==Dear Mr. Coyle:==
==Dear Mr. Coyle:==
On August 12, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014, through June 30, 2015. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
On August 12, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014, through June 30, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.


The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Indian Point Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRC's Reacto r Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., Green).
The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Indian Point Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., Green).


Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.


The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60855, "Operation of an Independent Spent Fuel Storage Installation at Operating Plants," IP 92723, "Follow-up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12 Month Period,"
The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60855, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, IP 92723, Follow-up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12 Month Period, IP 60845, Operation of Inter-Unit Fuel Transfer Canister and Cask System, Temporary Instruction (TI) 2516/001, Review of License Renewal Activities, and TI 2515/191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
IP 60845, "Operation of Inter-Unit Fuel Transfer Canister and Cask System," Temporary Instruction (TI) 2516/001, "Review of License Renewal Activities," and TI 2515/191, "Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans." The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as poss ible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.


In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," which requires licensees to have a reliable means of remotely monitoring wide-range spent fuel pool levels to support effective prioritization of event mitigation and  
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, which requires licensees to have a reliable means of remotely monitoring wide-range spent fuel pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The onsite portion of this audit has been completed for Indian Point Unit 3, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. The NRC staff will decide if another site audit visit is needed for Unit 2 based on the licensees updates for the Unit 2 strategy. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, as mentioned above, the NRC staff will confirm through inspections the full implementation of the orders mentioned above performing TI 2515/191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.


recovery actions in the event of a beyond-des ign-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The onsite portion of this audit has been completed for Indian Point Unit 3, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. The NRC staff will decide if another site audit visit is needed for Unit 2 based on the licensee's updates for the Unit 2 strategy. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, as mentioned above, the NRC staff will confirm through inspections the full implementation of the orders mentioned above performing TI 2515/191, "Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans."
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
In accordance with Title 10 of the Code of Federal Regulations , Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact me at (610)337-5069 with any questions you have regarding this letter.
Please contact me at (610)337-5069 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/ Arthur L. Burritt, Chief Reactor Projects Branch 2  
/RA/
 
Arthur L. Burritt, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64 Enclosure:
Division of Reactor Projects Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64  
Indian Point 2 & 3 Inspection/Activity Plan cc w/encl: Distribution via ListServ
 
Enclosure:
Indian Point 2 & 3 Inspection/Activity Plan cc w/encl: Distribution via ListServ  
 
ML15240A054 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer/TCS ABurritt/ALB DATE 8/18/15 8/19/15
 
Letter to Larry Coyle from Arthur L. Burritt dated September 1, 2015
 
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2015005 AND
 
05000286/2015005)
 
DISTRIBUTION: (via email) DDorman, RA DLew, DRA MScott, DRP JColaccino, DRP RLorson, DRS GSuber, DRS ABurritt, DRP TSetzer, DRP JSchussler, DRP
 
BPinson, DRP SStewart, DRP, SRI GNewman, DRP, RI SRich, DRP, RI DHochmuth, DRP, AA KMorganButler, RI OEDO RidsNrrPMIndianPoint Resource


RidsNrrDorlLpl1-1 Resource ROPReports Resources ADimitriadis, DRS
ML15240A054 Non-Sensitive  Publicly Available SUNSI Review Sensitive  Non-Publicly Available OFFICE RI/DRP  RI/DRP NAME TSetzer/TCS ABurritt/ALB DATE 8/18/15  8/19/15


JNoggle, DRS MGray, DRS  
Letter to Larry Coyle from Arthur L. Burritt dated September 1, 2015 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2015005 AND 05000286/2015005)
DISTRIBUTION: (via email)
DDorman, RA DLew, DRA MScott, DRP JColaccino, DRP RLorson, DRS GSuber, DRS ABurritt, DRP TSetzer, DRP JSchussler, DRP BPinson, DRP SStewart, DRP, SRI GNewman, DRP, RI SRich, DRP, RI DHochmuth, DRP, AA KMorganButler, RI OEDO RidsNrrPMIndianPoint Resource RidsNrrDorlLpl1-1 Resource ROPReports Resources ADimitriadis, DRS JNoggle, DRS MGray, DRS PKrohn, DRS JRogge, DRS DJackson, DRS DScrenci, PAO, NSheehan, PAO NMcNamara, SLO DTifft, SLO ROPassessment Resource RidsNrrDirslpabResource


PKrohn, DRS JRogge, DRS DJackson, DRS DScrenci, PAO,  
Page 1 of 3      Indian Point 08/19/2015 09:57:26    Inspection / Activity Plan Report 22 07/01/2015 - 06/30/2017 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site 7111107T - TRIENNIAL HEAT SINK      1 2, 3 07/06/2015 07/10/2015 IP 7111107T Heat Sink Performance CDBI - COMPONENT DESIGN BASIS INSPECTION      7 2, 3 07/20/2015 07/24/2015 IP 7111121 Component Design Bases Inspection 2, 3 08/03/2015 08/07/2015 IP 7111121 Component Design Bases Inspection 2, 3 08/17/2015 08/21/2015 IP 7111121 Component Design Bases Inspection 7111111B - IP3 REQUAL INSP W/ P/F RESULTS      2 3 09/21/2015 09/25/2015 IP 7111111B Licensed Operator Requalification Program 71124 - HP        1 2, 3 08/10/2015 08/14/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 08/10/2015 08/14/2015 IP 71124.05 Radiation Monitoring Instrumentation 2, 3 08/10/2015 08/14/2015 IP 71151  Performance Indicator Verification EP - EP PROGRAM INSPECTION      1 2, 3 08/17/2015 08/21/2015 IP 7111402 Alert and Notification System Testing 2, 3 08/17/2015 08/21/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2, 3 08/17/2015 08/21/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies ISFSI - ISFSI LOADING INSPECTION      2 2, 3 08/17/2015 08/21/2015 IP 60855  Operation Of An ISFSI 2 08/17/2015 08/21/2015 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 2516-001 - TI 2516-001 U3 LR COMMITMENTS INSPECTION      1 3 10/05/2015 10/09/2015 IP 2516/001 Review of License Renewal Activities 71124.08 - RADWASTE        1 2, 3 11/16/2015 11/20/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71152B - PI&R - BIENNIAL      4 2, 3 11/30/2015 12/04/2015 IP 71152B Problem Identification and Resolution 2, 3 12/14/2015 12/18/2015 IP 71152B Problem Identification and Resolution 92723 - 92723 - IMPACTING REGULATORY PROCESS      1 2, 3 12/07/2015 12/11/2015 IP 92723  Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S 71124 - HP        1 2 03/07/2016 03/11/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 03/07/2016 03/11/2016 IP 71124.02 Occupational ALARA Planning and Controls ISI - U2 INSERVICE INSPECTION      1 2 03/14/2016 03/25/2016 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.


NSheehan, PAO NMcNamara, SLO
This report shows only on-site and announced inspection procedures. Enclosure


DTifft, SLO ROPassessment Resource RidsNrrDirslpabResource
Page 2 of 3      Indian Point 08/19/2015 09:57:26    Inspection / Activity Plan Report 22 07/01/2015 - 06/30/2017 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site EP - EP EXERCISE EVALUATION      4 2, 3 06/27/2016 07/01/2016 IP 7111401 Exercise Evaluation TRI FI - TRIENNIAL FIRE PROTECTION      4 2, 3 05/23/2016 05/27/2016 IP 7111105T Fire Protection [Triennial]
2, 3 06/06/2016 06/10/2016 IP 7111105T Fire Protection [Triennial]
EXM10/31 - INDIAN POINT 2 INITIAL EXAMINATION      3 2 10/03/2016 10/07/2016 U01926 FY17-IP2 INITIAL OPERATOR LICENSING EXAM 2 10/31/2016 11/04/2016 U01926 FY17-IP2 INITIAL OPERATOR LICENSING EXAM 71124.07 - REMP        1 2, 3 06/20/2016 06/24/2016 IP 71124.07 Radiological Environmental Monitoring Program ISFSI - ISFSI WET TRANSFER INSPECTION      1 2, 3 07/25/2016 07/29/2016 IP 60845  Operation of Inter-Unit Fuel Transfer Canister and Cask System 7111111B - IP2 REQUAL INSP WITH P/F RESULTS      2 2 09/19/2016 09/23/2016 IP 7111111B Licensed Operator Requalification Program 71124 - HP INSPECTION      1 2, 3 09/12/2016 09/16/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 09/12/2016 09/16/2016 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 09/12/2016 09/16/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 71124 - HP & PI&R VERIFICATION      1 2, 3 11/14/2016 11/18/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 11/14/2016 11/18/2016 IP 71124.05 Radiation Monitoring Instrumentation 2, 3 11/14/2016 11/18/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 2, 3 11/14/2016 11/18/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences TI-191 - FUKUSHIMA LESSONS-LEARNED      1 2, 3 11/14/2016 11/18/2016 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 71124 - RETS INSPECTION      1 2, 3 01/09/2017 01/13/2017 IP 71124.05 Radiation Monitoring Instrumentation 2, 3 01/09/2017 01/13/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 71124 - HP INSPECTION      1 3 03/13/2017 03/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 03/13/2017 03/17/2017 IP 71124.02 Occupational ALARA Planning and Controls 7111108P - U3 INSERVICE INSPECTION      1 3 03/13/2017 03/24/2017 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.


Page 1 of 3 08/19/2015 09:57:26 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Indian PointInspection / Activity Plan 07/01/2015-06/30/20177111107T-TRIENNIAL HEAT SINK 1 2, 3 IP Heat Sink Performance7111107T 07/06/2015 07/10/2015 CDBI-COMPONENT DESIGN BASIS INSPECTION 7 2, 3 IP Component Design Bases Inspection7111121 07/20/2015 07/24/2015 2, 3 IP Component Design Bases Inspection7111121 08/03/2015 08/07/2015 2, 3 IP Component Design Bases Inspection7111121 08/17/2015 08/21/20157111111B-IP3 REQUAL INSP W/ P/F RESULTS 2 3 IP Licensed Operator Requalification Program7111111B 09/21/2015 09/25/201571124-HP 1 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 08/10/2015 08/14/2015 2, 3 IP Radiation Monitoring Instrumentation71124.05 08/10/2015 08/14/2015 2, 3 IP Performance Indicator Verification71151 08/10/2015 08/14/2015 EP-EP PROGRAM INSPECTION 1 2, 3 IP A lert and Notification System Testing7111402 08/17/2015 08/21/2015 2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 08/17/2015 08/21/2015 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 08/17/2015 08/21/2015 ISFSI-ISFSI LOADING INSPECTION 2 2, 3 IP Operation Of An ISFSI 60855 08/17/2015 08/21/2015 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 08/17/2015 08/21/2015 2516-001-TI 2516-001 U3 LR COMMITMENTS INSPECTION 1 3 IP Review of License Renewal Activities 2516/001 10/05/2015 10/09/201571124.08-RADWASTE 1 2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/16/201511/20/201571152B-PI&R - BIENNIAL 4 2, 3 IP Problem Identification and Resolution71152B11/30/2015 12/04/2015 2, 3 IP Problem Identification and Resolution71152B 12/14/2015 12/18/2015 92723-92723 - IMPACTING REGULATORY PROCESS 1 2, 3 IP Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S 92723 12/07/201512/11/201571124-HP 1 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/07/201603/11/2016 2 IP Occupational ALARA Planning and Controls71124.02 03/07/201603/11/2016 ISI-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 03/14/2016 03/25/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Page 2 of 3 08/19/2015 09:57:26 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Indian PointInspection / Activity Plan 07/01/2015-06/30/2017 EP-EP EXERCISE EVALUATION 4 2, 3 IP Exercise Evaluation7111401 06/27/2016 07/01/2016 TRI FI-TRIENNIAL FIRE PROTECTION 4 2, 3 IP Fire Protection [Triennial]7111105T 05/23/2016 05/27/2016 2, 3 IP Fire Protection [Triennial]7111105T 06/06/2016 06/10/2016 EXM10/31-INDIAN POINT 2 INITIAL EXAMINATION 3 2 FY17-IP2 INITIAL OPERATOR LICENSING EXAM U01926 10/03/2016 10/07/2016 2 FY17-IP2 INITIAL OPERATOR LICENSING EXAM U01926 10/31/201611/04/201671124.07-REMP 1 2, 3 IP Radiological Environmental Monitoring Program71124.07 06/20/2016 06/24/2016 ISFSI-ISFSI WET TRANSFER INSPECTION 1 2, 3 IP Operation of Inter-Unit Fuel Transfer Canister and Cask System 60845 07/25/2016 07/29/20167111111B-IP2 REQUAL INSP WITH P/F RESULTS 2 2 IP Licensed Operator Requalification Program7111111B 09/19/2016 09/23/201671124-HP INSPECTION 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/12/2016 09/16/2016 2, 3 IP Occupational ALARA Planning and Controls71124.02 09/12/2016 09/16/2016 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/12/2016 09/16/201671124-HP & PI&R VERIFICATION 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.0111/14/201611/18/2016 2, 3 IP Radiation Monitoring Instrumentation71124.0511/14/201611/18/2016 2, 3 IP Occupational Exposure Control Effectiveness71151-OR0111/14/201611/18/2016 2, 3 IP RETS/ODCM Radiological Effluent Occurrences71151-PR0111/14/201611/18/2016TI-191-FUKUSHIMA LESSONS-LEARNED 1 2, 3 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/19111/14/201611/18/201671124-RETS INSPECTION 1 2, 3 IP Radiation Monitoring Instrumentation71124.05 01/09/2017 01/13/2017 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 01/09/2017 01/13/201771124-HP INSPECTION 1 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/13/2017 03/17/2017 3 IP Occupational ALARA Planning and Controls71124.02 03/13/2017 03/17/20177111108P-U3 INSERVICE INSPECTION 1 3 IP Inservice Inspection Activities - PWR7111108P 03/13/2017 03/24/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 3 of 3     Indian Point 08/19/2015 09:57:26   Inspection / Activity Plan Report 22 07/01/2015 - 06/30/2017 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site 7111105T - TRIENNIAL FIRE PROTECTION     5 2, 3 05/01/2017 05/05/2017 IP 7111105T Fire Protection [Triennial]
2, 3 05/15/2017 05/19/2017 IP 7111105T Fire Protection [Triennial]
71124 - HP INSPECTION     1 2, 3 05/08/2017 05/12/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 05/08/2017 05/12/2017 IP 71124.02 Occupational ALARA Planning and Controls MODS - PERMANENT PLANT MODIFICATIONS    4 2, 3 06/05/2017 06/09/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 2, 3 06/19/2017 06/23/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications This report does not include INPO and OUTAGE activities.


Page 3 of 3 08/19/2015 09:57:26 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Indian PointInspection / Activity Plan 07/01/2015-06/30/20177111105T-TRIENNIAL FIRE PROTECTION 5 2, 3 IP Fire Protection [Triennial]7111105T 05/01/2017 05/05/2017 2, 3 IP Fire Protection [Triennial]7111105T 05/15/2017 05/19/201771124-HP INSPECTION 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/08/2017 05/12/2017 2, 3 IP Occupational ALARA Planning and Controls71124.02 05/08/2017 05/12/2017 MODS-PERMANENT PLANT MODIFICATIONS 4 2, 3 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 06/05/2017 06/09/2017 2, 3 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 06/19/2017 06/23/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 07:14, 31 October 2019

Mid-Cycle Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2015005 and 05000286/2015005)
ML15240A054
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 09/01/2015
From: Arthur Burritt
Reactor Projects Branch 2
To: Coyle L
Entergy Nuclear Operations
Burritt A
References
IR 2015005
Download: ML15240A054 (7)


Text

ber 1, 2015

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2015005 AND 05000286/2015005)

Dear Mr. Coyle:

On August 12, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014, through June 30, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Indian Point Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance and all PIs indicated that your performance was within the nominal, expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60855, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, IP 92723, Follow-up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12 Month Period, IP 60845, Operation of Inter-Unit Fuel Transfer Canister and Cask System, Temporary Instruction (TI) 2516/001, Review of License Renewal Activities, and TI 2515/191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, which requires licensees to have a reliable means of remotely monitoring wide-range spent fuel pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The onsite portion of this audit has been completed for Indian Point Unit 3, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. The NRC staff will decide if another site audit visit is needed for Unit 2 based on the licensees updates for the Unit 2 strategy. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, as mentioned above, the NRC staff will confirm through inspections the full implementation of the orders mentioned above performing TI 2515/191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610)337-5069 with any questions you have regarding this letter.

Sincerely,

/RA/

Arthur L. Burritt, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64 Enclosure:

Indian Point 2 & 3 Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML15240A054 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer/TCS ABurritt/ALB DATE 8/18/15 8/19/15

Letter to Larry Coyle from Arthur L. Burritt dated September 1, 2015 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2015005 AND 05000286/2015005)

DISTRIBUTION: (via email)

DDorman, RA DLew, DRA MScott, DRP JColaccino, DRP RLorson, DRS GSuber, DRS ABurritt, DRP TSetzer, DRP JSchussler, DRP BPinson, DRP SStewart, DRP, SRI GNewman, DRP, RI SRich, DRP, RI DHochmuth, DRP, AA KMorganButler, RI OEDO RidsNrrPMIndianPoint Resource RidsNrrDorlLpl1-1 Resource ROPReports Resources ADimitriadis, DRS JNoggle, DRS MGray, DRS PKrohn, DRS JRogge, DRS DJackson, DRS DScrenci, PAO, NSheehan, PAO NMcNamara, SLO DTifft, SLO ROPassessment Resource RidsNrrDirslpabResource

Page 1 of 3 Indian Point 08/19/2015 09:57:26 Inspection / Activity Plan Report 22 07/01/2015 - 06/30/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111107T - TRIENNIAL HEAT SINK 1 2, 3 07/06/2015 07/10/2015 IP 7111107T Heat Sink Performance CDBI - COMPONENT DESIGN BASIS INSPECTION 7 2, 3 07/20/2015 07/24/2015 IP 7111121 Component Design Bases Inspection 2, 3 08/03/2015 08/07/2015 IP 7111121 Component Design Bases Inspection 2, 3 08/17/2015 08/21/2015 IP 7111121 Component Design Bases Inspection 7111111B - IP3 REQUAL INSP W/ P/F RESULTS 2 3 09/21/2015 09/25/2015 IP 7111111B Licensed Operator Requalification Program 71124 - HP 1 2, 3 08/10/2015 08/14/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 08/10/2015 08/14/2015 IP 71124.05 Radiation Monitoring Instrumentation 2, 3 08/10/2015 08/14/2015 IP 71151 Performance Indicator Verification EP - EP PROGRAM INSPECTION 1 2, 3 08/17/2015 08/21/2015 IP 7111402 Alert and Notification System Testing 2, 3 08/17/2015 08/21/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2, 3 08/17/2015 08/21/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies ISFSI - ISFSI LOADING INSPECTION 2 2, 3 08/17/2015 08/21/2015 IP 60855 Operation Of An ISFSI 2 08/17/2015 08/21/2015 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 2516-001 - TI 2516-001 U3 LR COMMITMENTS INSPECTION 1 3 10/05/2015 10/09/2015 IP 2516/001 Review of License Renewal Activities 71124.08 - RADWASTE 1 2, 3 11/16/2015 11/20/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71152B - PI&R - BIENNIAL 4 2, 3 11/30/2015 12/04/2015 IP 71152B Problem Identification and Resolution 2, 3 12/14/2015 12/18/2015 IP 71152B Problem Identification and Resolution 92723 - 92723 - IMPACTING REGULATORY PROCESS 1 2, 3 12/07/2015 12/11/2015 IP 92723 Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S 71124 - HP 1 2 03/07/2016 03/11/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 03/07/2016 03/11/2016 IP 71124.02 Occupational ALARA Planning and Controls ISI - U2 INSERVICE INSPECTION 1 2 03/14/2016 03/25/2016 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 3 Indian Point 08/19/2015 09:57:26 Inspection / Activity Plan Report 22 07/01/2015 - 06/30/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP EXERCISE EVALUATION 4 2, 3 06/27/2016 07/01/2016 IP 7111401 Exercise Evaluation TRI FI - TRIENNIAL FIRE PROTECTION 4 2, 3 05/23/2016 05/27/2016 IP 7111105T Fire Protection [Triennial]

2, 3 06/06/2016 06/10/2016 IP 7111105T Fire Protection [Triennial]

EXM10/31 - INDIAN POINT 2 INITIAL EXAMINATION 3 2 10/03/2016 10/07/2016 U01926 FY17-IP2 INITIAL OPERATOR LICENSING EXAM 2 10/31/2016 11/04/2016 U01926 FY17-IP2 INITIAL OPERATOR LICENSING EXAM 71124.07 - REMP 1 2, 3 06/20/2016 06/24/2016 IP 71124.07 Radiological Environmental Monitoring Program ISFSI - ISFSI WET TRANSFER INSPECTION 1 2, 3 07/25/2016 07/29/2016 IP 60845 Operation of Inter-Unit Fuel Transfer Canister and Cask System 7111111B - IP2 REQUAL INSP WITH P/F RESULTS 2 2 09/19/2016 09/23/2016 IP 7111111B Licensed Operator Requalification Program 71124 - HP INSPECTION 1 2, 3 09/12/2016 09/16/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 09/12/2016 09/16/2016 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 09/12/2016 09/16/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 71124 - HP & PI&R VERIFICATION 1 2, 3 11/14/2016 11/18/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 11/14/2016 11/18/2016 IP 71124.05 Radiation Monitoring Instrumentation 2, 3 11/14/2016 11/18/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 2, 3 11/14/2016 11/18/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences TI-191 - FUKUSHIMA LESSONS-LEARNED 1 2, 3 11/14/2016 11/18/2016 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 71124 - RETS INSPECTION 1 2, 3 01/09/2017 01/13/2017 IP 71124.05 Radiation Monitoring Instrumentation 2, 3 01/09/2017 01/13/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 71124 - HP INSPECTION 1 3 03/13/2017 03/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 03/13/2017 03/17/2017 IP 71124.02 Occupational ALARA Planning and Controls 7111108P - U3 INSERVICE INSPECTION 1 3 03/13/2017 03/24/2017 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Indian Point 08/19/2015 09:57:26 Inspection / Activity Plan Report 22 07/01/2015 - 06/30/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111105T - TRIENNIAL FIRE PROTECTION 5 2, 3 05/01/2017 05/05/2017 IP 7111105T Fire Protection [Triennial]

2, 3 05/15/2017 05/19/2017 IP 7111105T Fire Protection [Triennial]

71124 - HP INSPECTION 1 2, 3 05/08/2017 05/12/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 05/08/2017 05/12/2017 IP 71124.02 Occupational ALARA Planning and Controls MODS - PERMANENT PLANT MODIFICATIONS 4 2, 3 06/05/2017 06/09/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 2, 3 06/19/2017 06/23/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.