U. S. NUCLEAR REGULATORY COMMISSION | U. S. NUCLEAR REGULATORY COMMISSION | ||
==REGION III== | ==REGION III== | ||
Report No. 50-341/85044(DRSS) | Report No. 50-341/85044(DRSS) | ||
Docket No. 50-341 | Docket No. 50-341 License No. DPF-33 Safeguards Group IV Licensee: Detroit Edison Company 2200 Second Avenue | ||
Detroit, MI 48226 Facility Name: | < | ||
Detroit, MI 48226 Facility Name: | |||
Enrico Fermi Atomic Power Plant Inspection At: | |||
Plant Site Inspection Conducted: | |||
September 30 through October 4, 1985 Da'te of Last Physical Security Inspection: | |||
June 10-14, 1985 Type of Inspection: | |||
Unannounced, Routine Physical Security Inspectors: | |||
1.1 b k O_ | |||
tolzstl65 A,T. J. Madeda Date Physical Security Inspector | |||
33. 1 P i h. | |||
Plan. Additionally, the inspection included a review of licensee action on previous inspection findings. Also,' licensee action on two security related events (unauthorized use of security equipment and an inadequate compensatory measure) were reviewed by the inspectors. The inspection involved 70 direct inspection hours by two NRC | i./2=tss G. L. Pirtle Date Physical Security Inspector Approved By: | ||
/0!aM!8f | |||
. | |||
R. Creed, Chief Date afeguards Section Inspection Summary Inspection on September 30 through October 4,1985 (Report No. 50-341/85044(DRSS)) | |||
Areas Inspected: | |||
Included a selective review of Management Effectiveness; Security Organization; Testing and Maintenance; Security Program Audit; Compensatory Measures; Access Control - Personnel; Access Control - Packages; Alarm Stations; Training and Qualification; and the Safeguards Contingency 851024 1:1cioure contains Bg02JOO 0%$1 SAFEGU/RDS INFMTI@ | |||
$ | |||
UpOn separation thfy TU is Decontrolled | |||
- | |||
- | |||
- -. | |||
- | |||
- - | |||
- | |||
- | |||
- | |||
- | |||
- | |||
.. | |||
. | |||
Plan. Additionally, the inspection included a review of licensee action on previous inspection findings. Also,' licensee action on two security related events (unauthorized use of security equipment and an inadequate compensatory measure) were reviewed by the inspectors. | |||
The inspection involved 70 direct inspection hours by two NRC inspectors. | |||
m Results: The licensee was found to be in compliance with NRC requirements within the areas inspected. | |||
In addition, all previously identified violations and open items are closed. | |||
(Details: UNCLASSIFIED ) | |||
! | ! | ||
b"closurecontains | b"closurecontains | ||
$MTGUARDS IWORMTION | |||
Epon separation thip page is Decontvolled | |||
. | |||
-. | |||
__ | |||
-. | |||
}} | }} | ||
Latest revision as of 19:17, 11 December 2024
| ML20138H348 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/24/1985 |
| From: | Creed J, Madeda T, Pirtle G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML20138H333 | List: |
| References | |
| 50-341-85-44, NUDOCS 8510290017 | |
| Download: ML20138H348 (2) | |
Text
-
.
U. S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-341/85044(DRSS)
Docket No. 50-341 License No. DPF-33 Safeguards Group IV Licensee: Detroit Edison Company 2200 Second Avenue
<
Detroit, MI 48226 Facility Name:
Enrico Fermi Atomic Power Plant Inspection At:
Plant Site Inspection Conducted:
September 30 through October 4, 1985 Da'te of Last Physical Security Inspection:
June 10-14, 1985 Type of Inspection:
Unannounced, Routine Physical Security Inspectors:
1.1 b k O_
tolzstl65 A,T. J. Madeda Date Physical Security Inspector
33. 1 P i h.
i./2=tss G. L. Pirtle Date Physical Security Inspector Approved By:
/0!aM!8f
.
R. Creed, Chief Date afeguards Section Inspection Summary Inspection on September 30 through October 4,1985 (Report No. 50-341/85044(DRSS))
Areas Inspected:
Included a selective review of Management Effectiveness; Security Organization; Testing and Maintenance; Security Program Audit; Compensatory Measures; Access Control - Personnel; Access Control - Packages; Alarm Stations; Training and Qualification; and the Safeguards Contingency 851024 1:1cioure contains Bg02JOO 0%$1 SAFEGU/RDS INFMTI@
$
UpOn separation thfy TU is Decontrolled
-
-
- -.
-
- -
-
-
-
-
-
..
.
Plan. Additionally, the inspection included a review of licensee action on previous inspection findings. Also,' licensee action on two security related events (unauthorized use of security equipment and an inadequate compensatory measure) were reviewed by the inspectors.
The inspection involved 70 direct inspection hours by two NRC inspectors.
m Results: The licensee was found to be in compliance with NRC requirements within the areas inspected.
In addition, all previously identified violations and open items are closed.
(Details: UNCLASSIFIED )
!
b"closurecontains