| number = ML18095A733
| number = ML18095A733
| issue date = 02/01/1991
| issue date = 02/01/1991
| title = Proposed Tech Spec 4.7.1.5 & Table 2.2-5 Allowing Continued Use of 8 MSIV Stroke Time During 10th Fuel Cycle
| title = Proposed Tech Spec 4.7.1.5 & Table 2.2-5 Allowing Continued Use of 8 MSIV Stroke Time During 10th Fuel Cycle
| author name =  
| author name =  
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:' .
{{#Wiki_filter:'.
INITIATING SIGNAL AND FUNCTION TABLE 3.3-5 (Continued~
0 TABLE 3.3-5 (Continued~
ENGINEERED SAFETY FEATURES RESPONSE TIMES RESPONSE TIME IN SECONDS
ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS
: 3. Pressurizer Pressure-I.ow
: 3.
: a. Safety Injection (ECCS)                       s  21.0< 1 >;12.0< 2 >
Pressurizer Pressure-I.ow
: b. Reactor Trip (from SI)                       s  2.0
: 4.
: c. Feedwater Isolation                           s  7.0
: a.
: d. Containment Isolation - Phase "A"             s  18.0< 2 >
Safety Injection (ECCS)
: e. Containment Ventilation Isolation             Not Applicable
: b.
: f. Auxiliary Feedwater Pumps                     < 60
Reactor Trip (from SI)
: g. Service Water System                         ~ 49.0< 1 >;13.'0&deg;< 2 >
: c.
: 4. Differential Pressure Betwee.n Steam Lines-High
Feedwater Isolation
: a. Safety Inj action (ECCS')                    s ~2.0< 2 >;22.0< 3 >
: d.
: b. Reactor Trip (from SI)                        s 2.0
Containment Isolation - Phase "A"
: c. Feedwater Isolation                          s 7 .0
: e.
: d. Containment Isolation - Phase  ~A"          s ~17 .-0 ( 2.> /2 7.0 ( 3 )
: f.
: e. Containment Ventilation Isolation            Not Applicable
: g.
: f.  *Auxiliary Feedwater Pumps                    s 60
Containment Ventilation Isolation Auxiliary Feedwater Pumps Service Water System Differential Pressure Betwee.n Steam Lines-High
: g. Service Water System                          s 13.0< 2 >/48.0< 3 >
: a.
: 5. Steam Flow in Two Steam Lines - High Coincident with Tavg -- Low-Low
: b.
: a. Safety InJection (ECCS)                      s 15.75< 2 >;25,75< 3 >
: c.
: b. Reactor Trip (from SI)                        s 5.75
: d.
: c. Feedwater Isolation                          s 10.75
Safety Inj action (ECCS')
: d. Containment Isolation - Phase "A"            s 20.15< 2 >;30.15< 3 >
Reactor Trip (from SI)
: e. Containment Ventilation Isolation            Not. Applicable
Feedwater Isolation Containment Isolation - Phase ~A"
: f. Auxiliary Feedwater Pumps                      s 61.75         .
: e.
: g. Service Water System                          s 15.75< >;50.15< 3 >
Containment Ventilation Isolation
2
: f.  
: h. St.eam Line Isolation                        s 10.75 *
*Auxiliary Feedwater Pumps
* Sl3.75 until restart following   t~ta refueling outage.
: g.
0 SALEM - UNIT 1                   3/4 3-28           Amendment No. 112
Service Water System
: 5.
Steam Flow in Two Steam Lines - High Coincident with Tavg -- Low-Low
: a.
: b.
: c.
: d.
: e.
: f.
: g.
: h.
Safety InJection (ECCS)
Reactor Trip (from SI)
Feedwater Isolation Containment Isolation - Phase "A" Containment Ventilation Isolation Auxiliary Feedwater Pumps Service Water System St.eam Line Isolation s 21.0<1>;12.0< 2>
s 2.0 s 7.0 s 18.0<2>
Not Applicable
< 60
~ 49.0<1> ;13.'0&deg;< 2>
s ~2.0<
2 >;22.0<
3 >
s 2.0 s 7.0 s ~17.-0 ( 2.> /2 7. 0 ( 3)
Not Applicable s 60 s 13.0<2>/48.0< 3>
s 15.75<2>;25,75< 3>
s 5.75 s 10.75 s 20.15< 2>;30.15< 3>
Not. Applicable s 61.75 s 15.75<2>;50.15< 3>
s 10.75 Sl3.75 until restart following t~ta refueling outage.
SALEM - UNIT 1 3/4 3-28 Amendment No. 112  


"t
"t TABLE 3.3-5 (Continue~
* TABLE 3.3-5 (Continue~
ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS
ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATING SIGNAL AND FUNCTION                           RESPONSE TIME IN SECONDS
: 6.
: 6. Steam Flow in Two Steam Lines-High Coincident with Steam Line Pressure - Low
Steam Flow in Two Steam Lines-High Coincident with Steam Line Pressure - Low
: a.     Safety Injection (ECCS)                          s 12.0< 2 );22.0< 3 )
: a.
: b.      Reactor Trip (from SI)                           s 2.0
: b.
: c.      Feedwater Isolation                             s 7.0
: c.
: d.      Containment Isolation-Phase "A"                 s 17.0< 2 );21.0< 3 )
: d.
: e.      Containment Ventilation Isolation               Not Applicable
: e.
: f. 0 Auxiliary Feedwater Pumps                       s 60 .*
Safety Injection (ECCS)
: g.       Service ~at~r System                           s 14.~~ 2 )/48.0( 3 )
Reactor Trip (from SI)
: h. * *. Steam Line IsOlatfon                             s 8.0*
Feedwater Isolation Containment Isolation-Phase "A" Containment Ventilation Isolation
: 7. Containment     Pressur~--High-High
: f.
: a.       Containment Spray                               s ~5.0 b.*     Containment Isolation-Phase "B".                 Not Applicable
0 Auxiliary Feedwater Pumps
: c.       Steam Line Isolation                             s 7.0 *
: g.
: d.     *C9ntainment Fan Cooler                           s 40.0.
Service ~at~r System
: 8. Steam Generator Water Level--High-High
: h. * *. Steam Line IsOlatfon
: a.       Turbine Trip                                    s 2.5
: 7.
: b.       Feedwater Isolation                             s 11.0*
Containment Pressur~--High-High
: 9. Steam Generator Water Level--Low-Low
: a.
: a.       Motor-Driven Auxiliary_ *:Feed~ater Pumps(4)                                         s 60.0
Containment Spray b.*
: b.       Turbine-Driven Auxiliary Feedwater Pumps(5)                                         s 60.0 lte&#xa3;+h I SlO.O seconds until restart following the       ~*refueling       outage.
Containment Isolation-Phase "B".
SALEM - UNIT 1                       3/4 3-29             Amendment No. 112
: c.
Steam Line Isolation
: d.  
*C9ntainment Fan Cooler
: 8.
Steam Generator Water Level--High-High
: a.
: b.
Turbine Trip Feedwater Isolation
: 9.
Steam Generator Water Level--Low-Low
: a.
Motor-Driven Auxiliary_ *:Feed~ater Pumps(4)
: b.
Turbine-Driven Auxiliary Feedwater Pumps(5) s 12.0<2);22.0< 3) s 2.0 s 7.0 s 17.0<2);21.0<3)
Not Applicable s 60.*
s 14.~~ 2 )/48.0( 3 )
s 8.0 s ~5.0 Not Applicable s 7.0 s 40.0.
s 2.5 s 11.0*
s 60.0 s 60.0 lte&#xa3;+h I SlO.O seconds until restart following the ~*refueling outage.
SALEM - UNIT 1 3/4 3-29 Amendment No. 112  


PLANT SYSTEMS MAIN STEAM LINE ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.7.1.S Each main steam line isolation valve shall be OPERABLE.
0 PLANT SYSTEMS
* MAIN STEAM LINE ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.7.1.S Each main steam line isolation valve shall be OPERABLE.
APPLICABILITY: MODES 1, 2 and 3.
APPLICABILITY: MODES 1, 2 and 3.
ACTION; MODES 1 - With one main steam line isolation valve inoperable, POWER OPERATION may continue provided the inoperable valve is either restored to OPERABLE status or closed within 4 hours; otherwise, be in HOT SHUTDOWN within the next 12 hours ..
ACTION; MODES 1 - With one main steam line isolation valve inoperable, POWER OPERATION may continue provided the inoperable valve is either restored to OPERABLE status or closed within 4 hours; otherwise, be in HOT SHUTDOWN within the next 12 hours..
MODES 2 - With one main steam line isolation ~alve inoperable, and 3     sub~equent operation in MODES 1, 2 or 3 may proceeA:provided;
MODES 2 - With one main steam line isolation ~alve inoperable, and 3 sub~equent operation in MODES 1, 2 or 3 may proceeA:provided;  
            . a. The isolation valve h maintained closed.
. a.
: b. The. provisions of Specification 3.0.4 ar~n6t applicable.
The isolation valve h maintained closed.
: b.
The. provisions of Specification 3.0.4 ar~n6t applicable.
Otherwise, be in HOT SHUTDOWN within. the next 12 hours.
Otherwise, be in HOT SHUTDOWN within. the next 12 hours.
SURVEILLANCE REQUIREMENTS 4.7.l\S   Each main steam line isolation v1lve shall be demonstrated OPERABLE by verifying full closure within 5 seconds when tested pursuant to o Specification 4.0.5.
SURVEILLANCE REQUIREMENTS 4.7.l\\S Each main steam line isolation v1lve shall be demonstrated OPERABLE by verifying full closure within 5 seconds when tested pursuant to o Specification 4.0.5.
      **      8 seconds until restart following t!e!a!s~ refueling outage.
8 seconds until restart following t!e!a!s~ refueling outage.
0 SALEM - UNIT 1                 3/4 7-10             Amendment No. 112}}
SALEM - UNIT 1 3/4 7-10 Amendment No. 112}}

Latest revision as of 02:57, 6 January 2025

Proposed Tech Spec 4.7.1.5 & Table 2.2-5 Allowing Continued Use of 8 MSIV Stroke Time During 10th Fuel Cycle
ML18095A733
Person / Time
Site: Salem PSEG icon.png
Issue date: 02/01/1991
From:
Public Service Enterprise Group
To:
Shared Package
ML18095A732 List:
References
NUDOCS 9102080144
Download: ML18095A733 (3)


Text

'.

0 TABLE 3.3-5 (Continued~

ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS

3.

Pressurizer Pressure-I.ow

4.
a.

Safety Injection (ECCS)

b.

Reactor Trip (from SI)

c.

Feedwater Isolation

d.

Containment Isolation - Phase "A"

e.
f.
g.

Containment Ventilation Isolation Auxiliary Feedwater Pumps Service Water System Differential Pressure Betwee.n Steam Lines-High

a.
b.
c.
d.

Safety Inj action (ECCS')

Reactor Trip (from SI)

Feedwater Isolation Containment Isolation - Phase ~A"

e.

Containment Ventilation Isolation

f.
g.

Service Water System

5.

Steam Flow in Two Steam Lines - High Coincident with Tavg -- Low-Low

a.
b.
c.
d.
e.
f.
g.
h.

Safety InJection (ECCS)

Reactor Trip (from SI)

Feedwater Isolation Containment Isolation - Phase "A" Containment Ventilation Isolation Auxiliary Feedwater Pumps Service Water System St.eam Line Isolation s 21.0<1>;12.0< 2>

s 2.0 s 7.0 s 18.0<2>

Not Applicable

< 60

~ 49.0<1> ;13.'0°< 2>

s ~2.0<

2 >;22.0<

3 >

s 2.0 s 7.0 s ~17.-0 ( 2.> /2 7. 0 ( 3)

Not Applicable s 60 s 13.0<2>/48.0< 3>

s 15.75<2>;25,75< 3>

s 5.75 s 10.75 s 20.15< 2>;30.15< 3>

Not. Applicable s 61.75 s 15.75<2>;50.15< 3>

s 10.75 Sl3.75 until restart following t~ta refueling outage.

SALEM - UNIT 1 3/4 3-28 Amendment No. 112

"t TABLE 3.3-5 (Continue~

ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS

6.

Steam Flow in Two Steam Lines-High Coincident with Steam Line Pressure - Low

a.
b.
c.
d.
e.

Safety Injection (ECCS)

Reactor Trip (from SI)

Feedwater Isolation Containment Isolation-Phase "A" Containment Ventilation Isolation

f.

0 Auxiliary Feedwater Pumps

g.

Service ~at~r System

h. * *. Steam Line IsOlatfon
7.

Containment Pressur~--High-High

a.

Containment Spray b.*

Containment Isolation-Phase "B".

c.

Steam Line Isolation

d.
  • C9ntainment Fan Cooler
8.

Steam Generator Water Level--High-High

a.
b.

Turbine Trip Feedwater Isolation

9.

Steam Generator Water Level--Low-Low

a.

Motor-Driven Auxiliary_ *:Feed~ater Pumps(4)

b.

Turbine-Driven Auxiliary Feedwater Pumps(5) s 12.0<2);22.0< 3) s 2.0 s 7.0 s 17.0<2);21.0<3)

Not Applicable s 60.*

s 14.~~ 2 )/48.0( 3 )

s 8.0 s ~5.0 Not Applicable s 7.0 s 40.0.

s 2.5 s 11.0*

s 60.0 s 60.0 lte£+h I SlO.O seconds until restart following the ~*refueling outage.

SALEM - UNIT 1 3/4 3-29 Amendment No. 112

0 PLANT SYSTEMS

APPLICABILITY: MODES 1, 2 and 3.

ACTION; MODES 1 - With one main steam line isolation valve inoperable, POWER OPERATION may continue provided the inoperable valve is either restored to OPERABLE status or closed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; otherwise, be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />..

MODES 2 - With one main steam line isolation ~alve inoperable, and 3 sub~equent operation in MODES 1, 2 or 3 may proceeA:provided;

. a.

The isolation valve h maintained closed.

b.

The. provisions of Specification 3.0.4 ar~n6t applicable.

Otherwise, be in HOT SHUTDOWN within. the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.l\\S Each main steam line isolation v1lve shall be demonstrated OPERABLE by verifying full closure within 5 seconds when tested pursuant to o Specification 4.0.5.

8 seconds until restart following t!e!a!s~ refueling outage.

SALEM - UNIT 1 3/4 7-10 Amendment No. 112