{{#Wiki_filter:3-qq Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:       April 21. 2004           Time:       1400       Preparer:               Andrea Longston           U I         R       28 NOTE:         Refer to base procedureNP 10.3.6for safety assessment checklist KSF definitions.
{{#Wiki_filter:3-qq Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:
NOTE:         Wheneverfuel has been removedfrom the reactorvessel and refueling cavity, allkey safety functions are GREEN ercept spentfuelpool cooling.
April 21. 2004 Time:
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/TIrue = I through 4 REACTIVITY                                                                           Subtotal    Condition
1400 Preparer:
: 1.       RCS Boron concentration = 2894 ppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C         (0-1)  1        0-1          RED
Andrea Longston U
: 2.       Number of boration paths                                           (0-2)  2        2
I R
: 3.       No fuel motion                                                     (0.1)   0         3-4                _2
28 NOTE:
: 4.       SR instrumentation operable                                        (0-1)   1         S           G;;>QX Subtotal =     4 CORE COOLING                                                                         Subtotal     Condition
Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.
: 1.       Number of SG available for DHR                                     (0-2)   0         0-1         RED
NOTE:
: 2.       Refueling cavity filled                                           (0-1)   0         2
Wheneverfuel has been removedfrom the reactor vessel and refueling cavity, all key safety functions are GREEN ercept spentfuelpool cooling.
: 3.       Number of trains RHR available                                     (0-2)   2         3           YELLOW
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/TIrue = I through 4 REACTIVITY
: 4.       RCS level above REDUCED INVENTORY                                 (0-1)   1         4-5         GREEN RCS TEMP = 100'F; 18 days shutdown; RCS 69%                       Subtotal =     3 RCS Time to Boll 47 min (Applicable at Cold or Refueling Shutdown)
: 1.
POWER AVAILABILITY                                                                   Subtotal     Condition
RCS Boron concentration = 2894 ppm a.)
: 1.       Independent off-site power sources                                                   I           RED available to A-05 and A-06 (totally                                                 2           ORANGE independent at the 4160 V, 13.8 kV,                                                 3           1 =
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)
and 345 kV levels)                                                 (0-2)   2         4-5         R EEN
For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C
: 2.       G-01 or G-021A-05/B-03 available                                   (0-1)   1 G-03 or G-04/A-06/B-04 available                                   (0-1)   1
: 2.
: 3.       G-05 available, Reactor Cavity filled to 223 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours.               (0-1)   0 Subtotal =     4 INVENTORY                                                                           Subtotal     Condition
Number of boration paths
: 1.       Pressurizer level 220 percent wlhead on                                             0-1         RED (0-1)   0         2
: 3.
: 2.       Refueling Cavity filled (see definition)                         (0-3)   0         3
No fuel motion
: 3.       RCS level above REDUCED INVENTORY                                 (0-1)   1         4
: 4.
: 4.       Makeup from VCTi/BLENDER and/or RWST available                                             (0-2)   2 Subtotal =     3 Information Inthis r~ernrd wnt dPIPt;4 III atIL.UIUdIILu t~ il LIWJ [ue0H1 o1 Iniormation Ac. xroi PBF-1562         F01
SR instrumentation operable Subtotal Condition RED
_2 G;;>QX (0-1) 1 (0-2) 2 (0.1) 0 (0-1) 1 0-1 2
3-4 S
Subtotal =
4 CORE COOLING Subtotal Condition
: 1.
Number of SG available for DHR (0-2) 0 0-1 RED
: 2.
Refueling cavity filled (0-1) 0 2
: 3.
Number of trains RHR available (0-2) 2 3
YELLOW
: 4.
RCS level above REDUCED INVENTORY (0-1) 1 4-5 GREEN RCS TEMP = 100'F; 18 days shutdown; RCS 69%
Subtotal =
3 RCS Time to Boll 47 min (Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition
: 1.
Independent off-site power sources I
RED available to A-05 and A-06 (totally 2
ORANGE independent at the 4160 V, 13.8 kV, 3
1  
=
and 345 kV levels)
(0-2) 2 4-5 R EEN
: 2.
G-01 or G-021A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
: 3.
G-05 available, Reactor Cavity filled to 223 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours.
(0-1) 0 Subtotal =
4 INVENTORY Subtotal Condition
: 1.
Pressurizer level 220 percent wlhead on 0-1 RED (0-1) 0 2
: 2.
Refueling Cavity filled (see definition)
(0-3) 0 3
: 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
: 4.
Makeup from VCTi/BLENDER and/or RWST available (0-2) 2 Subtotal =
3 Information In this r~ernrd wnt dPIPt;4 III atIL.UIUdIILu t~ il LIWJ [ue0H1 o1 Iniormation Ac. xroi F01 PBF-1562 Revision 2 10r3W VAx rA 4ige I of 9


==References:==
==References:==
NP 103.6 Revision 2 10r3W VAx                                                rA 4 ige I of 9                                              NP 10.21 3-I
NP 103.6 NP 10.21 3-I


Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT                                                                   Subtotal          Condition
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
: 1.       Containment integrity (TS 15.1.D) (Containment                               0                RED Operable) (ITS TS 3.6.11 set                             ( or 4)  0          l          *-AIUAA
: 1.
: 2.       Containment Closure CL-1E maintained                                         2-3 and closure < time to boil                               (O or 2)  2          4-5-6        <;W
Containment integrity (TS 15.1.D) (Containment Operable) (ITS TS 3.6.11 set
: 3.       No fuel motion                                             (0-1)  0'
: 2.
: 4.       DHR Capability:
Containment Closure CL-1E maintained and closure < time to boil
          -      cavity flooded and internals out OR
: 3.
          -      at least one SG available OR
No fuel motion
          -      one fan cooler with Equip hatch installed and personnel hatches capable of being shut                               (0-1)   1 Subtotal =     3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
: 4.
NOTE:           Take creditfor only one P-12 independenttoffsite power source duringperiods of single X-03 orX-04 availability (*).
DHR Capability:
Subtotal          Condition
cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut
: 1.       'A' SFP cooling pump available                                               0-I              RED with power available from:                                                   2                ORANGE
( or 4) 0 (O or 2) 2 (0-1) 0' Subtotal 0
          -      G-02 or G-01 via 2B-32                             (0-1) n/a          3                YELLOW
l 2-3 4-5-6 Condition RED
          -(*) an independent off-site power                                           4-5              GREEN source different thin that for Train B below                                       (0-1) n/a
*-AIUAA
: 2.       "B" SFP cooling pump available with power available from:
<;W (0-1) 1 Subtotal =
          -      G-03 or G-04 via 1B-42                             (0-1) n/a
3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
          .(*) an independent off-site power source different than that for Train A above                                       (0-1) n/a
NOTE:
: 3.       Temporary power available to one SFP cooling pump, 0-05 available, and SFP time to boil a 12 hours..                                                   (0-1) n/a SFP Temperatures:                                             Subtotal =    n/a NW           n/a     of SE           n/a     &deg;F 0
Take credit for only one P-12 independent
SFP Average Temp             n/a        F SFP Time to Boil             n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
: 1.  
'A' SFP cooling pump available with power available from:
G-02 or G-01 via 2B-32
-(*) an independent off-site power source different thin that for Train B below
: 2.  
"B" SFP cooling pump available with power available from:
G-03 or G-04 via 1B-42
.(*) an independent off-site power source different than that for Train A above
: 3.
Temporary power available to one SFP cooling pump, 0-05 available, and SFP time to boil a 12 hours..
t offsite power source during periods of single X-03 or X-04 availability (*).
Subtotal Condition 0-I RED 2
ORANGE (0-1) n/a 3
YELLOW 4-5 GREEN (0-1) n/a (0-1) n/a (0-1) n/a (0-1) n/a SFP Temperatures:
NW n/a of SE n/a  
&deg;F SFP Average Temp SFP Time to Boil Subtotal =
n/a n/a 0F n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
Reactivity and Containment Key Functions both turned YELLOW due to the Reactor Vessel Head Lift.
Reactivity and Containment Key Functions both turned YELLOW due to the Reactor Vessel Head Lift.
PBF-1562                                                                                                        
PBF-1562 Revision 2 10/30/02


==References:==
==References:==
NP 103.6 Revision 2 10/30/02                                            Page 2 of 9                                                  NP 10.2.1
NP 103.6 NP 10.2.1 Page 2 of 9


Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:       I             DATE:       April 21, 2004             TIME:       1400 KEY SAFETY FUNCTIONS:
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
REACTIVITY:                 YELLOW CORE COOLING:               YELLOW POWER AVAILABLE:             GREEN INVENTORY:                   YELLOW CONTAINMENT:               YELLOW SFP COOLING:                 NA PROTECTED EQUIPMENT:
I DATE:
April 21, 2004 TIME:
1400 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
YELLOW YELLOW GREEN YELLOW CONTAINMENT:
SFP COOLING:
YELLOW NA PROTECTED EQUIPMENT:
COMMENTS:
COMMENTS:
Unit I is in Mode 6                                                                   4 Fire Protection Condition III: Credit is taken for fire rounds as fire prevention contingency RCS Time to Boil is 47 minutes RCS is at 69% Reactor Vessel Level                                                             64 Hot Leg Vent Path is the Pressurizer manway PBF-1562                                                                                      
Unit I is in Mode 6 4
Fire Protection Condition III: Credit is taken for fire rounds as fire prevention contingency RCS Time to Boil is 47 minutes RCS is at 69% Reactor Vessel Level 64 Hot Leg Vent Path is the Pressurizer manway PBF-1562 Revision 2 10/30/2


==References:==
==References:==
NP 10.3.6 Revision 2 10/30/2                                    Page5 of 9                                            NP 10.2.1}}
NP 10.3.6 NP 10.2.1 Page5 of 9}}

Latest revision as of 17:29, 15 January 2025

Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051920218
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/21/2004
From: Longston A
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051920218 (3)


Text

3-qq Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

April 21. 2004 Time:

1400 Preparer:

Andrea Longston U

I R

28 NOTE:

Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.

NOTE:

Wheneverfuel has been removedfrom the reactor vessel and refueling cavity, all key safety functions are GREEN ercept spentfuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/TIrue = I through 4 REACTIVITY

1.

RCS Boron concentration = 2894 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Subtotal Condition RED

_2 G;;>QX (0-1) 1 (0-2) 2 (0.1) 0 (0-1) 1 0-1 2

3-4 S

Subtotal =

4 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 0 2

3.

Number of trains RHR available (0-2) 2 3

YELLOW

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 GREEN RCS TEMP = 100'F; 18 days shutdown; RCS 69%

Subtotal =

3 RCS Time to Boll 47 min (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

1

=

and 345 kV levels)

(0-2) 2 4-5 R EEN

2.

G-01 or G-021A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 223 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal =

4 INVENTORY Subtotal Condition

1.

Pressurizer level 220 percent wlhead on 0-1 RED (0-1) 0 2

2.

Refueling Cavity filled (see definition)

(0-3) 0 3

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

4.

Makeup from VCTi/BLENDER and/or RWST available (0-2) 2 Subtotal =

3 Information In this r~ernrd wnt dPIPt;4 III atIL.UIUdIILu t~ il LIWJ [ue0H1 o1 Iniormation Ac. xroi F01 PBF-1562 Revision 2 10r3W VAx rA 4ige I of 9

References:

NP 103.6 NP 10.21 3-I

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) (Containment Operable) (ITS TS 3.6.11 set

2.

Containment Closure CL-1E maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut

( or 4) 0 (O or 2) 2 (0-1) 0' Subtotal 0

l 2-3 4-5-6 Condition RED

  • -AIUAA

<;W (0-1) 1 Subtotal =

3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take credit for only one P-12 independent

1.

'A' SFP cooling pump available with power available from:

G-02 or G-01 via 2B-32

-(*) an independent off-site power source different thin that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via 1B-42

.(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, 0-05 available, and SFP time to boil a 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />..

t offsite power source during periods of single X-03 or X-04 availability (*).

Subtotal Condition 0-I RED 2

ORANGE (0-1) n/a 3

YELLOW 4-5 GREEN (0-1) n/a (0-1) n/a (0-1) n/a (0-1) n/a SFP Temperatures:

NW n/a of SE n/a

°F SFP Average Temp SFP Time to Boil Subtotal =

n/a n/a 0F n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

Reactivity and Containment Key Functions both turned YELLOW due to the Reactor Vessel Head Lift.

PBF-1562 Revision 2 10/30/02

References:

NP 103.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

April 21, 2004 TIME:

1400 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

YELLOW YELLOW GREEN YELLOW CONTAINMENT:

SFP COOLING:

YELLOW NA PROTECTED EQUIPMENT:

COMMENTS:

Unit I is in Mode 6 4

Fire Protection Condition III: Credit is taken for fire rounds as fire prevention contingency RCS Time to Boil is 47 minutes RCS is at 69% Reactor Vessel Level 64 Hot Leg Vent Path is the Pressurizer manway PBF-1562 Revision 2 10/30/2

References:

NP 10.3.6 NP 10.2.1 Page5 of 9