UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406 December 13, 2007 Mr. Theodore A. Sullivan Site Vice President Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500
SUBJECT:
CHANGE TO THE INSPECTION PLAN - VERMONT YANKEE NUCLEAR POWER STATION
Dear Mr. Sullivan:
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.
The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.
In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
T. Sullivan 2
Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-271 License No. DPR-28
Enclosures:
Vermont Yankee Nuclear Power Station Inspection/Activity Plans cc w/encl:
M. R. Kansler, Chief Nuclear Officer and President, Entergy Nuclear Operations, Inc.
G. J. Taylor, Group President, Utility Operations J. Wayne Leonard, Chairman and Chief Executive Officer, Entergy Operations J. T. Herron, Senior Vice President, Entergy Nuclear Operations M. A. Balduzzi, Senior Vice President and Chief Operating Officer J. DeRoy, Vice President, Operations Support O. Limpias, Vice President, Engineering D. J. Mannai, Manager, Licensing, Vermont Yankee Nuclear Power Station E. Cota, Operating Experience Coordinator, Vermont Yankee Nuclear Power Station W. F. Maguire, General Manager, Plant Operations, Entergy Nuclear Operations, Inc.
N. L. Rademacher, Director, Engineering, Vermont Yankee Nuclear Power Station J. F. McCann, Director, Nuclear Safety and Licensing E. Harkness, Director of Oversight, Entergy Nuclear Operations, Inc.
Assistant General Counsel, Entergy Nuclear Operations, Inc.
J. H. Sniezek, PWR SRC Consultant M. D. Lyster, PWR SRC Consultant G. Edwards S. Lousteau, Treasury Department, Entergy Services, Inc.
D. O Dowd, Administrator, Radiological Health Section, DPHS, State of New Hampshire W. Irwin, Chief, CHP, Radiological Health, Vermont Department of Health Chief, Safety Unit, Office of the Attorney General, Commonwealth of Mass.
D. Lewis, Pillsbury, Winthrop, Shaw, Pittman LLP G. D. Bisbee, Esquire, Deputy Attorney General, Environmental Protection Bureau J. Block, Esquire J. P. Matteau, Executive Director, Windham Regional Commission D. Katz, Citizens Awareness Network (CAN)
R. Shadis, New England Coalition Staff G. Sachs, President/Staff Person, c/o Stopthesale J. Volz, Chairman, Public Service Board, State of Vermont Chairman, Board of Selectman, Town of Vernon
T. Sullivan 3
C. Pope, State of New Hampsire, SLO D. O'Brien, State of Vermont, SLO J. Giarrusso, SLO, MEMA, Commonwealth of Massachusetts U. Vanags, State Nuclear Engineer, Vermont Department of Public Service S. Shaw
2 T. Sullivan Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket Nos. 50-271 License No. DPR-28
Enclosures:
Vermont Yankee Nuclear Power Station Inspection/Activity Plans Distribution w/encl:
S. Collins, RA ROPreports@nrc.gov M. Dapas, DRA J. Trapp, DRS D. Lew, DRP J. Rogge, DRS J. Clifford, DRP M. Sykes, DRS R. Powell, DRP J. White, DRS B. Norris, DRP L. Doerflein, DRS N. Sieller, DRP R. Conte, DRS G. West, RI OEDO (Acting)
L. Scholl, DRS M. Kowal, NRR P. Frechette, DRS J. Lubinski, NRR D. Silk, DRS J. Kim, PM, NRR D. Screnci, PAO J. Boska, Backup PM, NRR N. Sheehan, PAO R. Fernandes, SRI R. Barkley, ORA B. Sienel, DRP, Resident Inspector D. Holody, ORA A. Rancourt, DRP, Resident OA ROPreports@nrc.gov RidsNrrDirslpab@nrc.gov Region I Docket Room (with concurrences)
J. Thompson, NRR (JWT1@nrc.gov)
SUNSI Review Complete: RJP (Reviewer=s Initials)
DOCUMENT NAME: T:\\DRP\\BRANCH5\\ROP 8 LETTERS\\VY_DEC_07.DOC After declaring this document AAn Official Agency Record@ it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E"
= Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME NSieller/NSS RPowell/RJP DATE 12/12/07 12/12/07 OFFICIAL RECORD COPY
Vermont Yankee Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 12/11/2007 14:33:33 Report 22 1
- ISFSI INSPECTION Other Routine 02/01/2008 03/21/2008 1
60854 IP Preoperational Testing Of An ISFSI Other Routine 02/01/2008 03/21/2008 1
60854.1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P Other Routine 02/01/2008 03/21/2008 1
60855 IP Operation Of An ISFSI Other Routine 02/01/2008 03/21/2008 1
60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants Other Routine 02/01/2008 03/21/2008 1
60856 IP Review of 10 CFR 72.212(b) Evaluations 1
- PI&R SAMPLE - HPCI/RCIC FLOW OSCILLATION Baseline Inspections 03/17/2008 03/21/2008 1
71152-Reviews IP In-depth Reviews 3
7111111B
- L.O REQUAL INSPECTION Baseline Inspections 07/21/2008 07/25/2008 1
7111111B IP Licensed Operator Requalification Program Baseline Inspections 07/28/2008 08/01/2008 1
7111111B IP Licensed Operator Requalification Program 4
MODS
- MODS Baseline Inspections 05/19/2008 05/23/2008 1
7111117B IP Permanent Plant Modifications Baseline Inspections 06/02/2008 06/06/2008 1
7111117B IP Permanent Plant Modifications 1
71121
- OCC RAD SAFETY Baseline Inspections 05/19/2008 05/23/2008 1
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1
71121
- OCC RAD SAFETY Baseline Inspections 08/04/2008 08/08/2008 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 08/04/2008 08/08/2008 1
7112102 IP ALARA Planning and Controls 2
7111107B
- HEAT SINK Baseline Inspections 08/11/2008 08/15/2008 1
7111107B IP Heat Sink Performance 1
- PUB RAD SAFETY - RADWASTE Baseline Inspections 10/06/2008 10/10/2008 1
7112202 IP Radioactive Material Processing and Transportation 1
- EP PROGRAM INSPECTION EP Baseline Inspectio 10/05/2008 10/10/2008 1
7111402 IP Alert and Notification System Testing EP Baseline Inspectio 10/05/2008 10/10/2008 1
7111403 IP Emergency Response Organization Augmentation Testing EP Baseline Inspectio 10/05/2008 10/10/2008 1
7111404 IP Emergency Action Level and Emergency Plan Changes EP Baseline Inspectio 10/05/2008 10/10/2008 1
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 10/05/2008 10/10/2008 1
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/05/2008 10/10/2008 1
71151-EP02 IP ERO Drill Participation Baseline Inspections 10/05/2008 10/10/2008 1
71151-EP03 IP Alert & Notification System 1
7111108
- INSERVICE INSPECTION Baseline Inspections 10/20/2008 10/24/2008 1
7111108G IP Inservice Inspection Activities - BWR 2
71121
- OCC RAD SAFETY Baseline Inspections 10/27/2008 10/31/2008 1
7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Vermont Yankee Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 12/11/2007 14:33:33 Report 22 2
71121
- OCC RAD SAFETY Baseline Inspections 10/27/2008 10/31/2008 1
7112102 IP ALARA Planning and Controls Baseline Inspections 10/27/2008 10/31/2008 1
71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 10/27/2008 10/31/2008 1
71151-PR01 IP RETS/ODCM Radiological Effluent 1
7112201
- PUB RAD SAFETY - RETS Baseline Inspections 12/01/2008 12/05/2008 1
7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.