1 February 26, 2024 BW240007 U.S. Nuclear Regulatory Commission, Region Ill ATTN: Karla K. Stoedter 2443 Warrenville Road, Suite 210 Lisle, II 60532-4352 Braidwood Station, Unit 2 Renewed Facility Operating License No. NPF-77 NRC Docket No. STN 50-457 Consteliation Energy Generation, LLC (CEG)
Braidwood Station 35100 South Route 53, Suite 84 Bracev1ne, IL 60407-9619 www.constellationenergy.com
Subject:
Braidwood Station Regulatory Conference Supplemental Information
References:
- 1. Letter from J. Kozal (U.S. NRC Region Ill) to D. Rhoades (Constellation Energy Generation, LLC), "Braidwood Station - 28 Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 And Preliminary Greater Than Green Finding and Apparent Violation" dated January 24, 2024
- 2. Letter from G. Gugle (Constellation Energy Generation, LLC) to K. Stoedter (U.
S. NRC Region Ill), "Response to NRC Inspection Report and Preliminary Greater Than Green Finding and Apparent Violation," dated February 2, 2024 In accordance with the letters referenced above, Constellation Energy Generation, LLC (CEG) is providing the supporting presentation materials for the Regulatory Conference to be held on March 7, 2024, at the NRC's Region Ill Office as attachments to this letter. This material is being submitted prior to the Regulatory Conference as required by Reference 1.
Should you have any questions concerning this submittal, please contact Mr. Dane Brunswick, Regulatory Assurance Manager, at (779) 231-6246.
Respectfully, Gregory Gugle Site Vice President Braidwood Station
Attachments: 'i. Braidwood Station Regu!8tory Cor.ference Information
- 2. EC 640630 Rev. 000 - Documentat,on of Test Results with Diluted Lube Oil from Fuel In-Leakage*- 28 AF Diesel Engine Past Operability
- 3.
EC 640287 Rev. 000 - Past Operability Test Plan Acceptance Related to 2AF01PB-K
US NRC Regional Administrator, Region Ill NRC Document Control Desk NRC Project Manager, NRR, Braidwood and Byron Stations US NRC Senior Resident Inspector, Braidwood Station US NRC Director, Office of Enforcement