r | r JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1. | ||
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1. | |||
NARRATIVE | NARRATIVE | ||
| Line 24: | Line 23: | ||
OF OPERATIONS AUGUST, 1983 During the month of August, there were no unit shutdowns or significant power reductions. | OF OPERATIONS AUGUST, 1983 During the month of August, there were no unit shutdowns or significant power reductions. | ||
The following safety-related maintenance was performed in the month of August: | The following safety-related maintenance was performed in the month of August: | ||
1. | |||
Performed miscellaneous maintenance on diesel generators. | |||
2. | |||
Cleaned out 1A charging pump lube oil cooler. | |||
i- | 3. | ||
Replaced numerous waste evaporator: feed filters. | |||
8309200297 830901 PDR ADOCK 05000348 R | 4. | ||
Replaced mechanical seal on spent fuel pool skimmer pump. | |||
i-5. | |||
Adjusted numerous packing glands on main steam system valves. | |||
8309200297 830901 PDR ADOCK 05000348 R | |||
PDR | |||
OPERATING DATA REPORT DOCKET NO. | OPERATING DATA REPORT DOCKET NO. | ||
50-348 DATE 9-1-83 COMPLETED BY UA Unfrston III TELEPHONE (205) 899-5155 OPERATING STATUS | |||
: 1. Unit Nam *. | : 1. Unit Nam *. | ||
Joseph M.'Farlev - Unit 1 Notes | |||
: 1) Cumulative dasa since | : 1) Cumulative dasa since | ||
: 2. Reporting Period: | : 2. Reporting Period: | ||
: 3. Licensed Thermal Power (MWt): | An m" 10R1 12/1/77, data of | ||
: 4. Nameplate Rating (Gross MWe): | : 3. Licensed Thermal Power (MWt): | ||
: 5. Design Electrical Rating (Net MWe): | 2652 commercial operation. | ||
: 6. Maximum Dependable Capacity (Gross MWe): | 860 | ||
: 4. Nameplate Rating (Gross MWe): | |||
829 | |||
: 5. Design Electrical Rating (Net MWe): | |||
844.6 | |||
: 6. Maximum Dependable Capacity (Gross MWe): | |||
803.6 | |||
: 7. Maximum Dependable Capacity (Net MWe): | : 7. Maximum Dependable Capacity (Net MWe): | ||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since.Last Report. Give Reasons: | : 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since.Last Report. Give Reasons: | ||
N/A | N/A | ||
: 9. Power Level To Which Res*ricted,If Any (Net MWe): | : 9. Power Level To Which Res*ricted,If Any (Net MWe): | ||
: 10. Reasons For Restrictions,If Any: | ' M/A N/A | ||
: 10. Reasons For Restrictions,If Any: | |||
: 11. Hours In Reporting Period | This Month Yr..to.Date | ||
: 12. Number Of Hours Reactor Was Critical | ' Cur' ulative n | ||
: 13. Reactor Reserve Shutdown Hours | 744 5,831 50.399 | ||
: 14. Hours Generator On.Line | : 11. Hours In Reporting Period | ||
: 15. Unit Reserve Shutdown Hi urs | : 12. Number Of Hours Reactor Was Critical 766 r) 4,068.2 32,215.7 | ||
: 16. Gross Thermal Energy Generated (MWH) | : 13. Reactor Reserve Shutdown Hours 0.0 25.1 3,639.6 | ||
: 18. Net Electrical Energy Generated (MWH) | : 14. Hours Generator On.Line 744.0 1966.3 31,234.5 | ||
: 19. Unit Service Factor | : 15. Unit Reserve Shutdown Hi urs 0.0 0.0 0.0 | ||
: 20. Unit Availability Factor | : 16. Gross Thermal Energy Generated (MWH) 1.971.688 10,029,740 7g qio 7po I 7. Gross Electrical Energy Generated (MWH) 617,154 3,162,260 74;937_gog | ||
: 21. Unit Capacity Factor (Using MDC Net) | : 18. Net Electrical Energy Generated (MWH) 585,990 2,971,936 23.412.156 | ||
: 22. Unit Capacity Factor (Using DER Net) | : 19. Unit Service Factor 100.0 68.0 62.0 | ||
61.5 | : 20. Unit Availability Factor inn n 68.0 62.0 | ||
: 23. Unit Forced Outage Rate | : 21. Unit Capacity Factor (Using MDC Net) 98.0 63.4 57 g | ||
: 22. Unit Capacity Factor (Using DER Net) 95.0 61.5 56.0 | |||
: 23. Unit Forced Outage Rate 0.0 0.7 16.4 | |||
: 24. Shutdowns Scheduled Over Nevt 6 Months (Type. Date, and Duration of Eacht: | : 24. Shutdowns Scheduled Over Nevt 6 Months (Type. Date, and Duration of Eacht: | ||
: 25. If Shur Down At End Of Report Period. Estimated Date of Startup: | : 25. If Shur Down At End Of Report Period. Estimated Date of Startup: | ||
: 26. Units in Test Status iPrior to Commercial Operation): | N/A | ||
: 26. Units in Test Status iPrior to Commercial Operation): | |||
Forecast Achieved iNITIA L CRITICa LiTY R/6/77 8/o/77 INITIAL ELECTRICITY 8/20/77 8/l8/77 COMMERCIAL CPERATION 12/1/77 12/1/77 (4/77) | |||
DOCKET No. | DOCKET No. | ||
50-348 UNIT 9-1-83 DATE C05fPLETED BY W.G. Hairston, III (205) 899-5156 TELEPHONE StONTil August. 1983 DAY AVERAGE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL talwe Net) | |||
788 | (MWe-Net) 793 g, | ||
783 3 | 37 793 2 | ||
782 10 | 795 13 792 791 3 | ||
709 g9 789 J | |||
785 4 | |||
(9p7) w - | 783 5 | ||
787 21 6 | |||
22 781 785 7 | |||
788 23 7R9 783 3 | |||
797 24 786 9 | |||
g 72 3 782 10 785 26 785 788 g3 n | |||
12 787 | |||
;3 7ga 787 785 l3 3 | |||
14 30 788 789 IS 31 7on 796 16 INSTRUCTIONS On this fonn:t. list the svenge daily unit power levelin MWe Net for e:ch d:y in the reporting month. Compute to | |||
, the neste:t whole me;2 watt. | |||
(9p7) w - | |||
,,-,-c., | |||
w4 | |||
,c. | |||
-,,,7,- | |||
-,-%,y- | |||
,-.w------r e | |||
-Es----v--wy- | |||
-w-- - + - | |||
1-- | |||
-e- | |||
-w | |||
*w-- | |||
ww m-n | |||
--g- | |||
----tw*----~w, | |||
,, - + | |||
DOCKE T NO. _ _50-348 UNIT Sil01 DOWNS AND POWER REDUC 110NS UNII NAME J.M. Farley UnTt l' DAIE _9/1/83 COMPLEI ED ilY W.G. Ilairston, III ftEPORT alONiil Aueust. 1983 TEl.LPIIONE (205) 899-5156 3 | |||
c_ | c_ | ||
re 5 sa = | |||
5 sa = | 5" sX Licensee c.t. | ||
c. | |||
Cause & Coniective | |||
~. | |||
.2 e g | |||
9 No. | |||
Date g | |||
I I | 3g jg5 Event u? | ||
S: Sthednied | 8-3 Action to | ||
19/77) | $E 5 | ||
j5y Report | |||
* fu | |||
<# G Pacvent Recutience H | |||
5 THERE WERE NO JNIT Sil rTDOW) S OR SIGNIFICANT PuWER RH: DUCTIONS IN THE MONTil 0F AUGUST. | |||
I I | |||
2 3 | |||
4 1:: l'osted Reason: | |||
Method: | |||
Exhibit G. Instrutiion - | |||
S: Sthednied A liguipment Failure (Explain) 1 -Manual for Prepa:Jtion of Das i i | |||
11 Maintenance o( Test 2 M.mual Scram. | |||
Entiy Sheels foi 1.iccei C Itefacting 3 Autenuatic Scram. | |||
Esent Ilepint li.Elti! ! (NilRI:G-D.Itegulatory Resisittion 4 Othes (Esplain) 01611 I Operator Training & license Examination F. Adininist raiive 5 | |||
G Opciational Lisor (E= plain) | |||
INinhis t. S.une Som. | |||
19/77) ll Othes (E xplain) | |||
E Mailing Address e | |||
Alabama Power Comp ny 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr. | |||
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached | b | ||
Stolz to Mr. Alan R. Barton, dated October 21, 1977, a "Narra-tive Summa ry of Operating Experience" | = lac;3g7"' | ||
AlabamaPbwer the southem elettnc system September 12, 1983 Docket No. 50-348 Di rector, Of fice of Management Inf ormation and Program Control U. S. Nuclea r Regul atory Commi s sion Washington, D.C. | |||
20555 Dea r Si r: | |||
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the | |||
: August, 1983 Monthly Operating Report for Joseph M. | |||
F a rl ey Nuclear Plant, U r. i t 1, | |||
required by Section 6.9.1.10 of the Appendix A Tech-nical Specifications. | |||
As requested by letter f rom Mr. John F. | |||
Stolz to Mr. Alan R. | |||
Barton, dated October 21, 1977, a "Narra-tive Summa ry of Operating Experience" is included in the attached report. | |||
If you have any questions, please advise. | If you have any questions, please advise. | ||
Yours very | Yours very | ||
,uly, | |||
)?/ | |||
F. L. Cl ayton, J r. | ,/ | ||
6 F. | |||
L. Cl ayton, J r. | |||
ILCJr/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy) | ILCJr/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy) | ||
Director, IE (10 copies) | Director, IE (10 copies) | ||
Di rector, RIl | Di rector, RIl (1 copy) | ||
Z6- AC | Z6-AC | ||
'I '}} | |||
Latest revision as of 22:09, 14 December 2024
| ML20080G498 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/01/1983 |
| From: | Clayton F, Hairston W ALABAMA POWER CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8309200297 | |
| Download: ML20080G498 (5) | |
Text
-
r JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1.
NARRATIVE
SUMMARY
OF OPERATIONS AUGUST, 1983 During the month of August, there were no unit shutdowns or significant power reductions.
The following safety-related maintenance was performed in the month of August:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Cleaned out 1A charging pump lube oil cooler.
3.
Replaced numerous waste evaporator: feed filters.
4.
Replaced mechanical seal on spent fuel pool skimmer pump.
i-5.
Adjusted numerous packing glands on main steam system valves.
8309200297 830901 PDR ADOCK 05000348 R
OPERATING DATA REPORT DOCKET NO.
50-348 DATE 9-1-83 COMPLETED BY UA Unfrston III TELEPHONE (205) 899-5155 OPERATING STATUS
- 1. Unit Nam *.
Joseph M.'Farlev - Unit 1 Notes
- 1) Cumulative dasa since
- 2. Reporting Period:
An m" 10R1 12/1/77, data of
- 3. Licensed Thermal Power (MWt):
2652 commercial operation.
860
- 4. Nameplate Rating (Gross MWe):
829
- 5. Design Electrical Rating (Net MWe):
844.6
- 6. Maximum Dependable Capacity (Gross MWe):
803.6
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since.Last Report. Give Reasons:
N/A
- 9. Power Level To Which Res*ricted,If Any (Net MWe):
' M/A N/A
- 10. Reasons For Restrictions,If Any:
This Month Yr..to.Date
' Cur' ulative n
744 5,831 50.399
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 766 r) 4,068.2 32,215.7
- 13. Reactor Reserve Shutdown Hours 0.0 25.1 3,639.6
- 14. Hours Generator On.Line 744.0 1966.3 31,234.5
- 15. Unit Reserve Shutdown Hi urs 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1.971.688 10,029,740 7g qio 7po I 7. Gross Electrical Energy Generated (MWH) 617,154 3,162,260 74;937_gog
- 18. Net Electrical Energy Generated (MWH) 585,990 2,971,936 23.412.156
- 19. Unit Service Factor 100.0 68.0 62.0
- 20. Unit Availability Factor inn n 68.0 62.0
- 21. Unit Capacity Factor (Using MDC Net) 98.0 63.4 57 g
- 22. Unit Capacity Factor (Using DER Net) 95.0 61.5 56.0
- 23. Unit Forced Outage Rate 0.0 0.7 16.4
- 24. Shutdowns Scheduled Over Nevt 6 Months (Type. Date, and Duration of Eacht:
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status iPrior to Commercial Operation):
Forecast Achieved iNITIA L CRITICa LiTY R/6/77 8/o/77 INITIAL ELECTRICITY 8/20/77 8/l8/77 COMMERCIAL CPERATION 12/1/77 12/1/77 (4/77)
DOCKET No.
50-348 UNIT 9-1-83 DATE C05fPLETED BY W.G. Hairston, III (205) 899-5156 TELEPHONE StONTil August. 1983 DAY AVERAGE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL talwe Net)
(MWe-Net) 793 g,
37 793 2
795 13 792 791 3
709 g9 789 J
785 4
783 5
787 21 6
22 781 785 7
788 23 7R9 783 3
797 24 786 9
g 72 3 782 10 785 26 785 788 g3 n
12 787
- 3 7ga 787 785 l3 3
14 30 788 789 IS 31 7on 796 16 INSTRUCTIONS On this fonn:t. list the svenge daily unit power levelin MWe Net for e:ch d:y in the reporting month. Compute to
, the neste:t whole me;2 watt.
(9p7) w -
,,-,-c.,
w4
,c.
-,,,7,-
-,-%,y-
,-.w------r e
-Es----v--wy-
-w-- - + -
1--
-e-
-w
- w--
ww m-n
--g-
tw*----~w,
,, - +
DOCKE T NO. _ _50-348 UNIT Sil01 DOWNS AND POWER REDUC 110NS UNII NAME J.M. Farley UnTt l' DAIE _9/1/83 COMPLEI ED ilY W.G. Ilairston, III ftEPORT alONiil Aueust. 1983 TEl.LPIIONE (205) 899-5156 3
c_
re 5 sa =
5" sX Licensee c.t.
c.
Cause & Coniective
~.
.2 e g
9 No.
Date g
3g jg5 Event u?
8-3 Action to
$E 5
j5y Report
- fu
<# G Pacvent Recutience H
5 THERE WERE NO JNIT Sil rTDOW) S OR SIGNIFICANT PuWER RH: DUCTIONS IN THE MONTil 0F AUGUST.
I I
2 3
4 1:: l'osted Reason:
Method:
Exhibit G. Instrutiion -
S: Sthednied A liguipment Failure (Explain) 1 -Manual for Prepa:Jtion of Das i i
11 Maintenance o( Test 2 M.mual Scram.
Entiy Sheels foi 1.iccei C Itefacting 3 Autenuatic Scram.
Esent Ilepint li.Elti! ! (NilRI:G-D.Itegulatory Resisittion 4 Othes (Esplain) 01611 I Operator Training & license Examination F. Adininist raiive 5
G Opciational Lisor (E= plain)
INinhis t. S.une Som.
19/77) ll Othes (E xplain)
E Mailing Address e
Alabama Power Comp ny 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.
b
= lac;3g7"'
AlabamaPbwer the southem elettnc system September 12, 1983 Docket No. 50-348 Di rector, Of fice of Management Inf ormation and Program Control U. S. Nuclea r Regul atory Commi s sion Washington, D.C.
20555 Dea r Si r:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the
- August, 1983 Monthly Operating Report for Joseph M.
F a rl ey Nuclear Plant, U r. i t 1,
required by Section 6.9.1.10 of the Appendix A Tech-nical Specifications.
As requested by letter f rom Mr. John F.
Stolz to Mr. Alan R.
Barton, dated October 21, 1977, a "Narra-tive Summa ry of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very
,uly,
)?/
,/
6 F.
L. Cl ayton, J r.
ILCJr/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy)
Director, IE (10 copies)
Di rector, RIl (1 copy)
Z6-AC
'I '