IR 05000289/2016005: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:[Type here] | {{#Wiki_filter:[Type here] | ||
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. | UNITED STATES NUCLEAR REGULATORY COMMISSION | ||
==REGION I== | |||
2100 RENAISSANCE BLVD. | |||
KING OF PRUSSIA, PA 19406-2713 August 31, 2016 Mr. Bryan Hanson Senior Vice President, Exelon Generation, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd. | KING OF PRUSSIA, PA 19406-2713 August 31, 2016 Mr. Bryan Hanson Senior Vice President, Exelon Generation, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd. | ||
Warrenville, IL 60555 | Warrenville, IL 60555 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (REPORT 05000289/2016005) | ||
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (REPORT 05000289/2016005) | |||
==Dear Mr. Hanson:== | ==Dear Mr. Hanson:== | ||
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Three Mile Island Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, | On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Three Mile Island Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. | ||
The NRC determined that overall, Three Mile Island Nuclear Station, Unit 1 , operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Three Mile Island Nuclear Station, Unit 1, during the most recent quarter was within the Licensee Response Column of the | The NRC determined that overall, Three Mile Island Nuclear Station, Unit 1, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Three Mile Island Nuclear Station, Unit 1, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | ||
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last half of the inspection period in the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. | |||
the | |||
end-of-cycle assessment letters. | In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, (ADAMS Accession # | ||
ML16104A158) the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct assessment reviews and communicate changes in the assessment of licensee performance quarterly, and will also issue end-of-cycle assessment letters. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Please contact me at (610) 337-5046 with any questions you have regarding this letter. | Please contact me at (610) 337-5046 with any questions you have regarding this letter. | ||
| Line 45: | Line 44: | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects | Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects Docket No. 50-289 License No. DPR-50 Enclosure: | ||
Docket No. | |||
50-289 License No. | |||
DPR-50 Enclosure: | |||
Inspection Plan | Inspection Plan | ||
ML162135A334 SUNSI Review Non-Sensitive | ML162135A334 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME AZiedonis/AZ SShaffer/SS SKennedy/SK DATE 08/29/2016 08/17/2016 08/29/2016 Letter to Mr. Bryan Hanson from Silas R. Kennedy dated August 31, 2016. | ||
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (REPORT 05000289/2016005) | SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (REPORT 05000289/2016005) | ||
DISTRIBUTION w/encl: (via e-mail) DDorman, ORA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS SKennedy, DRP SShaffer, DRP SElkhiamy, DRP MHenrion, DRP AZiedonis, DRP, SRI (Acting SRI ends 9/3) | DISTRIBUTION w/encl: (via e-mail) | ||
BLin, DRP, RI ADiaz, DRP, AA JBowen, RI, OEDO | DDorman, ORA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS SKennedy, DRP SShaffer, DRP SElkhiamy, DRP MHenrion, DRP AZiedonis, DRP, SRI (Acting SRI ends 9/3) | ||
BLin, DRP, RI ADiaz, DRP, AA JBowen, RI, OEDO RidsNrrPMThreeMileIsland Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource RMcKinley, DRS JNoggle, DRS MGray, DRS PKrohn, DRS CCahill, DRS DJackson, DRS NMcNamara, RI, SLO DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource | |||
Page 1 of 2 Three Mile Island 08/29/2016 13:39:14 Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 711110T - TRIENNIAL HEAT SINK 1 1 07/18/2016 07/22/2016 IP 7111107T Heat Sink Performance 71124 - RAD SAFETY INSPECTION 1 1 08/08/2016 08/12/2016 IP 71124.05 Radiation Monitoring Instrumentation 71124 - RAD SAFETY INSPECTION 1 1 11/14/2016 11/18/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 11/14/2016 11/18/2016 IP 71124.02 Occupational ALARA Planning and Controls 1 11/14/2016 11/18/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 11/14/2016 11/18/2016 IP 71124.04 Occupational Dose Assessment 1 11/14/2016 11/18/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 6/26EXAM - TMI INITIAL OL EXAM 4 1 05/29/2017 06/02/2017 U01944 FY17-TMI INITIAL OPERATOR LICENSING EXAM 1 06/26/2017 07/07/2017 U01944 FY17-TMI INITIAL OPERATOR LICENSING EXAM 7111105T - TRIENNIAL FIRE PROTECTION 4 1 01/23/2017 01/27/2017 IP 7111105T Fire Protection [Triennial] | |||
1 02/06/2017 02/10/2017 IP 7111105T Fire Protection [Triennial] | |||
7111111B - TMI REQUAL INSP WITH P/F RESULTS 2 1 03/13/2017 03/17/2017 IP 7111111B Licensed Operator Requalification Program EP - EP EXERCISE EVALUATION 4 1 04/10/2017 04/14/2017 IP 7111401 Exercise Evaluation 1 04/10/2017 04/14/2017 IP 71151 Performance Indicator Verification 71124 - HP INSPECTION 1 1 05/08/2017 05/12/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 05/08/2017 05/12/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 05/08/2017 05/12/2017 IP 71124.04 Occupational Dose Assessment 1 05/08/2017 05/12/2017 IP 71124.05 Radiation Monitoring Instrumentation 71124 - REMP 1 1 07/24/2017 07/28/2017 IP 71124.07 Radiological Environmental Monitoring Program 1 07/24/2017 07/28/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71124.08 - RADWASTE 1 1 09/11/2017 09/15/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - HP INSPECTION 1 1 09/25/2017 09/29/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Page | Page 2 of 2 Three Mile Island 08/29/2016 13:39:14 Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - HP INSPECTION 1 1 09/25/2017 09/29/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 09/25/2017 09/29/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 09/25/2017 09/29/2017 IP 71124.04 Occupational Dose Assessment 7111108P - INSERVICE INSPECTION 1 1 09/25/2017 10/06/2017 IP 7111108P Inservice Inspection Activities - PWR 71124 - HP INSPECTION 1 1 11/13/2017 11/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 11/13/2017 11/17/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 11/13/2017 11/17/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 11/13/2017 11/17/2017 IP 71124.04 Occupational Dose Assessment 1 11/13/2017 11/17/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness EP - EP PROGRAM INSPECTION 1 1 03/05/2018 03/09/2018 IP 7111402 Alert and Notification System Testing 1 03/05/2018 03/09/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 03/05/2018 03/09/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 03/05/2018 03/09/2018 IP 71151 Performance Indicator Verification 71124 - RAD SAFETY INSP 1 1 02/12/2018 02/16/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 02/12/2018 02/16/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 7111121 - CDBI 6 1 02/26/2018 03/02/2018 IP 7111121 Component Design Bases Inspection 1 03/12/2018 03/16/2018 IP 7111121 Component Design Bases Inspection 1 03/26/2018 03/30/2018 IP 7111121 Component Design Bases Inspection 71152B - PI&R BIENNIAL 1 1 04/30/2018 05/04/2018 IP 71152B Problem Identification and Resolution 1 05/14/2018 05/18/2018 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities. | ||
This report shows only on-site and announced inspection procedures. | |||
}} | }} | ||
Revision as of 14:52, 30 October 2019
| ML16235A334 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 08/31/2016 |
| From: | Silas Kennedy NRC/RGN-I/DRP/PB6 |
| To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
| Kennedy S | |
| References | |
| IR 2016005 | |
| Download: ML16235A334 (6) | |
Text
[Type here]
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION I
2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406-2713 August 31, 2016 Mr. Bryan Hanson Senior Vice President, Exelon Generation, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.
Warrenville, IL 60555 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (REPORT 05000289/2016005)
Dear Mr. Hanson:
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Three Mile Island Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Three Mile Island Nuclear Station, Unit 1, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Three Mile Island Nuclear Station, Unit 1, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last half of the inspection period in the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, (ADAMS Accession #
ML16104A158) the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct assessment reviews and communicate changes in the assessment of licensee performance quarterly, and will also issue end-of-cycle assessment letters.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5046 with any questions you have regarding this letter.
Sincerely,
/RA/
Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects Docket No. 50-289 License No. DPR-50 Enclosure:
Inspection Plan
ML162135A334 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME AZiedonis/AZ SShaffer/SS SKennedy/SK DATE 08/29/2016 08/17/2016 08/29/2016 Letter to Mr. Bryan Hanson from Silas R. Kennedy dated August 31, 2016.
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (REPORT 05000289/2016005)
DISTRIBUTION w/encl: (via e-mail)
DDorman, ORA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS SKennedy, DRP SShaffer, DRP SElkhiamy, DRP MHenrion, DRP AZiedonis, DRP, SRI (Acting SRI ends 9/3)
BLin, DRP, RI ADiaz, DRP, AA JBowen, RI, OEDO RidsNrrPMThreeMileIsland Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource RMcKinley, DRS JNoggle, DRS MGray, DRS PKrohn, DRS CCahill, DRS DJackson, DRS NMcNamara, RI, SLO DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource
Page 1 of 2 Three Mile Island 08/29/2016 13:39:14 Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 711110T - TRIENNIAL HEAT SINK 1 1 07/18/2016 07/22/2016 IP 7111107T Heat Sink Performance 71124 - RAD SAFETY INSPECTION 1 1 08/08/2016 08/12/2016 IP 71124.05 Radiation Monitoring Instrumentation 71124 - RAD SAFETY INSPECTION 1 1 11/14/2016 11/18/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 11/14/2016 11/18/2016 IP 71124.02 Occupational ALARA Planning and Controls 1 11/14/2016 11/18/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 11/14/2016 11/18/2016 IP 71124.04 Occupational Dose Assessment 1 11/14/2016 11/18/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 6/26EXAM - TMI INITIAL OL EXAM 4 1 05/29/2017 06/02/2017 U01944 FY17-TMI INITIAL OPERATOR LICENSING EXAM 1 06/26/2017 07/07/2017 U01944 FY17-TMI INITIAL OPERATOR LICENSING EXAM 7111105T - TRIENNIAL FIRE PROTECTION 4 1 01/23/2017 01/27/2017 IP 7111105T Fire Protection [Triennial]
1 02/06/2017 02/10/2017 IP 7111105T Fire Protection [Triennial]
7111111B - TMI REQUAL INSP WITH P/F RESULTS 2 1 03/13/2017 03/17/2017 IP 7111111B Licensed Operator Requalification Program EP - EP EXERCISE EVALUATION 4 1 04/10/2017 04/14/2017 IP 7111401 Exercise Evaluation 1 04/10/2017 04/14/2017 IP 71151 Performance Indicator Verification 71124 - HP INSPECTION 1 1 05/08/2017 05/12/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 05/08/2017 05/12/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 05/08/2017 05/12/2017 IP 71124.04 Occupational Dose Assessment 1 05/08/2017 05/12/2017 IP 71124.05 Radiation Monitoring Instrumentation 71124 - REMP 1 1 07/24/2017 07/28/2017 IP 71124.07 Radiological Environmental Monitoring Program 1 07/24/2017 07/28/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71124.08 - RADWASTE 1 1 09/11/2017 09/15/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - HP INSPECTION 1 1 09/25/2017 09/29/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Three Mile Island 08/29/2016 13:39:14 Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - HP INSPECTION 1 1 09/25/2017 09/29/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 09/25/2017 09/29/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 09/25/2017 09/29/2017 IP 71124.04 Occupational Dose Assessment 7111108P - INSERVICE INSPECTION 1 1 09/25/2017 10/06/2017 IP 7111108P Inservice Inspection Activities - PWR 71124 - HP INSPECTION 1 1 11/13/2017 11/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 11/13/2017 11/17/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 11/13/2017 11/17/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 11/13/2017 11/17/2017 IP 71124.04 Occupational Dose Assessment 1 11/13/2017 11/17/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness EP - EP PROGRAM INSPECTION 1 1 03/05/2018 03/09/2018 IP 7111402 Alert and Notification System Testing 1 03/05/2018 03/09/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 03/05/2018 03/09/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 03/05/2018 03/09/2018 IP 71151 Performance Indicator Verification 71124 - RAD SAFETY INSP 1 1 02/12/2018 02/16/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 02/12/2018 02/16/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 7111121 - CDBI 6 1 02/26/2018 03/02/2018 IP 7111121 Component Design Bases Inspection 1 03/12/2018 03/16/2018 IP 7111121 Component Design Bases Inspection 1 03/26/2018 03/30/2018 IP 7111121 Component Design Bases Inspection 71152B - PI&R BIENNIAL 1 1 04/30/2018 05/04/2018 IP 71152B Problem Identification and Resolution 1 05/14/2018 05/18/2018 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.