IR 05000255/2020005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 38: Line 38:


Sincerely,
Sincerely,
/RA/
/RA/  
April Nguyen, Acting Chief Branch 2 Division of Reactor Projects Docket Nos. 50-255 and 72-007 License No. DPR-20 Enclosure(s):
 
Inspection Plan cc: Distribution via LISTSERV Letter to Darrell Corbin from April Nguyen dated September 1, 2020.
April Nguyen, Acting Chief Branch 2 Division of Reactor Projects  
 
Docket Nos. 50-255 and 72-007 License No. DPR-20  
 
Enclosure(s):
Inspection Plan  
 
cc: Distribution via LISTSERV Letter to Darrell Corbin from April Nguyen dated September 1, 2020.
 
SUBJECT:
UPDATED INSPECTION PLAN FOR PALISADES NUCLEAR PLANT (REPORT 05000255/2020005)


SUBJECT: UPDATED INSPECTION PLAN FOR PALISADES NUCLEAR PLANT (REPORT 05000255/2020005)
DISTRIBUTION:
DISTRIBUTION:
Jessie Quichocho Elise Burket RidsNrrPMPalisades Resource RidsNrrDorlLpl3 RidsNrrDroIrib Resource John Giessner Kenneth OBrien Jamnes Cameron Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML20244A282 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII RIII NAME RRuiz:wc via email ANguyen via email DATE 8/28/2020 8/28/2020 OFFICIAL RECORD COPY
Jessie Quichocho Elise Burket RidsNrrPMPalisades Resource RidsNrrDorlLpl3 RidsNrrDroIrib Resource John Giessner Kenneth OBrien Jamnes Cameron Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov  
 
ADAMS Accession Number: ML20244A282 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII  
 
RIII  
 
NAME RRuiz:wc via email ANguyen via email  
 
DATE 8/28/2020 8/28/2020  
 
OFFICIAL RECORD COPY  
 
07200007 - Palisades (ISFSI)
07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count ISFSI Security Inspection
 
1 09/20/2021 09/24/2021 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations 8/31/2020 1:30:35 PM Page 1 of 4 This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
IP 22 Inspection Activity Plan Report
 
Palisades 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Biennial Problem Identification and Resolution Inspection
 
1 06/22/2020 07/10/2020 IP 71152B 000747 Problem Identification and Resolution Radiation Protection Baseline Inspection
 
1 08/24/2020 09/11/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
 
08/24/2020 09/11/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls
 
08/24/2020 09/11/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Inservice Inspection
 
1 08/31/2020 09/17/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
Security Baseline Inspection
 
1 09/21/2020 09/25/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
 
09/21/2020 12/31/2020 IP 71130.09 001656 Security Plan Changes
 
10/05/2020 10/09/2020 IP 71130.08 000740 Fitness For Duty Program
 
10/05/2020 10/09/2020 IP 71151 001338 Performance Indicator Verification
 
10/26/2020 10/30/2020 IP 71130.02 000734 Access Control Cyber Security Inspection
 
1 10/19/2020 11/06/2020 IP 71130.10P 000741 Cyber Security Emergency Preparedness Exercise Inspection / Performance Indicator Verification
 
1 10/26/2020 10/30/2020 IP 71114.01 000716 Exercise Evaluation
 
10/26/2020 10/30/2020 IP 71151 001397 Performance Indicator Verification LIMITED SCOPE TACTICAL RESPONSE DRILLS - PAL
 
1 10/26/2020 10/30/2020 IP 92707 001711 Security Inspection of Facilities Impacted by a Local, State, or Federal Emergency Where the NRCs Ability to Conduct Triennial Force On-Force Exercises is Limited 8/31/2020 1:30:35 PM Page 2 of 4 This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
IP 22 Inspection Activity Plan Report
 
Palisades 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Radiation Protection Baseline Inspection
 
1 11/16/2020 11/20/2020 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &
Transportation Triennial Heat Sink Inspection
 
1 02/22/2021 03/01/2021 IP 71111.07T 000700 Heat Sink Performance Security Baseline Inspection
 
1 03/01/2021 03/05/2021 IP 71130.01 000733 Access Authorization
 
03/01/2021 03/05/2021 IP 71151 001338 Performance Indicator Verification Radiation Protection Baseline Inspection
 
1 03/29/2021 04/02/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls Radiation Protection Baseline Inspection
 
1 05/17/2021 05/21/2021 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Security Baseline Inspection
 
1 06/28/2021 07/02/2021 IP 71130.02 000734 Access Control
 
06/28/2021 07/02/2021 IP 71130.05 000737 Protective Strategy Evaluation
 
08/09/2021 08/13/2021 IP 71130.07 000739 Security Training OPC Temporary Instruction
 
1 08/30/2021 09/03/2021 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)
8/31/2020 1:30:35 PM Page 3 of 4 This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
IP 22 Inspection Activity Plan Report
 
Palisades 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Emergency Preparedness Baseline Inspection / Performance Indicator Verification
 
1 08/30/2021 09/03/2021 IP 71114.02 000717 Alert and Notification System Testing
 
08/30/2021 09/03/2021 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
 
08/30/2021 09/03/2021 IP 71114.05 000720 Maintenance of Emergency Preparedness
 
08/30/2021 09/03/2021 IP 71151 001397 Performance Indicator Verification Security Baseline Inspection


IP 22 Inspection Activity Plan Report 07200007 - Palisades (ISFSI)
1 10/01/2021 12/31/2021 IP 71130.09 001656 Security Plan Changes Triennial Fire Protection Inspection
07/01/2020 - 06/30/2022 Unit  Start  End  Activity CAC  Title  Staff Count ISFSI Security Inspection          1 1 09/20/2021 09/24/2021 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations This report does not include INPO and OUTAGE activities.      Page 1 of 4 This report shows only on-site and announced inspection procedures.


8/31/2020 1:30:35 PM
1 11/15/2021 12/04/2021 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
Radiation Protection Baseline Inspection


IP 22 Inspection Activity Plan Report Palisades 07/01/2020 - 06/30/2022 Unit  Start  End  Activity CAC  Title  Staff Count Biennial Problem Identification and Resolution Inspection        5 1 06/22/2020 07/10/2020 IP 71152B 000747 Problem Identification and Resolution Radiation Protection Baseline Inspection        2 1 08/24/2020 09/11/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 08/24/2020 09/11/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 08/24/2020 09/11/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Inservice Inspection          1 1 08/31/2020 09/17/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
1 11/15/2021 11/19/2021 IP 71124.05 000729 Radiation Monitoring Instrumentation Palisades 2022 Biennial Licensed Operator Requalification Program Inspection
Security Baseline Inspection          1 1 09/21/2020 09/25/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1 09/21/2020 12/31/2020 IP 71130.09 001656 Security Plan Changes 1 10/05/2020 10/09/2020 IP 71130.08 000740 Fitness For Duty Program 1 10/05/2020 10/09/2020 IP 71151 001338 Performance Indicator Verification 1 10/26/2020 10/30/2020 IP 71130.02 000734 Access Control Cyber Security Inspection          4 1 10/19/2020 11/06/2020 IP 71130.10P 000741 Cyber Security Emergency Preparedness Exercise Inspection / Performance Indicator Verification      4 1 10/26/2020 10/30/2020 IP 71114.01 000716 Exercise Evaluation 1 10/26/2020 10/30/2020 IP 71151 001397 Performance Indicator Verification LIMITED SCOPE TACTICAL RESPONSE DRILLS - PAL        6 1 10/26/2020 10/30/2020 IP 92707 001711 Security Inspection of Facilities Impacted by a Local, State, or Federal Emergency Where the NRCs Ability to Conduct Triennial Force On-Force Exercises is Limited This report does not include INPO and OUTAGE activities.        Page 2 of 4 This report shows only on-site and announced inspection procedures.


8/31/2020 1:30:35 PM
1 02/13/2022 02/19/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Evaluations of Changes, Test, and Experiments Inspection


IP 22 Inspection Activity Plan Report Palisades 07/01/2020 - 06/30/2022 Unit  Start  End  Activity CAC  Title  Staff Count Radiation Protection Baseline Inspection        1 1 11/16/2020 11/20/2020 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &
1 02/28/2022 03/04/2022 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments ISFSI Program Review Inspection 3Q2021
Transportation Triennial Heat Sink Inspection          2 1 02/22/2021 03/01/2021 IP 71111.07T 000700 Heat Sink Performance Security Baseline Inspection          1 1 03/01/2021 03/05/2021 IP 71130.01 000733 Access Authorization 1 03/01/2021 03/05/2021 IP 71151 001338 Performance Indicator Verification Radiation Protection Baseline Inspection        1 1 03/29/2021 04/02/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls Radiation Protection Baseline Inspection        2 1 05/17/2021 05/21/2021 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Security Baseline Inspection          3 1 06/28/2021 07/02/2021 IP 71130.02 000734 Access Control 1 06/28/2021 07/02/2021 IP 71130.05 000737 Protective Strategy Evaluation 1 08/09/2021 08/13/2021 IP 71130.07 000739 Security Training OPC Temporary Instruction          1 1 08/30/2021 09/03/2021 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)
This report does not include INPO and OUTAGE activities.        Page 3 of 4 This report shows only on-site and announced inspection procedures.


8/31/2020 1:30:35 PM
1 03/21/2022 03/25/2022 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 8/31/2020 1:30:35 PM Page 4 of 4 This report does not include INPO and OUTAGE activities.


IP 22 Inspection Activity Plan Report Palisades 07/01/2020 - 06/30/2022 Unit  Start  End  Activity CAC  Title  Staff Count Emergency Preparedness Baseline Inspection / Performance Indicator Verification      1 1 08/30/2021 09/03/2021 IP 71114.02 000717 Alert and Notification System Testing 1 08/30/2021 09/03/2021 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 08/30/2021 09/03/2021 IP 71114.05 000720 Maintenance of Emergency Preparedness 1 08/30/2021 09/03/2021 IP 71151 001397 Performance Indicator Verification Security Baseline Inspection          1 1 10/01/2021 12/31/2021 IP 71130.09 001656 Security Plan Changes Triennial Fire Protection Inspection        3 1 11/15/2021 12/04/2021 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
This report shows only on-site and announced inspection procedures.
Radiation Protection Baseline Inspection        1 1 11/15/2021 11/19/2021 IP 71124.05 000729 Radiation Monitoring Instrumentation Palisades 2022 Biennial Licensed Operator Requalification Program Inspection      2 1 02/13/2022 02/19/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Evaluations of Changes, Test, and Experiments Inspection        3 1 02/28/2022 03/04/2022 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments ISFSI Program Review Inspection 3Q2021        1 1 03/21/2022 03/25/2022 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants This report does not include INPO and OUTAGE activities.      Page 4 of 4 This report shows only on-site and announced inspection procedures.


8/31/2020 1:30:35 PM
IP 22 Inspection Activity Plan Report
}}
}}

Latest revision as of 04:40, 2 December 2024

Updated Inspection Plan for Palisades Nuclear Plant (Report 05000255/2020005)
ML20244A282
Person / Time
Site: Palisades  Entergy icon.png
Issue date: 09/01/2020
From: April Nguyen
NRC/RGN-III/DRP/B2
To: Corbin D
Entergy Nuclear Operations
References
IR 2020005
Download: ML20244A282 (7)


Text

September 1, 2020

SUBJECT:

UPDATED INSPECTION PLAN FOR PALISADES NUCLEAR PLANT (REPORT 05000255/2020005)

Dear Mr. Corbin:

The enclosed inspection plan lists the inspections scheduled through June 30, 2022, for Palisades Nuclear Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the Reactor Oversight Process (ROP), including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the May 28, 2020 memo, Inspection Guidance During Transition From COVID-19 Mandatory Telework (ML20141L766). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:

https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

In addition to the full-implementation cyber inspection scheduled to be completed at your site, the NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these baseline inspections are being developed by the NRC staff. The anticipated inspection dates are presented in the attached; however, the staff will confirm the schedule for these inspections with each utility separately.

Additionally, during this period the NRC will perform inspections per Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01).

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9587 with any questions you have regarding this letter.

Sincerely,

/RA/

April Nguyen, Acting Chief Branch 2 Division of Reactor Projects

Docket Nos. 50-255 and 72-007 License No. DPR-20

Enclosure(s):

Inspection Plan

cc: Distribution via LISTSERV Letter to Darrell Corbin from April Nguyen dated September 1, 2020.

SUBJECT:

UPDATED INSPECTION PLAN FOR PALISADES NUCLEAR PLANT (REPORT 05000255/2020005)

DISTRIBUTION:

Jessie Quichocho Elise Burket RidsNrrPMPalisades Resource RidsNrrDorlLpl3 RidsNrrDroIrib Resource John Giessner Kenneth OBrien Jamnes Cameron Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov

ADAMS Accession Number: ML20244A282 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII

RIII

NAME RRuiz:wc via email ANguyen via email

DATE 8/28/2020 8/28/2020

OFFICIAL RECORD COPY

07200007 - Palisades (ISFSI)

07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count ISFSI Security Inspection

1 09/20/2021 09/24/2021 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations 8/31/2020 1:30:35 PM Page 1 of 4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Palisades 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Biennial Problem Identification and Resolution Inspection

1 06/22/2020 07/10/2020 IP 71152B 000747 Problem Identification and Resolution Radiation Protection Baseline Inspection

1 08/24/2020 09/11/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

08/24/2020 09/11/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls

08/24/2020 09/11/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Inservice Inspection

1 08/31/2020 09/17/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

Security Baseline Inspection

1 09/21/2020 09/25/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

09/21/2020 12/31/2020 IP 71130.09 001656 Security Plan Changes

10/05/2020 10/09/2020 IP 71130.08 000740 Fitness For Duty Program

10/05/2020 10/09/2020 IP 71151 001338 Performance Indicator Verification

10/26/2020 10/30/2020 IP 71130.02 000734 Access Control Cyber Security Inspection

1 10/19/2020 11/06/2020 IP 71130.10P 000741 Cyber Security Emergency Preparedness Exercise Inspection / Performance Indicator Verification

1 10/26/2020 10/30/2020 IP 71114.01 000716 Exercise Evaluation

10/26/2020 10/30/2020 IP 71151 001397 Performance Indicator Verification LIMITED SCOPE TACTICAL RESPONSE DRILLS - PAL

1 10/26/2020 10/30/2020 IP 92707 001711 Security Inspection of Facilities Impacted by a Local, State, or Federal Emergency Where the NRCs Ability to Conduct Triennial Force On-Force Exercises is Limited 8/31/2020 1:30:35 PM Page 2 of 4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Palisades 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Radiation Protection Baseline Inspection

1 11/16/2020 11/20/2020 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation Triennial Heat Sink Inspection

1 02/22/2021 03/01/2021 IP 71111.07T 000700 Heat Sink Performance Security Baseline Inspection

1 03/01/2021 03/05/2021 IP 71130.01 000733 Access Authorization

03/01/2021 03/05/2021 IP 71151 001338 Performance Indicator Verification Radiation Protection Baseline Inspection

1 03/29/2021 04/02/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls Radiation Protection Baseline Inspection

1 05/17/2021 05/21/2021 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Security Baseline Inspection

1 06/28/2021 07/02/2021 IP 71130.02 000734 Access Control

06/28/2021 07/02/2021 IP 71130.05 000737 Protective Strategy Evaluation

08/09/2021 08/13/2021 IP 71130.07 000739 Security Training OPC Temporary Instruction

1 08/30/2021 09/03/2021 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)

8/31/2020 1:30:35 PM Page 3 of 4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Palisades 07/01/2020 - 06/30/2022 Unit Start End Activity CAC Title Staff Count Emergency Preparedness Baseline Inspection / Performance Indicator Verification

1 08/30/2021 09/03/2021 IP 71114.02 000717 Alert and Notification System Testing

08/30/2021 09/03/2021 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

08/30/2021 09/03/2021 IP 71114.05 000720 Maintenance of Emergency Preparedness

08/30/2021 09/03/2021 IP 71151 001397 Performance Indicator Verification Security Baseline Inspection

1 10/01/2021 12/31/2021 IP 71130.09 001656 Security Plan Changes Triennial Fire Protection Inspection

1 11/15/2021 12/04/2021 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

Radiation Protection Baseline Inspection

1 11/15/2021 11/19/2021 IP 71124.05 000729 Radiation Monitoring Instrumentation Palisades 2022 Biennial Licensed Operator Requalification Program Inspection

1 02/13/2022 02/19/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Evaluations of Changes, Test, and Experiments Inspection

1 02/28/2022 03/04/2022 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments ISFSI Program Review Inspection 3Q2021

1 03/21/2022 03/25/2022 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 8/31/2020 1:30:35 PM Page 4 of 4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report