Annual Assessment Letter for 2007 (NRC Inspection Report 05000390/2008001 and 05000391/2008001)
ML080630551
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 03/03/2008
From: Nease R
Reactor Projects Region 2 Branch 6
To: Campbell W
Tennessee Valley Authority
References
IR-08-001
Download: ML080630551 (7)


Text

March 3, 2008

SUBJECT:

ANNUAL ASSESSMENT LETTER - WATTS BAR NUCLEAR PLANT (NRC INSPECTION REPORT 05000390/2008001 AND 05000391/2008001)

Dear Mr. Campbell:

On February 7, 2008, the NRC staff completed its performance review of the Watts Bar Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only-Security-Related Information" will include the security cornerstone review and resultant inspection plan.

Overall, Watts Bar operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include TI 2515/171, Verification of Site Specific (B.5.b) Phase 2 and 3 Mitigation Strategies; TI 2515/172, Reactor Coolant System Dissimilar Metal; and TI 2515/174, Hydrogen Igniter Backup Power Verification.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public

TVA

Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4530 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Rebecca L. Nease, Chief Reactor Projects Branch 6 Division of Reactor Projects

Docket Nos.: 50-390, 50-391 License Nos.: NPF-90, CPPR-92

Enclosure: Watts Bar Inspection/Activity Plan (03/01/08 - 06/30/09)

cc w/encl: (See next page)

_________________________

OFFICE RII:DRP RII:DRP

SIGNATURE

/RA/

/RA/

NAME JBaptist RNease

DATE 3/3/08 3/3/08

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

TVA

cc w/encl:

Masoud Bajestani Vice President Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution

Gordon P. Arent New Generation Licensing Manager Tennessee Valley Authority Electronic Mail Distribution

Senior Resident Inspector Watts Bar Nuclear Plant U.S. NRC 1260 Nuclear Plant Road Spring City, TN 37381-2000

Michael K. Brandon Manager Licensing and Industry Affairs Tennessee Valley Authority Electronic Mail Distribution

William R. Campbell, Jr.

Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

James R. Douet Vice President Nuclear Support Tennessee Valley Authority Electronic Mail Distribution

John C. Fornicola General Manager Nuclear Assurance Tennessee Valley Authority Electronic Mail Distribution

General Counsel Tennessee Valley Authority Electronic Mail Distribution

Michael J. Lorek Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution

Lawrence E. Nanney Director TN Dept. of Environment & Conservation Electronic Mail Distribution

Larry E. Nicholson General Manager Performance Improvement Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

Michael D. Skaggs (WB2)

Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution

Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority Electronic Mail Distribution

Michael A. Purcell Senior Technical Advisor Nuclear Power Group Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801

H. Rick Rogers Vice President Nuclear Engineering and Technical Services Tennessee Valley Authority Electronic Mail Distribution

(cc w/encl contd - See next page)

TVA

cc w/encl contd:

Beth A. Wetzel Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority Electronic Mail Distribution

James H. Bassham Director Tennessee Emergency Management Agency Electronic Mail Distribution

TVA

Letter to William R. Campbell, Jr. from Rebecca L. Nease dated March 3, 2008

SUBJECT:

ANNUAL ASSESSMENT LETTER - WATTS BAR NUCLEAR PLANT

NRC INSPECTION REPORT 05000390/2008001 AND 05000391/2008001

Distribution w/encl:

C. Evans, RII EICS (Part 72 Only)

L. Slack, RII EICS OE Mail (email address if applicable)

RIDSNRRDIRS PUBLIC B. Moroney, NRR

Watts Bar Inspection / Activity Plan 03/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 03/03/2008 06:32:16 Report 22

EB3TI172

- TI-172 Generic Safety Inspection Reactor Coolant System Dissimiliar Metal Butt Welds 03/31/2008 04/04/2008

2515/172 IP

OL EXAM

- INITIAL EXAM PREP Not Applicable WATTS BAR/JANUARY 2008 EXAM AT POWER FACILITIES 04/21/2008 04/25/2008

V23277

OL EXAM

- INITIAL EXAM Not Applicable WATTS BAR/JANUARY 2008 EXAM AT POWER FACILITIES 05/12/2008 05/23/2008

V23277

PSB1-EP

- EP INSP EP Baseline Inspection Alert and Notification System Testing 08/25/2008 08/29/2008

7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 08/25/2008 08/29/2008

7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 08/25/2008 08/29/2008

7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 08/25/2008 08/29/2008

7111405 IP Baseline Inspections Drill/Exercise Performance 08/25/2008 08/29/2008

71151-EP01 IP Baseline Inspections ERO Drill Participation 08/25/2008 08/29/2008

71151-EP02 IP Baseline Inspections Alert & Notification System 08/25/2008 08/29/2008

71151-EP03 IP

TI-171

- B.5.B PHASE 2&3 Generic Safety Inspection Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 09/22/2008 09/26/2008

2515/171 IP

OL RQ

- REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 12/08/2008 12/12/2008

7111111B IP

EB1-MODS - MODIFICATIONS-10CFR50.59 Baseline Inspections Evaluation of Changes, Tests, or Experiments 01/19/2009 01/30/2009

7111102 IP Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 01/19/2009 01/30/2009

7111117B IP

OL EXAM

- INITIAL EXAM PREP Not Applicable WATTS BAR/MARCH 2009 EXAM AT POWER FACILITIES 02/09/2009 02/13/2009

V23316

OL EXAM

- INITIAL EXAM - WEEK 1 Not Applicable WATTS BAR/MARCH 2009 EXAM AT POWER FACILITIES 03/09/2009 03/13/2009

V23316

OL EXAM

- INITIAL EXAM - WEEK 2 Not Applicable WATTS BAR/MARCH 2009 EXAM AT POWER FACILITIES 03/23/2009 03/27/2009

V23316

PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 06/08/2009 06/12/2009

71152B IP Baseline Inspections Identification and Resolution of Problems 06/22/2009 06/26/2009

71152B IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.