{{#Wiki_filter:Page 1 of 2      Surry 03/02/2006 10:39:55    Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit        No. of Staff Planned Dates Inspection Number Inspection Activity    Title  on Site Start End Type EB3-ISI - U1 INSERVICE INSPECTION      1 1 IP 7111108P Inservice Inspection Activities - PWR    05/01/2006 05/05/2006 Baseline Inspections EB3SGISI - U1 STEAM GENERATOR ISI      1 1 IP 7111108P Inservice Inspection Activities - PWR    05/08/2006 05/12/2006 Baseline Inspections EB3-HS - HEAT SINK      2 1, 2 IP 7111107B Heat Sink Performance      05/22/2006 05/26/2006 Baseline Inspections EB2-TFP - TRIENNIAL FP PRE-INSPECTION VISIT    4 1, 2 IP 7111105T Fire Protection [Triennial]    05/16/2006 05/18/2006 Baseline Inspections ISFSI-PT - 60854 - PREOP TESTING OF AN ISFSI    2 1, 2 IP 60854  Preoperational Testing Of An ISFSI    06/05/2006 06/09/2006 Other Routine EB2-TFP - TRIENNIAL FIRE PROTECTION INSPECTION    4 1, 2 IP 7111105T Fire Protection [Triennial]    06/12/2006 06/16/2006 Baseline Inspections EB2-TFP - TRIENNIAL FIRE PROTECTION INSPECTION    4 1, 2 IP 7111105T Fire Protection [Triennial]    06/26/2006 06/30/2006 Baseline Inspections PSB1-RP - RP PUBLIC PREINSPECTION VISIT/ ISFSI    1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas    07/10/2006 07/12/2006 Baseline Inspections PSB1-RP - RP PUBLIC BASELINE      4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas    07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment  07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems  07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 71151  Performance Indicator Verification    07/31/2006 08/04/2006 Baseline Inspections EB3-MR - MR EFFECTIVENESS      2 1, 2 IP 7111112B Maintenance Effectiveness      08/28/2006 09/01/2006 Baseline Inspections PS2-EP - EP INSP      1 1, 2 IP 7111402 Alert and Notification System Testing    10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing    10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes    10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies  10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 71151  Performance Indicator Verification    10/23/2006 10/27/2006 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION      1 2 IP 7111108P Inservice Inspection Activities - PWR    10/30/2006 11/03/2006 Baseline Inspections EB3SGISI - U2 STEAM GENERATOR ISI      1 2 IP 7111108P Inservice Inspection Activities - PWR    11/06/2006 11/10/2006 Baseline Inspections This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Enclosure
{{#Wiki_filter:Surry Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2006 10:39:55 Report 22


Page 2 of 2     Surry 03/02/2006 10:39:55    Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit        No. of Staff Planned Dates Inspection Number Inspection Activity    Title  on Site Start End Type EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)   1 2 IP 71111  Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 11/12/2006 11/17/2006 Baseline Inspections OL RQ - REQUAL INSPECTION     2 1, 2 IP 7111111B Licensed Operator Requalification Program    03/05/2007 03/09/2007 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59     3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments   06/11/2007 06/15/2007 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications   06/11/2007 06/15/2007 Baseline Inspections PS2-EP - EP EXERCISE      3 1, 2 IP 7111401 Exercise Evaluation     07/09/2007 07/13/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes   07/09/2007 07/13/2007 Baseline Inspections 1, 2 IP 71151  Performance Indicator Verification   07/09/2007 07/13/2007 Baseline Inspections PI&R - PROBLEM IDENTIFICATION & RESOLUTION   4 1, 2 IP 71152B  Identification and Resolution of Problems    09/24/2007 09/28/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT/ISFSI   1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas   09/24/2007 09/26/2007 Baseline Inspections This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.
EB3-ISI
- U1 INSERVICE INSPECTION Baseline Inspections 05/01/2006 05/05/2006
 
7111108P IP Inservice Inspection Activities - PWR
 
EB3SGISI
- U1 STEAM GENERATOR ISI Baseline Inspections 05/08/2006 05/12/2006
 
7111108P IP Inservice Inspection Activities - PWR
 
EB3-HS
- HEAT SINK Baseline Inspections 05/22/2006 05/26/2006 1, 2 7111107B IP Heat Sink Performance
 
EB2-TFP
- TRIENNIAL FP PRE-INSPECTION VISIT Baseline Inspections 05/16/2006 05/18/2006 1, 2 7111105T IP Fire Protection [Triennial]
 
ISFSI-PT
- 60854 - PREOP TESTING OF AN ISFSI Other Routine 06/05/2006 06/09/2006 1, 2 60854 IP Preoperational Testing Of An ISFSI
 
EB2-TFP
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 06/12/2006 06/16/2006 1, 2 7111105T IP Fire Protection [Triennial]
 
EB2-TFP
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 06/26/2006 06/30/2006 1, 2 7111105T IP Fire Protection [Triennial]
 
PSB1-RP
- RP PUBLIC PREINSPECTION VISIT/ ISFSI Baseline Inspections 07/10/2006 07/12/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas
 
PSB1-RP
- RP PUBLIC BASELINE Baseline Inspections 07/31/2006 08/04/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/31/2006 08/04/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 07/31/2006 08/04/2006 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 07/31/2006 08/04/2006 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 07/31/2006 08/04/2006 1, 2 71151 IP Performance Indicator Verification
 
EB3-MR
- MR EFFECTIVENESS Baseline Inspections 08/28/2006 09/01/2006 1, 2 7111112B IP Maintenance Effectiveness
 
PS2-EP
- EP INSP Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 10/23/2006 10/27/2006 1, 2 71151 IP Performance Indicator Verification
 
EB3-ISI
- U2 INSERVICE INSPECTION Baseline Inspections 10/30/2006 11/03/2006
 
7111108P IP Inservice Inspection Activities - PWR
 
EB3SGISI
- U2 STEAM GENERATOR ISI Baseline Inspections 11/06/2006 11/10/2006
 
7111108P IP Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.
 
Enclosure
 
Surry Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2006 10:39:55 Report 22
 
EB1-SUMP
- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)
Baseline Inspections 11/12/2006 11/17/2006
 
71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity
 
OL RQ
- REQUAL INSPECTION Baseline Inspections 03/05/2007 03/09/2007 1, 2 7111111B IP Licensed Operator Requalification Program
 
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections 06/11/2007 06/15/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 06/11/2007 06/15/2007 1, 2 7111117B IP Permanent Plant Modifications
 
PS2-EP
- EP EXERCISE Baseline Inspections 07/09/2007 07/13/2007 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 07/09/2007 07/13/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 07/09/2007 07/13/2007 1, 2 71151 IP Performance Indicator Verification
 
PI&R
- PROBLEM IDENTIFICATION & RESOLUTION Baseline Inspections 09/24/2007 09/28/2007 1, 2 71152B IP Identification and Resolution of Problems
 
PSB1-RP
- RP OCCUPATIONAL PRE-INSP VISIT/ISFSI Baseline Inspections 09/24/2007 09/26/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 11:13, 15 January 2025

Inspection/Activity Plan - Surry Power Station (NRC Inspection Reports 05000280/2006001 & 05000281/2006001
ML060610422
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/02/2006
From:
Division Reactor Projects II
To:
Shared Package
ML060610416 List:
References
IR-06-001
Download: ML060610422 (2)


Text

Surry Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2006 10:39:55 Report 22

EB3-ISI

- U1 INSERVICE INSPECTION Baseline Inspections 05/01/2006 05/05/2006

7111108P IP Inservice Inspection Activities - PWR

EB3SGISI

- U1 STEAM GENERATOR ISI Baseline Inspections 05/08/2006 05/12/2006

7111108P IP Inservice Inspection Activities - PWR

EB3-HS

- HEAT SINK Baseline Inspections 05/22/2006 05/26/2006 1, 2 7111107B IP Heat Sink Performance

EB2-TFP

- TRIENNIAL FP PRE-INSPECTION VISIT Baseline Inspections 05/16/2006 05/18/2006 1, 2 7111105T IP Fire Protection [Triennial]

ISFSI-PT

- 60854 - PREOP TESTING OF AN ISFSI Other Routine 06/05/2006 06/09/2006 1, 2 60854 IP Preoperational Testing Of An ISFSI

EB2-TFP

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 06/12/2006 06/16/2006 1, 2 7111105T IP Fire Protection [Triennial]

EB2-TFP

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 06/26/2006 06/30/2006 1, 2 7111105T IP Fire Protection [Triennial]

PSB1-RP

- RP PUBLIC PREINSPECTION VISIT/ ISFSI Baseline Inspections 07/10/2006 07/12/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas

PSB1-RP

- RP PUBLIC BASELINE Baseline Inspections 07/31/2006 08/04/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/31/2006 08/04/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 07/31/2006 08/04/2006 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 07/31/2006 08/04/2006 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 07/31/2006 08/04/2006 1, 2 71151 IP Performance Indicator Verification

EB3-MR

- MR EFFECTIVENESS Baseline Inspections 08/28/2006 09/01/2006 1, 2 7111112B IP Maintenance Effectiveness

PS2-EP

- EP INSP Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 10/23/2006 10/27/2006 1, 2 71151 IP Performance Indicator Verification

EB3-ISI

- U2 INSERVICE INSPECTION Baseline Inspections 10/30/2006 11/03/2006

7111108P IP Inservice Inspection Activities - PWR

EB3SGISI

- U2 STEAM GENERATOR ISI Baseline Inspections 11/06/2006 11/10/2006

7111108P IP Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.

Enclosure

Surry Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2006 10:39:55 Report 22

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)

Baseline Inspections 11/12/2006 11/17/2006

71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity

OL RQ

- REQUAL INSPECTION Baseline Inspections 03/05/2007 03/09/2007 1, 2 7111111B IP Licensed Operator Requalification Program

EB1-MODS

- MODIFICATIONS-10CFR50.59 Baseline Inspections 06/11/2007 06/15/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 06/11/2007 06/15/2007 1, 2 7111117B IP Permanent Plant Modifications

PS2-EP

- EP EXERCISE Baseline Inspections 07/09/2007 07/13/2007 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 07/09/2007 07/13/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 07/09/2007 07/13/2007 1, 2 71151 IP Performance Indicator Verification

PI&R

- PROBLEM IDENTIFICATION & RESOLUTION Baseline Inspections 09/24/2007 09/28/2007 1, 2 71152B IP Identification and Resolution of Problems

PSB1-RP

- RP OCCUPATIONAL PRE-INSP VISIT/ISFSI Baseline Inspections 09/24/2007 09/26/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.