APPENDD( C REVISED OPERATING DATA REPORT DOCKET NO. 50-265 UNTT Two DATE March 8,1996 COMPLETED BY Kristal Moore TELEPHONE (309) 654-2241 OPERATING STATUS 0000 120195 | .o' i | ||
APPENDD( C REVISED OPERATING DATA REPORT DOCKET NO. | |||
50-265 UNTT Two DATE March 8,1996 COMPLETED BY Kristal Moore TELEPHONE (309) 654-2241 OPERATING STATUS 0000 120195 l | |||
: 1. REPORTING PERIOD: 2400 123195 GROSS HOURS IN REPORTING PERIOD: 744 | : 1. REPORTING PERIOD: 2400 123195 GROSS HOURS IN REPORTING PERIOD: 744 | ||
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACITY: 769 DESIGN ELECTRICAL RATING (MWe-NET): 789 | : 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACITY: 769 DESIGN ELECTRICAL RATING (MWe-NET): 789 | ||
: 3. POWER LEVELTO WHICH RESTRICTED (IF ANY)(MWe-Net): N/A | : 3. POWER LEVELTO WHICH RESTRICTED (IF ANY)(MWe-Net): N/A | ||
: 4. REASONS FOR RESTRICTION (IF ANY): | : 4. REASONS FOR RESTRICTION (IF ANY): | ||
THIS MONTH | THIS MONTH YR TO DATE CUMULA,T_IVE | ||
: 5. NUMBER OF HOURS REACTOR WAS CRITICAL | : 5. NUMBER OF HOURS REACTOR WAS CRITICAL 744.00 | ||
( 4294.60 P { 154070.45 i | |||
v: | |||
w | w | ||
: 6. REACTOR RESERVE SHUTDOWN HOURS | : 6. REACTOR RESERVE SHUTDOWN HOURS 0.00 0.00 29F5.80 | ||
: 7. HOUR 5 GENERATOR ON LINE | : 7. HOUR 5 GENERATOR ON LINE 744.00 3967.90 149899.55 | ||
: 8. UNTT RESERVE SHUTDOWN HOURS | : 8. UNTT RESERVE SHUTDOWN HOURS 0.00 0.00 702.90 | ||
: 9. GROSS THERMAL ENERGY GENERATED (MWM) | : 9. GROSS THERMAL ENERGY GENERATED (MWM) 1849886.10 8400516.82 32434122Q92 | ||
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) | : 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 596012.00 2631634.00 104145535.00 | ||
: 11. NET ELECTRICAL ENERGY GENERATED (MWH) | : 11. NET ELECTRICAL ENERGY GENERATED (MWH) 571746.00 24 % 977.00 98652886.00 | ||
: 12. REACTOR SERVICE FACTOR | : 12. REACTOR SERVICE FACTOR 106.0') | ||
: 13. REACTOR AVAILABILTTY FACTOR | 49.03 74.66 | ||
: 14. UNTT SERVICE FACTOR | : 13. REACTOR AVAILABILTTY FACTOR 100.00 49.03 76.10 | ||
: 15. UNTT AVAILABILrrY FACTOR | : 14. UNTT SERVICE FACTOR 100.00 45.30 72.64 | ||
: 16. UNTT CAPACITY FACTOR (Using MDC) | : 15. UNTT AVAILABILrrY FACTOR 100.00 45.30 72.98 | ||
: 17. UNTT CAPACITY FACTOR (Using Design MWe) | : 16. UNTT CAPACITY FACTOR (Using MDC) 99.93 37.07 62.16 | ||
: 18. UNTT FORCED OUTAGE RATE | : 17. UNTT CAPACITY FACTOR (Using Design MWe) 97.40 36.13 60.59 | ||
) | |||
: 18. UNTT FORCED OUTAGE RATE 0.00 22.19 10.30 | |||
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE DATE. AND DURATION OF EACH): | : 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE DATE. AND DURATION OF EACH): | ||
: 20. IF SHUTDOWN AT END OF REPORT PERIOD < ESTIMATED DATE OF STARTUP: | : 20. IF SHUTDOWN AT END OF REPORT PERIOD < ESTIMATED DATE OF STARTUP: | ||
: 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | : 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | ||
FORECAST | FORECAST ACHIEVED INTTIAL CRrrlCAllTY INITIAL ELECTRICTTY COMMERCIAL OPERATION 9603200116 960300 PDR ADOCK 05000254 R | ||
PDR}} | |||
Latest revision as of 05:07, 13 December 2024
| ML20101D209 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 12/31/1995 |
| From: | Moore K COMMONWEALTH EDISON CO. |
| To: | |
| Shared Package | |
| ML20101D175 | List: |
| References | |
| NUDOCS 9603200116 | |
| Download: ML20101D209 (1) | |
Text
'
o,
.o' i
APPENDD( C REVISED OPERATING DATA REPORT DOCKET NO.
50-265 UNTT Two DATE March 8,1996 COMPLETED BY Kristal Moore TELEPHONE (309) 654-2241 OPERATING STATUS 0000 120195 l
- 1. REPORTING PERIOD: 2400 123195 GROSS HOURS IN REPORTING PERIOD: 744
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACITY: 769 DESIGN ELECTRICAL RATING (MWe-NET): 789
- 3. POWER LEVELTO WHICH RESTRICTED (IF ANY)(MWe-Net): N/A
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULA,T_IVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 744.00
( 4294.60 P { 154070.45 i
v:
w
- 6. REACTOR RESERVE SHUTDOWN HOURS 0.00 0.00 29F5.80
- 7. HOUR 5 GENERATOR ON LINE 744.00 3967.90 149899.55
- 8. UNTT RESERVE SHUTDOWN HOURS 0.00 0.00 702.90
- 9. GROSS THERMAL ENERGY GENERATED (MWM) 1849886.10 8400516.82 32434122Q92
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 596012.00 2631634.00 104145535.00
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 571746.00 24 % 977.00 98652886.00
- 12. REACTOR SERVICE FACTOR 106.0')
49.03 74.66
- 13. REACTOR AVAILABILTTY FACTOR 100.00 49.03 76.10
- 14. UNTT SERVICE FACTOR 100.00 45.30 72.64
- 15. UNTT AVAILABILrrY FACTOR 100.00 45.30 72.98
- 16. UNTT CAPACITY FACTOR (Using MDC) 99.93 37.07 62.16
- 17. UNTT CAPACITY FACTOR (Using Design MWe) 97.40 36.13 60.59
)
- 18. UNTT FORCED OUTAGE RATE 0.00 22.19 10.30
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE DATE. AND DURATION OF EACH):
- 20. IF SHUTDOWN AT END OF REPORT PERIOD < ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INTTIAL CRrrlCAllTY INITIAL ELECTRICTTY COMMERCIAL OPERATION 9603200116 960300 PDR ADOCK 05000254 R