Beginning on January 1, 2023, the engineering inspection frequency will transition from a triennial (3-year) to a quadrennial (4-year) cycle. The new engineering inspection program will consist of a Comprehensive Engineering Team Inspection (CETI) 1 and three Focused Engineering Inspections (FEIs) that will be performed in each quadrennial cycle. For the cycle beginning in 2023, the FEIs will be: Fire Protection Team Inspection, Commercial Grade Dedication, and an engineering inspection that reviews age-related degradation and management 2. | Beginning on January 1, 2023, the engineering inspection frequency will transition from a triennial (3-year) to a quadrennial (4-year) cycle. The new engineering inspection program will consist of a Comprehensive Engineering Team Inspection (CETI) 1 and three Focused Engineering Inspections (FEIs) that will be performed in each quadrennial cycle. For the cycle beginning in 2023, the FEIs will be: Fire Protection Team Inspection, Commercial Grade Dedication, and an engineering inspection that reviews age-related degradation and management 2. | ||
In response to the | In response to the COVID 19 public health emergency (PHE), the NRC adjusted inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the Reactor Oversight Process (ROP). While the PHE continues, overall conditions throughout the country support performance of our inspection and oversight activities to return to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection samples. We continue to monitor site-specific conditions, and it may be necessary to alter how and when we perform our inspection | ||
Aspects of the Design Basis Assurance Inspection (DBAI), Evaluations of Changes, Tests, & Experiments, and Heat Sink inspections will be included in the CETI inspection. Attached Report 22 will reference DBAI procedure until the CETI procedure is made publicly available. Previously scheduled Evaluation of Changes, Tests, & Experiments and Heat Sink inspections have been cancelled and removed from attached Report 22. | 1 Aspects of the Design Basis Assurance Inspection (DBAI), Evaluations of Changes, Tests, & Experiments, and Heat Sink inspections will be included in the CETI inspection. Attached Report 22 will reference DBAI procedure until the CETI procedure is made publicly available. Previously scheduled Evaluation of Changes, Tests, & Experiments and Heat Sink inspections have been cancelled and removed from attached Report 22. | ||
The age-related degradation and management procedure is under development and will be publicly available by the end of calendar year 2022. | 2 The age-related degradation and management procedure is under development and will be publicly available by the end of calendar year 2022. | ||
E.Carr | E.Carr 2 | ||
and oversight activities as we balance the importance of protecting the health and safety of our staff with the need to conduct effective oversight that supports the NRCs critical safety mission. 3 | |||
For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about -nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling. | |||
In addition to baseline inspections, the NRC plans to conduct Inspection Procedure (IP) 71003, Post-Approval Site Inspection For License Renewal, at your facility. | In addition to baseline inspections, the NRC plans to conduct Inspection Procedure (IP) 71003, Post-Approval Site Inspection For License Renewal, at your facility. | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC w ebsite at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Please contact me at 610-337-5312 with any questions you have regarding this letter. | Please contact me at 610-337-5312 with any questions you have regarding this letter. | ||
Sincerely, | Sincerely, Brice A. Bickett, Chief Projects Branch 3 Division of Operating Reactor Safety | ||
Brice A. Bickett, Chief Projects Branch 3 Division of Operating Reactor Safety Docket No. 05000354 License No. NPF-57 Enclosure: | |||
Hope Creek Inspection Plan cc w/encl: Distribution via ListServ 3This is discussed in our memo, Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Reactor Safety Program (ML21295A302), dated November 2, 2021. | Docket No. 05000354 License No. NPF-57 | ||
Enclosure: | |||
Hope Creek Inspection Plan | |||
cc w/encl: Distribution via ListServ | |||
3This is discussed in our memo, Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Reactor Safety Program (ML21295A302), dated November 2, 2021. | |||
E.Carr 3 | |||
SUBJECT: UPDATED INSPECTION PLAN FOR HOPE CREEK GENERATING STATION (REPORT 05000354/2022005) DATED AUGUST 31, 2022 | |||
Distribution: | |||
BBickett, DORS PFinney, DORS JPatel, DORS, SRI EGarcia, DORS, RI SCalabrese, DORS, AA LMcKown, RI, OEDO RidsNrrPMHopeCreek Resource RidsNrrDorlLpl1 Resource DORS Specialist Branch Chiefs DRSS Reactor Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDrolrabResource | |||
DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP-23 Second Quarter Process/Branch 3/ROP-23 HC_IP_Transmittal Ltr.docx ADAMS Accession No. ML22241A075 SUNSI Review n -Sensitive Publvlle | |||
Sensitive n -Publiclyvlable | |||
OFFICE RI/DORS RI/DORS ME PFinney BBickett TE / 2 / 2 OFFIAL RERD CO Detailed Site Inspection Activity Hope Creek | |||
07/01/2022 - 06/30/2024 | |||
Unit Start End Activity CAC EPID # ADAMS # Title Staff Count | |||
Design Basis Assurance Inspection - Power Operated Valves - Hope Creek 3 | |||
1 7/11/2022 7/15/2022 IP 71111.21N.02 001645 I-2022-012-0008 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1 7/25/2022 7/29/2022 IP 71111.21N.02 001645 I-2022-012-0008 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements | |||
RP Rad Environmental Monitoring Program 71124.07 1 | |||
1 7/25/2022 7/29/2022 IP 71124.07 000731 I-2022-003-0034 Radiological Environmental Monitoring Program | |||
FY22 Hope Creek Initial Licensing Examination 4 | |||
1 8/7/2022 8/19/2022 EXAD 000500 L-2022-OLL-0006 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD) | |||
Cyber Security - Hope Creek 4 | |||
1 8/29/2022 9/2/2022 IP 71130.10 000741 I-2022-402-0042 Cybersecurity | |||
Hope Creek Requal Inspection with P/F Results 2 | |||
1 8/29/2022 9/30/2022 IP 71111.11B 000704 I-2022-003-0034 Licensed Operator Requalification Program and Licensed Operator Performance 1 9/12/2022 9/30/2022 IP 71111.11A 000703 I-2022-003-0034 Licensed Operator Requalification Program and Licensed Operator Performance | |||
Inservice Inspection - Hope Creek 1 | |||
1 10/3/2022 10/7/2022 IP 71111.08G 000701 I-2022-004-0034 Inservice Inspection Activities (BWR) | |||
RP Rad Hazard Assessment; Performance Indicator Verification 71124.01/71151 1 | |||
1 10/3/2022 10/7/2022 IP 71124.01 000725 I-2022-004-0034 Radiological Hazard Assessment and Exposure Controls | |||
1 10/3/2022 10/7/2022 IP 71151 000746 I-2022-004-0034 Performance Indicator Verification | |||
ISFSI Operational Inspection (60855) - HC 2 | |||
1 1/30/2023 2/3/2023 IP 60855 001001 Operation Of An ISFSI | |||
Prepared on 8/23/2022 8:26:56 AM 1 of 4 Detailed Site Inspection Activity | |||
FORCE-ON-FORCE PLANNING AND EXERCISE - SL/HC 4 | |||
1 2/27/2023 3/3/2023 IP 71130.03 000735 I-2023-420-0004 Contingency Response - Force-On-Force Testing | |||
1 3/20/2023 3/24/2023 IP 71130.03 000735 I-2023-420-0004 Contingency Response - Force-On-Force Testing | |||
RP Rad Hazard Assess & Control 71124.01 1 | |||
1 3/6/2023 3/10/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls | |||
Commercial Grade Dedication - Hope Creek 3 | |||
1 3/13/2023 3/17/2023 IP 71111.21N.03 001808 Commercial Grade Dedication | |||
1 3/27/2023 3/31/2023 IP 71111.21N.03 001808 Commercial Grade Dedication | |||
EP PROGRAM INSPECTION - HOPE CREEK 1 | |||
1 6/5/2023 6/9/2023 IP 71114.02 000717 Alert and Notification System Testing | |||
1 6/5/2023 6/9/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System | |||
1 6/5/2023 6/9/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes | |||
1 6/5/2023 6/9/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness | |||
1 6/5/2023 6/9/2023 IP 71151 001397 Performance Indicator Verification | |||
PI&R Team Inspection - HC 4 | |||
1 6/12/2023 6/16/2023 IP 71152B 000747 I-2023-010-0014 Problem Identification and Resolution | |||
1 6/26/2023 6/30/2023 IP 71152B 000747 I-2023-010-0014 Problem Identification and Resolution | |||
RP Rad Instrumentation 71124.05 1 | |||
1 7/17/2023 7/21/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation | |||
RP Rad Waste Processing and Transportation 71124.08 1 | |||
1 9/4/2023 9/8/2023 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation | |||
Material Control and Accountability - Hope Creek 1 | |||
1 9/11/2023 9/15/2023 IP 71130.11 000742 Material Control and Accounting (MC&A) | |||
Access Control, Equipment, Sec Trng, Sec Plan Review, PI-HC 3 | |||
Prepared on 8/23/2022 8:26:56 AM 2 of 4 Detailed Site Inspection Activity | |||
1 9/18/2023 9/22/2023 IP 71130.02 000734 Access Control | |||
1 9/18/2023 9/22/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance | |||
1 9/18/2023 9/22/2023 IP 71130.07 000739 Security Training | |||
1 9/18/2023 9/22/2023 IP 71130.09 001656 Security Plan Changes | |||
1 9/18/2023 9/22/2023 IP 71151 001338 Performance Indicator Verification | |||
RP PI Verification IP71151 1 | |||
1 11/27/2023 12/1/2023 IP 71151 000746 Performance Indicator Verification | |||
FY24 Hope Creek Initial License Exam 4 | |||
1 1/15/2024 1/19/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV) | |||
1 1/29/2024 2/9/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD) | 1 1/29/2024 2/9/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD) | ||
Detailed Site Inspection Activity 1 6/10/ | Access Auth, Fitness for Duty 2 | ||
1 2/5/2024 2/9/2024 IP 71130.01 000733 Access Authorization | |||
1 2/5/2024 2/9/2024 IP 71130.08 000740 Fitness For Duty Program | |||
License Renewal Phase 1 - Hope Creek 1 | |||
1 4/8/2024 4/12/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal | |||
Inservice Inspection - Hope Creek 1 | |||
1 4/8/2024 4/12/2024 IP 71111.08G 000701 Inservice Inspection Activities (BWR) | |||
RP - 71124.01 Rad Hazards 1 | |||
1 4/22/2024 4/26/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls | |||
EP Exercise Inspection - Hope Creek 5 | |||
1 5/20/2024 5/24/2024 IP 71114.01 000716 Exercise Evaluation | |||
1 5/20/2024 5/24/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes | |||
1 5/20/2024 5/24/2024 IP 71151 001397 Performance Indicator Verification | |||
RP - 71124.03 Airborne and 71124.04 Dose 1 | |||
1 6/10/2024 6/14/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation | |||
Prepared on 8/23/2022 8:26:56 AM 3 of 4 Detailed Site Inspection Activity | |||
1 6/10/20246/14/2024 IP 71124.04 000728 Occupational Dose Assessment | |||
Prepared on 8/23/2022 8:26:56 AM 4 of 4 | |||
}} | }} | ||
Revision as of 04:35, 16 November 2024
| ML22241A075 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 08/31/2022 |
| From: | Brice Bickett Division of Operating Reactors |
| To: | Carr E Public Service Enterprise Group |
| References | |
| IR 2022005 | |
| Download: ML22241A075 (7) | |
Text
August 31, 2022
SUBJECT:
UPDATED INSPECTION PLAN FOR HOPE CREEK GENERATING STATION (REPORT 05000354/2022005)
Dear Eric Carr:
The enclosed inspection plan lists the inspections scheduled through June 30, 2024, for Hope Creek Generating Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
Beginning on January 1, 2023, the engineering inspection frequency will transition from a triennial (3-year) to a quadrennial (4-year) cycle. The new engineering inspection program will consist of a Comprehensive Engineering Team Inspection (CETI) 1 and three Focused Engineering Inspections (FEIs) that will be performed in each quadrennial cycle. For the cycle beginning in 2023, the FEIs will be: Fire Protection Team Inspection, Commercial Grade Dedication, and an engineering inspection that reviews age-related degradation and management 2.
In response to the COVID 19 public health emergency (PHE), the NRC adjusted inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the Reactor Oversight Process (ROP). While the PHE continues, overall conditions throughout the country support performance of our inspection and oversight activities to return to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection samples. We continue to monitor site-specific conditions, and it may be necessary to alter how and when we perform our inspection
1 Aspects of the Design Basis Assurance Inspection (DBAI), Evaluations of Changes, Tests, & Experiments, and Heat Sink inspections will be included in the CETI inspection. Attached Report 22 will reference DBAI procedure until the CETI procedure is made publicly available. Previously scheduled Evaluation of Changes, Tests, & Experiments and Heat Sink inspections have been cancelled and removed from attached Report 22.
2 The age-related degradation and management procedure is under development and will be publicly available by the end of calendar year 2022.
E.Carr 2
and oversight activities as we balance the importance of protecting the health and safety of our staff with the need to conduct effective oversight that supports the NRCs critical safety mission. 3
For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about -nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.
In addition to baseline inspections, the NRC plans to conduct Inspection Procedure (IP) 71003, Post-Approval Site Inspection For License Renewal, at your facility.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC w ebsite at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5312 with any questions you have regarding this letter.
Sincerely, Brice A. Bickett, Chief Projects Branch 3 Division of Operating Reactor Safety
Docket No. 05000354 License No. NPF-57
Enclosure:
Hope Creek Inspection Plan
cc w/encl: Distribution via ListServ
3This is discussed in our memo, Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Reactor Safety Program (ML21295A302), dated November 2, 2021.
E.Carr 3
SUBJECT: UPDATED INSPECTION PLAN FOR HOPE CREEK GENERATING STATION (REPORT 05000354/2022005) DATED AUGUST 31, 2022
Distribution:
BBickett, DORS PFinney, DORS JPatel, DORS, SRI EGarcia, DORS, RI SCalabrese, DORS, AA LMcKown, RI, OEDO RidsNrrPMHopeCreek Resource RidsNrrDorlLpl1 Resource DORS Specialist Branch Chiefs DRSS Reactor Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDrolrabResource
DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP-23 Second Quarter Process/Branch 3/ROP-23 HC_IP_Transmittal Ltr.docx ADAMS Accession No. ML22241A075 SUNSI Review n -Sensitive Publvlle
Sensitive n -Publiclyvlable
OFFICE RI/DORS RI/DORS ME PFinney BBickett TE / 2 / 2 OFFIAL RERD CO Detailed Site Inspection Activity Hope Creek
07/01/2022 - 06/30/2024
Unit Start End Activity CAC EPID # ADAMS # Title Staff Count
Design Basis Assurance Inspection - Power Operated Valves - Hope Creek 3
1 7/11/2022 7/15/2022 IP 71111.21N.02 001645 I-2022-012-0008 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1 7/25/2022 7/29/2022 IP 71111.21N.02 001645 I-2022-012-0008 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements
RP Rad Environmental Monitoring Program 71124.07 1
1 7/25/2022 7/29/2022 IP 71124.07 000731 I-2022-003-0034 Radiological Environmental Monitoring Program
FY22 Hope Creek Initial Licensing Examination 4
1 8/7/2022 8/19/2022 EXAD 000500 L-2022-OLL-0006 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
Cyber Security - Hope Creek 4
1 8/29/2022 9/2/2022 IP 71130.10 000741 I-2022-402-0042 Cybersecurity
Hope Creek Requal Inspection with P/F Results 2
1 8/29/2022 9/30/2022 IP 71111.11B 000704 I-2022-003-0034 Licensed Operator Requalification Program and Licensed Operator Performance 1 9/12/2022 9/30/2022 IP 71111.11A 000703 I-2022-003-0034 Licensed Operator Requalification Program and Licensed Operator Performance
Inservice Inspection - Hope Creek 1
1 10/3/2022 10/7/2022 IP 71111.08G 000701 I-2022-004-0034 Inservice Inspection Activities (BWR)
RP Rad Hazard Assessment; Performance Indicator Verification 71124.01/71151 1
1 10/3/2022 10/7/2022 IP 71124.01 000725 I-2022-004-0034 Radiological Hazard Assessment and Exposure Controls
1 10/3/2022 10/7/2022 IP 71151 000746 I-2022-004-0034 Performance Indicator Verification
ISFSI Operational Inspection (60855) - HC 2
1 1/30/2023 2/3/2023 IP 60855 001001 Operation Of An ISFSI
Prepared on 8/23/2022 8:26:56 AM 1 of 4 Detailed Site Inspection Activity
FORCE-ON-FORCE PLANNING AND EXERCISE - SL/HC 4
1 2/27/2023 3/3/2023 IP 71130.03 000735 I-2023-420-0004 Contingency Response - Force-On-Force Testing
1 3/20/2023 3/24/2023 IP 71130.03 000735 I-2023-420-0004 Contingency Response - Force-On-Force Testing
RP Rad Hazard Assess & Control 71124.01 1
1 3/6/2023 3/10/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
Commercial Grade Dedication - Hope Creek 3
1 3/13/2023 3/17/2023 IP 71111.21N.03 001808 Commercial Grade Dedication
1 3/27/2023 3/31/2023 IP 71111.21N.03 001808 Commercial Grade Dedication
EP PROGRAM INSPECTION - HOPE CREEK 1
1 6/5/2023 6/9/2023 IP 71114.02 000717 Alert and Notification System Testing
1 6/5/2023 6/9/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
1 6/5/2023 6/9/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1 6/5/2023 6/9/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness
1 6/5/2023 6/9/2023 IP 71151 001397 Performance Indicator Verification
PI&R Team Inspection - HC 4
1 6/12/2023 6/16/2023 IP 71152B 000747 I-2023-010-0014 Problem Identification and Resolution
1 6/26/2023 6/30/2023 IP 71152B 000747 I-2023-010-0014 Problem Identification and Resolution
RP Rad Instrumentation 71124.05 1
1 7/17/2023 7/21/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation
RP Rad Waste Processing and Transportation 71124.08 1
1 9/4/2023 9/8/2023 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation
Material Control and Accountability - Hope Creek 1
1 9/11/2023 9/15/2023 IP 71130.11 000742 Material Control and Accounting (MC&A)
Access Control, Equipment, Sec Trng, Sec Plan Review, PI-HC 3
Prepared on 8/23/2022 8:26:56 AM 2 of 4 Detailed Site Inspection Activity
1 9/18/2023 9/22/2023 IP 71130.02 000734 Access Control
1 9/18/2023 9/22/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
1 9/18/2023 9/22/2023 IP 71130.07 000739 Security Training
1 9/18/2023 9/22/2023 IP 71130.09 001656 Security Plan Changes
1 9/18/2023 9/22/2023 IP 71151 001338 Performance Indicator Verification
1 11/27/2023 12/1/2023 IP 71151 000746 Performance Indicator Verification
FY24 Hope Creek Initial License Exam 4
1 1/15/2024 1/19/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1 1/29/2024 2/9/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
Access Auth, Fitness for Duty 2
1 2/5/2024 2/9/2024 IP 71130.01 000733 Access Authorization
1 2/5/2024 2/9/2024 IP 71130.08 000740 Fitness For Duty Program
License Renewal Phase 1 - Hope Creek 1
1 4/8/2024 4/12/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal
Inservice Inspection - Hope Creek 1
1 4/8/2024 4/12/2024 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
1 4/22/2024 4/26/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
EP Exercise Inspection - Hope Creek 5
1 5/20/2024 5/24/2024 IP 71114.01 000716 Exercise Evaluation
1 5/20/2024 5/24/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1 5/20/2024 5/24/2024 IP 71151 001397 Performance Indicator Verification
RP - 71124.03 Airborne and 71124.04 Dose 1
1 6/10/2024 6/14/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
Prepared on 8/23/2022 8:26:56 AM 3 of 4 Detailed Site Inspection Activity
1 6/10/20246/14/2024 IP 71124.04 000728 Occupational Dose Assessment
Prepared on 8/23/2022 8:26:56 AM 4 of 4