i February 27, 1986 Docket No. 50-16 f
    .                                                    February 27, 1986 Docket No. 50-16 f
Mr. Wayne H. Jens, Vice President Nuclear Operations Detroit Edison Company 6400 North Dixie Highway-Newport, Michigan 48166
Mr. Wayne H. Jens, Vice President Nuclear Operations Detroit Edison Company 6400 North Dixie Highway-Newport, Michigan 48166


==Dear Mr. Jens:==
==Dear Mr. Jens:==
==SUBJECT:==
==SUBJECT:==
REQUEST FOR ADDITIONAL INFORMATION l        
REQUEST FOR ADDITIONAL INFORMATION l


==Reference:==
==Reference:==
Enrico Fermi Atomic Power Plant, Unit No. 1 By application dated May 17, 1985 you requested a 40-year extension of the
Enrico Fermi Atomic Power Plant, Unit No. 1 By application dated May 17, 1985 you requested a 40-year extension of the
          " Possession Only" license (License No. DPR-9) for Fermi Unit No. 1. The
" Possession Only" license (License No. DPR-9) for Fermi Unit No. 1. The extension would allow Fermi No.1 to be maintained in its present safe storage (SAFSTOR) status until March 2025 at which time you plan to remove the residual radioactivity and request that License No. DPR-9 be terminated.
,          extension would allow Fermi No.1 to be maintained in its present safe storage (SAFSTOR) status until March 2025 at which time you plan to remove the residual radioactivity and request that License No. DPR-9 be terminated.
During our review of your application we determined that we need the infor-mation presented in Enclosure No. I to complete our evaluation. Your response is needed by March 31, 1986 for us to maintain our schedule.
During our review of your application we determined that we need the infor-mation presented in Enclosure No. I to complete our evaluation. Your                 '
response is needed by March 31, 1986 for us to maintain our schedule.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required.
Sincerely, Original signed by Herbert N. Berkow, Director Standardization & Special Projects Directorate
Sincerely, Original signed by Herbert N. Berkow, Director Standardization & Special Projects Directorate Division of PWR Licensing-B
.                                                Division of PWR Licensing-B


==Enclosures:==
==Enclosures:==
DISTRIBUTION:
DISTRIBUTION:
: 1. Request for Additional Information               i Decket. m er
1.
: 2. Letters dated April 21, 1982 and                   ~NRC PDR March 17, 1981 from NRC to Stanford             Local PDR University                                       DCS NSIC PNoonan PErickson Olynch H8erkow SSPD Reading i
Request for Additional Information i Decket. m er 2.
I D S rS:SSPD f
Letters dated April 21, 1982 and
DPWRL-B':55PD D f
~NRC PDR March 17, 1981 from NRC to Stanford Local PDR University DCS NSIC PNoonan PErickson Olynch H8erkow SSPD Reading i
                                                'B:SSPD
f f
                                                -          DPW
I D S rS:SSPD DPWRL-B':55PD D
:)SPD i           M r rn:ac     PErickson     OL ' h           HBer 0;/flp/86       02N11/86       02/g /86         02/ /86 g31{g             []
'B:SSPD DPW
P                   .
:)SPD i
                                                                                      --w---v--   w- -
M r rn:ac PErickson OL ' h HBer 0;/flp/86 02N11/86 02/g /86 02/ /86
- g31{g
[]
P
--w---v--
w- -


  .  ./         'o,,                         UNITED STATES
./
      !            o              NUCLEAR REEULATORY COMMISSION g           a                       WASHINGTON, C. C. 20555
'o,,
        % ,,, ,, #                                        February 27, 1986 Docket No. 50-16 Mr. Wayne H. Jens, Vice President Nuclear Operations Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166
UNITED STATES NUCLEAR REEULATORY COMMISSION o
g a
WASHINGTON, C. C. 20555 February 27, 1986 Docket No. 50-16 Mr. Wayne H. Jens, Vice President Nuclear Operations Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166


==Dear Mr. Jens:==
==Dear Mr. Jens:==
==SUBJECT:==
==SUBJECT:==
REQUEST FOR ADDITIONAL INFORMATION
REQUEST FOR ADDITIONAL INFORMATION
Line 62: Line 63:
==Reference:==
==Reference:==
Enrico Fermi Atomic Power Plant, Unit No. 1 By application dated May 17, 1985 you requested a 40-year extension of the
Enrico Fermi Atomic Power Plant, Unit No. 1 By application dated May 17, 1985 you requested a 40-year extension of the
            " Possession Only" license (License No. DPR-9) for Fermi Unit No. 1. The extension would allow Ferni No. I to be maintained in its present safe storage (SAFSTOR) status until March 2025 at which time you plan to remove the residual radioactivity and request that License No. DPR-9 be terminated.
" Possession Only" license (License No. DPR-9) for Fermi Unit No. 1. The extension would allow Ferni No. I to be maintained in its present safe storage (SAFSTOR) status until March 2025 at which time you plan to remove the residual radioactivity and request that License No. DPR-9 be terminated.
During our review of your application we determined that we need the infor-mation presented in Enclosure No. I to complete our evaluation. Your response is needed by March 31, 1986 for us to maintain our schedule.
During our review of your application we determined that we need the infor-mation presented in Enclosure No. I to complete our evaluation.
Your response is needed by March 31, 1986 for us to maintain our schedule.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required.
Sincerely, Herbert N. Berkow, Director Standardization & Special Projects Directorate Division of PWR Licensing-8
Sincerely, Herbert N. Berkow, Director Standardization & Special Projects Directorate Division of PWR Licensing-8


==Enclosures:==
==Enclosures:==
: 1. Request for Additional Information
1.
: 2. Letters dated April 21, 1982 and March 17, 1981 from NRC to Stanford University
Request for Additional Information 2.
Letters dated April 21, 1982 and March 17, 1981 from NRC to Stanford University


Enclosure 1 Request for Additional Information Fermi 1 Amendment Request l
Request for Additional Information Fermi 1 Amendment Request l
For Extension of " Possession Only" License Docket No. 50-16 1 - ALARA MEASURES Discuss specific measures which will be utilized during the forty additional years to maintain radiation exposures and releases of radioactive materials to unrestricted areas as low as reasonably achievable (ALARA). Discuss, also, the potential for a release of radioactivity during the safe storage period, and estimate the potential l         exposure to the public through various radiological pathways during
For Extension of " Possession Only" License Docket No. 50-16 1 - ALARA MEASURES Discuss specific measures which will be utilized during the forty additional years to maintain radiation exposures and releases of radioactive materials to unrestricted areas as low as reasonably achievable (ALARA). Discuss, also, the potential for a release of radioactivity during the safe storage period, and estimate the potential l
;          this period.
exposure to the public through various radiological pathways during this period.
f l     ,
f l
2 - DOSE ASSESSMENT l-         a)   Provide a table showing Fermi Unit 1 personnel exposure experience l               for the years 1973 thru 1985 showing the man-rem exposure by facility structure (i.e., reactor building, etc.), regardless of how these l
2 - DOSE ASSESSMENT l-a)
Provide a table showing Fermi Unit 1 personnel exposure experience l
for the years 1973 thru 1985 showing the man-rem exposure by facility structure (i.e., reactor building, etc.), regardless of how these l
exposures were obtained (e.g., decontamination, repair, etc.)
exposures were obtained (e.g., decontamination, repair, etc.)
!                or by whom (e.g., by plant personnel, plant maintenance personnel, l*
or by whom (e.g., by plant personnel, plant maintenance personnel, l*
l contractor /vendorpersonnel,etc).
l contractor /vendorpersonnel,etc).
b)   Provide a similar table of anticipated exposures for the years 1985 to 2025 from expected decontamination, decommissioning, additional maintenance and repair operations.
b)
Provide a similar table of anticipated exposures for the years 1985 to 2025 from expected decontamination, decommissioning, additional maintenance and repair operations.
3 - PROCEDURES Describe the methods and procedures for personnel monitoring (external and internal), including methods of recording, reporting, and analyzing results. Describe the program for internal radiation exposure assessment, (whole-body counting and bioassay), including the bases for selecting personnel who will be in the program, the frequency of their whole-body count and bioassay, and any nonroutine bioassay that will be performed, i
3 - PROCEDURES Describe the methods and procedures for personnel monitoring (external and internal), including methods of recording, reporting, and analyzing results. Describe the program for internal radiation exposure assessment, (whole-body counting and bioassay), including the bases for selecting personnel who will be in the program, the frequency of their whole-body count and bioassay, and any nonroutine bioassay that will be performed, i
l i
l i


.                                                                                                                                                                                                    i
i
                          ' Describe the methods and procedures for evaluating and controlling i
' Describe the methods and procedures for evaluating and controlling i
potential airborne radioactivity concentrations. Discuss any requirements                             ;
potential airborne radioactivity concentrations. Discuss any requirements for special air sampling and the issuance, selection, use, and maintenance
,                          for special air sampling and the issuance, selection, use, and maintenance
)
)                           of respiratory protective devices, including training programs and                                     '
of respiratory protective devices, including training programs and respiratory protective equipment fitting programs.
respiratory protective equipment fitting programs.
Methods of handling and storage of sealed and unsealed byproduct, source f
!,                          Methods of handling and storage of sealed and unsealed byproduct, source                             f I                           and special nuclear material should be described.                                                     ;
I and special nuclear material should be described.
i t
i t
l             .            4. - Attachments 1 and 2 of your application are difficult to review and to
l
:-                          cross-reference because of the lack of page numbers and proper formatting with sub-section numbers. A revised application with modified attachments
: 4. - Attachments 1 and 2 of your application are difficult to review and to cross-reference because of the lack of page numbers and proper formatting with sub-section numbers. A revised application with modified attachments
{                         should be submitted"to correct these deficiencies.
{
1
should be submitted"to correct these deficiencies.
,,                        5 - INVENTORY OF RADIONUCLIDES                                                                     .
1 5 - INVENTORY OF RADIONUCLIDES Your submittal indicates'that the only radionuclide now present at Fermi 1 is cobalt-60 which has a 5.2 year half-life. Your submittal states that l
Your submittal indicates'that the only radionuclide now present at Fermi 1 is cobalt-60 which has a 5.2 year half-life. Your submittal states that l                         the cobalt-58, iron-59 and chromium-51 present earlier are now essentially                             ,
the cobalt-58, iron-59 and chromium-51 present earlier are now essentially d
d i                           decayed.
i decayed.
l I-                         We agree that cobalt-58, iron-59 and chromium-51 are absent b'ecause i                           of their short half-lives (71 days or less). We have found, however, the                               !
l I-We agree that cobalt-58, iron-59 and chromium-51 are absent b'ecause i
presence of other radionuclides in most reactor decommissioning situations.                           !
of their short half-lives (71 days or less). We have found, however, the presence of other radionuclides in most reactor decommissioning situations.


Europium-152 is generally present in concrete shielding structures around reactor vessels. Since europium-152 has a 13.4 year half-life it might still be present at Fermi 1.     Cesium-137, with a 30 year half-life, is often found as a contaminant on surfaces and in reactor systems. Also, nickel-63, with a 100 year half-life would likely be present in the Fermi 1 reactor vessel and vessel components.
. Europium-152 is generally present in concrete shielding structures around reactor vessels. Since europium-152 has a 13.4 year half-life it might still be present at Fermi 1.
a)     We, therefore, request that you provide a more complete inventory of the residual radionuclides which have half-lives equal to or greater than that of cobalt-60. Include inventory estimates of cobalt-60, europium-152, cesium-137, nickel-63, niobium-94 and nickel-59, in particular, and discuss the potential health and safety impact of these radionuclides at Fermi 1 on the removal of residual radioactivity at the end of the additional 40-year storage period.
Cesium-137, with a 30 year half-life, is often found as a contaminant on surfaces and in reactor systems. Also, nickel-63, with a 100 year half-life would likely be present in the Fermi 1 reactor vessel and vessel components.
b)     Provide graphs of direct radiation exposure vs. time (zero to 40 years)asitmayimpactonworkersinvolvedindismantling.
a)
c)     Identify the benefits that result from the proposed additional 40-year delay in removal of residual radioactivity with respect to: the methods that would be used in removing radioactivity; reduction in the total man-rem exposure to workers; and reduction in the volume of radioactive waste produced during deconsnissioning.
We, therefore, request that you provide a more complete inventory of the residual radionuclides which have half-lives equal to or greater than that of cobalt-60.
Include inventory estimates of cobalt-60, europium-152, cesium-137, nickel-63, niobium-94 and nickel-59, in particular, and discuss the potential health and safety impact of these radionuclides at Fermi 1 on the removal of residual radioactivity at the end of the additional 40-year storage period.
b)
Provide graphs of direct radiation exposure vs. time (zero to 40 years)asitmayimpactonworkersinvolvedindismantling.
c)
Identify the benefits that result from the proposed additional 40-year delay in removal of residual radioactivity with respect to:
the methods that would be used in removing radioactivity; reduction in the total man-rem exposure to workers; and reduction in the volume of radioactive waste produced during deconsnissioning.


                                                  -  4-6 - ENCLOSURE NO. 2 (Letters from the NRC to Stanford University) states our present criteria'for release of a facility to unrestricted access.
4-6 - ENCLOSURE NO. 2 (Letters from the NRC to Stanford University) states our present criteria'for release of a facility to unrestricted access.
a)   Provide an evaluation of the predicted radiation levels after the additional 40 years in buildings, rooms and structures, relative to the Enclosure No. 2 criteria, b)   Estimate tne additional interval of time tha't would be required for all buildings, rooms and structures to meet the re, lease criteria presented in Enclosure No. 2 without removal of equipment or structures.
a)
Provide an evaluation of the predicted radiation levels after the additional 40 years in buildings, rooms and structures, relative to the Enclosure No. 2 criteria, b)
Estimate tne additional interval of time tha't would be required for all buildings, rooms and structures to meet the re, lease criteria presented in Enclosure No. 2 without removal of equipment or structures.
e 9
e 9
S 0}}
S 0}}

Latest revision as of 00:23, 11 December 2024

Forwards Request for Addl Info Re 850517 Application for 40-yr Extension of License DPR-9 (Possession Only).Response Requested by 860331 for Schedule to Be Maintained
ML20154J813
Person / Time
Site: Fermi, 05000000, 05000141
Issue date: 02/27/1986
From: Berkow H
Office of Nuclear Reactor Regulation
To: Jens W
DETROIT EDISON CO.
Shared Package
ML19253D843 List:
References
NUDOCS 8603110062
Download: ML20154J813 (6)


Text

.

i February 27, 1986 Docket No. 50-16 f

Mr. Wayne H. Jens, Vice President Nuclear Operations Detroit Edison Company 6400 North Dixie Highway-Newport, Michigan 48166

Dear Mr. Jens:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION l

Reference:

Enrico Fermi Atomic Power Plant, Unit No. 1 By application dated May 17, 1985 you requested a 40-year extension of the

" Possession Only" license (License No. DPR-9) for Fermi Unit No. 1. The extension would allow Fermi No.1 to be maintained in its present safe storage (SAFSTOR) status until March 2025 at which time you plan to remove the residual radioactivity and request that License No. DPR-9 be terminated.

During our review of your application we determined that we need the infor-mation presented in Enclosure No. I to complete our evaluation. Your response is needed by March 31, 1986 for us to maintain our schedule.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required.

Sincerely, Original signed by Herbert N. Berkow, Director Standardization & Special Projects Directorate Division of PWR Licensing-B

Enclosures:

DISTRIBUTION:

1.

Request for Additional Information i Decket. m er 2.

Letters dated April 21, 1982 and

~NRC PDR March 17, 1981 from NRC to Stanford Local PDR University DCS NSIC PNoonan PErickson Olynch H8erkow SSPD Reading i

f f

I D S rS:SSPD DPWRL-B':55PD D

'B:SSPD DPW

)SPD i

M r rn:ac PErickson OL ' h HBer 0;/flp/86 02N11/86 02/g /86 02/ /86

- g31{g

[]

P

--w---v--

w- -

./

'o,,

UNITED STATES NUCLEAR REEULATORY COMMISSION o

g a

WASHINGTON, C. C. 20555 February 27, 1986 Docket No. 50-16 Mr. Wayne H. Jens, Vice President Nuclear Operations Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166

Dear Mr. Jens:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION

Reference:

Enrico Fermi Atomic Power Plant, Unit No. 1 By application dated May 17, 1985 you requested a 40-year extension of the

" Possession Only" license (License No. DPR-9) for Fermi Unit No. 1. The extension would allow Ferni No. I to be maintained in its present safe storage (SAFSTOR) status until March 2025 at which time you plan to remove the residual radioactivity and request that License No. DPR-9 be terminated.

During our review of your application we determined that we need the infor-mation presented in Enclosure No. I to complete our evaluation.

Your response is needed by March 31, 1986 for us to maintain our schedule.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required.

Sincerely, Herbert N. Berkow, Director Standardization & Special Projects Directorate Division of PWR Licensing-8

Enclosures:

1.

Request for Additional Information 2.

Letters dated April 21, 1982 and March 17, 1981 from NRC to Stanford University

Request for Additional Information Fermi 1 Amendment Request l

For Extension of " Possession Only" License Docket No. 50-16 1 - ALARA MEASURES Discuss specific measures which will be utilized during the forty additional years to maintain radiation exposures and releases of radioactive materials to unrestricted areas as low as reasonably achievable (ALARA). Discuss, also, the potential for a release of radioactivity during the safe storage period, and estimate the potential l

exposure to the public through various radiological pathways during this period.

f l

2 - DOSE ASSESSMENT l-a)

Provide a table showing Fermi Unit 1 personnel exposure experience l

for the years 1973 thru 1985 showing the man-rem exposure by facility structure (i.e., reactor building, etc.), regardless of how these l

exposures were obtained (e.g., decontamination, repair, etc.)

or by whom (e.g., by plant personnel, plant maintenance personnel, l*

l contractor /vendorpersonnel,etc).

b)

Provide a similar table of anticipated exposures for the years 1985 to 2025 from expected decontamination, decommissioning, additional maintenance and repair operations.

3 - PROCEDURES Describe the methods and procedures for personnel monitoring (external and internal), including methods of recording, reporting, and analyzing results. Describe the program for internal radiation exposure assessment, (whole-body counting and bioassay), including the bases for selecting personnel who will be in the program, the frequency of their whole-body count and bioassay, and any nonroutine bioassay that will be performed, i

l i

i

' Describe the methods and procedures for evaluating and controlling i

potential airborne radioactivity concentrations. Discuss any requirements for special air sampling and the issuance, selection, use, and maintenance

)

of respiratory protective devices, including training programs and respiratory protective equipment fitting programs.

Methods of handling and storage of sealed and unsealed byproduct, source f

I and special nuclear material should be described.

i t

l

4. - Attachments 1 and 2 of your application are difficult to review and to cross-reference because of the lack of page numbers and proper formatting with sub-section numbers. A revised application with modified attachments

{

should be submitted"to correct these deficiencies.

1 5 - INVENTORY OF RADIONUCLIDES Your submittal indicates'that the only radionuclide now present at Fermi 1 is cobalt-60 which has a 5.2 year half-life. Your submittal states that l

the cobalt-58, iron-59 and chromium-51 present earlier are now essentially d

i decayed.

l I-We agree that cobalt-58, iron-59 and chromium-51 are absent b'ecause i

of their short half-lives (71 days or less). We have found, however, the presence of other radionuclides in most reactor decommissioning situations.

. Europium-152 is generally present in concrete shielding structures around reactor vessels. Since europium-152 has a 13.4 year half-life it might still be present at Fermi 1.

Cesium-137, with a 30 year half-life, is often found as a contaminant on surfaces and in reactor systems. Also, nickel-63, with a 100 year half-life would likely be present in the Fermi 1 reactor vessel and vessel components.

a)

We, therefore, request that you provide a more complete inventory of the residual radionuclides which have half-lives equal to or greater than that of cobalt-60.

Include inventory estimates of cobalt-60, europium-152, cesium-137, nickel-63, niobium-94 and nickel-59, in particular, and discuss the potential health and safety impact of these radionuclides at Fermi 1 on the removal of residual radioactivity at the end of the additional 40-year storage period.

b)

Provide graphs of direct radiation exposure vs. time (zero to 40 years)asitmayimpactonworkersinvolvedindismantling.

c)

Identify the benefits that result from the proposed additional 40-year delay in removal of residual radioactivity with respect to:

the methods that would be used in removing radioactivity; reduction in the total man-rem exposure to workers; and reduction in the volume of radioactive waste produced during deconsnissioning.

4-6 - ENCLOSURE NO. 2 (Letters from the NRC to Stanford University) states our present criteria'for release of a facility to unrestricted access.

a)

Provide an evaluation of the predicted radiation levels after the additional 40 years in buildings, rooms and structures, relative to the Enclosure No. 2 criteria, b)

Estimate tne additional interval of time tha't would be required for all buildings, rooms and structures to meet the re, lease criteria presented in Enclosure No. 2 without removal of equipment or structures.

e 9

S 0