ML20133N407: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 20: | Line 20: | ||
{{#Wiki_filter:* | {{#Wiki_filter:* | ||
Jif Jtf March 5,1979 i | Jif Jtf March 5,1979 i | ||
t'E"0RA!:DU!' FOR: | t'E"0RA!:DU!' FOR: | ||
J. P. O'Reilly, Director, Region II | B. H. Grier, Director, Region I J. P. O'Reilly, Director, Region II 3 | ||
J. G. Keppler, Director, Region III y. | |||
K. V. Seyfrit Director, Region IV R. H. Engelken, Director, Regien V | K. V. Seyfrit Director, Region IV R. H. Engelken, Director, Regien V FR0": | ||
FR0": | '!;oman C. l'oseley, Director) ROI, IE SL' EJECT: | ||
i | IE C"LLETI:: "O. 79 r2 PIFE SU~EC.7T C*SE IL*TE DESIG"5 USI:JG CO CRETE EXPA!!SIOil A?:CHCR ECLTS i | ||
Ti o suhioct Bulletin has been revised from that date' February 2f,1979 and is now transr.itted for issuance on f* arch 8,1979. The Bulletin should be issued for action to all power reactor facilities with an ocerating license or a construction percit. The text of the P.ulletin and ir:#t letter to licensees and pemit holders are er.c1csed for this purpose. | Ti o suhioct Bulletin has been revised from that date' February 2f,1979 and is now transr.itted for issuance on f* arch 8,1979. The Bulletin should be issued for action to all power reactor facilities with an ocerating license or a construction percit. The text of the P.ulletin and ir:#t letter to licensees and pemit holders are er.c1csed for this purpose. | ||
!:oman. C. *'eseley, Cirector Division of. Reactor Onerations Insnection Office of Inspection and Enforcement Enc 70sures: | |||
Enc 70sures: | i l | ||
l | : 1. - IE Sulletin ::o. 79-02 l | ||
f | 2. | ||
Draft Transmittal Letter for Action CC: TACT: | |||
C. J. DeCavec. IE l | |||
49-20180 i | |||
f t | |||
SEE PREVIOUS RLLOW FOR C,0t/CURRENCES ht. | |||
me,,,,,, | |||
ROI ROF RCI ROI XdOS hh 7h5/h===* | |||
i... | |||
. S.e.Y.e.C..... | |||
29.E. | |||
Tim | |||
~ | |||
.. 2,g,/,?!,,,,,,,,,,,,2/,f'g,7,9,,,,,, | |||
,,,g,/,/,Zp,,,,,,,,,2/M,9,,,,,,, | |||
M,',7, g,,,,,,, | |||
y,, | |||
t | t | ||
==> | |||
(Draft letter to all power reactor facilities with an operating license or a construction permit) | h 9 | ||
* u a-=== ==="='==== **-a = ' a a " * "' | |||
D 2cac semas sts m.7s> Nacas esse B508130479 850703 PDR FOIA HERRMAN85-301 PDR | |||
.o s (Draft letter to all power reactor facilities with an operating license or a construction permit) | |||
IE Bulletin No. 79-02 Addressee: | IE Bulletin No. 79-02 Addressee: | ||
The enclosed Bulletin 79-02 is forwarded to you for action. A written response is required. | The enclosed Bulletin 79-02 is forwarded to you for action. | ||
A written response is required. | |||
If you desire additional information regarding this matter, please contact this office. | |||
Sincerely, Signature (Regional Director) | Sincerely, Signature (Regional Director) | ||
==Enclosure:== | ==Enclosure:== | ||
IE Bulletin No. 79-02 I. | IE Bulletin No. 79-02 I. | ||
e i | e i | ||
.3... | |||
.}} | |||
Latest revision as of 07:22, 12 December 2024
Text
Jif Jtf March 5,1979 i
t'E"0RA!:DU!' FOR:
B. H. Grier, Director, Region I J. P. O'Reilly, Director, Region II 3
J. G. Keppler, Director, Region III y.
K. V. Seyfrit Director, Region IV R. H. Engelken, Director, Regien V FR0":
'!;oman C. l'oseley, Director) ROI, IE SL' EJECT:
IE C"LLETI:: "O. 79 r2 PIFE SU~EC.7T C*SE IL*TE DESIG"5 USI:JG CO CRETE EXPA!!SIOil A?:CHCR ECLTS i
Ti o suhioct Bulletin has been revised from that date' February 2f,1979 and is now transr.itted for issuance on f* arch 8,1979. The Bulletin should be issued for action to all power reactor facilities with an ocerating license or a construction percit. The text of the P.ulletin and ir:#t letter to licensees and pemit holders are er.c1csed for this purpose.
!:oman. C. *'eseley, Cirector Division of. Reactor Onerations Insnection Office of Inspection and Enforcement Enc 70sures:
i l
- 1. - IE Sulletin ::o. 79-02 l
2.
Draft Transmittal Letter for Action CC: TACT:
C. J. DeCavec. IE l
49-20180 i
f t
SEE PREVIOUS RLLOW FOR C,0t/CURRENCES ht.
me,,,,,,
ROI ROF RCI ROI XdOS hh 7h5/h===*
i...
. S.e.Y.e.C.....
29.E.
Tim
~
.. 2,g,/,?!,,,,,,,,,,,,2/,f'g,7,9,,,,,,
,,,g,/,/,Zp,,,,,,,,,2/M,9,,,,,,,
M,',7, g,,,,,,,
y,,
t
==>
h 9
- u a-=== ==="='==== **-a = ' a a " * "'
D 2cac semas sts m.7s> Nacas esse B508130479 850703 PDR FOIA HERRMAN85-301 PDR
.o s (Draft letter to all power reactor facilities with an operating license or a construction permit)
IE Bulletin No. 79-02 Addressee:
The enclosed Bulletin 79-02 is forwarded to you for action.
A written response is required.
If you desire additional information regarding this matter, please contact this office.
Sincerely, Signature (Regional Director)
Enclosure:
e i
.3...
.