{{#Wiki_filter:Exelon Nuclear www.exeloncorp.com Peach Bottom Atomic Power Station 1848 Lay Road Delta, PA 17314-9032 October 25, 2007 Mr. Samuel J. Collins Regional Administrator U. S. Nuclear Regulatory Comm,;sion Region 475 Allendale Rd. King of Prussia, PA 19406 | {{#Wiki_filter:Exelon Nuclear www.exeloncorp.com Peach Bottom Atomic Power Station Nuclear 1848 Lay Road Delta, PA 17314-9032 October 25, 2007 Mr. Samuel J. Collins Regional Administrator U. S. Nuclear Regulatory Comm,;sion Region 475 Allendale Rd. | ||
King of Prussia, PA 19406 Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 | |||
==Subject:== | ==Subject:== | ||
Confirmatory Action Letter Notification | Confirmatory Action Letter Notification | ||
==Reference:== | ==Reference:== | ||
Letter from Samuel J. Collins (U.S. Nuclear Regulatory Commission) to Christopher M. Crane (Exelon Generation Company, LLC) dated October 19, 2007 | |||
==Dear Mr. Collins:== | |||
In the referenced letter, Exelon corporate security management personnel, with the assistance of other security managers, were committed to conduct and document, daily random observations of security at Peach Bottom until November 18, 2007. This letter is to provide written notification that observations by corporate security management were not conducted on October 20, 2007. It should be noted, however, that site management performed five observations that day. Mr. Jim Trapp was verbally notified of this issue. We have entered this event into our corrective action process and additional actions have been taken to address this condition. | |||
In the referenced letter, Exelon corporate security management personnel, with the assistance of other security managers, were committed to conduct and document, daily random observations of security at Peach Bottom until November 18, 2007. This letter is to provide written notification that observations by corporate security management were not conducted on October 20, 2007. It should be noted, however, that site management performed five observations that day. Mr. Jim Trapp was verbally notified of this issue. | Should you have any questions or require additional information, please contact me at (717) 456 - 4000. | ||
We have entered this event into our corrective action process and additional actions have been taken to address this condition. Should you have any questions or require additional information, please contact me at (717) 456 - 4000. Sitehice President - Peach Bottom cc: F. L. Bower, Senior Resident Inspector, USNRC, PBAPS Document Control Desk, USNRC, Washington DC CCN: 07-108}} | Sitehice President - Peach Bottom cc: F. L. Bower, Senior Resident Inspector, USNRC, PBAPS Document Control Desk, USNRC, Washington DC CCN: 07-108}} | ||
Revision as of 01:17, 23 November 2019
| ML073040516 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/25/2007 |
| From: | Grimes J Exelon Nuclear |
| To: | Collins S Region 1 Administrator |
| References | |
| Download: ML073040516 (1) | |
Text
Exelon Nuclear www.exeloncorp.com Peach Bottom Atomic Power Station Nuclear 1848 Lay Road Delta, PA 17314-9032 October 25, 2007 Mr. Samuel J. Collins Regional Administrator U. S. Nuclear Regulatory Comm,;sion Region 475 Allendale Rd.
King of Prussia, PA 19406 Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278
Subject:
Confirmatory Action Letter Notification
Reference:
Letter from Samuel J. Collins (U.S. Nuclear Regulatory Commission) to Christopher M. Crane (Exelon Generation Company, LLC) dated October 19, 2007
Dear Mr. Collins:
In the referenced letter, Exelon corporate security management personnel, with the assistance of other security managers, were committed to conduct and document, daily random observations of security at Peach Bottom until November 18, 2007. This letter is to provide written notification that observations by corporate security management were not conducted on October 20, 2007. It should be noted, however, that site management performed five observations that day. Mr. Jim Trapp was verbally notified of this issue. We have entered this event into our corrective action process and additional actions have been taken to address this condition.
Should you have any questions or require additional information, please contact me at (717) 456 - 4000.
Sitehice President - Peach Bottom cc: F. L. Bower, Senior Resident Inspector, USNRC, PBAPS Document Control Desk, USNRC, Washington DC CCN: 07-108