ML20069F116: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:. i OPER ATING DAT 4 REPORT DOCKET NO.      50-317 DATE -3/17/83 COstPLETED BY _ __ Elaine Lotito TELEPilONE      (301) 78t-5363 OPE RATING STA1 US
: 1. U i: Narre:
Calvert Cliffs #1                                      Notes Revision October 1982
: 2. Rerortmg Period.
: 3. Li:ensed Thermal Pow er (MWti.
: i. Nameplate Rating iGr.,ss %IWei:
: 5. Desi .a Elcarical Rotin;t (Net MWel:
: 6. Masimum Dependabie Capacity ICross SIWel:
: 7. 4tasimum thpendable Capacity (Net SlWel:                            I
: 8. If Charges Occur in Cap., city Ratings tite,ns Nunter 3 Thrnyh 7) Since Last Report.Goe Reasons.
: 9. Power Lesel 10 bhich He tri:ted. If Any (Net 4 thel:
: 10. Itessora Fc Restrictic . ll Any:
This Month            % to D.te            Ct. nalatise
: 11. Ilours in Reporting PerioJ
: 12. Number Of Hours Reactor Was Critical
: 13. Reactor Res.:ne Shutdown Haurs                                                                  ,
: 14. Hours Generator On Line                                                      -
: 15. Unit itesene Shutdown linurs
: 16. Grots Thertual Ener Ay Gererated (MWHI                                                                              .
: 17. Gross Electrical Energy Generated 1%IWill            671,198      __
4,333,464      __ _ _ _ 40,327,461 _
: 18. Net Electrie:al Er.crgy Generated (MWHi                                        _
: 19. Lnit Senice Factor
: 20. Unit Assilability Facics
: 21. Unit Capacity Facter IUsi,g \1DC Net t
: 22. Unit C:pacity Factor IUung DER *ierl
: 23. Ur'it f orced Outage Rate
: 24. Shutdowns Scheduled 0.cr Sest 6 Stonths(Type. Date.an.1 Duration of Each:
: 25. If Shut tuwn At End Of Report Perso.l. Estimated Date of Startup:
: 24. Units in Test Status (Prior to Commercial Operstion):                        Forecast              Achiesed INITIA L CRITICALITY                                                                            .
INITl4L EL FC TRICITY                                                                  --
COST %!ERCI A L OPER ATION 8303220322 830317                                                                                                        (457)
PDR ADOCK 05000317      PDR R}}

Revision as of 23:36, 25 July 2020

Revised Monthly Operating Rept for Oct 1982
ML20069F116
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 03/17/1983
From: Lotito E
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20069F108 List:
References
NUDOCS 8303220322
Download: ML20069F116 (1)


Text

. i OPER ATING DAT 4 REPORT DOCKET NO. 50-317 DATE -3/17/83 COstPLETED BY _ __ Elaine Lotito TELEPilONE (301) 78t-5363 OPE RATING STA1 US

1. U i: Narre:

Calvert Cliffs #1 Notes Revision October 1982

2. Rerortmg Period.
3. Li:ensed Thermal Pow er (MWti.
i. Nameplate Rating iGr.,ss %IWei:
5. Desi .a Elcarical Rotin;t (Net MWel:
6. Masimum Dependabie Capacity ICross SIWel:
7. 4tasimum thpendable Capacity (Net SlWel: I
8. If Charges Occur in Cap., city Ratings tite,ns Nunter 3 Thrnyh 7) Since Last Report.Goe Reasons.
9. Power Lesel 10 bhich He tri:ted. If Any (Net 4 thel:
10. Itessora Fc Restrictic . ll Any:

This Month  % to D.te Ct. nalatise

11. Ilours in Reporting PerioJ
12. Number Of Hours Reactor Was Critical
13. Reactor Res.:ne Shutdown Haurs ,
14. Hours Generator On Line -
15. Unit itesene Shutdown linurs
16. Grots Thertual Ener Ay Gererated (MWHI .
17. Gross Electrical Energy Generated 1%IWill 671,198 __

4,333,464 __ _ _ _ 40,327,461 _

18. Net Electrie:al Er.crgy Generated (MWHi _
19. Lnit Senice Factor
20. Unit Assilability Facics
21. Unit Capacity Facter IUsi,g \1DC Net t
22. Unit C:pacity Factor IUung DER *ierl
23. Ur'it f orced Outage Rate
24. Shutdowns Scheduled 0.cr Sest 6 Stonths(Type. Date.an.1 Duration of Each:
25. If Shut tuwn At End Of Report Perso.l. Estimated Date of Startup:
24. Units in Test Status (Prior to Commercial Operstion): Forecast Achiesed INITIA L CRITICALITY .

INITl4L EL FC TRICITY --

COST %!ERCI A L OPER ATION 8303220322 830317 (457)

PDR ADOCK 05000317 PDR R