ML17087A089
| ML17087A089 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/03/2017 |
| From: | Jeffrey Riley Dominion Nuclear Connecticut |
| To: | David Silk Operations Branch I |
| Shared Package | |
| ML16337A097 | List: |
| References | |
| U01968 | |
| Download: ML17087A089 (2) | |
Text
ES-301 Administrative Topics Outline Form ES-301-1 Facility:
Millstone Unit 2 Date of Examination: 02/27/2017 Examination Level:
RO ~
SRO D Operating Test Number: ES17LI.
Administrative Topic (see Note)
Type Describe activity to be performed Code*
KIA 2.1.23 Ability to perform specific system and integrated plant procedures during all A 1.1-RO Conduct of Operations R,D modes of plant operation. (RO 4.3) f\\erl{l(. *£.-- v1' +'\\. 5/*i r-~ -}f-Calculate the maximum RCS venting time to eliminate a non-condensable void in the reactor vessel.
KIA 2.1.37 Knowledge of procedures, A 1.2-RO Conduct of Operations guidelines, or limitations associated with R,M reactivity management. (RO 4.3)
Determine Shutdown Margin with one CEA not inserted and crediting xenon reactivity worth.
KIA 2.1. 7 Ability to evaluate plant performance A 1. 3-RO Conduct of Operations [Spare) and make operational judgments based on R,D operating characteristics, reactor behavior, and instrument interpretation. (RO 4.4)
Evaluate an RCP Seal Failure KIA 2.2.12 Knowledge of surveillance A2-RO Equipment Control R,N procedures. (RO 3.7)
Complete "A" Service Water Pump Operability Surveillance, SP 2612A-003.
KIA 2.3.7 Ability to comply with radiation work permit requirements during normal or abnormal conditions. (RO 3.5)
A3-RO Radiation Control R,M For the task of venting a CTMT Spray pump, determine RWP clothing requirements, maximum dose and contamination levels in the area and adjacent to the valves being manipulated.
NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank(::; 3 for ROs; ::; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (2: 1)
(P)revious 2 exams (::; 1; randomly selected)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:
Millstone Unit 2 Date of Examination:
02/27/2017 Exam Level: RO ~
SRO-I D SRO-U D Operating Test No.:
ES17LI Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System I J PM Title Type Code*
Safety Function S-1 CVCS I Emergency Boration D,L,S 1
004/ A2. l 4 Emergency boration (RO 3.8)
S-2 LPSI I Verify adequate Safety Injection Flow IA W EOP 2532, LOCA A,L,N,S 2
0061 A3.03 ESF AS-operated valves (RO 4.1)
S-3 PZR Pressure Control I Force Pressurizer Sprays A,M,S 3
010/Al.07 RCS Pressure (RO 3.7)
S-4 Auxiliary Feedwater I Operate TDAFP IA W EOP 2541, App 6 A,L,N,S 4(S) 061/A2.04 Pump failure or improper operation (RO 3.4)
S-5 CTMT Spray I Restore from inadvertent CTMT Spray actuation EN,N,S 5
026/A4.05 Containment spray reset switches (RO 3.5)
S-6 Emergency Diesel Generators I Unload and secure a EDG A,D,S 6
064/A4.06 Manual start, loading, and stopping of the ED/G (RO 3.9)
S-7 RPS I Respond to SIG Level Safety Channel Failure Low~~
012/A4.03 Channel blocks and bypasses (RO 3.6)
!Vif""' 5pc:,~e.-¥ N,S 7
S-8 Circulating Water I Respond to the loss of a 2°d CW pump A,N,S 8
075/A2.02 Loss of circulating water pumps (RO 2.5)
Mitigating a Reactor Regulating System "".,
J T T
S-9 016/A4,01 NNI channel select controls (RO 2.9*)
N, s 7
In-Plant Systems. (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
P-1 AC Electrical (Instrument Power) I Transfer PPC Power Supply D
6 062/A4.0l All breakers (including available switchyard) (RO 3.3)
Service Water I On a loss of22E, swap the "B" SW Pump Strainer P-2 power supply to 22F to restore Facility 1 SW to operation E,M 4(S) 076/A2.0l Loss ofSWS (RO 3.5)
Waste Gas Disposal I Shift In-Service Waste Gas Decay Tank P-3 071/ A4.05 Gas decay tanks, including valves, indicators, and sample D,R 9
line (RO 2.6)
Local Manual Operation of a FRV [Spare}
P-4 035/A4.0l Shift of SIG controls between manual and automatic control, D,E 4(P) by bumpless transfer (RO 3. 7)
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO I SRO-I / SRO-U A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank
- S9/:58/:54 (E)mergency or abnormal in-plant
- ?:1/<:1/<:1 (EN)gineered safety feature
- ?:1 I <:1 I<: 1 (control room system)
(L)ow-Power I Shutdown
- ?:1/<:1/<:1 (N)ew or (M)odified from bank including 1 (A)
- ?:2/<:2/<:1 (P)revious 2 exams
- S 3 I ::; 3 I::; 2 (randomly selected)
(R)CA
- ?:1/<:1/<:1 (S)imulator