY,     LOFW           Tsw,       Pe                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       MMP   run               BB0007c           (LOFW             with no               AFW             and                 automatic Recovery)                                     SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 plant trip on                   low         SG   level).
:IG FIRE - OPS FAILS TO OPEN PZR 4.2E-03 4.2E-03 Tsw: In order to avoid core damage, bleed and feed PORVS FOR B/F COOLING (EXE would have to be initiated by 30 minutes (Tsw) per BBW ONLY, LOFW Tsw, Pe MMP run BB0007c (LOFW with no AFW and automatic Recovery) SOP plant trip on low SG level).
FIRE   -         OPERATORS         FAIL TO                                                                                                                                         1.0E-02                                                                                                                     NIA                                                                                                   Tsw:           In           order to   avoid         core           damage,                               feed and                   bleed INITIATE SI     FOR   BLEED   AND                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         would                   have         to   be           initiated by                   71.4 minutes           (Tsw)   per FEED   COOLING   (EXE         ONLY:                                                                                                                                                                                                                                                                                                                                                                                                                                                                     BBW           MMP   run               BB_LatestBF _Scram_30A.
FIRE - OPERATORS FAIL TO 1.0E-02 NIA Tsw: In order to avoid core damage, feed and bleed INITIATE SI FOR BLEED AND would have to be initiated by 71.4 minutes (Tsw) per FEED COOLING (EXE ONLY: BBW MMP run BB_LatestBF _Scram_30A.
LOFW           w         30s trip, NO   Pe   rec)           SOP
LOFW w 30s trip, NO Pe rec) SOP


.4E-02 was                     used           in   FPRA     quantification.
.4E-02 was used in FPRA quantification.


24 HEP   EDITS   MADE     SINCE   2022   BBW                 FPIE     UPDATE
24 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE


HFE   Description                                                                                                                                                                                 HEPs                                                                                 Update                                                                                                                                                                                                                                                                                                                                                                                                                                                       Edits 1.30.2024                                                                         2022 HEPs
HFE Description HEPs Update Edits 1.30.2024 2022 HEPs
;                                                                                                           FIRE     -         OPERATORS       FAIL TO                                                                                                                                     1.0E-02                                                                             1.0E-02                                                                   Tsw:         In           order to   avoid           core           damage,                               bleed and                   feed INITIATE     SI     FOR     BLEED AND                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             would                   have           to   be           initiated by                 30   minutes           (Tsw)     per BBW FEED     COOLING     (EXE       ONLY:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 MAAP     run             BB000?c         (LOFW             with no               AFW             and                   automatic LOFW               Tsw     used           in   Fire, NO   Pe                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   plant trip on                   low         SG   level).
; FIRE - OPERATORS FAIL TO 1.0E-02 1.0E-02 Tsw: In order to avoid core damage, bleed and feed INITIATE SI FOR BLEED AND would have to be initiated by 30 minutes (Tsw) per BBW FEED COOLING (EXE ONLY: MAAP run BB000?c (LOFW with no AFW and automatic LOFW Tsw used in Fire, NO Pe plant trip on low SG level).
rec)               SOP FIRE     -         OPERATORS       FAIL TO                                                                                                                                   1.5E-04                                                                                                         N/A                                                                                                     Tsw:         In           order to avoid         core           damage,                             feed and                   bleed INITIATE     SI     FOR     BLEED AND                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             would                   have           to   be           initiated by                   71.4   minutes           (Tsw)     per FEED     COOLING     (EXE     ONLY,                                                                                                                                                                                                                                                                                                                                                                                                                                                       BBW             MAAP   run               BB_LatestBF _Scram_30A.
rec) SOP FIRE - OPERATORS FAIL TO 1.5E-04 N/A Tsw: In order to avoid core damage, feed and bleed INITIATE SI FOR BLEED AND would have to be initiated by 71.4 minutes (Tsw) per FEED COOLING (EXE ONLY, BBW MAAP run BB_LatestBF _Scram_30A.
LOFW             w         30s trip, Pe   RECV)                             SOP
LOFW w 30s trip, Pe RECV) SOP


~                                                                                                                 FIRE     -         OPERATORS       FAIL TO                                                                                                                                     1.6E-03                                                                         1.6E-03                                                                         Tsw:         In           order to avoid         core           damage,                               bleed and                   feed INITIATE   SI     FOR     BLEED AND                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             would                   have           to   be           initiated by                     30   minutes           (Tsw)     per BBW FEED     COOLING     (EXE       ONLY,                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     MAAP   run             BB0007c         (LOFW             with no               AFW             and                   automatic LOFW             Tsw,         Pe   RECV)                           SOP                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           plant trip on                   low       SG   level).
~ FIRE - OPERATORS FAIL TO 1.6E-03 1.6E-03 Tsw: In order to avoid core damage, bleed and feed INITIATE SI FOR BLEED AND would have to be initiated by 30 minutes (Tsw) per BBW FEED COOLING (EXE ONLY, MAAP run BB0007c (LOFW with no AFW and automatic LOFW Tsw, Pe RECV) SOP plant trip on low SG level).


25
25
,al     Model         Conservatisms nements                       have             been                         identified but         were     not           pursued                   in the model           used           to   generate         SOP   results. These refinements are md           Table           4.2-2,   with the Fussel Vesely             metrics associated               with the refinement to show                   relative importance                       and                       potential
,al Model Conservatisms nements have been identified but were not pursued in the model used to generate SOP results. These refinements are md Table 4.2-2, with the Fussel Vesely metrics associated with the refinement to show relative importance and potential
  ~d         risk.
  ~d risk.


Table               4.2-1:       FPIE   Additional         Model       Conservatisms                                 with Estimated   Delta Risk Reductions
Table 4.2-1: FPIE Additional Model Conservatisms with Estimated Delta Risk Reductions
  )nservatisms                                                                                                                                                                                                                                                                                                                                                                                                                           Exposure                                       Period   1 Risk Reduction                                                                                                 Exposure                                     Period   2 Risk Reduction
  )nservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction
) AF   pump                         on                           U1                       not           available       due                                                                                                                                                                                                                                                                                                                                                         0.15%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     1%
) AF pump on U1 not available due 0.15% 1%
ance,                               can                                 be             removed                   since   there luring exposure                           period.
ance, can be removed since there luring exposure period.
:onservative         value           of 0.1       for pre-                                                                                                                                                                                                                                                                                                                                                                                                                                                       1%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       N/A system,           lower value             applicable   for 1/o,   assume                             a           reduction             of a           factor of
:onservative value of 0.1 for pre-1% N/A system, lower value applicable for 1/o, assume a reduction of a factor of
:ts a           bounding                                       value           applicable     to   all
:ts a bounding value applicable to all
: equipment,               not           the specific s SOP   (MH   pump                       to   S/G,     not Jattery chargers       and                           HH     pump                   for                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   '
: equipment, not the specific s SOP (MH pump to S/G, not Jattery chargers and HH pump for '


k reduction                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   1%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 1%
k reduction 1% 1%


fable         4.2-2:       FPRA       Additional         Model       Conservatisms                                 with Estimated   Delta Risk Reductions
fable 4.2-2: FPRA Additional Model Conservatisms with Estimated Delta Risk Reductions
)nservatisms                                                                                                                                                                                                                                                                                                                                                                                                                               Exposure                                       Period   1 Risk Reduction                                                                                                 Exposure                                       Period   2 Risk Reduction for Exposure                           Period 2,     although             it is                                                                                                                                                                                                                                                                                                                                 N/A                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   10%
)nservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction for Exposure Period 2, although it is N/A 10%
np             could                   have             run                 for some                     length and                     JHEPs for AF   related actions.
np could have run for some length and JHEPs for AF related actions.


26 fable         4.2-2:     FPRA       Additional           Model     Conservatisms                               with Estimated   Delta Risk Reductions
26 fable 4.2-2: FPRA Additional Model Conservatisms with Estimated Delta Risk Reductions
  )nservatisms                                                                                                                                                                                                                                                                                                                                                                                                                                       Exposure                                     Period     1 Risk Reduction                                                                                               Exposure                                       Period   2 Risk Reduction
  )nservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction
* pump                       could                 have             operated           for                                                                                                                                                                                                                                                                                                                                                                                                 10%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 NIA J   1.88   hour               demonstrated                           run               time
* pump could have operated for 10% NIA J 1.88 hour demonstrated run time
  ~             Period 1.     Improved                   HEPs and tions.
  ~ Period 1. Improved HEPs and tions.


s of MFW             and                       reactor         trip for all fire                                                                                                                                                                                                                                                                                                           10%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 10%
s of MFW and reactor trip for all fire 10% 10%
Jtion of those   to which         a           reactor         trip
Jtion of those to which a reactor trip
'or     a             U1                   or     U2                 trip -                   a           risk reduction the ASM-BW-009,                           Rev.       2, rhe reduction           of risk due           to Jment           with unknown                                                         location,                     no
'or a U1 or U2 trip - a risk reduction the ASM-BW-009, Rev. 2, rhe reduction of risk due to Jment with unknown location, no
~ss specific basis       for credit is ler of a               10% risk reduction               from       the duction                   due           to   incorporation                           of cable xder       of half this value.               However,                   the P configuration                     which         is driven by
~ss specific basis for credit is ler of a 10% risk reduction from the duction due to incorporation of cable xder of half this value. However, the P configuration which is driven by
~moval                 would                     be           expected             to     be
~moval would be expected to be


d and                       Feed   requires 1 SI     pump                         and                                                                                                                                                                                                                                                                                                                                                                                                                             NIA                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           3%
d and Feed requires 1 SI pump and NIA 3%
lpport a           change                                   in success                       criteria V.                   Quantification       is based                       on                     the Ji res 1 SI     pump                     and                       2   PO RVs               for tivity indicated that the reduction                     in was                   small, ~1 % for Exposure are       expected           for Exposure                             Period 2.
lpport a change in success criteria V. Quantification is based on the Ji res 1 SI pump and 2 PO RVs for tivity indicated that the reduction in was small, ~1 % for Exposure are expected for Exposure Period 2.


27 fable         4.2-2:       FPRA     Additional       Model       Conservatisms                                 with Estimated     Delta Risk Reductions
27 fable 4.2-2: FPRA Additional Model Conservatisms with Estimated Delta Risk Reductions
  >nservatisms                                                                                                                                                                                                                                                                                                                                                                                                                       Exposure                                       Period 1 Risk Reduction                                                                                                 Exposure                                     Period   2 Risk Reduction failure data.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               10%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     N/A
>nservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction failure data. 10% N/A


  .EX   system,           currently       0.1     value         with                                                                                                                                                                                                                                                                                                                                                                           4%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       N/A i       Period 1.
.EX system, currently 0.1 value with 4% N/A i Period 1.


  ) AF   pump                         on                           U1                       not           available       due                                                                                                                                                                                                                                                                                                                                                                                             10%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           17%
  ) AF pump on U1 not available due 10% 17%
ance,                             can                                   be             removed                 since   there luring exposure                             period.
ance, can be removed since there luring exposure period.
:onservative         value         of 0.1       for pre-                                                                                                                                                                                                                                                                                                                                                                                                                                                     9%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       N/A system,           lower value           applicable     for o,       assume                             a           reduction           of a           factor   of
:onservative value of 0.1 for pre-9% N/A system, lower value applicable for o, assume a reduction of a factor of
:ts a           bounding                                         value           applicable     to   all
:ts a bounding value applicable to all
: equipment,               not           the specific s SOP   (MH   pump                         to   S/G,   not Jattery chargers         and                         HH     pump                   for
: equipment, not the specific s SOP (MH pump to S/G, not Jattery chargers and HH pump for


,corporate                             EPRI     realism NUREGs,                                                                                                                                                                                                                                                                                                                                                                                                         10%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           10%
,corporate EPRI realism NUREGs, 10% 10%
:G-2233 ites use         of the AF crosstie after a                                                                                                   potentially not           trivial, not         yet   quantified                                 potentially not           trivial, not         yet quantified llow credit for an                     emergency                                 diesel
:G-2233 ites use of the AF crosstie after a potentially not trivial, not yet quantified potentially not trivial, not yet quantified llow credit for an emergency diesel
> pump                       to   be           donated                           to     Unit   2 via imps supply         the Unit       1 AF     needs, ind their support systems       are       not
> pump to be donated to Unit 2 via imps supply the Unit 1 AF needs, ind their support systems are not


probability for non-severe                           panel                                                                                                                                                                                                                                                                                                                                                                                                                                                                               5%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               6%
probability for non-severe panel 5% 6%
rol room                           fires
rol room fires


28 fable         4.2-2:       FPRA       Additional         Model       Conservatisms                                   with Estimated   Delta Risk Reductions Jnservatisms                                                                                                                                                                                                                                                                                                                                                                                                       Exposure                                       Period   1 Risk Reduction                                                                                                 Exposure                                     Period   2 Risk Reduction non-severe                           panel             scenarios,                                                                                                                                                                                                                                                                                                                                                                                                                                             -2.5%                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   -2.5%
28 fable 4.2-2: FPRA Additional Model Conservatisms with Estimated Delta Risk Reductions Jnservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction non-severe panel scenarios, -2.5% -2.5%
f spurious             operations.                   Max                     increase
f spurious operations. Max increase


29 1ity Calculations                                     and                                 External                   Hazards                       Extrapolation
29 1ity Calculations and External Hazards Extrapolation


30 SDPcase             ExptIme                                                             Fire Delta                                                                                         FPIE Delta Total                                             CDF over         Total                                                 LERF over CDF                                                     LERF                                               CDF                                                     LERF                                     Delta CDF       exp                                             Delta LERF     exp 3.64E*07                                                                                           SOP-1                                                                 105             1.0lE-05             1.llE-06       8.54E-06               2 47E-07               1.87E-05         5.39E-06                 1.36E-06           3.90E-07 4.SSE-07                                                                                           5DP-2                                                                                               22               2.94E-05               3.16E-06               1.18E-05             3.38E-07                 4.12E-05         2.49E-06                   3.SOE-06       2.llE-07 Total   risk over   exposure           period                                                                                                                                                                                                                                                                                                                                                                     7.BBE-06                                                                           6.0lE-07 1.17E-07 1.03E-07 SDP-2tor total exp time                                                                             127               2.94E-05             3.16E-06             l.18E-05               3.39E-07               4.12E-05           1.43E-05               3.50E-06           1.22E-06
30 SDPcase ExptIme Fire Delta FPIE Delta Total CDF over Total LERF over CDF LERF CDF LERF Delta CDF exp Delta LERF exp 3.64E*07 SOP-1 105 1.0lE-05 1.llE-06 8.54E-06 2 47E-07 1.87E-05 5.39E-06 1.36E-06 3.90E-07 4.SSE-07 5DP-2 22 2.94E-05 3.16E-06 1.18E-05 3.38E-07 4.12E-05 2.49E-06 3.SOE-06 2.llE-07 Total risk over exposure period 7.BBE-06 6.0lE-07 1.17E-07 1.03E-07 SDP-2tor total exp time 127 2.94E-05 3.16E-06 l.18E-05 3.39E-07 4.12E-05 1.43E-05 3.50E-06 1.22E-06


AFPmp                                                                                                                                                                                                                                                                                                                                                                                                                                                                       TOTAL                                                                                                       TOTAL Failure                                                                                                               DELTA                                 DELTA                                   DELTA                                     DELTA                                     DELTA                                                                                                         DELTA                                                                                                           H1ghW1nds,       Tornado,                   Over                             NewCDF FlexHEP           Prob                                                   Exp   Time               FCDF                                           FLERF                                       CDF                                                       LERF                                               CDF                                       *127/365         LERF                                     *127/365       and         SeIsmIc     delta CDF   exposure               Total
AFPmp TOTAL TOTAL Failure DELTA DELTA DELTA DELTA DELTA DELTA H1ghW1nds, Tornado, Over NewCDF FlexHEP Prob Exp Time FCDF FLERF CDF LERF CDF *127/365 LERF *127/365 and SeIsmIc delta CDF exposure Total
'i244E-07                                                             6.30E-02                                             0.1                                                 127             l.20E-06           l.30E-07             7.85E-07               2.21E-08               1.98E-06           6.91E-07               1.52E-07         5.29E-08                                                                                             2.20E-07           2.20E-07                 9.llE-07 1407E-07                                                             6.30E-02                                                 0.5                                                 127             6.20E-06               6.50E*07           4.56E-06               1.31E-07               1.0BE-05         3.74E-06               7.BlE-07         2.72E-07                                                                                           3.40E-07           3.40E-07                     4.08E-06 2620E-07                                                             6.30E-02                       TRUE                                                                     127               1.16E-05             1.25E-06             9.20E-06                 2.66E-07                 2.08E-05         7.24E-06                 1.52E-06         5.27E-07                                                                                           5.00E-07           5.00E-07                     7 .74E-06 H46E-07                                                                                 0.3                                                 0.1                                                 127             2.lOE-06           2.lOE-07           l.02E-06             2.84E-08               3.12E-06           1.09E-06                 2.38E-07           8.29E-08                                                                                           2.70E-07           2.70E-07                       1.36E-06
'i244E-07 6.30E-02 0.1 127 l.20E-06 l.30E-07 7.85E-07 2.21E-08 1.98E-06 6.91E-07 1.52E-07 5.29E-08 2.20E-07 2.20E-07 9.llE-07 1407E-07 6.30E-02 0.5 127 6.20E-06 6.50E*07 4.56E-06 1.31E-07 1.0BE-05 3.74E-06 7.BlE-07 2.72E-07 3.40E-07 3.40E-07 4.08E-06 2620E-07 6.30E-02 TRUE 127 1.16E-05 1.25E-06 9.20E-06 2.66E-07 2.08E-05 7.24E-06 1.52E-06 5.27E-07 5.00E-07 5.00E-07 7.74E-06 H46E-07 0.3 0.1 127 2.lOE-06 2.lOE-07 l.02E-06 2.84E-08 3.12E-06 1.09E-06 2.38E-07 8.29E-08 2.70E-07 2.70E-07 1.36E-06
)987E-07                                                                               0.3                                             0.5                                           127             9.40E-06               9.30E-07               5.09E-06               1.45E-07               1.45E-05         5.04E-06                   1.0BE-06         3.74E-07                                                                                         4.30E-07           4.30E-07                     5.47E-06 l410E-07                                                                               03                     TRUE                                                                     127             l.78E-05           l.BlE-06       l.OlE-05         2.90E-07               2.79E-05         9.70E-06               2.lOE-06       7.31E-07                                                                                           6.30E-07           6.30E-07                   l.03E-05 t940E-07                                                                 TRUE                                                                 0.1                                           127                 3.BOE-06                 3.BOE-07       1.39E-06               3.79E-08               5.19E-06           1.BOE-06           4.lBE-07         1.45E-07                                                                                   4.lOE-07       4.lOE-07                   2.21E-06 l587E-07                                                                 TRUE                                                                     0.5                                             127               1.49E-05               1.43E-06               5.89E-06               1.67E-07                 2.0BE-05         7.23E-06               1.60E-06           5.56E-07                                                                                                           6.SOE-07       6.50E-07                         7.BBE-06
)987E-07 0.3 0.5 127 9.40E-06 9.30E-07 5.09E-06 1.45E-07 1.45E-05 5.04E-06 1.0BE-06 3.74E-07 4.30E-07 4.30E-07 5.47E-06 l410E-07 03 TRUE 127 l.78E-05 l.BlE-06 l.OlE-05 2.90E-07 2.79E-05 9.70E-06 2.lOE-06 7.31E-07 6.30E-07 6.30E-07 l.03E-05 t940E-07 TRUE 0.1 127 3.BOE-06 3.BOE-07 1.39E-06 3.79E-08 5.19E-06 1.BOE-06 4.lBE-07 1.45E-07 4.lOE-07 4.lOE-07 2.21E-06 l587E-07 TRUE 0.5 127 1.49E-05 1.43E-06 5.89E-06 1.67E-07 2.0BE-05 7.23E-06 1.60E-06 5.56E-07 6.SOE-07 6.50E-07 7.BBE-06
'i408E-07                                                               TRUE                                         TRUE                                                                         127             2.77E*05           2.67E*06           1.14E-05               3.25E-07               3.91E-05         1.36E-05               2.99E-06           1.04E-06                                                                                                         9.SOE-07         9.SOE-07                 l.46E-05 7170E-07                                                                 TRUE                                       0.0534                                                 127               l.OOE-06       l.lOE-07         2.59E-07               5.87E-09               1.26E-06         4.38E-07                 1.16E-07           4.03E-08                                                                                                         3.BOE-07         3.BOE-07                 8.lBE-07
'i408E-07 TRUE TRUE 127 2.77E*05 2.67E*06 1.14E-05 3.25E-07 3.91E-05 1.36E-05 2.99E-06 1.04E-06 9.SOE-07 9.SOE-07 l.46E-05 7170E-07 TRUE 0.0534 127 l.OOE-06 l.lOE-07 2.59E-07 5.87E-09 1.26E-06 4.38E-07 1.16E-07 4.03E-08 3.BOE-07 3.BOE-07 8.lBE-07


FPIE LERF                                                                                                                                                                                                                                                                                                                                                             FIRECDF                                                                                                                                                                                                                                                                                                                                                                     FIRELERF 0.063                                                   0.3                       TRUE                                                                                                                                                                                               0.063                                                 0.3                       TRUE                                                                                                                                                                                                   0.063                                                                                                                                     0.3                     TRUE 0.0534   ,:t)i,1,t:tY f°}'l,-*c,.\\.                             2.0E*09                                                                                         0.0534   J.~'1;:,r:;,i;{:-   '.'.:~ .. ,:J'w,**                                 3.SE-07                                                                                   0.0534}                                                                                                                                                                                                                                                           3.BE-08 0.1                   7.7E-09                   9.9E-09                       1.3E-08                                                                                                                                   0.1                       4.2E-07                       7.3E-07                   13E-06                                                                                                                                 0.1                   4.SE-08                                                                                                   7 3E-08                   1.3E-07 0.5                   4.6E-08                 5.lE-08                       5.BE-08                                                                                                                                 0.5                       2.2E-06                       3.3E-06                       5.2E-06                                                                                                                               0.5                   2.3E-07                                                                                                   3.2E-07                   5.0E-07 TRUE                                     9.3E-08                   1.0E-07                   1.lE-07                                                                                                             TRUE                                             4.0E-06                       6.2E-06                       9.6E-06                                                                                                         TRUE                                         4.3E-07                                                                                                   6.3E-07                   9.3E-07
FPIE LERF FIRECDF FIRELERF 0.063 0.3 TRUE 0.063 0.3 TRUE 0.063 0.3 TRUE 0.0534,:t)i,1,t:tY f°}'l,-*c,.\\. 2.0E*09 0.0534 J.~'1;:,r:;,i;{:- '.'.:~..,:J'w,** 3.SE-07 0.0534} 3.BE-08 0.1 7.7E-09 9.9E-09 1.3E-08 0.1 4.2E-07 7.3E-07 13E-06 0.1 4.SE-08 7 3E-08 1.3E-07 0.5 4.6E-08 5.lE-08 5.BE-08 0.5 2.2E-06 3.3E-06 5.2E-06 0.5 2.3E-07 3.2E-07 5.0E-07 TRUE 9.3E-08 1.0E-07 1.lE-07 TRUE 4.0E-06 6.2E-06 9.6E-06 TRUE 4.3E-07 6.3E-07 9.3E-07


TOT AL LERF over     exp                                                                                                                                                   Total CDFoverexplncludlngexternal 0.063                                                   0.3                       TRUE                                                                                                                                                                                               0.063                                                 0.3                       TRUE 0.0534                                                                                                                                                                 4.0E-08                                                                                                 0.0534       ::::h'/.:'                                                                                                       8.2E*07 0.1                 5.3E*08               8.3E-08                       1.SE-07                                                                                                                                 0.1                   9.lE-07                     1.4E-06                       2.2E-06 0.5                   2.7E-07                   3.7E-07                       5.6E-07                                                                                                                                   0.5                   4.lE-06                     5.5E-06                       7.9E-06 TRUE                                       5.3E-07                   7.3E-07                     1.0E*06                                                                                                           TRUE                                             7.7E-06                       1.0E-05                       1.SE-05 External       Events Extrapolation HEP TRUE AF   FTR                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               3.8E-07 0.1                                                                                                                                                                                                                                                                                                                                                                                           2.2E-07                                                                                                                                                                                                                                                                                                                                                                                                                                                   2.7E-07                                                                                                                                                                                                                       4.lE-07 0.5                                                                                                                                                                                                                                                                                                                                                                                                 3.4E-07                                                                                                                                                                                                                                                                                                                                                                                                                                     4.3E-07                                                                                                                                                                                                                                                                     6.SE-07 TRUE                                                                                                                                                                                                                                                                                                                                                                                                                                           5.0E-07                                                                                                                                                                                                                                                                                                                                                                                                                                           6.3E-07                                                                                                                                                                                                                                                               9.SE-07 The   highlighted cells indicate values       provided   by             the NRC   in the initial choice         letter. The values         on                 the bottom                       right were         used       to extrapolate           the values         in the rest of the right column.                                 Then,         the value           in the lower     left was                 used         as           an                 anchor                           point,     and               the bottom                       middle value           was               calculated                 using       linear interpolation.       After the bottom                       row             and                 right column                               were       calculated,             the extrapolation                             was             then applied to the other values         in the table.
TOT AL LERF over exp Total CDFoverexplncludlngexternal 0.063 0.3 TRUE 0.063 0.3 TRUE 0.0534 4.0E-08 0.0534 ::::h'/.:' 8.2E*07 0.1 5.3E*08 8.3E-08 1.SE-07 0.1 9.lE-07 1.4E-06 2.2E-06 0.5 2.7E-07 3.7E-07 5.6E-07 0.5 4.lE-06 5.5E-06 7.9E-06 TRUE 5.3E-07 7.3E-07 1.0E*06 TRUE 7.7E-06 1.0E-05 1.SE-05 External Events Extrapolation HEP TRUE AF FTR 3.8E-07 0.1 2.2E-07 2.7E-07 4.lE-07 0.5 3.4E-07 4.3E-07 6.SE-07 TRUE 5.0E-07 6.3E-07 9.SE-07 The highlighted cells indicate values provided by the NRC in the initial choice letter. The values on the bottom right were used to extrapolate the values in the rest of the right column. Then, the value in the lower left was used as an anchor point, and the bottom middle value was calculated using linear interpolation. After the bottom row and right column were calculated, the extrapolation was then applied to the other values in the table.
Christensen,       Andrew
Christensen, Andrew


From:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Harden,             Adam Sent:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Saturday,                         February                               24,   2024   10:14 AM To:                                                                                               Vanover,                                       Donald;                       Kolonauski,                           Lynn;                               Farradj, Usama;                                           Graven,               Ethan;         Christensen, Andrew
From: Harden, Adam Sent: Saturday, February 24, 2024 10:14 AM To: Vanover, Donald; Kolonauski, Lynn; Farradj, Usama; Graven, Ethan; Christensen, Andrew


==Subject:==
==Subject:==
RE:       BW-SDP-006                 RO       Signatures
RE: BW-SDP-006 RO Signatures


I,   Adam                       Harden,                       sign   BW-SDP-006                             Rev. 0 as           a         qualified reviewer.
I, Adam Harden, sign BW-SDP-006 Rev. 0 as a qualified reviewer.


ADAM       J. HARDEN Staff Engineer           II
ADAM J. HARDEN Staff Engineer II


i F:     +'i a   i1 c, ,,dt~: ... 1 C:.i) !G n s~ r: ! : uq     tv~s. cc1n
i F: +'i a i1 c,,,dt~:... 1 C:.i) !G n s~ r: ! : uq tv~s. cc1n


jensenhughes.com
jensenhughes.com


From:                     Vanover,                                         Donald                   <DVanover@jensenhughes.com>
From: Vanover, Donald <DVanover@jensenhughes.com>
Sent:           Saturday,                           February                                   24,   2024   10:08 AM To:               Kolonauski,                               Lynn                           <LKolonauski@jensenhughes.com>;                                                                                   Farradj, Usama                                       <UFarradj@jensenhughes.com>;                                                                       Graven,                   Ethan
Sent: Saturday, February 24, 2024 10:08 AM To: Kolonauski, Lynn <LKolonauski@jensenhughes.com>; Farradj, Usama <UFarradj@jensenhughes.com>; Graven, Ethan
  <EGraven@jensenhughes.com>;                                                                   Christensen, Andrew                 <andrew.christensen@jensenhughes.com>;                                                                                       Harden,                 Adam
  <EGraven@jensenhughes.com>; Christensen, Andrew <andrew.christensen@jensenhughes.com>; Harden, Adam
  <AHarden@jensenhughes.com>
  <AHarden@jensenhughes.com>


==Subject:==
==Subject:==
RE:       BW-SDP-006             RO     Signatures
RE: BW-SDP-006 RO Signatures


I,   Donald                       Vanover,                                         sign BW-SDP-006                             Rev. 0 as           a         qualified reviewer.
I, Donald Vanover, sign BW-SDP-006 Rev. 0 as a qualified reviewer.


DONALD       VANOVER Global         Service Line   Leader,       Energy                 +   Utilities
DONALD VANOVER Global Service Line Leader, Energy + Utilities


153   VVesl           C,ay                 Street, Suite 400,     West     Chester, PA   19380 0:       +1         42-4*-250-6852 i                         +1         4.34-4~~7-4372 dvanover@iensenhughes.com
153 VVesl C,ay Street, Suite 400, West Chester, PA 19380 0: +1 42-4*-250-6852 i +1 4.34-4~~7-4372 dvanover@iensenhughes.com


jensenhughes.com
jensenhughes.com


From:                       Kolonauski,                               Lynn                           <LKolonauski@iensenhughes.com>
From: Kolonauski, Lynn <LKolonauski@iensenhughes.com>
Sent:         Saturday,                           February                                 24,   2024   11:05   AM To:               Farradj,   Usama                                     <UFarradi@iensenhughes.com>;                                                                         Graven,                 Ethan           <EGraven@iensenhughes.com>;                                                                 Christensen, Andrew                 <andrew.christensen@iensenhughes.com>;                                                                                           Harden,               Adam                     <AHarden@jensenhughes.com>;                                                                       Vanover,                                           Donald
Sent: Saturday, February 24, 2024 11:05 AM To: Farradj, Usama <UFarradi@iensenhughes.com>; Graven, Ethan <EGraven@iensenhughes.com>; Christensen, Andrew <andrew.christensen@iensenhughes.com>; Harden, Adam <AHarden@jensenhughes.com>; Vanover, Donald
<DVanover@jensenhughes.com>
<DVanover@jensenhughes.com>


==Subject:==
==Subject:==
RE:       BW-SDP-006             RO       Signatures
RE: BW-SDP-006 RO Signatures


I,   Lynn                             Kolonauski,                                   sign BW-SDP-006                             Rev. 0 as           a         qualified co-preparer.
I, Lynn Kolonauski, sign BW-SDP-006 Rev. 0 as a qualified co-preparer.


LYNN         KOLONAUSKI Senior       Engineer Risk-Informed           Engineering
LYNN KOLONAUSKI Senior Engineer Risk-Informed Engineering


158 West   Gay                   Street, Suite 400 West     Chesler, PA   19380 0                 (484)   260-4737 1
158 West Gay Street, Suite 400 West Chesler, PA 19380 0 (484) 260-4737 1
lkolonauski@iensenhughes.com
lkolonauski@iensenhughes.com


jensenhughes.com
jensenhughes.com


From:                       Farradj,   Usama                                       <UFarradi@iensenhughes.com>
From: Farradj, Usama <UFarradi@iensenhughes.com>
Sent:       Saturday,                             February                                 24,   2024   11:04   AM To:               Graven,                     Ethan           <EGraven@iensenhughes.com>;                                                                   Christensen, Andrew                 <andrew.christensen@iensenhughes.com>;
Sent: Saturday, February 24, 2024 11:04 AM To: Graven, Ethan <EGraven@iensenhughes.com>; Christensen, Andrew <andrew.christensen@iensenhughes.com>;
Kolonauski,                                 Lynn                           <LKolonauski@iensenhughes.com>;                                                                               Harden,                   Adam                     <AHarden@iensenhughes.com>;                                                                       Vanover,                                         Donald
Kolonauski, Lynn <LKolonauski@iensenhughes.com>; Harden, Adam <AHarden@iensenhughes.com>; Vanover, Donald
  <DVanover@jensenhughes.com>
  <DVanover@jensenhughes.com>


==Subject:==
==Subject:==
RE:       BW-SDP-006             RO     Signatures
RE: BW-SDP-006 RO Signatures


I,   Usama                                             Farradj,       sign BW-SDP-006                             Rev. 0 as         a         qualified co-preparer.
I, Usama Farradj, sign BW-SDP-006 Rev. 0 as a qualified co-preparer.


USAMA                     FARRADJ Manager
USAMA FARRADJ Manager


                          '.31 ufarradj@jensenhughes.com
'.31 ufarradj@jensenhughes.com


From:                       Graven,                     Ethan           <EGraven@jensenhughes.com>
From: Graven, Ethan <EGraven@jensenhughes.com>
Sent:       Saturday,                             February                                 24,   2024   8:03   AM To:               Christensen, Andrew                 <andrew.christensen@jensenhughes.com>;                                                                                             Farradj,   Usama                                       <UFarradi@jensenhughes.com>;
Sent: Saturday, February 24, 2024 8:03 AM To: Christensen, Andrew <andrew.christensen@jensenhughes.com>; Farradj, Usama <UFarradi@jensenhughes.com>;
Kolonauski,                                   Lynn                           <LKolonauski@lensenhughes.com>;                                                                             Harden,                   Adam                     <AHarden@iensenhughes.com>;                                                                         Vanover,                                         Donald
Kolonauski, Lynn <LKolonauski@lensenhughes.com>; Harden, Adam <AHarden@iensenhughes.com>; Vanover, Donald
  <DVanover@jensenhughes.com>
  <DVanover@jensenhughes.com>


==Subject:==
==Subject:==
RE:       BW-SDP-006             RO     Signatures
RE: BW-SDP-006 RO Signatures


I,       Ethan             Graven,                   sign BW-SDP-006               Rev Oas         a         qualified co-preparer.
I, Ethan Graven, sign BW-SDP-006 Rev Oas a qualified co-preparer.
: Thanks, ETHAN       GRAVEN Manager,                         Midwest
: Thanks, ETHAN GRAVEN Manager, Midwest


jensenhughes.com
jensenhughes.com


cmmECT                                   WITH             us Receive   the latest company                                                   updates,           industry     news                 and                   free educational                           insights from       our             experts. Siqn-uo                     here
cmmECT WITH us Receive the latest company updates, industry news and free educational insights from our experts. Siqn-uo here


From:                     Christensen, Andrew                 <andrew.christensen@jensenhughes.com>
From: Christensen, Andrew <andrew.christensen@jensenhughes.com>
Sent:         Saturday,                               February                                 24,   2024   10:00   AM To:               Graven,                     Ethan           <EGraven@iensenhughes.com>;                                                                       Farradj,   Usama                                       <UFarradi@ljensenhughes.com>;                                                           Kolonauski,                               Lynn
Sent: Saturday, February 24, 2024 10:00 AM To: Graven, Ethan <EGraven@iensenhughes.com>; Farradj, Usama <UFarradi@ljensenhughes.com>; Kolonauski, Lynn
<LKolonauski@iensenhughes.com>;                                                                                     Harden,                 Adam                     <AHarden@jensenhughes.com>;                                                                         Vanover,                                           Donald
<LKolonauski@iensenhughes.com>; Harden, Adam <AHarden@jensenhughes.com>; Vanover, Donald


2
2
Line 577: Line 576:


==Subject:==
==Subject:==
BW-SDP-OO6       RO     Signatures
BW-SDP-OO6 RO Signatures


I,   Andrew                   Christensen, sign BW-SDP-OO6       RO       as           a       qualified co-preparer
I, Andrew Christensen, sign BW-SDP-OO6 RO as a qualified co-preparer


Andy                         Christensen         (he/him/his)
Andy Christensen (he/him/his)
Associate
Associate


1 0   South         Wacker                       Drive, Suite 1300,   Chicago,                   IL 60606 C:     +1       847-257-5765
1 0 South Wacker Drive, Suite 1300, Chicago, IL 60606 C: +1 847-257-5765


andrew.christensen(Q)iensenhuahes.com jensenhughes.com
andrew.christensen(Q)iensenhuahes.com jensenhughes.com


CONNECT       WITH                   US Receive the latest company                                                     updates,           industry     news                   and                   free educational                           insights from       our             experts. Siem-up           here
CONNECT WITH US Receive the latest company updates, industry news and free educational insights from our experts. Siem-up here


3 Christensen,     Andrew
3 Christensen, Andrew


From:                                                                                               Linthicum,           Roy                     R:(Constellation Nuclear)             < roy.linthicum@constellation.com>
From: Linthicum, Roy R:(Constellation Nuclear) < roy.linthicum@constellation.com>
Sent:                                                                                               Saturday,                         February                                 24,   2024     11 :40 AM To:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Christensen, Andrew
Sent: Saturday, February 24, 2024 11 :40 AM To: Christensen, Andrew


==Subject:==
==Subject:==
Re:       [EXTERNAL]FW: BW-SDP-006                 RO       Signatures
Re: [EXTERNAL]FW: BW-SDP-006 RO Signatures


[CAUTION             -         EXTERNAL SENDER]                                                                                                                                                                                 Warning                                   this email     comes                               from               an                     external             source.
[CAUTION - EXTERNAL SENDER] Warning this email comes from an external source.


I,     Roy                     Linthicum,             Sr. Manager,                                       Risk Management,                                               approve                         BW-SDP-006             Rev. 0
I, Roy Linthicum, Sr. Manager, Risk Management, approve BW-SDP-006 Rev. 0


Roy                   Linthicum Sr. Manager,                                     Risk Management Constellation         Energy 779-231-6097 630-926-3034             (cell) _..._,,
Roy Linthicum Sr. Manager, Risk Management Constellation Energy 779-231-6097 630-926-3034 (cell) _..._,,
    ~                                 Constellation
~ Constellation


From:                     Christensen, Andrew                 <andrew.christensen@jensenhughes.com>
From: Christensen, Andrew <andrew.christensen@jensenhughes.com>
Sent:         Saturday,                           February                                   24,   2024   10:17   AM To:               Linthicum,               Roy                     R:(Constellation           Nuclear)           <roy.linthicum@constellation.com>
Sent: Saturday, February 24, 2024 10:17 AM To: Linthicum, Roy R:(Constellation Nuclear) <roy.linthicum@constellation.com>


==Subject:==
==Subject:==
[EXTERNAL]FW: BW-SDP-006               RO     Signatures
[EXTERNAL]FW: BW-SDP-006 RO Signatures


Andy                       Christensen         (he/him/his)
Andy Christensen (he/him/his)
Associate
Associate


10 South         Wacker                     Drive, Suite 1300, Chicago,                 IL 60606 C           +1         847-257-5765
10 South Wacker Drive, Suite 1300, Chicago, IL 60606 C +1 847-257-5765


andrew.christensen@jensenhuqhes.com
andrew.christensen@jensenhuqhes.com
Line 620: Line 619:
jensenhughes.com
jensenhughes.com


From:                     Harden,                 Adam                     <AHarden@jensenhughes.com>
From: Harden, Adam <AHarden@jensenhughes.com>
Sent:         Saturday,                           February                                     24,   2024   10:14   AM To:             Vanover,                                         Donald                     <DVanover@jensenhughes.com>;                                                                                                     Kolonauski,                               Lynn                           <LKolonauski@jensenhughes.com>;                                                                                     Farradj, Usama                                       <UFarradj@jensenhughes.com>;                                                                           Graven,                   Ethan           <EGraven@jensenhughes.com>;                                                                     Christensen, Andrew
Sent: Saturday, February 24, 2024 10:14 AM To: Vanover, Donald <DVanover@jensenhughes.com>; Kolonauski, Lynn <LKolonauski@jensenhughes.com>; Farradj, Usama <UFarradj@jensenhughes.com>; Graven, Ethan <EGraven@jensenhughes.com>; Christensen, Andrew
<andrew.christensen@jensenhughes.com>
<andrew.christensen@jensenhughes.com>


==Subject:==
==Subject:==
RE:       BW-SDP-006                   RO       Signatures
RE: BW-SDP-006 RO Signatures


1}}
1}}

Revision as of 13:59, 5 October 2024

Attachment 4: BW-SDP-006 Rev. 0 - Braidwood 2B AF Pump Fuel Oil Leak SOP Sensitivities
ML24057A306
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 02/24/2024
From:
Constellation Energy Generation
To:
NRC/RGN-III
Shared Package
ML24057A301 List:
References
BW240007 BW-SDP-006, Rev 0
Download: ML24057A306 (1)


Text

RM DOCUMENTATION NO. BW-SDP-006, Rev. 0 PAGE NO.1

STATION: Braidwood UNIT(S) AFFECTED: UNIT2

TITLE: Braidwood 28 AF Pump Fuel Oil Leak SDP Sensitivities

SUMMARY

This document describes the FPIE and FPRA modeling, associated results, and sensitivities discussed in reference to the 2B AF pump fuel oil leak at Braidwood.

URE(s) Impacted: None Number of pages: 32 gages, including this gage.

RM Document Level: Level 1, ger ER-AA-600-1012 [1].

Internal RM Documentation Electronic Calculation Data Files: BW-SDP-006_R0_Attachment.zip, 83,176 KB, 2/24/2024, 9:45 AM

Co-Prepared by: Andrew Christensen / Signed Via Email /2/24/2024 Print Sign Date

Co-Prepared by: Ethan Graven / Signed Via Email /2/24/2024 Print Sign Date

Co-Prepared by: Usama Farradj / Signed Via Email /2/24/2024 Print Sign Date

Co-Prepared by: Lynn Kolonauski / Signed Via Email /2/24/2024 Print Sign Date

Reviewed by: Adam Harden / Signed Via Email /2/24/2024 Print Sign Date

Reviewed by: Donald Vanover / Signed Via Email /2/24/2024 Print Sign Date

Approved by: Roy Linthicum / Signed Via Email /2/24/2024 Print Sign Date

Method of Review: [ X] Detailed [] Alternate This RM documentation supersedes: N/A in its entirety.

External RM Documentation Prepared by: N/A I I

- Print Sign Date Approved by: N/A I I

- Print Sign Date Do any ASSUMPTIONS I ENGINEER/NG JUDGEMENTS require later verification? [] Yes [ X] No Tracked By: AT#, URE# etc.)

Braidwood Unit 2

2B AF Pump Fuel Oil Leak SDP Sensitivities

CONTACTS Braidwood

Site Risk Mgmt Engineer Andrew Christensen (773) 718-6601

Fleet. Risk Mgmt Engineer Ethan Graven (224) 422-9458

Internal Events Model Owner Adam Harden

Fire PRA Model Owner Usama Farradj

2 Table of Contents

1.0 EVENT OVERVIEW....................................................................................................................................................4

2.0 MAJOR PRA MODEL REFINEMENTS FOR THE SDP.................................................................................................... 4 2.1 FPIE.................................................................................................................................................... 4 2.2 FPRA.................................................................................................................................................. 5

3.0 RESULTS................................................................................................................................................................... 5

4.0 SENSITIVITIES........................................................................................................................................................... 5 4.1 FLEX HEP Sensitivity......................................................................................................................... 5 4.2 28 AF Pump Failure Probability Sensitivity........................................................................................ 9 4.3 Sensitivity Results............................................................................................................................... 9 4.4 Impact from External Events............................................................................................................. 11 4.5 Additional Sensitivity......................................................................................................................... 11 4.6 Key Conservatisms........................................................................................................................... 12

5.0 CONCLUSION

S........................................................................................................................................................ 12

6.0 REFERENCES

........................................................................................................................................................... 13

APPENDIX A FPIE AND FPRA HEP CHANGES................................................................................................................. 14

APPENDIX B ADDITIONAL MODEL CONSERVATISMS.................................................................................................... 26

APPENDIX C SENSITIVITY CALCULATIONS AND EXTERNAL HAZARDS EXTRAPOLATION................................................ 30

3 BW-SDP-006, Rev. 0

1.0 Event Overview Elevated fuel content was identified in the 2B Auxiliary Feedwater (AF) diesel engine lube oil sample during quarterly sampling. A confirmatory sample determined the fuel content was above fault limits and could not be evaluated to be acceptable. An emergent 72-hour LCO entry was made to perform repairs which found fuel leaks at compression fittings on 2 fuel injector return lines and exited on 9/23/2023. The fuel lines and fittings were originally replaced during preventative maintenance during A2R23 (spring 2023). The last previous in-range oil sample was taken on 5/19/2023. Fuel leaks were identified on fuel injectors that had been refurbished at Paragon, Inc. The 16 units were returned to stock at Byron Station on March 27, 2023, PO 1390618 was issued to Paragon March 29, 2023, and repair units were received back onsite at Braidwood Station from Paragon on April 17, 2023. Material condition deficiencies with refurbished fuel injectors, including fuel injector cap sealing surface defects and degraded O-ring, resulted in diesel fuel leaking into the diesel engine oil.

Testing was performed on a Detroit Diesel Series 149 diesel engine to determine if the 2B AF diesel engine could have performed its safety function of driving the 2B AF pump and other connected equipment for a period of at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The engine started with fuel oil diluted lubricating oil representative of the 2B AF engine conditions and operated in this condition for over 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, with additional fuel oil being added to the lube oil during the test to represent the September 2023 as-found condition. Based on the successful performance of the test engine with the fuel oil diluted lube oil and MPR's evaluation determining the test addressed all of the likely engine failure modes, MPR concluded that there is reasonable assurance the Braidwood 2B AF Pump Diesel Drive would have performed its safety function of driving the 2B AF pump and other connected equipment for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> [1]

Based on this testing, the 2B AF pump would have met its PRA success criteria and PRA mission time.

Therefore, the 2B AF pump would be considered available for the duration of the SOP exposure period.

Following IMC 0609 Appendix A Exhibit 2, the 2B AF pump would have maintained its PRA functionality and would screen as Green [2]. The following PRA model refinements, results, and sensitivities are provided under the assumption that the pump would not have met its mission time, in the event the NRC does not agree that PRA success criteria and PRA mission time are met.

2.0 Major PRA Model Refinements for the SDP 2.1 FPIE The major model refinements made to the FPIE model are as follows:

  • Refined support system initiating event (SSIE) fault trees to improve quantification times
  • Included loss of ESF AC bus initiators as general transients o Controlled shutdown following loss of ESF AC bus would not need to recognize loss of secondary cooling as FW is available during shutdown.
  • Incorporated more credit to the DC crosstie to opposite unit DC bus, specifically adding credit for DC crosstie (train A; train B already credited) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of associated battery charger not being energized.

o Credited the DC bus 111 to 211 DC crosstie (for controlled shutdown following loss of ESF AC bus initiating events only).

  • Medium Head (MH) FLEX pump credit to supply flow to Steam Generators (SGs) from the RWST, including credit to the N+1 FLEX pump after 4 successful hours of the first FLEX pump.
  • Updated loss of AC power recovery values for SOP Exposure Period 1 due to credit from ~2 hour 2B AF pump demonstrated run time during Exposure Period 1
  • Updated various HEPs due to credit for ~2 hour 2B AF pump demonstrated run time during Exposure Period 1. Refer to Appendix A for additional details.
  • Updated various HEPs due to applying a 10% probability that operators fail to manually trip the unit within 30 seconds of a total loss of Main Feedwater, as opposed to allowing the unit to automatically trip on low SG level.

o Applied to both the base case and Exposure Period 2

4 BW-SDP-006, Rev. 0

o Refer to Appendix A for additional details 2.2 FPRA The major model refinements made to the FPRA model are as follows:

  • Scenarios where no reactor trip was anticipated, for U1 (relative to the availability of the U1 cross tie to support U2) and for U2 received a conservative 0.1 unit trip probability.
  • 11.4C-0 Rad Waste Control Room fire modeling refinements, specifically the size and spread of fires in this zone and how they impact the Unit 1 cables in the zone
  • MH FLEX pump credit to supply flow to SGs from the Refueling Water Storage Tank (RWST),

including credit to the N+1 FLEX pump after 4 successful hours of the first FLEX pump.

  • Updated various HEPs due to credit from ~2 hour 2B AF pump demonstrated run time during Exposure Period 1. Refer to Appendix A for additional details.
  • Updated various HEPs due to applying a 10% probability that operators fail to manually trip the unit within 30 seconds of a total loss of Main Feedwater, as opposed to allowing the unit to automatically trip on low SG level.

o Applied to both the base case and Exposure Period 2 o Refer to Appendix A for additional details.

3.0 Results Table 3.0-1 below shows the results of Braidwood's FPIE and FPRA models following the refinements discussed in Section 2. These models were quantified with average maintenance and with the 2B AF pump Fail to Run event set to TRUE. The exposure period is split up into 2 different periods: Exposure Period 1 is the time before September 1 and Exposure Period 2 is the time after September 1. There are different PRA results before and after September 1 because the 2B AF pump ran for approximately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> on September 1. Exposure Period 1 credits this proven run time while Exposure Period 2 does not.

Table 3.0-1: SOP Results End FPIE FPRA FPIE FPRA Exposure Total State Delta Delta Time (Days)

Base CDF 7.1 E-06 2.7E-05 N/A N/A N/A N/A Case LERF 1.2E-07 3.3E-06 N/A N/A N/A N/A

Exposure CDF 1.6E-05 3.7E-05 8.5E-06 1.0E-05 105 5.4E-06 Period 1 LERF 3.6E-07 4.4E-06 2.5E-07 1.1 E-06 105 3.9E-07

Exposure CDF 1.9E-05 5.6E-05 1.2E-05 2.9E-05 22 2.5E-06 Period 2 LERF 4.6E-07 6.5E-06 3.4E-07 3.2E-06 22 2.1 E-07

Total CDF 127 7.9E-06 Exposure LERF 127 6.0E-07 Period

4.0 Sensitivities 4.1 FLEX HEP Sensitivity After detailed discussions and walkdowns, the NRC has challenged the acceptability of deploying the MH FLEX pump to pull suction from the RWST to supply the SGs. While a detailed human error probability (HEP) calculation for failing to deploy the MH FLEX pump has been completed, the challenge that the NRC has presented is understood. Therefore, the sensitivity increased the execution timing for the HEP calculation. These adjusted HEPs were then used to quantify the FPIE and FPRA models associated with Exposure Period 1. These results are summarized in Section 4.3.

5 BW-SDP-006, Rev. 0

The timing used to calculate the probability that the operators fail to align the MH FLEX pump includes 5 parts:

1. The length of time for operators to decide to use FLEX per 2BwFR-H.1 - 19 minutes
2. The time to set up the high head FLEX pump - 132 minutes
3. The amount of extra time required to establish procedure steps to align the MH FLEX pump. Base case assumes an additional 20 minutes for this part of the action and this is included in the execution time.
4. The additional time required to set up the MH FLEX pump discharge hoses - 23 minutes
5. The amount of time required to depressurize the SG that will be fed with the MH FLEX pump - 20 minutes

Interval 1 - Before Operations decides to use FLEX, they must rule out the use of the AF crosstie. This, along with making the decision to use FLEX, was simulated by the Operations day shift on 12/10/23 and was determined to be 19 minutes. This time is included in Tcielay depicted in Table 4.1-1 as a 20 minute value.

Intervals 2-4 cover the MH FLEX pump alignment. The reason the high head FLEX pump execution timing is used in Interval 1 is because that action was validated as part of the ELAP FLEX strategy.

OP-BR-102-106 Rev 015 reports this timing under FTSA#8 as 132 minutes. This timing reflects the high head FLEX pump pulling suction from the RWST. Interval 3 reflects the extra time required to establish procedure steps to align the MH FLEX pump to the RWST. Sensitivity to this assumption is explored in Table 4.1-1. Finally, when aligning the MH FLEX pump to pull suction from the RWST, additional discharge hose staging is required for the pump to discharge into the SGs. Therefore, an additional 23 minutes is included as Interval 4. This time was simulated by the day shift on 12/10/23.

Interval 5 - The length of time to depressurize the SGs sufficiently such that the MH FLEX pump can inject flow is accounted for and takes 20 minutes.

Table 4.1-1: Differing Additional Time Applied Due to Procedural Complexity and AF Pump Run Times, with Resulting Action Timing and HEPs In ut Parameters HEP Values Case Available Times Time Required to Establish Procedure Steps to Ali n Medium Head FLEX Pum AFW Tsw Tdelay Tsw-20 Min 30 Min 40 Min 50 Min Pump Run (Min) (Min) Tdelay Time Min 1.88 Hours 350 132 218 6.3E-02 2.0 Hours 365 140 225 6.3E-02 3.0 Hours 440 200 240 4.7E-02 4.0 Hours 520 260 260 3.9E-02 4.?E-02

  • Tree= 0; 2.2E-1 is the HEP value with no recovery. Tree= 0 if Tsw is 365 minutes and an additional 50 minutes are used to determine the alignment procedure implementation steps. Note that the MAAP runs quoted in Table 4.1-3 indicate Tsw for 2.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> of AF run time could be as large as 370 minutes and Tsw for 3.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> of AF run time could be as high as 445 minutes. The Tsw values quoted in Table 4. 1-1 are slightly conservative.

The sensitivity in Table 4.1-1 adds additional time for the assumed extra time needed to establish procedure steps to align the MH FLEX pump and shows the change in HEP when the recovery time is reduced. The HEP naturally increases as execution time increases because the recovery time is shorter, which increases the dependency factor. The HEPs based on recovery time available and associated dependency factor are summarized in Table 4.1-2.

6 BW-SDP-006, Rev. 0

Table 4.1-2: HEP Based on Recovery Time Available and Associated Dependency Factor

Tree (min) Dependency Factor FLEX HEP

> 60 Zero Dependence 3.9E-02

> 30 and up to 60 Low Dependence 4.7E-02

> 15 and up to 30 Medium Dependence 6.3E-02

> 0 and up to 15 High Dependence 1.2E-01 0 Complete Dependence 2.2E-01 NeQative N/A 1.0

Table 4.1-1 also varies the amount of time the 28 AF pump ran. By increasing this run time, the core will produce less decay heat when the 28 AF pump fails to run. This lengthens the time to core damage, and thus lengthens the system window time as well as the time available to deploy the MH FLEX pump.

Additional recovery time yields lower dependence and lower HEPs. System window times are determined by the thermal hydraulic analysis in Table 4.1-3, which uses MAAP.

Table 4.1-3: MAAP Quantifications Corresponding to Differing AF Pump Run Time

Case BB_506_OSG - BB_506_OSG - BB_506_OSG - BB_506_OSG -

DD188 FLEX1 DD200 FLEX1 DD300 FLEX1 DD400 FLEX1 DDAFW 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br /> 2 hours 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 4 hours operation time SG dryout 241.4 min 250.1 min 321.3 min 390.1 min

Core 309.6 min 318.3 min 396.1 min 466.9 min uncovery FLEX start 349.6 min 370 min 445 min 520 min time Peak core 1211 °F 1306 °F 1255 °F 1243 °F temperature

The total system window, Tsw, corresponds to the FLEX start time needed to avoid core damage. Delay time, Tdelay, is the 28 AF pump run time plus the time it takes operators to decide to use FLEX. The difference between Tsw and Tdelay is the total amount of time available for operators to complete an action, or Time Required, Tr. The difference between total available time and the time required to execute is Tree, or amount of time available for recovery. Figure 4.1-1 illustrates the timing definitions.

7 BW-SDP-006, Rev. 0

I System Window, T~w

! Time Required, TR

L R~o~ry time, ~]I Expected Performance Time, ET I *' i


....., 1.-I.. ----------.-.... -.**f----------....... -...,- time

t\\:c O ~\\_[~--------

Qpef.1',l,)!f' is cl.HHJ to perform action

\\ _________,----1 -~

loitiatin~ Event Occurs lrre(:ovenble eod state

Figure 4.1-1 Timing Criteria

Credit for the ~2 hour 2B AF pump run time provides enough margin to credit the MH FLEX pump deployment. Additionally, earlier in the total exposure period, the 2B AF pump demonstrated at least 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> of run time, incrementally decreasing as monthly test runs were completed. Table 4.1-4 shows this demonstrated run time.

Table 4.1-4: 28 AF Pump Demonstrated Runtime Date Run Time (Hours) 6/8/2023 0.61 7/14/2023 0.57 8/10/2023 0.52 9/1/2023 1.88 Total 3.58

Along with the greater than 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> run time from the Detroit Diesel test, the 2B AF pump run times currently credited in the analysis are bounding. Credit for additional run time could substantially influence the assumed boundary conditions in this analysis.

On 12/10/23, the day shift on Braidwood Unit 2 walked through a simulated operator response of what they would do after the 2B AF pump tripped after a unit trip, and the 2A AF pump, FW restoration, and the AF crosstie were all unavailable. They recognized the need to restore SG feed in time to prevent core damage would be the major objective and the MH FLEX pump pulling suction from the RWST would be faster than the using the low head FLEX pump pulling suction from the lake to supply the MH FLEX pump. The crew identified they would use the MH FLEX pump but noted concerns due to supplying the SGs with contaminated RWST water. They recognized the Shift Manager would have implemented 1 O CFR 50.54(x) which allows Operations to make decisions outside of procedures in order to protect the health and safety of the public. One identified strategy was to supply the MH FLEX pump via the fire protection system, if it were available, which would be substantially quicker than connecting the FLEX pump to the RWST and would alleviate contamination concerns. This would also alleviate the need to connect the 3400' of 5" hose required to connect the low head FLEX pump drafting off of the cooling lake to supply the MH FLEX pump, should this suction supply option be selected as described in the

8 BW-SDP-006, Rev. 0

procedure. However, the crew would pursue alternate success paths in parallel provided the operator resources were available.

The operations crews are made up of highly trained individuals dedicated to protecting the health and safety of the public. If the crew lost AF, FW restoration, and the AF crosstie, they would not stop attempting alternative strategies to restore secondary cooling. While these additional operator actions were not quantified in the FPIE and FPRA models, these operator actions should be qualitatively considered in tandem with the modeled operator actions.

The discussion above demonstrates a realistic pathway towards cooling the core in the understood scenario. Operations has stated that by implementing 10 CFR 50.54(x), they would implement non proceduralized actions to protect the health and safety of the public. This includes different suction sources for the MH FLEX pump, like the Fire Protection header. While the implementation of 10 CFR 50.54(x) does introduce some level of unpredictability in operator response, operators are trained to cool the core in any way possible. While they may not take the exact actions discussed in the HEP development above, they would take action. The purpose of this HEP sensitivity is to bound this uncertainty. The sensitivity results, included in Section 4.3, considers 3 HEPs for the MH FLEX pump HFE: 0.063 (nominal or medium dependence, as shown in Table 4.1-2), 0.3, and 1.0 (no flex credit).

4.2 28 AF Pump Failure Probability Sensitivity The example Detroit Diesel testing report shows that the 2B AF pump would have met its PRA mission time and would have been considered available for the duration of the SOP exposure period. However, an additional sensitivity, modifying the 2B AF pump failure rate, is included to address any proposed uncertainty regarding the Detroit Diesel engine testing. The results of this sensitivity are included in Tables 4.3-1 through 4.3-6.

4.3 Sensitivity Results The tables below contain the results of several sensitivity studies. The FLEX HEP described in Section 4.1 is varied from its nominal value of 0.063 to 0.3 to 1.0 (True). Additionally, the 2B AF pump FTR value is varied from 0.1 to 0.5 to 1.0 (True). Tables 4.3-1 and 4.3-2 show the ~CDF and ~LERF values for the FPIE model sensitivity results, respectively. Similarly, Tables 4.3-3 and 4.3-4 show the ~CDF and ~LERF values for the FPRA model sensitivity results, respectively. Finally, the FPIE and FPRA results are combined in Tables 4.3-5 and 4.3-6 for ~CDF and ~LERF, respectively.

Due to the Detroit Diesel test running for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the pump is assumed to run for at least 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for the duration of the exposure period. Therefore, the values in these tables use the Exposure Period 1 refinements for the entire 127-day duration. This is different from the SOP calculation in Table 3.0-1, which uses the Exposure Period 2 base over the entire exposure period. The base from Exposure Period 1 was used because it credits the MH FLEX pump strategy and the demonstrated 2B AF pump/engine run time. This yields a lower base metric and therefore larger and more conservative difference between the base and sensitivity CDF and LERF.

Appendix C provides additional detail for the sensitivity calculations.

9 BW-SDP-006, Rev. 0

Table 4.3-1 FPIE LiCDF Sensitivities FLEX HEP 0.063 0.3 TRUE 2BAF 0.1 2.?E-07 3.6E-07 4.8E-07 Pump 0.5 1.6E-06 1.8E-06 2.0E-06 Failure TRUE Probability 3.2E-06 3.5E-06 4.0E-06

Table 4.3-2 FPIE LiLERF Sensitivities FLEX HEP 0.063 0.3 TRUE 2BAF 0.1 7.?E-09 9.9E-09 1.3E-08 Pump 0.5 4.6E-08 5.1E-08 5.8E-08 Failure TRUE Probability 9.3E-08 1.0E-07 1.1 E-07

Table 4.3-3 FIRE LiCDF Sensitivities FLEX HEP 0.063 0.3 TRUE 2BAF 0.1 4.2E-07 7.3E-07 1.3E-06 Pump 0.5 2.2E-06 3.3E-06 5.2E-06 Failure TRUE Probability 4.0E-06 6.2E-06 9.6E-06

Table 4.3-4 FIRE b.LERF Sensitivities FLEX HEP 0.063 0.3 TRUE 2BAF 0.1 4.5E-08 7.3E-08 1.3E-07 Pump 0.5 2.3E-07 3.2E-07 5.0E-07 Failure TRUE Probability 4.3E-07 6.3E-07 9.3E-07

10 BW-SDP-006, Rev. 0

Table 4.3-5 TOTAL LiCDF Sensitivities FLEX HEP 0.063 0.3 TRUE 28AF 0.1 6.9E-07 1.1 E-06 1.SE-06 Pump 0.5 3.?E-06 5.0E-06 7.2E-06 Failure TRUE Probability 7.2E-06 9.?E-06 1.4E-05

Table 4.3-6 TOTAL LiLERF Sensitivities FLEX HEP 0.063 0.3 TRUE 28AF 0.1 5.3E-08 8.3E-08 1.5E-07 Pump 0.5 2.?E-07 3.?E-07 5.6E-07 Failure TRUE Probability 5.3E-07 7.3E-07 1.0E-06

4.4 Impact from External Events The NRC provided 3 tiCDF data points for their external, high winds and seismic contributions to the SDP determination: 9.5E-7, 6.5E-7, and 5E-7. These values are highlighted in Table 4.4-1. 9.5E-7 is the base case, and then the NRC provided a sensitivity with the FLEX HEP set to 0.063 and 0.5 for the 2B AF pump FTR value. In lieu of trying to reproduce the modifications that were made to the SPAR model, an extrapolation is performed. The first step was to extrapolate to the top right value first. Then, the other values are derived after assigning their FLEX sensitivity to the bottom left as an anchor point.

T bl 4 4 1 LiCDF a e - ue o eIsmIc, IQ In s, an dT d d t S.. H. h w* d orna oes FLEX HEP 0.063 0.3 TRUE 28 AF Pump 0.1 2.2E-07 2.?E-07 4.1 E-07 Failure Probability 0.5 3.4E-07 4.3E-07 6.5E-07 TRUE 5.0E-07 6.3E-07 9.5E-07

Adding these extrapolated results to Table 4.3-5 leads to the following:

T bl 4 4 2 T t I LiCDF. I d. S. a e - oa, inc u InQ eIsmIc, IQ In s, an H. hW. d dT d orna oes FLEX HEP 0.063 0.3 TRUE 28 AF Pump Failure 0.1 9.1 E-7 1.4E-6 2.2E-6 Probability 0.5 4.1 E-6 5.5E-6 7.9E-6 TRUE 7.7E-6 1.0E-5 1.5E-5

4.5 Additional Sensitivity An additional sensitivity is included in Table 4.5-1 that shows the LiCDF and LiLERF representing the 2B AF pump FTR probability set to 0.053 (twice the nominal failure probability) and no MH FLEX pump credit. Since there is no MH FLEX pump credit, the Exposure Period 2 base is used in the LiCDF and LiLERF calculations, which is more appropriate for this sensitivity case. Only the case in which FLEX is not credited is performed, because these results bound any case that credits FLEX. The LiCDF for Seismic, High Winds, and Tornadoes uses the same extrapolation methodology described in Section 4.4.

yielding a conservative addition of 3.SE-07 to the total shown in Table 4.5-1.

11 BW-SDP-006, Rev. 0

Appendix C provides additional detail for the sensitivity calculations.

T bl 4 5 1 AddT IS T *t R a e - 11ona ens1 IVl[Y It esu s FPIE FIRE Seismic, High Winds, Total and Tornadoes LlCDF 9.0E-08 3.SE-07 3.8E-07 8.2E-07 LlLERF 2.0E-09 3.8E-08 N/A 4.0E-08

4.6 Key Conservatisms There are conservatisms included in this analysis that should be considered for impacts on results. On 2/8/24, an Operations crew was put in a loss of feedwater scenario in the control room simulator to validate the timing used in the FLEX HEP calculation. The scenario consisted of a total loss of feedwater and failure of AF pumps to start. Operations responded to the loss of feedwater by tripping the unit and entering the Loss of Heat Sink procedure after failing to restart the AF pumps. They simulated sending an equipment operator to open the AF crosstie valves, and then attempted to restart Feedwater and Condensate/Condensate Booster pumps. After those strategies failed, the simulated equipment operator reported back that the AF crosstie valves could not be opened. The control room responded by entering FSG-3 and directing equipment operators to begin aligning the MH FLEX pump.

In summary, the operators took 13 minutes from the LOFW to trip the unit, navigate emergency operating procedures, and finally, direct equipment operators to align the MH FLEX pump for SG feed flow. The fully developed HEP assumes the operators take 20 minutes to arrive at this decision, which is conservative.

Additionally, operators in the control room simulator had to execute post-trip actions in parallel with the AF failure and had the added stress of using multiple procedures simultaneously. In the modeled scenario, the 2B AF pump provides SG feed flow for approximately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after the unit trip. In those 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, operators would have completed the post-trip actions and stabilized the unit. This is an additional conservatism because in the control room simulator, the operators had to respond to the unit trip and the loss of heat sink simultaneously.

Finally, by the time the 2B AF pump is assumed to trip at ~2 hours after the unit trip, additional Operations personnel would have reported to the station per administrative procedures in response to the plant trip.

These personnel, who are not credited in the FLEX HEP calculation, would be available to assist in the decision making or execution tasks for the MH FLEX pump alignment.

5.0 Conclusions The results of this analysis provide an overview of the impact of crediting FLEX and the Detroit Diesel testing for the SOP evaluation.

The sensitivity results show that a FLEX HEP of 0.3 or setting the 2B AF pump fail to run probability to 0.5 would yield no greater than a White finding. Considering the Detroit Diesel test ran for over 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, it is reasonable to conclude that the 2B AF pump would have run for longer than the assumed ~2hours.

Additionally, the operator simulation discussed in Section 4.6 provides high confidence that the FLEX strategy can be implemented.

Additional model conservatisms have also been identified that could lead to additional reductions in the calculated risk for the Detailed Risk Evaluation, which are detailed in Appendix B.

12 BW-SDP-006, Rev. 0

6.0 References

1. 4101-0031-RPT-001 Revision 0, "Test Report and Past Operability Evaluation Braidwood AF Diesel Drive Test with Lube Oil Diluted by Fuel Oil". January 2024
2. NRC Inspection Manual Chapter 0609 Appendix A, "The Significance Determination Process for Findings At-Power". January 2021.

13 d FPRA HEP Changes

) edits made to the FPIE and FPRA models for SOP quantifications. HFEs ending in "-F" signify FPRA HFEs, which have

p1E version.

HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE

HFE Description HEPs Update 1.30.2024 2022 Edits HEPs OPERATORS FAIL TO CLOSE 2.8E-02 3.8E-02 The execution time for the AF crosstie (13 minutes) was OPPOSITE UNIT AF0005 VALVES entered by mistake. The applicable execution time is 6 LOCALLY (LOFW) minutes. This is the time to close the AF005s locally per operator interviews conducted at Byron in May 2009.

OPERATOR FAILS TO XTIE 3.5E-03 #N/A This is a new action developed to replace the original TRAIN A or B DC BUS POWER action 0DC-12-XTIE-HDCOA, OPERATOR FAILS TO FROM OPPOSITE UNIT (NON-XTIE TRAIN B DC BUS POWER FROM OPPOSITE ELAP) UNIT, which was developed for ELAP scenarios.

OPERATORS FAIL TO RESTORE 1.3E-03 1.6E-03 Removed an execution subtask found to be non-critical.

LEVEL TO SX TOWER BASIN The action originally included BOP SX-12 Step F.1.c to (BYRON ONLY) "VERIFY/OPEN 0SX158A/B or 0SX157A/B, Essential Service Water Basin Inlet Valve." This subtask was removed as the SX CT System Notebook (BB-PRA-005.018 R3) states, "The basin makeup valves (0SX157A

& B, 0SX158A & B) are assumed to be normally open, do not need to change position, and therefore are not modeled.

OPS FAILS TO TRIP RCP TO 2.1 E-02 2.9E-02 1 Corrected execution time, Texe, from an overly PROTECT SD SEALS - NO SEAL conservative 5 minutes to 2 minutes based on COOLING Operations input collected on 1.2.2024 during the BW2 AF SOP effort.

OPS FAILS TO TRIP RCP TO 2.1 E-03 2.2E-03 2 Corrected execution time, Texe, from an overly PROTECT NON-SD SEALS - NO conservative 5 minutes to 2 minutes based on SEAL COOLING Operations input collected on 1.2.2024 during the BW2 AF SOP effort.

node! update HEP value was used for the FPIE SOP quantification.

nodel update HEP value was used for the FPIE SOP quantification.

14 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE

HFE Description HEPs Update Edits 1.30.2024 2022 HEPs OPERATORS FAIL TO STOP RH 2.3E-03 6.0E-03 Edited CBOTM element Pee, "Skip a Step in Procedure",

PUMPS (TRANSIENT) to endstate "h". The step was originally treated as 2.6E-03 "hidden" (i.e., endstate "i"), which is considered overly conservative.

Current Pee entry:

- The Note located prior to Step 25 in FRH1 specifically states that the RH pumps should not be run longer than 2.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> without CC flow applied to the RH HX. (Not treated as "hidden".)

- The crew is possibly in more than one procedure, depending on the given scenario. ("Multiple" procedures selected.)

- While the direction is located within a Note with a border, it is not considered to be graphically distinct.

-While the BBW operators use the circle/slash method of placekeeping and this method satisfies the requirements of Constellation procedure HU-AA-104-101, because the 2.4-hour direction is located in a Note and in not in a procedure step, no credit is taken for placekeeping aids.

OPERATORS FAIL TO REFILL 1.4E-04 6.9E-04 1 AF01 PB-FO-HXVOA-F is for refilling the OOAF fuel oil OOAFP FUEL OIL DAY TANK supply for the non-SOP unit (Unit 1). While there is FROM STORAGE TANK 5.7E-04 3 5.7E-03 sufficient time to support the feasibility for TSC activation

("ERF Review" in the HRAC), TSC recovery credit was not applied in the baseline HEP calc as an Alert was not assured for every scenario in which this action is credited. TSC activation is justified and applied in the SOP scenario.

,.5E-04 was used in FPRA quantification.

15 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE

HFE Description HEPs Update Edits 1.30.2024 2022 HEPs SOP INTERVAL 1 HEP EDITS p OPERATORS FAIL TO ALIGN 6.3E-02 N/A This action was developed to reflect use of the MH FLEX FLEX PUMP FOR SG pump taking suction on the RWST for the SDP-1 INVENTORY MAKEUP (GIVEN exposure period. This baseline version adds an 1.88 HR AF SUCCESS, EXEC additional 20 minutes to the execution time for ONLY) communication between the operators executing the alignment and shift Operations management as the execution procedures do not exactly match the non-ELAP scenario and step omissions will be needed.

Given the cue timing, the same HEP applies for FPIE and Fire.

OPERATORS FAIL TO CLOSE 1.4E-03 N/A Tsw: With AF success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />, reestablishing SG OPPOSITE UNIT AF0005 VALVES feed by the 349.6 minute (5.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br />) point allows LOCALLY (1.88 HR AF 2.2E-03 avoidance of core damage per MAAP run credit)_SDP BB_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

OPERATORS FAIL TO EXECUTE 2.5E-03 N/A Tsw: With AF success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />, reestablishing SG AF CROSSTIE FROM OPPOSITE feed by the 349.6 minute (5.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br />) point allows UNIT (EXE ONLY; 1.88 HR AF 2.?E-03 avoidance of core damage per MAAP run credit)_SDP BB_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 2BwFR-H.1 Attachment Band supported by multiple operator interviews.

FIRE - OPERATORS FAIL TO 6.?E-03 N/A Tsw: With AF success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />, reestablishing SG OPEN AF005 VALVES (LOCALLY feed by the 349.6 minute (5.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br />) point allows FAIL AIR; LOFW w 1.88 HR AF avoidance of core damage per MAAP run credit)_SDP BB_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

OPERATOR FAILS TO START 1.8E-03 N/A Tsw: With AF success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />, reestablishing SG MOTOR-DRIVEN AFW PUMP feed by the 349.6 minute (5.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br />) point allows AFTER FAILURE OF DC (1.88 HR 5.2E-02 avoidance of core damage per MAAP run AF credit)_SDP BB_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

16 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE

HFE Description HEPs Update Edits 1.30.2024 2022 HEPs OPERATORS FAIL TO LOCALLY 2.3E-03 N/A Tsw: With AF success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />, reestablishing SG START 8 AUXILIARY feed by the 349.6 minute (5.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br />) point allows FEEDWATER PUMP (1.88 HR AF avoidance of core damage per MAAP run credit)_SDP 88_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 28wFR-H.1 Attachment 8 and supported by multiple operator interviews.

OPERATORS FAIL TO MANUALLY 5.4E-04 N/A Tsw: With AF success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />, reestablishing SG START AF PUMPS FROM CR feed by the 349.6 minute (5.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br />) point allows (1.88 HR AF credit)_SDP 1.1 E-03 avoidance of core damage per MAAP run 88_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 28wFR-H.1 Attachment 8 and supported by multiple operator interviews.

OPERATORS FAIL TO 8.1 E-04 N/A Tsw: With AF success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />, reestablishing SG RECOGNIZE THE LOSS OF feed by the 349.6 minute (5.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br />) point allows SECONDARY COOLING 7.0E-04 avoidance of core damage per MAAP run (COGNITIVE ONLY; 1.88 HR 88_506_OSG_DD188_FLEXh. This is past SG dryout as AF)_SDP allowed by 28wFR-H.1 Attachment 8 and supported by multiple operator interviews.

OPERATORS FAIL TO RESTORE 1.0E-03 N/A Tsw: With AF success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />, reestablishing SG ALTERNATE FEEDWATER (EXE feed by the 349.6 minute (5.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br />) point allows ONLY; 1.88 HRAF credit)_SDP 1.4E-02 avoidance of core damage per MAAP run 88_506_OSG_DD188_FLEXh. This is past SG dryout as allowed by 28wFR-H.1 Attachment 8 and supported by multiple operator interviews.

OPERATORS FAIL TO EXECUTE 2.4E-04 N/A Tsw: For the 8&F action for the SDP-1 interval (AF TO OPEN PZR PORVS FOR 8/F success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />), MAAP run COOLING (EXE ONLY; 1.88 HR 2.8E-02 88506_ 1 PORV _ 1SI_DDAFW188d indicates core AF credit)_SDP damage can be avoided if 8&F is initiated within 204.0 minutes. This is NOT prior to SG dryout.

FIRE - OPS FAILS TO OPEN PZR 2.4E-04 N/A Tsw: For the 8&F action for the SDP-1 interval (AF PORVS FOR 8/F COOLING (EXE success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />), MAAP run ONLY, LOFW w 1.88 HR AF credit, 88506_ 1 PORV _ 1SI_DDAFW188d indicates core Pe Recovery)_SDP damage can be avoided if 8&F is initiated within 204.0 minutes. This is NOT prior to SG dryout.

17 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE

HFE Description HEPs Update Edits 1.30.2024 2022 HEPs OPERATORS FAIL TO INITIATE SI 1.5E-04 N/A Tsw: For the B&F action for the SDP-1 interval (AF FOR BLEED AND FEED success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />), MMP run COOLING (EXE ONLY; 1.88 HR 1.0E-02 BB506_ 1 PORV _ 1SI_DDAFW188d indicates core AF credit)_SDP damage can be avoided if B&F is initiated within 204.0 minutes. This is NOT prior to SG dryout.

FIRE - OPERATORS FAIL TO 1.5E-04 N/A Tsw: For the B&F action for the SDP-1 interval (AF INITIATE SI FOR BLEED AND success for 1.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />), MMP run FEED COOLING (EXE ONLY, BB506_ 1 PORV _ 1SI_DDAFW188d indicates core LOFW w 1.88 HR AF credit, Pe damage can be avoided if B&F is initiated within 204.0 Recovery) SOP minutes. This is NOT prior to SG dryout.

BASE CASE AND SOP INTERVAL 2 HEP EDITS

cenarios, the original baseline actions for SG feed restoration and Bleed and Feed (B&F) used a system window that reflected N SG level at -45 seconds. Operator interviews and observed simulator scenarios identified that the BBW crews are trained to insert
Jiately upon the recognition of the total loss of feed condition. The SG Feed restoration and B&F actions were revised to reflect a split reactor trip at 30 seconds with a failure rate of 10%. That is, the HEPs for total LOFW initiators and failure of AF were numerically

[0.1 *(HEPsase) + 0.9*(HEPsoP-2)]

1e baseline HEPs associated with the common cognitive action, 1 FW-FRH1-FHSGOA, all used the time to optimized B&F as a zed B&F time is 30 minutes for scenarios that only credit the automatic plant trip on low SG level. This is conservative for SG feed

~un BB_NoBF _Scram_AutoC (LOFW with no AFW and automatic plant trip on low SG level) indicates that the SGs will retain

>red by 39.9 minutes.

OPERATORS FAIL TO CLOSE 1.4E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual OPPOSITE UNIT AF0005 VALVES reactor trip upon recognition of the LOFW. If AFW is LOCALLY (LOFW w 30s trip)_SDP initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

G OPERATORS FAIL TO CLOSE 6.6E-03 3.8E-02 Tsw: MMP Run BB_NoBF _Scram_AutoC (LOFW with OPPOSITE UNIT AF0005 VALVES no AFW and automatic plant trip on low SG level)

LOCALLY (LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point. (Note the 2022 HEP value includes the higher Texe value which was corrected in the SOP effort and in the working copy of the HRAC.)

18 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE

HFE Description HEPs Update Edits 1.30.2024 2022 HEPs OPERATORS FAIL TO EXECUTE 2.5E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual AF CROSSTIE FROM OPPOSITE reactor trip upon recognition of the LOFW. If AFW is UNIT (EXE ONLY; LOFWw 30s initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is trip)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

3 OPERATORS FAIL TO EXECUTE 2.1 E-02 7.0E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFWwith AF CROSSTIE FROM OPPOSITE no AFW and automatic plant trip on low SG level)

UNIT (EXE ONLY; LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.

OPERATORS FAIL TO OPEN 4.0E-02 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual AF005 VALVES (LOCALLY FAIL reactor trip upon recognition of the LOFW. If AFW is AIR; LOFW w 30s trip)_SDP initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

~ OPERATORS FAIL TO OPEN 4.1 E-02 9.7E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with J

AF005 VALVES (LOCALLY FAIL no AFW and automatic plant trip on low SG level)

AIR; LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.

OPERATOR FAILS TO START 1.SE-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual MOTOR-DRIVEN AFW PUMP reactor trip upon recognition of the LOFW. If AFW is AFTER FAILURE OF DC (LOFW w initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is 30s trip)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

RIG OPERATOR FAILS TO START 7.SE-03 2.SE-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with MOTOR-DRIVEN AFW PUMP no AFW and automatic plant trip on low SG level)

AFTER FAILURE OF DC indicates that the SGs will retain inventory if SG feed is (LOFW) SOP restored by the 39.9 minute point.

19 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE

HFE Description HEPs Update Edits 1.30.2024 2022 HEPs OPERATORS FAIL TO LOCALLY 2.3E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual START B AUXILIARY reactor trip upon recognition of the LOFW. If AFW is FEEDWATER PUMP (LOFW w 30s initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is trip)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

~IG OPERATORS FAIL TO LOCALLY 9.6E-03 1.5E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with START B AUXILIARY no AFW and automatic plant trip on low SG level)

FEEDWATER PUMP (LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.

OPERATORS FAIL TO MANUALLY 5.4E-04 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual START AF PUMPS FROM CR reactor trip upon recognition of the LOFW. If AFW is (LOFWw 30s trip)_SDP initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

RIG OPERATORS FAIL TO MANUALLY 8.7E-04 1.7E-03 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with START AF PUMPS FROM CR no AFW and automatic plant trip on low SG level)

(LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.

OPERATORS FAIL RECOGNIZE 8.1 E-04 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual THE LOSS OF SECONDARY reactor trip upon recognition of the LOFW. If AFW is COOLING (COGNITIVE ONLY; initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is LOFW w 30s trip_no AF)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

IIG OPERATORS FAIL RECOGNIZE 2.2E-03 3.3E-03 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with THE LOSS OF SECONDARY no AFW and automatic plant trip on low SG level)

COOLING (COGNITIVE ONLY; indicates that the SGs will retain inventory if SG feed is LOFW) SOP restored by the 39.9 minute point.

20 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE

HFE Description HEPs Update Edits 1.30.2024 2022 HEPs OPERATORS FAIL TO RESTORE 1.0E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual ALTERNATE FEEDWATER (EXE reactor trip upon recognition of the LOFW. If AFW is ONLY; LOFWw 30s trip)_SDP initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

~IG OPERATORS FAIL TO RESTORE 1.0E-02 3.6E-02 Tsw: MMP Run BB_NoBF _Scram_AutoC (LOFW with ALTERNATEFEEDWATER(EXE no AFW and automatic plant trip on low SG level)

ONLY; LOFW)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.

OPERATORS FAIL TO EXECUTE 2.4E-04 N/A Tsw: MMP run BB_LatestBF _Scram_30A, indicates that TO OPEN PZR PORVS FOR B/F the latest time for B&F to prevent core damage with a COOLING (EXE ONLY; LOFWw manual plant trip at 30 seconds and without SG feed is 30s trip) SOP 71.4 minutes.

, OPERATORS FAIL TO EXECUTE 4.2E-03 4.2E-03 Tsw: In order to avoid core damage, bleed and feed TO OPEN PZR PORVS FOR B/F would have to be initiated by 30 minutes (Tsw) per BBW COOLING (EXE ONLY; MMP run BB0007c (LOFW with no AFW and automatic LOFW) SOP plant trip on low SG level).

OPERATORS FAIL TO INITIATE SI 1.5E-04 NIA Tsw: MMP run BB_LatestBF _Scram_30A, indicates that FOR BLEED AND FEED the latest time for B&F to prevent core damage with a COOLING (EXE ONLY; LOFWw manual plant trip at 30 seconds and without SG feed is 30s trip) SOP 71.4 minutes.

OPERATORS FAIL TO INITIATE SI 1.6E-03 1.6E-03 Tsw: In order to avoid core damage, bleed and feed FOR BLEED AND FEED would have to be initiated by 30 minutes (Tsw) per BBW COOLING (EXE ONLY; MAAP run BB0007c (LOFW with no AFW and automatic LOFW) SOP plant trip on low SG level).

FIRE - OPERATORS FAIL TO 1.7E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual CLOSE OPPOSITE UNIT AF005 reactor trip upon recognition of the LOFW. If AFW is VALVES LOCALLY (LOFWw initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is manual trip at 30s)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

21 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE

HFE Description HEPs Update Edits 1.30.2024 2022 HEPs

~IG FIRE - OPERATORS FAIL TO 2.SE-02 1.0 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with CLOSE OPPOSITE UNIT AF005 no AFW and automatic plant trip on low SG level)

VALVES LOCALLY (LOFWTsw indicates that the SGs will retain inventory if SG feed is used for Fire) SOP restored by the 39.9 minute point.

FIRE - OPERATORS FAIL TO 2.SE-03 4 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual ALIGN AF XTIE FROM OPPOSITE reactor trip upon recognition of the LOFW. If AFW is UNIT (EXE ONLY; LOFWw 30s initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is trip)_SOP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

~IG FIRE - OPERATORS FAIL TO 6.6E-02 7.0E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFWwith ALIGN AF XTIE FROM OPPOSITE no AFW and automatic plant trip on low SG level)

UNIT (EXE ONLY; LOFWTsw used indicates that the SGs will retain inventory if SG feed is for Fire) SOP restored by the 39.9 minute point.

FIRE - OPERATORS FAIL TO 6.7E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual OPEN AF005 VALVES (LOCALLY reactor trip upon recognition of the LOFW. If AFW is FAIL AIR; LOFWw 30s trip)_SOP initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is I past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

FIRE - OPERATORS FAIL TO 1.7E-02 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual OPEN AF005 VALVES (LOCALLY reactor trip upon recognition of the LOFW. If AFW is FAIL AIR; LOFWw 30s trip)_SOP initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is 1 past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

'.IG FIRE - OPERATORS FAIL TO 5.2E-02 2.8E-01 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with OPEN AF005 VALVES (LOCALLY no AFW and automatic plant trip on low SG level)

FAIL AIR; LOFWTsw used for indicates that the SGs will retain inventory if SG feed is Fire) SOP restored by the 39.9 minute point.

.7E-03 was used in FPRA quantification.

22 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE

HFE Description HEPs Update Edits 1.30.2024 2022 HEPs FIRE - OPS FAILS TO START MD 2.2E-03 5 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual AFW PUMP AFTER FAILURE OF reactor trip upon recognition of the LOFW. If AFW is DC (LOFW w 30s trip)_SDP initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dry out as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

ORIG FIRE - OPS FAILS TO START MD 1.0E-02 9.5E-02 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with AFW PUMP AFTER FAILURE OF no AFW and automatic plant trip on low SG level)

DC (LOFW Tsw used in Fire)_SDP indicates that the SGs will retain inventory if SG feed is restored by the 39.9 minute point.

FIRE - OPERATORS FAIL TO 1.1E-03 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual MANUALLY START AF PUMPS reactor trip upon recognition of the LOFW. If AFW is FROM CR (LOFW w 30s trip)_SDP initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

RIG FIRE - OPERATORS FAIL TO 1.5E-03 4.9E-03 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFW with MANUALLY START AF PUMPS no AFW and automatic plant trip on low SG level)

FROM CR (LOFW Tsw used in indicates that the SGs will retain inventory if SG feed is Fire) SDP restored by the 39.9 minute point.

FIRE - OPERATORS FAIL 7.0E-04 NIA Tsw: MAAP run BB_LatestBF _Scram_30A, indicates that RECOGNIZE THE CUE TO the latest time for B&F to prevent core damage with a SECONDARY COOLING (LOFW w manual plant trip at 30 seconds and without SG feed is 30s trip)_SDP 71.4 minutes. After this time, RCS injection flow cannot prevent core damage when the bleed path is opened.

RIG FIRE - OPERATORS FAIL 8.5E-03 8.3E-03 Tsw: MAAP Run BB_NoBF _Scram_AutoC (LOFWwith RECOGNIZE THE CUE TO no AFW and automatic plant trip on low SG level)

SECONDARY COOLING (LOFW indicates that the SGs will retain inventory if SG feed is Tsw used for Fire) SDP restored by the 39.9 minute point.

,.2E-02 was used in FPRA quantification.

23 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE

HFE Description HEPs Update Edits 1.30.2024 2022 HEPs FIRE - OPERATORS FAIL TO 6.7E-03 6 N/A Tsw: BB_NoBF _Scram30E includes credit for a manual RESTORE ALTERNATE reactor trip upon recognition of the LOFW. If AFW is FEEDWATER (EXE ONLY; LOFW initiated by 2.46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> (147.6 minutes) core damage is w 30s trip)_SDP avoided. (Max core temperature node of 1796F). This is past SG dryout as allowed by 2BwFR-H.1 Attachment B and supported by multiple operator interviews.

HIG FIRE - OPERATORS FAIL TO 3.SE-02 4.5E-02 Tsw: MMP Run BB_NoBF _Scram_AutoC (LOFWwith RESTORE ALTERNATE no AFW and automatic plant trip on low SG level)

FEEDWATER (EXE ONLY; LOFW indicates that the SGs will retain inventory if SG feed is Tsw used in Fire) SOP restored by the 39.9 minute point.

FIRE - OPS FAILS TO OPEN PZR 2.SE-02 N/A Tsw: In order to avoid core damage, feed and bleed PORVS FOR B/F COOLING (EXE would have to be initiated by 71.4 minutes (Tsw) per ONLY; LOFWw 30s trip; NO Pe BBW MMP run BB_LatestBF _Scram_30A.

rec) SOP IG FIRE - OPS FAILS TO OPEN PZR 2.SE-02 2.SE-02 Tsw: In order to avoid core damage, bleed and feed PORVS FOR B/F COOLING (EXE would have to be initiated by 30 minutes (Tsw) per BBW ONLY; LOFWTsw; NO Pe MAAP run BB0007c (LOFW with no AFW and automatic recovery) SOP plant trip on low SG level).

FIRE - OPS FAILS TO OPEN PZR 2.4E-04 N/A Tsw: In order to avoid core damage, feed and bleed PORVS FOR B/F COOLING (EXE would have to be initiated by 71.4 minutes (Tsw) per ONLY, LOFWw 30s trip, Pe BBW MMP run BB_LatestBF _Scram_30A.

Recovery) SOP

IG FIRE - OPS FAILS TO OPEN PZR 4.2E-03 4.2E-03 Tsw: In order to avoid core damage, bleed and feed PORVS FOR B/F COOLING (EXE would have to be initiated by 30 minutes (Tsw) per BBW ONLY, LOFW Tsw, Pe MMP run BB0007c (LOFW with no AFW and automatic Recovery) SOP plant trip on low SG level).

FIRE - OPERATORS FAIL TO 1.0E-02 NIA Tsw: In order to avoid core damage, feed and bleed INITIATE SI FOR BLEED AND would have to be initiated by 71.4 minutes (Tsw) per FEED COOLING (EXE ONLY: BBW MMP run BB_LatestBF _Scram_30A.

LOFW w 30s trip, NO Pe rec) SOP

.4E-02 was used in FPRA quantification.

24 HEP EDITS MADE SINCE 2022 BBW FPIE UPDATE

HFE Description HEPs Update Edits 1.30.2024 2022 HEPs

FIRE - OPERATORS FAIL TO 1.0E-02 1.0E-02 Tsw
In order to avoid core damage, bleed and feed INITIATE SI FOR BLEED AND would have to be initiated by 30 minutes (Tsw) per BBW FEED COOLING (EXE ONLY: MAAP run BB000?c (LOFW with no AFW and automatic LOFW Tsw used in Fire, NO Pe plant trip on low SG level).

rec) SOP FIRE - OPERATORS FAIL TO 1.5E-04 N/A Tsw: In order to avoid core damage, feed and bleed INITIATE SI FOR BLEED AND would have to be initiated by 71.4 minutes (Tsw) per FEED COOLING (EXE ONLY, BBW MAAP run BB_LatestBF _Scram_30A.

LOFW w 30s trip, Pe RECV) SOP

~ FIRE - OPERATORS FAIL TO 1.6E-03 1.6E-03 Tsw: In order to avoid core damage, bleed and feed INITIATE SI FOR BLEED AND would have to be initiated by 30 minutes (Tsw) per BBW FEED COOLING (EXE ONLY, MAAP run BB0007c (LOFW with no AFW and automatic LOFW Tsw, Pe RECV) SOP plant trip on low SG level).

25

,al Model Conservatisms nements have been identified but were not pursued in the model used to generate SOP results. These refinements are md Table 4.2-2, with the Fussel Vesely metrics associated with the refinement to show relative importance and potential

~d risk.

Table 4.2-1: FPIE Additional Model Conservatisms with Estimated Delta Risk Reductions

)nservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction

) AF pump on U1 not available due 0.15% 1%

ance, can be removed since there luring exposure period.

onservative value of 0.1 for pre-1% N/A system, lower value applicable for 1/o, assume a reduction of a factor of
ts a bounding value applicable to all
equipment, not the specific s SOP (MH pump to S/G, not Jattery chargers and HH pump for '

k reduction 1% 1%

fable 4.2-2: FPRA Additional Model Conservatisms with Estimated Delta Risk Reductions

)nservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction for Exposure Period 2, although it is N/A 10%

np could have run for some length and JHEPs for AF related actions.

26 fable 4.2-2: FPRA Additional Model Conservatisms with Estimated Delta Risk Reductions

)nservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction

  • pump could have operated for 10% NIA J 1.88 hour0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br /> demonstrated run time

~ Period 1. Improved HEPs and tions.

s of MFW and reactor trip for all fire 10% 10%

Jtion of those to which a reactor trip

'or a U1 or U2 trip - a risk reduction the ASM-BW-009, Rev. 2, rhe reduction of risk due to Jment with unknown location, no

~ss specific basis for credit is ler of a 10% risk reduction from the duction due to incorporation of cable xder of half this value. However, the P configuration which is driven by

~moval would be expected to be

d and Feed requires 1 SI pump and NIA 3%

lpport a change in success criteria V. Quantification is based on the Ji res 1 SI pump and 2 PO RVs for tivity indicated that the reduction in was small, ~1 % for Exposure are expected for Exposure Period 2.

27 fable 4.2-2: FPRA Additional Model Conservatisms with Estimated Delta Risk Reductions

>nservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction failure data. 10% N/A

.EX system, currently 0.1 value with 4% N/A i Period 1.

) AF pump on U1 not available due 10% 17%

ance, can be removed since there luring exposure period.

onservative value of 0.1 for pre-9% N/A system, lower value applicable for o, assume a reduction of a factor of
ts a bounding value applicable to all
equipment, not the specific s SOP (MH pump to S/G, not Jattery chargers and HH pump for

,corporate EPRI realism NUREGs, 10% 10%

G-2233 ites use of the AF crosstie after a potentially not trivial, not yet quantified potentially not trivial, not yet quantified llow credit for an emergency diesel

> pump to be donated to Unit 2 via imps supply the Unit 1 AF needs, ind their support systems are not

probability for non-severe panel 5% 6%

rol room fires

28 fable 4.2-2: FPRA Additional Model Conservatisms with Estimated Delta Risk Reductions Jnservatisms Exposure Period 1 Risk Reduction Exposure Period 2 Risk Reduction non-severe panel scenarios, -2.5% -2.5%

f spurious operations. Max increase

29 1ity Calculations and External Hazards Extrapolation

30 SDPcase ExptIme Fire Delta FPIE Delta Total CDF over Total LERF over CDF LERF CDF LERF Delta CDF exp Delta LERF exp 3.64E*07 SOP-1 105 1.0lE-05 1.llE-06 8.54E-06 2 47E-07 1.87E-05 5.39E-06 1.36E-06 3.90E-07 4.SSE-07 5DP-2 22 2.94E-05 3.16E-06 1.18E-05 3.38E-07 4.12E-05 2.49E-06 3.SOE-06 2.llE-07 Total risk over exposure period 7.BBE-06 6.0lE-07 1.17E-07 1.03E-07 SDP-2tor total exp time 127 2.94E-05 3.16E-06 l.18E-05 3.39E-07 4.12E-05 1.43E-05 3.50E-06 1.22E-06

AFPmp TOTAL TOTAL Failure DELTA DELTA DELTA DELTA DELTA DELTA H1ghW1nds, Tornado, Over NewCDF FlexHEP Prob Exp Time FCDF FLERF CDF LERF CDF *127/365 LERF *127/365 and SeIsmIc delta CDF exposure Total

'i244E-07 6.30E-02 0.1 127 l.20E-06 l.30E-07 7.85E-07 2.21E-08 1.98E-06 6.91E-07 1.52E-07 5.29E-08 2.20E-07 2.20E-07 9.llE-07 1407E-07 6.30E-02 0.5 127 6.20E-06 6.50E*07 4.56E-06 1.31E-07 1.0BE-05 3.74E-06 7.BlE-07 2.72E-07 3.40E-07 3.40E-07 4.08E-06 2620E-07 6.30E-02 TRUE 127 1.16E-05 1.25E-06 9.20E-06 2.66E-07 2.08E-05 7.24E-06 1.52E-06 5.27E-07 5.00E-07 5.00E-07 7.74E-06 H46E-07 0.3 0.1 127 2.lOE-06 2.lOE-07 l.02E-06 2.84E-08 3.12E-06 1.09E-06 2.38E-07 8.29E-08 2.70E-07 2.70E-07 1.36E-06

)987E-07 0.3 0.5 127 9.40E-06 9.30E-07 5.09E-06 1.45E-07 1.45E-05 5.04E-06 1.0BE-06 3.74E-07 4.30E-07 4.30E-07 5.47E-06 l410E-07 03 TRUE 127 l.78E-05 l.BlE-06 l.OlE-05 2.90E-07 2.79E-05 9.70E-06 2.lOE-06 7.31E-07 6.30E-07 6.30E-07 l.03E-05 t940E-07 TRUE 0.1 127 3.BOE-06 3.BOE-07 1.39E-06 3.79E-08 5.19E-06 1.BOE-06 4.lBE-07 1.45E-07 4.lOE-07 4.lOE-07 2.21E-06 l587E-07 TRUE 0.5 127 1.49E-05 1.43E-06 5.89E-06 1.67E-07 2.0BE-05 7.23E-06 1.60E-06 5.56E-07 6.SOE-07 6.50E-07 7.BBE-06

'i408E-07 TRUE TRUE 127 2.77E*05 2.67E*06 1.14E-05 3.25E-07 3.91E-05 1.36E-05 2.99E-06 1.04E-06 9.SOE-07 9.SOE-07 l.46E-05 7170E-07 TRUE 0.0534 127 l.OOE-06 l.lOE-07 2.59E-07 5.87E-09 1.26E-06 4.38E-07 1.16E-07 4.03E-08 3.BOE-07 3.BOE-07 8.lBE-07

FPIE LERF FIRECDF FIRELERF 0.063 0.3 TRUE 0.063 0.3 TRUE 0.063 0.3 TRUE 0.0534,:t)i,1,t:tY f°}'l,-*c,.\\. 2.0E*09 0.0534 J.~'1;:,r:;,i;{:- '.'.:~..,:J'w,** 3.SE-07 0.0534} 3.BE-08 0.1 7.7E-09 9.9E-09 1.3E-08 0.1 4.2E-07 7.3E-07 13E-06 0.1 4.SE-08 7 3E-08 1.3E-07 0.5 4.6E-08 5.lE-08 5.BE-08 0.5 2.2E-06 3.3E-06 5.2E-06 0.5 2.3E-07 3.2E-07 5.0E-07 TRUE 9.3E-08 1.0E-07 1.lE-07 TRUE 4.0E-06 6.2E-06 9.6E-06 TRUE 4.3E-07 6.3E-07 9.3E-07

TOT AL LERF over exp Total CDFoverexplncludlngexternal 0.063 0.3 TRUE 0.063 0.3 TRUE 0.0534 4.0E-08 0.0534 ::::h'/.:' 8.2E*07 0.1 5.3E*08 8.3E-08 1.SE-07 0.1 9.lE-07 1.4E-06 2.2E-06 0.5 2.7E-07 3.7E-07 5.6E-07 0.5 4.lE-06 5.5E-06 7.9E-06 TRUE 5.3E-07 7.3E-07 1.0E*06 TRUE 7.7E-06 1.0E-05 1.SE-05 External Events Extrapolation HEP TRUE AF FTR 3.8E-07 0.1 2.2E-07 2.7E-07 4.lE-07 0.5 3.4E-07 4.3E-07 6.SE-07 TRUE 5.0E-07 6.3E-07 9.SE-07 The highlighted cells indicate values provided by the NRC in the initial choice letter. The values on the bottom right were used to extrapolate the values in the rest of the right column. Then, the value in the lower left was used as an anchor point, and the bottom middle value was calculated using linear interpolation. After the bottom row and right column were calculated, the extrapolation was then applied to the other values in the table.

Christensen, Andrew

From: Harden, Adam Sent: Saturday, February 24, 2024 10:14 AM To: Vanover, Donald; Kolonauski, Lynn; Farradj, Usama; Graven, Ethan; Christensen, Andrew

Subject:

RE: BW-SDP-006 RO Signatures

I, Adam Harden, sign BW-SDP-006 Rev. 0 as a qualified reviewer.

ADAM J. HARDEN Staff Engineer II

i F: +'i a i1 c,,,dt~:... 1 C:.i) !G n s~ r: ! : uq tv~s. cc1n

jensenhughes.com

From: Vanover, Donald <DVanover@jensenhughes.com>

Sent: Saturday, February 24, 2024 10:08 AM To: Kolonauski, Lynn <LKolonauski@jensenhughes.com>; Farradj, Usama <UFarradj@jensenhughes.com>; Graven, Ethan

<EGraven@jensenhughes.com>; Christensen, Andrew <andrew.christensen@jensenhughes.com>; Harden, Adam

<AHarden@jensenhughes.com>

Subject:

RE: BW-SDP-006 RO Signatures

I, Donald Vanover, sign BW-SDP-006 Rev. 0 as a qualified reviewer.

DONALD VANOVER Global Service Line Leader, Energy + Utilities

153 VVesl C,ay Street, Suite 400, West Chester, PA 19380 0: +1 42-4*-250-6852 i +1 4.34-4~~7-4372 dvanover@iensenhughes.com

jensenhughes.com

From: Kolonauski, Lynn <LKolonauski@iensenhughes.com>

Sent: Saturday, February 24, 2024 11:05 AM To: Farradj, Usama <UFarradi@iensenhughes.com>; Graven, Ethan <EGraven@iensenhughes.com>; Christensen, Andrew <andrew.christensen@iensenhughes.com>; Harden, Adam <AHarden@jensenhughes.com>; Vanover, Donald

<DVanover@jensenhughes.com>

Subject:

RE: BW-SDP-006 RO Signatures

I, Lynn Kolonauski, sign BW-SDP-006 Rev. 0 as a qualified co-preparer.

LYNN KOLONAUSKI Senior Engineer Risk-Informed Engineering

158 West Gay Street, Suite 400 West Chesler, PA 19380 0 (484) 260-4737 1

lkolonauski@iensenhughes.com

jensenhughes.com

From: Farradj, Usama <UFarradi@iensenhughes.com>

Sent: Saturday, February 24, 2024 11:04 AM To: Graven, Ethan <EGraven@iensenhughes.com>; Christensen, Andrew <andrew.christensen@iensenhughes.com>;

Kolonauski, Lynn <LKolonauski@iensenhughes.com>; Harden, Adam <AHarden@iensenhughes.com>; Vanover, Donald

<DVanover@jensenhughes.com>

Subject:

RE: BW-SDP-006 RO Signatures

I, Usama Farradj, sign BW-SDP-006 Rev. 0 as a qualified co-preparer.

USAMA FARRADJ Manager

'.31 ufarradj@jensenhughes.com

From: Graven, Ethan <EGraven@jensenhughes.com>

Sent: Saturday, February 24, 2024 8:03 AM To: Christensen, Andrew <andrew.christensen@jensenhughes.com>; Farradj, Usama <UFarradi@jensenhughes.com>;

Kolonauski, Lynn <LKolonauski@lensenhughes.com>; Harden, Adam <AHarden@iensenhughes.com>; Vanover, Donald

<DVanover@jensenhughes.com>

Subject:

RE: BW-SDP-006 RO Signatures

I, Ethan Graven, sign BW-SDP-006 Rev Oas a qualified co-preparer.

Thanks, ETHAN GRAVEN Manager, Midwest

jensenhughes.com

cmmECT WITH us Receive the latest company updates, industry news and free educational insights from our experts. Siqn-uo here

From: Christensen, Andrew <andrew.christensen@jensenhughes.com>

Sent: Saturday, February 24, 2024 10:00 AM To: Graven, Ethan <EGraven@iensenhughes.com>; Farradj, Usama <UFarradi@ljensenhughes.com>; Kolonauski, Lynn

<LKolonauski@iensenhughes.com>; Harden, Adam <AHarden@jensenhughes.com>; Vanover, Donald

2

<DVanover@jensenhughes.com>

Subject:

BW-SDP-OO6 RO Signatures

I, Andrew Christensen, sign BW-SDP-OO6 RO as a qualified co-preparer

Andy Christensen (he/him/his)

Associate

1 0 South Wacker Drive, Suite 1300, Chicago, IL 60606 C: +1 847-257-5765

andrew.christensen(Q)iensenhuahes.com jensenhughes.com

CONNECT WITH US Receive the latest company updates, industry news and free educational insights from our experts. Siem-up here

3 Christensen, Andrew

From: Linthicum, Roy R:(Constellation Nuclear) < roy.linthicum@constellation.com>

Sent: Saturday, February 24, 2024 11 :40 AM To: Christensen, Andrew

Subject:

Re: [EXTERNAL]FW: BW-SDP-006 RO Signatures

[CAUTION - EXTERNAL SENDER] Warning this email comes from an external source.

I, Roy Linthicum, Sr. Manager, Risk Management, approve BW-SDP-006 Rev. 0

Roy Linthicum Sr. Manager, Risk Management Constellation Energy 779-231-6097 630-926-3034 (cell) _..._,,

~ Constellation

From: Christensen, Andrew <andrew.christensen@jensenhughes.com>

Sent: Saturday, February 24, 2024 10:17 AM To: Linthicum, Roy R:(Constellation Nuclear) <roy.linthicum@constellation.com>

Subject:

[EXTERNAL]FW: BW-SDP-006 RO Signatures

Andy Christensen (he/him/his)

Associate

10 South Wacker Drive, Suite 1300, Chicago, IL 60606 C +1 847-257-5765

andrew.christensen@jensenhuqhes.com

jensenhughes.com

From: Harden, Adam <AHarden@jensenhughes.com>

Sent: Saturday, February 24, 2024 10:14 AM To: Vanover, Donald <DVanover@jensenhughes.com>; Kolonauski, Lynn <LKolonauski@jensenhughes.com>; Farradj, Usama <UFarradj@jensenhughes.com>; Graven, Ethan <EGraven@jensenhughes.com>; Christensen, Andrew

<andrew.christensen@jensenhughes.com>

Subject:

RE: BW-SDP-006 RO Signatures

1