ML17087A089: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ES-301                                     Administrative Topics Outline                           Form ES-301-1 Facility:     Millstone Unit 2                                         Date of Examination:   02/27/2017 Examination Level:           RO   ~           SRO     D                 Operating Test Number:     ES17LI.
{{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1 Facility:
Administrative Topic (see Note)               Type             Describe activity to be performed Code*
Millstone Unit 2 Date of Examination: 02/27/2017 Examination Level:
KIA 2.1.23 Ability to perform specific system and integrated plant procedures during all A 1.1-RO Conduct of Operations                         R,D     modes of plant operation. (RO 4.3)
RO ~
Calculate the maximum RCS venting time to f\erl{l(.           +'\. 5/*i r-~ -}f-
SRO D Operating Test Number: ES17LI.
*                *£.-- v1'                                      eliminate a non-condensable void in the reactor vessel.
Administrative Topic (see Note)
KIA 2.1.37 Knowledge of procedures, guidelines, or limitations associated with A 1.2-RO Conduct of Operations                         R,M     reactivity management. (RO 4.3)
Type Describe activity to be performed Code*
KIA 2.1.23 Ability to perform specific system and integrated plant procedures during all A 1.1-RO Conduct of Operations R,D modes of plant operation. (RO 4.3) f\\erl{l(. *£.-- v1' +'\\. 5/*i r-~ -}f-Calculate the maximum RCS venting time to eliminate a non-condensable void in the reactor vessel.
KIA 2.1.37 Knowledge of procedures, A 1.2-RO Conduct of Operations guidelines, or limitations associated with R,M reactivity management. (RO 4.3)
Determine Shutdown Margin with one CEA not inserted and crediting xenon reactivity worth.
Determine Shutdown Margin with one CEA not inserted and crediting xenon reactivity worth.
KIA 2.1. 7 Ability to evaluate plant performance and make operational judgments based on A 1. 3-RO Conduct of Operations [Spare)               R,D     operating characteristics, reactor behavior, and instrument interpretation. (RO 4.4)
KIA 2.1. 7 Ability to evaluate plant performance A 1. 3-RO Conduct of Operations [Spare) and make operational judgments based on R,D operating characteristics, reactor behavior, and instrument interpretation. (RO 4.4)
Evaluate an RCP Seal Failure KIA 2.2.12 Knowledge of surveillance A2-RO Equipment Control                                       procedures. (RO 3.7)
Evaluate an RCP Seal Failure KIA 2.2.12 Knowledge of surveillance A2-RO Equipment Control R,N procedures. (RO 3.7)
R,N Complete "A" Service Water Pump Operability Surveillance, SP 2612A-003.
Complete "A" Service Water Pump Operability Surveillance, SP 2612A-003.
KIA 2.3.7 Ability to comply with radiation work permit requirements during normal or abnormal conditions. (RO 3.5)
KIA 2.3.7 Ability to comply with radiation work permit requirements during normal or abnormal conditions. (RO 3.5)
A3-RO Radiation Control                               R,M     For the task of venting a CTMT Spray pump, determine RWP clothing requirements, maximum dose and contamination levels in the area and adjacent to the valves being manipulated.
A3-RO Radiation Control R,M For the task of venting a CTMT Spray pump, determine RWP clothing requirements, maximum dose and contamination levels in the area and adjacent to the valves being manipulated.
NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).  
*Type Codes & Criteria:                 (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank(::; 3 for ROs; ::; 4 for SROs & RO retakes)
*Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank(::; 3 for ROs; ::; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (2: 1)
(N)ew or (M)odified from bank (2: 1)
(P)revious 2 exams (::; 1; randomly selected)
(P)revious 2 exams (::; 1; randomly selected)  


ES-301                             Control Room/In-Plant Systems Outline                                   Form ES-301-2 Facility:   Millstone Unit 2                                             Date of Examination:             02/27/2017 Exam Level:       RO ~           SRO-I   D       SRO-U D             Operating Test No.:           ES17LI Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U Safety System I J PM Title                                       Type Code*
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:
Function CVCS I Emergency Boration S-1                                                                                          D,L,S                 1 004/A2. l 4 Emergency boration (RO 3 .8)
Millstone Unit 2 Date of Examination:
LPSI I Verify adequate Safety Injection Flow IA W EOP 2532, LOCA S-2                                                                                        A,L,N,S                 2 0061A3 .03 ESFAS-operated valves (RO 4.1)
02/27/2017 Exam Level: RO ~
PZR Pressure Control I Force Pressurizer Sprays S-3                                                                                          A,M,S                 3 010/Al.07 RCS Pressure (RO 3.7)
SRO-I D SRO-U D Operating Test No.:
Auxiliary Feedwater I Operate TDAFP IA W EOP 2541, App 6 S-4                                                                                        A,L,N,S               4(S) 061/A2.04 Pump failure or improper operation (RO 3.4)
ES17LI Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System I J PM Title Type Code*
CTMT Spray I Restore from inadvertent CTMT Spray actuation S-5                                                                                        EN,N,S                 5 026/A4.05 Containment spray reset switches (RO 3.5)
Safety Function S-1 CVCS I Emergency Boration D,L,S 1
Emergency Diesel Generators I Unload and secure a EDG S-6                                                                                          A,D,S                 6 064/A4.06 Manual start, loading, and stopping of the ED/G (RO 3.9)
004/ A2. l 4 Emergency boration (RO 3.8)
RPS I Respond to SIG Level Safety Channel Failure Low~~
S-2 LPSI I Verify adequate Safety Injection Flow IA W EOP 2532, LOCA A,L,N,S 2
S-7 012/A4.03 Channel blocks and bypasses (RO 3.6)       !Vif""' 5pc:,~e.- ¥                 N,S                 7 Circulating Water I Respond to the loss of a 2°d CW pump S-8                                                                                          A,N,S                 8 075/A2.02 Loss of circulating water pumps (RO 2.5)
0061 A3.03 ESF AS-operated valves (RO 4.1)
Mitigating a Reactor Regulating System "" ., T   J T
S-3 PZR Pressure Control I Force Pressurizer Sprays A,M,S 3
S-9 016/A4,01 NNI channel select controls (RO 2.9*)                                           N, s               7 In-Plant Systems. (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
010/Al.07 RCS Pressure (RO 3.7)
AC Electrical (Instrument Power) I Transfer PPC Power Supply P-1                                                                                              D                 6 062/A4.0l All breakers (including available switchyard) (RO 3.3)
S-4 Auxiliary Feedwater I Operate TDAFP IA W EOP 2541, App 6 A,L,N,S 4(S) 061/A2.04 Pump failure or improper operation (RO 3.4)
Service Water I On a loss of22E, swap the "B" SW Pump Strainer P-2 power supply to 22F to restore Facility 1 SW to operation                                 E,M               4(S) 076/A2.0l Loss ofSWS (RO 3.5)
S-5 CTMT Spray I Restore from inadvertent CTMT Spray actuation EN,N,S 5
Waste Gas Disposal I Shift In-Service Waste Gas Decay Tank P-3   071/A4.05 Gas decay tanks, including valves, indicators, and sample                     D,R                 9 line (RO 2.6)
026/A4.05 Containment spray reset switches (RO 3.5)
S-6 Emergency Diesel Generators I Unload and secure a EDG A,D,S 6
064/A4.06 Manual start, loading, and stopping of the ED/G (RO 3.9)
S-7 RPS I Respond to SIG Level Safety Channel Failure Low~~
012/A4.03 Channel blocks and bypasses (RO 3.6)  
!Vif""' 5pc:,~e.-¥ N,S 7
S-8 Circulating Water I Respond to the loss of a 2°d CW pump A,N,S 8
075/A2.02 Loss of circulating water pumps (RO 2.5)
Mitigating a Reactor Regulating System "".,
J T T
S-9 016/A4,01 NNI channel select controls (RO 2.9*)
N, s 7
In-Plant Systems. (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
P-1 AC Electrical (Instrument Power) I Transfer PPC Power Supply D
6 062/A4.0l All breakers (including available switchyard) (RO 3.3)
Service Water I On a loss of22E, swap the "B" SW Pump Strainer P-2 power supply to 22F to restore Facility 1 SW to operation E,M 4(S) 076/A2.0l Loss ofSWS (RO 3.5)
Waste Gas Disposal I Shift In-Service Waste Gas Decay Tank P-3 071/ A4.05 Gas decay tanks, including valves, indicators, and sample D,R 9
line (RO 2.6)
Local Manual Operation of a FRV [Spare}
Local Manual Operation of a FRV [Spare}
P-4 035/A4.0l Shift ofSIG controls between manual and automatic control,                       D,E               4(P) by bumpless transfer (RO 3. 7)
P-4 035/A4.0l Shift of SIG controls between manual and automatic control, D,E 4(P) by bumpless transfer (RO 3. 7)
* All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.  
                        *Type Codes                                       Criteria for RO I SRO-I / SRO-U A)lternate path                                                       4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                     :S9/:58/:54 (E)mergency or abnormal in-plant                                       ::?:1/<:1/<:1 (EN)gineered safety feature                                           ::?:1 I <:1 I<: 1 (control room system)
*Type Codes Criteria for RO I SRO-I / SRO-U A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank
(L)ow-Power I Shutdown                                                 ::?:1/<:1/<:1 (N)ew or (M)odified from bank including 1(A)                         ::?:2/<:2/<:1 (P)revious 2 exams                                                   :S 3 I ::; 3 I::; 2 (randomly selected)
:S9/:58/:54 (E)mergency or abnormal in-plant
(R)CA                                                                 ::?:1/<:1/<:1 (S)imulator}}
::?:1/<:1/<:1 (EN)gineered safety feature
::?:1 I <:1 I<: 1 (control room system)
(L)ow-Power I Shutdown
::?:1/<:1/<:1 (N)ew or (M)odified from bank including 1 (A)
::?:2/<:2/<:1 (P)revious 2 exams
:S 3 I ::; 3 I::; 2 (randomly selected)
(R)CA
::?:1/<:1/<:1 (S)imulator}}

Latest revision as of 10:48, 9 January 2025

Draft - Outlines (Folder 2)
ML17087A089
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/03/2017
From: Jeffrey Riley
Dominion Nuclear Connecticut
To: David Silk
Operations Branch I
Shared Package
ML16337A097 List:
References
U01968
Download: ML17087A089 (2)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility:

Millstone Unit 2 Date of Examination: 02/27/2017 Examination Level:

RO ~

SRO D Operating Test Number: ES17LI.

Administrative Topic (see Note)

Type Describe activity to be performed Code*

KIA 2.1.23 Ability to perform specific system and integrated plant procedures during all A 1.1-RO Conduct of Operations R,D modes of plant operation. (RO 4.3) f\\erl{l(. *£.-- v1' +'\\. 5/*i r-~ -}f-Calculate the maximum RCS venting time to eliminate a non-condensable void in the reactor vessel.

KIA 2.1.37 Knowledge of procedures, A 1.2-RO Conduct of Operations guidelines, or limitations associated with R,M reactivity management. (RO 4.3)

Determine Shutdown Margin with one CEA not inserted and crediting xenon reactivity worth.

KIA 2.1. 7 Ability to evaluate plant performance A 1. 3-RO Conduct of Operations [Spare) and make operational judgments based on R,D operating characteristics, reactor behavior, and instrument interpretation. (RO 4.4)

Evaluate an RCP Seal Failure KIA 2.2.12 Knowledge of surveillance A2-RO Equipment Control R,N procedures. (RO 3.7)

Complete "A" Service Water Pump Operability Surveillance, SP 2612A-003.

KIA 2.3.7 Ability to comply with radiation work permit requirements during normal or abnormal conditions. (RO 3.5)

A3-RO Radiation Control R,M For the task of venting a CTMT Spray pump, determine RWP clothing requirements, maximum dose and contamination levels in the area and adjacent to the valves being manipulated.

NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes & Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank(::; 3 for ROs; ::; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (2: 1)

(P)revious 2 exams (::; 1; randomly selected)

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:

Millstone Unit 2 Date of Examination:

02/27/2017 Exam Level: RO ~

SRO-I D SRO-U D Operating Test No.:

ES17LI Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System I J PM Title Type Code*

Safety Function S-1 CVCS I Emergency Boration D,L,S 1

004/ A2. l 4 Emergency boration (RO 3.8)

S-2 LPSI I Verify adequate Safety Injection Flow IA W EOP 2532, LOCA A,L,N,S 2

0061 A3.03 ESF AS-operated valves (RO 4.1)

S-3 PZR Pressure Control I Force Pressurizer Sprays A,M,S 3

010/Al.07 RCS Pressure (RO 3.7)

S-4 Auxiliary Feedwater I Operate TDAFP IA W EOP 2541, App 6 A,L,N,S 4(S) 061/A2.04 Pump failure or improper operation (RO 3.4)

S-5 CTMT Spray I Restore from inadvertent CTMT Spray actuation EN,N,S 5

026/A4.05 Containment spray reset switches (RO 3.5)

S-6 Emergency Diesel Generators I Unload and secure a EDG A,D,S 6

064/A4.06 Manual start, loading, and stopping of the ED/G (RO 3.9)

S-7 RPS I Respond to SIG Level Safety Channel Failure Low~~

012/A4.03 Channel blocks and bypasses (RO 3.6)

!Vif""' 5pc:,~e.-¥ N,S 7

S-8 Circulating Water I Respond to the loss of a 2°d CW pump A,N,S 8

075/A2.02 Loss of circulating water pumps (RO 2.5)

Mitigating a Reactor Regulating System "".,

J T T

S-9 016/A4,01 NNI channel select controls (RO 2.9*)

N, s 7

In-Plant Systems. (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

P-1 AC Electrical (Instrument Power) I Transfer PPC Power Supply D

6 062/A4.0l All breakers (including available switchyard) (RO 3.3)

Service Water I On a loss of22E, swap the "B" SW Pump Strainer P-2 power supply to 22F to restore Facility 1 SW to operation E,M 4(S) 076/A2.0l Loss ofSWS (RO 3.5)

Waste Gas Disposal I Shift In-Service Waste Gas Decay Tank P-3 071/ A4.05 Gas decay tanks, including valves, indicators, and sample D,R 9

line (RO 2.6)

Local Manual Operation of a FRV [Spare}

P-4 035/A4.0l Shift of SIG controls between manual and automatic control, D,E 4(P) by bumpless transfer (RO 3. 7)

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO I SRO-I / SRO-U A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank
S9/:58/:54 (E)mergency or abnormal in-plant
?:1/<:1/<:1 (EN)gineered safety feature
?:1 I <:1 I<: 1 (control room system)

(L)ow-Power I Shutdown

?:1/<:1/<:1 (N)ew or (M)odified from bank including 1 (A)
?:2/<:2/<:1 (P)revious 2 exams
S 3 I ::; 3 I::; 2 (randomly selected)

(R)CA

?:1/<:1/<:1 (S)imulator