ML19209D103: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:. _ . . - . _ _     . . _ . _ _ _ . _ . _ _ - . _ . _ _ _ . . . . _ _ _ .      ._    ..        ..    .
{{#Wiki_filter:. _.. -. _ _
i, USNRC REO'O-
i, USNRC REO'O-Georga Power Corroany
                                                                          - T' A NTA. 'r Georga Power Corroany Post Office Box 4545 Atlanta, Georps 303o2 L
- T' A NTA. 'r Post Office Box 4545 L
Telephone 404 522-606o 79 0       9 A10     37 Vogtle Project Southem Company Sennces, Inc.
Atlanta, Georps 303o2 79 0 9
Post Office Box 2625 Birmngham, Alabama 35202 Telephone 205 870-6on October 8, 1979 United States Nuclear Regulatory Commission                                          
A10 37 Vogtle Project Telephone 404 522-606o Southem Company Sennces, Inc.
Post Office Box 2625 Birmngham, Alabama 35202 Telephone 205 870-6on October 8, 1979 United States Nuclear Regulatory Commission


==REFERENCE:==
==REFERENCE:==
 
Office of Inspection and Enforcement 50-424 Region II - Suite 3100 50-425 101 Marietta Street, N.W.
Office of Inspection and Enforcement                                                   50-424 Region II - Suite 3100                                                                 50-425 101 Marietta Street, N.W.                                                             File: X7BG03 Atlanta, GA 30303                                                     .              Log:   GM-509 Attn: Mr. James P. O'Reilly Gentlemen:
File: X7BG03 Atlanta, GA 30303 Log:
In the letter dated July 31, 1979 on the embed assemblies for the Vogtle Nuclear Plant - Units 1 & 2, Georgia Power Company indicated an interim report would be submitted by October 1, 1979. Since our last report a sample of bolts in the embeds have been subjected to pull tests. No sample bolt failed the pull test. Based upon analysis of the test data, and by calculations accordir.g to ASTM E-122-72 " Standard Recommended Practice for Claim of Sample Size to Estimate the Average Quality of a Lot or Process," a high confidence level can be exhibited for the remaining bolts in the embeds.
GM-509 Attn: Mr. James P. O'Reilly Gentlemen:
In the {{letter dated|date=July 31, 1979|text=letter dated July 31, 1979}} on the embed assemblies for the Vogtle Nuclear Plant - Units 1 & 2, Georgia Power Company indicated an interim report would be submitted by October 1, 1979. Since our last report a sample of bolts in the embeds have been subjected to pull tests. No sample bolt failed the pull test. Based upon analysis of the test data, and by calculations accordir.g to ASTM E-122-72 " Standard Recommended Practice for Claim of Sample Size to Estimate the Average Quality of a Lot or Process," a high confidence level can be exhibited for the remaining bolts in the embeds.
The above test data will allow the completion of the potential signi-ficant deficiency analysis. Georgia Power Company will submit a final report on this subject to the NRC no later than November 15, 1979.
The above test data will allow the completion of the potential signi-ficant deficiency analysis. Georgia Power Company will submit a final report on this subject to the NRC no later than November 15, 1979.
Very truly aurs,   1 Q                     -
Very truly aurs, 1
DougDutto(n Project General Manager 3
Q DougDutto(n Project General Manager 3
CWH:tp xc:         U. S. Nuclear Regulatory Commission Attn: John G. Davis, Acting Director Office of Inspection and Enforcement Washington, DC 20555 M. D. Hunt, NRC Region II                                                                 e 1173 298         b gp 7 910190 YO 7 A i:-
CWH:tp xc:
U. S. Nuclear Regulatory Commission Attn: John G. Davis, Acting Director Office of Inspection and Enforcement Washington, DC 20555 M. D. Hunt, NRC Region II e
1173 298 b gp 7 910190 YO 7 A
i:-


      .~
.~
United States Nuclear Regulatory Commission GM-509 October 8, 1979 Page 2 xc: J. H. Miller, Jr.
United States Nuclear Regulatory Commission GM-509 October 8, 1979 Page 2 xc:
J. H. Miller, Jr.
F. G. Mitchell, Jr.
F. G. Mitchell, Jr.
R. J. Kelly C. F. Whitmer R. E. Conway D. E. Dutton J. T. Beckham, Jr.
R. J. Kelly C. F. Whitmer R. E. Conway D. E. Dutton J. T. Beckham, Jr.
R. W. Staffa K. fl. Gillespie L. T. Gucwa C. R. Miles, Jr.
R. W. Staffa K. fl. Gillespie L. T. Gucwa C. R. Miles, Jr.
E. D. Groover D. L. McCrary                       *
E. D. Groover D. L. McCrary R. A. Thomas
* R. A. Thomas
: 0. Batum J. A. Bailey H. Z. Jeric B. L. Lex
: 0. Batum J. A. Bailey H. Z. Jeric B. L. Lex
      ~,
~,
s
s
                                                              .P 1173 299
.P 1173 299
                                                        .}}
.}}

Latest revision as of 22:27, 4 January 2025

Interim Deficiency Rept Re Embed Assemblies.No Sample Bolts Failed Pull Test.Final Rept Will Be Submitted by 791115
ML19209D103
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/08/1979
From: Dutton D
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
X7BGO3, NUDOCS 7910190407
Download: ML19209D103 (2)


Text

. _.. -. _ _

i, USNRC REO'O-Georga Power Corroany

- T' A NTA. 'r Post Office Box 4545 L

Atlanta, Georps 303o2 79 0 9

A10 37 Vogtle Project Telephone 404 522-606o Southem Company Sennces, Inc.

Post Office Box 2625 Birmngham, Alabama 35202 Telephone 205 870-6on October 8, 1979 United States Nuclear Regulatory Commission

REFERENCE:

Office of Inspection and Enforcement 50-424 Region II - Suite 3100 50-425 101 Marietta Street, N.W.

File: X7BG03 Atlanta, GA 30303 Log:

GM-509 Attn: Mr. James P. O'Reilly Gentlemen:

In the letter dated July 31, 1979 on the embed assemblies for the Vogtle Nuclear Plant - Units 1 & 2, Georgia Power Company indicated an interim report would be submitted by October 1, 1979. Since our last report a sample of bolts in the embeds have been subjected to pull tests. No sample bolt failed the pull test. Based upon analysis of the test data, and by calculations accordir.g to ASTM E-122-72 " Standard Recommended Practice for Claim of Sample Size to Estimate the Average Quality of a Lot or Process," a high confidence level can be exhibited for the remaining bolts in the embeds.

The above test data will allow the completion of the potential signi-ficant deficiency analysis. Georgia Power Company will submit a final report on this subject to the NRC no later than November 15, 1979.

Very truly aurs, 1

Q DougDutto(n Project General Manager 3

CWH:tp xc:

U. S. Nuclear Regulatory Commission Attn: John G. Davis, Acting Director Office of Inspection and Enforcement Washington, DC 20555 M. D. Hunt, NRC Region II e

1173 298 b gp 7 910190 YO 7 A

i:-

.~

United States Nuclear Regulatory Commission GM-509 October 8, 1979 Page 2 xc:

J. H. Miller, Jr.

F. G. Mitchell, Jr.

R. J. Kelly C. F. Whitmer R. E. Conway D. E. Dutton J. T. Beckham, Jr.

R. W. Staffa K. fl. Gillespie L. T. Gucwa C. R. Miles, Jr.

E. D. Groover D. L. McCrary R. A. Thomas

0. Batum J. A. Bailey H. Z. Jeric B. L. Lex

~,