From:
<DSTRAKA@
sc.com>
To:
<atgnrc.gov>
DAT(OO&Y Date:
7/6/04 1:09PM
/
Subject:
FW: Oil Lift Pump Tony:
Enclosed is information on the RCP thermal overload settings.
There was a question should the RCP starting procedures have a CAUTION statement regarding the lift pumps:
Procedure 400P-9RC01 section 3.7 cautions that the lift pump must be run 7 minutes prior to starting the RCP and follow on sections for starting RCPs (4.3.18 for example) also contain a step for starting each pump.
- Regards, Don Straka Senior Consultant - Regulatory Affairs dstraka@apsc.com phone: 623.393.5041 pager: 602.509.6240 mobile: 602.509.6240
> ----Original Message----
> From:
Custodio, Prudencio B(Z99694)
> Sent:
Tuesday, July 06, 2004 10:28 AM
> To: Sahay, Prem P(Z83476); Withers, Douglas W(Z98444); Holmes, John
> J(Z98811); Kesler, Steven L(Z55768); Straka, Donald J(Z99942)
Subject:
Oil Lift Pump
> <<White Paper Oil Lift Pump.doc>>
> Prem,
> Here's my input.
> Thanks,
> Denny CC:
<DMAULDIN@apsc.com>, <JTAYLO01@apsc.com>,
<SKESLER@apsc.com>, <PBCUSTOD@apsc.com>, <DWITHERS@apsc.com>,
<JHOLME01 @apsc.com>, <Z75655@apsc.com>, <NHENRY01 @apsc.com>