r JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1.
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1.
NARRATIVE  
NARRATIVE  


Line 24: Line 23:
OF OPERATIONS AUGUST, 1983 During the month of August, there were no unit shutdowns or significant power reductions.
OF OPERATIONS AUGUST, 1983 During the month of August, there were no unit shutdowns or significant power reductions.
The following safety-related maintenance was performed in the month of August:
The following safety-related maintenance was performed in the month of August:
: 1. Performed miscellaneous maintenance on diesel generators.
1.
: 2. Cleaned out 1A charging pump lube oil cooler.
Performed miscellaneous maintenance on diesel generators.
: 3. Replaced numerous waste evaporator: feed filters.
2.
: 4. Replaced mechanical seal on spent fuel pool skimmer pump.
Cleaned out 1A charging pump lube oil cooler.
i-
3.
: 5. Adjusted numerous packing glands on main steam system valves.
Replaced numerous waste evaporator: feed filters.
8309200297 830901 PDR ADOCK 05000348 R               PDR
4.
Replaced mechanical seal on spent fuel pool skimmer pump.
i-5.
Adjusted numerous packing glands on main steam system valves.
8309200297 830901 PDR ADOCK 05000348 R
PDR


OPERATING DATA REPORT DOCKET NO.     50-348 DATE     9-1-83 COMPLETED BY     UA Unfrston III TELEPHONE     (205) 899-5155 OPERATING STATUS Joseph M.'Farlev - Unit 1                                  Notes
OPERATING DATA REPORT DOCKET NO.
50-348 DATE 9-1-83 COMPLETED BY UA Unfrston III TELEPHONE (205) 899-5155 OPERATING STATUS
: 1. Unit Nam *.
: 1. Unit Nam *.
An m"    10R1
Joseph M.'Farlev - Unit 1 Notes
: 1) Cumulative dasa since
: 1) Cumulative dasa since
: 2. Reporting Period:                                                                         12/1/77, data of
: 2. Reporting Period:
: 3. Licensed Thermal Power (MWt):           2652                                             commercial operation.
An m" 10R1 12/1/77, data of
: 4. Nameplate Rating (Gross MWe):             860
: 3. Licensed Thermal Power (MWt):
: 5. Design Electrical Rating (Net MWe):       829
2652 commercial operation.
: 6. Maximum Dependable Capacity (Gross MWe):                         844.6
860
: 4. Nameplate Rating (Gross MWe):
829
: 5. Design Electrical Rating (Net MWe):
844.6
: 6. Maximum Dependable Capacity (Gross MWe):
803.6
: 7. Maximum Dependable Capacity (Net MWe):
: 7. Maximum Dependable Capacity (Net MWe):
803.6
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since.Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since.Last Report. Give Reasons:
N/A
N/A
: 9. Power Level To Which Res*ricted,If Any (Net MWe):                         ' M/A
: 9. Power Level To Which Res*ricted,If Any (Net MWe):
: 10. Reasons For Restrictions,If Any:                                             N/A This Month         Yr..to.Date           n ulative
' M/A N/A
                                                                                                                                            ' Cur'
: 10. Reasons For Restrictions,If Any:
: 11. Hours In Reporting Period                                           744                  5,831            50.399
This Month Yr..to.Date
: 12. Number Of Hours Reactor Was Critical                               766 r)             4,068.2           32,215.7
' Cur' ulative n
: 13. Reactor Reserve Shutdown Hours                                     0.0                 25.1             3,639.6
744 5,831 50.399
: 14. Hours Generator On.Line                                             744.0               1966.3           31,234.5
: 11. Hours In Reporting Period
: 15. Unit Reserve Shutdown Hi urs                                       0.0                 0.0               0.0
: 12. Number Of Hours Reactor Was Critical 766 r) 4,068.2 32,215.7
: 16. Gross Thermal Energy Generated (MWH)                               1.971.688             10,029,740       7g qio 7po I 7. Gross Electrical Energy Generated (MWH)                           617,154             3,162,260         74;937_gog
: 13. Reactor Reserve Shutdown Hours 0.0 25.1 3,639.6
: 18. Net Electrical Energy Generated (MWH)                               585,990             2,971,936         23.412.156
: 14. Hours Generator On.Line 744.0 1966.3 31,234.5
: 19. Unit Service Factor                                                 100.0               68.0             62.0
: 15. Unit Reserve Shutdown Hi urs 0.0 0.0 0.0
: 20. Unit Availability Factor                                             inn n               68.0             62.0
: 16. Gross Thermal Energy Generated (MWH) 1.971.688 10,029,740 7g qio 7po I 7. Gross Electrical Energy Generated (MWH) 617,154 3,162,260 74;937_gog
: 21. Unit Capacity Factor (Using MDC Net)                               98.0                 63.4             57 g
: 18. Net Electrical Energy Generated (MWH) 585,990 2,971,936 23.412.156
: 22. Unit Capacity Factor (Using DER Net)                               95.0           __
: 19. Unit Service Factor 100.0 68.0 62.0
61.5             56.0
: 20. Unit Availability Factor inn n 68.0 62.0
: 23. Unit Forced Outage Rate                                               0.0                 0.7             16.4
: 21. Unit Capacity Factor (Using MDC Net) 98.0 63.4 57 g
: 22. Unit Capacity Factor (Using DER Net) 95.0 61.5 56.0
: 23. Unit Forced Outage Rate 0.0 0.7 16.4
: 24. Shutdowns Scheduled Over Nevt 6 Months (Type. Date, and Duration of Eacht:
: 24. Shutdowns Scheduled Over Nevt 6 Months (Type. Date, and Duration of Eacht:
: 25. If Shur Down At End Of Report Period. Estimated Date of Startup:                     N/A
: 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status iPrior to Commercial Operation):                                     Forecast           Achieved iNITIA L CRITICa LiTY                                             R/6/77               8/o/77 INITIAL ELECTRICITY                                               8/20/77             8/l8/77 COMMERCIAL CPERATION                                             12/1/77             12/1/77 (4/77)
N/A
: 26. Units in Test Status iPrior to Commercial Operation):
Forecast Achieved iNITIA L CRITICa LiTY R/6/77 8/o/77 INITIAL ELECTRICITY 8/20/77 8/l8/77 COMMERCIAL CPERATION 12/1/77 12/1/77 (4/77)


DOCKET No.           50-348 UNIT DATE 9-1-83 C05fPLETED BY             W.G. Hairston, III (205) 899-5156 TELEPHONE August. 1983 StONTil DAY             AVERAGE DAILY POWER LEVEL                                                     DAY'   AVERAGE DAILY POWER LEVEL talwe Net)                                                                 (MWe-Net) 793                                                                                  793 g,                                                                                         37 2                     795                                                                   13           792 709                                                                    g9            791 3
DOCKET No.
4                    789                                                                   J             785 787                                                                                  783 5                                                                                           21 785                                                                    22           781 6
50-348 UNIT 9-1-83 DATE C05fPLETED BY W.G. Hairston, III (205) 899-5156 TELEPHONE StONTil August. 1983 DAY AVERAGE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL talwe Net)
788                                                                   23           7R9 7
(MWe-Net) 793 g,
783 3                   797                                                                   24 786                                                                   g             72 3 9
37 793 2
782 10                     785                                                                   26 g3 785                                                                    n             788 787                                                                   ;3           7ga 12 787                                                                                 785 l3                                                                                           3 789                                                                    30           788 14 31           7on
795 13 792 791 3
      -        IS 796 16 INSTRUCTIONS On this fonn:t. list the svenge daily unit power levelin MWe Net for e:ch d:y in the reporting month. Compute to
709 g9 789 J
            , the neste:t whole me;2 watt.
785 4
(9p7) w -         ,,-,-c.,       w4 ,c. . , - - , , ,    -,,,7,-   -,-%,y-     .-, ,-.w------r e -Es----v--wy- -w-- - + -     1-- -- -e- <-  -w *w-- ww m-n --g- ----tw*----~w, , , - +
783 5
787 21 6
22 781 785 7
788 23 7R9 783 3
797 24 786 9
g 72 3 782 10 785 26 785 788 g3 n
12 787
;3 7ga 787 785 l3 3
14 30 788 789 IS 31 7on 796 16 INSTRUCTIONS On this fonn:t. list the svenge daily unit power levelin MWe Net for e:ch d:y in the reporting month. Compute to
, the neste:t whole me;2 watt.
(9p7) w -
,,-,-c.,
w4
,c.
-,,,7,-
-,-%,y-
,-.w------r e
-Es----v--wy-
-w-- - + -
1--
-e-
-w
*w--
ww m-n
--g-
----tw*----~w,
,, - +


UNIT Sil01 DOWNS AND POWER REDUC 110NS                  DOCKE T NO. _ _50-348 UNII NAME J.M. Farley UnTt l' DAIE _9/1/83 COMPLEI ED ilY W.G. Ilairston, III ftEPORT alONiil Aueust. 1983                     TEl.LPIIONE (205) 899-5156 3                               -
DOCKE T NO. _ _50-348 UNIT Sil01 DOWNS AND POWER REDUC 110NS UNII NAME J.M. Farley UnTt l' DAIE _9/1/83 COMPLEI ED ilY W.G. Ilairston, III ftEPORT alONiil Aueust. 1983 TEl.LPIIONE (205) 899-5156 3
                      ~.
c_
c_
                                .2 e re g
re 5 sa =
5 sa =
5" sX Licensee c.t.
9 sX Licensee     c .t.
c.
5"
Cause & Coniective
: c.                 Cause & Coniective No.         Date       g       3g         ;;  jg5           Event     u?         8-3                     Action to H
~.
                                $E         5   j5y 5
.2 e g
Report * ,
9 No.
                                                                            <# G fu                  Pacvent Recutience THERE WERE   NO     JNIT Sil rTDOW) S OR       SIGNIFICANT PuWER RH: DUCTIONS       IN THE MONTil 0F AUGUST.
Date g
I I                   2                                                   3                               4 1:: l'osted           Reason:                                             Method:                         Exhibit G . Instrutiion -
3g jg5 Event u?
S: Sthednied         A liguipment Failure (Explain)                     1 -Manual                       for Prepa:Jtion of Das i               i 11 Maintenance o( Test                             2 M.mual Scram.                 Entiy Sheels foi 1.iccei C Itefacting                                       3 Autenuatic Scram.             Esent Ilepint li.Elti! ! (NilRI:G-D.Itegulatory Resisittion                           4 Othes (Esplain)               01611 I Operator Training & license Examination F. Adininist raiive                                                               5 G Opciational Lisor (E= plain)                                                       INinhis t . S.une Som.
8-3 Action to
19/77)                 ll Othes (E xplain)
$E 5
j5y Report
* fu
<# G Pacvent Recutience H
5 THERE WERE NO JNIT Sil rTDOW) S OR SIGNIFICANT PuWER RH: DUCTIONS IN THE MONTil 0F AUGUST.
I I
2 3
4 1:: l'osted Reason:
Method:
Exhibit G. Instrutiion -
S: Sthednied A liguipment Failure (Explain) 1 -Manual for Prepa:Jtion of Das i i
11 Maintenance o( Test 2 M.mual Scram.
Entiy Sheels foi 1.iccei C Itefacting 3 Autenuatic Scram.
Esent Ilepint li.Elti! ! (NilRI:G-D.Itegulatory Resisittion 4 Othes (Esplain) 01611 I Operator Training & license Examination F. Adininist raiive 5
G Opciational Lisor (E= plain)
INinhis t. S.une Som.
19/77) ll Othes (E xplain)


e E Mailing Address Alabama Power Comp ny 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.                                                                 b
E Mailing Address e
      = lac;3g7"'                                                         AlabamaPbwer the southem elettnc system September 12, 1983 Docket No. 50-348 Di rector, Of fice of Management Inf ormation and Program Control U. S. Nuclea r Regul atory Commi s sion Washington, D.C. 20555 Dea r Si r:
Alabama Power Comp ny 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are   two (2) copies   of   the     August,           1983 Monthly Operating Report for Joseph M. F a rl ey Nuclear Plant, U r. i t 1, required by Section 6.9.1.10 of the Appendix A Tech-nical Specifications.           As requested by letter f rom Mr. John F.
b
Stolz to Mr. Alan R. Barton, dated October 21, 1977, a "Narra-tive Summa ry of Operating Experience"               is   included in the attached report.
= lac;3g7"'
AlabamaPbwer the southem elettnc system September 12, 1983 Docket No. 50-348 Di rector, Of fice of Management Inf ormation and Program Control U. S. Nuclea r Regul atory Commi s sion Washington, D.C.
20555 Dea r Si r:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the
: August, 1983 Monthly Operating Report for Joseph M.
F a rl ey Nuclear Plant, U r. i t 1,
required by Section 6.9.1.10 of the Appendix A Tech-nical Specifications.
As requested by letter f rom Mr. John F.
Stolz to Mr. Alan R.
Barton, dated October 21, 1977, a "Narra-tive Summa ry of Operating Experience" is included in the attached report.
If you have any questions, please advise.
If you have any questions, please advise.
Yours very     ,uly,
Yours very
                                                        )?/6
,uly,
                                                                  ,/
)?/
F. L. Cl ayton, J r.
,/
6 F.
L. Cl ayton, J r.
ILCJr/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy)
ILCJr/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy)
Director, IE (10 copies)
Director, IE (10 copies)
Di rector, RIl     (1 copy)
Di rector, RIl (1 copy)
Z6- AC
Z6-AC
                                                                                            'I '}}
'I '}}

Latest revision as of 22:09, 14 December 2024

Monthly Operating Rept for Aug 1983
ML20080G498
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/01/1983
From: Clayton F, Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8309200297
Download: ML20080G498 (5)


Text

-

r JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1.

NARRATIVE

SUMMARY

OF OPERATIONS AUGUST, 1983 During the month of August, there were no unit shutdowns or significant power reductions.

The following safety-related maintenance was performed in the month of August:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Cleaned out 1A charging pump lube oil cooler.

3.

Replaced numerous waste evaporator: feed filters.

4.

Replaced mechanical seal on spent fuel pool skimmer pump.

i-5.

Adjusted numerous packing glands on main steam system valves.

8309200297 830901 PDR ADOCK 05000348 R

PDR

OPERATING DATA REPORT DOCKET NO.

50-348 DATE 9-1-83 COMPLETED BY UA Unfrston III TELEPHONE (205) 899-5155 OPERATING STATUS

1. Unit Nam *.

Joseph M.'Farlev - Unit 1 Notes

1) Cumulative dasa since
2. Reporting Period:

An m" 10R1 12/1/77, data of

3. Licensed Thermal Power (MWt):

2652 commercial operation.

860

4. Nameplate Rating (Gross MWe):

829

5. Design Electrical Rating (Net MWe):

844.6

6. Maximum Dependable Capacity (Gross MWe):

803.6

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since.Last Report. Give Reasons:

N/A

9. Power Level To Which Res*ricted,If Any (Net MWe):

' M/A N/A

10. Reasons For Restrictions,If Any:

This Month Yr..to.Date

' Cur' ulative n

744 5,831 50.399

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 766 r) 4,068.2 32,215.7
13. Reactor Reserve Shutdown Hours 0.0 25.1 3,639.6
14. Hours Generator On.Line 744.0 1966.3 31,234.5
15. Unit Reserve Shutdown Hi urs 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1.971.688 10,029,740 7g qio 7po I 7. Gross Electrical Energy Generated (MWH) 617,154 3,162,260 74;937_gog
18. Net Electrical Energy Generated (MWH) 585,990 2,971,936 23.412.156
19. Unit Service Factor 100.0 68.0 62.0
20. Unit Availability Factor inn n 68.0 62.0
21. Unit Capacity Factor (Using MDC Net) 98.0 63.4 57 g
22. Unit Capacity Factor (Using DER Net) 95.0 61.5 56.0
23. Unit Forced Outage Rate 0.0 0.7 16.4
24. Shutdowns Scheduled Over Nevt 6 Months (Type. Date, and Duration of Eacht:
25. If Shur Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status iPrior to Commercial Operation):

Forecast Achieved iNITIA L CRITICa LiTY R/6/77 8/o/77 INITIAL ELECTRICITY 8/20/77 8/l8/77 COMMERCIAL CPERATION 12/1/77 12/1/77 (4/77)

DOCKET No.

50-348 UNIT 9-1-83 DATE C05fPLETED BY W.G. Hairston, III (205) 899-5156 TELEPHONE StONTil August. 1983 DAY AVERAGE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL talwe Net)

(MWe-Net) 793 g,

37 793 2

795 13 792 791 3

709 g9 789 J

785 4

783 5

787 21 6

22 781 785 7

788 23 7R9 783 3

797 24 786 9

g 72 3 782 10 785 26 785 788 g3 n

12 787

3 7ga 787 785 l3 3

14 30 788 789 IS 31 7on 796 16 INSTRUCTIONS On this fonn:t. list the svenge daily unit power levelin MWe Net for e:ch d:y in the reporting month. Compute to

, the neste:t whole me;2 watt.

(9p7) w -

,,-,-c.,

w4

,c.

-,,,7,-

-,-%,y-

,-.w------r e

-Es----v--wy-

-w-- - + -

1--

-e-

-w

  • w--

ww m-n

--g-


tw*----~w,

,, - +

DOCKE T NO. _ _50-348 UNIT Sil01 DOWNS AND POWER REDUC 110NS UNII NAME J.M. Farley UnTt l' DAIE _9/1/83 COMPLEI ED ilY W.G. Ilairston, III ftEPORT alONiil Aueust. 1983 TEl.LPIIONE (205) 899-5156 3

c_

re 5 sa =

5" sX Licensee c.t.

c.

Cause & Coniective

~.

.2 e g

9 No.

Date g

3g jg5 Event u?

8-3 Action to

$E 5

j5y Report

  • fu

<# G Pacvent Recutience H

5 THERE WERE NO JNIT Sil rTDOW) S OR SIGNIFICANT PuWER RH: DUCTIONS IN THE MONTil 0F AUGUST.

I I

2 3

4 1:: l'osted Reason:

Method:

Exhibit G. Instrutiion -

S: Sthednied A liguipment Failure (Explain) 1 -Manual for Prepa:Jtion of Das i i

11 Maintenance o( Test 2 M.mual Scram.

Entiy Sheels foi 1.iccei C Itefacting 3 Autenuatic Scram.

Esent Ilepint li.Elti! ! (NilRI:G-D.Itegulatory Resisittion 4 Othes (Esplain) 01611 I Operator Training & license Examination F. Adininist raiive 5

G Opciational Lisor (E= plain)

INinhis t. S.une Som.

19/77) ll Othes (E xplain)

E Mailing Address e

Alabama Power Comp ny 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

b

= lac;3g7"'

AlabamaPbwer the southem elettnc system September 12, 1983 Docket No. 50-348 Di rector, Of fice of Management Inf ormation and Program Control U. S. Nuclea r Regul atory Commi s sion Washington, D.C.

20555 Dea r Si r:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the

August, 1983 Monthly Operating Report for Joseph M.

F a rl ey Nuclear Plant, U r. i t 1,

required by Section 6.9.1.10 of the Appendix A Tech-nical Specifications.

As requested by letter f rom Mr. John F.

Stolz to Mr. Alan R.

Barton, dated October 21, 1977, a "Narra-tive Summa ry of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very

,uly,

)?/

,/

6 F.

L. Cl ayton, J r.

ILCJr/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Di rector, RIl (1 copy)

Z6-AC

'I '