ML103010271: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 13: Line 13:
| page count = 7
| page count = 7
}}
}}
See also: [[see also::IR 05000327/2011006]]
See also: [[followed by::IR 05000327/2011006]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                                NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                                REGION II
REGION II  
                              245 PEACHTREE CENTER AVENUE NE, SUITE 1200
245 PEACHTREE CENTER AVENUE NE, SUITE 1200  
                                      ATLANTA, GEORGIA 30303-1257
ATLANTA, GEORGIA 30303-1257  
                                            October 28, 2010
Mr. R. M. Krich
October 28, 2010  
Vice President, Nuclear Licensing
Tennessee Valley Authority
Mr. R. M. Krich  
3R Lookout Place
Vice President, Nuclear Licensing  
1101 Market Street
Tennessee Valley Authority  
Chattanooga, TN 37402-2801
3R Lookout Place  
SUBJECT:       SEQUOYAH NUCLEAR PLANT - NOTIFICATION OF CONDUCT OF A
1101 Market Street  
                TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION
Chattanooga, TN 37402-2801  
                REPORT NO. 05000327/2011006 AND 05000328/2011006)
Dear Mr. Krich:
SUBJECT:  
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
SEQUOYAH NUCLEAR PLANT - NOTIFICATION OF CONDUCT OF A  
Region II staff will conduct a triennial fire protection baseline inspection at the Sequoyah
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION  
Nuclear Plant in January and February 2011. The inspection team will be led by Mr. McKenzie
REPORT NO. 05000327/2011006 AND 05000328/2011006)  
Thomas, NRC Senior Reactor Inspector, of the Region II Office. The team will be composed of
personnel from the NRC Region II Office. The inspection will be conducted in accordance with
Dear Mr. Krich:  
Inspection Procedure 71111.05T, the NRCs triennial fire protection inspection procedure, dated
September 30, 2010. The inspection guidance will concentrate on the fire protection program
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)  
infrastructure and the adequacy of compensatory measures implemented for identified
Region II staff will conduct a triennial fire protection baseline inspection at the Sequoyah  
departures from code requirements. Inspection of circuit analysis is included in the inspection
Nuclear Plant in January and February 2011. The inspection team will be led by Mr. McKenzie  
procedure.
Thomas, NRC Senior Reactor Inspector, of the Region II Office. The team will be composed of  
On October 19, 2010, during a telephone conversation between Ms. Beth Wetzel (Sequoyah
personnel from the NRC Region II Office. The inspection will be conducted in accordance with  
Licensing and Industry Affairs Manager) of your staff, and Mr. Thomas, our respective staffs
Inspection Procedure 71111.05T, the NRCs triennial fire protection inspection procedure, dated  
confirmed arrangements for a three-day information gathering onsite visit and a two-week onsite
September 30, 2010. The inspection guidance will concentrate on the fire protection program  
inspection. The schedule for the inspection is as follows:
infrastructure and the adequacy of compensatory measures implemented for identified  
    *   Information gathering visit: January 4 - 6, 2011
departures from code requirements. Inspection of circuit analysis is included in the inspection  
    *   Week 1 of onsite inspection: January 24 - 28, 2011
procedure.
    *   Week 2 of onsite inspection: February 7 - 11, 2011
The purposes of the information gathering visit are to obtain information and documentation
On October 19, 2010, during a telephone conversation between Ms. Beth Wetzel (Sequoyah  
needed to support the inspection, to become familiar with the Sequoyah Nuclear Plant fire
Licensing and Industry Affairs Manager) of your staff, and Mr. Thomas, our respective staffs  
protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,
confirmed arrangements for a three-day information gathering onsite visit and a two-week onsite  
and mitigating strategies to address Section B.5.b of the Interim Compensatory Measures
inspection. The schedule for the inspection is as follows:  
Order, EA-02-026, of February 25, 2002/10 CFR 50.54(hh)(2). The types of documents the
team will be interested in reviewing, and possibly obtaining, are listed in Enclosures 1 and 2.
*  
Please contact Mr. Thomas at (404) 997-4673 prior to preparing copies of the materials listed in
Information gathering visit: January 4 - 6, 2011  
the Enclosures. The inspection team will try to minimize your administrative burden by
*  
Week 1 of onsite inspection: January 24 - 28, 2011  
*  
Week 2 of onsite inspection: February 7 - 11, 2011  
The purposes of the information gathering visit are to obtain information and documentation  
needed to support the inspection, to become familiar with the Sequoyah Nuclear Plant fire  
protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,  
and mitigating strategies to address Section B.5.b of the Interim Compensatory Measures  
Order, EA-02-026, of February 25, 2002/10 CFR 50.54(hh)(2). The types of documents the  
team will be interested in reviewing, and possibly obtaining, are listed in Enclosures 1 and 2.  
Please contact Mr. Thomas at (404) 997-4673 prior to preparing copies of the materials listed in  
the Enclosures. The inspection team will try to minimize your administrative burden by  
specifically identifying those documents required for inspection preparation.
specifically identifying those documents required for inspection preparation.


TVA                                               2
TVA  
During the information gathering visit, the team will also discuss the following inspection support
2  
administrative details: office space; specific documents to be made available to the team in their
office space; arrangements for unescorted site access (including radiation protection training,
security, safety and fitness for duty requirements); and the availability of knowledgeable plant
engineering and licensing organization personnel to serve as points of contact during the
During the information gathering visit, the team will also discuss the following inspection support  
inspection.
administrative details: office space; specific documents to be made available to the team in their  
We request that during the inspection weeks you ensure that copies of analyses, evaluations or
office space; arrangements for unescorted site access (including radiation protection training,  
documentation regarding the implementation and maintenance of the Sequoyah Nuclear Plant
security, safety and fitness for duty requirements); and the availability of knowledgeable plant  
fire protection program, including post-fire safe shutdown capability, be readily accessible to the
engineering and licensing organization personnel to serve as points of contact during the  
team for their review. Of specific interest for the fire protection portion of the inspection are
inspection.
those documents which establish that your fire protection program satisfies NRC regulatory
requirements and conforms to applicable NRC and industry fire protection guidance. For the
We request that during the inspection weeks you ensure that copies of analyses, evaluations or  
B.5.b portion of the inspection, those documents implementing your mitigating strategies and
documentation regarding the implementation and maintenance of the Sequoyah Nuclear Plant  
demonstrating the management of your commitments for the strategies are of specific interest.
fire protection program, including post-fire safe shutdown capability, be readily accessible to the  
Also, personnel should be available at the site during the inspection who are knowledgeable
team for their review. Of specific interest for the fire protection portion of the inspection are  
regarding those plant systems required to achieve and maintain safe shutdown conditions from
those documents which establish that your fire protection program satisfies NRC regulatory  
inside and outside the control room (including the electrical aspects of the relevant post-fire safe
requirements and conforms to applicable NRC and industry fire protection guidance. For the  
shutdown analyses), reactor plant fire protection systems and features, and the Sequoyah
B.5.b portion of the inspection, those documents implementing your mitigating strategies and  
Nuclear Plant fire protection program and its implementation.
demonstrating the management of your commitments for the strategies are of specific interest.  
This letter does not contain new or amended information collection requirements subject to the
Also, personnel should be available at the site during the inspection who are knowledgeable  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
regarding those plant systems required to achieve and maintain safe shutdown conditions from  
requirements were approved by the Office of Management and Budget, control number 3150-
inside and outside the control room (including the electrical aspects of the relevant post-fire safe  
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
shutdown analyses), reactor plant fire protection systems and features, and the Sequoyah  
request for information or an information collection requirement unless the requesting document
Nuclear Plant fire protection program and its implementation.
displays a currently valid Office of Management and Budget control number.
Your cooperation and support during this inspection will be appreciated. If you have questions
This letter does not contain new or amended information collection requirements subject to the  
concerning this inspection, or the inspection team's information or logistical needs, please
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
contact Mr. Thomas at (404) 997-4673, or me at (404) 997-4530.
requirements were approved by the Office of Management and Budget, control number 3150-  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a  
enclosures will be available electronically for public inspection in the NRC Public Document
request for information or an information collection requirement unless the requesting document  
Room or from the Publicly Available Records (PARS) component of NRCs document system
displays a currently valid Office of Management and Budget control number.
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Your cooperation and support during this inspection will be appreciated. If you have questions  
                                              Sincerely,
concerning this inspection, or the inspection team's information or logistical needs, please  
                                              /RA/
contact Mr. Thomas at (404) 997-4673, or me at (404) 997-4530.
                                              Rebecca L. Nease, Chief
                                              Engineering Branch 2
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
                                              Division of Reactor Safety
enclosures will be available electronically for public inspection in the NRC Public Document  
Docket Nos.: 50-327, 50-328, 72-034
Room or from the Publicly Available Records (PARS) component of NRCs document system  
License Nos.: DPR-77, DPR-79
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
Enclosures:     1. Triennial Fire Protection Inspection Support Documentation
rm/adams.html (the Public Electronic Reading Room).  
                2. Mitigating Strategies Support Documentation
cc w/encls: (See page 3)
Sincerely,  
/RA/  
Rebecca L. Nease, Chief  
Engineering Branch 2  
Division of Reactor Safety
Docket Nos.: 50-327, 50-328, 72-034  
License Nos.: DPR-77, DPR-79
Enclosures:  
1. Triennial Fire Protection Inspection Support Documentation
2. Mitigating Strategies Support Documentation
cc w/encls: (See page 3)  


TVA                                   3
TVA  
cc w/encls:
3  
C.R. Church
Vice President
Sequoyah Nuclear Plant
Tennessee Valley Authority
cc w/encls:  
P.O. Box 2000
C.R. Church  
Soddy-Daisy, TN 37384-2000
Vice President  
K. Langdon
Sequoyah Nuclear Plant  
Plant Manager
Tennessee Valley Authority  
Sequoyah Nuclear Plant
P.O. Box 2000  
Tennessee Valley Authority
Soddy-Daisy, TN   37384-2000  
P.O. Box 2000
Soddy Daisy, TN 37384-2000
K. Langdon  
B. A. Wetzel
Plant Manager  
Manager
Sequoyah Nuclear Plant  
Licensing and Industry Affairs
Tennessee Valley Authority  
Sequoyah Nuclear Plant
P.O. Box 2000  
Tennessee Valley Authority
Soddy Daisy, TN   37384-2000  
P.O. Box 2000
Soddy Daisy, TN 37384-2000
B. A. Wetzel  
E. J. Vigluicci
Manager  
Assistant General Counsel
Licensing and Industry Affairs  
Tennessee Valley Authority
Sequoyah Nuclear Plant  
6A West Tower
Tennessee Valley Authority  
400 West Summit Hill Drive
P.O. Box 2000  
Knoxville, TN 37902
Soddy Daisy, TN   37384-2000  
County Mayor
Hamilton County
E. J. Vigluicci  
Hamilton County Courthouse
Assistant General Counsel  
Chattanooga, TN 37402-2801
Tennessee Valley Authority  
Division of Radiological Health
6A West Tower  
TN Dept. of Environment & Conservation
400 West Summit Hill Drive  
401 Church Street
Knoxville, TN   37902  
Nashville, TN 37243-1532
Senior Resident Inspector
County Mayor  
U.S. Nuclear Regulatory Commission
Hamilton County  
Sequoyah Nuclear Plant
Hamilton County Courthouse  
2600 Igou Ferry Road
Chattanooga, TN   37402-2801  
Soddy Daisy, TN 37379-3624
Ann Harris
Division of Radiological Health  
341 Swing Loop
TN Dept. of Environment & Conservation  
Rockwood, TN 37854
401 Church Street  
Nashville, TN   37243-1532  
Senior Resident Inspector  
U.S. Nuclear Regulatory Commission  
Sequoyah Nuclear Plant  
2600 Igou Ferry Road  
Soddy Daisy, TN   37379-3624  
Ann Harris  
341 Swing Loop  
Rockwood, TN   37854




_________________________                       G SUNSI REVIEW COMPLETE
_________________________  
OFFICE             RII:DRS           RII:DRP               RII:DRS
SIGNATURE                   RA       RA                   RA
G   SUNSI REVIEW COMPLETE  
NAME               MThomas           EGuthrie             RNease
OFFICE  
DATE                   10/28/2010         10/ 28 /2010       10/ 28 /2010 10/ /2010 10/   /2010   10/ /2010 10/
RII:DRS  
E-MAIL COPY?         YES       NO     YES           NO    YES         NO YES       YES       NO YES       NO
RII:DRP  
       
RII:DRS  
                    Triennial Fire Protection Inspection Support Documentation
Note: This is a broad list of the documents the NRC inspection team may be interested in
reviewing, and possibly obtaining, during the information gathering site visit. The current
version of these documents is expected unless specified otherwise. Electronic media is
preferred, if readily available. (The preferred file format on CD-ROM or DVDROM is .pdf).
SIGNATURE  
The CD/DVD-ROM should be indexed, hyperlinked, readable, and searchable to facilitate ease
              RA  
of use. Please provide 5 copies of each CD/DVD-ROM submitted). Information in lists should
RA  
contain enough information to be easily understood by someone who has knowledge of the
RA  
technology. The lead inspector will discuss specific information needs with the licensee staff
and may request additional documents or electronic information.
    1. The current version of the Fire Protection Program and Fire Hazards Analysis.
    2. Corrective Action closeouts as part of operator manual actions corrective actions.
    3. List of identified fire-induced circuit failure configurations for select fire areas.
NAME  
    4. Corrective actions for fire-induced circuit failures, both single and multiple spurious
MThomas  
        actuations for select fire areas.
EGuthrie  
    5. Cable routing for components and equipment credited for safe shutdown for select fire
RNease  
        areas.
    6. List of protected safe shutdown train equipment for select fire areas.
    7. Current versions of the fire protection program implementing procedures (e.g.,
        administrative controls, surveillance testing, fire brigade).
    8.    Fire brigade training program and pre-fire plans.
DATE  
    9.    Post-fire safe shutdown systems and separation analysis.
10/28/2010  
  10.    Post-fire alternative shutdown analysis.
10/ 28 /2010  
   11.    Piping and instrumentation (flow) diagrams showing the components used to achieve
10/ 28 /2010  
          and maintain hot standby and cold shutdown for fires outside the control room and
10/     /2010
          those components used for those areas requiring alternative shutdown capability.
10/     /2010  
  12.    Plant layout and equipment drawings which identify the physical plant locations of hot
10/     /2010  
          standby and cold shutdown equipment.
10/    
  13.    Plant layout drawings which identify plant fire area delineation, areas protected by
E-MAIL COPY?  
          automatic fire suppression and detection, and the locations of fire protection equipment.
    YES  
  14. Plant layout drawings which identify the general location of the post-fire emergency
NO       YES  
        lighting.
NO    YES  
                                                                                            Enclosure 1
NO   YES
  YES  
NO   YES  
NO     


                                                  2
  15. Plant operating procedures which would be used and describe shutdown from inside
      the control room with a postulated fire occurring in any plant area outside the control
      room, procedures which would be used to implement alternative shutdown capability in
Enclosure 1
      the event of a fire in either the control or cable spreading room.
Triennial Fire Protection Inspection Support Documentation
  16Maintenance and surveillance testing procedures for alternative shutdown capability
   
      and fire barriers, detectors, pumps and suppression systems.
Note: This is a broad list of the documents the NRC inspection team may be interested in  
  17Maintenance procedures which routinely verify fuse breaker coordination in accordance
reviewing, and possibly obtaining, during the information gathering site visit.  The current
      with the post-fire safe shutdown coordination analysis.
version of these documents is expected unless specified otherwise.  Electronic media is
  18A list of significant fire protection and post-fire safe shutdown related design change
preferred, if readily available.  (The preferred file format on CD-ROM or DVDROM is .pdf).   
      packages and Generic Letter 86-10 evaluations.
The CD/DVD-ROM should be indexed, hyperlinked, readable, and searchable to facilitate ease
  19. The reactor plant's IPEEE, results of any post-IPEEE reviews, and listings of actions
of use. Please provide 5 copies of each CD/DVD-ROM submitted)Information in lists should
      taken/plant modifications conducted in response to IPEEE information.
contain enough information to be easily understood by someone who has knowledge of the
  21Organization charts of site personnel down to the level of fire protection staff personnel.
technology.  The lead inspector will discuss specific information needs with the licensee staff
  22. If applicable, layout/arrangement drawings of potential reactor coolant/recirculation
and may request additional documents or electronic information. 
      pump lube oil system leakage points and associated lube oil collection systems.
  23. Licensing basis documents for fire protection (safety evaluation reports, pertinent
1. The current version of the Fire Protection Program and Fire Hazards Analysis.
      sections of the final safety analysis report, exemptions, deviations, letters to/from the
      NRC regarding fire protection/fire safe shutdown, etc.).
2. Corrective Action closeouts as part of operator manual actions corrective actions.   
  24Procedures/instructions that control the configuration of the reactor plant's fire
      protection program, features, and post-fire safe shutdown methodology and system
3. List of identified fire-induced circuit failure configurations for select fire areas. 
      design.
  25. A list of applicable codes and standards related to the design of plant fire protection
4. Corrective actions for fire-induced circuit failures, both single and multiple spurious
      features and evaluations of code deviations.
actuations for select fire areas. 
  26. Procedures/instructions that govern the implementation of plant modifications,
      maintenance, and special operations, and their impact on fire protection.
5. Cable routing for components and equipment credited for safe shutdown for select fire
  27. Internal and external self-assessments, audits, peer-assessments or similar reviews
areas.   
      related to post-fire safe shutdown capability or the fire protection program completed
      since the previous NRC fire protection triennial inspection.
6. List of protected safe shutdown train equipment for select fire areas.
  28. Recent QA surveillances of fire protection activities.
   
29.   A listing of open and closed fire protection problem identification and resolution reports
      (also known as condition reports/problem evaluation reports/NCRs) since the last
7. Current versions of the fire protection program implementing procedures (e.g.,  
      triennial inspection.
administrative controls, surveillance testing, fire brigade).  
                                                                                        Enclosure 1
8Fire brigade training program and pre-fire plans. 
9.  Post-fire safe shutdown systems and separation analysis. 
10. Post-fire alternative shutdown analysis. 
11. Piping and instrumentation (flow) diagrams showing the components used to achieve
and maintain hot standby and cold shutdown for fires outside the control room and
those components used for those areas requiring alternative shutdown capability.
12. Plant layout and equipment drawings which identify the physical plant locations of hot
standby and cold shutdown equipment.
13. Plant layout drawings which identify plant fire area delineation, areas protected by
automatic fire suppression and detection, and the locations of fire protection equipment.
   
14. Plant layout drawings which identify the general location of the post-fire emergency
lighting.


                        Mitigating Strategies Support Documentation
    Note: This is a broad list of the documents the NRC inspection team may be interested
2
    in reviewing, and possibly obtaining, during the information gathering visit. The current
    version of these documents is expected unless specified otherwise. Electronic media is
    preferred, if readily available. (The preferred file format on CD-ROM or DVDROM is
Enclosure 1
    .pdf). The CD/DVD-ROM should be indexed, hyperlinked, readable, and searchable to
    facilitate ease of use. Please provide 5 copies of each CD/DVD-ROM submitted). The
15. Plant operating procedures which would be used and describe shutdown from inside
    lead inspector will discuss specific information needs with the licensee staff and may
the control room with a postulated fire occurring in any plant area outside the control
    request additional documents or electronic information.
room, procedures which would be used to implement alternative shutdown capability in
1. A list of all modifications to regulatory commitments made to meet the requirements of
the event of a fire in either the control or cable spreading room. 
    Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently
    imposed license conditions, and 10 CFR 50.54(hh)(2).
2. Copies of procedures/guidelines that were revised or generated to implement the
16. Maintenance and surveillance testing procedures for alternative shutdown capability
    mitigation strategies. These could be extensive damage mitigation guidelines (EDMGs),
and fire barriers, detectors, pumps and suppression systems.
    severe accident management guidelines (SAMGs), emergency operating procedures
    (EOPs), abnormal operating procedures (AOPs), etc.
3. A matrix that shows the correlation between the mitigation strategies identified in
17. Maintenance procedures which routinely verify fuse breaker coordination in accordance
    Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are
with the post-fire safe shutdown coordination analysis. 
    used to implement each strategy.
4. Engineering evaluations/calculations that were used to verify engineering bases for the
    mitigation strategies.
18. A list of significant fire protection and post-fire safe shutdown related design change
5. Piping and instrumentation diagram (P&ID) or simplified flow diagrams for systems relied
packages and Generic Letter 86-10 evaluations.
    upon in the mitigation strategies. These could be the type used for training.
6. A modification package or simplified drawings/descriptions of modifications that were
    made to plant systems to implement the mitigation strategies.
19. The reactor plant's IPEEE, results of any post-IPEEE reviews, and listings of actions
7. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.) required
taken/plant modifications conducted in response to IPEEE information.
    to be used to implement the mitigation strategies.
8. A list of B.5.b strategies, if any, which have implementing details that differ from that
    documented in the submittals and the safety evaluation report.
21.  Organization charts of site personnel down to the level of fire protection staff personnel.
9. A copy of site general arrangement drawing(s) that show the majority of buildings/areas
    referenced in B.5.b documents.
10. Training records/training matrix/lesson plans related to B.5.b.
22. If applicable, layout/arrangement drawings of potential reactor coolant/recirculation
11. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments)
pump lube oil system leakage points and associated lube oil collection systems.
    required to implement any mitigating strategies.
                                                                                    Enclosure 2
23. Licensing basis documents for fire protection (safety evaluation reports, pertinent
sections of the final safety analysis report, exemptions, deviations, letters to/from the
NRC regarding fire protection/fire safe shutdown, etc.).
24. Procedures/instructions that control the configuration of the reactor plant's fire
protection program, features, and post-fire safe shutdown methodology and system
design.
25. A list of applicable codes and standards related to the design of plant fire protection
features and evaluations of code deviations.
26. Procedures/instructions that govern the implementation of plant modifications,
maintenance, and special operations, and their impact on fire protection.
27. Internal and external self-assessments, audits, peer-assessments or similar reviews
related to post-fire safe shutdown capability or the fire protection program completed
since the previous NRC fire protection triennial inspection.
28. Recent QA surveillances of fire protection activities. 
29.
A listing of open and closed fire protection problem identification and resolution reports
(also known as condition reports/problem evaluation reports/NCRs) since the last
triennial inspection.
 
Enclosure 2
Mitigating Strategies Support Documentation  
Note: This is a broad list of the documents the NRC inspection team may be interested  
in reviewing, and possibly obtaining, during the information gathering visit. The current  
version of these documents is expected unless specified otherwise. Electronic media is  
preferred, if readily available. (The preferred file format on CD-ROM or DVDROM is  
.pdf). The CD/DVD-ROM should be indexed, hyperlinked, readable, and searchable to  
facilitate ease of use. Please provide 5 copies of each CD/DVD-ROM submitted). The  
lead inspector will discuss specific information needs with the licensee staff and may  
request additional documents or electronic information.  
1. A list of all modifications to regulatory commitments made to meet the requirements of  
Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently  
imposed license conditions, and 10 CFR 50.54(hh)(2).  
2. Copies of procedures/guidelines that were revised or generated to implement the  
mitigation strategies. These could be extensive damage mitigation guidelines (EDMGs),  
severe accident management guidelines (SAMGs), emergency operating procedures  
(EOPs), abnormal operating procedures (AOPs), etc.
3. A matrix that shows the correlation between the mitigation strategies identified in  
Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are  
used to implement each strategy.  
4. Engineering evaluations/calculations that were used to verify engineering bases for the  
mitigation strategies.
5. Piping and instrumentation diagram (P&ID) or simplified flow diagrams for systems relied  
upon in the mitigation strategies. These could be the type used for training.
6. A modification package or simplified drawings/descriptions of modifications that were  
made to plant systems to implement the mitigation strategies.
7. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.) required  
to be used to implement the mitigation strategies.  
8. A list of B.5.b strategies, if any, which have implementing details that differ from that  
documented in the submittals and the safety evaluation report.
9. A copy of site general arrangement drawing(s) that show the majority of buildings/areas  
referenced in B.5.b documents.  
10. Training records/training matrix/lesson plans related to B.5.b.  
  11. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments)  
required to implement any mitigating strategies.
}}
}}

Latest revision as of 02:12, 14 January 2025

Notification of Conduct of a Triennial Fire Protection Baseline Inspection (IR 05000327-11-006 and 05000328-11-006)
ML103010271
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/28/2010
From: Nease R
NRC/RGN-II/DRS/EB2
To: Krich R
Tennessee Valley Authority
References
Download: ML103010271 (7)


See also: IR 05000327/2011006

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

October 28, 2010

Mr. R. M. Krich

Vice President, Nuclear Licensing

Tennessee Valley Authority

3R Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

SUBJECT:

SEQUOYAH NUCLEAR PLANT - NOTIFICATION OF CONDUCT OF A

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION

REPORT NO. 05000327/2011006 AND 05000328/2011006)

Dear Mr. Krich:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a triennial fire protection baseline inspection at the Sequoyah

Nuclear Plant in January and February 2011. The inspection team will be led by Mr. McKenzie

Thomas, NRC Senior Reactor Inspector, of the Region II Office. The team will be composed of

personnel from the NRC Region II Office. The inspection will be conducted in accordance with

Inspection Procedure 71111.05T, the NRCs triennial fire protection inspection procedure, dated

September 30, 2010. The inspection guidance will concentrate on the fire protection program

infrastructure and the adequacy of compensatory measures implemented for identified

departures from code requirements. Inspection of circuit analysis is included in the inspection

procedure.

On October 19, 2010, during a telephone conversation between Ms. Beth Wetzel (Sequoyah

Licensing and Industry Affairs Manager) of your staff, and Mr. Thomas, our respective staffs

confirmed arrangements for a three-day information gathering onsite visit and a two-week onsite

inspection. The schedule for the inspection is as follows:

Information gathering visit: January 4 - 6, 2011

Week 1 of onsite inspection: January 24 - 28, 2011

Week 2 of onsite inspection: February 7 - 11, 2011

The purposes of the information gathering visit are to obtain information and documentation

needed to support the inspection, to become familiar with the Sequoyah Nuclear Plant fire

protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,

and mitigating strategies to address Section B.5.b of the Interim Compensatory Measures

Order, EA-02-026, of February 25, 2002/10 CFR 50.54(hh)(2). The types of documents the

team will be interested in reviewing, and possibly obtaining, are listed in Enclosures 1 and 2.

Please contact Mr. Thomas at (404) 997-4673 prior to preparing copies of the materials listed in

the Enclosures. The inspection team will try to minimize your administrative burden by

specifically identifying those documents required for inspection preparation.

TVA

2

During the information gathering visit, the team will also discuss the following inspection support

administrative details: office space; specific documents to be made available to the team in their

office space; arrangements for unescorted site access (including radiation protection training,

security, safety and fitness for duty requirements); and the availability of knowledgeable plant

engineering and licensing organization personnel to serve as points of contact during the

inspection.

We request that during the inspection weeks you ensure that copies of analyses, evaluations or

documentation regarding the implementation and maintenance of the Sequoyah Nuclear Plant

fire protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest for the fire protection portion of the inspection are

those documents which establish that your fire protection program satisfies NRC regulatory

requirements and conforms to applicable NRC and industry fire protection guidance. For the

B.5.b portion of the inspection, those documents implementing your mitigating strategies and

demonstrating the management of your commitments for the strategies are of specific interest.

Also, personnel should be available at the site during the inspection who are knowledgeable

regarding those plant systems required to achieve and maintain safe shutdown conditions from

inside and outside the control room (including the electrical aspects of the relevant post-fire safe

shutdown analyses), reactor plant fire protection systems and features, and the Sequoyah

Nuclear Plant fire protection program and its implementation.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Mr. Thomas at (404) 997-4673, or me at (404) 997-4530.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Rebecca L. Nease, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos.: 50-327, 50-328,72-034

License Nos.: DPR-77, DPR-79

Enclosures:

1. Triennial Fire Protection Inspection Support Documentation

2. Mitigating Strategies Support Documentation

cc w/encls: (See page 3)

TVA

3

cc w/encls:

C.R. Church

Vice President

Sequoyah Nuclear Plant

Tennessee Valley Authority

P.O. Box 2000

Soddy-Daisy, TN 37384-2000

K. Langdon

Plant Manager

Sequoyah Nuclear Plant

Tennessee Valley Authority

P.O. Box 2000

Soddy Daisy, TN 37384-2000

B. A. Wetzel

Manager

Licensing and Industry Affairs

Sequoyah Nuclear Plant

Tennessee Valley Authority

P.O. Box 2000

Soddy Daisy, TN 37384-2000

E. J. Vigluicci

Assistant General Counsel

Tennessee Valley Authority

6A West Tower

400 West Summit Hill Drive

Knoxville, TN 37902

County Mayor

Hamilton County

Hamilton County Courthouse

Chattanooga, TN 37402-2801

Division of Radiological Health

TN Dept. of Environment & Conservation

401 Church Street

Nashville, TN 37243-1532

Senior Resident Inspector

U.S. Nuclear Regulatory Commission

Sequoyah Nuclear Plant

2600 Igou Ferry Road

Soddy Daisy, TN 37379-3624

Ann Harris

341 Swing Loop

Rockwood, TN 37854

_________________________

G SUNSI REVIEW COMPLETE

OFFICE

RII:DRS

RII:DRP

RII:DRS

SIGNATURE

RA

RA

RA

NAME

MThomas

EGuthrie

RNease

DATE

10/28/2010

10/ 28 /2010

10/ 28 /2010

10/ /2010

10/ /2010

10/ /2010

10/

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

YES

NO YES

NO

Enclosure 1

Triennial Fire Protection Inspection Support Documentation

Note: This is a broad list of the documents the NRC inspection team may be interested in

reviewing, and possibly obtaining, during the information gathering site visit. The current

version of these documents is expected unless specified otherwise. Electronic media is

preferred, if readily available. (The preferred file format on CD-ROM or DVDROM is .pdf).

The CD/DVD-ROM should be indexed, hyperlinked, readable, and searchable to facilitate ease

of use. Please provide 5 copies of each CD/DVD-ROM submitted). Information in lists should

contain enough information to be easily understood by someone who has knowledge of the

technology. The lead inspector will discuss specific information needs with the licensee staff

and may request additional documents or electronic information.

1. The current version of the Fire Protection Program and Fire Hazards Analysis.

2. Corrective Action closeouts as part of operator manual actions corrective actions.

3. List of identified fire-induced circuit failure configurations for select fire areas.

4. Corrective actions for fire-induced circuit failures, both single and multiple spurious

actuations for select fire areas.

5. Cable routing for components and equipment credited for safe shutdown for select fire

areas.

6. List of protected safe shutdown train equipment for select fire areas.

7. Current versions of the fire protection program implementing procedures (e.g.,

administrative controls, surveillance testing, fire brigade).

8. Fire brigade training program and pre-fire plans.

9. Post-fire safe shutdown systems and separation analysis.

10. Post-fire alternative shutdown analysis.

11. Piping and instrumentation (flow) diagrams showing the components used to achieve

and maintain hot standby and cold shutdown for fires outside the control room and

those components used for those areas requiring alternative shutdown capability.

12. Plant layout and equipment drawings which identify the physical plant locations of hot

standby and cold shutdown equipment.

13. Plant layout drawings which identify plant fire area delineation, areas protected by

automatic fire suppression and detection, and the locations of fire protection equipment.

14. Plant layout drawings which identify the general location of the post-fire emergency

lighting.

2

Enclosure 1

15. Plant operating procedures which would be used and describe shutdown from inside

the control room with a postulated fire occurring in any plant area outside the control

room, procedures which would be used to implement alternative shutdown capability in

the event of a fire in either the control or cable spreading room.

16. Maintenance and surveillance testing procedures for alternative shutdown capability

and fire barriers, detectors, pumps and suppression systems.

17. Maintenance procedures which routinely verify fuse breaker coordination in accordance

with the post-fire safe shutdown coordination analysis.

18. A list of significant fire protection and post-fire safe shutdown related design change

packages and Generic Letter 86-10 evaluations.

19. The reactor plant's IPEEE, results of any post-IPEEE reviews, and listings of actions

taken/plant modifications conducted in response to IPEEE information.

21. Organization charts of site personnel down to the level of fire protection staff personnel.

22. If applicable, layout/arrangement drawings of potential reactor coolant/recirculation

pump lube oil system leakage points and associated lube oil collection systems.

23. Licensing basis documents for fire protection (safety evaluation reports, pertinent

sections of the final safety analysis report, exemptions, deviations, letters to/from the

NRC regarding fire protection/fire safe shutdown, etc.).

24. Procedures/instructions that control the configuration of the reactor plant's fire

protection program, features, and post-fire safe shutdown methodology and system

design.

25. A list of applicable codes and standards related to the design of plant fire protection

features and evaluations of code deviations.

26. Procedures/instructions that govern the implementation of plant modifications,

maintenance, and special operations, and their impact on fire protection.

27. Internal and external self-assessments, audits, peer-assessments or similar reviews

related to post-fire safe shutdown capability or the fire protection program completed

since the previous NRC fire protection triennial inspection.

28. Recent QA surveillances of fire protection activities.

29.

A listing of open and closed fire protection problem identification and resolution reports

(also known as condition reports/problem evaluation reports/NCRs) since the last

triennial inspection.

Enclosure 2

Mitigating Strategies Support Documentation

Note: This is a broad list of the documents the NRC inspection team may be interested

in reviewing, and possibly obtaining, during the information gathering visit. The current

version of these documents is expected unless specified otherwise. Electronic media is

preferred, if readily available. (The preferred file format on CD-ROM or DVDROM is

.pdf). The CD/DVD-ROM should be indexed, hyperlinked, readable, and searchable to

facilitate ease of use. Please provide 5 copies of each CD/DVD-ROM submitted). The

lead inspector will discuss specific information needs with the licensee staff and may

request additional documents or electronic information.

1. A list of all modifications to regulatory commitments made to meet the requirements of

Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently

imposed license conditions, and 10 CFR 50.54(hh)(2).

2. Copies of procedures/guidelines that were revised or generated to implement the

mitigation strategies. These could be extensive damage mitigation guidelines (EDMGs),

severe accident management guidelines (SAMGs), emergency operating procedures

(EOPs), abnormal operating procedures (AOPs), etc.

3. A matrix that shows the correlation between the mitigation strategies identified in

Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are

used to implement each strategy.

4. Engineering evaluations/calculations that were used to verify engineering bases for the

mitigation strategies.

5. Piping and instrumentation diagram (P&ID) or simplified flow diagrams for systems relied

upon in the mitigation strategies. These could be the type used for training.

6. A modification package or simplified drawings/descriptions of modifications that were

made to plant systems to implement the mitigation strategies.

7. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.) required

to be used to implement the mitigation strategies.

8. A list of B.5.b strategies, if any, which have implementing details that differ from that

documented in the submittals and the safety evaluation report.

9. A copy of site general arrangement drawing(s) that show the majority of buildings/areas

referenced in B.5.b documents.

10. Training records/training matrix/lesson plans related to B.5.b.

11. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments)

required to implement any mitigating strategies.