ML042960454: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:From: | {{#Wiki_filter:From: | ||
To: | <DSTRAKA@ | ||
sc.com> | |||
To: | |||
<atgnrc.gov> | |||
DAT(OO&Y Date: | |||
7/6/04 1:09PM | |||
/ | |||
==Subject:== | ==Subject:== | ||
| Line 25: | Line 31: | ||
Procedure 400P-9RC01 section 3.7 cautions that the lift pump must be run 7 minutes prior to starting the RCP and follow on sections for starting RCPs (4.3.18 for example) also contain a step for starting each pump. | Procedure 400P-9RC01 section 3.7 cautions that the lift pump must be run 7 minutes prior to starting the RCP and follow on sections for starting RCPs (4.3.18 for example) also contain a step for starting each pump. | ||
: Regards, Don Straka Senior Consultant - Regulatory Affairs dstraka@apsc.com phone: 623.393.5041 pager: 602.509.6240 mobile: 602.509.6240 | : Regards, Don Straka Senior Consultant - Regulatory Affairs dstraka@apsc.com phone: 623.393.5041 pager: 602.509.6240 mobile: 602.509.6240 | ||
> | > ----Original Message---- | ||
> | > From: | ||
> | Custodio, Prudencio B(Z99694) | ||
> Sent: | |||
> | Tuesday, July 06, 2004 10:28 AM | ||
> To: Sahay, Prem P(Z83476); Withers, Douglas W(Z98444); Holmes, John | |||
> J(Z98811); Kesler, Steven L(Z55768); Straka, Donald J(Z99942) | |||
==Subject:== | ==Subject:== | ||
Oil Lift Pump | Oil Lift Pump | ||
> <<White Paper Oil Lift Pump.doc>> | |||
> Prem, | |||
> Here's my input. | |||
> Thanks, | |||
> Denny CC: | |||
<DMAULDIN@apsc.com>, <JTAYLO01@apsc.com>, | |||
<SKESLER@apsc.com>, <PBCUSTOD@apsc.com>, <DWITHERS@apsc.com>, | |||
<JHOLME01 @apsc.com>, <Z75655@apsc.com>, <NHENRY01 @apsc.com>}} | |||
Latest revision as of 00:30, 16 January 2025
| ML042960454 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/06/2004 |
| From: | Straka D Arizona Public Service Co |
| To: | Gody A Office of Nuclear Reactor Regulation, Division of Reactor Safety IV |
| References | |
| FOIA/PA-2004-0307 | |
| Download: ML042960454 (1) | |
Text
From:
<DSTRAKA@
sc.com>
To:
<atgnrc.gov>
DAT(OO&Y Date:
7/6/04 1:09PM
/
Subject:
FW: Oil Lift Pump Tony:
Enclosed is information on the RCP thermal overload settings.
There was a question should the RCP starting procedures have a CAUTION statement regarding the lift pumps:
Procedure 400P-9RC01 section 3.7 cautions that the lift pump must be run 7 minutes prior to starting the RCP and follow on sections for starting RCPs (4.3.18 for example) also contain a step for starting each pump.
- Regards, Don Straka Senior Consultant - Regulatory Affairs dstraka@apsc.com phone: 623.393.5041 pager: 602.509.6240 mobile: 602.509.6240
> ----Original Message----
> From:
Custodio, Prudencio B(Z99694)
> Sent:
Tuesday, July 06, 2004 10:28 AM
> To: Sahay, Prem P(Z83476); Withers, Douglas W(Z98444); Holmes, John
> J(Z98811); Kesler, Steven L(Z55768); Straka, Donald J(Z99942)
Subject:
Oil Lift Pump
> <<White Paper Oil Lift Pump.doc>>
> Prem,
> Here's my input.
> Thanks,
> Denny CC:
<DMAULDIN@apsc.com>, <JTAYLO01@apsc.com>,
<SKESLER@apsc.com>, <PBCUSTOD@apsc.com>, <DWITHERS@apsc.com>,
<JHOLME01 @apsc.com>, <Z75655@apsc.com>, <NHENRY01 @apsc.com>