ML20101D209

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Dec 1995 for Qcs Unit 2
ML20101D209
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 12/31/1995
From: Moore K
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20101D175 List:
References
NUDOCS 9603200116
Download: ML20101D209 (1)


Text

'

o,

.o' i

APPENDD( C REVISED OPERATING DATA REPORT DOCKET NO.

50-265 UNTT Two DATE March 8,1996 COMPLETED BY Kristal Moore TELEPHONE (309) 654-2241 OPERATING STATUS 0000 120195 l

1. REPORTING PERIOD: 2400 123195 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACITY: 769 DESIGN ELECTRICAL RATING (MWe-NET): 789
3. POWER LEVELTO WHICH RESTRICTED (IF ANY)(MWe-Net): N/A
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULA,T_IVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 744.00

( 4294.60 P { 154070.45 i

v:

w

6. REACTOR RESERVE SHUTDOWN HOURS 0.00 0.00 29F5.80
7. HOUR 5 GENERATOR ON LINE 744.00 3967.90 149899.55
8. UNTT RESERVE SHUTDOWN HOURS 0.00 0.00 702.90
9. GROSS THERMAL ENERGY GENERATED (MWM) 1849886.10 8400516.82 32434122Q92
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 596012.00 2631634.00 104145535.00
11. NET ELECTRICAL ENERGY GENERATED (MWH) 571746.00 24 % 977.00 98652886.00
12. REACTOR SERVICE FACTOR 106.0')

49.03 74.66

13. REACTOR AVAILABILTTY FACTOR 100.00 49.03 76.10
14. UNTT SERVICE FACTOR 100.00 45.30 72.64
15. UNTT AVAILABILrrY FACTOR 100.00 45.30 72.98
16. UNTT CAPACITY FACTOR (Using MDC) 99.93 37.07 62.16
17. UNTT CAPACITY FACTOR (Using Design MWe) 97.40 36.13 60.59

)

18. UNTT FORCED OUTAGE RATE 0.00 22.19 10.30
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE DATE. AND DURATION OF EACH):
20. IF SHUTDOWN AT END OF REPORT PERIOD < ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INTTIAL CRrrlCAllTY INITIAL ELECTRICTTY COMMERCIAL OPERATION 9603200116 960300 PDR ADOCK 05000254 R

PDR