{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406 December 13, 2007 Mr. Theodore A. Sullivan Site Vice President Entergy Nuclear Operations, Inc.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406 December 13, 2007 Mr. Theodore A. Sullivan Site Vice President Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500
Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500  


==SUBJECT:==
==SUBJECT:==
CHANGE TO THE INSPECTION PLAN - VERMONT YANKEE NUCLEAR POWER STATION
CHANGE TO THE INSPECTION PLAN - VERMONT YANKEE NUCLEAR POWER STATION  


==Dear Mr. Sullivan:==
==Dear Mr. Sullivan:==
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.
The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.
The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.
In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).  


T. Sullivan                                 2 Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.
T. Sullivan 2
Sincerely,
Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.
                                              /RA/
Sincerely,  
Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-271 License No. DPR-28
/RA/
Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-271 License No. DPR-28  


==Enclosures:==
==Enclosures:==
Line 41: Line 41:
D. O Dowd, Administrator, Radiological Health Section, DPHS, State of New Hampshire W. Irwin, Chief, CHP, Radiological Health, Vermont Department of Health Chief, Safety Unit, Office of the Attorney General, Commonwealth of Mass.
D. O Dowd, Administrator, Radiological Health Section, DPHS, State of New Hampshire W. Irwin, Chief, CHP, Radiological Health, Vermont Department of Health Chief, Safety Unit, Office of the Attorney General, Commonwealth of Mass.
D. Lewis, Pillsbury, Winthrop, Shaw, Pittman LLP G. D. Bisbee, Esquire, Deputy Attorney General, Environmental Protection Bureau J. Block, Esquire J. P. Matteau, Executive Director, Windham Regional Commission D. Katz, Citizens Awareness Network (CAN)
D. Lewis, Pillsbury, Winthrop, Shaw, Pittman LLP G. D. Bisbee, Esquire, Deputy Attorney General, Environmental Protection Bureau J. Block, Esquire J. P. Matteau, Executive Director, Windham Regional Commission D. Katz, Citizens Awareness Network (CAN)
R. Shadis, New England Coalition Staff G. Sachs, President/Staff Person, c/o Stopthesale J. Volz, Chairman, Public Service Board, State of Vermont Chairman, Board of Selectman, Town of Vernon
R. Shadis, New England Coalition Staff G. Sachs, President/Staff Person, c/o Stopthesale J. Volz, Chairman, Public Service Board, State of Vermont Chairman, Board of Selectman, Town of Vernon  


T. Sullivan                             3 C. Pope, State of New Hampsire, SLO D. O'Brien, State of Vermont, SLO J. Giarrusso, SLO, MEMA, Commonwealth of Massachusetts U. Vanags, State Nuclear Engineer, Vermont Department of Public Service S. Shaw
T. Sullivan 3
C. Pope, State of New Hampsire, SLO D. O'Brien, State of Vermont, SLO J. Giarrusso, SLO, MEMA, Commonwealth of Massachusetts U. Vanags, State Nuclear Engineer, Vermont Department of Public Service S. Shaw  


2 T. Sullivan Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.
2 T. Sullivan Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
Sincerely,  
                                                  /RA/
/RA/
Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-271 License No. DPR-28
Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-271 License No. DPR-28  


==Enclosures:==
==Enclosures:==
Vermont Yankee Nuclear Power Station Inspection/Activity Plans Distribution w/encl:
Vermont Yankee Nuclear Power Station Inspection/Activity Plans Distribution w/encl:
S. Collins, RA                                   ROPreports@nrc.gov M. Dapas, DRA                           J. Trapp, DRS D. Lew, DRP                                     J. Rogge, DRS J. Clifford, DRP                         M. Sykes, DRS R. Powell, DRP                           J. White, DRS B. Norris, DRP                           L. Doerflein, DRS N. Sieller, DRP                         R. Conte, DRS G. West, RI OEDO (Acting)                       L. Scholl, DRS M. Kowal, NRR                           P. Frechette, DRS J. Lubinski, NRR                                 D. Silk, DRS J. Kim, PM, NRR                                   D. Screnci, PAO J. Boska, Backup PM, NRR                         N. Sheehan, PAO R. Fernandes, SRI                               R. Barkley, ORA B. Sienel, DRP, Resident Inspector               D. Holody, ORA A. Rancourt, DRP, Resident OA           ROPreports@nrc.gov RidsNrrDirslpab@nrc.gov                           Region I Docket Room (with concurrences)
S. Collins, RA ROPreports@nrc.gov M. Dapas, DRA J. Trapp, DRS D. Lew, DRP J. Rogge, DRS J. Clifford, DRP M. Sykes, DRS R. Powell, DRP J. White, DRS B. Norris, DRP L. Doerflein, DRS N. Sieller, DRP R. Conte, DRS G. West, RI OEDO (Acting)
L. Scholl, DRS M. Kowal, NRR P. Frechette, DRS J. Lubinski, NRR D. Silk, DRS J. Kim, PM, NRR D. Screnci, PAO J. Boska, Backup PM, NRR N. Sheehan, PAO R. Fernandes, SRI R. Barkley, ORA B. Sienel, DRP, Resident Inspector D. Holody, ORA A. Rancourt, DRP, Resident OA ROPreports@nrc.gov RidsNrrDirslpab@nrc.gov Region I Docket Room (with concurrences)
J. Thompson, NRR (JWT1@nrc.gov)
J. Thompson, NRR (JWT1@nrc.gov)
SUNSI Review Complete:       RJP     (Reviewer=s Initials)
SUNSI Review Complete: RJP (Reviewer=s Initials)
DOCUMENT NAME: T:\DRP\BRANCH5\ROP 8 LETTERS\VY_DEC_07.DOC After declaring this document AAn Official Agency Record@ it will be released to the Public.
DOCUMENT NAME: T:\\DRP\\BRANCH5\\ROP 8 LETTERS\\VY_DEC_07.DOC After declaring this document AAn Official Agency Record@ it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E"
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E"  
= Copy with attachment/enclosure "N" = No copy OFFICE       RI/DRP                     RI/DRP NAME         NSieller/NSS               RPowell/RJP DATE         12/12/07                   12/12/07 OFFICIAL RECORD COPY
= Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME NSieller/NSS RPowell/RJP DATE 12/12/07 12/12/07 OFFICIAL RECORD COPY  


Page 1 of 2                                                                                Vermont Yankee 12/11/2007    14:33:33                                                              Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit                                                                                                                              No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                  Title                                              on Site       Start    End            Type ISFSI           - ISFSI INSPECTION                                                                                             1 1              IP 60854                Preoperational Testing Of An ISFSI                                                                         02/01/2008 03/21/2008 Other Routine 1             IP 60854.1             Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P             02/01/2008 03/21/2008 Other Routine 1             IP 60855                Operation Of An ISFSI                                                                                     02/01/2008 03/21/2008 Other Routine 1             IP 60855.1             Operation of an Independent Spent Fuel Storage Installation at Operating Plants                           02/01/2008 03/21/2008 Other Routine 1             IP 60856                Review of 10 CFR 72.212(b) Evaluations                                                                     02/01/2008 03/21/2008 Other Routine 71152           - PI&R SAMPLE - HPCI/RCIC FLOW OSCILLATION                                                                     1 1              IP 71152-Reviews        In-depth Reviews                                                                                          03/17/2008 03/21/2008 Baseline Inspections 7111111B       - L.O REQUAL INSPECTION                                                                                         3 1              IP 7111111B            Licensed Operator Requalification Program                                                                  07/21/2008 07/25/2008 Baseline Inspections 1             IP 7111111B            Licensed Operator Requalification Program                                                                 07/28/2008 08/01/2008 Baseline Inspections MODS           - MODS                                                                                                         4 1              IP 7111117B            Permanent Plant Modifications                                                                              05/19/2008 05/23/2008 Baseline Inspections 1             IP 7111117B            Permanent Plant Modifications                                                                             06/02/2008 06/06/2008 Baseline Inspections 71121           - OCC RAD SAFETY                                                                                               1 1              IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                                              05/19/2008 05/23/2008 Baseline Inspections 71121           - OCC RAD SAFETY                                                                                               1 1              IP 7112101              Access Control to Radiologically Significant Areas                                                         08/04/2008 08/08/2008 Baseline Inspections 1             IP 7112102              ALARA Planning and Controls                                                                               08/04/2008 08/08/2008 Baseline Inspections 7111107B       - HEAT SINK                                                                                                     2 1              IP 7111107B            Heat Sink Performance                                                                                      08/11/2008 08/15/2008 Baseline Inspections 71122.02       - PUB RAD SAFETY - RADWASTE                                                                                     1 1              IP 7112202              Radioactive Material Processing and Transportation                                                         10/06/2008 10/10/2008 Baseline Inspections EP              - EP PROGRAM INSPECTION                                                                                        1 1              IP 7111402              Alert and Notification System Testing                                                                     10/05/2008 10/10/2008 EP Baseline Inspectio 1             IP 7111403              Emergency Response Organization Augmentation Testing                                                       10/05/2008 10/10/2008 EP Baseline Inspectio 1             IP 7111404              Emergency Action Level and Emergency Plan Changes                                                         10/05/2008 10/10/2008 EP Baseline Inspectio 1             IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies                                           10/05/2008 10/10/2008 EP Baseline Inspectio 1             IP 71151-EP01           Drill/Exercise Performance                                                                                 10/05/2008 10/10/2008 Baseline Inspections 1             IP 71151-EP02           ERO Drill Participation                                                                                   10/05/2008 10/10/2008 Baseline Inspections 1             IP 71151-EP03           Alert & Notification System                                                                               10/05/2008 10/10/2008 Baseline Inspections 7111108        - INSERVICE INSPECTION                                                                                          1 1              IP 7111108G            Inservice Inspection Activities - BWR                                                                     10/20/2008 10/24/2008 Baseline Inspections 71121          - OCC RAD SAFETY                                                                                                2 1             IP 7112101              Access Control to Radiologically Significant Areas                                                         10/27/2008 10/31/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
Vermont Yankee Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 12/11/2007 14:33:33 Report 22 1
ISFSI
- ISFSI INSPECTION Other Routine 02/01/2008 03/21/2008 1
60854 IP Preoperational Testing Of An ISFSI Other Routine 02/01/2008 03/21/2008 1
60854.1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P Other Routine 02/01/2008 03/21/2008 1
60855 IP Operation Of An ISFSI Other Routine 02/01/2008 03/21/2008 1
60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants Other Routine 02/01/2008 03/21/2008 1
60856 IP Review of 10 CFR 72.212(b) Evaluations 1
71152
- PI&R SAMPLE - HPCI/RCIC FLOW OSCILLATION Baseline Inspections 03/17/2008 03/21/2008 1
71152-Reviews IP In-depth Reviews 3
7111111B
- L.O REQUAL INSPECTION Baseline Inspections 07/21/2008 07/25/2008 1
7111111B IP Licensed Operator Requalification Program Baseline Inspections 07/28/2008 08/01/2008 1
7111111B IP Licensed Operator Requalification Program 4
MODS
- MODS Baseline Inspections 05/19/2008 05/23/2008 1
7111117B IP Permanent Plant Modifications Baseline Inspections 06/02/2008 06/06/2008 1
7111117B IP Permanent Plant Modifications 1
71121
- OCC RAD SAFETY Baseline Inspections 05/19/2008 05/23/2008 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1
71121
- OCC RAD SAFETY Baseline Inspections 08/04/2008 08/08/2008 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 08/04/2008 08/08/2008 1
7112102 IP ALARA Planning and Controls 2
7111107B
- HEAT SINK Baseline Inspections 08/11/2008 08/15/2008 1
7111107B IP Heat Sink Performance 1
71122.02
- PUB RAD SAFETY - RADWASTE Baseline Inspections 10/06/2008 10/10/2008 1
7112202 IP Radioactive Material Processing and Transportation 1
EP
- EP PROGRAM INSPECTION EP Baseline Inspectio 10/05/2008 10/10/2008 1
7111402 IP Alert and Notification System Testing EP Baseline Inspectio 10/05/2008 10/10/2008 1
7111403 IP Emergency Response Organization Augmentation Testing EP Baseline Inspectio 10/05/2008 10/10/2008 1
7111404 IP Emergency Action Level and Emergency Plan Changes EP Baseline Inspectio 10/05/2008 10/10/2008 1
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 10/05/2008 10/10/2008 1
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/05/2008 10/10/2008 1
71151-EP02 IP ERO Drill Participation Baseline Inspections 10/05/2008 10/10/2008 1
71151-EP03 IP Alert & Notification System 1
7111108
- INSERVICE INSPECTION Baseline Inspections 10/20/2008 10/24/2008 1
7111108G IP Inservice Inspection Activities - BWR 2
71121
- OCC RAD SAFETY Baseline Inspections 10/27/2008 10/31/2008 1
7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Page 2 of 2                                                                            Vermont Yankee 12/11/2007    14:33:33                                                            Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit                                                                                                          No. of Staff   Planned Dates        Inspection Number      Inspection Activity                                                Title                          on Site       Start    End            Type 71121           - OCC RAD SAFETY                                                                           2 1             IP 7112102              ALARA Planning and Controls                                                           10/27/2008 10/31/2008 Baseline Inspections 1             IP 71151-OR01           Occupational Exposure Control Effectiveness                                           10/27/2008 10/31/2008 Baseline Inspections 1             IP 71151-PR01           RETS/ODCM Radiological Effluent                                                       10/27/2008 10/31/2008 Baseline Inspections 7112201         - PUB RAD SAFETY - RETS                                                                   1 1              IP 7112201              Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems             12/01/2008 12/05/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
Vermont Yankee Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 12/11/2007 14:33:33 Report 22 2
71121
- OCC RAD SAFETY Baseline Inspections 10/27/2008 10/31/2008 1
7112102 IP ALARA Planning and Controls Baseline Inspections 10/27/2008 10/31/2008 1
71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 10/27/2008 10/31/2008 1
71151-PR01 IP RETS/ODCM Radiological Effluent 1
7112201
- PUB RAD SAFETY - RETS Baseline Inspections 12/01/2008 12/05/2008 1
7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 19:31, 14 January 2025

ROP8 - Vermont Yankee - Change to Inspection Plan, 12/13/07
ML073470958
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 12/13/2007
From: Racquel Powell
NRC/RGN-I/DRP/PB5
To: Ted Sullivan
Entergy Nuclear Operations
powell, rj
References
Download: ML073470958 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406 December 13, 2007 Mr. Theodore A. Sullivan Site Vice President Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500

SUBJECT:

CHANGE TO THE INSPECTION PLAN - VERMONT YANKEE NUCLEAR POWER STATION

Dear Mr. Sullivan:

As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.

The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

T. Sullivan 2

Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-271 License No. DPR-28

Enclosures:

Vermont Yankee Nuclear Power Station Inspection/Activity Plans cc w/encl:

M. R. Kansler, Chief Nuclear Officer and President, Entergy Nuclear Operations, Inc.

G. J. Taylor, Group President, Utility Operations J. Wayne Leonard, Chairman and Chief Executive Officer, Entergy Operations J. T. Herron, Senior Vice President, Entergy Nuclear Operations M. A. Balduzzi, Senior Vice President and Chief Operating Officer J. DeRoy, Vice President, Operations Support O. Limpias, Vice President, Engineering D. J. Mannai, Manager, Licensing, Vermont Yankee Nuclear Power Station E. Cota, Operating Experience Coordinator, Vermont Yankee Nuclear Power Station W. F. Maguire, General Manager, Plant Operations, Entergy Nuclear Operations, Inc.

N. L. Rademacher, Director, Engineering, Vermont Yankee Nuclear Power Station J. F. McCann, Director, Nuclear Safety and Licensing E. Harkness, Director of Oversight, Entergy Nuclear Operations, Inc.

Assistant General Counsel, Entergy Nuclear Operations, Inc.

J. H. Sniezek, PWR SRC Consultant M. D. Lyster, PWR SRC Consultant G. Edwards S. Lousteau, Treasury Department, Entergy Services, Inc.

D. O Dowd, Administrator, Radiological Health Section, DPHS, State of New Hampshire W. Irwin, Chief, CHP, Radiological Health, Vermont Department of Health Chief, Safety Unit, Office of the Attorney General, Commonwealth of Mass.

D. Lewis, Pillsbury, Winthrop, Shaw, Pittman LLP G. D. Bisbee, Esquire, Deputy Attorney General, Environmental Protection Bureau J. Block, Esquire J. P. Matteau, Executive Director, Windham Regional Commission D. Katz, Citizens Awareness Network (CAN)

R. Shadis, New England Coalition Staff G. Sachs, President/Staff Person, c/o Stopthesale J. Volz, Chairman, Public Service Board, State of Vermont Chairman, Board of Selectman, Town of Vernon

T. Sullivan 3

C. Pope, State of New Hampsire, SLO D. O'Brien, State of Vermont, SLO J. Giarrusso, SLO, MEMA, Commonwealth of Massachusetts U. Vanags, State Nuclear Engineer, Vermont Department of Public Service S. Shaw

2 T. Sullivan Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-271 License No. DPR-28

Enclosures:

Vermont Yankee Nuclear Power Station Inspection/Activity Plans Distribution w/encl:

S. Collins, RA ROPreports@nrc.gov M. Dapas, DRA J. Trapp, DRS D. Lew, DRP J. Rogge, DRS J. Clifford, DRP M. Sykes, DRS R. Powell, DRP J. White, DRS B. Norris, DRP L. Doerflein, DRS N. Sieller, DRP R. Conte, DRS G. West, RI OEDO (Acting)

L. Scholl, DRS M. Kowal, NRR P. Frechette, DRS J. Lubinski, NRR D. Silk, DRS J. Kim, PM, NRR D. Screnci, PAO J. Boska, Backup PM, NRR N. Sheehan, PAO R. Fernandes, SRI R. Barkley, ORA B. Sienel, DRP, Resident Inspector D. Holody, ORA A. Rancourt, DRP, Resident OA ROPreports@nrc.gov RidsNrrDirslpab@nrc.gov Region I Docket Room (with concurrences)

J. Thompson, NRR (JWT1@nrc.gov)

SUNSI Review Complete: RJP (Reviewer=s Initials)

DOCUMENT NAME: T:\\DRP\\BRANCH5\\ROP 8 LETTERS\\VY_DEC_07.DOC After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E"

= Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME NSieller/NSS RPowell/RJP DATE 12/12/07 12/12/07 OFFICIAL RECORD COPY

Vermont Yankee Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 12/11/2007 14:33:33 Report 22 1

ISFSI

- ISFSI INSPECTION Other Routine 02/01/2008 03/21/2008 1

60854 IP Preoperational Testing Of An ISFSI Other Routine 02/01/2008 03/21/2008 1

60854.1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P Other Routine 02/01/2008 03/21/2008 1

60855 IP Operation Of An ISFSI Other Routine 02/01/2008 03/21/2008 1

60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants Other Routine 02/01/2008 03/21/2008 1

60856 IP Review of 10 CFR 72.212(b) Evaluations 1

71152

- PI&R SAMPLE - HPCI/RCIC FLOW OSCILLATION Baseline Inspections 03/17/2008 03/21/2008 1

71152-Reviews IP In-depth Reviews 3

7111111B

- L.O REQUAL INSPECTION Baseline Inspections 07/21/2008 07/25/2008 1

7111111B IP Licensed Operator Requalification Program Baseline Inspections 07/28/2008 08/01/2008 1

7111111B IP Licensed Operator Requalification Program 4

MODS

- MODS Baseline Inspections 05/19/2008 05/23/2008 1

7111117B IP Permanent Plant Modifications Baseline Inspections 06/02/2008 06/06/2008 1

7111117B IP Permanent Plant Modifications 1

71121

- OCC RAD SAFETY Baseline Inspections 05/19/2008 05/23/2008 1

7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1

71121

- OCC RAD SAFETY Baseline Inspections 08/04/2008 08/08/2008 1

7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 08/04/2008 08/08/2008 1

7112102 IP ALARA Planning and Controls 2

7111107B

- HEAT SINK Baseline Inspections 08/11/2008 08/15/2008 1

7111107B IP Heat Sink Performance 1

71122.02

- PUB RAD SAFETY - RADWASTE Baseline Inspections 10/06/2008 10/10/2008 1

7112202 IP Radioactive Material Processing and Transportation 1

EP

- EP PROGRAM INSPECTION EP Baseline Inspectio 10/05/2008 10/10/2008 1

7111402 IP Alert and Notification System Testing EP Baseline Inspectio 10/05/2008 10/10/2008 1

7111403 IP Emergency Response Organization Augmentation Testing EP Baseline Inspectio 10/05/2008 10/10/2008 1

7111404 IP Emergency Action Level and Emergency Plan Changes EP Baseline Inspectio 10/05/2008 10/10/2008 1

7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 10/05/2008 10/10/2008 1

71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/05/2008 10/10/2008 1

71151-EP02 IP ERO Drill Participation Baseline Inspections 10/05/2008 10/10/2008 1

71151-EP03 IP Alert & Notification System 1

7111108

- INSERVICE INSPECTION Baseline Inspections 10/20/2008 10/24/2008 1

7111108G IP Inservice Inspection Activities - BWR 2

71121

- OCC RAD SAFETY Baseline Inspections 10/27/2008 10/31/2008 1

7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Vermont Yankee Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 12/11/2007 14:33:33 Report 22 2

71121

- OCC RAD SAFETY Baseline Inspections 10/27/2008 10/31/2008 1

7112102 IP ALARA Planning and Controls Baseline Inspections 10/27/2008 10/31/2008 1

71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 10/27/2008 10/31/2008 1

71151-PR01 IP RETS/ODCM Radiological Effluent 1

7112201

- PUB RAD SAFETY - RETS Baseline Inspections 12/01/2008 12/05/2008 1

7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.