{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2013
{{#Wiki_filter:March 4, 2013


==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT UNIT 1, (REPORT 05000390/2012001)
ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT  
 
UNIT 1, (REPORT 05000390/2012001)


==Dear Mr. Shea:==
==Dear Mr. Shea:==
Line 38: Line 40:


Sincerely,
Sincerely,
/RA/
/RA/  
Richard P. Croteau, Director Division of Reactor Projects Docket No.: 50-390 License No.: NPF-90 Enclosure: Watts Bar Inspection/Activity Plan cc w/encl: (See page 3)
 
Richard P. Croteau, Director Division of Reactor Projects  
 
Docket No.:
50-390 License No.: NPF-90  
 
Enclosure: Watts Bar Inspection/Activity Plan  
 
cc w/encl: (See page 3)  
 
__ _______________________
 
X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRS RII:DRP
 
SIGNATURE JDH /RA/
SMS /RA/
WBJ /RA/
JCS /RA/
RPC /RA/
 
NAME JHamman SShaeffer WJones JShehee RCroteau
 
DATE 03/01/2013 03/01/2013 03/01/2013 03/01/2013 03/04/2013


__ _______________________  X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRS RII:DRP SIGNATURE JDH /RA/ SMS /RA/ WBJ /RA/ JCS /RA/ RPC /RA/
E-MAIL COPY?
NAME JHamman SShaeffer WJones JShehee RCroteau DATE  03/01/2013 03/01/2013 03/01/2013 03/01/2013 03/04/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl: Ann Harris 341 Swing Loop Site Vice President  Rockwood, TN 37854 Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution David H. Gronek Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Donna K. Guinn Manager, Site Licensing Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Terry E. Cribbe Manager, Corporate Licensing Tennessee Valley Authority Electronic Mail Distribution Edward J. Vigluicci Associate General Counsel, Nuclear Tennessee Valley Authority Electronic Mail Distribution Gordon P. Arent Senior Manager, Licensing WBN Unit 2 Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution County Mayor P.O. Box 156 Decatur, TN 37322 County Executive 375 Church Street Suite 215 Dayton, TN 37321 Tennessee Department of Environment &
YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl:  
Conservation Division of Radiological Health 401 Church Street Nashville, TN 37243 Letter to Joseph from Scott M. Shaeffer dated March 4, 2013 SUBJECT: ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT UNIT 1, REPORT 05000390/2012001 Distribution w/encl:
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMWattsBar1 Resource ROP Assessment Institute of Nuclear Power Operations (INPO)


Page 1 of 2      Watts Bar 03/04/2013 08:39:32    Inspection / Activity Plan Report 22 03/01/2013 - 06/30/2014 Unit Planned Dates          No. of Staff Number Start End Inspection Activity    Title  on Site OL EXAM - INITIAL EXAM PREP      3 1 02/25/2013 03/01/2013 V23389 WATTS BAR/MARCH 2013 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1      3 1 03/18/2013 03/22/2013 V23389 WATTS BAR/MARCH 2013 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2      3 1 03/25/2013 03/29/2013 V23389 WATTS BAR/MARCH 2013 INITIAL EXAM AT POWER FACILITIES TI-182 - TI-182 BURIED PIPING/TANK - PHASE 1      1 1 06/03/2013 06/07/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping RP - RP OCCUPATIONAL BASELINE      3 1 07/22/2013 07/26/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 07/22/2013 07/26/2013 IP 71124.02 Occupational ALARA Planning and Controls 1 07/22/2013 07/26/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 07/22/2013 07/26/2013 IP 71124.04 Occupational Dose Assessment 1 07/22/2013 07/26/2013 IP 71124.05 Radiation Monitoring Instrumentation 1 07/22/2013 07/26/2013 IP 71151  Performance Indicator Verification RP - RP OCCUPATIONAL BASELINE WEEK2      2 1 08/05/2013 08/09/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 08/05/2013 08/09/2013 IP 71124.02 Occupational ALARA Planning and Controls 1 08/05/2013 08/09/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 08/05/2013 08/09/2013 IP 71124.04 Occupational Dose Assessment 1 08/05/2013 08/09/2013 IP 71124.05 Radiation Monitoring Instrumentation 1 08/05/2013 08/09/2013 IP 71151  Performance Indicator Verification TFPI - TRIENNIAL FIRE PROTECTION INSP      5 1 09/09/2013 09/13/2013 IP 7111105T Fire Protection [Triennial]
Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution
1 09/23/2013 09/27/2013 IP 7111105T Fire Protection [Triennial]
EP - EMERGENCY PREPAREDNESS EXERCISE      1 1 10/28/2013 11/01/2013 IP 7111401 Exercise Evaluation 1 10/28/2013 11/01/2013 IP 71151  Performance Indicator Verification OL EXAM - INITIAL EXAM PREP      3 1 09/23/2013 09/27/2013 V23395 WATTS BAR/OCTOBER 2013 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 1      3 1 10/14/2013 10/18/2013 V23395 WATTS BAR/OCTOBER 2013 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 2      3 1 10/21/2013 10/25/2013 V23395 WATTS BAR/OCTOBER 2013 INITIAL EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.       Enclosure
David H. Gronek Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution


Page 2 of 2      Watts Bar 03/04/2013 08:39:32     Inspection / Activity Plan Report 22 03/01/2013 - 06/30/2014 Unit Planned Dates      No. of Staff Number Start End Inspection Activity     Title on Site ISI - UNIT 1 IN-SERVICE INSPECTION   1 1 04/14/2014 04/18/2014 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL BASELINE   2 1 04/21/2014 04/25/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/21/2014 04/25/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 04/21/2014 04/25/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/21/2014 04/25/2014 IP 71124.04 Occupational Dose Assessment 1 04/21/2014 04/25/2014 IP 71124.05 Radiation Monitoring Instrumentation 1 04/21/2014 04/25/2014 IP 71151 Performance Indicator Verification SGISI - UNIT 1 SG IN-SERVICE INSPECTION   1 1 04/21/2014 04/25/2014 IP 7111108P Inservice Inspection Activities - PWR Comments:
Donna K. Guinn Manager, Site Licensing Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution
 
Terry E. Cribbe Manager, Corporate Licensing Tennessee Valley Authority Electronic Mail Distribution
 
Edward J. Vigluicci Associate General Counsel, Nuclear Tennessee Valley Authority Electronic Mail Distribution
 
Gordon P. Arent Senior Manager, Licensing WBN Unit 2 Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution
 
County Mayor P.O. Box 156 Decatur, TN 37322
 
County Executive 375 Church Street Suite 215 Dayton, TN 37321
 
Tennessee Department of Environment &
Conservation Division of Radiological Health 401 Church Street Nashville, TN 37243 Ann Harris 341 Swing Loop Rockwood, TN 37854 Letter to Joseph from Scott M. Shaeffer dated March 4, 2013
 
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT
 
UNIT 1, REPORT 05000390/2012001
 
Distribution w/encl:
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMWattsBar1 Resource ROP Assessment Institute of Nuclear Power Operations (INPO)
 
Watts Bar Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 1 of 2 03/04/2013 08:39:32 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title
 
OL EXAM
- INITIAL EXAM PREP
 
02/25/2013 03/01/2013 V23389 WATTS BAR/MARCH 2013 INITIAL EXAM AT POWER FACILITIES
 
OL EXAM
- INITIAL EXAM - WEEK 1
 
03/18/2013 03/22/2013 V23389 WATTS BAR/MARCH 2013 INITIAL EXAM AT POWER FACILITIES
 
OL EXAM
- INITIAL EXAM - WEEK 2
 
03/25/2013 03/29/2013 V23389 WATTS BAR/MARCH 2013 INITIAL EXAM AT POWER FACILITIES
 
TI-182
- TI-182 BURIED PIPING/TANK - PHASE 1
 
06/03/2013 06/07/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping
 
RP
- RP OCCUPATIONAL BASELINE
 
07/22/2013 07/26/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
 
07/22/2013 07/26/2013 IP 71124.02 Occupational ALARA Planning and Controls
 
07/22/2013 07/26/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation
 
07/22/2013 07/26/2013 IP 71124.04 Occupational Dose Assessment
 
07/22/2013 07/26/2013 IP 71124.05 Radiation Monitoring Instrumentation
 
07/22/2013 07/26/2013 IP 71151 Performance Indicator Verification
 
RP
- RP OCCUPATIONAL BASELINE WEEK2
 
08/05/2013 08/09/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
 
08/05/2013 08/09/2013 IP 71124.02 Occupational ALARA Planning and Controls
 
08/05/2013 08/09/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation
 
08/05/2013 08/09/2013 IP 71124.04 Occupational Dose Assessment
 
08/05/2013 08/09/2013 IP 71124.05 Radiation Monitoring Instrumentation
 
08/05/2013 08/09/2013 IP 71151 Performance Indicator Verification
 
TFPI
- TRIENNIAL FIRE PROTECTION INSP
 
09/09/2013 09/13/2013 IP 7111105T Fire Protection [Triennial]
 
09/23/2013 09/27/2013 IP 7111105T Fire Protection [Triennial]
 
EP
- EMERGENCY PREPAREDNESS EXERCISE
 
10/28/2013 11/01/2013 IP 7111401 Exercise Evaluation
 
10/28/2013 11/01/2013 IP 71151 Performance Indicator Verification
 
OL EXAM
- INITIAL EXAM PREP
 
09/23/2013 09/27/2013 V23395 WATTS BAR/OCTOBER 2013 INITIAL EXAM AT POWER FACILITIES
 
OL EXAM
- INITIAL EXAM WEEK 1
 
10/14/2013 10/18/2013 V23395 WATTS BAR/OCTOBER 2013 INITIAL EXAM AT POWER FACILITIES
 
OL EXAM
- INITIAL EXAM WEEK 2
 
10/21/2013 10/25/2013 V23395 WATTS BAR/OCTOBER 2013 INITIAL EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
Enclosure
 
Watts Bar Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 2 of 2 03/04/2013 08:39:32 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title
 
ISI
- UNIT 1 IN-SERVICE INSPECTION
 
04/14/2014 04/18/2014 IP 7111108P Inservice Inspection Activities - PWR
 
RP
- RP OCCUPATIONAL BASELINE
 
04/21/2014 04/25/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
 
04/21/2014 04/25/2014 IP 71124.02 Occupational ALARA Planning and Controls
 
04/21/2014 04/25/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation
 
04/21/2014 04/25/2014 IP 71124.04 Occupational Dose Assessment
 
04/21/2014 04/25/2014 IP 71124.05 Radiation Monitoring Instrumentation
 
04/21/2014 04/25/2014 IP 71151 Performance Indicator Verification
 
SGISI
- UNIT 1 SG IN-SERVICE INSPECTION
 
04/21/2014 04/25/2014 IP 7111108P Inservice Inspection Activities - PWR Comments:
This report does not include INPO and OUTAGE activities.
This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures. Enclosure
This report shows only on-site and announced inspection procedures.
 
Enclosure
}}
}}

Latest revision as of 10:42, 11 January 2025

Annual Assessment Letter for Watts Bar Nuclear Plant Unit 1 (Report 05000390/2012001)
ML13063A513
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/04/2013
From: Croteau R
Division Reactor Projects II
To: James Shea
Tennessee Valley Authority
References
IR-12-001
Download: ML13063A513 (7)


Text

March 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT

UNIT 1, (REPORT 05000390/2012001)

Dear Mr. Shea:

On February 14, 2013, the NRC completed its end-of-cycle performance review of the Watts Bar Nuclear Plant Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Watts Bar Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Watts Bar Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e. green) safety significance, and all PIs indicated that you performance was within the nominal, expected range (i.e. green). Therefore, the NRC plans to conduct baseline inspections at your facility.

The NRC determined the performance at Watts Bar Unit 1 during the first two calendar quarters was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP)

Action Matrix because of one greater-than-green Security Cornerstone input as described in Report Number 05000390/2011402 sent on September 20, 2011. On June, 29, 2012, the NRC completed a supplemental inspection for the security issue. Based on the successful completion of the supplemental inspection, the finding was removed from the assessment process after four quarters and Watts Bar Unit 1 returned to the Licensee Response Column in the 3rd quarter 2012.

The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publically available correspondence. In addition to the baseline inspection we plan on conducting initial reactor operator licensing examinations and Temporary Instruction (TI) 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Scott Shaeffer at 404-997-4521 with any questions you have regarding this letter.

Sincerely,

/RA/

Richard P. Croteau, Director Division of Reactor Projects

Docket No.:

50-390 License No.: NPF-90

Enclosure: Watts Bar Inspection/Activity Plan

cc w/encl: (See page 3)

__ _______________________

X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:DRS RII:DRP

SIGNATURE JDH /RA/

SMS /RA/

WBJ /RA/

JCS /RA/

RPC /RA/

NAME JHamman SShaeffer WJones JShehee RCroteau

DATE 03/01/2013 03/01/2013 03/01/2013 03/01/2013 03/04/2013

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc w/encl:

Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution

David H. Gronek Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution

Donna K. Guinn Manager, Site Licensing Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution

Terry E. Cribbe Manager, Corporate Licensing Tennessee Valley Authority Electronic Mail Distribution

Edward J. Vigluicci Associate General Counsel, Nuclear Tennessee Valley Authority Electronic Mail Distribution

Gordon P. Arent Senior Manager, Licensing WBN Unit 2 Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution

County Mayor P.O. Box 156 Decatur, TN 37322

County Executive 375 Church Street Suite 215 Dayton, TN 37321

Tennessee Department of Environment &

Conservation Division of Radiological Health 401 Church Street Nashville, TN 37243 Ann Harris 341 Swing Loop Rockwood, TN 37854 Letter to Joseph from Scott M. Shaeffer dated March 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT

UNIT 1, REPORT 05000390/2012001

Distribution w/encl:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMWattsBar1 Resource ROP Assessment Institute of Nuclear Power Operations (INPO)

Watts Bar Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 1 of 2 03/04/2013 08:39:32 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title

OL EXAM

- INITIAL EXAM PREP

02/25/2013 03/01/2013 V23389 WATTS BAR/MARCH 2013 INITIAL EXAM AT POWER FACILITIES

OL EXAM

- INITIAL EXAM - WEEK 1

03/18/2013 03/22/2013 V23389 WATTS BAR/MARCH 2013 INITIAL EXAM AT POWER FACILITIES

OL EXAM

- INITIAL EXAM - WEEK 2

03/25/2013 03/29/2013 V23389 WATTS BAR/MARCH 2013 INITIAL EXAM AT POWER FACILITIES

TI-182

- TI-182 BURIED PIPING/TANK - PHASE 1

06/03/2013 06/07/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping

RP

- RP OCCUPATIONAL BASELINE

07/22/2013 07/26/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

07/22/2013 07/26/2013 IP 71124.02 Occupational ALARA Planning and Controls

07/22/2013 07/26/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

07/22/2013 07/26/2013 IP 71124.04 Occupational Dose Assessment

07/22/2013 07/26/2013 IP 71124.05 Radiation Monitoring Instrumentation

07/22/2013 07/26/2013 IP 71151 Performance Indicator Verification

RP

- RP OCCUPATIONAL BASELINE WEEK2

08/05/2013 08/09/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

08/05/2013 08/09/2013 IP 71124.02 Occupational ALARA Planning and Controls

08/05/2013 08/09/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

08/05/2013 08/09/2013 IP 71124.04 Occupational Dose Assessment

08/05/2013 08/09/2013 IP 71124.05 Radiation Monitoring Instrumentation

08/05/2013 08/09/2013 IP 71151 Performance Indicator Verification

TFPI

- TRIENNIAL FIRE PROTECTION INSP

09/09/2013 09/13/2013 IP 7111105T Fire Protection [Triennial]

09/23/2013 09/27/2013 IP 7111105T Fire Protection [Triennial]

EP

- EMERGENCY PREPAREDNESS EXERCISE

10/28/2013 11/01/2013 IP 7111401 Exercise Evaluation

10/28/2013 11/01/2013 IP 71151 Performance Indicator Verification

OL EXAM

- INITIAL EXAM PREP

09/23/2013 09/27/2013 V23395 WATTS BAR/OCTOBER 2013 INITIAL EXAM AT POWER FACILITIES

OL EXAM

- INITIAL EXAM WEEK 1

10/14/2013 10/18/2013 V23395 WATTS BAR/OCTOBER 2013 INITIAL EXAM AT POWER FACILITIES

OL EXAM

- INITIAL EXAM WEEK 2

10/21/2013 10/25/2013 V23395 WATTS BAR/OCTOBER 2013 INITIAL EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Watts Bar Inspection / Activity Plan 03/01/2013 - 06/30/2014 Unit Number Page 2 of 2 03/04/2013 08:39:32 Report 22 No. of Staff on Site Planned Dates Start End Inspection Activity Title

ISI

- UNIT 1 IN-SERVICE INSPECTION

04/14/2014 04/18/2014 IP 7111108P Inservice Inspection Activities - PWR

RP

- RP OCCUPATIONAL BASELINE

04/21/2014 04/25/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

04/21/2014 04/25/2014 IP 71124.02 Occupational ALARA Planning and Controls

04/21/2014 04/25/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation

04/21/2014 04/25/2014 IP 71124.04 Occupational Dose Assessment

04/21/2014 04/25/2014 IP 71124.05 Radiation Monitoring Instrumentation

04/21/2014 04/25/2014 IP 71151 Performance Indicator Verification

SGISI

- UNIT 1 SG IN-SERVICE INSPECTION

04/21/2014 04/25/2014 IP 7111108P Inservice Inspection Activities - PWR Comments:

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure