ML20204J237: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 20: | Line 20: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:5[<Y"%[9 l | ||
/j/f ' p yjc d-J 4 | |||
5[<Y"%[9 | 4 UNITED STATES y | ||
g NUCLEAR REGULATORY COMMISSION 5 | |||
j WASHINGTON. D. C. 20555 | |||
/ | |||
MAR 131985 Docket No. 50-293 MEMORANDUM FOR: | |||
MAR 131985 Docket No. 50-293 MEMORANDUM FOR: | Gus C. Lainas, Assistant Director for Operating Reactors Division of Licensing FROM: | ||
William V. Johnston, Assistant Director Materials, Chemical & Environmental Technology Division of Engineering | |||
==SUBJECT:== | ==SUBJECT:== | ||
SAFETY EVALUATION FOR TECHNICAL SPECIFICATION CHANGE TO FACILITATE HYDR 0 GEN ADDITION - PILGRIM hUCLEAR POWER STATION (TAC #56820) | SAFETY EVALUATION FOR TECHNICAL SPECIFICATION CHANGE TO FACILITATE HYDR 0 GEN ADDITION - PILGRIM hUCLEAR POWER STATION (TAC #56820) | ||
Plant Name: | Plant Name: | ||
Pilgrim Nuclear Power Station, Unit 1 Suppliers: General Electric Company; Boston Edison Company Licensing Stage: OR Docket No.: 50-293 Responsible Branch & Project Manager: ORB #2; P. Leech CMEB Reviewer: | |||
F. J. Witt Description of Task: Technical Specification Change to Facilitate Hydrogen Addition Status: Safety Evaluation Complete By letters dated February 1 and 15, 1985, the licensee requested a temporary Tech Spec change to the main steam line high radiation trip level set point. | |||
The purpose of the requested Tech Spec change is to conduct an operational test of hydrogen additive reactor water chemistry. | The purpose of the requested Tech Spec change is to conduct an operational test of hydrogen additive reactor water chemistry. | ||
The Radiological Assessment Branch (RAB) has reviewed the request for Technical Specification changes. Attached is the evaluation and SALP prepared by RAB. | The Radiological Assessment Branch (RAB) has reviewed the request for Technical Specification changes. Attached is the evaluation and SALP prepared by RAB. | ||
We recommend that the proposed technical specification changes be approved. | We recommend that the proposed technical specification changes be approved. | ||
Q/ | Q/ | ||
{,br Y (wL A | |||
William V. Johnston, Assistant Director Materials, Chemical & Environmental Technology Division of Engineering | |||
==Attachment:== | ==Attachment:== | ||
| Line 41: | Line 46: | ||
==Contact:== | ==Contact:== | ||
F. Witt x28360 cc: See next page p2p | F. Witt x28360 cc: See next page p2p 850 | ||
~ 325M W XA r. | |||
. + | |||
MAR 131995 Gus C. Lainas | MAR 131995 Gus C. Lainas cc: | ||
S. Pawlicki F. Witt F. Congel M. Lamastra | J. Knight H. Thompson V. Benaroya C. McCracken D. Vassallo P. Leech T. Sulliven S. Pawlicki F. Witt F. Congel M. Lamastra | ||
= | |||
i | i | ||
)}} | |||
Latest revision as of 19:43, 7 December 2024
Text
5[<Y"%[9 l
/j/f ' p yjc d-J 4
4 UNITED STATES y
g NUCLEAR REGULATORY COMMISSION 5
j WASHINGTON. D. C. 20555
/
MAR 131985 Docket No. 50-293 MEMORANDUM FOR:
Gus C. Lainas, Assistant Director for Operating Reactors Division of Licensing FROM:
William V. Johnston, Assistant Director Materials, Chemical & Environmental Technology Division of Engineering
SUBJECT:
SAFETY EVALUATION FOR TECHNICAL SPECIFICATION CHANGE TO FACILITATE HYDR 0 GEN ADDITION - PILGRIM hUCLEAR POWER STATION (TAC #56820)
Plant Name:
Pilgrim Nuclear Power Station, Unit 1 Suppliers: General Electric Company; Boston Edison Company Licensing Stage: OR Docket No.: 50-293 Responsible Branch & Project Manager: ORB #2; P. Leech CMEB Reviewer:
F. J. Witt Description of Task: Technical Specification Change to Facilitate Hydrogen Addition Status: Safety Evaluation Complete By letters dated February 1 and 15, 1985, the licensee requested a temporary Tech Spec change to the main steam line high radiation trip level set point.
The purpose of the requested Tech Spec change is to conduct an operational test of hydrogen additive reactor water chemistry.
The Radiological Assessment Branch (RAB) has reviewed the request for Technical Specification changes. Attached is the evaluation and SALP prepared by RAB.
We recommend that the proposed technical specification changes be approved.
Q/
{,br Y (wL A
William V. Johnston, Assistant Director Materials, Chemical & Environmental Technology Division of Engineering
Attachment:
As stated
Contact:
F. Witt x28360 cc: See next page p2p 850
~ 325M W XA r.
. +
MAR 131995 Gus C. Lainas cc:
J. Knight H. Thompson V. Benaroya C. McCracken D. Vassallo P. Leech T. Sulliven S. Pawlicki F. Witt F. Congel M. Lamastra
=
i
)