{{#Wiki_filter:July 27, 2022
{{#Wiki_filter:Mr. David Rhoades
Mr. David Rhoades
Senior Vice President
Senior Vice President
Constellation Energy Generation, LLC
Constellation Energy Generation, LLC
Line 24: Line 23:
Constellation Nuclear
Constellation Nuclear
4300 Winfield Road
4300 Winfield Road
Warrenville, IL 60555
Warrenville, IL 60555
SUBJECT: BYRON STATION - NOTIFICATION OF NRC DESIGN BASES ASSURANCE
SUBJECT: BYRON STATION - NOTIFICATION OF NRC DESIGN BASES ASSURANCE  
            INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR INFORMATION:
INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR INFORMATION:
            INSPECTION REPORT 05000454/2022010 AND 05000455/2022010
INSPECTION REPORT 05000454/2022010 AND 05000455/2022010
Dear Mr. Rhoades:
Dear Mr. Rhoades:
On November 28, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline
On November 28, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline  
Design Bases Assurance Inspection (Programs) at Byron Station. This inspection will be
Design Bases Assurance Inspection (Programs) at Byron Station. This inspection will be  
performed in accordance with NRC Baseline Inspection Procedure 71111.21N, Design Bases
performed in accordance with NRC Baseline Inspection Procedure 71111.21N, Design Bases  
Assurance Inspection (Programs), Attachment 2, Design-Basis Capability of Power-Operated
Assurance Inspection (Programs), Attachment 2, Design-Basis Capability of Power-Operated  
Valves Under 10 CFR 50.55a Requirements.
Valves Under 10 CFR 50.55a Requirements.
This inspection will evaluate the reliability, functional capability, and design basis of
This inspection will evaluate the reliability, functional capability, and design basis of  
risk-important power-operated valves (POVs) as required by Title 10 of the Code of Federal
risk-important power-operated valves (POVs) as required by Title 10 of the Code of Federal  
Regulations (10 CFR) 50.55a and applicable 10 CFR Part 50, Appendix A and Appendix B,
Regulations (10 CFR) 50.55a and applicable 10 CFR Part 50, Appendix A and Appendix B,  
requirements. In conducting this inspection, the team will select risk-important POVs used to
requirements. In conducting this inspection, the team will select risk-important POVs used to  
prevent and mitigate the consequences of a design basis accident.
prevent and mitigate the consequences of a design basis accident.
The inspection will include two weeks of onsite inspection. The inspection team will consist of
The inspection will include two weeks of onsite inspection. The inspection team will consist of  
three NRC inspectors. The current inspection schedule is as follows:
three NRC inspectors. The current inspection schedule is as follows:
      Preparation week: November 21 - 25, 2022
Preparation week: November 21 - 25, 2022
      Onsite weeks: November 28 - December 2, 2022, and December 12 - 16, 2022
Onsite weeks: November 28 - December 2, 2022, and December 12 - 16, 2022
Experience with previous baseline engineering inspections of similar depth and length has
Experience with previous baseline engineering inspections of similar depth and length has  
shown this type of inspection is extremely resource intensive, both for the NRC inspectors and
shown this type of inspection is extremely resource intensive, both for the NRC inspectors and  
the licensee staff. In order to minimize the inspection impact on the site and to ensure a
the licensee staff. In order to minimize the inspection impact on the site and to ensure a  
productive inspection for both parties, we have enclosed a request for information needed for
productive inspection for both parties, we have enclosed a request for information needed for  
the inspection. It is important that all of these documents are up-to-date and complete in order
the inspection. It is important that all of these documents are up-to-date and complete in order  
to minimize the number of additional documents requested during the preparation and/or the
to minimize the number of additional documents requested during the preparation and/or the  
onsite portions of the inspection. Insofar as possible, this information should be provided
onsite portions of the inspection. Insofar as possible, this information should be provided  
electronically to the lead inspector. The information request has been divided into four groups:
electronically to the lead inspector. The information request has been divided into four groups:
      The first group lists information necessary for our initial risk-informed scoping activities.
The first group lists information necessary for our initial risk-informed scoping activities.
        This information should be provided to the lead inspector no later than August 29, 2022.
This information should be provided to the lead inspector no later than August 29, 2022.July 27, 2022
D. Rhoades                                                      - 2 -
 
 
    The second group lists information necessary for our initial inspection scoping activities.
      This information should be provided to the lead inspector no later than September 26,
      2022.  By October 11, 2022, the lead inspector will communicate the initial selected
      samples and any additional information needed to support the in-office preparation
      activities.
 
    The third group of documents requested are those items needed to support our in-office
      preparation activities.  This set of documents should be provided to the lead inspector no
      later than November 14, 2022.  During the preparation activities, the team may identify
      additional information needed to support the inspection.
 
    The fourth group includes the additional information above as well as plant-specific
      reference material.  This information should be available to the team onsite on
      November 28, 2022.  It is also requested that corrective action documents and answers
      to questions developed during the inspection be provided to the lead inspector as the
      documents are generated.


D. Rhoades                                      -2-
      The second group lists information necessary for our initial inspection scoping activities.
        This information should be provided to the lead inspector no later than September 26,
        2022. By October 11, 2022, the lead inspector will communicate the initial selected
        samples and any additional information needed to support the in-office preparation
        activities.
      The third group of documents requested are those items needed to support our in-office
        preparation activities. This set of documents should be provided to the lead inspector no
        later than November 14, 2022. During the preparation activities, the team may identify
        additional information needed to support the inspection.
      The fourth group includes the additional information above as well as plant-specific
        reference material. This information should be available to the team onsite on
        November 28, 2022. It is also requested that corrective action documents and answers
        to questions developed during the inspection be provided to the lead inspector as the
        documents are generated.
In addition, the enclosure includes information and requests addressing inspection logistics.
In addition, the enclosure includes information and requests addressing inspection logistics.
These items are requested to be provided to the lead inspector by November 7, 2022.
These items are requested to be provided to the lead inspector by November 7, 2022.
The lead inspector for this inspection is Jorge Corujo-Sandin. We understand that our licensing
 
contact for this inspection is Zoe L. Cox of your organization. If there are any questions about
The lead inspector for this inspection is Jorge Corujo-Sandin. We understand that our licensing
contact for this inspection is Zoe L. Cox of your organization. If there are any questions about
the inspection or the material requested in the enclosure, contact the lead inspector at
the inspection or the material requested in the enclosure, contact the lead inspector at
630-829-9741 or via e-mail at Jorge.Corujo-Sandin@nrc.gov.
630-829-9741 or via e-mail at Jorge.Corujo-Sandin@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control
requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
requesting document displays a currently valid Office of Management and Budget Control
Number.
Number.
 
D. Rhoades - 3 -
D. Rhoades                                     -3-
This letter and its enclosure will be made available for public inspection and copying at  
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
                                            Sincerely,
Sincerely,
                                                                      Signed by Corujo-Sandin, Jorge
Jorge Corujo-Sandin, Senior Reactor Inspector
                                                                      on 07/27/22
Engineering Branch 2
                                            Jorge Corujo-Sandin, Senior Reactor Inspector
Division of Reactor Safety
                                            Engineering Branch 2
                                            Division of Reactor Safety
Docket Nos. 05000454 and 05000455
Docket Nos. 05000454 and 05000455
License Nos. NPF-37 and NPF-66
License Nos. NPF-37 and NPF-66
Enclosure:
Enclosure:
Design Bases Assurance Inspection
Design Bases Assurance Inspection  
(Programs) Document Request
  (Programs) Document Request
cc: Distribution via LISTSERV
cc: Distribution via LISTSERV
Signed by Corujo-Sandin, Jorge
on 07/27/22
 
D. Rhoades                                                      - 4 -
 


D. Rhoades                                  -4-
Letter to David Rhoades from Jorge Corujo-Sandin dated July 27, 2022.
Letter to David Rhoades from Jorge Corujo-Sandin dated July 27, 2022.
SUBJECT: BYRON STATION - NOTIFICATION OF NRC DESIGN BASES ASSURANCE
 
            INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR INFORMATION:
SUBJECT: BYRON STATION - NOTIFICATION OF NRC DESIGN BASES ASSURANCE
            INSPECTION REPORT 05000454/2022010 AND 05000455/2022010
          INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR INFORMATION:
          INSPECTION REPORT 05000454/2022010 AND 05000455/2022010
 
 
DISTRIBUTION:
DISTRIBUTION:
Jessie Quichocho
Jessie Quichocho
Line 117: Line 126:
DRPIII
DRPIII
DRSIII
DRSIII
ADAMS Accession Number: ML22207B857
    Publicly Available      Non-Publicly Available      Sensitive  Non-Sensitive
OFFICE      RIII
NAME        JCorujo-Sandin:mb
DATE        07/27/2022
                                OFFICIAL RECORD COPY


                DESIGN BASES ASSURANCE INSPECTION - POV PROGRAM
 
                                  REQUEST FOR INFORMATION
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ADAMS Accession Number:  ML22207B857
  Publicly Available            Non-Publicly Available              Sensitive Non-Sensitive
OFFICE    RIII
NAME      JCorujo-Sandin:mb
DATE      07/27/2022
                              OFFICIAL RECORD COPY
              DESIGN BASES ASSURANCE INSPECTION - POV PROGRAM
                              REQUEST FOR INFORMATION
 
 
I.  ADMINISTRATIVE INSPECTION INFORMATION
I.  ADMINISTRATIVE INSPECTION INFORMATION
  Inspection Report Number:      05000454/2022010 and 05000455/2022010
                                  November 28 - December 2, 2022, and
  Onsite Inspection Dates:
                                  December 12 - 16, 2022
                                  IP 71111.21N, Design Bases Assurance Inspection
  Inspection Procedure:          (Programs), Attachment 2, Design-Basis Capability of
                                  Power-Operated Valves Under 10 CFR 50.55a Requirements
                                  Jorge Corujo-Sandin, Senior Reactor Inspector, RIII/DRS
  Lead Inspector:                630-829-9741
                                  Jorge.Corujo-Sandin@nrc.gov
                                  Kevin Barclay, Reactor Inspector, RIII/DRS
  Teammate Inspectors:
                                  Michael Jones, Reactor Inspector, RIII/DRS
II. LOGISTICS
    Email the following inspection logistics to the lead inspector by November 7, 2022, or
    sooner:
    1. Inspection room name/number, directions from the main access facility, and phone
        number;
    2. Interview room name/number;
    3. Response team contact information (names and phone numbers) and team roles
        (e.g., management sponsor, lead, inspector counterpart);
    4. Any site access/badging actions needed for each inspector;
    5. Any dosimetry actions needed for each inspector;
    6. Entrance meeting time and location;
    7. Confirmation that the team will have access to a licensee computer with a nearby printer;
    8. Confirmation that the team will have Wi-Fi access;
    9. Cafeteria location and hours;
    10. Inspection response team normal working hours; and
                                                                                        Enclosure


    11. Any potential resource conflicts during the inspection (e.g., emergency drill and all-staff
Inspection Report Number:    05000454/2022010 and 05000455/2022010
        meetings).
 
Onsite Inspection Dates:    November 28 - December 2, 2022, and
                              December 12 - 16, 2022
 
                              IP 71111.21N, Design Bases Assurance Inspection
Inspection Procedure:        (Programs), Attachment 2, Design-Basis Capability of
                              Power-Operated Valves Under 10 CFR 50.55a Requirements
 
                              Jorge Corujo-Sandin, Senior Reactor Inspector, RIII/DRS
Lead Inspector:              630-829-9741
                              Jorge.Corujo-Sandin@nrc.gov
 
Teammate Inspectors:        Kevin Barclay, Reactor Inspector, RIII/DRS
                              Michael Jones, Reactor Inspector, RIII/DRS
 
 
 
II.  LOGISTICS
 
  Email the following inspection logistics to the lead inspector by November 7, 2022, or
  sooner:
 
  1.  Inspection room name/number, directions from the main access facility, and phone
      number;
 
  2.  Interview room name/number;
 
  3.  Response team contact information (names and phone numbers) and team roles
      (e.g., management sponsor, lead, inspector counterpart);
 
  4.  Any site access/badging actions needed for each inspector;
 
  5.  Any dosimetry actions needed for each inspector;
 
  6.  Entrance meeting time and location;
 
  7.  Confirmation that the team will have access to a licensee computer with a nearby printer;
 
  8.  Confirmation that the team will have Wi-Fi access;
 
  9.  Cafeteria location and hours;
 
  10.Inspection response team normal working hours; and
 
 
 
 
                                                                                Enclosure
  11.Any potential resource conflicts during the inspection (e.g., emergency drill and all-staff
      meetings).
 
III. INFORMATION REQUEST
III. INFORMATION REQUEST
    Contact the lead inspector as soon as possible if you have any questions regarding this
    information request. Provide the information electronically in searchable formats, if possible.
    The files should contain descriptive names, and be indexed and hyperlinked to facilitate
    ease of use. Information in lists should contain enough information to be easily
    understood by someone who has knowledge of light-water reactor technology.
    Important Note: For the purpose of this inspection, POVs are valves with power actuators.
    Examples include motor-operated valves (MOVs), air-operated valves (AOVs), hydraulic-
    operated valves (HOVs), solenoid-operated valves (SOVs), and pyrotechnic-operated valves
    (e.g., squib valves).
    1. Information Requested to Support Risk-Informed Selections
        The following information is requested by August 29, 2022, or sooner, to facilitate the
        initial sample selection.
        1.1. List of systems, system numbers/designators, and corresponding system names.
        1.2. Probabilistic safety analysis (PSA) system notebooks and latest PSA summary
                document.
        1.3. List of POVs from your site-specific PSA sorted by Risk-Achievement Worth
                (RAW). Include values for Birnbaum Importance, Risk-Reduction Worth, and
                Fussell-Veseley (as applicable). The list should include (a) component
                identification number, including noun name (i.e., descriptive name); (b) applicable
                plant system; (c) American Society of Mechanical Engineers (ASME) Boiler and
                Pressure Vessel Code (BPV Code) Class; (d) safety-related or nonsafety-related
                classification; (e) valve type, size, and manufacturer; and (f) actuator type, size,
                and manufacturer. If the U.S. Nuclear Regulatory Commission (NRC) has granted
                a license amendment to categorize structures, systems, and component in
                accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.69,
                please provide the Risk-Informed Safety Category of the component. (Please
                provide in Excel.)
        1.4. List of corrective action documents related to the POV programs for the last
                5 years, including the document identifier and brief description. Provide a separate
                list for each POV program.
        1.5. List of POVs in the Maintenance Rule (a)(1) category for the last 5 years. The list
                should include a brief description of the surrounding circumstances.
    2. Information Requested for Initial Inspection Scoping Activities
        The following information is requested by September 26, 2022, or sooner, to facilitate
        the initial sample selection.
                                                      2


   2.1. NRC Safety Evaluation Report(s) associated with the In-Service Testing (IST)
  Contact the lead inspector as soon as possible if you have any questions regarding this
          Program and relief and alternative requests submitted in accordance with
  information request.  Provide the information electronically in searchable formats, if possible.
          10 CFR 50.55a for POVs. Identify the edition of the ASME Operation and
  The files should contain descriptive names, and be indexed and hyperlinked to facilitate
          Maintenance of Nuclear Power Plants (OM Code) that is the Code of record for the
  ease of use.  Information in lists should contain enough information to be easily
          current 10-year IST Program interval, as well as any self-imposed standards
  understood by someone who has knowledge of light-water reactor technology.
          related to the IST Program elements applicable to POVs.
 
   2.2. IST Program documents, including implementing procedures, IST plan, and the
  Important Note:  For the purpose of this inspection, POVs are valves with power actuators.
          document that identifies the in-scope valves and the associated IST Program
  Examples include motor-operated valves (MOVs), air-operated valves (AOVs), hydraulic-
          requirements for each valve (e.g., IST valve table identifying category,
  operated valves (HOVs), solenoid-operated valves (SOVs), and pyrotechnic-operated valves
          active/passive function).
  (e.g., squib valves).
   2.3. Site (and corporate if applicable) procedures associated with implementation of the
 
          POV programs required by 10 CFR 50.55a(b)(3)(ii) and/or ASME OM Code
  1.  Information Requested to Support Risk-Informed Selections
          Mandatory Appendix III.
 
   2.4. Joint Owners Group (JOG) MOV program classification evaluation.
      The following information is requested by August 29, 2022, or sooner, to facilitate the
   2.5. List of any valve removed from a POV program and basis for removal.
      initial sample selection.
   2.6. Current list of operator workarounds.
 
   2.7. List of open operability evaluations related to POVs.
      1.1.  List of systems, system numbers/designators, and corresponding system names.
   2.8. List of permanent plant modifications to POVs completed in the last 5 years. For
 
          the purpose of this inspection, permanent plant modifications include permanent:
      1.2.  Probabilistic safety analysis (PSA) system notebooks and latest PSA summary
          plant changes, design changes, set point changes, equivalency evaluations,
            document.
          suitability analyses, and commercial grade dedications. The list should contain the
 
          modification identifier, title, revision/date, the affected system, completion date, and
      1.3.  List of POVs from your site-specific PSA sorted by Risk-Achievement Worth
          a brief modification description.
            (RAW).  Include values for Birnbaum Importance, Risk-Reduction Worth, and
   2.9. Any self-assessment and/or audit of POV programs completed in the last 5 years.
            Fussell-Veseley (as applicable).  The list should include (a) component
   2.10. Updated Final Safety Analysis Report (in one file), Technical Specifications,
            identification number, including noun name (i.e., descriptive name); (b) applicable
          Technical Specifications Bases, and Technical Requirements Manual.
            plant system; (c) American Society of Mechanical Engineers (ASME) Boiler and
   2.11. The lead inspector will deliver forms to the licensee point of contact identified in the
            Pressure Vessel Code (BPV Code) Class; (d) safety-related or nonsafety-related
          letter for approximately 30 valves. Fill out the valve characteristics in the form
            classification; (e) valve type, size, and manufacturer; and (f) actuator type, size,
          fields. It is possible that not all fields can be completed. For those fields that
            and manufacturer.  If the U.S. Nuclear Regulatory Commission (NRC) has granted
          cannot be filled, leave the fields blank.
            a license amendment to categorize structures, systems, and component in
   2.12. Current management and engineering organizational chart.
            accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.69,
3. Information Requested to Support Inspection Preparation Activities
            please provide the Risk-Informed Safety Category of the component.  (Please
            provide in Excel.)
 
      1.4.  List of corrective action documents related to the POV programs for the last
            5 years, including the document identifier and brief description.  Provide a separate
            list for each POV program.
 
      1.5.  List of POVs in the Maintenance Rule (a)(1) category for the last 5 years.  The list
            should include a brief description of the surrounding circumstances.
 
  2.  Information Requested for Initial Inspection Scoping Activities
 
      The following information is requested by September 26, 2022, or sooner, to facilitate
      the initial sample selection.
 
 
 
                                              2
   2.1. NRC Safety Evaluation Report(s) associated with the In-Service Testing (IST)
        Program and relief and alternative requests submitted in accordance with
        10 CFR 50.55a for POVs. Identify the edition of the ASME Operation and
        Maintenance of Nuclear Power Plants (OM Code) that is the Code of record for the
        current 10-year IST Program interval, as well as any self-imposed standards
        related to the IST Program elements applicable to POVs.
 
   2.2. IST Program documents, including implementing procedures, IST plan, and the
        document that identifies the in-scope valves and the associated IST Program
        requirements for each valve (e.g., IST valve table identifying category,
        active/passive function).
 
   2.3. Site (and corporate if applicable) procedures associated with implementation of the
        POV programs required by 10 CFR 50.55a(b)(3)(ii) and/or ASME OM Code
        Mandatory Appendix III.
 
   2.4. Joint Owners Group (JOG) MOV program classification evaluation.
 
   2.5. List of any valve removed from a POV program and basis for removal.
 
   2.6. Current list of operator workarounds.
 
   2.7. List of open operability evaluations related to POVs.
 
   2.8. List of permanent plant modifications to POVs completed in the last 5 years. For
        the purpose of this inspection, permanent plant modifications include permanent:
        plant changes, design changes, set point changes, equivalency evaluations,
        suitability analyses, and commercial grade dedications. The list should contain the
        modification identifier, title, revision/date, the affected system, completion date, and
        a brief modification description.
 
   2.9. Any self-assessment and/or audit of POV programs completed in the last 5 years.
 
   2.10.Updated Final Safety Analysis Report (in one file), Technical Specifications,
        Technical Specifications Bases, and Technical Requirements Manual.
 
   2.11.The lead inspector will deliver forms to the licensee point of contact identified in the
        letter for approximately 30 valves. Fill out the valve characteristics in the form
        fields. It is possible that not all fields can be completed. For those fields that
        cannot be filled, leave the fields blank.
 
   2.12.Current management and engineering organizational chart.
 
3. Information Requested to Support Inspection Preparation Activities
 
   The following information is requested by November 14, 2022, or sooner, to facilitate the
   The following information is requested by November 14, 2022, or sooner, to facilitate the
   final inspection preparation.
   final inspection preparation.
                                                  3


3.1. All corrective action documents, evaluations, and NRC correspondence, including
 
 
 
 
 
 
                                          3
3.1. All corrective action documents, evaluations, and NRC correspondence, including
     any associated NRC requests for additional information (RAIs) and Safety
     any associated NRC requests for additional information (RAIs) and Safety
     Evaluation Report(s), generated in response to the NRC communications listed
     Evaluation Report(s), generated in response to the NRC communications listed
     below. Also, any NRC inspection reports that were conducted to close out the
     below. Also, any NRC inspection reports that were conducted to close out the
     sites associated responses.
     sites associated responses.
     3.1.1. Generic Letter (GL) 89-10;
 
     3.1.2. GL 96-05;
     3.1.1. Generic Letter (GL) 89-10;
     3.1.3. GL 95-07;
 
     3.1.4. Bulletin 85-03;
     3.1.2. GL 96-05;
     3.1.5. Regulatory Issue Summary (RIS) 2000-03; and
 
     3.1.6. GL 88-14.
     3.1.3. GL 95-07;
3.2. Any NRC correspondence regarding the stations POV programs other than the
 
     3.1.4. Bulletin 85-03;
 
     3.1.5. Regulatory Issue Summary (RIS) 2000-03; and
 
     3.1.6. GL 88-14.
 
3.2. Any NRC correspondence regarding the stations POV programs other than the
     IST Program, including any associated NRC RAIs and any NRC Safety Evaluation
     IST Program, including any associated NRC RAIs and any NRC Safety Evaluation
     Report(s). Identify any self-imposed standards related to these programs.
     Report(s). Identify any self-imposed standards related to these programs.
3.3. Preventive Maintenance (PM) Program document, implementing procedures, and
 
3.3. Preventive Maintenance (PM) Program document, implementing procedures, and
     PM templates applicable to POVs.
     PM templates applicable to POVs.
3.4. Title 10 CFR 50, Appendix J Program document and implementing procedures.
 
3.5. Corrective Action Program procedures, including the operability/functionality
3.4. Title 10 CFR 50, Appendix J Program document and implementing procedures.
 
3.5. Corrective Action Program procedures, including the operability/functionality
     determination procedure.
     determination procedure.
3.6. Quality Assurance Program document.
 
3.7. Procedure for addressing issues captured in 10 CFR 21 notifications.
3.6. Quality Assurance Program document.
3.8. All emergency and abnormal operating procedures.
 
3.9. For each selected POV, including its actuator (the response should be separated
3.7. Procedure for addressing issues captured in 10 CFR 21 notifications.
 
3.8. All emergency and abnormal operating procedures.
 
3.9. For each selected POV, including its actuator (the response should be separated
     by POV such as by creating a folder for each valve that includes the associated
     by POV such as by creating a folder for each valve that includes the associated
     documents):
     documents):
    3.9.1. Procurement and design specifications, and Certificate of Conformance.
    3.9.2. Vendor documents addressing installation, operation, and maintenance.
    3.9.3. Piping and instrumentation drawings (PI&Ds) for the associated system.
    3.9.4. Electrical diagrams, including control logic diagrams.
    3.9.5. Valve and actuator component drawings.
    3.9.6. System description and/or training documents associated with the POV.
                                        4


3.9.7. Operations procedures that direct operators to control the valve, including
    3.9.1.  Procurement and design specifications, and Certificate of Conformance.
        alarm response procedures.
 
3.9.8. Applicable Maintenance Rule scoping document and the Maintenance Rule
    3.9.2.  Vendor documents addressing installation, operation, and maintenance.
        performance criteria which would cause the system or component to be
 
        moved from (a)(2) status to (a)(1) status. Also, documents (e.g., corrective
    3.9.3.  Piping and instrumentation drawings (PI&Ds) for the associated system.
        action and work orders) associated with any instance the POV was placed
 
        in (a)(1) status during the last 5 years.
    3.9.4.  Electrical diagrams, including control logic diagrams.
3.9.9. List of tests, including technical specification surveillances. The list should
 
        identify the test periodicity and test procedure identifier.
    3.9.5.  Valve and actuator component drawings.
3.9.10. Completed tests and surveillances performed during the last 5 years. For
 
        those tests and surveillances performed at a periodicity of less than 1 year
    3.9.6.  System description and/or training documents associated with the POV.
        or greater than 5 years, provide the latest three performed. Include the
 
        associated acceptance criteria basis calculations.
 
3.9.11. Completed preservice testing (PST).
                                      4
3.9.12. List of applicable PMs. The list should identify the PM periodicity and last
3.9.7. Operations procedures that direct operators to control the valve, including
        completion date, and briefly describe the PM.
      alarm response procedures.
3.9.13. Completed PMs performed during the last 5 years, including any post
 
        maintenance testing. For those PMs performed at a periodicity of less than
3.9.8. Applicable Maintenance Rule scoping document and the Maintenance Rule
        1 year or greater than 5 years, provide the latest three performed.
      performance criteria which would cause the system or component to be
3.9.14. Corrective maintenance work orders performed on the POV during the last
      moved from (a)(2) status to (a)(1) status. Also, documents (e.g., corrective
        5 years, including any post maintenance testing.
      action and work orders) associated with any instance the POV was placed
3.9.15. An all-inclusive list of calculation revisions in effect associated with the
      in (a)(1) status during the last 5 years.
        POV. The list should include the document identifier, title, and revision
 
        number.
3.9.9. List of tests, including technical specification surveillances. The list should
3.9.16. Calculations associated with the POV. Data files may be excluded.
      identify the test periodicity and test procedure identifier.
        Calculation examples include (as applicable):
 
          Minimum available and required voltage at transient and steady state;
3.9.10.Completed tests and surveillances performed during the last 5 years. For
          Thermal overload sizing evaluation;
      those tests and surveillances performed at a periodicity of less than 1 year
          Critical setpoint calculations (e.g., limit switch settings);
      or greater than 5 years, provide the latest three performed. Include the
          Required thrust/torque;
      associated acceptance criteria basis calculations.
          Maximum allowed leakage;
 
          Maximum differential pressure;
3.9.11.Completed preservice testing (PST).
          Ambient room temperature under normal and accident conditions;
 
          Environmental qualification (EQ) file;
3.9.12.List of applicable PMs. The list should identify the PM periodicity and last
          (For AOVs) Pneumatic supply sizing and setpoint calculations;
      completion date, and briefly describe the PM.
          System hydraulic calculations;
 
          Pressure locking/thermal binding evaluations; and
3.9.13.Completed PMs performed during the last 5 years, including any post
          Valve weak link/seismic weak link analysis.
      maintenance testing. For those PMs performed at a periodicity of less than
                                      5
      1 year or greater than 5 years, provide the latest three performed.
 
3.9.14.Corrective maintenance work orders performed on the POV during the last
      5 years, including any post maintenance testing.
 
3.9.15.An all-inclusive list of calculation revisions in effect associated with the
      POV. The list should include the document identifier, title, and revision
      number.
 
3.9.16.Calculations associated with the POV. Data files may be excluded.
      Calculation examples include (as applicable):
 
        Minimum available and required voltage at transient and steady state;
        Thermal overload sizing evaluation;
        Critical setpoint calculations (e.g., limit switch settings);
        Required thrust/torque;
        Maximum allowed leakage;
        Maximum differential pressure;
        Ambient room temperature under normal and accident conditions;
        Environmental qualification (EQ) file;
        (For AOVs) Pneumatic supply sizing and setpoint calculations;
        System hydraulic calculations;
        Pressure locking/thermal binding evaluations; and
        Valve weak link/seismic weak link analysis.
 
 
 
 


        3.9.17. History of permanent modifications performed on the POV since
                                  5
                 installation. Include modification identifier and brief modification
        3.9.17.History of permanent modifications performed on the POV since
                 installation. Include modification identifier and brief modification
                 description.
                 description.
        3.9.18. List of corrective action documents associated with the POV for the last
 
                 5 years. The list should include the document identifier, brief description,
        3.9.18.List of corrective action documents associated with the POV for the last
                 5 years. The list should include the document identifier, brief description,
                 and status (e.g., open or completed).
                 and status (e.g., open or completed).
        3.9.19. Open and closed operability evaluations originated during the last 5 years.
 
4. Additional Information to be Provided Onsite
        3.9.19.Open and closed operability evaluations originated during the last 5 years.
   4.1. During the in-office preparation activities, the team may identify additional
 
        information needed to support the inspection. The lead inspector will provide a list
4. Additional Information to be Provided Onsite
        of the additional information needed during the week of November 28, 2022.
 
   4.2. Information requested to be provided throughout the inspection:
   4.1. During the in-office preparation activities, the team may identify additional
        4.2.1.   Any corrective action documents generated as a result of the teams
        information needed to support the inspection. The lead inspector will provide a list
        of the additional information needed during the week of November 28, 2022.
 
   4.2. Information requested to be provided throughout the inspection:
 
        4.2.1.     Any corrective action documents generated as a result of the teams
                   questions during this inspection as the documents are generated.
                   questions during this inspection as the documents are generated.
        4.2.2.   List of questions and/or document requests submitted by the team and
 
                   their status (e.g., open, closed) sorted by inspector. Provide to each
        4.2.2.     List of questions and/or document requests submitted by the team and
                   inspector daily 1.5 hours prior to the daily debrief. It is recommended to
                   their status (e.g., open, closed) sorted by inspector. Provide to each
                   inspector daily 1.5 hours prior to the daily debrief. It is recommended to
                   provide the team leader with a master list sorted by inspector and each
                   provide the team leader with a master list sorted by inspector and each
                   inspector with a list containing only the items originated by that inspector.
                   inspector with a list containing only the items originated by that inspector.
        4.2.3.   If available in hardcopy form, one complete set of PI&Ds and simplified
 
                   drawings (e.g., training schematics). If any of these documents are not
        4.2.3.     If available in hardcopy form, one complete set of PI&Ds and simplified
                   drawings (e.g., training schematics). If any of these documents are not
                   available in hardcopy form, contact the lead inspector.
                   available in hardcopy form, contact the lead inspector.
                                              6
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                            6
}}
}}

Revision as of 07:47, 16 November 2024

Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information Inspection Report 05000454/2022010 and 05000455/2022010
ML22207B857
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/27/2022
From: Jorge Corujo-Sandin
NRC/RGN-III/DRS/EB2
To: Rhoades D
Constellation Energy Generation
References
IR 2022010
Download: ML22207B857 (10)


See also: IR 05000454/2022010

Text

Mr. David Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Officer (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: BYRON STATION - NOTIFICATION OF NRC DESIGN BASES ASSURANCE

INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR INFORMATION:

INSPECTION REPORT 05000454/2022010 AND 05000455/2022010

Dear Mr. Rhoades:

On November 28, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

Design Bases Assurance Inspection (Programs) at Byron Station. This inspection will be

performed in accordance with NRC Baseline Inspection Procedure 71111.21N, Design Bases

Assurance Inspection (Programs), Attachment 2, Design-Basis Capability of Power-Operated

Valves Under 10 CFR 50.55a Requirements.

This inspection will evaluate the reliability, functional capability, and design basis of

risk-important power-operated valves (POVs) as required by Title 10 of the Code of Federal

Regulations (10 CFR) 50.55a and applicable 10 CFR Part 50, Appendix A and Appendix B,

requirements. In conducting this inspection, the team will select risk-important POVs used to

prevent and mitigate the consequences of a design basis accident.

The inspection will include two weeks of onsite inspection. The inspection team will consist of

three NRC inspectors. The current inspection schedule is as follows:

Preparation week: November 21 - 25, 2022

Onsite weeks: November 28 - December 2, 2022, and December 12 - 16, 2022

Experience with previous baseline engineering inspections of similar depth and length has

shown this type of inspection is extremely resource intensive, both for the NRC inspectors and

the licensee staff. In order to minimize the inspection impact on the site and to ensure a

productive inspection for both parties, we have enclosed a request for information needed for

the inspection. It is important that all of these documents are up-to-date and complete in order

to minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection. Insofar as possible, this information should be provided

electronically to the lead inspector. The information request has been divided into four groups:

The first group lists information necessary for our initial risk-informed scoping activities.

This information should be provided to the lead inspector no later than August 29, 2022.July 27, 2022

D. Rhoades - 2 -

The second group lists information necessary for our initial inspection scoping activities.

This information should be provided to the lead inspector no later than September 26,

2022. By October 11, 2022, the lead inspector will communicate the initial selected

samples and any additional information needed to support the in-office preparation

activities.

The third group of documents requested are those items needed to support our in-office

preparation activities. This set of documents should be provided to the lead inspector no

later than November 14, 2022. During the preparation activities, the team may identify

additional information needed to support the inspection.

The fourth group includes the additional information above as well as plant-specific

reference material. This information should be available to the team onsite on

November 28, 2022. It is also requested that corrective action documents and answers

to questions developed during the inspection be provided to the lead inspector as the

documents are generated.

In addition, the enclosure includes information and requests addressing inspection logistics.

These items are requested to be provided to the lead inspector by November 7, 2022.

The lead inspector for this inspection is Jorge Corujo-Sandin. We understand that our licensing

contact for this inspection is Zoe L. Cox of your organization. If there are any questions about

the inspection or the material requested in the enclosure, contact the lead inspector at

630-829-9741 or via e-mail at Jorge.Corujo-Sandin@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

D. Rhoades - 3 -

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

Jorge Corujo-Sandin, Senior Reactor Inspector

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 05000454 and 05000455

License Nos. NPF-37 and NPF-66

Enclosure:

Design Bases Assurance Inspection

(Programs) Document Request

cc: Distribution via LISTSERV

Signed by Corujo-Sandin, Jorge

on 07/27/22

D. Rhoades - 4 -

Letter to David Rhoades from Jorge Corujo-Sandin dated July 27, 2022.

SUBJECT: BYRON STATION - NOTIFICATION OF NRC DESIGN BASES ASSURANCE

INSPECTION (PROGRAMS) AND INITIAL REQUEST FOR INFORMATION:

INSPECTION REPORT 05000454/2022010 AND 05000455/2022010

DISTRIBUTION:

Jessie Quichocho

Robert Orlikowski

RidsNrrDorlLpl3

RidsNrrPMByron Resource

RidsNrrDroIrib Resource

John Giessner

Mohammed Shuaibi

Diana Betancourt-Roldan

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML22207B857

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

OFFICE RIII

NAME JCorujo-Sandin:mb

DATE 07/27/2022

OFFICIAL RECORD COPY

DESIGN BASES ASSURANCE INSPECTION - POV PROGRAM

REQUEST FOR INFORMATION

I. ADMINISTRATIVE INSPECTION INFORMATION

Inspection Report Number: 05000454/2022010 and 05000455/2022010

Onsite Inspection Dates: November 28 - December 2, 2022, and

December 12 - 16, 2022

IP 71111.21N, Design Bases Assurance Inspection

Inspection Procedure: (Programs), Attachment 2, Design-Basis Capability of

Power-Operated Valves Under 10 CFR 50.55a Requirements

Jorge Corujo-Sandin, Senior Reactor Inspector, RIII/DRS

Lead Inspector: 630-829-9741

Jorge.Corujo-Sandin@nrc.gov

Teammate Inspectors: Kevin Barclay, Reactor Inspector, RIII/DRS

Michael Jones, Reactor Inspector, RIII/DRS

II. LOGISTICS

Email the following inspection logistics to the lead inspector by November 7, 2022, or

sooner:

1. Inspection room name/number, directions from the main access facility, and phone

number;

2. Interview room name/number;

3. Response team contact information (names and phone numbers) and team roles

(e.g., management sponsor, lead, inspector counterpart);

4. Any site access/badging actions needed for each inspector;

5. Any dosimetry actions needed for each inspector;

6. Entrance meeting time and location;

7. Confirmation that the team will have access to a licensee computer with a nearby printer;

8. Confirmation that the team will have Wi-Fi access;

9. Cafeteria location and hours;

10.Inspection response team normal working hours; and

Enclosure

11.Any potential resource conflicts during the inspection (e.g., emergency drill and all-staff

meetings).

III. INFORMATION REQUEST

Contact the lead inspector as soon as possible if you have any questions regarding this

information request. Provide the information electronically in searchable formats, if possible.

The files should contain descriptive names, and be indexed and hyperlinked to facilitate

ease of use. Information in lists should contain enough information to be easily

understood by someone who has knowledge of light-water reactor technology.

Important Note: For the purpose of this inspection, POVs are valves with power actuators.

Examples include motor-operated valves (MOVs), air-operated valves (AOVs), hydraulic-

operated valves (HOVs), solenoid-operated valves (SOVs), and pyrotechnic-operated valves

(e.g., squib valves).

1. Information Requested to Support Risk-Informed Selections

The following information is requested by August 29, 2022, or sooner, to facilitate the

initial sample selection.

1.1. List of systems, system numbers/designators, and corresponding system names.

1.2. Probabilistic safety analysis (PSA) system notebooks and latest PSA summary

document.

1.3. List of POVs from your site-specific PSA sorted by Risk-Achievement Worth

(RAW). Include values for Birnbaum Importance, Risk-Reduction Worth, and

Fussell-Veseley (as applicable). The list should include (a) component

identification number, including noun name (i.e., descriptive name); (b) applicable

plant system; (c) American Society of Mechanical Engineers (ASME) Boiler and

Pressure Vessel Code (BPV Code) Class; (d) safety-related or nonsafety-related

classification; (e) valve type, size, and manufacturer; and (f) actuator type, size,

and manufacturer. If the U.S. Nuclear Regulatory Commission (NRC) has granted

a license amendment to categorize structures, systems, and component in

accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.69,

please provide the Risk-Informed Safety Category of the component. (Please

provide in Excel.)

1.4. List of corrective action documents related to the POV programs for the last

5 years, including the document identifier and brief description. Provide a separate

list for each POV program.

1.5. List of POVs in the Maintenance Rule (a)(1) category for the last 5 years. The list

should include a brief description of the surrounding circumstances.

2. Information Requested for Initial Inspection Scoping Activities

The following information is requested by September 26, 2022, or sooner, to facilitate

the initial sample selection.

2

2.1. NRC Safety Evaluation Report(s) associated with the In-Service Testing (IST)

Program and relief and alternative requests submitted in accordance with

10 CFR 50.55a for POVs. Identify the edition of the ASME Operation and

Maintenance of Nuclear Power Plants (OM Code) that is the Code of record for the

current 10-year IST Program interval, as well as any self-imposed standards

related to the IST Program elements applicable to POVs.

2.2. IST Program documents, including implementing procedures, IST plan, and the

document that identifies the in-scope valves and the associated IST Program

requirements for each valve (e.g., IST valve table identifying category,

active/passive function).

2.3. Site (and corporate if applicable) procedures associated with implementation of the

POV programs required by 10 CFR 50.55a(b)(3)(ii) and/or ASME OM Code

Mandatory Appendix III.

2.4. Joint Owners Group (JOG) MOV program classification evaluation.

2.5. List of any valve removed from a POV program and basis for removal.

2.6. Current list of operator workarounds.

2.7. List of open operability evaluations related to POVs.

2.8. List of permanent plant modifications to POVs completed in the last 5 years. For

the purpose of this inspection, permanent plant modifications include permanent:

plant changes, design changes, set point changes, equivalency evaluations,

suitability analyses, and commercial grade dedications. The list should contain the

modification identifier, title, revision/date, the affected system, completion date, and

a brief modification description.

2.9. Any self-assessment and/or audit of POV programs completed in the last 5 years.

2.10.Updated Final Safety Analysis Report (in one file), Technical Specifications,

Technical Specifications Bases, and Technical Requirements Manual.

2.11.The lead inspector will deliver forms to the licensee point of contact identified in the

letter for approximately 30 valves. Fill out the valve characteristics in the form

fields. It is possible that not all fields can be completed. For those fields that

cannot be filled, leave the fields blank.

2.12.Current management and engineering organizational chart.

3. Information Requested to Support Inspection Preparation Activities

The following information is requested by November 14, 2022, or sooner, to facilitate the

final inspection preparation.

3

3.1. All corrective action documents, evaluations, and NRC correspondence, including

any associated NRC requests for additional information (RAIs) and Safety

Evaluation Report(s), generated in response to the NRC communications listed

below. Also, any NRC inspection reports that were conducted to close out the

sites associated responses.

3.1.1. Generic Letter (GL) 89-10;

3.1.2. GL 96-05;

3.1.3. GL 95-07;

3.1.4. Bulletin 85-03;

3.1.5. Regulatory Issue Summary (RIS) 2000-03; and

3.1.6. GL 88-14.

3.2. Any NRC correspondence regarding the stations POV programs other than the

IST Program, including any associated NRC RAIs and any NRC Safety Evaluation

Report(s). Identify any self-imposed standards related to these programs.

3.3. Preventive Maintenance (PM) Program document, implementing procedures, and

PM templates applicable to POVs.

3.4. Title 10 CFR 50, Appendix J Program document and implementing procedures.

3.5. Corrective Action Program procedures, including the operability/functionality

determination procedure.

3.6. Quality Assurance Program document.

3.7. Procedure for addressing issues captured in 10 CFR 21 notifications.

3.8. All emergency and abnormal operating procedures.

3.9. For each selected POV, including its actuator (the response should be separated

by POV such as by creating a folder for each valve that includes the associated

documents):

3.9.1. Procurement and design specifications, and Certificate of Conformance.

3.9.2. Vendor documents addressing installation, operation, and maintenance.

3.9.3. Piping and instrumentation drawings (PI&Ds) for the associated system.

3.9.4. Electrical diagrams, including control logic diagrams.

3.9.5. Valve and actuator component drawings.

3.9.6. System description and/or training documents associated with the POV.

4

3.9.7. Operations procedures that direct operators to control the valve, including

alarm response procedures.

3.9.8. Applicable Maintenance Rule scoping document and the Maintenance Rule

performance criteria which would cause the system or component to be

moved from (a)(2) status to (a)(1) status. Also, documents (e.g., corrective

action and work orders) associated with any instance the POV was placed

in (a)(1) status during the last 5 years.

3.9.9. List of tests, including technical specification surveillances. The list should

identify the test periodicity and test procedure identifier.

3.9.10.Completed tests and surveillances performed during the last 5 years. For

those tests and surveillances performed at a periodicity of less than 1 year

or greater than 5 years, provide the latest three performed. Include the

associated acceptance criteria basis calculations.

3.9.11.Completed preservice testing (PST).

3.9.12.List of applicable PMs. The list should identify the PM periodicity and last

completion date, and briefly describe the PM.

3.9.13.Completed PMs performed during the last 5 years, including any post

maintenance testing. For those PMs performed at a periodicity of less than

1 year or greater than 5 years, provide the latest three performed.

3.9.14.Corrective maintenance work orders performed on the POV during the last

5 years, including any post maintenance testing.

3.9.15.An all-inclusive list of calculation revisions in effect associated with the

POV. The list should include the document identifier, title, and revision

number.

3.9.16.Calculations associated with the POV. Data files may be excluded.

Calculation examples include (as applicable):

Minimum available and required voltage at transient and steady state;

Thermal overload sizing evaluation;

Critical setpoint calculations (e.g., limit switch settings);

Required thrust/torque;

Maximum allowed leakage;

Maximum differential pressure;

Ambient room temperature under normal and accident conditions;

Environmental qualification (EQ) file;

(For AOVs) Pneumatic supply sizing and setpoint calculations;

System hydraulic calculations;

Pressure locking/thermal binding evaluations; and

Valve weak link/seismic weak link analysis.

5

3.9.17.History of permanent modifications performed on the POV since

installation. Include modification identifier and brief modification

description.

3.9.18.List of corrective action documents associated with the POV for the last

5 years. The list should include the document identifier, brief description,

and status (e.g., open or completed).

3.9.19.Open and closed operability evaluations originated during the last 5 years.

4. Additional Information to be Provided Onsite

4.1. During the in-office preparation activities, the team may identify additional

information needed to support the inspection. The lead inspector will provide a list

of the additional information needed during the week of November 28, 2022.

4.2. Information requested to be provided throughout the inspection:

4.2.1. Any corrective action documents generated as a result of the teams

questions during this inspection as the documents are generated.

4.2.2. List of questions and/or document requests submitted by the team and

their status (e.g., open, closed) sorted by inspector. Provide to each

inspector daily 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> prior to the daily debrief. It is recommended to

provide the team leader with a master list sorted by inspector and each

inspector with a list containing only the items originated by that inspector.

4.2.3. If available in hardcopy form, one complete set of PI&Ds and simplified

drawings (e.g., training schematics). If any of these documents are not

available in hardcopy form, contact the lead inspector.

6