{{#Wiki_filter:ust 28, 2017
{{#Wiki_filter:August 28, 2017


==SUBJECT:==
==SUBJECT:==
Line 28: Line 28:
Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. This inspection will be conducted at South Texas Project Electric Generating Station Units 1 and 2 to confirm the stations full implementation of Commission Orders EA-12-049 and EA-12-051.
Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. This inspection will be conducted at South Texas Project Electric Generating Station Units 1 and 2 to confirm the stations full implementation of Commission Orders EA-12-049 and EA-12-051.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for UNITED STATES NUCLEAR REGULATORY COMMISSION
 
==REGION IV==
1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact me at (817) 200-1141 with any questions you have regarding this letter.
Please contact me at (817) 200-1141 with any questions you have regarding this letter.
Line 35: Line 38:
/RA D. Proulx for/
/RA D. Proulx for/
Nicholas H. Taylor, Branch Chief Project Branch B Division of Reactor Projects Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80 Enclosure:
Nicholas H. Taylor, Branch Chief Project Branch B Division of Reactor Projects Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80 Enclosure:
South Texas Project Electric Generating Station Inspection Plan
South Texas Project Electric Generating Station Inspection Plan  
 
SUNSI Review ADAMS:
Non-Publicly Available Non-Sensitive Keyword:NRC-002 By:NHT/dll Yes No Publicly Available Sensitive OFFICE RIV/DRP:SPE RIV/DRP:C NAME DProulx NTaylor SIGNATURE
/RA/
/RA/DProulx for DATE 8/28/17 8/28/17
 
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site South Texas Project Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 1 of 2 08/25/2017 08:24:16 EXAM
- INITIAL EXAM
 
1 INITIAL EXAM STP U1 (09/2017)
X02592 08/14/2017 08/18/2017


ML17242A182 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:NRC-002 By:NHT/dll Yes No Publicly Available Sensitive OFFICE RIV/DRP:SPE RIV/DRP:C NAME DProulx NTaylor SIGNATURE /RA/ /RA/DProulx for DATE 8/28/17 8/28/17
INITIAL EXAM STP U2 (09/2017)
X02593 08/14/2017 08/18/2017


Page 1 of 2    South Texas Project 08/25/2017 08:24:16    Inspection / Activity Plan Report 22 07/01/2017 - 06/30/2019 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site EXAM - INITIAL EXAM      4 1 08/14/2017 08/18/2017 X02592 INITIAL EXAM STP U1 (09/2017)
INITIAL EXAM STP U1 (09/2017)
2 08/14/2017 08/18/2017 X02593 INITIAL EXAM STP U2 (09/2017)
X02592 09/25/2017 10/04/2017
1 09/25/2017 10/04/2017 X02592 INITIAL EXAM STP U1 (09/2017)
 
2 09/25/2017 10/04/2017 X02593 INITIAL EXAM STP U2 (09/2017)
INITIAL EXAM STP U2 (09/2017)
RS 24 - RADIATION SAFETY       2 1, 2 07/31/2017 08/04/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 07/31/2017 08/04/2017 IP 71124.04 Occupational Dose Assessment TI-191 - MITIGATING STRATEGIES/SFP INST FOR BDBEE     4 1, 2 10/23/2017 10/27/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 BRQ - BRQ INSPECTION       2 1, 2 10/16/2017 10/20/2017 IP 7111111B Licensed Operator Requalification Program RS 12PI - RAD SAFETY       2 1, 2 03/26/2018 03/30/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/26/2018 03/30/2018 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/26/2018 03/30/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 03/26/2018 03/30/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 7111108 - INSERVICE INSPECTION UNIT 2     1 2 04/02/2018 04/13/2018 IP 7111108P Inservice Inspection Activities - PWR EXAM - INITIAL EXAM       4 1 09/17/2018 09/21/2018 X02626 INITIAL EXAM STP U1(11/18)
X02593 09/25/2017 10/04/2017 RS 24
2 09/17/2018 09/21/2018 X02627 INITIAL EXAM STP U2(11/2018)
- RADIATION SAFETY
1 10/22/2018 11/01/2018 X02626 INITIAL EXAM STP U1(11/18)
 
2 10/22/2018 11/01/2018 X02627 INITIAL EXAM STP U2(11/2018)
1, 2 IP Occupational ALARA Planning and Controls 71124.02 07/31/2017 08/04/2017 1, 2 IP Occupational Dose Assessment 71124.04 07/31/2017 08/04/2017 TI-191
EB1-07T - STP HEAT SINK PERFORMANCE       2 1, 2 06/11/2018 06/15/2018 IP 7111107T Heat Sink Performance EP-1 - EP EXERCISE INSPECTION       5 1, 2 06/11/2018 06/15/2018 IP 7111401 Exercise Evaluation 1, 2 06/11/2018 06/15/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 06/11/2018 06/15/2018 IP 71151-EP01 Drill/Exercise Performance 1, 2 06/11/2018 06/15/2018 IP 71151-EP02 ERO Readiness 1, 2 06/11/2018 06/15/2018 IP 71151-EP03 Alert & Notification System Reliability This report does not include INPO and OUTAGE activities.
- MITIGATING STRATEGIES/SFP INST FOR BDBEE
 
1, 2 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 10/23/2017 10/27/2017 BRQ
- BRQ INSPECTION
 
1, 2 IP Licensed Operator Requalification Program 7111111B 10/16/2017 10/20/2017 RS 12PI
- RAD SAFETY
 
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/26/2018 03/30/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/26/2018 03/30/2018 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 03/26/2018 03/30/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 03/26/2018 03/30/2018 7111108
- INSERVICE INSPECTION UNIT 2
 
2 IP Inservice Inspection Activities - PWR 7111108P 04/02/2018 04/13/2018 EXAM
- INITIAL EXAM
 
1 INITIAL EXAM STP U1(11/18)
X02626 09/17/2018 09/21/2018
 
INITIAL EXAM STP U2(11/2018)
X02627 09/17/2018 09/21/2018
 
INITIAL EXAM STP U1(11/18)
X02626 10/22/2018 11/01/2018
 
INITIAL EXAM STP U2(11/2018)
X02627 10/22/2018 11/01/2018 EB1-07T
- STP HEAT SINK PERFORMANCE
 
1, 2 IP Heat Sink Performance 7111107T 06/11/2018 06/15/2018 EP-1
- EP EXERCISE INSPECTION
 
1, 2 IP Exercise Evaluation 7111401 06/11/2018 06/15/2018 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 06/11/2018 06/15/2018 1, 2 IP Drill/Exercise Performance 71151-EP01 06/11/2018 06/15/2018 1, 2 IP ERO Readiness 71151-EP02 06/11/2018 06/15/2018 1, 2 IP Alert & Notification System Reliability 71151-EP03 06/11/2018 06/15/2018 This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Page 2 of 2    South Texas Project 08/25/2017 08:24:16    Inspection / Activity Plan Report 22 07/01/2017 - 06/30/2019 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site RS 5678 - RAD SAFETY       4 1, 2 07/23/2018 07/27/2018 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 07/23/2018 07/27/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 07/23/2018 07/27/2018 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 07/23/2018 07/27/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation PI&R - BIENNIAL PI&R INSPECTION       4 1, 2 08/06/2018 08/10/2018 IP 71152B Problem Identification and Resolution 1, 2 08/20/2018 08/24/2018 IP 71152B Problem Identification and Resolution 7111108 - INSERVICE INSPECTION UNIT 1     1 1 10/15/2018 10/26/2018 IP 7111108P Inservice Inspection Activities - PWR RS 24 - RP INSPECTION       2 1, 2 01/28/2019 02/01/2019 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 01/28/2019 02/01/2019 IP 71124.04 Occupational Dose Assessment EB1-21M - SOUTH TEXAS DBA TEAM INSPECTION     6 1, 2 03/25/2019 04/12/2019 IP 7111121M Design Bases Assurance Inspection (Teams)
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site South Texas Project Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 2 of 2 08/25/2017 08:24:16 RS 5678
This report does not include INPO and OUTAGE activities.
- RAD SAFETY
 
1, 2 IP Radiation Monitoring Instrumentation 71124.05 07/23/2018 07/27/2018 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 07/23/2018 07/27/2018 1, 2 IP Radiological Environmental Monitoring Program 71124.07 07/23/2018 07/27/2018 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 07/23/2018 07/27/2018 PI&R
- BIENNIAL PI&R INSPECTION
 
1, 2 IP Problem Identification and Resolution 71152B 08/06/2018 08/10/2018 1, 2 IP Problem Identification and Resolution 71152B 08/20/2018 08/24/2018 7111108
- INSERVICE INSPECTION UNIT 1
 
1 IP Inservice Inspection Activities - PWR 7111108P 10/15/2018 10/26/2018 RS 24
- RP INSPECTION
 
1, 2 IP Occupational ALARA Planning and Controls 71124.02 01/28/2019 02/01/2019 1, 2 IP Occupational Dose Assessment 71124.04 01/28/2019 02/01/2019 EB1-21M
- SOUTH TEXAS DBA TEAM INSPECTION
 
1, 2 IP Design Bases Assurance Inspection (Teams)
7111121M 03/25/2019 04/12/2019 This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 12:31, 8 January 2025

Updated Inspection Plan (Reports 05000498/2017005 and 05000499/2017005)
ML17242A182
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 08/28/2017
From: Nick Taylor
NRC/RGN-IV/DRP/RPB-B
To: Gerry Powell
South Texas
NICK TAYLOR
References
IR 2017005
Download: ML17242A182 (5)


Text

August 28, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNITS 1 AND 2 (REPORTS 05000498/2017005 AND 05000499/2017005)

Dear Mr. Powell:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for South Texas Project Electric Generating Station Units 1 and 2. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. This inspection will be conducted at South Texas Project Electric Generating Station Units 1 and 2 to confirm the stations full implementation of Commission Orders EA-12-049 and EA-12-051.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1141 with any questions you have regarding this letter.

Sincerely,

/RA D. Proulx for/

Nicholas H. Taylor, Branch Chief Project Branch B Division of Reactor Projects Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80 Enclosure:

South Texas Project Electric Generating Station Inspection Plan

SUNSI Review ADAMS:

Non-Publicly Available Non-Sensitive Keyword:NRC-002 By:NHT/dll Yes No Publicly Available Sensitive OFFICE RIV/DRP:SPE RIV/DRP:C NAME DProulx NTaylor SIGNATURE

/RA/

/RA/DProulx for DATE 8/28/17 8/28/17

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site South Texas Project Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 1 of 2 08/25/2017 08:24:16 EXAM

- INITIAL EXAM

1 INITIAL EXAM STP U1 (09/2017)

X02592 08/14/2017 08/18/2017

INITIAL EXAM STP U2 (09/2017)

X02593 08/14/2017 08/18/2017

INITIAL EXAM STP U1 (09/2017)

X02592 09/25/2017 10/04/2017

INITIAL EXAM STP U2 (09/2017)

X02593 09/25/2017 10/04/2017 RS 24

- RADIATION SAFETY

1, 2 IP Occupational ALARA Planning and Controls 71124.02 07/31/2017 08/04/2017 1, 2 IP Occupational Dose Assessment 71124.04 07/31/2017 08/04/2017 TI-191

- MITIGATING STRATEGIES/SFP INST FOR BDBEE

1, 2 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 10/23/2017 10/27/2017 BRQ

- BRQ INSPECTION

1, 2 IP Licensed Operator Requalification Program 7111111B 10/16/2017 10/20/2017 RS 12PI

- RAD SAFETY

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/26/2018 03/30/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/26/2018 03/30/2018 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 03/26/2018 03/30/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 03/26/2018 03/30/2018 7111108

- INSERVICE INSPECTION UNIT 2

2 IP Inservice Inspection Activities - PWR 7111108P 04/02/2018 04/13/2018 EXAM

- INITIAL EXAM

1 INITIAL EXAM STP U1(11/18)

X02626 09/17/2018 09/21/2018

INITIAL EXAM STP U2(11/2018)

X02627 09/17/2018 09/21/2018

INITIAL EXAM STP U1(11/18)

X02626 10/22/2018 11/01/2018

INITIAL EXAM STP U2(11/2018)

X02627 10/22/2018 11/01/2018 EB1-07T

- STP HEAT SINK PERFORMANCE

1, 2 IP Heat Sink Performance 7111107T 06/11/2018 06/15/2018 EP-1

- EP EXERCISE INSPECTION

1, 2 IP Exercise Evaluation 7111401 06/11/2018 06/15/2018 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 06/11/2018 06/15/2018 1, 2 IP Drill/Exercise Performance 71151-EP01 06/11/2018 06/15/2018 1, 2 IP ERO Readiness 71151-EP02 06/11/2018 06/15/2018 1, 2 IP Alert & Notification System Reliability 71151-EP03 06/11/2018 06/15/2018 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site South Texas Project Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 2 of 2 08/25/2017 08:24:16 RS 5678

- RAD SAFETY

1, 2 IP Radiation Monitoring Instrumentation 71124.05 07/23/2018 07/27/2018 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 07/23/2018 07/27/2018 1, 2 IP Radiological Environmental Monitoring Program 71124.07 07/23/2018 07/27/2018 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 07/23/2018 07/27/2018 PI&R

- BIENNIAL PI&R INSPECTION

1, 2 IP Problem Identification and Resolution 71152B 08/06/2018 08/10/2018 1, 2 IP Problem Identification and Resolution 71152B 08/20/2018 08/24/2018 7111108

- INSERVICE INSPECTION UNIT 1

1 IP Inservice Inspection Activities - PWR 7111108P 10/15/2018 10/26/2018 RS 24

- RP INSPECTION

1, 2 IP Occupational ALARA Planning and Controls 71124.02 01/28/2019 02/01/2019 1, 2 IP Occupational Dose Assessment 71124.04 01/28/2019 02/01/2019 EB1-21M

- SOUTH TEXAS DBA TEAM INSPECTION

1, 2 IP Design Bases Assurance Inspection (Teams)

7111121M 03/25/2019 04/12/2019 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.