ML20134K576: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:,               .                                                                      _
{{#Wiki_filter:,
Callaway Pl ant p ,
p Callaway Pl ant Post Office Bcx 620 Fu!:an, Missoun 65251 UNTON Eucnuc 33 November 6,1996 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop Pl-137 Washington, DC 20555-0001 ULNRC-3485 Gentlemen:
Post Office Bcx 620 Fu!:an, Missoun 65251 UNTON Eucnuc 33                                                         November 6,1996             :
I U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop Pl-137 Washington, DC 20555-0001                                                               l ULNRC-3485 Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTIILY OPERATING REPORT OCTOBER 1996 The enclosed Monthly Operating Report for October 1996 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTIILY OPERATING REPORT OCTOBER 1996 The enclosed Monthly Operating Report for October 1996 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
M R. D. ffolter Manager, Callaway Plant RDA/ Mall /Imf Enclosure f&:24'i 9611190218 961031 PDR     ADOCK 05000483 R                           PDR
M R. D.
ffolter Manager, Callaway Plant RDA/ Mall /Imf Enclosure f&:24'i 9611190218 961031 PDR ADOCK 05000483 R
PDR


4 ULNRC-3485                                               l l              November 6,1996                                         '
4 ULNRC-3485 l
L            . Page 2 cc: Mr. L. Joe Callan Regional Administrator l                   U.S. Nuclear Regulatory Commission l                   Region IV l                   611 Ryan Plaza Drive, Suite 400                     '
November 6,1996 L
Arlington, TX 76011-8064 l
Page 2 cc: Mr. L. Joe Callan Regional Administrator l
l-                 E.aior Resident Inspector
U.S. Nuclear Regulatory Commission l
{
Region IV l
l                  Callaway Resident OITice                             l U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Ms. Kristine M. Thomas (2 copies)                   :
611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 l
l                   Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation                 !
l-E.aior Resident Inspector l
l                  U. S. Nuclear Regulatory Commission
Callaway Resident OITice U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Ms. Kristine M. Thomas (2 copies) l Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation l
!                  Mail Stop 13E16 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.                                 i Washington, DC 20037                               !
U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.
I l
i Washington, DC 20037 I
l


i ULNRC-3485 November 6,1996 f-                 ,  ' Page 3 bec: Institute of Nuclear Power Operations Records Center .
i ULNRC-3485 November 6,1996 f-
Suite 100                                                                     !
' Page 3 bec: Institute of Nuclear Power Operations Records Center.
700 Galleria Parkway                                                           I Atlanta, GA 30339-5957 l                              Dottie Sherman
Suite 100 700 Galleria Parkway I
!~                                                                                                             '
Atlanta, GA 30339-5957 Dottie Sherman l
!~
American Nuclear Insurers 29 S. Main Street
American Nuclear Insurers 29 S. Main Street
                              - West Hartford, CT 06107                                                       l l
- West Hartford, CT 06107 Mr. T. M. Handlan Westinghouse Electric Corp.
Mr. T. M. Handlan                                                             I Westinghouse Electric Corp.
I1601 Lilburn Park Road St. Louis, MO 63146 Mr. Fred Yost -
I1601 Lilburn Park Road St. Louis, MO 63146 Mr. Fred Yost -
Director of Research                                                           .
Director of Research Utility Data Institute 1700 K. Street Northwest Suite 400 i
Utility Data Institute 1700 K. Street Northwest Suite 400                                                                     i Washington DC 20006 D. F. Schnell (400)
Washington DC 20006 D. F. Schnell (400)
G. L. Randolph J. V. Laux/G. A. Hughes A. C. Passwater/D. E. Shafer (470)
G. L. Randolph J. V. Laux/G. A. Hughes A. C. Passwater/D. E. Shafer (470)
M. P. Barrett (100)
M. P. Barrett (100)
P. L. Reynolds (470) NSRB R. J. Irwin (470)
P. L. Reynolds (470) NSRB R. J. Irwin (470)
M. E. Taylor
M. E. Taylor H. D. Bono E210.0001 A160.0761 RDA Chrono Manager, Plant Support Wolf Creek Nuclear Operating Corporation PO Box 411 Budington,KS 66839 r
!                              H. D. Bono E210.0001 A160.0761 RDA Chrono Manager, Plant Support Wolf Creek Nuclear Operating Corporation PO Box 411 r
Budington,KS 66839


_ . _ _    ._ .    . . . . . . . . . . . . _  ___ _      -_.__....._m         . . . . __    _ . _ _ . . . _        _, . . . _ _
-_.__....._m
=.      .
=.
l i
l i
i i;              -
i i
?
?
DOCKET NO.:                   50-483 UNIT NAME:
DOCKET NO.:
                                                                                                                                        )
50-483
CALLAWAY UNIT 1'-                                                                     '
)
DATE:                         11/6/96 COMPLETED BY:                 M. A. llotmes                                                                         I TELEPliONE:                   573/676-8842                                                                         i FAX:                         573/676-8562 T
UNIT NAME:
l l
CALLAWAY UNIT 1'-
DATE:
11/6/96 COMPLETED BY:
M. A. llotmes I
TELEPliONE:
573/676-8842 i
FAX:
573/676-8562 T
l PART A -OPERATIONS  
l PART A -OPERATIONS  


==SUMMARY==
==SUMMARY==
The plant started a refueling outage coast down during the month of October. The coast down stat ,d at approximately 0200 on 10/6/96 and continued until licensed operators removed the unit from service at 0018 on 10/12/96. This is the eighth refueling outage for Callaway.
The plant started a refueling outage coast down during the month of October. The coast down stat,d at approximately 0200 on 10/6/96 and continued until licensed operators removed the unit from service at 0018 on 10/12/96. This is the eighth refueling outage for Callaway.
PART B- PORY AA 4. iFETY VALVE  
PART B-PORY AA
: 4. iFETY VALVE  


==SUMMARY==
==SUMMARY==
:                                                                              l None.
None.
i l
i l
l l
1 Page1of4
1 Page1of4


    .. - . . . ..            -. - - ._ ~ .        .. . - _ - - - .      - --        .    . . . - .    .      .- .-.
-. - -._ ~.
4 a
4 a
l PART C AVERAGE DAILY UNIT POWER LEVEL                                     I l
PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:
DOCKET NO:       50-483 l                                                                               UNIT:             Callaway Unit 1       l DATE:             11/6/96
50-483 l
*                                                                                                                      {
UNIT:
Callaway Unit 1 DATE:
11/6/96
{
COMPLETED BY:
COMPLETED BY:
M. A. Holmes -
M. A. Holmes -
TELEPHONE:       573/676-8842 FAX:             573/676-8562 MONTH: OCTOBER 1996 i
TELEPHONE:
AVERAGE DAILY POWER                     AVERAGE DAILY POWER LEVEL                                     LEVEL DAY                 (MWe-Net)                 DAY           (MWe-Net) 1                   1.156                   17               0 2                   1.157                   18               0 3                   1.169                   19               0 4                   1.168                   20               0 5                   1.158                   21               0 6                   1.042                   22               0                             l l
573/676-8842 FAX:
7                   1.001                   23               0 8                   1.010                   24               0 9                     936                   25               0 10                     721                   26               0 1
573/676-8562 MONTH: OCTOBER 1996 i
i
AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL DAY (MWe-Net)
                        .11                     610                   27               0                             l 12                 0                       28               0 13                 0                       29               0 14                 0                       30               0 15                 0                       31               0 i
DAY (MWe-Net) 1 1.156 17 0
16                 0 Page 2 0f 4
2 1.157 18 0
3 1.169 19 0
4 1.168 20 0
5 1.158 21 0
6 1.042 22 0
7 1.001 23 0
8 1.010 24 0
9 936 25 0
10 721 26 0
1 i
.11 610 27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
i 16 0
Page 2 0f 4


i       .
i 1-i PART D l
1-
l OPERATING DATA REPORT 4
* i PART D                                                                       l l                                                         OPERATING DATA REPORT 4
DOCKET NO.:
DOCKET NO.:                   50-483                                 !
50-483 UNIT NAME:
UNIT NAME:                     CALLAWAY UNIT 1
CALLAWAY UNIT 1 DATE:
!                                                                          DATE:                         11/6/96                                 l I
11/6/96 I
COMPLETED BY:                   M. A. Holmes                           !
COMPLETED BY:
;                                                                          TELEPHONE:                     573/676-8842 4
M. A. Holmes TELEPHONE:
FAX:                           573/676-8562 OPERATING STATUS:
573/676-8842 4
(OCT)                 (YTD)             (CUM)
FAX:
                      'l. REPORTING PERIOD:
573/676-8562 OPERATING STATUS:
GROSS HOURS IN REPORTING PERIOD:               745                   7,320.0           104,005.5 2 CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125 DESIGN ELECTRICAL RATING (MWe-Net): 1171
(OCT)
                      - 3. POWER LEVEL TO WillCH RESTRICTED (IF ANY)(MWe-Net): 100 %
(YTD)
(CUM)
'l.
REPORTING PERIOD:
GROSS HOURS IN REPORTING PERIOD:
745 7,320.0 104,005.5 2 CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125 DESIGN ELECTRICAL RATING (MWe-Net): 1171
- 3.
POWER LEVEL TO WillCH RESTRICTED (IF ANY)(MWe-Net): 100 %
4 REASONS FOR RESTRICTION (IF ANY):
4 REASONS FOR RESTRICTION (IF ANY):
THIS MONTH                 YR TO DATE               CUMULATIVE
THIS MONTH YR TO DATE CUMULATIVE 5.
: 5.     NUMBER OF FLOURS REACTOR WAS CRITICAL,                 266.0                 6,814.0                 91,939.5
NUMBER OF FLOURS REACTOR WAS CRITICAL, 266.0 6,814.0 91,939.5 6.
: 6.     REACTOR RESERVE SHUTDOWN HOURS                             0                     0                       0
REACTOR RESERVE SHUTDOWN HOURS 0
: 7. IIOURS GENERATOR ON-LINE                               264.3                 6,787.0                 90,428.4
0 0
: 8. UNIT RESERVE SHUTDOWN HOURS                               0                     0                       0
7.
: 9. GROSS THERMAL ENERGY GENERATED (MWH                 829,440               23,794,074               306,752,792 1
IIOURS GENERATOR ON-LINE 264.3 6,787.0 90,428.4 8.
: 10. GROSS ELECTRICAL ENERGY GENERATED                   281,418                 8,092,356               104,613,210 l
UNIT RESERVE SHUTDOWN HOURS 0
                              - (MWH) l1. NET ELECTRICAL ENERGY GENERATED                     261,293                 7,713,757               99,537,129 (MWH)
0 0
: 12. REACTOR SERVICE FACTC'1                                 35.7                   93.1                 88.4
9.
: 13. REACTOR AVAILABILITY FACTOR                             35.7                   93.1                 88.4
GROSS THERMAL ENERGY GENERATED (MWH 829,440 23,794,074 306,752,792 1
: 14. UNIT SERVICE FACTOR                                     35.4                   92.7               - 86.9
10.
: 15. UNIT AVAILABILITY FACTOR                                 35.4                   92.7                 86.9 i
GROSS ELECTRICAL ENERGY GENERATED 281,418 8,092,356 104,613,210
: 16.   ~ UNIT CAPACITY FACTOR (Using MDC)                       31.2                   93.7                 85.1
- (MWH) l1.
                      ' 17. UNIT CAPACITY FACTOR (Using Design MWe)                 30.0                   90.0                 81.7
NET ELECTRICAL ENERGY GENERATED 261,293 7,713,757 99,537,129 (MWH) 12.
: 18. ~ UNIT FORCED OUTAGE RATE                                   0.0                   0.56                 2.21
REACTOR SERVICE FACTC'1 35.7 93.1 88.4 13.
REACTOR AVAILABILITY FACTOR 35.7 93.1 88.4 14.
UNIT SERVICE FACTOR 35.4 92.7
- 86.9 15.
UNIT AVAILABILITY FACTOR 35.4 92.7 86.9 i
16.
~ UNIT CAPACITY FACTOR (Using MDC) 31.2 93.7 85.1
' 17.
UNIT CAPACITY FACTOR (Using Design MWe) 30.0 90.0 81.7
: 18. ~ UNIT FORCED OUTAGE RATE 0.0 0.56 2.21
: 19. SilVTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
: 19. SilVTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling Date: 10/12/96 Duration: 42 days
Refueling Date: 10/12/96 Duration: 42 days
Line 121: Line 166:
Page 3 of 4
Page 3 of 4


                                                                                                                                                                                                                                                                          . t PART E                                                           '
t PART E UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:             50-483 UNIT NAME:               CALLAWAY UNIT I                   ,
50-483 UNIT NAME:
DATE:                   11/6/96                           !
CALLAWAY UNIT I DATE:
COMPLETED BY:           M. A. Holmes TELEPHONE:               573/676-8842 FAX:                     573/676-8562 REPORT MONTH: OCTOBER 1996 i
11/6/96 COMPLETED BY:
METHOD GF                                                                               i TYPE                                                                                                                                                     SHUTTING DOWN
M. A. Holmes TELEPHONE:
}                           F: FORCED                     DURATION                                                                                                                   THE REACTOR OR CORRECTIVE NO.     DATE         S: SCHEDULED                 (HOURS)                                                             REASON                                                 REDUCING POWER ACTIONS / COMMENTS 7       961012                 S                                   480.7                                                                 C                                               1 Refueling outage. See comments below.
573/676-8842 FAX:
573/676-8562 REPORT MONTH: OCTOBER 1996 i
METHOD GF i-TYPE SHUTTING DOWN
}
F: FORCED DURATION THE REACTOR OR CORRECTIVE NO.
DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER ACTIONS / COMMENTS 7
961012 S
480.7 C
1 Refueling outage. See comments below.


==SUMMARY==
==SUMMARY==
: 7. The plant started a refueling outage coast down during the month of October. The coast down started at approximately 0200 on 10/6/96 and continued until licensed operators removed the unit from service at 0018 on 10/12/96. This is the eighth refueling outage for Callaway.
: 7. The plant started a refueling outage coast down during the month of October. The coast down started at approximately 0200 on 10/6/96 and continued until licensed operators removed the unit from service at 0018 on 10/12/96. This is the eighth refueling outage for Callaway.
REASON                                                                                                                                               METHOD A: EQUIPMENT FAILURE (EXPLAIN)                                                                                                     1: MANUAL B. MAINT. OR TEST                                                                                                                 2: MANUAL SCRAM                                                                                                                       '
REASON METHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B. MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATICSCRAM D: REGULATORY RESTRICTION 4: OTHER(EXPLAIN)
C: REFUELING                                                                                                                     3: AUTOMATICSCRAM D: REGULATORY RESTRICTION                                                                                                         4: OTHER(EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN) l H: OTHER(EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN)                                                                                                                                                                                                                                           l H: OTHER(EXPLAIN)
Page 3 of 4 l.
Page 3 of 4
.}}
: l.                           _        __      _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ __________ ____}}

Latest revision as of 04:00, 12 December 2024

Monthly Operating Rept for Oct 1996 for Callaway Plant Unit 1
ML20134K576
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/31/1996
From: Affolter R, Holmes M
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-3485, NUDOCS 9611190218
Download: ML20134K576 (7)


Text

,

p Callaway Pl ant Post Office Bcx 620 Fu!:an, Missoun 65251 UNTON Eucnuc 33 November 6,1996 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop Pl-137 Washington, DC 20555-0001 ULNRC-3485 Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTIILY OPERATING REPORT OCTOBER 1996 The enclosed Monthly Operating Report for October 1996 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

M R. D.

ffolter Manager, Callaway Plant RDA/ Mall /Imf Enclosure f&:24'i 9611190218 961031 PDR ADOCK 05000483 R

PDR

4 ULNRC-3485 l

November 6,1996 L

Page 2 cc: Mr. L. Joe Callan Regional Administrator l

U.S. Nuclear Regulatory Commission l

Region IV l

611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 l

l-E.aior Resident Inspector l

Callaway Resident OITice U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Ms. Kristine M. Thomas (2 copies) l Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation l

U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.

i Washington, DC 20037 I

l

i ULNRC-3485 November 6,1996 f-

' Page 3 bec: Institute of Nuclear Power Operations Records Center.

Suite 100 700 Galleria Parkway I

Atlanta, GA 30339-5957 Dottie Sherman l

!~

American Nuclear Insurers 29 S. Main Street

- West Hartford, CT 06107 Mr. T. M. Handlan Westinghouse Electric Corp.

I1601 Lilburn Park Road St. Louis, MO 63146 Mr. Fred Yost -

Director of Research Utility Data Institute 1700 K. Street Northwest Suite 400 i

Washington DC 20006 D. F. Schnell (400)

G. L. Randolph J. V. Laux/G. A. Hughes A. C. Passwater/D. E. Shafer (470)

M. P. Barrett (100)

P. L. Reynolds (470) NSRB R. J. Irwin (470)

M. E. Taylor H. D. Bono E210.0001 A160.0761 RDA Chrono Manager, Plant Support Wolf Creek Nuclear Operating Corporation PO Box 411 Budington,KS 66839 r

-_.__....._m

=.

l i

i i

?

DOCKET NO.:

50-483

)

UNIT NAME:

CALLAWAY UNIT 1'-

DATE:

11/6/96 COMPLETED BY:

M. A. llotmes I

TELEPliONE:

573/676-8842 i

FAX:

573/676-8562 T

l PART A -OPERATIONS

SUMMARY

The plant started a refueling outage coast down during the month of October. The coast down stat,d at approximately 0200 on 10/6/96 and continued until licensed operators removed the unit from service at 0018 on 10/12/96. This is the eighth refueling outage for Callaway.

PART B-PORY AA

4. iFETY VALVE

SUMMARY

None.

i l

1 Page1of4

-. - -._ ~.

4 a

PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50-483 l

UNIT:

Callaway Unit 1 DATE:

11/6/96

{

COMPLETED BY:

M. A. Holmes -

TELEPHONE:

573/676-8842 FAX:

573/676-8562 MONTH: OCTOBER 1996 i

AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL DAY (MWe-Net)

DAY (MWe-Net) 1 1.156 17 0

2 1.157 18 0

3 1.169 19 0

4 1.168 20 0

5 1.158 21 0

6 1.042 22 0

7 1.001 23 0

8 1.010 24 0

9 936 25 0

10 721 26 0

1 i

.11 610 27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

i 16 0

Page 2 0f 4

i 1-i PART D l

l OPERATING DATA REPORT 4

DOCKET NO.:

50-483 UNIT NAME:

CALLAWAY UNIT 1 DATE:

11/6/96 I

COMPLETED BY:

M. A. Holmes TELEPHONE:

573/676-8842 4

FAX:

573/676-8562 OPERATING STATUS:

(OCT)

(YTD)

(CUM)

'l.

REPORTING PERIOD:

GROSS HOURS IN REPORTING PERIOD:

745 7,320.0 104,005.5 2 CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125 DESIGN ELECTRICAL RATING (MWe-Net): 1171

- 3.

POWER LEVEL TO WillCH RESTRICTED (IF ANY)(MWe-Net): 100 %

4 REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE 5.

NUMBER OF FLOURS REACTOR WAS CRITICAL, 266.0 6,814.0 91,939.5 6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 0

7.

IIOURS GENERATOR ON-LINE 264.3 6,787.0 90,428.4 8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

9.

GROSS THERMAL ENERGY GENERATED (MWH 829,440 23,794,074 306,752,792 1

10.

GROSS ELECTRICAL ENERGY GENERATED 281,418 8,092,356 104,613,210

- (MWH) l1.

NET ELECTRICAL ENERGY GENERATED 261,293 7,713,757 99,537,129 (MWH) 12.

REACTOR SERVICE FACTC'1 35.7 93.1 88.4 13.

REACTOR AVAILABILITY FACTOR 35.7 93.1 88.4 14.

UNIT SERVICE FACTOR 35.4 92.7

- 86.9 15.

UNIT AVAILABILITY FACTOR 35.4 92.7 86.9 i

16.

~ UNIT CAPACITY FACTOR (Using MDC) 31.2 93.7 85.1

' 17.

UNIT CAPACITY FACTOR (Using Design MWe) 30.0 90.0 81.7

18. ~ UNIT FORCED OUTAGE RATE 0.0 0.56 2.21
19. SilVTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling Date: 10/12/96 Duration: 42 days

20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:

Page 3 of 4

t PART E UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

50-483 UNIT NAME:

CALLAWAY UNIT I DATE:

11/6/96 COMPLETED BY:

M. A. Holmes TELEPHONE:

573/676-8842 FAX:

573/676-8562 REPORT MONTH: OCTOBER 1996 i

METHOD GF i-TYPE SHUTTING DOWN

}

F: FORCED DURATION THE REACTOR OR CORRECTIVE NO.

DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER ACTIONS / COMMENTS 7

961012 S

480.7 C

1 Refueling outage. See comments below.

SUMMARY

7. The plant started a refueling outage coast down during the month of October. The coast down started at approximately 0200 on 10/6/96 and continued until licensed operators removed the unit from service at 0018 on 10/12/96. This is the eighth refueling outage for Callaway.

REASON METHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B. MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATICSCRAM D: REGULATORY RESTRICTION 4: OTHER(EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN) l H: OTHER(EXPLAIN)

Page 3 of 4 l.

.