ML042960454

From kanterella
Jump to navigation Jump to search
E-mail from D. Straka Regarding Oil Lift Pump
ML042960454
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/06/2004
From: Straka D
Arizona Public Service Co
To: Gody A
Office of Nuclear Reactor Regulation, Division of Reactor Safety IV
References
FOIA/PA-2004-0307
Download: ML042960454 (1)


Text

From:

<DSTRAKA@

sc.com>

To:

<atgnrc.gov>

DAT(OO&Y Date:

7/6/04 1:09PM

/

Subject:

FW: Oil Lift Pump Tony:

Enclosed is information on the RCP thermal overload settings.

There was a question should the RCP starting procedures have a CAUTION statement regarding the lift pumps:

Procedure 400P-9RC01 section 3.7 cautions that the lift pump must be run 7 minutes prior to starting the RCP and follow on sections for starting RCPs (4.3.18 for example) also contain a step for starting each pump.

Regards, Don Straka Senior Consultant - Regulatory Affairs dstraka@apsc.com phone: 623.393.5041 pager: 602.509.6240 mobile: 602.509.6240

> ----Original Message----

> From:

Custodio, Prudencio B(Z99694)

> Sent:

Tuesday, July 06, 2004 10:28 AM

> To: Sahay, Prem P(Z83476); Withers, Douglas W(Z98444); Holmes, John

> J(Z98811); Kesler, Steven L(Z55768); Straka, Donald J(Z99942)

Subject:

Oil Lift Pump

> <<White Paper Oil Lift Pump.doc>>

> Prem,

> Here's my input.

> Thanks,

> Denny CC:

<DMAULDIN@apsc.com>, <JTAYLO01@apsc.com>,

<SKESLER@apsc.com>, <PBCUSTOD@apsc.com>, <DWITHERS@apsc.com>,

<JHOLME01 @apsc.com>, <Z75655@apsc.com>, <NHENRY01 @apsc.com>