ML022520170: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:September 9, 2002 RN-02-045 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT REGULATORY ACTION Licensee:       Nuclear Management Company, LLC                     (EA-02-049)
{{#Wiki_filter:PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION September 9, 2002 RN-02-045 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT REGULATORY ACTION Licensee:
Nuclear Management Company, LLC (EA-02-049)
Point Beach Nuclear Plant, Units 1 and 2 Docket No. 50-266, 301
Point Beach Nuclear Plant, Units 1 and 2 Docket No. 50-266, 301


Line 25: Line 26:
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION This is to inform the Commission that a WHITE Significance Determination Process (SDP) finding will be issued on or around September 12, 2002, to Nuclear Management Company, LLC, as a result of inspections at the Point Beach Nuclear Plant. This WHITE finding, an issue with low to moderate importance to safety, which may require additional NRC inspections, involved the adequacy of the licensees critique of two performance issues during the biennial emergency preparedness exercise that was conducted on February 12, 2002. The critique did not identify an inaccurate PAR development, which is considered a failure to identify an exercise weakness associated with a risk significant planning standard (RSPS).
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION This is to inform the Commission that a WHITE Significance Determination Process (SDP) finding will be issued on or around September 12, 2002, to Nuclear Management Company, LLC, as a result of inspections at the Point Beach Nuclear Plant. This WHITE finding, an issue with low to moderate importance to safety, which may require additional NRC inspections, involved the adequacy of the licensees critique of two performance issues during the biennial emergency preparedness exercise that was conducted on February 12, 2002. The critique did not identify an inaccurate PAR development, which is considered a failure to identify an exercise weakness associated with a risk significant planning standard (RSPS).
It should be noted that the licensee has not been specifically informed of this action. The schedule of issuance and notification are:
It should be noted that the licensee has not been specifically informed of this action. The schedule of issuance and notification are:
Mailing of Final Significance Determination         September 12, 2002 Telephone Notification of licensee                   September 12, 2002 The State of Wisconsin will be informed.
Mailing of Final Significance Determination September 12, 2002 Telephone Notification of licensee September 12, 2002 The State of Wisconsin will be informed.
Contacts:         J. Dixon-Herrity, OE, 415-1980     J. Luehman, OE, 415-2741 Distribution:
Contacts:
OWFN                     OWFN                  TWFN                    Regional Offices Chairman Meserve         EDO                    OCFO                    RI        RII Comm. Dicus               DEDR                  OP CENTER              RIII      RIV Comm. Diaz               DEDE                  NMSS Comm. McGaffigan         OE                    OIG Comm. Merrifield         OGC                   OCIO                    MAIL NRR                   RES                    ADAMS SECY                      NSIR                   ACRS OCA                      OI PA                        SP IP OE:ES                           OE:DD JDixon-Herrity                 JLuehman     File Name:
J. Dixon-Herrity, OE, 415-1980 J. Luehman, OE, 415-2741 Distribution:
C:\ORPCheckout\FileNET\ML022520170.wpd 09/9/2002                       09/9/2002     ADAMS ACCESSION NO.
OWFN Chairman Meserve Comm. Dicus Comm. Diaz Comm. McGaffigan Comm. Merrifield SECY OCA PA IP OWFN EDO DEDR DEDE OE OGC NRR NSIR OI SP TWFN OCFO OP CENTER NMSS OIG OCIO RES ACRS Regional Offices RI RII RIII RIV MAIL ADAMS OE:ES OE:DD JDixon-Herrity JLuehman File Name:
PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION}}
C:\\ORPCheckout\\FileNET\\ML022520170.wpd 09/9/2002 09/9/2002 ADAMS ACCESSION NO.}}

Latest revision as of 15:59, 16 January 2025

RN-02-045, Nuclear Management Company, LLC
ML022520170
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/09/2002
From: Luehman J
NRC/OE
To:
Dixon-Herrity J
References
EA-02-049 RN-02-045
Download: ML022520170 (1)


Text

PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION September 9, 2002 RN-02-045 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT REGULATORY ACTION Licensee:

Nuclear Management Company, LLC (EA-02-049)

Point Beach Nuclear Plant, Units 1 and 2 Docket No. 50-266, 301

Subject:

ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION This is to inform the Commission that a WHITE Significance Determination Process (SDP) finding will be issued on or around September 12, 2002, to Nuclear Management Company, LLC, as a result of inspections at the Point Beach Nuclear Plant. This WHITE finding, an issue with low to moderate importance to safety, which may require additional NRC inspections, involved the adequacy of the licensees critique of two performance issues during the biennial emergency preparedness exercise that was conducted on February 12, 2002. The critique did not identify an inaccurate PAR development, which is considered a failure to identify an exercise weakness associated with a risk significant planning standard (RSPS).

It should be noted that the licensee has not been specifically informed of this action. The schedule of issuance and notification are:

Mailing of Final Significance Determination September 12, 2002 Telephone Notification of licensee September 12, 2002 The State of Wisconsin will be informed.

Contacts:

J. Dixon-Herrity, OE, 415-1980 J. Luehman, OE, 415-2741 Distribution:

OWFN Chairman Meserve Comm. Dicus Comm. Diaz Comm. McGaffigan Comm. Merrifield SECY OCA PA IP OWFN EDO DEDR DEDE OE OGC NRR NSIR OI SP TWFN OCFO OP CENTER NMSS OIG OCIO RES ACRS Regional Offices RI RII RIII RIV MAIL ADAMS OE:ES OE:DD JDixon-Herrity JLuehman File Name:

C:\\ORPCheckout\\FileNET\\ML022520170.wpd 09/9/2002 09/9/2002 ADAMS ACCESSION NO.