{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGI ON I V 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005 June 2, 2011 Mr. Randall K. Edington, Executive Vice President, Nuclear and Chief Nuclear Officer Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034
{{#Wiki_filter:June 2, 2011 Mr. Randall K. Edington, Executive Vice President, Nuclear and Chief Nuclear Officer Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034  


==SUBJECT:==
==SUBJECT:==
Line 21: Line 21:


==SUMMARY==
==SUMMARY==
FOR PUBLIC MEETING WITH ARIZONA PUBLIC SERVICE
FOR PUBLIC MEETING WITH ARIZONA PUBLIC SERVICE  


==Dear Mr. Edington:==
==Dear Mr. Edington:==
On May 11, 2011, representatives of Arizona Public Service and NRC personnel met at the Palo Verde Energy Education Center in Buckeye, AZ. This open house meeting was held to allow members of the public an opportunity to discuss the performance results for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 for the period of January 1 through December 31, 2010, as well as ask NRC personnel general questions about our regulatory process or other issues of concern. The meeting attendance list is enclosed.
On May 11, 2011, representatives of Arizona Public Service and NRC personnel met at the Palo Verde Energy Education Center in Buckeye, AZ. This open house meeting was held to allow members of the public an opportunity to discuss the performance results for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 for the period of January 1 through December 31, 2010, as well as ask NRC personnel general questions about our regulatory process or other issues of concern. The meeting attendance list is enclosed.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at www.nrc.gov/reading-rm/adams.html.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at www.nrc.gov/reading-rm/adams.html.
Sincerely,
Sincerely,  
                                              /RA/
/RA/
Ryan E. Lantz, Chief Project Branch D Division of Reactor Projects Docket Nos. 50-528, 50-529, 50-530 License Nos. NPF-41, NPF-51, NPF-74
Ryan E. Lantz, Chief Project Branch D Division of Reactor Projects Docket Nos. 50-528, 50-529, 50-530 License Nos. NPF-41, NPF-51, NPF-74  


==Enclosure:==
==Enclosure:==
: 1. Meeting Attendance List
: 1. Meeting Attendance List UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005


Southern California Edison   cc: Distribution via ListServ
Southern California Edison cc: Distribution via ListServ  


Southern California Edison                           Electronic distribution by RIV:
Southern California Edison Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
Line 56: Line 55:
Regional Counsel (Karla.Fuller@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource R:\_REACTORS\EOC 2010\PV EOC2010 MS05112011.docx ADAMS: No           Yes       SUNSI Review Complete       Reviewer Initials:
OEMail Resource R:\\_REACTORS\\EOC 2010\\PV EOC2010 MS05112011.docx ADAMS: No Yes SUNSI Review Complete Reviewer Initials:
Publicly Available           Non-Sensitive Non-publicly Available       Sensitive RIV/SPE:DRP/D           C:DRP/D DALLEN                 RLANTZ
Publicly Available Non-Sensitive Non-publicly Available Sensitive RIV/SPE:DRP/D C:DRP/D DALLEN RLANTZ  
/RA/R.Lantz for         /RA/
/RA/R.Lantz for  
6/2/11                 6/2/11 OFFICIAL RECORD COPY                                   T=Telephone     E=E-mail     F=Fax}}
/RA/
6/2/11 6/2/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax}}

Latest revision as of 05:58, 13 January 2025

Meeting Summary for Public Meeting with Arizona Public Service to Discuss the Performance Results for Palo Verde, Units 1, 2 and 3 for the Period of January 1 Through December 31, 2010
ML111570491
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/02/2011
From: Ryan Lantz
NRC/RGN-IV/DRP/RPB-D
To: Edington R
Arizona Public Service Co
References
Download: ML111570491 (6)


Text

June 2, 2011 Mr. Randall K. Edington, Executive Vice President, Nuclear and Chief Nuclear Officer Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034

SUBJECT:

MEETING

SUMMARY

FOR PUBLIC MEETING WITH ARIZONA PUBLIC SERVICE

Dear Mr. Edington:

On May 11, 2011, representatives of Arizona Public Service and NRC personnel met at the Palo Verde Energy Education Center in Buckeye, AZ. This open house meeting was held to allow members of the public an opportunity to discuss the performance results for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 for the period of January 1 through December 31, 2010, as well as ask NRC personnel general questions about our regulatory process or other issues of concern. The meeting attendance list is enclosed.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Ryan E. Lantz, Chief Project Branch D Division of Reactor Projects Docket Nos. 50-528, 50-529, 50-530 License Nos. NPF-41, NPF-51, NPF-74

Enclosure:

1. Meeting Attendance List UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005

Southern California Edison cc: Distribution via ListServ

Southern California Edison Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

Senior Resident Inspector (Tony.Brown@nrc.gov)

Resident Inspector (Joseph.Bashore@nrc.gov)

Resident Inspector (Mica.Baquera@nrc.gov)

Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)

Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)

SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov)

Project Engineer, DRP/D (Zachary.Hollcraft@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Lauren.Gibson@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource R:\\_REACTORS\\EOC 2010\\PV EOC2010 MS05112011.docx ADAMS: No Yes SUNSI Review Complete Reviewer Initials:

Publicly Available Non-Sensitive Non-publicly Available Sensitive RIV/SPE:DRP/D C:DRP/D DALLEN RLANTZ

/RA/R.Lantz for

/RA/

6/2/11 6/2/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax