Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051920218
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/21/2004
From: Longston A
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051920218 (3)


Text

3-qq Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

April 21. 2004 Time:

1400 Preparer:

Andrea Longston U

I R

28 NOTE:

Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.

NOTE:

Wheneverfuel has been removedfrom the reactor vessel and refueling cavity, all key safety functions are GREEN ercept spentfuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/TIrue = I through 4 REACTIVITY

1.

RCS Boron concentration = 2894 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Subtotal Condition RED

_2 G;;>QX (0-1) 1 (0-2) 2 (0.1) 0 (0-1) 1 0-1 2

3-4 S

Subtotal =

4 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 0 2

3.

Number of trains RHR available (0-2) 2 3

YELLOW

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 GREEN RCS TEMP = 100'F; 18 days shutdown; RCS 69%

Subtotal =

3 RCS Time to Boll 47 min (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

1

=

and 345 kV levels)

(0-2) 2 4-5 R EEN

2.

G-01 or G-021A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 223 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal =

4 INVENTORY Subtotal Condition

1.

Pressurizer level 220 percent wlhead on 0-1 RED (0-1) 0 2

2.

Refueling Cavity filled (see definition)

(0-3) 0 3

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

4.

Makeup from VCTi/BLENDER and/or RWST available (0-2) 2 Subtotal =

3 Information In this r~ernrd wnt dPIPt;4 III atIL.UIUdIILu t~ il LIWJ [ue0H1 o1 Iniormation Ac. xroi F01 PBF-1562 Revision 2 10r3W VAx rA 4ige I of 9

References:

NP 103.6 NP 10.21 3-I

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) (Containment Operable) (ITS TS 3.6.11 set

2.

Containment Closure CL-1E maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut

( or 4) 0 (O or 2) 2 (0-1) 0' Subtotal 0

l 2-3 4-5-6 Condition RED

  • -AIUAA

<;W (0-1) 1 Subtotal =

3 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take credit for only one P-12 independent

1.

'A' SFP cooling pump available with power available from:

G-02 or G-01 via 2B-32

-(*) an independent off-site power source different thin that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via 1B-42

.(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, 0-05 available, and SFP time to boil a 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />..

t offsite power source during periods of single X-03 or X-04 availability (*).

Subtotal Condition 0-I RED 2

ORANGE (0-1) n/a 3

YELLOW 4-5 GREEN (0-1) n/a (0-1) n/a (0-1) n/a (0-1) n/a SFP Temperatures:

NW n/a of SE n/a

°F SFP Average Temp SFP Time to Boil Subtotal =

n/a n/a 0F n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

Reactivity and Containment Key Functions both turned YELLOW due to the Reactor Vessel Head Lift.

PBF-1562 Revision 2 10/30/02

References:

NP 103.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

April 21, 2004 TIME:

1400 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

YELLOW YELLOW GREEN YELLOW CONTAINMENT:

SFP COOLING:

YELLOW NA PROTECTED EQUIPMENT:

COMMENTS:

Unit I is in Mode 6 4

Fire Protection Condition III: Credit is taken for fire rounds as fire prevention contingency RCS Time to Boil is 47 minutes RCS is at 69% Reactor Vessel Level 64 Hot Leg Vent Path is the Pressurizer manway PBF-1562 Revision 2 10/30/2

References:

NP 10.3.6 NP 10.2.1 Page5 of 9