ML20093D516: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.                                                      . . .  .
{{#Wiki_filter:.
l l
l l
Beaver Valley Power Station
Beaver Valley Power Station hipp n PA 15077-0004
                    .                                hipp n     PA 15077-0004
.,g (412) 643-8069 FAX D o Vice P es de t I
            .,g                                   (412) 643-8069 FAX D o Vice P es de t I
Zl*UO'amion October 6,1995 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
October 6,1995 Zl*UO'amion U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001


==Subject:==
==Subject:==
Line 29: Line 28:
has been completed, and it is requested that the attached six pages be reissued to correct the following typographical errors.
has been completed, and it is requested that the attached six pages be reissued to correct the following typographical errors.
BV-1 Amendment 192:
BV-1 Amendment 192:
_P_a.ge       Change 3/43-6     In Action 7.b, replace "their" with "other."
_P_a.ge Change 3/43-6 In Action 7.b, replace "their" with "other."
B 3/4 2-7     In Action b, replace " Action a" with " ACTION a."
B 3/4 2-7 In Action b, replace " Action a" with " ACTION a."
BV-2 Amendment 75:
BV-2 Amendment 75:
Page           Channe 3/42-9     In Action e, replace "show QPTR" with "show a QPTR."
Page Channe 3/42-9 In Action e, replace "show QPTR" with "show a QPTR."
3/43-6     In Action 3.a, replace "increaing" with " increasing."
3/43-6 In Action 3.a, replace "increaing" with " increasing."
B 3/4 2-7     In Action a, replace " Time" with " time."
B 3/4 2-7 In Action a, replace " Time" with " time."
B 3/4 2-9     In SR 4.2.4.a, add "high" before "neudon flux."
B 3/4 2-9 In SR 4.2.4.a, add "high" before "neudon flux."
This request follows the discussion between our NRC Project Manager and a member of the Duquesne Light Company staff on September 25,1995. Issuance of these changes is requested by November 1,1995, to allow implementation of the subject
This request follows the discussion between our NRC Project Manager and a member of the Duquesne Light Company staff on September 25,1995. Issuance of these changes is requested by November 1,1995, to allow implementation of the subject
        . amendments on November 10,1995.
. amendments on November 10,1995.
Sincerely, 1SOG21 9510130282 951006                                                                     >MS PDR     ADOCK 0500       4 George S. Thomas c:   Mr. L. W. Rossbach, Sr. Resident Inspector
Sincerely, 1SOG21 9510130282 951006
    '          Mr. T. T. Martin, NRC Region I Administrator Mr. D. S. Brinkman, Sr. Project Manager
>MS PDR ADOCK 0500 4
                                                                                                        .h I}}
George S. Thomas c:
Mr. L. W. Rossbach, Sr. Resident Inspector Mr. T. T. Martin, NRC Region I Administrator Mr. D. S. Brinkman, Sr. Project Manager
.h I
-}}

Latest revision as of 10:36, 13 December 2024

Forwards Pages Reissued to Correct Submitted Typographical Errors in Amends 192 & 75 to Licenses DPR-66 & NPF-73
ML20093D516
Person / Time
Site: Beaver Valley
Issue date: 10/06/1995
From: George Thomas
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20093D519 List:
References
NUDOCS 9510130282
Download: ML20093D516 (1)


Text

.

l l

Beaver Valley Power Station hipp n PA 15077-0004

.,g (412) 643-8069 FAX D o Vice P es de t I

Zl*UO'amion October 6,1995 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. I and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Amendment 192 and 75 Administrative Changes

,1 On September 15, 1995, the Nuclear Regulatory Commission issued Technical Specification Amendment Nos.192 and 75 to Beaver Valley Power Station Unit Nos. I and 2, respectively. A review of Amendments 192 and 75, " Quadrant Power Tilt Ratio,"

has been completed, and it is requested that the attached six pages be reissued to correct the following typographical errors.

BV-1 Amendment 192:

_P_a.ge Change 3/43-6 In Action 7.b, replace "their" with "other."

B 3/4 2-7 In Action b, replace " Action a" with " ACTION a."

BV-2 Amendment 75:

Page Channe 3/42-9 In Action e, replace "show QPTR" with "show a QPTR."

3/43-6 In Action 3.a, replace "increaing" with " increasing."

B 3/4 2-7 In Action a, replace " Time" with " time."

B 3/4 2-9 In SR 4.2.4.a, add "high" before "neudon flux."

This request follows the discussion between our NRC Project Manager and a member of the Duquesne Light Company staff on September 25,1995. Issuance of these changes is requested by November 1,1995, to allow implementation of the subject

. amendments on November 10,1995.

Sincerely, 1SOG21 9510130282 951006

>MS PDR ADOCK 0500 4

George S. Thomas c:

Mr. L. W. Rossbach, Sr. Resident Inspector Mr. T. T. Martin, NRC Region I Administrator Mr. D. S. Brinkman, Sr. Project Manager