APPENDD( C REVISED OPERATING DATA REPORT DOCKET NO. 50-265 UNTT Two DATE March 8,1996 COMPLETED BY Kristal Moore TELEPHONE (309) 654-2241 OPERATING STATUS 0000 120195                                                                       l
.o' i
APPENDD( C REVISED OPERATING DATA REPORT DOCKET NO.
50-265 UNTT Two DATE March 8,1996 COMPLETED BY Kristal Moore TELEPHONE (309) 654-2241 OPERATING STATUS 0000 120195 l
: 1. REPORTING PERIOD: 2400 123195 GROSS HOURS IN REPORTING PERIOD: 744
: 1. REPORTING PERIOD: 2400 123195 GROSS HOURS IN REPORTING PERIOD: 744
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACITY: 769 DESIGN ELECTRICAL RATING (MWe-NET): 789
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACITY: 769 DESIGN ELECTRICAL RATING (MWe-NET): 789
: 3. POWER LEVELTO WHICH RESTRICTED (IF ANY)(MWe-Net): N/A
: 3. POWER LEVELTO WHICH RESTRICTED (IF ANY)(MWe-Net): N/A
: 4. REASONS FOR RESTRICTION (IF ANY):
: 4. REASONS FOR RESTRICTION (IF ANY):
THIS MONTH     YR TO DATE       CUMULA,T_IVE
THIS MONTH YR TO DATE CUMULA,T_IVE
: 5. NUMBER OF HOURS REACTOR WAS CRITICAL                   744.00   ( 4294.60       P { 154070.45   ,
: 5. NUMBER OF HOURS REACTOR WAS CRITICAL 744.00
i v:       -
( 4294.60 P { 154070.45 i
v:
w
w
: 6. REACTOR RESERVE SHUTDOWN HOURS                           0.00           0.00           29F5.80
: 6. REACTOR RESERVE SHUTDOWN HOURS 0.00 0.00 29F5.80
: 7. HOUR 5 GENERATOR ON LINE                               744.00       3967.90         149899.55
: 7. HOUR 5 GENERATOR ON LINE 744.00 3967.90 149899.55
: 8. UNTT RESERVE SHUTDOWN HOURS                               0.00           0.00           702.90
: 8. UNTT RESERVE SHUTDOWN HOURS 0.00 0.00 702.90
: 9. GROSS THERMAL ENERGY GENERATED (MWM)               1849886.10     8400516.82     32434122Q92
: 9. GROSS THERMAL ENERGY GENERATED (MWM) 1849886.10 8400516.82 32434122Q92
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)             596012.00   2631634.00       104145535.00
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 596012.00 2631634.00 104145535.00
: 11. NET ELECTRICAL ENERGY GENERATED (MWH)               571746.00   24 % 977.00       98652886.00
: 11. NET ELECTRICAL ENERGY GENERATED (MWH) 571746.00 24 % 977.00 98652886.00
: 12. REACTOR SERVICE FACTOR                                 106.0')         49.03             74.66
: 12. REACTOR SERVICE FACTOR 106.0')
: 13. REACTOR AVAILABILTTY FACTOR                           100.00         49.03             76.10
49.03 74.66
: 14. UNTT SERVICE FACTOR                                   100.00         45.30             72.64
: 13. REACTOR AVAILABILTTY FACTOR 100.00 49.03 76.10
: 15. UNTT AVAILABILrrY FACTOR                               100.00         45.30             72.98
: 14. UNTT SERVICE FACTOR 100.00 45.30 72.64
: 16. UNTT CAPACITY FACTOR (Using MDC)                       99.93         37.07             62.16
: 15. UNTT AVAILABILrrY FACTOR 100.00 45.30 72.98
: 17. UNTT CAPACITY FACTOR (Using Design MWe)                 97.40         36.13             60.59       )
: 16. UNTT CAPACITY FACTOR (Using MDC) 99.93 37.07 62.16
: 18. UNTT FORCED OUTAGE RATE                                 0.00         22.19             10.30       l
: 17. UNTT CAPACITY FACTOR (Using Design MWe) 97.40 36.13 60.59
)
: 18. UNTT FORCED OUTAGE RATE 0.00 22.19 10.30
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE DATE. AND DURATION OF EACH):
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE DATE. AND DURATION OF EACH):
: 20. IF SHUTDOWN AT END OF REPORT PERIOD < ESTIMATED DATE OF STARTUP:
: 20. IF SHUTDOWN AT END OF REPORT PERIOD < ESTIMATED DATE OF STARTUP:
: 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
: 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST       ACHIEVED INTTIAL CRrrlCAllTY INITIAL ELECTRICTTY COMMERCIAL OPERATION 9603200116 960300 PDR       ADOCK 05000254 R                         PDR}}
FORECAST ACHIEVED INTTIAL CRrrlCAllTY INITIAL ELECTRICTTY COMMERCIAL OPERATION 9603200116 960300 PDR ADOCK 05000254 R
PDR}}

Latest revision as of 05:07, 13 December 2024

Revised Monthly Operating Rept for Dec 1995 for Qcs Unit 2
ML20101D209
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 12/31/1995
From: Moore K
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20101D175 List:
References
NUDOCS 9603200116
Download: ML20101D209 (1)


Text

'

o,

.o' i

APPENDD( C REVISED OPERATING DATA REPORT DOCKET NO.

50-265 UNTT Two DATE March 8,1996 COMPLETED BY Kristal Moore TELEPHONE (309) 654-2241 OPERATING STATUS 0000 120195 l

1. REPORTING PERIOD: 2400 123195 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACITY: 769 DESIGN ELECTRICAL RATING (MWe-NET): 789
3. POWER LEVELTO WHICH RESTRICTED (IF ANY)(MWe-Net): N/A
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULA,T_IVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 744.00

( 4294.60 P { 154070.45 i

v:

w

6. REACTOR RESERVE SHUTDOWN HOURS 0.00 0.00 29F5.80
7. HOUR 5 GENERATOR ON LINE 744.00 3967.90 149899.55
8. UNTT RESERVE SHUTDOWN HOURS 0.00 0.00 702.90
9. GROSS THERMAL ENERGY GENERATED (MWM) 1849886.10 8400516.82 32434122Q92
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 596012.00 2631634.00 104145535.00
11. NET ELECTRICAL ENERGY GENERATED (MWH) 571746.00 24 % 977.00 98652886.00
12. REACTOR SERVICE FACTOR 106.0')

49.03 74.66

13. REACTOR AVAILABILTTY FACTOR 100.00 49.03 76.10
14. UNTT SERVICE FACTOR 100.00 45.30 72.64
15. UNTT AVAILABILrrY FACTOR 100.00 45.30 72.98
16. UNTT CAPACITY FACTOR (Using MDC) 99.93 37.07 62.16
17. UNTT CAPACITY FACTOR (Using Design MWe) 97.40 36.13 60.59

)

18. UNTT FORCED OUTAGE RATE 0.00 22.19 10.30
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE DATE. AND DURATION OF EACH):
20. IF SHUTDOWN AT END OF REPORT PERIOD < ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INTTIAL CRrrlCAllTY INITIAL ELECTRICTTY COMMERCIAL OPERATION 9603200116 960300 PDR ADOCK 05000254 R

PDR